HomeMy WebLinkAbout01-21-2026 Agenda PacketMayor and City Council of the City of San Bernardino Page 1
CITY OF SAN BERNARDINO
AGENDA
FOR THE
REGULAR MEETING OF THE MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO,
MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS THE SUCCESSOR
AGENCY TO THE REDEVELOPMENT AGENCY, MAYOR AND CITY COUNCIL OF THE CITY OF SAN
BERNARDINO ACTING AS THE SUCCESSOR HOUSING AGENCY TO THE REDEVELOPMENT
AGENCY, AND MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS THE
HOUSING AUTHORITY, AND MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO
ACTING AS THE SAN BERNARDINO JOINT POWERS FINANCING AUTHORITY
WEDNESDAY, JANUARY 21, 2026
3:00 PM - CLOSED SESSION 5:00 PM - OPEN SESSION
NORMAN F. FELDHEYM CENTRAL LIBRARY • 555 WEST 6 STREET • SAN BERNARDINO, CA
92410 • WWW.SBCITY.ORG
Theodore Sanchez Helen Tran
Dr. Treasure Ortiz
COUNCIL MEMBER, WARD 1 COUNCIL MEMBER, WARD 7
MAYOR
Sandra Ibarra Eric Levitt
COUNCIL MEMBER, WARD 2 CITY MANAGER
Juan Figueroa Sonia Carvalho
COUNCIL MEMBER, WARD 3 CITY ATTORNEY
Fred Shorett Telicia Lopez
COUNCIL MEMBER, WARD 4 CITY CLERK
Kim Knaus
MAYOR PRO TEM, WARD 5
Mario Flores
COUNCIL MEMBER, WARD 6
Welcome to a meeting of the Mayor and City Council of the City of San Bernardino
PLEASE VIEW THE LAST PAGES OF THE AGENDA FOR PUBLIC
COMMENT OPTIONS, OR CLICK ON THE FOLLOWING
LINK: TINYURL.COM/MCCPUBLICCOMMENTS
PLEASE CONTACT THE CITY CLERK'S OFFICE (909) 998-2680 TWO
WORKING DAYS PRIOR TO THE MEETING FOR ANY REQUESTS FOR
REASONABLE ACCOMMODATIONS
To view PowerPoint presentations, written comments, or any revised
documents for this meeting date, use this link: tinyurl.com/agendabackup.
Select the corresponding year and meeting date folders to view documents.
Mayor and City Council of the City of San Bernardino Page 2
CALL TO ORDER
Attendee Name
Council Member, Ward 1 Theodore Sanchez
Council Member, Ward 2 Sandra Ibarra
Council Member, Ward 3 Juan Figueroa
Council Member, Ward 4 Fred Shorett
Mayor Pro Tem, Ward 5 Kim Knaus
Council Member, Ward 6 Mario Flores
Council Member, Ward 7 Dr. Treasure Ortiz
Mayor Helen Tran
City Manager Eric Levitt
City Attorney Sonia Carvalho
City Clerk Telicia Lopez
3:00 P.M.
CLOSED SESSION PUBLIC COMMENT
CLOSED SESSION p. 15
A) CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION (Pursuant to
Government Code Section 54956.9(a) and (d)(1):
i. Brian Pellis, et al. v. City of San Bernardino, San Bernardino Superior Court
Case No. CIVSB2226731
ii. Billy Hill v. City of San Bernardino, United States District Court Case No. 5:25-
cv-00817
iii. Daniel Diaz Gomez v. City of San Bernardino, et al., United States District
Court Case No. 5:25-cv-01012
iv. Treasure Ortiz v. City of San Bernardino, et al, United States District Court
Case No. 2:25-cv-10650
v. Christopher Shipley v. City of San Bernardino, Workers’ Compensation Case
Nos. ADJ18713159, ADJ18713105, ADJ17563827, and ADJ17582508
vi. David Bailey v. City of San Bernardino, Workers’ Compensation Case
Nos. ADJ7361034 and ADJ7364032
vii. Gerardo Orozco v. City of San Bernardino, Workers’ Compensation Case
Nos. ADJ16747286 and ADJ6588293
B) CONFERENCE WITH LABOR NEGOTIATOR (Pursuant to Government Code
Section 54957.6):
Agency Designated Representative: City Manager or Designee Unrepresented
Group – Executive Group
C) CONFERENCE WITH LEGAL COUNSEL – Significant Exposure to Litigation (Pursuant
to Government Code Section 54956.9(d)(2)): 1 Case.
D) CONFERENCE WITH REAL PROPERTY NEGOTIATORS (Pursuant to Government
Code Section 54956.8) – Discuss Sale of Property
Property: 320 North E Street, San Bernardino, CA 92401 City Negotiator: City
Manager or Designee Negotiating Parties: Enterprise Technology Alliance, Inc. Under
Negotiations: Price and Terms
Mayor and City Council of the City of San Bernardino Page 3
5:00 P.M.
INVOCATION AND PLEDGE OF ALLEGIANCE
CLOSED SESSION REPORT
PUBLIC HEARING
1. Introduce for First Reading Ordinance No. MC-1659 Approving Development
Code Amendment 25-11 (Accessory Dwelling Unit 2025 Legislative Update) p.
17
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino:
1. Introduce and read by title only, and waive further reading of Ordinance
No. MC-1659 of the Mayor and City Council of the City of San
Bernardino, California, approving Development Code Amendment 25-
11 amending Chapter 19.04 (Residential Zones); Section 19.04.030(2)
(P) (Residential Zones Specific Standards - Accessory Dwelling Units)
of the City of San Bernardino Development Code (SBMC Title 19) to
update the development standards for Accessory Dwelling Units and
Junior Accessory Dwelling Units in compliance with recent changes in
state law; and finding such action statutorily exempt from the California
Environmental Quality Act under Public Resources Code Section
21080.17;
2. Schedule the adoption of Ordinance No. MC-1659 to the regularly
scheduled meeting of the Mayor and City Council on February 4, 2026.
CITY MANAGER UPDATE
PUBLIC COMMENTS FOR ITEMS LISTED AND NOT LISTED ON THE AGENDA
We ask that you please observe proper decorum, and do not speak out of turn or make comments from your seat. If you wish to address the Mayor and City Council please be sure to submit a speaker slip. If you speak out of turn or disrupt the meeting a warning may be given and/or you will be asked to leave the meeting pursuant to Government Code Section 54957.9 and Penal Code 403.
CONSENT CALENDAR
Items on the Consent Calendar are Considered Routine and are Voted on in a Single Motion Unless the Mayor and City Council or a Staff Member has Pulled the Item for More Discussion.
Mayor and City Council of the City of San Bernardino Page 4
2. Approval of Various Mayor and City Council Meeting Minutes p. 55
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, approve the meeting minutes for the following dates:
1. July 20, 2022 Regular Meeting Minutes
2. December 14, 2022 Special Meeting Minutes
3. May 9, 2023 Special Meeting Minutes
4. May 11-13, 2023 Special Meeting Minutes
5. November 19, 2025 Regular Meeting Minutes
6. December 3, 2025 Special Meeting Minutes
7. December 10, 2025 Special Meeting Minutes
3. American Rescue Plan Update (All Wards) p. 102
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, receive and file this report providing an update on American Rescue Plan
Act (ARPA)-funded expenditures as of September 30, 2025.
4. Approval of Commercial and Payroll Disbursements and Purchase
Card Transactions for October 2025 (All Wards) p. 107
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, approve the commercial, payroll disbursements and purchasing card
transactions for October 2025.
5. Investment Portfolio Report for October 2025 (All Wards) p. 219
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, receive and file the Monthly Investment Portfolio Report for October 2025.
6. Adopting the Executive Compensation and Benefits Plan; and Amending
the Executive Group Salary Schedule p. 246
Recommendation: It is recommended that the Mayor and City Council of the City of San Bernardino, California,
1. Adopt Resolution No. 2026-001 of the Mayor and City Council of the City of
San Bernardino, California, approving the Executive Compensation and
Benefits Plan and repealing Resolution No. 2022-59; and
2. Amend the Executive Group Salary Schedule effective 7/7/2025 and the
Citywide Salary Schedule for Full-Time, Part-Time, Temporary, and Seasonal
Employees effective 1/5/2026
Mayor and City Council of the City of San Bernardino Page 5
7. Basic Compensation Plan for Part-Time, Temporary and Seasonal
Employees (All Wards) p. 280
Recommendation: It is recommended that the Mayor and City Council of the City of San Bernardino, California, adopt Resolution No. 2026-002:
1. Approving a basic compensation plan for part-time, temporary and seasonal
employees, and
2. Amending the City-wide salary schedule for full-time, part-time, temporary,
and seasonal positions.
8. Technical Correction Authorizing the Carryover of Unspent ERP Funds from
FY 2024/25 to Amend the FY 2025/26 Operating Budget (All Wards) p. 297
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, authorize the Director of Finance & Management Services to amend the
Fiscal Year (FY) 2025/26 Operating Budget to increase expenditures by
$4,172,551.87, reflecting the carryover of unspent Enterprise Resource Planning
(ERP) funds from the Fiscal Year 2024/25.
9. Award of Agreement for University Parkway Extension – Median & Streetscape
Improvements in the amount of $1,011,835 to H L Hitchcock Construction Inc.
(Ward 6) p. 301
Recommendation: It is recommended that the Mayor and City Council of the City of San Bernardino, California:
1. Approve the award of an Agreement with H L Hitchcock Construction Inc. in
the amount of $1,011,835.00 for the construction cost of the University
Parkway Extension – Median & Streetscape Improvements (Project); and
2. Authorize the construction contingencies, construction management, and
administrative costs in the total amount of $118,000 for the Project, bringing
the total project budget to $1,129,835.00; and
3. Authorize the City Manager or designee to execute all documents with H L
Hitchcock Construction Inc; and
4. Authorize the City Manager or designee to expend the contingency fund, if
necessary, to complete the project.
Mayor and City Council of the City of San Bernardino Page 6
10. Award of Construction Agreement to PowerTech Inc. for Rowe Library -
Parking Lot Surfacing in the amount of $110,367.08 and Contingency of
$109,632.92 for a Total Amount of $220,000 (Ward 7) p. 544
Recommendation: It is recommended that the Mayor and City Council of the City of San Bernardino, California;
1. Approve the award of a Construction Agreement with PowerTech Inc.,
in the amount of $110,367.08 for the Rowe Library - Parking Lot
Surfacing (Project); and
2. Authorize the construction contingencies, construction management,
and administrative costs in the total amount of $109,632.92 for the
Project, bringing the total Project budget to $220,000; and
3. Authorize the City Manager or designee to execute all documents with
PowerTech Inc.; and
4. Authorize the City Manager or designee to expend the contingency
fund, if necessary, to complete the Project.
11. Approve Amendment No. 1 to the Professional Services Agreement with
Next Practice Partners, LLC for the City of San Bernardino Parks Master Plan
(All Wards) p. 702
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Approve Amendment No. 1 to the Professional Services Agreement with
Next Practice Partners, LLC to renew and extend the contract term for
preparation of the City of San Bernardino Parks Master Plan through June
30, 2026; and,
2. Authorize the City Manager, or designee, to execute Amendment No. 1; and
3. Authorize the Interim Director of Management Services to establish a
purchase order for the remaining contract balance in an amount not to
exceed $98,139.00.
12. Approval of Amendment No. 1 to the Maintenance Services Agreement with Cal
Stripe, Inc. to Correct the Not-to-Exceed Amount and Clarify the Total Contract
Value for All Option Years (All Wards) p. 766
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Approve Amendment No. 1 to the Maintenance Services Agreement with Cal
Stripe, Inc. to increase the not -to -exceed amount from $420,000.00 to
$2,100,000.00, clarifying that the total contract value reflects the cumulative
amount for the full five-year term, which includes the initial term and all four
option years, as authorized under the Original Agreement; and
2. Authorize the City Manager to execute all related documents necessary to
effectuate this amendment.
Mayor and City Council of the City of San Bernardino Page 7
13. Approve Stop Sign Installation at Various Locations (Wards 1, 2, 4, 5) p. 793
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino
California, adopt Resolution No. 2026-003 authorizing the City Manager and/or
designee to amend the City’s Master List of certain streets or portions thereof
designated as Through Highways and authorizing the establishment of stop control
at the following locations:
a. Pine Ave & Irvington Ave (Ward 5)
b. 11th St & J St (Ward 1)
c. 11th St & Wall Ave (Ward 1)
d. 11th St & Perris St (Ward 1)
e. 49th St & E St (Ward 4)
f. Mountain Ave & Marshall Blvd (Ward 4)
g. 28th St & Turill Ave (Ward 2)
h. Bobbet Dr & Olive St (Ward 1)
14. Award of Construction Agreement to Toro Enterprises Inc. for Construction of
a Raised Median Island Along Kendall Drive Between H Street and E Street
Project - in the Amount of $2,489,475.40 and Contingency of $560,524.60 for a
Total Amount of $3,050,000 (Ward 4,5 and 7) p. 850
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California;
1. Approve the award of a Construction Agreement with Toro Enterprises Inc.,
in the amount of $2,489,475.40 for the Construction of a Raised Median
Island Along Kendall Drive Between H Street and E Street Project; and
2. Authorize the construction contingencies, construction management, and
administrative costs in the total amount of $560,524.60 for the Project,
bringing the total Project budget to $3,050,000; and
3. Authorize the Interim Director of Finance and Management Services to
approve the reallocation of Measure I funds in the amount of
$1,135,945.42 from the Street Improvements (Rehabilitation) City Wide at
50 Locations To Be Constructed in Phases Project (SS25-001) to fully fund
the Construction of a Raised Median Island Along Kendall Drive Between
H Street and E Street Project; and
4. Adopt Resolution No. 2026-004 amending the FY 2025-26 Capital
Improvement Program Budget to reallocate Measure I funds in the
amount of $1,135,945.42 from the Street Improvements
(Rehabilitation) City Wide at 50 Locations To Be Constructed in Phases
Project (SS25-001) to fully fund the Construction of a Raised Median Island
Along Kendall Drive Between H Street and E Street Project.
5. Authorize the City Manager or designee to execute all documents with Toro
Enterprises Inc.; and
6. Authorize the City Manager or designee to expend the contingency fund, if
necessary, to complete the Project.
Mayor and City Council of the City of San Bernardino Page 8
DISCUSSION
15. Award of Construction Agreement to Spec Construction Co Inc. for
Construction of Homeless Navigation Center SB Campus Project in the amount
of $15,037,000 and Contingency of $2,255,550 for a Total Amount of
$17,292,500 (Ward 1) p.1078
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California;
1. Approve the award of a Construction Agreement with Spec Construction Co Inc.,
in the amount of $15,037,000 for the Construction of Homeless Navigation
Center SB Campus Project; and
2. Authorize the construction contingencies and administrative costs in the total
amount of $2,255,550 for the Project, bringing the total Project budget for the
Construction Agreement to $17,292,550; and
3. Approve Resolution No. 2026-005 authorizing the Interim Director of Finance
and Management Services to amend the FY 2025-2026 Operating Budget to
loan $8,768,982 from the General Fund - Fund Balance to fully fund the
construction of the San Bernardino Homeless Navigation Center SB Campus
Project; and
4. Authorize the City Manager or designee to execute all documents with Spec
Construction Co Inc.; and
5. Authorize the City Manager or designee to expend the contingency fund, if
necessary, to complete the Project.
Mayor and City Council of the City of San Bernardino Page 9
16. Exclusive Negotiating Agreement (ENA) with Neighborhood Housing
Services of the Inland Empire (NHSIE) for the Development of Surplus Land
Act Site 8, 9 and 10 for Affordable Housing (Ward 4) p.1383
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California adopt Resolution No. 2026-006:
1. Approve the Exclusive Negotiating Agreement (ENA) between the City of
San Bernardino and Neighborhood Housing Services of the Inland Empire
(NHSIE), a California non-profit public benefit corporation, for the
development of approximately 0.86 acres of city-owned surplus land,
identified as sites 8, 9 and 10 (“Property”), for affordable housing; and
2. Authorize the City Manager, Deputy City Manager, or designee to execute
the ENA, along with any subsequent amendments, extensions, and other
necessary documents to complete the transaction.
MAYOR & CITY COUNCIL UPDATES/REPORTS ON CONFERENCES & MEETINGS
ADJOURNMENT
The next joint regular meeting of the Mayor and City Council and the Mayor and City
Council Acting as the Successor Agency to the Redevelopment Agency will be held on
February 04, 2026 at the Feldheym Central Library located at 555 West 6th Street, San
Bernardino, California 92410. Closed Session will begin at 4:00 p.m. and Open Session
will begin at 5:00 p.m.
Mayor and City Council of the City of San Bernardino Page 10
CERTIFICATION OF POSTING AGENDA
I, Telicia Lopez, CMC, City Clerk for the City of San Bernardino, California, hereby certify
that the agenda for the January 21, 2026, Regular Meeting of the Mayor and City Council
and the Mayor and City Council acting as the Successor Agency to the Redevelopment
Agency was posted on the City's bulletin board located at 201 North "E" Street, San
Bernardino, California, 92401 at the Feldheym Central Library located at 555 West 6th
Street, San Bernardino, California, 92410 and on the City's website sbcity.org on Friday,
January 16, 2026.
I declare under the penalty of perjury that the foregoing is true and correct.
Telicia Lopez, CMC, City Clerk
Mayor and City Council of the City of San Bernardino Page 11
NOTICE:
Any member of the public desiring to speak to the Mayor and City Council and the Mayor
and City Council Acting as the Successor Agency to the Redevelopment Agency
concerning any matter on the agenda, which is within the subject matter jurisdiction of the
Mayor and City Council and the Mayor and City Council Acting as the Successor Agency
to the Redevelopment Agency may address the body during the period reserved for public
comments.
In accordance with Resolution No. 2018-89 adopted by the Mayor and City Council on
March 21, 2018, the following are the rules set forth for Public Comments and Testimony:
Public Comments and Testimony:
Rule 1. Public comment shall be received on a first-come, first-served basis. If the
presiding officer determines that the meeting or hearing may be lengthy or complicated,
the presiding officer may, in his or her discretion, modify these rules, including the time
limits stated below.
Rule 2. All members of the public who wish to speak shall fill out a speaker' s reservation
card and turn in the speaker reservation card to the City Clerk prior to the time designated
on the agenda. Comments will be received in the order the cards are turned in to the City
Clerk. Failure of a person to promptly respond when their time to speak is called shall
result in the person forfeiting their right to address the Mayor and City Council.
Rule 3. The presiding officer may request that a member of the public providing comment
audibly state into the microphone, if one is present, his or her name and address
before beginning comment. If that person is representing a group or organization the
presiding officer may request that the speaker identify that group or organization, including
that group or organization' s Address.
Rule 4. Notwithstanding the provisions of Rule 2 and 3 above, a person shall not be required
to provide their name or address as a condition of speaking.
Rule 5. Time Limits:
5.01 Each member of the public shall have a reasonable time, not to exceed
three (3) minutes per meeting, to address items on the agenda and items not on
the agenda but within the subject matter jurisdiction of the Mayor and City
Council.
5.02 Notwithstanding the time limits set forth in subsection 5. 01 above, any member of the
public desiring to provide public testimony at a public hearing shall have a reasonable time,
not to exceed (3) minutes, to provide testimony during each public hearing.
Mayor and City Council of the City of San Bernardino Page 12
Any member of the public desiring to speak to the Mayor and City Council and the Mayor
and City Council Acting as the Successor Agency to the Redevelopment Agency
concerning any matter not on the agenda but which is within the subject matter jurisdiction
of the Mayor and City Council and the Mayor and City Council Acting as the Successor
Agency to the Redevelopment Agency may address the body at the end of the meeting,
during the period reserved for public comments. Said total period for public comments
shall not exceed 60 minutes, unless such time limit is extended by the Mayor and City
Council and the Mayor and City Council Acting as the Successor Agency to the
Redevelopment Agency. A three-minute limitation shall apply to each member of the
public, unless such time limit is extended by the Mayor and City Council and the Mayor
and City Council Acting as the Successor Agency to the Redevelopment Agency. No
member of the public shall be permitted to "share" his/her three minutes with any other
member of the public.
Speakers who wish to present documents to the governing body may hand the documents
to the City Clerk at the time the request to speak is made.
The Mayor and City Council and the Mayor and City Council Acting as the Successor
Agency to the Redevelopment Agency may refer any item raised by the public to staff,
or to any commission, board, bureau, or committee for appropriate action or have the
item placed on the next agenda of the Mayor and City Council and the Mayor and City
Council Acting as the Successor Agency to the Redevelopment Agency. However, no
other action shall be taken nor discussion held by the Mayor and City Council and the
Mayor and City Council Acting as the Successor Agency to the Redevelopment Agency
on any item which does not appear on the agenda unless the action is otherwise
authorized in accordance with the provisions of subdivision (b) of Section 54954.2 of the
Government Code.
Public comments will not be received on any item on the agenda when a public hearing
has been conducted and closed.
Mayor and City Council of the City of San Bernardino Page 13
ALTERNATE MEETING VIEWING METHOD:
If there are any technical issues with the live stream or recording from the main agenda portal or if
you require an option with Closed Captioning, you may view the meeting from the following
location (TV3).
https://reflect-sanbernardino.cablecast.tv/internetchannel/watch-now?channel=6
PUBLIC COMMENT OPTIONS
Please use ONE of the following options to provide a public comment:
Written comments can be emailed to publiccomments@sbcity.org. Written public
comments received up to 1:30 p.m. on the day of the meeting (or otherwise indicated on
the agenda) will be provided to the Mayor and City council and made part of the meeting
record. Written public comments will not be read aloud by city staff. Written
correspondence can be accessed by the public online at
tinyurl.com/agendabackup .
Attend the meeting in person and fill out a speaker slip. Please note that the meeting Chair
decides the cutoff time for public comment, and the time may vary per meeting. If you
wish to submit your speaker slip in advance of the meeting, please submit your request to
speak using the form on the following page: tinyurl.com/mccpubliccomments. Any requests
to speak submitted electronically after the 1:30 p.m. deadline will not be accepted.
Please note: messages submitted via email and this page are only monitored from the
publication of the final agenda until the deadline to submit public comments. Please contact
the City Clerk at 909998-2680 or SBCityClerk@sbcity.org for assistance outside of this
timeframe. Written correspondence submitted after the deadline will be provided to the Mayor
and City Council at the following regular meeting.
MEETING TIME
NOTE: Pursuant to Resolution No. 2024-029, adopted by the Mayor and City Council on February
21, 2024:
“Section 3. All meetings are scheduled to terminate at 10:00 P.M. on the same day it began.
At 9:00 P.M., the Mayor and City Council shall determine which of the remaining agenda
items can be considered and acted upon prior to 10:00 P.M. and will continue all other items on
which additional time is required until a future Mayor and City Council meeting. A majority vote
of the Council is required to extend a meeting beyond 10:00 P.M. to discuss specified items.”
Mayor and City Council of the City of San Bernardino Page 14
This Page Left Intentionally Blank
8
2
8
6
CLOSED SESSION
City of San Bernardino
Request for Council Action
January 21, 2025
Honorable Mayor and City Council Members
Sonia Carvalho, City Attorney
City Attorney's Office
Recommendation:
A)CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION (Pursuant to
Government Code Section 54956.9(a) and (d)(1):
i. Brian Pellis, et al. v. City of San Bernardino, San Bernardino Superior Court
Case No. CIVSB2226731
ii. Billy Hill v. City of San Bernardino, United States District Court Case No.
5:25-cv-00817
iii. Daniel Diaz Gomez v. City of San Bernardino, et al., United States District
Court Case No. 5:25-cv-01012
iv. Treasure Ortiz v. City of San Bernardino, et al, United States District Court
Case No. 2:25-cv-10650
v. Christopher Shipley v. City of San Bernardino, Workers’ Compensation
Case Nos. ADJ18713159, ADJ18713105, ADJ17563827, and
ADJ17582508
vi. David Bailey v. City of San Bernardino, Workers’ Compensation Case Nos.
ADJ7361034 and ADJ7364032
vii. Gerardo Orozco v. City of San Bernardino, Workers’ Compensation Case
Nos. ADJ16747286 and ADJ6588293
B)CONFERENCE WITH LABOR NEGOTIATOR (Pursuant to Government Code
Section 54957.6):
Agency Designated Representative: City Manager or Designee
Unrepresented Group – Executive Group
C)CONFERENCE WITH LEGAL COUNSEL – Significant Exposure to Litigation
(Pursuant to Government Code Section 54956.9(d)(2)): 1 Case
Packet Page. 15
8
2
8
6
D) CONFERENCE WITH REAL PROPERTY NEGOTIATORS (Pursuant to
Government Code Section 54956.8) – Discuss Sale of Property
Property: 320 North E Street, San Bernardino, CA 92401
City Negotiator: City Manager or Designee
Negotiating Parties: Enterprise Technology Alliance, Inc.
Under Negotiations: Price and Terms
Packet Page. 16
3
1
2
3
PUBLIC HEARING
January 21, 2026
Honorable Mayor and City Council Members
Gabriel Elliott, Director of Community Development & Housing
Community Development & Housing
It is recommended that the Mayor and City Council of the City of San Bernardino:
1. Introduce and read by title only, and waive further reading of Ordinance No.
MC-1659 of the Mayor and City Council of the City of San Bernardino,
California, approving Development Code Amendment 25-11 amending
Chapter 19.04 (Residential Zones); Section 19.04.030(2)(P) (Residential
Zones Specific Standards - Accessory Dwelling Units) of the City of San
Bernardino Development Code (SBMC Title 19) to update the development
standards for Accessory Dwelling Units and Junior Accessory Dwelling
Units in compliance with recent changes in state law; and finding such
action statutorily exempt from the California Environmental Quality Act
under Public Resources Code Section 21080.17;
2. Schedule the adoption of Ordinance No. MC-1659 to the regularly
scheduled meeting of the Mayor and City Council on February 4, 2026.
No comments.
Approval of Development Code Amendment 25-11 will amend Chapter 19.04 (Residential
Zones); Section 19.04.030(2)(P) (Residential Zones Specific Standards - Accessory
Dwelling Units) of the City of San Bernardino Development Code (SBMC Title 19) to comply
with recent changes to state law that impose new limits on local authority to regulate
Packet Page. 17
3
1
2
3
Accessory Dwelling Units (ADUs) and Junior Accessory Dwelling Units (JADUs). Except
as otherwise noted, these new laws take effect on January 1, 2026. AB 1154 and SB
543 clarifies definitions and provides additional clean up language regarding the
regulation of Accessory Dwelling Units and Junior Accessory Dwelling Units.
Background
The Development Code (SBMC Title 19) is the primary mechanism by which the City
implements the policies, goals, and objectives of both the General Plan and the Housing
Element (an element of the General Plan). The Development Code achieves this by
guiding development, on a lot-by-lot basis, throughout the city.
On May 5, 2021, the Mayor and City Council adopted Ordinance No. MC-1559,
establishing standards for the development of Accessory Dwelling Units.
On December 7, 2022, the Mayor and City Council adopted Urgency Ordinance No. MC-
1604 which updated the verbiage regarding ADU’s on multi-family lots and established
standards for units of certain sizes.
On January 15, 2025, the Mayor and City Council adopted Ordinance No. MC-1645 which
streamlined the application process, updated definitions, expanded the prohibition on
replacement parking and increased the allowable number of detached accessory dwelling
units on a multi-family lot.
More recently, the California Department of Housing and Community Development (HCD)
adopted additional standards pertaining to ADUs on October 10, 2025. As a result, the
Mayor and City Council adopted Urgency Ordinance No. MC-1658U which became
effective immediately and granted City staff additional time to be compliant with recent
State law (AB 462, AB 1154 and SB 543).
Following the adoption of Urgency Ordinance No. MC-1658U on December 3, 2025, the
Planning Commission of the City of San Bernardino had approved Resolution No. 2025-
060 on December 9, 2025 forwarding a recommendation to the Mayor and City Council
for adoption of the standard ordinance.
Discussion
The proposed ordinance amends the City’s local regulatory scheme for the construction
of ADUs and JADUs to comply with recently amended provisions of Chapter 13 of Division
1 of Title 7 of the Government Code.
Failure to comply with Chapter 13 of Division 1 of Title 7 of the Government Code (as
amended) by January 1, 2026, renders the City’s ADU ordinance null and void, thereby
limiting the City to the application of the few default state standards provided in the
Government Code. The approval of ADUs and JADUs based solely on these default
statutory standards, without local regulations governing height, setback, landscape, and
architectural review, among other things, would threaten the character of existing
neighborhoods, and negatively impact property values, personal privacy, and fire safety.
Packet Page. 18
3
1
2
3
The attached proposed Ordinance includes changes to Chapter 19.04 (Residential
Zones); Section 19.04.030(2)(P) (Residential Zones Specific Standards - Accessory
Dwelling Units) of the City of San Bernardino Development Code (SBMC Title 19).
AB 462 – Certificates of Occupancy
AB 462 modifies several permitting requirements associated with processing Coastal
Development Permits for ADUs located in the Coastal Zone.
Beyond changes to CDP processing, AB 462 modifies the rules governing the issuance
of a certificate of occupancy (C of O) for an ADU. Historically, state law has prohibited a
local agency from issuing a C of O for an ADU before one is issued for the primary
dwelling (i.e., the primary dwelling must have a C of O before the ADU can receive one).
AB 462 creates a narrow exception to this prohibition for detached ADUs when all of the
following conditions are satisfied: (1) the Governor has declared a state of emergency for
the county on or after February 1, 2025; (2) the primary dwelling was substantially
damaged or destroyed by an event referenced in the state of emergency proclamation;
and (3) the ADU has been issued construction permits and passed all required
inspections. (Gov. Code, § 66328(b).) If these conditions are satisfied, the detached ADU
can receive a C of O before the primary dwelling. In all other scenarios, the primary
dwelling still needs a C of O before one can be issued for an ADU.
AB 462 was enacted as an urgency measure that took effect immediately when signed
by the Governor (on October 10, 2025).
The following three bills were enacted as non-urgency measures and take effect on
January 1, 2026.
AB 1154 – JADU Owner-Occupancy; Short-Term Rental
When a JADU is developed, existing state law requires a property owner to reside in the
JADU or remaining portion of the single-family dwelling. AB 1154 narrows this
requirement to now only apply when a JADU shares sanitation facilities (bathroom) with
the single-family dwelling. If the JADU has its own bathroom, then the property owner
does not have to reside on the property at all. (See amended Gov. Code, § 66333(b).)
AB 1154 also expressly prohibits JADUs from being used as short-term rentals (i.e.,
rented for a term shorter than 30 days). (See amended Gov. Code, § 66333(g).) Most
ADU ordinances already included this prohibition (as well as prohibiting ADUs from being
used as short-term rentals). But now it’s required by state law.
SB 9: SB 543 – ADU Ordinance Submittal to HCD; Approval
Under existing law, local agencies are required to submit a copy of their ADU ordinance
to the California Department of Housing and Community Development (HCD) within 60
days of adoption.
Packet Page. 19
3
1
2
3
This year’s SB 91 and SB 543 create a penalty for failing to do so by rendering null and
void any local ordinance that is not submitted to HCD within 60 days of adoption. (See
amended Gov. Code, § 66326(d); new Gov. Code, § 66333.5(d).) The bills further specify
that a local ADU ordinance is null and void if HCD issues findings that the ordinance does
not comply with state law and the local agency fails to respond to HCD within 30 days.
(Id.)
SB 543 – ADU Size; Number of ADUs; Impact Fees; Permitting Timeline
ADU & JADU Size
Impact Fees
interior livable space or on a JADU with less than 500 square feet of interior livable
space.
Quantity of ADUs Created Under Government Code Section 66323
1 Not to be confused with the SB 9 of 2021 (Stats. 2021, Ch. 162) regarding urban lot splits and second
primary dwelling units.
Packet Page. 20
3
1
2
3
(2) a detached ADU created on a lot with a proposed or existing single-family dwelling
(Gov. Code, § 66323(a)(2));
(3) converted ADUs created in an existing multifamily dwelling (Gov. Code, §
66323(a)(3)); and
(4) detached ADUs created on a lot with a proposed or existing multifamily dwelling.
For some time, there has been uncertainty as to whether ADUs created under
Government Code section 66323 could be combined. Some practitioners interpreted the
statute to not require local agencies to allow combinations. Initially, HCD took the same
position, in its 2020 ADU Handbook. But for the last few years, HCD has taken the
opposite position: that combinations are permitted. (See HCD January 2025 ADU
Handbook, at p. 19 [“[P]ursuant to Government Code section 66323, subdivision (a), local
governments must allow units created pursuant to subparagraphs (1) and (2) together or
(3) and (4) together”].)
SB 543 codifies HCD’s most recent interpretation by amending Government Code section
66323 to specifically allow combinations. Thus, a lot with a multifamily dwelling can now
have a converted ADU or ADUs created under section 66323(a)(3) and detached ADUs
created under section 66323(a)(4). And a lot with a single family dwelling can now have
a converted ADU and a JADU created under section 66323(a)(1) and a detached ADU
created under section 66323(a)(2).
ADU Permitting Process
Existing law has long required local agencies to approve or deny an ADU application
within 60 days of receiving a complete application. However, state law was silent with
respect to incompleteness determinations, subsequent resubmittals, and appealing local
decisions on ADU applications.
SB 543 requires local agencies to now:
(1) determine whether an ADU application is complete within 15 business days of
submittal;
(2) if the application is incomplete, within the same 15 days provide the applicant with
a list of incomplete items and how to address them;
(3) review a resubmitted application for completeness within 15 business days;
(4) provide the applicant with a written appeal process for any incompleteness
determination or denial (to the Planning Commission or City Council, or both); and
(5) provide a final written determination on the appeal within 60 business days of
receiving the appeal). (See amended Gov. Code, §§ 66317 [ADUs], 66335
[JADUs].)
Packet Page. 21
3
1
2
3
Proposed Amendment
In order to ensure that the City’s development standards for Accessory Dwelling Units
and Junior Accessory Dwelling Units comply with state law, this amendment will update
Section 19.04.030(2)(P) (Accessory Dwelling Units). The attached exhibits (Attachment
2) include the specific changes as proposed for adoption into the Development Code.
This ordinance will become effective thirty (30) days following final adoption by the Mayor
and City Council.
The City of San Bernardino General Plan includes goals and policies to guide future
development, as follow:
Land Use Goal 2.1: Preserve and enhance San Bernardino’s unique
Neighborhoods.
Land Use Element Policy 2.1.1: Actively enforce development standards,
design guidelines, and policies to preserve and enhance the character of
San Bernardino’s neighborhoods.
The adoption and implementation of Development Code Amendment 25-11 is consistent
with the City’s General Plan by allowing for the development of Accessory Dwelling Units
within the single-family residential and multi-family residential zones in a manner that will
prevent negative impacts to the existing residential neighborhoods and the community at-
large, while maintaining consistency with state law. Additionally, as regulated by
Development Code Amendment 2-10, new Accessory Dwelling Units (ADUs) will serve
the City’s housing needs in compliance with Chapter 13 of Division 1 of Title 7 of the
California Government Code.
Under California Public Resources Code Section 21080.17, CEQA does not apply to the
adoption of an ordinance by a city or county implementing the provisions of Article 2 of
Chapter 13 of Division 1 of Title 7 of the Government Code, which is California’s ADU
law. Therefore, the adoption of the proposed ordinance is statutorily exempt from CEQA
in that it implements state ADU law.
Development Code Amendment 25-11 aligns with Key Target Goal No. 3: Improved
Quality of Life and 4(b): Economic Growth and Development – Update the General Plan
and Development Code. Specifically, the amendment will update the Development Code
for compliance with state law. The amendment to the Development Code will ensure
consistency with state law.
There will be no fiscal impact to the City’s General Fund as a result of this action.
Packet Page. 22
3
1
2
3
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino:
1. Introduce and read by title only, and waive further reading of Ordinance No.
MC-1659 of the Mayor and City Council of the City of San Bernardino,
California, approving Development Code Amendment 25-11 amending
Chapter 19.04 (Residential Zones); Section 19.04.030(2)(P) (Residential
Zones Specific Standards - Accessory Dwelling Units) of the City of San
Bernardino Development Code (SBMC Title 19) to update the development
standards for Accessory Dwelling Units and Junior Accessory Dwelling
Units in compliance with recent changes in state law; and finding such
action statutorily exempt from the California Environmental Quality Act
under Public Resources Code Section 21080.17;
2. Schedule the adoption of Ordinance No. MC-1659 to the regularly
scheduled meeting of the Mayor and City Council on February 4, 2026.
.
Attachment 1 Ordinance No. MC-XXXX
Attachment 2 Ordinance No. MC-XXXX – Exhibit A
Attachment 3 Planning Commission Resolution No. 2025-060
Attachment 4 Newspaper Publication
Attachment 5 PowerPoint
All Wards
On May 5, 2021, the Mayor and City Council adopted Ordinance No. MC-1559,
establishing standards for the development of Accessory Dwelling Units.
On December 7, 2022, the Mayor and City Council adopted Urgency Ordinance No. MC-
1604 which updated the verbiage regarding ADU’s on multi-family lots and established
standards for units of certain sizes.
On January 15, 2025, the Mayor and City Council adopted Ordinance No. MC-1645 which
streamlined the application process, updated definitions, expanded the prohibition on
replacement parking and increased the allowable number of detached accessory dwelling
units on a multi-family lot.
On December 3, 2025, the Mayor and City Council adopted Urgency Ordinance No. MC-
1658U putting the City of San Bernardino in compliance with recent updates to 2025 state
law pertaining to ADU’s.
Eric Levitt, City Manager
Packet Page. 23
ORDINANCE NO. MC-1659
1
ORDINANCE NO. MC-1659 AN ORDINANCE OF THE MAYOR AND CITY COUNCIL
OF THE CITY OF SAN BERNARDINO, CALIFORNIA,
APPROVING DEVELOPMENT CODE AMENDMENT 25-11
AMENDING CHAPTER 19.04 (RESIDENTIAL ZONES);
SECTION 19.04.030(2)(P) (ACCESSORY DWELLING
UNITS) OF THE CITY OF SAN BERNARDINO
DEVELOPMENT CODE (SBMC TITLE 19) IN ORDER TO
UPDATE THE DEVELOPMENT STANDARDS FOR
ACCESSORY DWELLING UNITS AND JUNIOR
ACCESSORY DWELLING UNITS IN COMPLIANCE WITH
RECENT CHANGES IN STATE LAW; AND FINDING THAT
DEVELOPMENT CODE AMENDMENT 25-11 IS
STATUTORILY EXEMPT UNDER THE CALIFORNIA
ENVIRONMENTAL QUALITY ACT
WHEREAS, the City of San Bernardino, California (“City”) is a municipal corporation,
duly organized under the constitution and laws of the State of California; and
WHEREAS, the state law authorizes cities to act to provide for the creation and regulation
of accessory dwelling units (“ADUs”) and junior accessory dwelling units (“JADUs”); and
WHEREAS, in recent years, the California Legislature has approved, and the Governor
has signed into law, a number of bills that, among other things, amend various sections of the
Government Code to impose new limits on local authority to regulate ADUs and JADUs; and
WHEREAS, in 2025, the California Legislature approved, and the Governor signed into
law, further amendments to state ADU law; and
WHEREAS, new updates to state ADU law take effect January 1, 2026, and for the City’s
ADU ordinance to remain valid, it must be amended to reflect the most recent changes to state
law; and
WHEREAS, the City desires to amend its local regulatory scheme for the construction of
ADUs and JADUs to reflect the most recent changes to state law; and
WHEREAS, Development Code Amendment 25-11 is a City-initiated amendment to
Chapter 19.04 (Residential Zones); Section 19.04.030(2)(P) (Residential Zones Specific Standards -
Accessory Dwelling Units) of the City of San Bernardino Development Code (SBMC Title 19) in
order to update the development standards for Accessory Dwelling Units and Junior Accessory
Dwelling Units in compliance with recent changes in state law; and
WHEREAS, the Planning Division of the Community Development Department of the
City of San Bernardino has prepared Development Code Amendment 25-11 in compliance with
the California Government Code, consistent with the City of San Bernardino General Plan, and
incompliance with the City of San Bernardino Development Code; and
Packet Page. 24
ORDINANCE NO. MC-1659
2
WHEREAS, pursuant to requirements of the California Environmental Quality Act
(“CEQA”), the Planning Division of the Community Development and Housing Department
evaluated Development Code Amendment 25-11 and determined that it is exempt from CEQA
under California Public Resources Code Section 21080.17; and
WHEREAS, notice of the January 21, 2026 public hearing for the Mayor and City
Council's consideration of Development Code Amendment 25-11 was published in The San
Bernardino Sun newspaper on January 10, 2026, in accordance with Development Code Chapter
19.52 (Hearing and Appeals); and
WHEREAS, pursuant to the requirements of Chapters 19.52 (Hearing and Appeals) and
Chapter 19.42 (Development Code Amendments) of the City of San Bernardino Development
Code, the Mayor and City Council have the authority to take action on Development Code
Amendment 25-11; and
WHEREAS, on December 9, 2025, the Planning Commission held a duly-noticed public
hearing and considered the staff report, recommendations by staff, and public testimony
concerning this proposed Ordinance. Following the public hearing, the Planning Commission
voted to forward the Ordinance to the City Council with a recommendation in favor of its adoption;
and
WHEREAS, on January 21, 2026, the City Council held a duly-noticed public hearing to
consider the Ordinance, including: (1) the public testimony and agenda reports prepared in
connection with the Ordinance, (2) the policy considerations discussed therein, and (3) the
consideration and recommendation by the City’s Planning Commission; and
NOW THEREFORE, THE MAYOR AND CITY COUNCIL OF THE CITY OF SAN
BERNARDINO, CALIFORNIA, DO ORDAIN AS FOLLOWS:
SECTION 1. Incorporation of Recitals. The above recitals are true and correct and are
incorporated herein.
SECTION 2. Compliance with the California Environmental Quality Act. The Mayor and
City Council having independently reviewed and analyzed the record before it, including written
and oral testimony, and having exercised their independent judgment, Development Code
Amendment 25-11 and this Ordinance No. MC-1659 is exempt from the requirements of the
California Environmental Quality Act (“CEQA”) under California Public Resources Code Section
21080.17, as the California Environmental Quality Act (“CEQA”) does not apply to the adoption
of an ordinance by a city or county implementing the provisions of Article 2 of Chapter 13 of
Division 1 of Title 7 of the California Government Code, which is California’s ADU law and
which also regulates JADUs, as defined by Section 66313. Therefore, adoption of the proposed
ordinance is statutorily exempt from CEQA.
Packet Page. 25
ORDINANCE NO. MC-1659
3
SECTION 3. Finding of Facts – Development Code Amendment 25-11
Finding No. 1: The proposed amendment is consistent with the General Plan.
Finding of Fact: Development Code Amendment 25-11 is consistent with the General Plan,
as follows:
Land Use Goal 2.1: Preserve and enhance San Bernardino’s
unique Neighborhoods. Land Use
Element Policy 2.1.1: Actively enforce development
standards, design guidelines, and policies to preserve and
enhance the character of San Bernardino’s neighborhoods.
The implementation of Development Code Amendment 25-11 is consistent
with the City’s General Plan by allowing for the development of Accessory
Dwelling Units within the single-family residential and multi-family
residential zones in a manner that will prevent negative impacts to the
existing residential neighborhoods and the community at-large, while
maintaining consistency with state law. Additionally, as regulated by
Development Code Amendment 25-11, new Accessory Dwelling Units
(ADUs) will serve the City’s housing needs in compliance with Chapter 13
of Division 1 of Title 7 of the California Government Code.
Finding No. 2: The proposed amendment would not be detrimental to the public interest,
health, safety, convenience, or welfare of the City.
Finding of Fact: The adoption and implementation of Development Code Amendment 25-
11 is necessary and desirable for the development of the community and is
in the interests or furtherance of the public health, safety, convenience, and
general welfare. In enacting the aforementioned legislation the State
Legislature identified Accessory Dwelling Units (ADUs) as an important
housing option for renters and homeowners, given the undersupply of
housing that exists in the State. Development Code Amendment 25-11 will
bring the City’s Development Code into compliance with the
aforementioned statute.
SECTION 4. Adoption of Ordinance. Development Code Amendment 25-11 to amend
Chapter 19.04 (Residential Zones); Section 19.04.030(2)(P) (Residential Zones Specific Standards -
Accessory Dwelling Units) of the City of San Bernardino Development Code (SBMC Title 19) to
update the development standards for Accessory Dwelling Units and Junior Accessory Dwelling
Units in compliance with state law is hereby amended and restated to read in its entirety as provided
in Exhibit A, attached hereto and incorporated herein by this reference.
SECTION 5. Notice of Exemption: The Planning Division of the Community
Development and Housing Department is hereby directed to file a Notice of Exemption with the
Packet Page. 26
ORDINANCE NO. MC-1659
4
County Clerk of the County of San Bernardino within five (5) working days of final approval
certifying the City’s compliance with the California Environmental Quality Act in approving
Development Code Amendment 25-11.
SECTION 6. Severability: If any section, subsection, subdivision, sentence, or clause or
phrase in this Ordinance or any part thereof is for any reason held to be unconstitutional, invalid
or ineffective by any court of competent jurisdiction, such decision shall not affect the validity or
effectiveness of the remaining portions of this Ordinance or any part thereof. The City Council
hereby declares that it would have adopted each section irrespective of the fact that any one or
more subsections, subdivisions, sentences, clauses, or phrases be declared unconstitutional,
invalid, or ineffective.
SECTION 7. Effective Date. This Ordinance takes effect thirty (30) days after its
adoption.
SECTION 8. HCD Submittal. In accordance with Government Code sections 66326 and
66333.5, the City Clerk is directed to submit a copy of this Ordinance to the California Department
of Housing and Community Development within 60 days after adoption.
SECTION 9. Notice of Adoption. The City Clerk of the City of San Bernardino shall
either: (a) have this ordinance published in a newspaper of general circulation within 15 days after
its adoption or (b) have a summary of this ordinance published twice in a newspaper of general
circulation, within 15 days after its adoption.
APPROVED and ADOPTED by the City Council and signed by the Mayor and attested
by the City Clerk this ___ day of __________, 2026.
__________________________________
Helen Tran, Mayor
City of San Bernardino
Attest:
__________________________________
Telicia Lopez, CMC, City Clerk
Approved as to form:
__________________________________
Sonia Carvalho, City Attorney
Packet Page. 27
ORDINANCE NO. MC-1659
5
CERTIFICATION
STATE OF CALIFORNIA
COUNTY OF SAN BERNARDINO
CITY OF SAN BERNARDINO
I, Telicia Lopez, CMC, City Clerk, hereby certify that the attached is a true copy of
Ordinance No. MC-1659, introduced by the City Council of the City of San Bernardino, California,
at a regular meeting held the 21st day of January 2026. Ordinance No. MC-1659 was approved,
passed and adopted at a regular meeting held the __ day of ______ by the following vote:
Council Members: AYES NAYS ABSTAIN ABSENT
SANCHEZ _____ _____ _______ _______
IBARRA _____ _____ _______ _______
FIGUEROA _____ _____ _______ _______
SHORETT _____ _____ _______ _______
KNAUS _____ _____ _______ _______
FLORES _____ _____ _______ _______
ORTIZ _____ _____ _______ _______
WITNESS my hand and official seal of the City of San Bernardino this ___ day of ____________
2026.
___________________________
Telicia Lopez, CMC, City Clerk
Packet Page. 28
EXHIBIT A
Development Code Section 19.04.030(2)(P)
(Residential Zones Specific Standards Accessory Dwelling Units)
19.04.030(2)(P) (Residential Zones Specific Standards - Accessory Dwelling Units) shall be
amended and restated to read in its entirety as follows:
P. Accessory Dwelling Units
1. Purpose. The purpose of this section is to allow and regulate accessory dwelling units
(ADUs) and junior accessory dwelling units (JADUs) in compliance with Chapter 13 of
Division 1 of Title 7 of the California Government Code.
2. Effect of Conforming. An ADU or JADU that conforms to the standards in this section
will not be:
a. Deemed to be inconsistent with the city’s general plan and zoning designation for
the lot on which the ADU or JADU is located.
b. Deemed to exceed the allowable density for the lot on which the ADU or JADU is
located.
c. Considered in the application of any local ordinance, policy, or program to limit
residential growth.
d. Required to correct a nonconforming zoning condition, as defined in subsection
(c)(8) below. This does not prevent the city from enforcing compliance with
applicable building standards in accordance with Health and Safety Code section
17980.12.
3. Definitions. As used in this section, terms are defined as follows:
a. “Accessory dwelling unit” or “ADU” means an attached or a detached residential
dwelling unit that provides complete independent living facilities for one or more
persons and is located on a lot with a proposed or existing primary residence. An
accessory dwelling unit also includes the following:
i. An efficiency unit, as defined by section 17958.1 of the California Health
and Safety Code; and
ii. A manufactured home, as defined by section 18007 of the California Health
and Safety Code.
b. “Accessory structure” means a structure that is accessory and incidental to a
dwelling located on the same lot.
c. “Complete independent living facilities” means permanent provisions for living,
sleeping, eating, cooking, and sanitation on the same parcel as the single-family or
multifamily dwelling is or will be situated.
Packet Page. 29
2
d. “Efficiency kitchen” means a kitchen that includes all of the following:
i. A cooking facility with appliances.
ii. A food preparation counter and storage cabinets that are of a reasonable size
in relation to the size of the JADU.
e. “Junior accessory dwelling unit” or “JADU” means a residential unit that satisfies
all of the following:
i. It is no more than 500 square feet of interior livable space in size.
ii. It is contained entirely within an existing or proposed single-family
structure. An enclosed use within the residence, such as an attached garage,
is considered to be a part of and contained within the single-family structure.
iii. It includes its own separate sanitation facilities or shares sanitation facilities
with the existing or proposed single-family structure.
iv. If the unit does not include its own separate bathroom, then it contains an
interior entrance to the main living area of the existing or proposed single-
family structure in addition to an exterior entrance that is separate from the
main entrance to the primary dwelling.
v. It includes an efficiency kitchen, as defined in subsection (3)(D) above.
f. “Livable space” means a space in a dwelling intended for human habitation,
including living, sleeping, eating, cooking, or sanitation.
g. “Living area” means the interior habitable area of a dwelling unit, including
basements and attics, but does not include a garage or any accessory structure.
h. “Nonconforming zoning condition” means a physical improvement on a property
that does not conform with current zoning standards.
i. “Passageway” means a pathway that is unobstructed clear to the sky and extends
from a street to one entrance of the ADU or JADU.
j. “Proposed dwelling” means a dwelling that is the subject of a permit application
and that meets the requirements for permitting.
k. “Public transit” means a location, including, but not limited to, a bus stop or train
station, where the public may access buses, trains, subways, and other forms of
transportation that charge set fares, run on fixed routes, and are available to the
public.
Packet Page. 30
3
l. “Tandem parking” means that two or more automobiles are parked on a driveway
or in any other location on a lot, lined up behind one another.
4. Approvals. The following approvals apply to ADUs and JADUs created under this section:
a. Ministerial ADU and Building Permits Required. Every ADU and JADU
requires an ADU permit and a building permit. The city will review and approve
permit applications in accordance with subsection (4)(c) below.
b. Processing Fee. The city may charge a fee to reimburse it for costs incurred in
processing ADU permits, including the costs of adopting or amending the city’s
ADU ordinance. The ADU-permit processing fee is determined by the director of
community development and approved by the city council by resolution.
c. Process and Timing.
i. Completeness.
a) Determination in 15 days. The city will determine whether an
application to create or serve an ADU or JADU is complete and will
provide written notice of the determination to the applicant within
15 business days after the city receives the application submittal.
b) Incomplete items. If the city’s determination under subsection
(4)(c)(i)(a) above is that the application is incomplete, the city’s
notice must list the incomplete items and describe how the
application can be made complete.
c) Cure. After receiving a notice that the application is incomplete, the
applicant may cure and address the items that were deemed by the
city to be incomplete.
d) Subsequent submittals. If the applicant submits additional
information to address incomplete items, within 15 business days of
the subsequent submittal the city will determine in writing whether
the additional information remedies all the incomplete items that the
city identified in its original notice. The city may not require the
application to include an item that was not included in the original
notice.
e) Deemed complete. If the city does not make a timely determination
as required by this subsection (i), the application or resubmitted
application is deemed complete for the purposes of subsection
(4)(c)(iii) below.
f) Appeal of incompleteness. An applicant may appeal the city’s
determination that the application is incomplete by submitting a
Packet Page. 31
4
written appeal to the city clerk. The planning commission will
review the written appeal and affirm or reverse the completeness
determination and provide a final written determination to the
applicant within 60 business days after receipt of the appeal.
ii. No discretion or hearing. Ministerial permits for an ADU or JADU are
considered and approved without discretionary review or a hearing.
iii. Deadline to approve or deny ministerial approvals. The city must
approve or deny an application to create an ADU or JADU within 60 days
from the date that the city receives a complete application. If the city has
not approved or denied the complete application within 60 days, the
application is deemed approved unless either:
a) The applicant requests a delay, in which case the 60-day time period
is tolled for the period of the requested delay, or
b) When an application to create an ADU or JADU is submitted with
a permit application to create a new single-family or multifamily
dwelling on the lot, the city may delay acting on the permit
application for the ADU or JADU until the city acts on the permit
application to create the new single-family or multifamily dwelling,
but the application to create the ADU or JADU will still be
considered ministerially without discretionary review or a hearing.
iv. Denial. If the city denies an application to create an ADU or JADU, the city
must provide the applicant with comments that include, among other things,
a list of all the defective or deficient items and a description of how the
application may be remedied by the applicant. Notice of the denial and
corresponding comments must be provided to the applicant within the 60-
day time period established by subsection (4)(C)(iii) above.
v. Appeal of denial. An applicant may appeal the city’s denial of the
application by submitting a written appeal to the city clerk. The planning
commission will review the written appeal and affirm or reverse the denial
and provide a final written determination to the applicant within 60 business
days after receipt of the appeal.
vi. Concurrent review of demolition. A demolition permit for a detached
garage that is to be replaced with an ADU is reviewed with the application
for the ADU and issued at the same time.
5. Classes.
a. Class 1: Statutorily Regulated. Class 1 ADUs and JADUs are approved under
Government Code section 66323. If an ADU or JADU complies with each of the
Packet Page. 32
5
general requirements in subsection (6) below, it is allowed in each of the scenarios
provided in this subsection (5)(a). An ADU and JADU approved under subsection
(5)(a)(i) may be combined with an ADU approved under subsection (5)(a)(ii), and
ADUs approved under subsection (5)(a)(iii) may be combined with ADUs
approved under subsection (5)(a)(iv).
i. Converted on Lot with Single-Family: One ADU as described in this
subsection (5)(a)(i) and one JADU on a lot with a proposed or existing
single-family dwelling on it, where the ADU or JADU:
a) Is either: within the space of a proposed single-family dwelling;
within the existing space of an existing single-family dwelling; or
(in the case of an ADU only) within the existing space of an
accessory structure, plus up to 150 additional square feet if the
expansion is limited to accommodating ingress and egress; and
b) Has exterior access that is independent of that for the single-family
dwelling; and
c) Has side and rear setbacks sufficient for fire and safety, as dictated
by applicable building and fire codes.
d) The JADU complies with the requirements of Government Code
sections 66333 through 66339.
ii. Limited Detached on Lot with Single-Family: One detached, new-
construction ADU on a lot with a proposed or existing single-family
dwelling, if the detached ADU satisfies each of the following limitations:
a) The side- and rear-yard setbacks are at least four feet.
b) The total floor area is 800 square feet of livable space or smaller.
c) The peak height above grade does not exceed the applicable height
limit in subsection (6)(b) below.
iii. Converted on Lot with Multifamily: One or more ADUs within portions
of existing multifamily dwelling structures that are not used as livable
space, including but not limited to storage rooms, boiler rooms,
passageways, attics, basements, or garages, if each converted ADU
complies with state building standards for dwellings. Under this subsection
(5)(a)(iii), at least one converted ADU is allowed within an existing
multifamily dwelling, up to a quantity equal to 25 percent of the existing
multifamily dwelling units.
iv. Limited Detached on Lot with Multifamily: No more than two detached
ADUs on a lot with a proposed multifamily dwelling, or up to eight
Packet Page. 33
6
detached ADUs on a lot with an existing multifamily dwelling, if each
detached ADU satisfies all of the following:
a) The side- and rear-yard setbacks are at least four feet. If the existing
multifamily dwelling has a rear or side yard setback of less than four
feet, the city will not require any modification to the multifamily
dwelling as a condition of approving the ADU.
b) The peak height above grade does not exceed the applicable height
limit provided in subsection (6)(b) below.
c) If the lot has an existing multifamily dwelling, the quantity of
detached ADUs does not exceed the number of primary dwelling
units on the lot.
b. Class 2: Locally Regulated. Class 2 ADUs are approved under Government Code
sections 66314–66322. Except for Class 1 ADUs approved under subsection (5)(a)
above, all ADUs are subject to the standards set forth in subsections (6) and (7)
below.
6. General Requirements. The following requirements apply to all Class 1 and Class 2
ADUs and JADUs:
a. Zoning.
i. A Class 1 ADU approved under subsection (5)(a) may be created on a lot
in a residential or mixed-use zone.
ii. A Class 2 ADU approved under subsection (5)(b) above may be created on
a lot that is zoned to allow single-family dwelling residential use or
multifamily dwelling residential use.
iii. In accordance with Government Code section 66333(a), a JADU may only
be created on a lot zoned for single-family residences.
b. Height.
i. Except as otherwise provided by subsections (6)(b)(ii) and (6)(b)(iii) below,
a detached ADU created on a lot with an existing or proposed single family
or multifamily dwelling unit may not exceed 16 feet in height.
ii. A detached ADU may be up to 18 feet in height if it is created on a lot with
an existing or proposed single family or multifamily dwelling unit that is
located within one-half mile walking distance of a major transit stop or high
quality transit corridor, as those terms are defined in Section 21155 of the
Public Resources Code, and the ADU may be up to two additional feet in
Packet Page. 34
7
height (for a maximum of 20 feet) if necessary to accommodate a roof pitch
on the ADU that is aligned with the roof pitch of the primary dwelling unit.
iii. A detached ADU created on a lot with an existing or proposed multifamily
dwelling that has more than one story above grade may not exceed 18 feet
in height.
iv. An ADU that is attached to the primary dwelling may not exceed 25 feet in
height or the height limitation imposed by the underlying zone that applies
to the primary dwelling, whichever is lower. Notwithstanding the foregoing,
ADUs subject to this subsection (6)(b)(iv) may not exceed two stories.
v. For purposes of this subsection (6)(b), height is measured from existing
legal grade or the level of the lowest floor, whichever is lower, to the peak
of the structure.
c. Fire Sprinklers.
i. Fire sprinklers are required in an ADU or JADU if sprinklers are required
in the primary residence.
ii. The construction of an ADU or JADU does not trigger a requirement for
fire sprinklers to be installed in the existing primary dwelling.
d. Rental Term. No ADU or JADU may be rented for a term that is shorter than 30
days. This prohibition applies regardless of when the ADU or JADU was created.
e. No Separate Conveyance. An ADU or JADU may be rented, but, except as
otherwise provided in Government Code section 66341, no ADU or JADU may be
sold or otherwise conveyed separately from the lot and the primary dwelling (in the
case of a single-family lot) or from the lot and all of the dwellings (in the case of a
multifamily lot).
f. Septic System. If the ADU or JADU will connect to an onsite wastewater-treatment
system, the owner must include with the application a percolation test completed
within the last five years or, if the percolation test has been recertified, within the
last 10 years.
g. Owner Occupancy.
i. ADUs. ADUs are not subject to an owner-occupancy requirement.
ii. JADUs.
a) Generally. As required by state law, JADUs are generally subject
to an owner-occupancy requirement. A natural person with legal or
equitable title to the property must reside on the property, in either
Packet Page. 35
8
the primary dwelling or JADU, as the person’s legal domicile and
permanent residence.
b) Exceptions. The owner-occupancy requirement in this subsection
(6)(g)(ii) does not apply in either of the following situations:
(I) The JADU has separate sanitation facilities (i.e., does not
share sanitation facilities with the existing primary dwelling
unit structure).
(II) The property is entirely owned by another governmental
agency, land trust, or housing organization.
h. Deed Restriction. Prior to issuance of a certificate of occupancy for an JADU, a
deed restriction must be recorded against the title of the property in the County
Recorder’s office and a copy filed with the Director. The deed restriction must run
with the land and bind all future owners. The form of the deed restriction will be
provided by the city and must provide that:
i. The JADU may not be sold separately from the primary dwelling.
ii. The JADU is restricted to the approved size and to other attributes allowed
by this section.
iii. The deed restriction runs with the land and may be enforced against future
property owners.
iv. The deed restriction may be removed if the owner eliminates the JADU, as
evidenced by, for example, removal of the kitchen facilities. To remove the
deed restriction, an owner may make a written request of the Director,
providing evidence that the JADU has in fact been eliminated. The Director
may then determine whether the evidence supports the claim that the JADU
has been eliminated. Appeal may be taken from the Director’s
determination consistent with other provisions of this Code. If the JADU is
not entirely physically removed, but is only eliminated by virtue of having
a necessary component of an JADU removed, the remaining structure and
improvements must otherwise comply with applicable provisions of this
Code.
v. The deed restriction is enforceable by the director or his or her designee for
the benefit of the city. Failure of the property owner to comply with the deed
restriction may result in legal action against the property owner, and the city
is authorized to obtain any remedy available to it at law or equity, including,
but not limited to, obtaining an injunction enjoining the use of the JADU in
violation of the recorded restrictions or abatement of the illegal unit.
Packet Page. 36
9
i. Building & Safety.
i. Must comply with building code. Subject to subsection (6)(i)(ii) below,
all ADUs and JADUs must comply with all local building code
requirements.
ii. No change of occupancy. Construction of an ADU does not constitute a
Group R occupancy change under the local building code, as described in
Section 310 of the California Building Code, unless the building official or
Code Enforcement Division officer makes a written finding based on
substantial evidence in the record that the construction of the ADU could
have a specific, adverse impact on public health and safety. Nothing in this
subsection (f)(9)(B) prevents the city from changing the occupancy code of
a space that was uninhabitable space or that was only permitted for
nonresidential use and was subsequently converted for residential use in
accordance with this section.
j. Certificate of Occupancy Timing.
i. Generally. No certificate of occupancy for an ADU or JADU may be issued
before the certificate of occupancy is issued for the primary dwelling unit.
ii. Limited Exception for State-declared Emergencies. Notwithstanding
subsection (6)(j)(i) above, a certificate of occupancy for an ADU may be
issued before a certificate of occupancy for the primary dwelling if each of
the following requirements are met:
a) The county is subject to a proclamation of a state of emergency
made by the California Governor on or after February 1, 2025.
b) The primary dwelling was substantially damaged or destroyed by an
event referenced in the Governor’s state of emergency
proclamation.
c) The ADU has been issued construction permits and has passed all
required inspections.
d) The ADU is not attached to the primary dwelling.
7. Specific ADU Requirements. The following requirements apply only to Class 2 ADUs
approved under subsection (5)(b) above. This subsection (7) does not apply to Class 1
ADUs or JADUs approved under subsection (5)(a) above.
a. Maximum Size.
i. The maximum size of a detached or attached ADU subject to this subsection
(7) is 850 square feet of interior livable space for a studio or one-bedroom
Packet Page. 37
10
unit and 1,000 square feet of interior livable space for a unit with two or
more bedrooms.
ii. An attached ADU that is created on a lot with an existing primary dwelling
is further limited to 50 percent of the floor area of the existing primary
dwelling.
iii. Application of other development standards in this subsection (7), such as
FAR or lot coverage, might further limit the size of the ADU, but no
application of the percent-based size limit in subsection (7)(a)(ii) above or
of an FAR, front setback, lot coverage limit, or open-space requirement may
require the ADU have less than 800 square feet of interior livable space.
b. Floor Area Ratio (FAR). No ADU subject to this subsection (7) may cause the
total FAR of the lot to exceed 45 percent, subject to subsection (7)(a)(iii) above.
c. Setbacks.
i. ADUs that are subject to this subsection (7) must conform to 4-foot side and
rear setbacks. ADUs that are subject to this subsection (g) must conform to
25-foot front setbacks, subject to subsection (7)(a)(iii) above.
ii. No setback is required for an ADU that is subject to this subsection (7) if
the ADU is constructed in the same location and to the same dimensions as
an existing structure.
d. Lot Coverage. No ADU subject to this subsection (7) may cause the total lot
coverage of the lot to exceed 50 percent, subject to subsection (7)(a)(iii) above.
e. Minimum Open Space. No ADU subject to this subsection (7) may cause the total
percentage of open space of the lot to fall below 50 percent, subject to subsection
(7)(a)(iii) above.
f. Passageway. No passageway, as defined by subsection (3)(i) above, is required for
an ADU.
g. Parking.
i. Generally. One off-street parking space is required for each ADU or
bedroom, whichever is less. The parking space may be provided in setback
areas or as tandem parking, as defined by subsection (3)(l) above.
ii. Exceptions. No parking under subsection (7)(g)(i) is required in the
following situations:
a) The ADU is located within one-half mile walking distance of public
transit, as defined in subsection (3)(k) above.
Packet Page. 38
11
b) The ADU is located within an architecturally and historically
significant historic district.
c) The ADU is part of the proposed or existing primary residence or an
accessory structure.
d) When on-street parking permits are required but not offered to the
occupant of the ADU.
e) When there is an established car share vehicle stop located within
one block of the ADU.
f) When the permit application to create an ADU is submitted with an
application to create a new single-family or new multifamily
dwelling on the same lot, provided that the ADU or the lot satisfies
any other criteria listed in subsections (7)(g)(ii)(a) through (e)
above.
iii. No Replacement. When a garage, carport, covered parking structure, or
uncovered parking space is demolished in conjunction with the construction
of an ADU or converted to an ADU, those off-street parking spaces are not
required to be replaced.
h. Architectural Requirements.
i. The materials and colors of the exterior walls, roof, and windows and doors
must be the same as those of the primary dwelling.
ii. The roof slope must match that of the dominant roof slope of the primary
dwelling. The dominant roof slope is the slope shared by the largest portion
of the roof.
iii. The exterior lighting must be limited to down-lights or as otherwise
required by the building or fire code.
iv. The ADU must have an independent exterior entrance, apart from that of
the primary dwelling.
v. The interior horizontal dimensions of an ADU must be at least 10 feet wide
in every direction, with a minimum interior wall height of seven feet.
vi. No window or door of the ADU may have a direct line of sight to an
adjoining residential property. Each window and door must either be
located where there is no direct line of sight or screened using fencing,
landscaping, or privacy glass to prevent a direct line of sight.
Packet Page. 39
12
vii. All windows and doors in an ADU less than 30 feet from a property line
that is not a public right-of-way line must either be (for windows) clerestory
with the bottom of the glass at least six feet above the finished floor, or (for
windows and for doors) utilize frosted or obscure glass.
i. Landscape Requirements. Evergreen landscape screening must be planted and
maintained between the ADU and adjacent parcels as follows:
i. At least one 15-gallon size plant must be provided for every five linear feet
of exterior ADU wall. Alternatively, at least one 24” box size plant must be
provided for every ten linear feet of exterior ADU wall.
ii. Plant specimens must be at least six feet tall when installed. As an
alternative, a solid fence of at least six feet in height may be installed.
iii. All landscaping must be drought-tolerant.
iv. All landscaping must be from the city’s approved plant list.
j. Historical Protections. An ADU that is on or within 600 feet of real property that
is listed in the California Register of Historic Resources must be located so as to
not be visible from any public right-of-way.
k. Allowed Stories. No ADU subject to this subsection (7) may have more than one
story, except that an ADU that is attached to the primary dwelling may have the
stories allowed under subparagraph (6)(b)(4) of this section.
8. Fees. The following requirements apply to all Class 1 ADUs and JADUs and Class 2 ADUs
that are approved under subsections (5)(a) or (5)(b) above.
a. Impact Fees.
i. No impact fee is required for a JADU or for an ADU that has less than 750
square feet of interior livable space. For purposes of this subsection (8)(a),
“impact fee” means a “fee” under the Mitigation Fee Act (Gov. Code
§ 66000(b)) and a fee under the Quimby Act (Gov. Code § 66477). “Impact
fee” here does not include any connection fee or capacity charge for water
or sewer service.
ii. A JADU or ADU with less than 500 square feet of interior livable space
does not increase assessable space by 500 square feet for purposes of
Education Code section 17620(a)(1)(C), and is therefore not subject to
school fees under Education Code section 17620.
iii. Any impact fee that is required for an ADU that has 750 square feet or more
of interior livable space must be charged proportionately in relation to the
square footage of the primary dwelling unit. (E.g., the floor area of the
Packet Page. 40
13
ADU, divided by the floor area of the primary dwelling, times the typical
fee amount charged for a new dwelling.)
b. Utility Fees.
i. If an ADU or JADU is constructed with a new single-family home, a
separate utility connection directly between the ADU or JADU and the
utility and payment of the normal connection fee and capacity charge for a
new dwelling are required.
ii. Except as described in subsection (8)(b)(i), JADUs and converted ADUs on
a single-family lot that are created under subsection (5)(a)(i) above are not
required to have a new or separate utility connection directly between the
JADU or ADU and the utility. Nor is a connection fee or capacity charge
required. Notwithstanding the rest of this paragraph, a direct utility
connection is required for separate conveyance of an ADU when separate
conveyance is allowed under this code.
iii. Except as described in subsection (8)(b)(i), all ADUs that are not covered
by subsection (8)(b)(ii) require a new, separate utility connection directly
between the ADU and the utility for any utility that is provided by the city.
All utilities that are not provided by the city are subject to the connection
and fee requirements of the utility provider.
a) The connection is subject to a connection fee or capacity charge that
is proportionate to the burden created by the ADU based on either
the floor area or the number of drainage-fixture units (DFU) values,
as defined by the Uniform Plumbing Code, upon the water or sewer
system.
b) The portion of the fee or charge that is charged by the city may not
exceed the reasonable cost of providing this service.
9. Nonconforming Zoning Code Conditions, Building Code Violations, and
Unpermitted Structures.
a. Generally. The city will not deny an ADU or JADU application due to a
nonconforming zoning condition, building code violation, or unpermitted structure
on the lot that does not present a threat to the public health and safety and that is
not affected by the construction of the ADU or JADU.
b. Unpermitted ADUs and JADUs constructed before 2020.
i. Permit to Legalize. As required by state law, the city may not deny a permit
to legalize an existing but unpermitted ADU or JADU that was constructed
before January 1, 2020, if denial is based on either of the following grounds:
Packet Page. 41
14
a) The ADU or JADU violates applicable building standards, or
b) The ADU or JADU does not comply with state ADU or JADU law
or this ADU ordinance (Section 19.04.030(2)(P)).
ii. Exceptions:
a) Notwithstanding subsection (9)(b)(i) above, the city may deny a
permit to legalize an existing but unpermitted ADU or JADU that
was constructed before January 1, 2020, if the city makes a finding
that correcting a violation is necessary to comply with the standards
specified in California Health and Safety Code section 17920.3.
b) Subsection (9)(b)(i) above does not apply to a building that is
deemed to be substandard in accordance with California Health and
Safety Code section 17920.3.
10. Nonconforming ADUs and Discretionary Approval. Any proposed ADU or JADU that
would otherwise be allowed under this section but that does not conform to the objective
design or development standards set forth in subsections (1) through (9) of this section may
be allowed by the city with a conditional use permit, in accordance with the other
provisions of this title.
Packet Page. 42
Packet Page. 43
Packet Page. 44
Packet Page. 45
Packet Page. 46
Packet Page. 47
NOTICE OF PUBLIC HEARING
CITY COUNCIL OF THE CITY OF SAN BERNARDINO
th Street, San Bernardino, California. Visit the City’s agenda
portal at www.sbcity.org to access more meeting information.
DEVELOPMENT CODE AMENDMENT 25-11 – A City-initiated request to amend Chapter 19.04
(Residential Zones); Section 19.04.030(2)(P) (Residential Zones Specific Standards - Accessory Dwelling
Units) of the City of San Bernardino Development Code (SBMC Title 19) in order to update the
development standards for Accessory Dwelling Units and Junior Accessory Dwelling Units in compliance
with state law.
Packet Page. 48
Development Code Amendment 25-11
2025 Accessory Dwelling Unit Legislative Update
Presented by George Velarde, Associate Planner
Community Development and Housing Department
Packet Page. 49
Background:
May 2021 – MC-1559 adopted, establishing standards for Accessory Dwelling Units in compliance with Government Code
December 2022 – MC-1604 adopted, updating standards for Accessory Dwelling Units in compliance with SB 897
January 2025 – MC-1645 adopted, provided updated definitions, expanded the prohibition on parking and increased the allowable number of detached accessory dwelling units on a multi-family lot
December 2025 – MC –1658U, placed the City in compliance with 2025 state law pertaining to ADU’s
Packet Page. 50
Significant Changes:
AB 1154
§ JADU owner-occupancy
§Prohibition on short-term rentals
Packet Page. 51
Significant Changes:
SB 543
§Provide update to California Department of Housing and Community
Development (HCD) within 60 days of adoption. If not provided, the City’s
own ADU ordinances becomes null and void.
§Clarified definitions and clean up language
§Development Impact Fees (DIFS) and school fees
Packet Page. 52
Next Steps:
§ Any local ordinance that is not in compliance with AB 1154 and SB 543
on January 1, 2026, will be found null and void in its entirety.
§ Urgency ordinance will take effect immediately upon adoption.
§ Re-adoption of ordinance will be brought back for first reading on
January 21, 2026
Packet Page. 53
Recommendation:
Introduce for first reading, read by title only, and waive further reading of Ordinance
No. MC-1659 of the Mayor and City Council of the City of San Bernardino, California,
approving Development Code Amendment 25-11; and finding such action statutorily
exempt from the California Environmental Quality Act under Public Resources Code
Section 21080.17; and
Schedule the adoption of the Ordinance to the regularly scheduled meeting of the
Mayor and City Council on February 4th, 2026.
The Mayor and City
Council:
1.
2.
Packet Page. 54
CONSENT CALENDAR
January 21, 2026
Honorable Mayor and City Council Members
Telicia Lopez, City Clerk
City Clerk
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, approve the meeting minutes for the following dates:
1. July 20, 2022 Regular Meeting Minutes
2. December 14, 2022 Special Meeting Minutes
3. May 9, 2023 Special Meeting Minutes
4. May 11-13, 2023 Special Meeting Minutes
5. November 19, 2025 Regular Meeting Minutes
6. December 3, 2025 Special Meeting Minutes
7. December 10, 2025 Special Meeting Minutes
Packet Page. 55
City of San Bernardino
201 North E Street
San Bernardino, CA 92401
http://www.sbcity.org
Draft Minutes
FOR THE
REGULAR MEETING OF THE MAYOR AND CITY COUNCIL
OF THE CITY OF SAN BERNARDINO, MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS THE
SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY, MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO
ACTING AS THE SUCCESSOR HOUSING AGENCY TO THE REDEVELOPMENT AGENCY, MAYOR AND CITY COUNCIL OF THE
CITY OF SAN BERNARDINO ACTING AS THE HOUSING AUTHORITY, AND MAYOR AND CITY COUNCIL OF THE CITY OF SAN
BERNARDINO ACTING AS THE SAN BERNARDINO JOINT POWERS FINANCING AUTHORITY
WEDNESDAY, JULY 20, 2022
5:30 PM
The Regular Meeting of the Mayor and City Council of the City of San Bernardino was called to
order at 5:36 PM by Mayor John Valdivia on Wednesday, July 20, 2022, at Feldheym Central
Library, San Bernardino, CA.
CALL TO ORDER
Attendee Name Title Status Arrived
Theodore Sanchez Council Member, Ward 1 Present
Sandra Ibarra Council Member, Ward 2 Present
Juan Figueroa Mayor Pro-Tem, Ward 3 Present
Fred Shorett Council Member, Ward 4 Present
Ben Reynoso Council Member, Ward 5 Present
Kimberly Calvin Council Member, Ward 6 Present
Damon L Alexander Council Member, Ward 7 Present
John Valdivia Mayor Present
Robert D. Field City Manager Present
Sonia Carvalho City Attorney Present
Genoveva Rocha City Clerk Present
Mayor John Valdivia
Council Members
Theodore Sanchez
Sandra Ibarra
Juan Figueroa
Fred Shorett
Ben Reynoso
Kimberly Calvin
Damon Alexander
Packet Page. 56
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 2
5:30 P.M.
CLOSED SESSION PUBLIC COMMENT
There were no public comments or requests to speak for Closed Session.
CLOSED SESSION
A) CONFERENCE WITH LEGAL COUNSEL EXISTING LITIGATION (PURSUANT TO
GOVERNMENT CODE SECTION 54956.9(A) AND (D)(1):
1. Anthony Thomas Duran v. City of San Bernardino, et al., San Bernardino
Superior Court Case No. CIVSB2104740
2. Jessica Hernandez v. City of San Bernardino, et al., San Bernardino San
Bernardino Superior Court Case No. CIVDS1825804
7:00 PM
INVOCATION AND PLEDGE OF ALLEGIANCE
Chaplain Paul Lujan from Victory Outreach led the invocation. Mayor John Valdivia lead the
Pledge of Allegiance to the Flag.
CLOSED SESSION REPORT
City Attorney Sonia Carvalho announced two Closed Session items were discussed .
Direction was given towards settlement, when those become final they will become
reportable. At this time, there was no reportable action.
CITY MANAGER UPDATE
City Manager Field announced that in lieu of his usual City Manager report staff would play the
Critical Incident Debrief video regarding the officer involved shooting that took place on
Saturday, July 16, 2022.
MAYOR & CITY COUNCIL UPDATES/REPORTS ON CONFERENCES/MEETINGS
At this time, the Mayor and City Council provided updates to the community. Council members
addressed the ongoing investigation into the officer-involved shooting and expressed
condolences to Rob Adams’s family. Council Members expressed support for community
programs such as the street vendor work center and encouraged residents to participate in
upcoming local events. Council Member Alexander reported that he attended the curtain of
Courage. Mayor Pro Tem Figueroa highlighted upcoming Neighborhood Association Meeting
and tournament for the senior citizens. Mayor Valdivia encouraged everyone to attend the
opening of terminal event at the San Bernardino International Airport on July 23 at 7:30 p.m.
Packet Page. 57
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 3
PUBLIC COMMENTS FOR ITEMS LISTED AND NOT LISTED ON THE AGENDA
Leslie Stevens spoke about the officer-involved shooting incident, and she asked that the
Council back the Police Chief and that the community wait on the final results of the
investigation.
Mark Hartley discussed the need for more police and code enforcement prior to building more
apartments.
David McKenny spoke about Agenda Item No. 3 and discussed that the cannabis stores could
not continue to operate legally.
Ruth spoke about street vendors and stated that a resource center was needed so street
vendors could be provided with the necessary information.
Wendy McCammack spoke about Agenda Item No. 3 and the increasing crime. She spoke
against continuing to allow illegal dispensaries.
Cameron spoke about Agenda Item No. 3 and suggested that more money be put into traffic
control.
Casey Daly spoke Agenda Item No. 4 and stated that the mall needed to be demolished.
At this time Public Comments was paused to move onto the Public Hearing items at
8:00 PM.
PUBLIC HEARINGS
6. Public Hearing on Annexation No. 17 to Community Facilities District 20191 (Ward
3)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Hold a Public Hearing;
2. Adopt Resolution No. 2022106 of the Mayor and City Council of the City of San
Bernardino, California, calling an election to submit to the qualified electors the
question of levying a special tax within the area proposed to be annexed to
Community Facilities District No. 20191 (Maintenance Services) (Annexation No. 17);
3. Hold a special landowner election and canvass the election;
4. Adopt Resolution No. 2022107 of the Mayor and City Council of the City of San
Bernardino, California, declaring election results for Community Facilities District No.
20191 (Maintenance Services) (Annexation No. 17);
5. Introduce, read by title only, and waive further reading of Ordinance No. MC1582 of
the Mayor and City Council of the City of San Bernardino, California, amending
Ordinance No. MC 1522 and levying special taxes to be collected during Fiscal Year
202223 to pay the annual costs of the maintenance and servicing of landscaping,
lighting, water quality improvements, graffiti, streets, street sweeping, parks and trail
Packet Page. 58
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 4
maintenance, a reserve fund for capital replacement, and administrative expenses with
respect to the City of San Bernardino Community Facilities District No. 20191
(Maintenance Services); and
6. Schedule the adoption of Ordinance No. MC1582 for August 3, 2022.
Mayor Valdivia opened the public hearing at 8:04 p.m.
There were no public speakers for this item.
No written protests were received and there were no registered voters within Annexation No.
17.
The public hearing was closed at 8:10 p.m.
RESULT: ADOPTED RESOLUTION NO. 2022-106 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Juan Figueroa, Council Member, 3rd Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
RESULT: ADOPTED RESOLUTION NO. 2022-107 [7-0]
MOVER: Sandra Ibarra, Council Member, 2nd Ward
SECONDER: Juan Figueroa, Council Member, 3rd Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
RESULT: INTRODUCED FOR FIRST READING ORDINANCE NO. MC 1582 AND
SCHEDULED THE ADOPTION FOR AUGUST 3, 2022 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Juan Figueroa, Council Member, 3rd Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
7. Public Hearing on Annexation No. 20 to Community Facilities District 2019-1
(Ward 7)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Hold a Public Hearing;
2. Adopt Resolution No. 2022116 of the Mayor and City Council of the City of San
Bernardino, California, calling an election to submit to the qualified electors the
question of levying a special tax within the area proposed to be annexed to Community
Facilities District No. 20191 (Maintenance Services) (Annexation No. 20);
3. Hold a special landowner election and canvass the election;
4. Adopt Resolution No. 2022117 of the Mayor and City Council of the City of San
Bernardino, California, declaring election results for Community Facilities District No.
20191 (Maintenance Services) (Annexation No. 20);
Packet Page. 59
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 5
5. Introduce, read by title only, and waive further reading of Ordinance No. MC1586 of the
Mayor and City Council of the City of San Bernardino, California, amending
Ordinance No. MC1522 and levying special taxes to be collected during Fiscal Year
20222023 to pay annual costs of the maintenance and servicing of landscaping,
lighting, water quality improvements, graffiti, streets, street sweeping, parks and trail
maintenance, a reserve fund for capital replacement, and administrative expenses with
respect to City of San Bernardino Community Facilities District No.
20191 (Maintenance Services); and
6. Schedule the adoption of Ordinance No MC1586 for August 3, 2022.
Mayor Valdivia left the room before discussion, due to conflicts on items 7, 8, 10, 11,
19, 20, 21, 22, 23, and 24 due to campaign contributions received. All items indicated
by Mayor Valdivia were taken first in numerical order.
Mayor ProTem Figueroa opened the public hearing at 8:10 p.m. There were no public
speakers.
No written protests were received, and there were no registered voters within Annexation No.
20.
The public hearing was closed at 8:12 p.m.
RESULT: ADOPTED RESOLUTION NO. 2022-116 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Sandra Ibarra, Council Member, 2nd Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
RESULT: ADOPTED RESOLUTION NO. 2022-117 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Sandra Ibarra, Council Member, 2nd Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
RESULT: INTRODUCED FOR FIRST READING ORDINANCE NO. MC 1586 AND
SCHEDULED THE ADOPTION FOR AUGUST 3, 2022 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Sandra Ibarra, Council Member, 2nd Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
8. Public Hearing on Annexation No. 23 to Community Facilities District 20191
(Ward 7)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Hold a Public Hearing;
2. Adopt Resolution No. 2022118 of the Mayor and City Council of the City of San
Packet Page. 60
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 6
Bernardino, California, calling an election to submit to the qualified electors the
question of levying a special tax within the area proposed to be annexed to Community
Facilities District No. 20191 (Maintenance Services) (Annexation No. 23);
3. Hold a special landowner election and canvass the election;
4. Adopt Resolution No. 2022119 of the Mayor and City Council of the City of San
Bernardino, California, declaring election results for Community Facilities District No.
20191 (Maintenance Services) (Annexation No. 23);
5. Introduce, read by title only, and waive further reading of Ordinance No. MC1587 of the
Mayor and City Council of the City of San Bernardino, California, amending
Ordinance No. MC1522 and levying special taxes to be collected during Fiscal Year
20222023 to pay annual costs of the maintenance and servicing of landscaping,
lighting, water quality improvements, graffiti, streets, street sweeping, parks and trail
maintenance, a reserve fund for capital replacement, and administrative expenses with
respect to City of San Bernardino Community Facilities District No. 20191
(Maintenance Services); and
6. Schedule the final reading and adoption of Ordinance No MC1587 for August 3, 2022.
Mayor ProTem Figueroa opened the public hearing at 8:13 p.m.
There were no public speakers for this item.
The public hearing was closed at 8:14 p.m.
RESULT: ADOPTED RESOLUTION NO. 2022-118[7-0]
MOVER: Sandra Ibarra, Council Member, 2nd Ward
SECONDER: Fred Shorett, Council Member, 4th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
RESULT: ADOPTED RESOLUTION NO. 2022-107 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Damon Alexander, Council Member, 7th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
RESULT: INTRODUCED FOR FIRST READING ORDINANCE NO. MC 1587 AND
SCHEDULED THE ADOPTION FOR AUGUST 3, 2022 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Damon Alexander, Council Member, 7th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
Packet Page. 61
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 7
10. Warmington Homes – Palm Avenue Project (Ward 4)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Adopt Resolution No. 2022157 of the Mayor and City Council of the City of San
Bernardino, California, adopting the Mitigated Negative Declaration and Mitigation
Monitoring and Reporting Program, and approving General Plan Amendment 2102
changing the General Plan Land Use Designation of five (5) parcels (APN: 0285211
05, 21, 22, 23 and 25) containing a total of approximately 14.70 acres from
Commercial to MultipleFamily Residential;
2. Introduce, read by title only, and waive further reading of Ordinance No. MC1588 of the
Mayor and City Council of the City of San Bernardino, California, approving
Development Code Amendment (Zoning Map Amendment) 2107 changing the
Zoning District Classification of five (5) parcels (APN: 028521105, 21, 22, 23 and
25) containing a total of approximately 14.70 acres from Commercial General (CG1) to
Residential Medium (RM), pursuant to a Mitigated Negative Declaration;
3. Adopt Resolution No. 2022158 of the Mayor and City Council of the City of San
Bernardino, California, approving Subdivision 2113 (Tentative Parcel Map 20495)
allowing the subdivision five (5) parcels (APNS: 028521105, 21, 22, 23 and 25)
containing a total of approximately 14.70 acres into one hundred thirtythree (133)
singlefamily residential lots and nine (9) lettered lots for common facility
improvements, and Development Permit TypeP 2107 allowing the development and
establishment of a Planned Unit Development comprised of one hundred
thirtythree(133) detached singlefamily residences located on the northwest
corner of E. Highland Avenue and N. Palm Avenue, pursuant to a Mitigated Negative
Declaration; and
4. Schedule the adoption of the Ordinance for the regularly scheduled meeting of the
Mayor and City Council on August 3, 2022.
Mayor Pro-Tem Figueroa opened the public hearing at 8:17 PM.
Staff provided a report on the Warmington Homes project.
An unknown community member raised concerns about the project and stated that it
would be too compact of an area and it would become a future slum.
Mayor Pro-Tem Figueroa closed the public hearing at 8:24 PM.
Council Member Sanchez asked if vinyl fencing would be used to separate the
properties. Staff reported that the vinyl fencing would be used between properties.
Moses Kim, the representative of the applicant, stated that cinder blocks would be used.
Council Member Ibarra asked if they were townhomes. Moses Kim stated that there
would be detached single-family homes with shared parking as well as traditional single -
family homes in another portion of the area. Council Ibarra asked about parking and if a
study was done. Moses Kim confirmed that there was a parking study done and that
there was visitor parking.
Council Member Sanchez motioned to approve the recommendation with the
amendment that cinder blocks would be used to divide the properties. Ben Reynoso
seconded the motion, and the motion passed.
Packet Page. 62
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 8
RESULT: APPROVED AS AMENDED FOR CINDER BLOCKS TO BE USED TO
DIVIDE THE PROPERTIES [6-1]
MOVER: Theodore Sanchez, Council Member, 1st Ward
SECONDER: Ben Reynoso, Council Member, 5th Ward
AYES: Sanchez, Ibarra, Figueroa, Reynoso, Calvin, Alexander
NOES: Shorett
11. Warmington Homes Medical Center Drive Project (Ward 6)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Adopt Resolution No. 2022159 of the Mayor and City Council of the City of San
Bernardino, California, adopting the Mitigated Negative Declaration and Mitigation
Monitoring and Reporting Program, and approving General Plan Amendment 2101
changing the General Plan Land Use Designation of one (1) parcel (APN:
014319159) containing approximately 9.9 acres from Commercial to MultipleFamily
Residential (Attachment 1);
2. Introduce, read by title only, and waive further reading of Ordinance No. MC1589 of the
Mayor and City Council of the City of San Bernardino, California, approving
Development Code Amendment (Zoning Map Amendment) 2106 changing the
Zoning District Cl assification of one (1) parcel (APN: 014319159) containing
approximately 9.9 acres from Commercial General (CG1) to Residential Medium
(RM), pursuant to a Mitigated Negative Declaration (Attachment 2);
3. Adopt Resolution No. 2022160 of the Mayor and City Council of the City of San
Bernardino, California, approving Subdivision 2112 (Tentative Parcel Map 20494)
allowing the subdivision of one (1) parcel (APN: 014319159) containing
approximately 9.9 acres into ninetyfive (95) singlefamily residential lots and nine (9)
lettered lots for common facility improvements, and Development Permit TypeP 2106
allowing the development and establishment of a Planned Unit Development
comprising ninetyfive (95) detached singlefamily residences located on the south side
of W. Highland Avenue, approximately 600 feet west of N. Medical Center Drive,
pursuant to a Mitigated Negative Declaration (Attachment 3); and
4. Schedule the adoption of the above Ordinance for the regularly scheduled meeting of
the Mayor and City Council on August 3, 2022.
Mayor Pro-Tem Figueroa opened the public hearing at 8:28 PM.
Council Member Sanchez stated that he wanted the same condition of having the cinder
blocks.
Council Member Calvin commented on the aesthetic of the frontage.
Moses Kim stated he would work with the staff on the aesthetic of the frontage, and he
confirmed that they could use cinder blocks instead of vinyl.
Packet Page. 63
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 9
RESULT: APPROVED AS AMENDED APPROVED AS AMENDED FOR CINDER
BLOCKS TO BE USED TO DIVIDE THE PROPERTIES [7-0]
MOVER: Theodore Sanchez, Council Member, 1st Ward
SECONDER: Ben Reynoso, Council Member, 5th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
9. Public Hearing on Fiscal Year 202223 Assessment Levies for Previously Formed
Assessment Districts. (All Wards)
Recommendation:
It is recommended that the Mayor and City Council hold the public hearing and:
1. Adopt Resolution No. 2022-152 of the Mayor and City Council of the City of San
Bernardino, California, Confirming the Diagram and Assessment for Assessment District
No. 1022 and Zones 1, 2, and 3 thereof for Fiscal Year 2022-23;
2. Adopt Resolution No. 2022-153 of the Mayor and City Council of the City of San
Bernardino, California, Confirming the Diagram and Assessment for Assessment
District Nos. 1017, 1019, 1020, 1023 and 1024 for Fiscal Year 2022-23;
3. Adopt Resolution No. 2022154 of the Mayor and City Council of the City of San
Bernardino, California, Confirming the Diagram and Assessment for Assessment
District Nos. 1028, 1029, 1030, 1031, 1032, 1035 (ZONE 1), 1035 (ZONE 2), 1036,
1037, 1038, 1039, 1040, 1041, 1042, 1043 (ZONE 1), 1043 (ZONE 2), 1045, 1046,
1047, 1048, 1050, 1052, 1054, 1055, 1056, 1057, 1059, 1060, 1063, 1064 and 1068 for
Fiscal Year 2022-23;
4. Adopt Resolution No. 2022155 of the Mayor and City Council of the City of San
Bernardino, California, Confirming the Diagram and Assessment for Assessment
District Nos. 951 (ZONE 1), 951 (ZONE 2), 952 (ZONES 1, 2 AND 2A), 952 (ZONE 3),
953, 956, 959 (ZONE 1), 962, 963, 968, 974, 975, 976, 981, 982, 986, 989, 991, 993,
997, 1001, 1002, 1005, 1007, 1012 and 1016 for Fiscal Year 2022-23;
5. Assessment for Assessment District Nos. 1025 and 1027 for Fiscal Year 2022-23.
Mayor Valdivia returned for Agenda Item No. 9.
Mayor Valdivia opened the public hearing at 8:41 PM.
Alex Qishta provided a staff report on the item.
RESULT: ADOPTED RESOLUTION NO. 2022-157 [6-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Figueroa, Shorett, Reynoso, Calvin, Alexander
ASENT: Sandra Ibarra
Packet Page. 64
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 10
12. Draft Fiscal Year 20222023 Annual Action Plan Associated with the
Community Development Block Grant, HOME Investment Partnerships and
Emergency Solutions Grant Programs (All Wards)
Recommendation:
1. Conduct a public hearing on the draft Fiscal Year 202223 Annual Action Plan
associated with the Community Block Grant (CDBG), HOME Investment Partnerships
(HOME), and Emergency Solutions Grant (ESG) programs and related grant funding;
and
2. Adopt the draft Fiscal Year 202223 Annual Action Plan as an application for
funding under Community Development Block Grant (CDBG), Home Investment
Partnerships (HOME), and Emergency Solutions Grant (ESG) programs and authorize
the City Manager or designee to take any further actions and execute any further
documents as are necessary to effectuate the submittal of the Draft HUD Fiscal Year
202223 Annual Action Plan and Certification to HUD.
Mayor Valdivia opened the public hearing at 8:45 PM.
City Manager Robert Field welcomed the new staff member, Cassandra Searcy, to provide the
staff report.
Mayor Valdivia closed the public hearing at 8:47PM.
RESULT: APPROVED THE ADOPTION OF THE DRAFT FISCAL YEAR 2022-23
ANNUAL ACTION PLAN [6-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Shorett, Reynoso, Calvin, Alexander
ASENT: Juan Figueroa
PUBLIC COMMENTS FOR ITEMS LISTED AND NOT LISTED ON THE AGENDA
Public Comments was resumed.
The following speakers spoke in support of Street Vendors and the need for a Street Vendor
Workplace Center.
Juanelle Milan Ginny Ruiz Olga Flores Miriam Del Rosa
Virginia Lopez Juan Sanbel Veronica Roman Rosario Rio
Ingrid Salazar Albert Desaro Paula Espero Natalie Bautista
Rodriguez Ortiz Claudia Baustista Marco Monroe
Isabella raised concerns about who would clean up after the street vendors.
Malibu raised concerns about the police violence and asked for the officers to be held
accountable.
Packet Page. 65
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 11
Jim Penman urged the Police Chief to be supported and allow the investigation to be finished.
A ten-minute recess was taken at 9:30 PM. The meeting was resumed at 9:40 PM.
PRESENTATIONS
1. Citizen of the Month – Robert Segura
Council Member Reynoso presented Robert Segura with a certificate for citizen of the Month.
DISCUSSION
2. Amendment to Exclusive Negotiating Agreement (ENA) – Carousel Mall (Ward
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Approve the Amendment to the Exclusive Negotiating Agreement (“ENA”) between the
City of San Bernardino and San Bernardino Development Company, LLC and LPC West,
Inc., for the development of Carousel Mall; and
2. Authorize the City Manager, or designee, to take any further actions and execute any
further documents as necessary to effectuate the agreements.
Nathan Freeman, Agency Director of Housing and Economic Development, provided a report
on the Third Amendment to the Exclusive Negotiating Agreement (ENA).
Mayor Valdivia asked if the payment for the additional $55,000 fell on the previous developer.
Nathan Freeman confirmed that it did, and they were in good standing. Mayor Valdivia asked who
was responsible for the payment for Lincoln Property. Nathan Freeman stated that RDICO was a
silent partner and the $100,000 would remain.
Council Member Reynoso asked about the process of selecting the team and if it was legal for
there to be a silent partner. City Manager Field confirmed that it was and stated that it was always
an intention for RDICO to be a silent partner.
Council Member Alexander raised concerns about the pace of the project. City Manager Robert
Field stated that Lincoln Properties was not a slow-moving entity, and they would want to move
quickly.
Mayor Valdivia expressed concern regarding the length of time taken to achieve progress and the
involvement of the two additional partners. RDICO representative Donald Monty noted that he
had assisted in developing the project.
RESULT: APPROVED STAFF’S RECOMMENDATION [4-3]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Figueroa, Shorett, Calvin
NOES: Ibarra, Reynoso, Alexander
Mayor Valdivia vetoed the 4-3 the vote to approve staff’s recommendation.
Packet Page. 66
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 12
RESULT: THE CITY COUNCIL DIRECTED STAFF TO CONTINUE THE ITEM TO
THE AUGUST 3RD MEETING FOR LINCOLN PROPERTIES TO PROVIDE
A PRESENTATION [5-2]
MOVER: Sandra Ibarra, Council Member, 2nd Ward
SECONDER: Theodore Sanchez, Council Member, 1st Ward
AYES: Sanchez, Ibarra, Figueroa, Alexander, Reynoso
NOES: Shorett, Calvin
3. Annual Increases per Bargaining Unit MOUs, Correction to Reclassification of
Deputy Director of Public Works/City Engineer and City Clerk Agreement
Recommendation:
Adopt Resolution No. 2022135 of the Mayor and City Council of the City of San
Bernardino, California, approving the salary schedule for the SBPOA, SBCMA, Middle
Management, General Unit, SBPDA and Executive Group, approving the
reclassification of the Deputy Director of Public Works/City Engineer and approving the
First Amendment to the City Clerk's Employment.
Agency Director of Administrative Services Barbara Whitehorn provided a report on the item.
Edelia Eveland read the terms of the amended City Clerk agreement.
RESULT: ADOPTED RESOLUTION NO. 2022-135 AND APPROVED STAFF’S
RECOMMENDATION [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Theodore Sanchez, Council Member, 1st Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
4. Carousel Mall Demolition and Professional Services Agreement for 24/7 Security
Services (Ward 1)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Direct the City Manager to prepare and issue the necessary documents for the
demolition of the Carousel Mall through a designbuild contract; and
2. Authorize the City Manager to execute a monthtomonth Professional Services
Agreement between City of San Bernardino and Redwood Private Security for 24/7
security patrol of the Carousel Mall.
Agency Director of Public Works, Daniel Hernandez, provided the staff report on the Carousel
Mall.
Council Member Calvin inquired whether the demolition fee was included in the property sale,
and City Manager Robert Field explained that the demolition is being accelerated due to
vandalism and that the fee would be incorporated into the overall cost.
Packet Page. 67
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 13
Council Member Alexander asked if Redwood already provided security, and Agency Director
of Public Works Daniel Hernandez confirmed that some security was provided, while City
Manager Field clarified that the 24/7 security currently in place is being funded by the City.
Council Member Reynoso sought clarification on the duration of security services, and
Director Hernandez stated that security would be maintained throughout the process, with
City funding ending once demolition occurs. When asked about the demolition timeline,
Hernandez noted that demolition is expected by October, and Council Member Reynoso
suggested allowing 24/7 demolition to expedite progress.
RESULT: APPROVED STAFF’S RECOMMENDATION [6-1]
MOVER: Theodore Sanchez, Council Member, 1st Ward
SECONDER: Fred Shorett, Council Member, 4th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Calvin, Alexander
NOES: Reynoso
5. San Bernardino Active Transportation Plan (All Wards)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, approve the San Bernardino Active Transportation Plan (Attachment 1).
There was no discussion.
RESULT: APPROVED STAFF’S RECOMMENDATION [7-0]
MOVER: Sandra Ibarra, Council Member, 2nd Ward
SECONDER: Theodore Sanchez, Council Member, 1st Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
CONSENT CALENDAR
Items on the Consent Calendar are considered routine and are voted on in a single motion
unless a council or staff member has pulled the item for more discussion.
Mayor Valdivia left the meeting at 10:47 PM.
City Clerk Genoveva Rocha announced that Item No. 20 is being continued to the August 3 rd,
2022 Mayor and City Council Meeting.
RESULT: APPROVED THE CONSENT CALENDAR WITH ITEM 20 BEING
CONTINUED TO THE AUGUST 3RD MEETING AND PULLED ITEM NO. 32
FOR FURTHER DISCUSSION [70]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
Packet Page. 68
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 14
13. Resolution Approving Acceptance of Grant Funds from the California Arts
Council (Ward 1)
Recommendation:
Adopt Resolution No. 2022136 of the Mayor and City Council of the City of San
Bernardino, California:
1. Approving acceptance of Grant Funds from the California Arts Council for the
California Theatre; and
2. Approving the submission of the Project Information Package; and
3. Authorizing the City Manager, or Designee, to execute the Grant Agreement and
all related documents.
RESULT: ADOPTED RESOLUTION NO. 2022-136 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
14. Construction Contract Award 5th Street Senior Center Kitchen
Improvements CIP (Ward 1)
Recommendation:
Adopt Resolution No. 2022137 of the Mayor and City Council of the City of San
Bernardino, California:
1. Approving the award of a construction contract with Preferred General Services, in
the amount of $394,974 to provide improvements to the 5th Street Senior
Center kitchen; and
2. Authorizing the Agency Director of Administrative Services to record a budget
amendment from the Measure S fund to appropriate an additional $217,061 to
fund the project; and
3. Authorizing construction, contingencies, and inspection costs in an amount not to
exceed $465,000 for the 5th Street Senior Center Kitchen Improvements project; and
4. Authorizing the City Manager or designee to execute all documents for the
construction of the 5th Street Senior Center Kitchen Improvements project
with Preferred General Services; and
5. Authorizing the City Manager or designee to expend the con tingency fund, if
necessary, to complete the project.
RESULT: ADOPTED RESOLUTION NO. 2022-137 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
Packet Page. 69
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 15
15. Final Reading and Adoption of Ordinance MC1585 (Ward 4)
Recommendation:
Adopt Ordinance MC1585 of Mayor and City Council of the City of San Bernardino,
California, amending Ordinance MC1522 and levying special taxes to be collected
during Fiscal Year 20222023 to pay the annual costs of the maintenance and
servicing of landscaping, lighting, water quality improvements, graffiti, streets, street
sweeping, parks and trail maintenance, a reserve fund for capital replacement, and
administrative expenses with respect to City of San Bernardino Community Facilities
District No. 20191 (Maintenance Services).
RESULT: ADOPTED ORDINANCE NO. MC-1585 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
16. Construction Contract Award Parking Lot Improvements at Perris Hill Park, Paul
Villasenor Branch Library & Wildwood Park – (Wards 1, 2 & 4)
Recommendation:
Adopt Resolution No. 2022138 of the Mayor and City Council of the City of San
Bernardino, California:
1. Approving the award of a construction contract with All American Asphalt, in the
amount of $1,672,149 to provide parking lot improvements to Perris Hill Park, Paul
Villasenor Branch Library, and Wildwood Park Project; and
2. Authorizing the Agency Director of Administrative Services to record a budget
amendment from the Measure S fund to appropriate an additional $963,000 to fund
the project; and
3. Authorizing construction, contingencies, and inspection costs in the total amount of
$1,990,000 for the parking lot improvements to Perris Hill Park, Paul Villasenor Branch
Library, and Wildwood Park Project; and
4. Authorizing the City Manager or designee to execute all documents for the
construction of the parking lot improvements to Perris Hill Park, Paul Villasenor Branch
Library, and Wildwood Park project with All American Asphalt; and
5. Authorizing the City Manager or designee to expend the contingency fund, if
necessary, to complete the project.
RESULT: ADOPTED RESOLUTION NO. 2022-138 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
Packet Page. 70
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 16
17. Final Reading and Adoption of Ordinance MC1584 (Ward 1)
Recommendation:
Adopt Ordinance MC1584 of the Mayor and City Council of the City of San
Bernardino, California, amending Ordinance MC1522 and levying special taxes to be
collected during Fiscal Year 20222023 to pay the annual costs of the maintenance and
servicing of landscaping, lighting, water quality improvements, graffiti, streets, street
sweeping, parks and trail maintenance, a reserve fund for capital replacement, and
administrative expenses with respect to City of San Bernardino Community Facilities
District No. 20191 (Maintenance Services).
RESULT: ADOPTED ORDINANCE NO. MC-1584 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
18. Rejecting Construction Bids for Citywide Pavement Rehabilitation
(Slurry/Crack Seal) (All Wards)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, Reject Construction Bids for the Citywide Pavement Rehabilitation
(Slurry/Crack Seal).
RESULT: APPROVED STAFF’S RECOMMENDATION [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
19. Resolution Declaring Intent to Annex Territory: Community Facilities District No.
20191 (Maintenance Services): Annexation No. 24, Tax Zone No. 25
(Highland/Medical Center) (Ward 6)
Recommendation:
Adopt Resolution No. 2022139 of the Mayor and City Council of the City of San
Bernardino, California, declaring its intention to annex territory into Community Facilities
District No. 20191 (Maintenance Services) of the City of San Bernardino, adopting a
map of the area to be proposed (Annexation No. 24) and authorizing the levy of a
special taxes therein.
RESULT: ADOPTED RESOLUTION NO. 2022-139 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
Packet Page. 71
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 17
20. Resolution Declaring Intent to Annex Territory: Community Facilities District No.
20191 (Maintenance Services): Annexation No. 25, Tax Zone No. 26 (Palm) (Ward 4)
Recommendation:
Adopt Resolution No. 2022140 of the Mayor and City Council of the City of San
Bernardino, California, declaring its intention to annex territory into Community Facilities
District No. 20191 (Maintenance Services) of the City of San Bernardino, adopting a map
of the area to be proposed (Annexation No. 25) and authorizing the levy of a special taxes
therein.
STAFF REQUESTED THE ITEM BE CONTINUED TO THE AUGUST 3RD MEETING.
21. Initiation of Proceedings to Form Proposed Community Facilities District No.
20221 (Highland/Medical)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Adopt Resolution No. 2022141 of the Mayor and City Council of the City of San
Bernardino, California, Declaring Intention to Establish Proposed Community
Facilities District No. 20221(Highland/Medical) of the City of San Bernardino;
2. Adopt Resolution No. 2022142 of the Mayor and City Council of the City of San
Bernardino, California, Declaring Necessity to Incur a Bonded Indebtedness of
Proposed Community Facilities District No. 20221 (Highland/Medical) of the City of San
Bernardino
RESULT: ADOPTED RESOLUTION NO. 2022-141 AND NO. 2022-142 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
22. Initiation of Proceedings to Form Proposed Community Facilities District No.
20222 (Palm)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Adopt Resolution No. 2022143 of the Mayor and City Council of the City of San
Bernardino, California, Declaring Intention to Establish Proposed Community
Facilities District No. 20222 (Palm) of the City of San Bernardino;
2. Adopt Resolution No. 2022144 of the Mayor and City Council of the City of San
Bernardino, Californ ia, Declaring Necessity to Incur a Bonded Indebtedness of
Proposed Community Facilities District No. 20222 (Palm) of the City of San
Bernardino
Packet Page. 72
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 18
RESULT: ADOPTED RESOLUTION NO. 2022-143 AND NO. 2022-144 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
23. Resolution Declaring Intent to Annex Territory: Community Facilities District No.
20181 (Safety Services) Annexation No. 6, (TR 20494)
Recommendation:
A dopt Resolution No. 2022145 of the Mayor and City Council of the City of San
Bernardino, California, declaring its intention to annex territory into Community
Facilities District No. 20181 (Safety Services) of the City of San Bernardino, adopting a
map of the area to be proposed (Annexation No. 6) and authorizing the levy of special
taxes therein.
RESULT: ADOPTED RESOLUTION NO. 2022-145 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
24. Resolution Declaring Intent to Annex Territory: Community Facilities District No.
20181 (Safety Services) Annexation No. 7, (TR 20495) (Ward 4)
Recommendation:
Adopt Resolution No. 2022146 of the Mayor and City Council of the City of San
Bernardino, California, declaring its intention to consider annexing territory to Community
Facilities District No. 20181 (Safety Services) of the City of San Bernardino, adopting a
map of the area to be proposed (Annexation No. 7) and authorizing the levy of special
taxes therein.
RESULT: ADOPTED RESOLUTION NO. 2022-146 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
25. Investment Portfolio Report for April and May 2022 (All Wards)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, accept and file the Monthly Investment Portfolio Report for April & May 2022.
RESULT: APPROVED STAFF’S RECOMMENDATION [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
Packet Page. 73
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 19
26. Approval of Commercial and Payroll Disbursements (All Wards)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California approve the commercial and payroll disbursements for May and June 2022.
RESULT: APPROVED STAFF’S RECOMMENDATION [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
27. Authorize the City Manager to Execute a Police Services Agreement with Dignity
Health Corporation.
Recommendation:
Authorize the City Manager to execute the Proposed Fifth Amendment to the
Agreement with Dignity Health Corporation for Police services at two locations.
RESULT: APPROVED STAFF’S RECOMMENDATION [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
28. Acceptance of 2020 and 2021 JAG
Recommendation:
Adopt Resolution No. 2022147 of the Mayor and City Council of the City of San
Bernardino, California, authorizing the acceptance of the 2020 and 2021 Edward
Byrne Justice Assistance Grants and increasing the FY2022/23 Adopted Budget grant
revenue and expenditures $379,025.
RESULT: ADOPTED RESOLUTION NO. 2022-147 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
29. Community Facilities District No. 20201 (Rancho Palma) Special Tax Bonds,
Series 2022
Recommendation:
Adopt Resolution No. 2022148 of the Mayor and City Council of the City of San
Bernardino, California, authorizing the issuance of, not to exceed $5,000,000,
aggregate principal amount of Community Facilities District No. 20201 (Rancho
Palma) of the City of San Bernardino Special Tax Bonds, Series 2022, appointing Fiscal
Agent, approving forms of the Fiscal Agent Agreement, Purchase Contract and
Continuing Disclosure Certificate, approving the form Preliminary Official Statement and
authorizing preparation of Final Official Statement and authorizing certain City staff to
negotiate the terms of the sale of the Bonds.
Packet Page. 74
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 20
RESULT: ADOPTED RESOLUTION NO. 2022-148 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
30. Agreement with the Counseling Team International for the Employee Assistance
Program (All Wards) Agreement with the Counseling Team International for the
Employee Assistance Program (All Wards)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, authorize the City Manager to execute a professional services agreement
with The Counseling Team International for an Employee Assistance Program.
RESULT: APPROVED STAFF’S RECOMMENDATION [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
31. Adopt Resolution No. 2022149 Authorizing the Agency Director of
Administrative Services to Amend the FY 2022/2324 Liability Fund Budget in the
amount of $363,000 for both FY 2022/23 and 2023/24 and approving an
Agreement with George Hills for General Liability Third Party Administrator
Services (All Wards).
Recommendation:
Authorize the City Manager to enter into an Agreement with George Hills for General
Liability Third Party Administrator Services and Adopt Resolution No. 2022149.
Authorizing the Agency Director of Administrative Services to Amend the FY 2022/23 24
Liability Fund Budget in the amount of $363,000 for both FY 2022/23 and 2023/24 (All
Wards).
RESULT: ADOPTED RESOLUTION NO. 2022-149 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
Packet Page. 75
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 21
32. Five-year Capital Improvement Program FY 2022/23 to FY 2026/27 for Measure I
Local Expenditures (All Wards)
Recommendation:
Adopt Resolution No. 2022150 of the Mayor and City Council of the City of San
Bernardino, California, approving the Measure I Five-year Capital Improvement Plan for
Fiscal Year 2022/23 through Fiscal Year 2026/27 and Measure I Expenditure Strategy.
Council Member Reynoso asked about the storm drain. Alex Qishta stated that it was a
new area that they were studying, and they were actively working on it and getting an
RFP.
RESULT: ADOPTED RESOLUTION NO. 2022-150 [7-0]
MOVER: Ben Reynoso, Council Member, 5th Ward
SECONDER: Fred Shorett, Council Member, 4th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
33. City Board, Commission, and Citizen Advisory Committee Minutes Approved in
May/June 2022
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino receive
and file the minutes from the City board, commission, and citizen advisory committee
meetings approved in May and June 2022.
RESULT: APPROVED STAFF’S RECOMMENDATION [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
34. Certifying Results of the Primary Municipal Election held on June 7, 2022.
Recommendation:
Adopt Resolution No. 2022151 of the Mayor and City Council of the City of San
Bernardino, California, reciting the facts of the Primary Municipal Election held on June
7, 2022, certifying the election results and such other matters as provided by law.
RESULT: ADOPTED RESOLUTION NO. 2022-151 [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
35. Ratification of Council Travel and PreApproval of Travel for FY 2022/23
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino ratify
Council travel detailed herein, and preapprove specific travel for the Mayor and
Council Members for FY 2022/23.
Packet Page. 76
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 22
RESULT: APPROVED STAFF’S RECOMMENDATION [7-0]
MOVER: Fred Shorett, Council Member, 4th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
At 10:46 PM, the public comment was heard for Agenda Item No. 36.
Ronald Donis raised concerns about the police department approach toward street vendors
and spoke about the need for the worker center.
ITEMS TO BE CONSIDERED FOR FUTURE MEETINGS
36. Day Laborer and Street Vendor Work Center (All Wards) Council Member Reynoso
No Discussion, Item was moved to approve.
RESULT: APPROVED TO BE CONSIDERED AT A FUTURE MEETING [7-0]
MOVER: Ben Reynoso, Council Member, 5th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
37. Non Fossil Fuel Fleet Vehicles for City of San Bernardino (All Wards) – Council
Member Alexander
Council Member Alexander asked for other options than fossil fuels to be explored
for the fleet vehicles.
RESULT: APPROVED TO BE CONSIDERED AT A FUTURE MEETING [7-0]
MOVER: Ben Reynoso, Council Member, 5th Ward
SECONDER: Kimberly Calvin, Council Member, 6th Ward
AYES: Sanchez, Ibarra, Figueroa, Shorett, Reynoso, Calvin, Alexander
At 10:57 PM, the public comment was reopened for items not on the agenda.
Robert Porter discussed having an enterprise zone for the street vendors and suggested
setting aside money to allow artists to show their art.
Chachi Wright discussed the officer-involved shooting incident and the need for justice.
Luis Herrera spoke about the need to support the street vendors.
Council Member Ibarra read a written comment that discussed the need to ensure that the
sidewalk city ordinance is upheld.
Packet Page. 77
Regular Meeting Draft Minutes July 20, 2022
Mayor and City Council of the City of San Bernardino Page 23
Melva Parada discussed a program to guide participants in the creation of their own
businesses.
ADJOURNMENT
The meeting of the Mayor and City Council was adjourned on Wednesday, July 20, 2022, at
11:13 p.m.
The next joint regular meeting of the Mayor and City Council and the Mayor and City Council
Acting as the Successor Agency to the Redevelopment Agency will be held on Wednesday,
August 03, 2022 at the Feldheym Central Library located at 555 West 6th Street, San
Bernardino, California 92401. Closed Session will begin at 5:30 p.m. and Open Session will
begin at 7:00 p.m.
By:__________ _______________
Telicia Lopez, CMC
Packet Page. 78
Draft Minutes
FOR THE
SPECIAL MEETING OF THE MAYOR AND CITY COUNCIL
OF THE CITY OF SAN BERNARDINO, MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO
ACTING AS THE SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY, MAYOR AND CITY COUNCIL OF THE CITY
OF SAN BERNARDINO ACTING AS THE SUCCESSOR HOUSING AGENCY TO THE
REDEVELOPMENT AGENCY, MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS THE
HOUSING AUTHORITY, AND MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO
ACTING AS THE SAN BERNARDINO JOINT POWERS FINANCING AUTHORITY
WEDNESDAY, DECEMBER 14, 2022
6:00 PM
The Special Meeting of the Mayor and City Council of the City of San Bernardino was called to
order at 6:00 PM by Mayor John Valdivia on Wednesday December 14, 2022, at Feldheym Central
Library, San Bernardino, CA
Call to Order
Attendee Name Title Status Arrived
Theodore Sanchez Council Member, Ward 1 Present
Sandra Ibarra Council Member, Ward 2 Late 6:04 p.m.
Juan Figueroa Mayor Pro-Tem, Ward 3 Present
Fred Shorett Council Member, Ward 4 Present
Ben Reynoso Council Member, Ward 5 Present
Kimberly Calvin Council Member, Ward 6 Present
Damon L Alexander Council Member, Ward 7 Present
John Valdivia Mayor Present
Robert D. Field City Manager Present
Thomas Rice Assistant City Attorney Present
Genoveva Rocha City Clerk Present
City of San Bernardino
201 North E Street
San Bernardino, CA 92401
http://www.sbcity.org
Mayor John Valdivia
Council Members
Theodore Sanchez
Sandra Ibarra
Juan Figueroa
Fred Shorett
Ben Reynoso
Kimberly Calvin
Damon L. Alexander
Packet Page. 79
Special Closed Session Draft Minutes December 14, 2022
Mayor and City Council of the City of San Bernardino Page 2
6:00 P.M.
CLOSED SESSION PUBLIC COMMENT
Paula Plunk spoke on the need for a city manager to be guided by morality and honesty
and criticized past leadership. She accused the City Council and City Management of
using fear and closed-door tactics and neglecting community welfare.
Treasure Ortiz, criticized the City Council for ignoring warnings, and cited frequent City
Manager turnover as evidence of systemic governance failures. The speaker
emphasized the need for an experienced, qualified City Manager to handle major
projects and urged the City Council to make an objective, experience-based decision for
which they would be fully accountable.
CLOSED SESSION
A) PUBLIC EMPLOYEE APPOINTMENT (Pursuant to Government Code Section
54957)
Acting City Manager; Interim City Manager; City Manager
CLOSED SESSION REPORT
Assistant City Attorney Thomas Rice reported that the Mayor and Council directed staff
to begin the process to find an interim city manager and the process for a permanent city
manager.
ADJOURNMENT
The Special meeting of the Mayor and City Council was adjourned on Wednesday,
December 14, 2022, at 6:36 PM. The Mayor and City Council and the Mayor and City
Council Acting as the Successor Agency to the Redevelopment Agency will adjourn to
the next joint Special Meeting will be held on December 21, 2022, at the Feldheym Central
Library located at 555 West 6th Street, San Bernardino, California 92401. The meeting will
begin at 6:00 p.m.
Telicia Lopez, CMC, City Clerk
Packet Page. 80
City of San Bernardino
201 North E Street
San Bernardino, CA 92401
http://www.sbcity.org
Draft Minutes
FOR THE
SPECIAL MEETING OF THE MAYOR AND CITY COUNCIL
OF THE CITY OF SAN BERNARDINO, MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS
THE SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY, MAYOR AND CITY COUNCIL OF THE CITY OF SAN
BERNARDINO ACTING AS THE SUCCESSOR HOUSING AGENCY TO THE REDEVELOPMENT AGENCY, MAYOR AND
CITY COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS THE HOUSING AUTHORITY, AND MAYOR AND CITY
COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS THE SAN BERNARDINO JOINT POWERS FINANCING
AUTHORITY
TUESDAY, MAY 09, 2023
5:30 PM
The Special Meeting of the Mayor and City Council of the City of San Bernardino was
called to order at 5:35 PM by Mayor Helen Tran on Tuesday, May 9, 2023, at 201 N E
Street 2nd Floor Multipurpose Room San Bernardino, CA 92410.
CALL TO ORDER
Attendee Name Title Status Arrived
Theodore Sanchez Council Member, Ward 1 Present
Sandra Ibarra Council Member, Ward 2 Late 5:57 p.m.
Juan Figueroa Council Member, Ward 3 Present
Fred Shorett Mayor Pro-Tem, Ward 4 Present
Ben Reynoso Council Member, Ward 5 Present
Kimberly Calvin Council Member, Ward 6 Present
Damon L Alexander Council Member, Ward 7 Present
Helen Tran Mayor Present
Charles McNeely Interim City Manager Absent
Sonia Carvalho City Attorney Present
Genoveva Rocha City Clerk Present
Mayor Helen Tran
Council Members
Theodore Sanchez
Sandra Ibarra
Juan Figueroa
Fred Shorett
Ben Reynoso
Kimberly Calvin
Damon L. Alexander
Packet Page. 81
Special Meeting Draft Minutes May 09, 2023
Mayor and City Council of the City of San Bernardino Page 2
5:30 PM
INVOCATION AND PLEDGE OF ALLEGIANCE
Mayor Pro Tem Fred Shorett lead the Pledge of Allegiance to the Flag.
PUBLIC COMMENTS FOR ITEMS LISTED AND NOT LISTED ON THE AGENDA
There were no public comments.
PRESENTATION
1. Workshop: Proposed Budget Fiscal Year 2023/24 Biennial MidCycle Review
Interim City Manager Charles McNeely, Barbara Whitehorn Administrative Services
Manager, and Budget Division Manager Zuyva Ruiz gave a presentation to the Mayor
and City Council. Key points included Revenues and Expenditures, changes in the
budget that have been made to date, forecast, and fund balance status.
The Mayor and City Council discussed the importance of transparency in staffing levels,
vacancies, budgeting, and the need to fill existing positions before creating new ones.
Competitive compensation was recognized as critical to recruitment and retention, along
with the importance of asset stewardship of city-owned properties and conservative
fiscal management supported by strong reserves. The discussion also highlighted the
need for clear reporting and accountability on long-standing projects.
The Mayor and City Council, by consensus, directed staff to provide a snapshot-in-time
report of filled versus vacant positions, complete and present salary competitiveness
studies for hard-to-fill positions, and deliver a comprehensive Capital Improvement
Program (CIP) status report by June 7th. Additionally, staff would clarify the authority
and process for cannabis license extensions, finalize and report the results of the
citywide fee study, and continue evaluating risk management and insurance strategies.
ADJOURNMENT
The Special meeting of the Mayor and City Council was adjourned Tuesday, May 09,
2023, at 6:43 PM. The next joint regular meeting of the Mayor and City Council and the
Mayor and City Council Acting as the Successor Agency to the Redevelopment Agency
will be held on Wednesday, May 17, 2023, at the Feldheym Central Library located at
555 West 6th Street, San Bernardino, California 92401. Closed Session will begin at
5:30 p.m. and Open Session will begin at 7:00 p.m.
By:_________________________
Telicia Lopez, CMC
Packet Page. 82
City of San Bernardino
201 North E Street
San Bernardino, CA 92401
http://www.sbcity.org
Draft Minutes
FOR THE
SPECIAL MEETING OF THE MAYOR AND CITY COUNCIL
OF THE CITY OF SAN BERNARDINO, MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS
THE SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY, MAYOR AND CITY COUNCIL OF THE CITY OF SAN
BERNARDINO ACTING AS THE SUCCESSOR HOUSING AGENCY TO THE REDEVELOPMENT AGENCY, MAYOR AND
CITY COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS THE HOUSING AUTHORITY, AND MAYOR AND CITY
COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS THE SAN BERNARDINO JOINT POWERS FINANCING
AUTHORITY
THURSDAY, MAY 11, 2023 – 12 P.M. TO 5 P.M.
FRIDAY, MAY 12, 2023 – 9 A.M. TO 5 P.M.
SATURDAY, MAY 13, 2023 – 8 A.M. TO 12 P.M.
The Special Meetings of the Mayor and City Council of the City of San Bernardino were called
to order by Mayor Helen Tran at 12:00 PM on Thursday, May 11, 2023, at 9:00 AM on Friday,
May 12, 2023, at 8:00 AM on Saturday, May 13, 2023 at the Orange Show, L'Orange Room,
686 S Arrowhead Avenue Gate 9, San Bernardino, CA 92408.
CALL TO ORDER
Attendee Name Title Status Arrived
Theodore Sanchez Council Member, Ward 1 Present
Sandra Ibarra Council Member, Ward 2 Present
Juan Figueroa Council Member, Ward 3 Present
Fred Shorett Mayor Pro-Tem, Ward 4 Present
Ben Reynoso Council Member, Ward 5 Present
Kimberly Calvin Council Member, Ward 6 Present
Damon L Alexander Council Member, Ward 7 Present
Helen Tran Mayor Present
Charles McNeely Interim City Manager Present
Sonia Carvalho City Attorney Present
Genoveva Rocha City Clerk Present
12:00 PM
INVOCATION AND PLEDGE OF ALLEGIANCE
Mayor Helen Tran
Council Members
Theodore Sanchez
Sandra Ibarra
Juan Figueroa
Fred Shorett
Ben Reynoso
Kimberly Calvin
Damon L. Alexander
Packet Page. 83
Special Meeting Draft Minutes May 11-13, 2023
Mayor and City Council of the City of San Bernardino Page 2
PUBLIC COMMENTS FOR ITEMS LISTED AND NOT LISTED ON THE AGENDA
An unknown speaker commented on the importance of the Mayor and City Council
working in unity to better serve the City of San Bernardino.
DISCUSSION
1. Mayor and City Council Team Building Session
The Mayor, City Council, City Manager, and Facilitator William R. Kelly,
President/CEO of Kelly Associates Management Group, will hold a team building
session. The session will include, but it is not limited to, a discussion of the
Councilmembers’ communication styles; and setting tentative goal definitions and
priorities.
ADJOURNMENT
The meeting of the Mayor and City Council was adjourned on Saturday May 13, 2023 at
an unspecified time.
The next joint special meeting of the Mayor and City Council and the Mayor and City
Council Acting as the Successor Agency to the Redevelopment Agency will be held on
May 17, 2023, at the Feldheym Central Library located at 555 West 6th Street, San
Bernardino, California 92401. Open Session will begin at 5:30 p.m.
By:_________________________
Telicia Lopez, CMC, City Clerk
Packet Page. 84
City of San Bernardino
201 North E Street
San Bernardino, CA 92401
http://www.sbcity.org
Draft Minutes
FOR THE
REGULAR MEETING OF THE MAYOR AND CITY COUNCIL
OF THE CITY OF SAN BERNARDINO, MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS THE
SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY, MAYOR AND CITY COUNCIL OF THE CITY OF SAN
BERNARDINO ACTING AS THE SUCCESSOR HOUSING AGENCY TO THE REDEVELOPMENT AGENCY, MAYOR AND
CITY COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS THE HOUSING AUTHORITY, AND MAYOR AND CITY
COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS THE SAN BERNARDINO JOINT POWERS FINANCING
AUTHORITY
WEDNESDAY, NOVEMBER 19, 2025
4:00 PM
The Regular Meeting of the Mayor and City Council of the City of San Bernardino was
called to order at 4:03 PM by Mayor Helen Tran on Wednesday, November 19, 2025, at
Feldheym Central Library, San Bernardino, CA.
CALL TO ORDER
Attendee Name Title Status Arrived
Theodore Sanchez Council Member, Ward 1 Present
Sandra Ibarra Council Member, Ward 2 Absent
Juan Figueroa Mayor Pro-Tem, Ward 3 Absent
Fred Shorett Council Member, Ward 4 Present
Kim Knaus Council Member, Ward 5 Late 4:10 PM
Mario Flores Council Member, Ward 6 Present
Dr. Treasure Ortiz Council Member, Ward 7 Present
Helen Tran Mayor Present
Eric Levitt City Manager Present
Albert Maldonado Deputy City Attorney Present
Telicia Lopez City Clerk Present
Courtney Bowen Deputy City Clerk Present
Mayor Helen Tran
Council Members
Theodore Sanchez
Sandra Ibarra
Juan Figueroa
Fred Shorett
Kim Knaus
Mario Flores
Dr. Treasure Ortiz
Packet Page. 85
Regular Meeting Draft Minutes November 19, 2025
Mayor and City Council of the City of San Bernardino Page 2
4:00 P.M.
CLOSED SESSION PUBLIC COMMENT
There were no public comments or requests to speak for Closed Session.
Prior to convening to Closed Session, Deputy City Attorney Albert Maldonado stated
that Closed Session Item B) was related to the ongoing case with Mandeville Modular.
CLOSED SESSION
A)CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION
(Pursuant to Government Code Section 54956.9(a) and (d)(1):
i.) Jose Manuel Andrade v. City of San Bernardino, United States District
Court Case 5:24-cv-000582-JWH MBK
ii.) Meritzel Escamilla v. City of San Bernardino, et al. San Bernardino Superior
Court Case No. CIVSB 2500291
B)CONFERENCE WITH LEGAL COUNSEL - Significant Exposure to Litigation
(Pursuant to Government Code Section 54956.9(d)(2)): (2) Cases
5:00 PM
The Regular Meeting of the Mayor and City Council of the City of San Bernardino was
called to order at 5:00 PM by Mayor Helen Tran on Wednesday, November 5, 2025, at
Feldheym Central Library, San Bernardino, CA.
Attendee Name Title Status Arrived
Theodore Sanchez Council Member, Ward 1 Present
Sandra Ibarra Council Member, Ward 2 Absent
Juan Figueroa Mayor Pro-Tem, Ward 3 Absent
Fred Shorett Council Member, Ward 4 Present
Kim Knaus Council Member, Ward 5 Present
Mario Flores Council Member, Ward 6 Present
Dr. Treasure Ortiz Council Member, Ward 7 Present
Helen Tran Mayor Present
Eric Levitt City Manager Present
Albert Maldonado Deputy City Attorney Present
Telicia Lopez City Clerk Present
Perla Lopez Deputy City Clerk Present
INVOCATION AND PLEDGE OF ALLEGIANCE
Pastor Dr. Rich Hall from The Rock Church led the invocation, and Council Member
Flores the Pledge of Allegiance to the Flag.
CLOSED SESSION REPORT
Deputy City Attorney Albert Maldonado stated that the City Council voted unanimously
amongst members present to approve a $250,000 settlement in the matter of Item A)ii).
The motion was made by Council Member Sanchez and Seconded by Council Member
Ortiz.
Packet Page. 86
Regular Meeting Draft Minutes November 19, 2025
Mayor and City Council of the City of San Bernardino Page 3
PRESENTATIONS
1.
The Mayor and City Council presented the proclamation to Elliott’s Pet Emporium
and Laymon Candy Company. “Spine n Shine Nursery” was also recognized,
though they were not present at the meeting.
It is recommended that the Mayor and City Council of the City of San Bernardino,
California,
1. Adopt Resolution No. 2025-352 of the Mayor and City Council of the
City of San Bernardino, California denying Appeal 24-06 of Appeal
24-05, thereby upholding the Planning Commission’s approval of
Appeal 24-05, which restored the deleted conditions of approval 20
(twenty) through 26 (twenty-six) that were redacted within the
Community Development and Housing Departments approval of
Amendment to Conditions of Approval 23-01 for Administrative
Development Permit 22-020; for the property located at 379 E.
Industrial Road on 0.83 acres (APN: 0141-581-03) within the
Industrial Light (IL) zone, Ward 3 (Attachment 1 (A1)).
OR
2. Adopt Resolution No. 2025-353 of the Mayor and City Council of the
City of San Bernardino, California approving Appeal 24-06, thereby
overturning the Planning Commission’s approval of Appeal 24-05,
regarding conditions of approval 20 (twenty) through 26 (twenty-six),
that were redacted through the Community Development and
Housing Departments approval of Amendment to Conditions of
Approval 23-01 originally drafted for Administrative Development
Permit 22-020; for the property located at 379 E. Industrial Road on
0.83 acres (APN: 0141-581-03) within the Industrial Light (IL) zone,
Ward 3 (Attachment 3 (A2)).
Council Member Ortiz noted that it was unfortunate that the parties involved were
unable to come to an agreement since the September 17, 2025 meeting. She stated
that due to the fact that the response to appeal 24-06 was not properly filed within
the 15-day timeframe allowed by the City’s Municipal Code, she would make a
motion to adopt Resolution No. 2025-353, approving Appeal 24-06. The motion was
seconded by Council Member Knaus. Resolution No. 2022-352 would be void.
There was no further discussion regarding the item.
Packet Page. 87
Regular Meeting Draft Minutes November 19, 2025
Mayor and City Council of the City of San Bernardino Page 4
RESULT: ADOPTED RESOLUTION NO. 2025-353 [5-0]
MOVER:Treasure Ortiz, Council Member, Ward 7
SECONDER:Kim Knaus, Council Member, Ward 5
AYES:Sanchez, Shorett, Knaus, Flores, Ortiz
NOES:None
ABSENT:Sandra Ibarra, Juan Figueroa
City Clerk Lopez read the title of the resolution into the record.
CITY MANAGER UPDATE
City Manager Eric Levitt provided updates to the community. Highlights included
Veterans’ Day events, new businesses in the City, the 10-year anniversary of the Garcia
Center for the Arts, and upcoming holiday events.
PUBLIC COMMENTS FOR ITEMS LISTED AND NOT LISTED ON THE AGENDA
Al Palazzo commented about revitalizing the downtown area.
Bernice Altamirano spoke about socioeconomic issues in Ward 2.
Erick Marquez thanked Council Members and announced personal updates.
Jim Smith commented about Veterans Day, the charter review committee, and recognized
Deputy Andrew Nunes, who was recently killed in the line of duty.
Stephanie Liggins asked for Council approval for road reinforcement and curb work.
Scott Olson commented on street improvements and economic development.
Delores Armstead spoke about comments at a previous meeting, the community’s interest,
City Hall, and amenities for large City events.
Keith Benitez spoke in favor of Item No. 17.
Niki Dettman, CEO of the Making Hope Happen Foundation, spoke in favor of Item No. 17.
Ulyzes Benitez commented about efforts to restore youth civic engagement opportunities.
Zazette Scott from the Family Assistance Program spoke about upcoming housing and
employment initiatives.
Maelena Enriques from the Family Assistance Program, spoke in support of Item No. 17.
John Schollenberger commented about public accountability.
Firenza Anderson-Philpot commented on air quality, warehouse impacts, and community
equity.
Joe Salas discussed parking issues in his neighborhood and an upcoming neighborhood
cleanup.
Les commented on election season and political concerns, neighborhood conditions and
the Carousel Mall property.
Packet Page. 88
Regular Meeting Draft Minutes November 19, 2025
Mayor and City Council of the City of San Bernardino Page 5
CONSENT CALENDAR
Items on the Consent Calendar are considered routine and are voted on in a single
motion unless a council or staff member has pulled the item for more discussion.
City Manager Levitt announced that Item No. 6 would be pulled from the agenda and
brought back at the next regular meeting on December 3, 2025.
Fred Shorett, Council Member, Ward 4
Theodore Sanchez, Council Member, Ward 1
Sanchez, Shorett, Knaus, Flores, Ortiz
Sandra Ibarra, Juan Figueroa
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, approve the meeting minutes for the following dates:
1.August 16, 2023 Regular Meeting Draft Minutes
2.October 1, 2025 Regular Meeting Draft Minutes
3.October 15, 2025 Regular Meeting Draft Minutes
Fred Shorett, Council Member, Ward 4
Theodore Sanchez, Council Member, Ward 1
Sanchez, Shorett, Knaus, Flores, Ortiz
Sandra Ibarra, Juan Figueroa
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, adopt Ordinance No. MC-1655 amending Ordinance No. MC-1522 and
levying special taxes to be collected during Fiscal Year 2025-2026 to pay the
annual costs of the maintenance and servicing of landscaping, lighting, streets,
drainage and a reserve fund for capital replacement, and administrative
expenses with respect to City of San Bernardino Community Facilities District
No. 2019-1 (Maintenance Services).
Fred Shorett, Council Member, Ward 4
Theodore Sanchez, Council Member, Ward 1
Sanchez, Shorett, Knaus, Flores, Ortiz
Sandra Ibarra, Juan Figueroa
Packet Page. 89
Regular Meeting Draft Minutes November 19, 2025
Mayor and City Council of the City of San Bernardino Page 6
5.Authorization to Proceed with Street Vacation of a Portion of Parley Ave
(Ward 6)
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, authorize staff to proceed with an investigation and analysis for the
proposed vacation of a portion of Parley Ave.
Fred Shorett, Council Member, Ward 4
Theodore Sanchez, Council Member, Ward 1
Sanchez, Shorett, Knaus, Flores, Ortiz
Sandra Ibarra, Juan Figueroa
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, authorize staff to proceed with an investigation and analysis for the
proposed vacation of a portion of Victoria Ave. also known as San Manuel Blvd.
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, pre-approve travel for elected officials for FY 2025/26 as outlined.
Council Member Knaus pulled this item for further discussion. She originally made a
motion to remove the International Council of Shopping Centers Conference (“ICSC”) and
the International City/County Management Association (“ICMA”) from the Mayor’s travel
approvals. However, after some discussion amongst the Mayor and Council Members, the
motion was amended to only remove the ICMA from approval. The amended motion was
seconded by Council Member Sanchez.
Kim Knaus, Council Member, Ward 5
Theodore Sanchez, Council Member, Ward 1
Sanchez, Shorett, Knaus, Flores, Ortiz
Sandra Ibarra, Juan Figueroa
Packet Page. 90
Regular Meeting Draft Minutes November 19, 2025
Mayor and City Council of the City of San Bernardino Page 7
8.Investment Portfolio Report for September 2025 (All Wards)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, accept and file the Monthly Investment Portfolio Report for September
2025.
Fred Shorett, Council Member, Ward 4
Theodore Sanchez, Council Member, Ward 1
Sanchez, Shorett, Knaus, Flores, Ortiz
Sandra Ibarra, Juan Figueroa
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, receive and file all listed administrative budget transfers from July 1,
2025 through September 30, 2025.
Fred Shorett, Council Member, Ward 4
Theodore Sanchez, Council Member, Ward 1
Sanchez, Shorett, Knaus, Flores, Ortiz
Sandra Ibarra, Juan Figueroa
It is recommended that the Mayor and City Council of the City of San Bernardino,
California approve the commercial, payroll disbursements and purchasing card
transactions for September 2025.
Fred Shorett, Council Member, Ward 4
Theodore Sanchez, Council Member, Ward 1
Sanchez, Shorett, Knaus, Flores, Ortiz
Sandra Ibarra, Juan Figueroa
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, approve the City’s health benefit plans for plan year 2026 and authorize
the City Manager to execute any agreements necessary to effectuate the medical,
dental, vision, life, short and long-term disability, and other ancillary and voluntary
plans that the City offers as part of its benefits package to employees.
Packet Page. 91
Regular Meeting Draft Minutes November 19, 2025
Mayor and City Council of the City of San Bernardino Page 8
RESULT: APPROVED STAFF’S RECOMMENDATION [5-0]
MOVER:Fred Shorett, Council Member, Ward 4
SECONDER:Theodore Sanchez, Council Member, Ward 1
AYES:Sanchez, Shorett, Knaus, Flores, Ortiz
NOES:Sandra Ibarra, Juan Figueroa
12.Security Alarm Program – Fee Exemptions and Master Fee Schedule
Update (All Wards)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, adopt Resolution No. 2025-390 to:
1. Exempt all City-owned or operated buildings and departments from
annual security alarm system permit fees, while maintaining
compliance with registration and other ordinance requirements; and
2. Amend the City’s Master Fee Schedule to provide written eligibility
criteria for the low-income resident security alarm system permit fee.
RESULT: ADOPTED RESOLUTION NO. 2025-390 [5-0]
MOVER:Fred Shorett, Council Member, Ward 4
SECONDER:Theodore Sanchez, Council Member, Ward 1
AYES:Sanchez, Shorett, Knaus, Flores, Ortiz
ABSENT:Sandra Ibarra, Juan Figueroa
13.Approval Amendment No. 1 to the Agreements with Espinoza Electric, dba
Quality Electric and Horizon Lighting for Street Light Maintenance and
Related Services (All Wards)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Approve Amendment No. 1 to the Maintenance Services
Agreement with Espinoza Electric dba Quality Light & Electrical, Inc. to
increase the not-to-exceed amount from $750,000.00 to $3,750,000.00
and clarify that the total contract value reflects the cumulative amount
for the full five-year term, including the initial term and all option
years, in accordance with the compensation provisions of the
Original Agreement.
2. Approve Amendment No. 1 to the Maintenance Services Agreement
with Horizon Lighting to increase the not-to-exceed amount from
$750,000.00 to $3,750,000.00 and clarify that the total contract value
reflects the cumulative amount for the full five-year term, including the
initial term and all option years, in accordance with the compensation
provisions of the Original Agreement.
3. Authorize the City Manager to execute all related documents
necessary to effectuate these amendments.
Packet Page. 92
Regular Meeting Draft Minutes November 19, 2025
Mayor and City Council of the City of San Bernardino Page 9
RESULT: APPROVED STAFF’S RECOMMENDATION [5-0]
MOVER:Fred Shorett, Council Member, Ward 4
SECONDER:Theodore Sanchez, Council Member, Ward 1
AYES:Sanchez, Shorett, Knaus, Flores, Ortiz
ABSENT:Sandra Ibarra, Juan Figueroa
14.Approve Amendment No. 1 to the Maintenance Services Agreement with
Yunex LLC for Traffic Signal Intersection On-Call and Emergency Repair
Services (All Wards)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Approve Amendment No. 1 to the Maintenance Services Agreement
with Yunex LLC to extend the term of the agreement from June 30,
2025, to June 30, 2026; and increase the not-to-exceed amount
from $600,000 to $3,000,000 and clarify that the total contract value
reflects the cumulative amount for the full term, including the initial
term and all option years, in accordance with the compensation
provisions of the Original Agreement; and
2. Authorize the City Manager to execute all related documents
necessary to effectuate these amendments.
RESULT: APPROVED STAFF’S RECOMMENDATION [5-0]
MOVER:Fred Shorett, Council Member, Ward 4
SECONDER:Theodore Sanchez, Council Member, Ward 1
AYES:Sanchez, Shorett, Knaus, Flores, Ortiz
ABSENT:Sandra Ibarra, Juan Figueroa
15. Approving Amendment No. 3 to Cooperative Agreement No. 22-1002720
with the San Bernardino County Transportation Authority (SBCTA) in the
amount of $65,382, for the State Route 210/ Waterman Avenue Interchange
Project (Ward 7)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, adopt Resolution No. 2025-391:
1. Authorizing the Director of Finance and Management Services to
amend the State Route 210/Waterman Avenue Interchange
Project budget and the Fiscal Year 2025/26 Capital Improvement
Program (CIP) budget in the amount of $65,382. from the Measure
I Fund, for a total not-to exceed amount of $2,014,316 and;
2. Authorizing the City Manager to execute Amendment No. 3 to
Cooperative Agreement No. 22-1002720 with the San Bernardino
County Transportation Authority (SBCTA) for the State Route
Packet Page. 93
Regular Meeting Draft Minutes November 19, 2025
Mayor and City Council of the City of San Bernardino Page 10
210/Waterman Avenue Interchange Project, increasing the City’s
not-to-exceed contribution by $65,382 for a total not-to-exceed
amount of $2,014,316 and;
3. Authorize the City Manager or designee to expend the contingency
fund in the amount of $12,776, if necessary, to complete the
project.
RESULT: ADOPTED RESOLUTION NO. 2025-391 [5-0]
MOVER:Fred Shorett, Council Member, Ward 4
SECONDER:Theodore Sanchez, Council Member, Ward 1
AYES:Sanchez, Shorett, Knaus, Flores, Ortiz
ABSENT:Sandra Ibarra, Juan Figueroa
DISCUSSION
16. Adopt Resolution Imposing Liens on Certain Real Property to Recover
Costs for Code Enforcement Abatements (All Wards)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, adopt Resolution No. 2025-392, imposing liens on certain real property
located within the City of San Bernardino for the costs of public nuisance
abatements.
The Mayor and City Council declined to hear staff’s presentation and discussion.
RESULT: ADOPTED RESOLUTION NO. 2025-392 [5-0]
MOVER:Fred Shorett, Council Member, Ward 4
SECONDER:Theodore Sanchez, Council Member, Ward 1
AYES:Sanchez, Shorett, Knaus, Flores, Ortiz
ABSENT:Sandra Ibarra, Juan Figueroa
ITEMS TO BE CONSIDERED FOR FUTURE MEETINGS
17.Discuss the Selection of City Council Members to the Bridge Committee; a
Partnership Established Between the City and the San Bernardino City
Unified School District Focused on Improving Student Outcomes by
Fostering Collaboration Between Schools, Families and Community
Partners, and Re-establishing the City’s Youth Civic Engagement Council
(All Wards)(Council Member – Ortiz)
RESULT: APPROVED TO BE CONSIDERED AT A FUTURE MEETING [5-0]
MOVER:Fred Shorett, Council Member, Ward 4
SECONDER:Theodore Sanchez, Council Member, Ward 1
AYES:Sanchez, Shorett, Knaus, Flores, Ortiz
ABSENT:Sandra Ibarra, Juan Figueroa
Packet Page. 94
Regular Meeting Draft Minutes November 19, 2025
Mayor and City Council of the City of San Bernardino Page 11
MAYOR & CITY COUNCIL UPDATES/REPORTS ON CONFERENCES & MEETINGS
At this time, the Mayor and City Council provided updates to the community. Highlights
included upcoming Thanksgiving Day events, neighborhood association meetings, and
recognition of “No Shave November” to raise awareness for men’s cancers.
It was noted that Council Members Sandra Ibarra and Juan Figueroa were absent from
the meeting due to their attendance at the National League of Cities City Summit
Conference in Salt Lake City, Utah.
The meeting of the Mayor and City Council was adjourned on Wednesday, November
19, 2025 at 6:29 p.m. The meeting was closed in memory of Jesus Rios, and Assembly
Member James Ramos’ mother Rowena Ramos.
The next joint regular meeting of the Mayor and City Council and the Mayor and City
Council Acting as the Successor Agency to the Redevelopment Agency will be held on
December 3, 2025, at the Feldheym Central Library located at 555 West 6th Street, San
Bernardino, California 92410. Closed Session will begin at 4:00 PM and Open Session
will begin at 5:00 PM.
______
Telicia Lopez, CMC
City Clerk
Packet Page. 95
City of San Bernardino
201 North E Street
San Bernardino, CA 92401
http://www.sbcity.org
Theodore Sanchez
Sandra Ibarra
Juan Figueroa
Fred Shorett
Kim Knaus
Mario Flores
Dr. Treasure Ortiz
Draft Minutes
FOR THE
SPECIAL MEETING OF THE MAYOR AND CITY COUNCIL
OF THE CITY OF SAN BERNARDINO, MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS
THE SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY, MAYOR AND CITY COUNCIL OF THE CITY OF SAN
BERNARDINO ACTING AS THE SUCCESSOR HOUSING AGENCY TO THE REDEVELOPMENT AGENCY, MAYOR AND
CITY COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS THE HOUSING AUTHORITY, AND MAYOR AND CITY
COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS THE SAN BERNARDINO JOINT POWERS FINANCING
AUTHORITY
WEDNESDAY, DECEMBER 3, 2025
3:30 PM
The Special Meeting of the Mayor and City Council of the City of San Bernardino was
called to order at 3:33 p.m. by Mayor Helen Tran on Wednesday, December 3, 2025, at
Feldheym Central Library, San Bernardino, CA.
CALL TO ORDER
Attendee Name Title Status Arrived
Packet Page. 96
Special Meeting Draft Minutes December 3, 2025
Mayor and City Council of the City of San Bernardino Page 2
3:30 P.M.
PUBLIC COMMENTS FOR ITEMS LISTED ON THE SPECIAL MEETING AGENDA
John Shollenberger opposed the removal of Suarez, stating it was unwarranted and a
misuse of taxpayer resources.
Dolores Armstead opposed removing Commissioner Victor Suarez, stating there is no
evidence of misconduct and that the action appears retaliatory.
Victor Suarez stated he is committed to ethical public service and said his comments
addressed alleged harassment and retaliation affecting his duties.
Tim Prince urged the Council not to remove the commissioner, citing First Amendment
protections, and called on Council Members to focus on city issues rather than political
conflicts.
Christian Shaughnessy criticized the Council for prioritizing Commissioner Suarez’s
removal over urgent community issues.
Kim Calvin condemned the Council for prioritizing Suarez’s removal over pressing city
issues.
Jim Smith, chairman of the Historical Preservation Commission, urged the Council to
keep Victor Suarez on the commission.
Ronald Donis, Parks, Recreation, and Community Services Commission chair, criticized
the special meeting as a misuse of resources, and a violation of Commissioner
Suarez’s.
City Clerk Telicia Lopez advised that written comments were also received and
would be available on the City’s website for public review.
Packet Page. 97
Special Meeting Draft Minutes December 3, 2025
Mayor and City Council of the City of San Bernardino Page 3
APPOINTMENT
1) Arts and Historical Preservation Commission Removal of Victor Suarez (7th
Ward)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, discuss and take possible action to remove Victor Suarez from the Arts
and Historical Preservation Commission representing Ward 7.
Council Members discussed the proposed removal of Victor Suarez from the Arts and
Historic Preservation Commission. Deputy City Attorney Maldonado clarified that
commissioners serve at the pleasure of the Mayor and City Council; removal may be
made with or without cause; and such action does not violate First Amendment rights.
Council Member Ortiz opposed the removal, stating that Commissioner Suarez had not
violated the commission's bylaws, that his comments at a prior meeting were accurate,
and that removal would diminish Seventh Ward representation. Council Member Ibarra
supported removal, asserting that Commissioner Suarez used his commissioner title to
make unprofessional and potentially slanderous public comments regarding city staff,
raising concerns about liability. Other Council Members requested evidence of
misconduct, noting the distinction between comments made as a commissioner and as
a private resident. Council Member Ortiz read Commissioner Suarez's comment.
Council Member Ibarra made a motion for the removal of Commissioner Suarez, and
Council Member Knaus seconded the motion.
RESULT: MOTION FAILED TO REMOVE ARTS AND HISTORICAL
PRESERVATION COMMISSIONER VICTOR SUAREZ [4-4]
MOVER: Sandra Ibarra, Council Member, Ward 2
SECONDER: Kim Knaus, Council Member, Ward 5
AYES: Sanchez, Ibarra, Shorett, Knaus
NOES: Figueroa, Flores, Ortiz, Mayor Tran
ADJOURNMENT
The meeting of the Mayor and City Council was adjourned on Wednesday, December 3,
2025, at 4:30 p.m. The next joint special meeting of the Mayor and City Council and the
Mayor and City Council Acting as the Successor Agency to the Redevelopment Agency
will be held on December 3, 2025, at the Feldheym Central Library located at 555 West
6th Street, San Bernardino, California 92410. Closed Session will begin at 4:00 p.m. and
Open Session will begin at 5:00 p.m.
Telicia Lopez, CMC, City Clerk
Packet Page. 98
City of San Bernardino
201 North E Street
San Bernardino, CA 92401
http://www.sbcity.org
Theodore Sanchez
Sandra Ibarra
Juan Figueroa
Fred Shorett
Kim Knaus
Mario Flores
Dr. Treasure Ortiz
Draft Minutes
FOR THE
SPECIAL MEETING OF THE MAYOR AND CITY COUNCIL
OF THE CITY OF SAN BERNARDINO, MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS
THE SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY, MAYOR AND CITY COUNCIL OF THE CITY OF SAN
BERNARDINO ACTING AS THE SUCCESSOR HOUSING AGENCY TO THE REDEVELOPMENT AGENCY, MAYOR AND
CITY COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS THE HOUSING AUTHORITY, AND MAYOR AND CITY
COUNCIL OF THE CITY OF SAN BERNARDINO ACTING AS THE SAN BERNARDINO JOINT POWERS FINANCING
AUTHORITY
WEDNESDAY, DECEMBER 10, 2025
4:00 PM
The Special Meeting of the Mayor and City Council of the City of San Bernardino was
called to order at 4:00 p.m. by Mayor Helen Tran on Wednesday, December 10, 2025,
at Feldheym Central Library, San Bernardino, CA.
CALL TO ORDER
Attendee Name Title Status Arrived
Packet Page. 99
Special Meeting Draft Minutes December 10, 2025
Mayor and City Council of the City of San Bernardino Page 2
4:00 P.M.
PLEDGE OF ALLEGIANCE
Mayor Pro-Tem Figueroa led the Pledge of Allegiance to the Flag.
PUBLIC COMMENTS – NO PUBLIC COMMENTS BE ACCEPTED
The Public Hearing was opened and closed on December 3, 2025; no further comments
would be accepted regarding this item.
PUBLIC HEARING
1. Continuation of General Plan Amendment 25-03 from December 3, 2025,
Mayor and City Council Meeting (Public Hearing Closed)(All Wards)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino:
1. Adopt Resolution No. 2025-393 of the Mayor and City Council of the City
of San Bernardino, California, adopting a Categorical Exemption under
the California Environmental Quality Act Section 15301(c), and approving
General Plan Amendment 25-03 to amend the Circulation Element to add
Citywide Truck Routes Option A pursuant to Assembly Bill 98 (AB 98),
(Attachment 1A).
OR
2. Adopt Resolution No. 2025-394 of the Mayor and City Council of the City
of San Bernardino, California, adopting a Categorical Exemption under
the California Environmental Quality Act Section 15301(c), and approving
General Plan Amendment 25-03 to amend the Circulation Element to add
Citywide Truck Routes Option B pursuant to Assembly Bill 98 (AB 98),
(Attachment 1B);
Director of Community Development and Housing, Gabriel Elliott, and Deputy
Director/City Engineer, Azzam Jabsheh, presented the Mayor and City Council with the
updated map. They presented a revised General Plan amendment and truck route
ordinance, incorporating the City Council’s prior direction by removing and adjusting
designated truck routes on the map. The updated maps were reviewed to confirm
changes based on council and community input, with staff noting coordination with the
Police Department’s commercial unit.
Council discussed revisions to the proposed truck route map, focusing on connectivity
with neighboring jurisdictions, weight-restricted routes, and potential impacts to
residential areas, schools, and traffic safety.
Council Member Sanchez made a motion to approve the staff recommendation and
amend the map by removing a designated truck route segment on Tippecanoe Avenue
between the 10 Freeway and San Bernardino Avenue. Council Member Shorett
seconded the motion.
Packet Page. 100
Special Meeting Draft Minutes December 10, 2025
Mayor and City Council of the City of San Bernardino Page 3
RESULT: ADOPTED RESOLUTION NO. 2025-394 AND AMENDED THE MAP
BY REMOVING A DESIGNATED TRUCK ROUTE SEGMENT ON
TIPPECANOE AVENUE BETWEEN THE 10 FREEWAY AND SAN
BERNARDINO AVENUE [7-0]
MOVER: Theodore Sanchez, Council Member, Ward 1
SECONDER: Fred Shorett, Council Member, Ward 4
AYES: Sanchez, Ibarra, Figueroa, Shorett, Knaus, Flores, Ortiz
NOES: None
ADJOURNMENT
The meeting of the Mayor and City Council was adjourned on Wednesday, December
10, 2025, at 4:40 p.m. The next joint special meeting of the Mayor and City Council and
the Mayor and City Council Acting as the Successor Agency to the Redevelopment
Agency will be held on December 17, 2025, at the Feldheym Central Library located at
555 West 6th Street, San Bernardino, California 92410. Closed Session will begin at
4:00 p.m. and Open Session will begin at 5:00 p.m.
Telicia Lopez, CMC, City Clerk
Packet Page. 101
3
1
3
0
CONSENT CALENDAR
January 21, 2026
Honorable Mayor and City Council Members
C. Jeannie Fortune, Interim Director of Finance and Management
Services
Finance & Management Services
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, receive and file this report providing an update on American Rescue Plan
Act (ARPA)-funded expenditures as of September 30, 2025.
No Comment.
The City of San Bernardino was awarded $77,656,407 in American Rescue Plan Act
(ARPA) funds, distributed in two tranches—half received in May 2021 and the
remaining half in May 2022. This staff report provides an update on projects funded
through the ARPA allocation and details expenditures totaling $51.3M as of September
30, 2025, and reported to Treasury on October 31, 2025.
The U.S. Treasury required ARPA funds to be obligated by December 31, 2024, and
fully expended by December 31, 2026. To date, Mayor and City Council have obligated
the total $77,656,407 in ARPA funds prior to the obligation deadline. Projects funded
by ARPA align with Treasury issued final rules for allowable investments within the
Enumerated Use Categories as well as expenditures within the revenue loss (standard
allowance) category.
This is a routine update for the ARPA quarterly reporting period of July 1, 2025 –
September 30, 2025. ARPA funded projects are in various stages to completion with
one (1) project completed this quarter. The Guadalupe Fields project was completed
with a ribbon cutting ceremony on August 26, 2025, to commemorate the
Packet Page. 102
3
1
3
0
occasion. The 2.25-acre park received improvements to the baseball fields with new
turf, a new infield surface, scoreboard and fencing. This project was made possible
with ARPA funding from both the City ($863,851) and San Bernardino County
($995,000).
ARPA fund expenditures as of September 30, 2025, total $51.3M, approximately 66%
of the total award of $77.6m. Additional details and listing by project are provided in
Attachment 1 along with projected project completion dates.
2021-2025 Strategic Targets and Goals
Investments in the community using the American Rescue Plan funds support Key
Strategic Goal 2b Focused, Aligned Leadership and Unified Community - Evaluate
operations and performance, investment in resources, technology, and tools to
continually improve organizational efficiency and effectiveness; and Goal 3. Improved
Quality of Life.
Fiscal Impact
There is no General Fund impact associated with approval of this item.
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, receive and file this report providing an update on American Rescue Plan
Act (ARPA)-funded expenditures as of September 30, 2025, and reported to Treasury
on October 31, 2025.
Attachments
Attachment 1 American Rescue Plan (ARPA) Allocation an Expenditure Update
1.26
Ward:
All Wards
Synopsis of Previous Council Actions:
October 3, 2025 Mayor and City Council received and filed an ARPA Allocation
and Expenditure Update.
May 21, 2025 Mayor and City Council received and filed an ARPA Allocation
and Expenditure Update.
January 18, 2025 Mayor and City Council received and filed an ARPA Allocation
and Expenditure Update.
December 18, 2024 Mayor and City Council received an update on ARPA funding
and approved the final allocation of $129,948 in additional
ARPA funds to the Asphalt Maintenance and Street Segment
Repair Project.
Packet Page. 103
3
1
3
0
December 4, 2024 Mayor and City Council approved staff’s recommendation to
reallocate $2,955,215 for the Asphalt Maintenance and Street
Segment Repair Project and $2,650,000 towards the
purchase of Palm Field.
October 2, 2024 Mayor and City Council received an update on ARPA funding
and projects and approved staff recommendations for
unallocated or project surplus and staff direction on
reallocation of funds. New Projects presented for approval
were the Police Real Time Information Center in the amount
of $2,497,500. Economic Development Software Program in
the amount of $ 129,948, and the Library Animaker Space in
the amount of $1,797,174.
September 18, 2024 Mayor and City Council received an update on ARPA funding
and projects and provided staff direction on any unassigned
ARPA funds.
June 5, 2024 Mayor and City Council approved $863,851 in ARPA funds for
the Guadalupe Field at Sal Saavedra Park Revitalization
Project.
April 17, 2024 Mayor and City Council approved $655,000 in ARPA funds for
the Encanto Community Center.
September 6, 2023 Mayor and City Council approved $5,145,000 in ARPA funds
for “Hero Pay” to city and water department employees.
August 16, 2023 Mayor and City Council approved $500,000 in ARPA funds
related to various nuisance and property abatement costs.
July 19, 2023 Mayor and City Council received and filed an update on ARPA
funds and adopted Resolution No. 2023-107 assigning
$10,000,000 in American Rescue Plan Act funds for the
replacement of the City’s Enterprise Resource Planning
System and amending the FY 2022/23-2024/24 Biennial
Budget by $10,000,000.
May 17, 2023 Mayor and City Council reallocated unspent funding from the
ASU Temporary Housing and the full allocation from the San
Bernardino Valley College for a total of $973,500 for interim
housing during development of the SB Hope Campus.
December 7, 2022 Mayor and City Council Adopted Resolution No. 2022- 26
Amending the FY 2021/22 Operating and Capital Budget
allocating $24,650,000 in ARPA funds.
Packet Page. 104
3
1
3
0
February 2, 2022 Mayor and City Council Adopted Resolution No. 2022- 26
Amending the FY 2021/22 Operating and Capital Budget
allocating $24,050,000 in ARPA funds
October 20, 2021 Mayor and City Council Adopted Resolution No. 2021- 247
Amending the FY 2021/22 Operating and Capital Budget
allocating $8,160,000 in ARPA funds.
August 4, 2021 Mayor and City Council received a report and discussed the
categories for spending the City’s American Rescue Plan
Allocation.
March 17, 2021 Mayor and City Council received a presentation on the
American Rescue Plan from Congressman Pete Aguilar.
CC: Eric Levitt, City Manager
Packet Page. 105
Department
Number Contractor/
Subrecipient
Interagency
Agreement
as of
06/30/2025
Contractor/
Subrecipient
Interagency
Agreement
as of
09/30/2025
Remaining
as of
Economic Development 8930 1 Small Business Non-Profit Assistance 3,126,300 3,126,300 - 3,126,300 3,126,300 3,126,300 - 3,126,300 - Completed
Economic Development 8931 2 1,873,700 1,873,700 - 1,873,700 1,873,700 1,873,700 - 1,873,700 - Completed
Economic Development 9073 3 Façade Improvements (Paintbrush Program)1,000,000 - 1,000,000 - 1,000,000 - 1,000,000 30,877 969,123 Will be completed by Jun-2026
Parks & Recreation 8928 4 Seccombe Park Renovations 12,792,332 12,769,611 22,721 3,991,021 12,792,332 12,769,611 22,721 5,323,377 7,468,955 Will be completed by Dec-2026
Parks & Recreation 8745 5 Nicholson Park 7,080,602 7,080,602 - 6,541,819 7,080,602 7,080,602 - 6,541,819 538,783 Will be completed by Dec-2026
Parks & Recreation 8870 6
Parks & Recreation 8929 7
Parks & Recreation 9055 8
City Services 8920 9
City Services 0150 10
City Services 9076 11
City Services 9078 12
Water Infrastructure 8921 14
Homelessness Initiatives 8981 15 5,000,000 5,000,000 - 462,901 5,000,000 5,000,000 - 590,020 4,409,981 Will be completed by Dec-2026
Homelessness Initiatives 9034 16
Homelessness Initiatives 8985 17
Homelessness Initiatives 8983 18
Homelessness Initiatives 8984 19
Homelessness Initiatives 8986 20
Homelessness Initiatives 0158 21 500,000 500,000 - 462,408 500,000 500,000 - 462,408 37,592 Will be completed by Mar-2026
Homelessness Initiatives 9100 22 2,650,000 - 2,650,000 2,650,000 2,650,000 - 2,650,000 2,650,000 - Completed
IT Infrastructure 8934 23 6,670,052 6,181,397 488,655 6,401,294 6,670,052 6,181,397 488,655 6,346,952 323,100 Will be completed by Dec-2026
IT Infrastructure 8934 24 3,200,000 3,200,000 - 2,458,026 3,200,000 3,200,000 - 2,680,462 519,538 Will be completed by Dec-2026
Economic Development 9077 25 129,948 129,948 - 67,121 129,948 129,948 - 129,948 -Completed
Staff Salaries 0053 26
GRAND TOTAL 77,656,407 71,575,177 6,081,230 49,445,460 77,656,407 71,575,177 6,081,230 51,333,399 26,323,008
American Rescue Plan Act Fund Status
Revised Obligations Revised Obligations
Packet Page. 106
3
1
2
6
CONSENT CALENDAR
January 21, 2026
Honorable Mayor and City Council Members
C. Jeannie Fortune, Interim Director of Finance and Management
Services
Finance & Management Services
It is recommended that the Mayor and City Council of the City of San Bernardino,
California approve the commercial, payroll disbursements and purchasing card
transactions for October 2025.
No Comments
This action is to approve the commercial and payroll disbursements. This is regular
business of the Mayor and City Council ensuring that the City pays vendors,
employees, and the retirement system timely, accurately and with full transparency for
the community.
Completed commercial and payroll disbursement registers are submitted to the Mayor
and City Council for approval. This happens on a regular basis, typically every meeting
for the most recently completed disbursement registers.
The detailed warrant registers are available on the City Website and are updated
weekly by the Finance Department. The registers may be accessed by copying the
following link into an internet browser:
https://www.sanbernardino.gov/DocumentCenter/Index/1081
Packet Page. 107
3
1
2
6
2021-2025 Strategic Targets and Goals
Approval of the noted check and EFT registers for commercial and payroll
disbursements align with Key Target No. 1: Improved Operational & Financial Capacity
by creating a framework for spending decisions.
Fiscal Impact
Amounts noted in the disbursement registers have no further fiscal impact. Amounts
were paid consistent with existing budget authorization and no further budgetary impact
is required.
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino
approve the commercial and payroll disbursements for October 2025.
Attachments
Attachment 1 Payroll Summary Report for October 2025
Attachment 2 Commercial checks & Payroll Register #20
Attachment 3 Commercial checks & Payroll Register #21
Attachment 4 Commercial checks & Payroll Register #22
Attachment 5 Commercial checks & Payroll Register #23
Attachment 6 Commercial checks & Payroll Register #24
Attachment 7 Commercial EFT Registers #1889-1896
Gross Payroll
Bi-Weekly for Oct 12, 2025 $3,714,413.81
Bi-Weekly for Oct 26, 2025 $3,604,150.89
Monthly for October, 2025 $28,839.37
Total Payroll Demands: $7,347,404.07
The following check registers are being presented for approval:
October 2, 2025 2025/26 (Register #20)$1,165,975.41
October 9, 2025 2025/26 (Register #21)$1,698,991.10
October 16, 2025 2025/26 (Register #22)$6,303,092.07
October 23, 2025 2025/26 (Register #23)$2,659,228.17
October 30, 2025 2025/26 (Register #24)$6,091,788.66
Total commercial check demands:$17,919,075.41
The following Electronic Funds Transfer (EFT) registers presented for approval:
Sept 25, 2025-Sept 30, 2025 2025/26 (Register #1889-1896)$2,497,247.82
Total commercial EFT demands:$2,497,247.82
Purchasing Card Charges:
October 2025 $71,990.00
Total Purchasing Card Charges:$71,990.00
Packet Page. 108
3
1
2
6
Attachment 8 PCard Charges for October 2025
Ward:
All Wards
Synopsis of Previous Council Actions:
N/A
CC: Eric Levitt, City Manager
Packet Page. 109
------------------
10/23/2025
Packet Page. 110
Packet Page. 111
Packet Page. 112
Fund 001 - General 700,674.51$
Fund 008 - American Rescue Plan Fund 10,000.00$
Fund 107 - Cable Television Fund 8,539.56$
Fund 108 - Asset Forfeiture FED DOJ 225.00$
Fund 111 - AB2766 air quality 50.00$
Fund 119 - Community Developmnt Block Grant 7,022.75$
Fund 123 - Federal Grant Programs 2,426.66$
Fund 124 - Animal control 13,515.57$
Fund 126 - Gas Tax Fund 395.87$
Fund 127 - Low Mod Housing Fund 1,500.00$
Fund 130 - State And Other Grant Programs 12,394.98$
Fund 527 - Integrated waste management 88,116.07$
Fund 629 - Liability insurance fund 750.00$
Fund 635 - Fleet services fund 259,291.12$
Fund 679 - Information technology 56,068.40$
Fund 784 - Payroll Clearing Fund 5,004.92$
$1,165,975.41
City of San Bernardino
Accounts Payable Warrant Register
Summary by Fund
Register #20 October 2, 2025
Packet Page. 113
Bank Account:City Commercial - City Commercial - A/P, P/R taxes
Check 10/02/2025 922043 Accounts Payable A & G TOWING 524.16
Invoice Date Description Check Sort Code Amount.
9182025 09/18/2025 TOWING FEES- CASE #2025-109608 524.16
Check 10/02/2025 922044 Accounts Payable ONSITE COMPUTING INC 3,877.50
Invoice Date Description Check Sort Code Amount.
54004447 08/07/2025 ERP Data Conversion Project 07/01/2025 to 07/31/2025 3,877.50
Check 10/02/2025 922045 Accounts Payable EDITH ACOSTA 55.00
Invoice Date Description Check Sort Code Amount.
9825 09/08/2025 REFUND OF YOUTH VOLLEYBALL FEES 55.00
Check 10/02/2025 922046 Accounts Payable ACRISURE MID ATLANTIC XS
PROGRAM
2,742.03
Invoice Date Description Check Sort Code Amount.
12390 03/24/2025 ANNUAL LIABILITY INSURANCE FOR SCP 7/1/25 TO 6/30/2026 714.38
12393 03/24/2025 RSVP LIABILITY INSURANCE FOR VOLUNTEERS 2,027.65
Check 10/02/2025 922047 Accounts Payable AFFORDABLE FUNERAL SUPPLY LLC 112.38
Invoice Date Description Check Sort Code Amount.
99767 08/14/2025 STRAPS FOR BURIALS 112.38
Check 10/02/2025 922048 Accounts Payable ALAN R SIMS 6,800.00
Invoice Date Description Check Sort Code Amount.
9242025 09/24/2025 SLA APPRAIL REPORTS FOR REAL PROPERTY 6,800.00
Check 10/02/2025 922049 Accounts Payable AMAZON CAPITAL SERVICES 6,669.62
Invoice Date Description Check Sort Code Amount.
1GPG16GMDKYG 08/27/2025 PANGCH BIRD SPIKES 20.65
11WDFTLN6QG1 09/16/2025 BENCHMARK GRINDER CUT OFF 35.29
19NPXRF934K6 09/18/2025 ECON SEPTEMBER 2025 AMAZON ORDER 841.24
19LFHGL61F79 09/18/2025 CM OFFICE SUPPLIES 105.38
16VXD6HF9KTV 09/10/2025 PLAN FOR ELECTRONIC PURCHASE 87.98
1MXM1LTW9R3P 09/18/2025 PICTURE FRAME SET OF 9 345.62
1PWRRLPLKLFL 09/09/2025 ITEMS FOR INTERGENERATIONAL 435.68
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/02/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 1 of 16 10/2/2025 12:56:00 PM
Packet Page. 114
11KQYPTV3JPC 08/07/2025 FY25/26 CD&H Office Supplies Invoice 2,150.32
19VYXPJJGHDJ 09/29/2025 STORESMART FLASHDRIVE ZIPPER CASE 50PK 115.55
1FL77XV1D1JX 09/23/2025 WANTEK CORDED TELEPHONE HEADSET 28.17
1DGH9CFY3WPX 09/29/2025 TAPE STRIPS, WALL FILE, MAGNETS, PENS, PUSH PINS, CLOCK
SIGN
153.06
1RF3314PHCVV 09/22/2025 FLASH DRIVES 638.40
1WC3XQFW31YH 09/24/2025 WEATHER GUARD TOOL BOX 1,398.93
1VNXNJQP7N6W 09/23/2025 PHONE CASE, LIGHTS WINDSHIELD, KNIPEX, SLICING WIRE, LIGHTS
BAR
313.35
Check 10/02/2025 922050 Accounts Payable ROXANNA ANGEL 626.74
Invoice Date Description Check Sort Code Amount.
9302025 09/30/2025 ROXANNA ANGEL-2025 ADMIN PROFESSIONALS CONFERENCE 626.74
Check 10/02/2025 922051 Accounts Payable APOLLO MADRIGAL 66.96
Invoice Date Description Check Sort Code Amount.
932025 09/03/2025 TOTAL MEAL EXPENSES 66.96
Check 10/02/2025 922052 Accounts Payable ARROWHEAD POOL SERVICE & REPAIR
INC
150.00
Invoice Date Description Check Sort Code Amount.
91061 09/30/2025 SEPTEMBER 25 FOUNTAIN MAINTENANCE 150.00
Check 10/02/2025 922053 Accounts Payable AT & T 400.00
Invoice Date Description Check Sort Code Amount.
581304 08/25/2025 8/19/25-8/22/25 GPS SERVICES 225.00
583515 09/04/2025 9/3/25 GPS SERVICES 175.00
Check 10/02/2025 922054 Accounts Payable ATKINSON ANDELSON LOYA RUUD &
ROMO
6,582.50
Invoice Date Description Check Sort Code Amount.
759176 07/31/2025 INVESTIGATIVE SERVICES 5,137.50
759160 07/31/2025 INVESTIGATIVE SERVICES 1,020.00
759169 07/31/2025 INVESTIGATIVE SERVICES 425.00
Check 10/02/2025 922055 Accounts Payable AXON ENTERPRISE INC 26,098.84
Invoice Date Description Check Sort Code Amount.
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/02/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 2 of 16 10/2/2025 12:56:00 PM
Packet Page. 115
237721 03/26/2024 25 PRO LICENCES BUNDLE 6,366.20
277519 09/01/2024 10 PRO LICENSE BUNDLES 5,171.63
277223 09/01/2024 25 PRO LICENSE BUNDLES 12,242.70
237792 03/26/2024 10 PRO LICENSE BUNDLES 2,318.31
Check 10/02/2025 922056 Accounts Payable B & H PHOTO VIDEO 19.56
Invoice Date Description Check Sort Code Amount.
237601263 09/22/2025 HDMI TO VGA VIDEO CONVERTER 19.56
Check 10/02/2025 922057 Accounts Payable BURRTEC WASTE INDUSTRIES INC 581.02
Invoice Date Description Check Sort Code Amount.
4320697770 08/31/2025 CA THEATRE REFUSE AUG 2025 193.75
4320698027 08/31/2025 ARMY NATIONAL REFUSE AUG 2025 387.27
Check 10/02/2025 922058 Accounts Payable CHARTER COMMUNICATIONS 3,908.42
Invoice Date Description Check Sort Code Amount.
187887401091425 09/14/2025 09/16/25-10/15/25 Cable TV/DIA CHARGES ACCT 187887401 Invoice Da 3,908.42
Check 10/02/2025 922059 Accounts Payable CHEMCO PRODUCTS COMPANY 1,081.25
Invoice Date Description Check Sort Code Amount.
243698 09/15/2025 MONTHY WATER TREATMENT SEPT 2025 1,081.25
Check 10/02/2025 922060 Accounts Payable CITY OF SAN BERNARDINO WATER 109,778.87
Invoice Date Description Check Sort Code Amount.
7838 08/20/2025 FY 25-26 WATER CHARGES 54,994.39
7843 08/28/2025 FY 25-26 WATER CHARGES 54,784.48
Check 10/02/2025 922061 Accounts Payable SAN BERNARDINO MUNICIPAL WATER 1,265.76
Invoice Date Description Check Sort Code Amount.
42669 07/31/2025 FY 25-26 WATER CHARGES - GEOTHERMAL 1,265.76
Check 10/02/2025 922062 Accounts Payable ANNIE A CLARK 8,330.00
Invoice Date Description Check Sort Code Amount.
202526001 08/01/2025 JULY 2025 FINANCIAL CONSULTING SERVICES 8,330.00
Check 10/02/2025 922063 Accounts Payable COLONIAL LIFE 3,485.02
Invoice Date Description Check Sort Code Amount.
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/02/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 3 of 16 10/2/2025 12:56:00 PM
Packet Page. 116
44829490913522 09/13/2025 09/2025 Critical Care/Accident 3,485.02
Check 10/02/2025 922064 Accounts Payable COMPASS PEST MANAGEMENT INC 152.00
Invoice Date Description Check Sort Code Amount.
306003 09/05/2025 Rodent Services 09/05/25 40.00
308000 09/29/2025 SEPTEMBER 25 PEST CONTROL 112.00
Check 10/02/2025 922065 Accounts Payable COMPUTERSHARE TRUST COMPANY
NA
1,500.00
Invoice Date Description Check Sort Code Amount.
2477397 09/10/2025 SB 108 HUD ARDEN GUTHRIE PROJECT ADMIN FEES 09/01/25-
08/31/26
1,500.00
Check 10/02/2025 922066 Accounts Payable REYNALDO CONTRERAS 75.00
Invoice Date Description Check Sort Code Amount.
24299879 07/29/2024 Spay Neuter Deposit Refund 75.00
Check 10/02/2025 922067 Accounts Payable COSTCO WHOLESALE 2,178.03
Invoice Date Description Check Sort Code Amount.
478615751 09/14/2025 INTERGENERATIONAL - PAINT N SIP 33.73
478625604 09/05/2025 INTERGENERATIONAL - GRANDPARENTS DAY EVENT 1,759.53
478863117 09/19/2025 INTERGENERATIONAL PROGRAMMING 384.77
Check 10/02/2025 922068 Accounts Payable COUNTY OF SAN BERNARDINO INFO
SVCS DEPT
1,245.09
Invoice Date Description Check Sort Code Amount.
31312 07/31/2025 July 2025 Maintenance 1,245.09
Check 10/02/2025 922069 Accounts Payable CULLIGAN OF INLAND EMPIRE 246.88
Invoice Date Description Check Sort Code Amount.
1462263 06/30/2025 FLEET WATER TREATMENT 7/1 TO 7/31 123.44
1469321 08/31/2025 FLEET WATER TREATMENT 9/1 TO 9/30 123.44
Check 10/02/2025 922070 Accounts Payable CULLIGAN OF ONTARIO 123.44
Invoice Date Description Check Sort Code Amount.
1465891 07/31/2025 FLEET WATER TREATMENT 8/1 TO 8/31 123.44
Check 10/02/2025 922071 Accounts Payable ROGER CUMMINGS 75.00
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/02/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 4 of 16 10/2/2025 12:56:00 PM
Packet Page. 117
Invoice Date Description Check Sort Code Amount.
24300289 08/17/2024 Adoption Refund 75.00
Check 10/02/2025 922072 Accounts Payable DASH MEDICAL GLOVES INC 1,044.00
Invoice Date Description Check Sort Code Amount.
1338647 09/19/2025 BLACK MAXX NITRILE EXAM GLOVES 1,044.00
Check 10/02/2025 922073 Accounts Payable RICHARD DELGADO 100.00
Invoice Date Description Check Sort Code Amount.
24300869 09/16/2024 Adoption Refund, spay neuter refund 100.00
Check 10/02/2025 922074 Accounts Payable DIBS SAFE & LOCK SERVICE 278.05
Invoice Date Description Check Sort Code Amount.
1282086 08/13/2025 DUPLICATE KEY STAMP KEYS 42.56
1282070 08/13/2025 REKEY MASTER SHOP DUPLICATE KEY 31.67
1282154 08/15/2025 REKEY MASTER SHOP DUP KEY 31.26
1282183 08/18/2025 SD1 KEY 1435 KEY 21.78
1282201 08/19/2025 RING DUPLICATE KEY STAMP KEYS 35.62
1282249 08/22/2025 REKEY MASTER SHOP DUPLICATE KEY 17.81
1282340 08/27/2025 DUPLICATE KEY 3.81
1282568 09/09/2025 KEY COPIES 32.63
1282650 09/12/2025 KEY COPIES 15.23
1282635 09/12/2025 KEY COPIES 45.68
Check 10/02/2025 922075 Accounts Payable EAST VALLEY WATER DISTRICT 450.18
Invoice Date Description Check Sort Code Amount.
7844 08/28/2025 FY 25-26 WATER CHARGES 450.18
Check 10/02/2025 922076 Accounts Payable EMPIRE ACCESSORIES INC 2,594.11
Invoice Date Description Check Sort Code Amount.
15984 09/17/2025 2025 CHEVY COLORADO WT RETRAX AND LABOR 2,594.11
Check 10/02/2025 922077 Accounts Payable ENVIRONMENTAL PROJECT SERVICES
INC
161,077.48
Invoice Date Description Check Sort Code Amount.
9216 09/08/2025 CONCRETE REPAIRS VALENCIA AVE HIGHLAND TO 30TH 161,077.48
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/02/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 5 of 16 10/2/2025 12:56:00 PM
Packet Page. 118
Check 10/02/2025 922078 Accounts Payable FAIRVIEW FORD SALES INC 61,776.58
Invoice Date Description Check Sort Code Amount.
251161 09/08/2025 2025 FORD TRANSIT 12 VIN#1FBAX2YG3SKB08587 61,776.58
Check 10/02/2025 922079 Accounts Payable JOSEPH FERNANDEZ 5,400.00
Invoice Date Description Check Sort Code Amount.
536807 09/19/2025 Coverage and Live streaming 5,400.00
Check 10/02/2025 922080 Accounts Payable MATTHEW FISHER 50.00
Invoice Date Description Check Sort Code Amount.
9232025 09/23/2025 2025 ANNUAL WALKING SUBSITY 50.00
Check 10/02/2025 922081 Accounts Payable BRIANA FLORES 88.00
Invoice Date Description Check Sort Code Amount.
9242025 09/24/2025 BRIANA FLORES TRAVEL AUTHORITY REIMBURSEMENT CALED
KEYS COURSE
88.00
Check 10/02/2025 922082 Accounts Payable FRANK REYES CONSTRUCTION 10,000.00
Invoice Date Description Check Sort Code Amount.
2025815 08/15/2025 ARPA FACADE IMPROVEMENT PROGRAM 10,000.00
Check 10/02/2025 922083 Accounts Payable FRONTIER CALIFORNIA INC 100.87
Invoice Date Description Check Sort Code Amount.
91225 09/12/2025 09/12/25-10/11/25 LANDLINE SERVICES 909-796-0187-040124-5 100.87
Check 10/02/2025 922084 Accounts Payable GALLS LLC 580.41
Invoice Date Description Check Sort Code Amount.
32445615 09/04/2025 PD UNIFORMS HGC 82.00
32445612 09/04/2025 PD UNIFORMS HGC 245.99
32477082 09/08/2025 PD UNIFORMS JG 161.59
32477089 09/08/2025 PD UNIFORMS DG 90.83
Check 10/02/2025 922085 Accounts Payable GOVINVEST INC 81,540.49
Invoice Date Description Check Sort Code Amount.
20256436 07/24/2025 GovInvest Modules 81,540.49
Check 10/02/2025 922086 Accounts Payable HDL COREN & CONE 795.00
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/02/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 6 of 16 10/2/2025 12:56:00 PM
Packet Page. 119
Invoice Date Description Check Sort Code Amount.
52954 07/31/2025 2024-25 ACFR Statistical Package 795.00
Check 10/02/2025 922087 Accounts Payable HIGH TECH SECURITY LLC 3,197.58
Invoice Date Description Check Sort Code Amount.
146311 06/01/2025 ANNUAL ALARM MONITORING 7/1/25 TO 6/30/26 1,680.00
146265 06/01/2025 ANNUAL ALARM MONITORING 7/1/25 TO 6/30/26 480.00
142656 08/22/2025 12V/25AH BATTERIES 633.58
146707 08/26/2025 SIMPLEX PULL STATION SIMPLEX KEYS PROTECTIVE COVER 404.00
Check 10/02/2025 922088 Accounts Payable ROBERTA HOLTZMAN 75.00
Invoice Date Description Check Sort Code Amount.
24301942 11/02/2024 Spay Neuter Deposit Refund 75.00
Check 10/02/2025 922089 Accounts Payable IMAGING PRODUCTS INTERNATIONAL 97.88
Invoice Date Description Check Sort Code Amount.
113462 09/18/2025 FOLDING TABLE AND TABLECLOTH 97.88
Check 10/02/2025 922090 Accounts Payable INGRAM LIBRARY SERVICES 292.21
Invoice Date Description Check Sort Code Amount.
90576397 09/17/2025 Library Books 64.15
90576398 09/17/2025 Library Books 38.08
90576399 09/17/2025 Library Books 189.98
Check 10/02/2025 922091 Accounts Payable INSIGHT POLYGRAPH & PRIVATE
INVESTIGATIONS
700.00
Invoice Date Description Check Sort Code Amount.
527 09/19/2025 4 POLYGRAPH EXAMINATIONS 700.00
Check 10/02/2025 922092 Accounts Payable INTERNATIONAL TIRE CENTER INC 511.20
Invoice Date Description Check Sort Code Amount.
64936 08/27/2025 NEW TIRES FOR FLEET 511.20
Check 10/02/2025 922093 Accounts Payable JL GROUP LLC 34,109.04
Invoice Date Description Check Sort Code Amount.
241121 07/30/2025 INVESTIGATIVE SERVICES 34,109.04
Check 10/02/2025 922094 Accounts Payable RICKY JOHNSON 100.00
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/02/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 7 of 16 10/2/2025 12:56:00 PM
Packet Page. 120
Invoice Date Description Check Sort Code Amount.
25304276 02/28/2025 Adoption Refund, spay neuter refund 100.00
Check 10/02/2025 922095 Accounts Payable RICK KING 75.00
Invoice Date Description Check Sort Code Amount.
24302742 12/08/2024 Spay Neuter Deposit Refund 75.00
Check 10/02/2025 922096 Accounts Payable L & S AUTO GLASS 540.00
Invoice Date Description Check Sort Code Amount.
2894 09/12/2025 DW 2568 INSTALLED UNIT 2004 540.00
Check 10/02/2025 922097 Accounts Payable LAW ENFORCEMENT MEDICAL
SERVICES INC
13,522.00
Invoice Date Description Check Sort Code Amount.
18773 09/25/2025 SEPTEMBER 25 MEDICAL EVIDENCE COLLECTION 13,522.00
Check 10/02/2025 922098 Accounts Payable KAY LEE 75.00
Invoice Date Description Check Sort Code Amount.
24300381 08/22/2024 Spay Neuter Deposit Refund 75.00
Check 10/02/2025 922099 Accounts Payable LOMA LINDA UNIVERSITY HEALTH
SERVICES
379.00
Invoice Date Description Check Sort Code Amount.
93028 09/16/2025 August 2025 - Evaluator for SB VIP 379.00
Check 10/02/2025 922100 Accounts Payable LUIS H MARQUEZ 322.85
Invoice Date Description Check Sort Code Amount.
992025 09/09/2025 SEPT 10-12, 2025 LEGISLATION MEETING - END OF SESSION 322.85
Check 10/02/2025 922101 Accounts Payable ANNA MCKENNA 301.00
Invoice Date Description Check Sort Code Amount.
10/25 GARDEN GRO 09/25/2025 SUPERVISORY LEADERSHIP INSTITUTE 301.00
Check 10/02/2025 922102 Accounts Payable MERIT OIL COMPANY 246,181.55
Invoice Date Description Check Sort Code Amount.
910685 07/07/2025 UNLEADED FUEL 30,905.13
912062 07/15/2025 UNLEADED FUEL 30,858.32
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/02/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 8 of 16 10/2/2025 12:56:00 PM
Packet Page. 121
913292 07/23/2025 UNLEADED FUEL 29,012.70
915233 08/05/2025 UNLEADED FUEL 29,228.99
916452 08/14/2025 UNLEADED FUEL 30,486.93
916669 08/18/2025 DIESEL FUEL 3,995.64
917648 08/21/2025 UNLEADED FUEL 28,878.83
918566 08/28/2025 UNLEADED FUEL 28,452.14
919581 09/05/2025 UNLEADED FUEL 31,290.00
92952 07/11/2025 FUEL CREDIT CARDS 389.05
93107 07/18/2025 FUEL CREDIT CARDS 284.07
93258 07/25/2025 FUEL CREDIT CARDS 307.93
93396 07/31/2025 FUEL CREDIT CARDS 319.35
93680 08/08/2025 FUEL CREDIT CARDS 466.05
93829 08/15/2025 FUEL CREDIT CARDS 161.74
93991 08/22/2025 FUEL CREDIT CARDS 113.83
94148 08/29/2025 FUEL CREDIT CARDS 236.73
94349 08/31/2025 FUEL CREDIT CARDS 165.83
94487 09/05/2025 FUEL CREDIT CARDS 185.72
94628 09/12/2025 FUEL CREDIT CARDS 442.57
Check 10/02/2025 922103 Accounts Payable RUBY MONTILLA 75.00
Invoice Date Description Check Sort Code Amount.
24297919 04/11/2024 Spay Neuter Deposit Refund 75.00
Check 10/02/2025 922104 Accounts Payable MOTOROLA SOLUTIONS INC 17,846.64
Invoice Date Description Check Sort Code Amount.
8282010728 10/29/2024 ACO radio chargers 1,776.76
8282155162 07/01/2025 Remote speaker microphones for ACOs 4,629.88
1411190177 07/02/2025 LPR SOFTWARE SUBSCRIPTION 8.1.25-7.31.26 11,440.00
Check 10/02/2025 922105 Accounts Payable NATIONAL COMMUNITY DEVELOPMENT
ASSOCIATION
1,545.00
Invoice Date Description Check Sort Code Amount.
26453 04/25/2025 FY2025/2026 Membership Dues July 1, 2025 - June 30, 2026 1,545.00
Check 10/02/2025 922106 Accounts Payable NEW HOPE MISSIONARY BAPTIST
CHURCH
3,069.00
Invoice Date Description Check Sort Code Amount
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/02/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 9 of 16 10/2/2025 12:56:00 PM
Packet Page. 122
.
968 09/17/2025 Rent October 2025 3,069.00
Check 10/02/2025 922107 Accounts Payable NOWDOCS INTERNATIONAL INC 400.00
Invoice Date Description Check Sort Code Amount.
70311 02/24/2025 DIGITIZE AND STORE SIGNATURE 400.00
Check 10/02/2025 922108 Accounts Payable P F SERVICES INC 190.00
Invoice Date Description Check Sort Code Amount.
21436 07/23/2025 30 DAY UST OPERATOR VISUAL INSPECTION JULY 2025 190.00
Check 10/02/2025 922109 Accounts Payable PARTS AUTHORITY METRO LLC 6,026.61
Invoice Date Description Check Sort Code Amount.
062594018 07/28/2025 BATTERY AIR FILTER BRAKE ROTOR CABIN AIR BRAKE PAD 3,697.60
062718654 09/05/2025 LOCK-EASE 18.79
062732174 09/10/2025 PURGE VALVE CONTROL MOTOR 198.56
062060449 09/11/2025 CREDIT ON ORIG INV 062683746 SERPENTINE BELT (8.08)
062060450 09/11/2025 CREDIT ON ORIG INV 062713861 CV AXLE (137.78)
062060452 09/11/2025 CREDIT ON ORIG INV 350667817 REGULATOR (70.50)
062655470 08/15/2025 TRANS FILTER 178.57
062691620 08/27/2025 PCV VALVE UNIT F1902 12.60
062691571 08/27/2025 PURGE VALVE VAPOR CANISTERS UNIT F1902 46.79
062695915 08/28/2025 ALTERNATOR ASY SERPENTINE BELS UNIT F1806 475.88
062696021 08/28/2025 CAMBER ADJUSTMS FOR STOCK 42.79
117597728 08/28/2025 HEGO SENSOR UNIT F1806 119.61
062696918 08/28/2025 WINDOW SWITCH UNIT 1689 77.63
062697284 08/28/2025 GAS STRUT CONTR ARM ASSES UNIT F1602 225.79
064337844 08/29/2025 CABIN AIR FOR STOCK 51.07
062700144 08/29/2025 OIL FILTER CABIN AIR FILTER SYN1Q UNIT F2107 1,097.29
Check 10/02/2025 922110 Accounts Payable SANDY PAVELCHAK 75.00
Invoice Date Description Check Sort Code Amount.
24301466 10/12/2024 Spay Neuter Deposit Refund 75.00
Check 10/02/2025 922111 Accounts Payable RICHARD PELAYO 100.00
Invoice Date Description Check Sort Code Amount.
24301361 10/08/2024 Adoption Refund, spay neuter refund 100.00
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/02/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 10 of 16 10/2/2025 12:56:00 PM
Packet Page. 123
Check 10/02/2025 922112 Accounts Payable PET BENEFIT SOLUTIONS 1,519.90
Invoice Date Description Check Sort Code Amount.
217922 09/05/2025 September 2025 Pet Benefit/Insurance 1,222.40
217921 09/05/2025 September 2025 Pet Benefit/Insurance 297.50
Check 10/02/2025 922113 Accounts Payable JONATHAN PLUMMER 473.00
Invoice Date Description Check Sort Code Amount.
10/25 SAN DIEGO 09/25/2025 MANAGEMENT COURSE 473.00
Check 10/02/2025 922114 Accounts Payable PRUDENTIAL OVERALL SUPPLY 2,146.75
Invoice Date Description Check Sort Code Amount.
23836073 07/31/2025 FLEET SUPPLY RENTAL 87.33
23836074 07/31/2025 FLEET UNIFORM RENTAL 102.38
23812835 06/05/2025 FLEET SUPPLY RENTAL 87.33
23815760 06/12/2025 FLEET SUPPLY RENTAL 87.33
23818556 06/19/2025 FLEET SUPPLY RENTAL 87.33
23821515 06/26/2025 FLEET SUPPLY RENTAL 87.33
23844679 08/21/2025 CUSTODIAL SUPPLY RENTAL 103.00
23844680 08/21/2025 CUSTODIAL UNIFORM RENTAL 110.54
23844670 08/21/2025 AQUATICS UNIFORM RENTAL 3.12
23844671 08/21/2025 BUILD MAINT UNIFORM RENTAL 23.13
23847685 08/28/2025 BUILD MAINT UNIFORM RENTAL 25.85
23841869 08/14/2025 FLEET UNIFORM RENTAL 41.43
23844668 08/21/2025 FLEET SUPPLY RENTAL 87.33
23844669 08/21/2025 FLEET UNIFORM RENTAL 41.43
23847682 08/28/2025 FLEET SUPPLY RENTAL 87.33
23847683 08/28/2025 FLEET UNIFORM RENTAL 72.44
23850706 09/04/2025 FLEET SUPPLY RENTAL 87.33
23850707 09/04/2025 FLEET UNIFORM RENTAL 42.37
23853717 09/11/2025 UNIFORM RENTAL LIGHTING 52.97
23853718 09/11/2025 UNIFORM RENTAL STORM DRAINS 17.77
23853719 09/11/2025 UNIFORM RENTAL SIGNS 17.05
23853720 09/11/2025 UNIFORM RENTAL GRAFFITI 35.72
23853721 09/11/2025 UNIFORM RENTAL FORESTRY 103.91
23853722 09/11/2025 UNIFORM RENTAL STREETS 168.45
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/02/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 11 of 16 10/2/2025 12:56:00 PM
Packet Page. 124
23853723 09/11/2025 UNIFORM RENTAL PARKS 44.11
23856659 09/18/2025 9/18/25 WEEKLY TOWEL SERVICE 213.83
23859559 09/25/2025 9/25/25 WEEKLY TOWEL SERVICE 228.61
Check 10/02/2025 922115 Accounts Payable QUINN COMPANY 757.70
Invoice Date Description Check Sort Code Amount.
514868 08/27/2025 KIT TILT LEV MIRROR 331.52
495131 05/07/2025 NIPPLE COUPLING BALL 426.18
Check 10/02/2025 922116 Accounts Payable VERONICA RENDON 88.00
Invoice Date Description Check Sort Code Amount.
9242025 09/24/2025 VERONICA RENDON TRAVEL AUTHORITY REIMBURSEMENT CALED
KEYS COURSE
88.00
Check 10/02/2025 922117 Accounts Payable RICK ENGINEERING COMPANY 29,787.50
Invoice Date Description Check Sort Code Amount.
110509 09/25/2025 PROFESSIONAL SERVICES JULY 26 2025 TO AUGUST 29 2025 12,255.00
109867 08/14/2025 PROFESSIONAL SERVICES JUNE 28 2025 TO JULY 25 2025 17,532.50
Check 10/02/2025 922118 Accounts Payable ROBERT WINDLE LABOR CONSULTANT 750.00
Invoice Date Description Check Sort Code Amount.
6 09/17/2025 LABOR NEGOTIATIONS CONSULTING SERVICES - AUGUST 2025 750.00
Check 10/02/2025 922119 Accounts Payable SAN BERNARDINO COUNTY FIRE
DEPARTMENT
88,116.07
Invoice Date Description Check Sort Code Amount.
226 09/01/2025 OCTOBER - DECEMBER 2025 HOUSEHOLD HAZARDOUS WASTE
FEES
88,116.07
Check 10/02/2025 922120 Accounts Payable SAN BERNARDINO COUNTY FIRE DEPT 409.00
Invoice Date Description Check Sort Code Amount.
352422 08/24/2025 ANNUAL INSPECTION-ADMIN FEE 44.00
352578 08/25/2025 ANNUAL INSPECTION BASE PERMIT FEE 365.00
Check 10/02/2025 922121 Accounts Payable SAN BERNARDINO SYMPHONY
ORCHESTRA
75,000.00
Invoice Date Description Check Sort Code Amount.
9225 09/02/2025 FY 25/26 ANNUAL ALLOCATION TO THE CALIFORNIA THEATER SB 75,000.00
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/02/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 12 of 16 10/2/2025 12:56:00 PM
Packet Page. 125
SYMPHONY
Check 10/02/2025 922122 Accounts Payable SAN LUIS EQUIPMENT RENTAL INC 397.20
Invoice Date Description Check Sort Code Amount.
38811 09/18/2025 REACH FORKLIFT JOB, DIESEL, PROTECTION PLAN 397.20
Check 10/02/2025 922123 Accounts Payable SBX SERVICES INC 1,044.40
Invoice Date Description Check Sort Code Amount.
2815 08/05/2025 CAR WASH FOR CITY VEHICLES JULY 2025 1,044.40
Check 10/02/2025 922124 Accounts Payable SHRED IT 120.00
Invoice Date Description Check Sort Code Amount.
8011866981 08/31/2025 Steri-safe budget subscription 09-01-25 to 09-30-25 120.00
Check 10/02/2025 922125 Accounts Payable SOUTHERN CALIFORNIA EDISON 53,002.34
Invoice Date Description Check Sort Code Amount.
7839 08/21/2025 FY 25-26 ELECTRIC CHARGES 46,835.88
7848 09/03/2025 FY 25-26 ELECTRIC CHARGES 6,166.46
Check 10/02/2025 922126 Accounts Payable SOUTHERN CALIFORNIA GAS
COMPANY
3,141.06
Invoice Date Description Check Sort Code Amount.
7837 08/22/2025 FY 25-26 GAS CHARGES 2,414.94
7845 08/29/2025 FY 25-26 GAS CHARGES 726.12
Check 10/02/2025 922127 Accounts Payable STAPLES BUSINESS ADVANTAGE 564.78
Invoice Date Description Check Sort Code Amount.
7006731323 09/01/2025 OFFICE SUPPLIES FOR PRCSD FOR AUGUST 2025 564.78
Check 10/02/2025 922128 Accounts Payable SUSAN SAXE CLIFFORD PHD 800.00
Invoice Date Description Check Sort Code Amount.
2505223 05/22/2025 1 PSYCHOLOGICAL EVALUATION EXAM 400.00
2504175 04/17/2025 1 PSYCHOLOGICAL EVALUATION EXAM 400.00
Check 10/02/2025 922129 Accounts Payable SYN TECH SYSTEMS INC 2,650.00
Invoice Date Description Check Sort Code Amount.
314951A 05/15/2025 SYN TECH PREMIUM SERV 12/1/24-11/30/29 2,650.00
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/02/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 13 of 16 10/2/2025 12:56:00 PM
Packet Page. 126
Check 10/02/2025 922130 Accounts Payable TPX COMMUNICATIONS 18,394.11
Invoice Date Description Check Sort Code Amount.
1872738360 09/16/2025 PRI and MPLS Services 09/16/2025 - 10/15/2025 18,394.11
Check 10/02/2025 922131 Accounts Payable TROPHY HOUSE 1,242.06
Invoice Date Description Check Sort Code Amount.
10586 08/28/2025 AWARDS FOR YOUTH SPORTS 1,242.06
Check 10/02/2025 922132 Accounts Payable UNITED RENTALS NORTH AMERICA INC 2,680.05
Invoice Date Description Check Sort Code Amount.
252072002001 08/23/2025 HANDICAP RESTROOM PORTABLE STANDARD 2,680.05
Check 10/02/2025 922133 Accounts Payable UNITED STATES POSTAL SERVICE 370.00
Invoice Date Description Check Sort Code Amount.
9152025 09/15/2025 ANNUAL PERMIT FEE #450 EDDM 11/09/25-11/08/26 370.00
Check 10/02/2025 922134 Accounts Payable VIDEO FP 3,120.00
Invoice Date Description Check Sort Code Amount.
250930 09/30/2025 09/22/2025 -10/05/2025 WHAT'S UP SB, INLAND EMPIRE ALIVE 3,120.00
Check 10/02/2025 922135 Accounts Payable CHAD WALTERS 122.20
Invoice Date Description Check Sort Code Amount.
9162025 09/16/2025 TOTAL MEAL EXPENSES 122.20
Check 10/02/2025 922136 Accounts Payable WATERLINE TECHNOLOGIES INC 23,115.70
Invoice Date Description Check Sort Code Amount.
5751619 06/18/2025 HERNANDEZ CTR POOL CHEMICALS 1,296.84
5752717 06/23/2025 HERNANDEZ CTR POOL CHEMICALS 947.76
5752718 06/23/2025 PERRIS HILL SWIM CTR POOL CHEMICALS 1,842.23
5762108 09/11/2025 PERRIS HILL SWIM CTR POOL CHEMICALS 3,014.55
5762109 09/11/2025 PERRIS HILL SWIM CTR POOL CHEMICALS 60.83
5762110 09/11/2025 HERNANDEZ CTR POOL CHEMICALS 518.74
5762111 09/11/2025 DELMANN HEIGHTS POOL CHEMICALS 518.74
5753953 06/30/2025 HERNANDEZ CTR POOL CHEMICALS 447.23
5753954 06/30/2025 PERRIS HILL SWIM CTR POOL CHEMICALS 1,720.04
5753955 06/30/2025 DELMANN HEIGHTS POOL CHEMICALS 968.69
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/02/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 14 of 16 10/2/2025 12:56:00 PM
Packet Page. 127
5754062 06/30/2025 FLEET FOUNTAIN DELIVERY 1,857.78
5759715 09/02/2025 PERRIS HILL SWIM CTR POOL CHEMICALS 2,528.50
5759741 09/02/2025 PERRIS HILL SWIM CTR POOL CHEMICALS 3,890.53
5759837 09/02/2025 PERRIS HILL SWIM CTR POOL CHEMICALS 712.49
5760554 09/04/2025 DELMANN HEIGHTS POOL CHEMICALS 947.76
5760555 09/04/2025 HERNANDEZ CTR POOL CHEMICALS 1,020.84
5760556 09/04/2025 PERRIS HILL SWIM CTR POOL CHEMICALS 822.15
Check 10/02/2025 922137 Accounts Payable WILSON TOWING L L C 640.00
Invoice Date Description Check Sort Code Amount.
55461 09/22/2025 9/19/25 TOW SERVICE 640.00
Check 10/02/2025 922138 Accounts Payable WIRZ AND COMPANY PRINTING INC 4,041.17
Invoice Date Description Check Sort Code Amount.
143461 08/15/2025 TABLECOTHS FOR SENIOR SERVICES 182.70
143711 09/05/2025 FLYERS FOR SENIOR SERVICES 78.30
143976 09/14/2025 40th Event Flyers 143.55
143944 09/14/2025 HEALTH FAIR BANNER 96.79
143877 09/09/2025 HEALTH FAIR BANNERS 284.93
143974 09/14/2025 HEALTH FAIR POSTERS 121.80
143945 09/14/2025 HEALTH FAIR FLYERS 143.55
143984 09/14/2025 SENIOR GAMES POSTERS 26.10
143682 09/05/2025 PRINTING - INTERGENERATION/SCP/RSVP/SR SERVICES 880.88
143753 09/08/2025 LUAU POSTERS FOR INTERGENERATIONAL EVENT 221.85
143754 09/08/2025 ICE CREAM SOCIAL POSTERS - INTERGENERATIONAL 147.90
143751 09/08/2025 ICE CREAM SOCIAL FLYERS - INTERGENERATIONAL 717.75
143797 09/08/2025 SIGNS FOR GRANDPARENT'S DAY - INTERGENERATIONAL 84.83
143699 09/05/2025 Prohibited Items Banners 652.50
144052 09/19/2025 BUSINESS CARDS FOR ERIC LEVITT 46.76
143946 09/14/2025 CTYSB SEAL LABEL COPIES - QTY 500 178.35
144112 09/23/2025 BC MATTHEW BLOCK 32.63
Check 10/02/2025 922139 Accounts Payable WOMENS INSPIRATIONAL NETWORK 7,049.62
Invoice Date Description Check Sort Code Amount.
82025 08/01/2025 GRANT PROGRAM AUGUST 2025 7,049.62
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/02/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 15 of 16 10/2/2025 12:56:00 PM
Packet Page. 128
City Commercial City Commercial - A/P, P/R taxes Totals:Transactions: 97 $1,165,975.41
Checks:97 $1,165,975.41
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/02/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 16 of 16 10/2/2025 12:56:00 PM
Packet Page. 129
Fund 001 - General 318,931.25$
Fund 008 - American Rescue Plan Fund 254,331.70$
Fund 101 - City of SB State of the City 400.00$
Fund 107 - Cable Television Fund 24,757.76$
Fund 108 - Asset Forfeiture FED DOJ 4,011.17$
Fund 119 - Community Developmnt Block Grant 5,437.78$
Fund 123 - Federal grant programs 224,604.05$
Fund 124 - Animal Control 230.00$
Fund 125 - RMRA-GAS TAX 617,010.23$
Fund 126 - Gas Tax Fund 703.09$
Fund 130 - State And Other Grant Programs 9,635.76$
Fund 247 - Cultural Developmnt Construction 6,224.85$
Fund 527 - Integrated waste management 452.00$
Fund 629 - Liability insurance fund 33,400.00$
Fund 635 - Fleet services fund 1,118.00$
Fund 678 - Workers compensation 3,325.96$
Fund 679 - Information technology 148,012.99$
Fund 772 - Special deposits fund 3,981.60$
Fund 784 - Payroll Clearing Fund 42,422.91$
1,698,991.10$
City of San Bernardino
Accounts Payable Warrant Register
Summary by Fund
Register #21 October 9, 2025
Packet Page. 130
Bank Account:City Commercial - City Commercial - A/P, P/R taxes
Check 10/09/2025 922140 Accounts Payable AARON ORTIZ 301.00
Invoice Date Description Check Sort Code Amount.
7/25 WATSONVILLE 09/25/2025 TACTICAL OPERATIONS MJ TASK FORCE REIMBURSEMENT 301.00
Check 10/09/2025 922141 Accounts Payable ONSITE COMPUTING INC 33,605.00
Invoice Date Description Check Sort Code Amount.
54004894 10/02/2025 LMS DATA CONVERSION PROJECT SEPTEMBER 2025 33,605.00
Check 10/09/2025 922142 Accounts Payable ALTA LANGUAGE SERVICES INC 276.00
Invoice Date Description Check Sort Code Amount.
808602 09/30/2025 ASL EMPLOYEE LISTENING/SPEAKING LIVE (4)276.00
Check 10/09/2025 922143 Accounts Payable AMAZON CAPITAL SERVICES 758.83
Invoice Date Description Check Sort Code Amount.
116YWHD963LG 08/26/2025 BIRD B GONE BONTEC 64.61
1HXPM6DV7FVX 10/01/2025 D LEAD ABRASIVE HAND SOAP 71.88
1Y7HJ6Y9CKX9 10/02/2025 CM OFFICE SUPPLIES 51.86
1CXJGCQHCRPX 09/24/2025 MAYORS OFFICE SUPPLIES 382.71
1TC7LG4W643M 09/29/2025 MAYORS OFFICE SUPPLIES 31.21
191P9PRYMLT7 09/26/2025 CM OFFICE SUPPLIES 156.56
Check 10/09/2025 922144 Accounts Payable ANGEL HEART BIO TRAUMA LLC 753.48
Invoice Date Description Check Sort Code Amount.
4240204 09/27/2025 CRIME SCENE CLEAN-UP 425 A ROCKFORD ST 753.48
Check 10/09/2025 922145 Accounts Payable ASSUREHIRE 1,120.52
Invoice Date Description Check Sort Code Amount.
116510 10/01/2025 PRE-EMPLOYMENT SCREENING SERVICES 1,120.52
Check 10/09/2025 922146 Accounts Payable ATKINSON ANDELSON LOYA RUUD &
ROMO
2,744.20
Invoice Date Description Check Sort Code Amount.
761120 08/31/2025 AALR&R - MIRANDA 2,744.20
Check 10/09/2025 922147 Accounts Payable B&H PHOTO VIDEO 3,714.56
Invoice Date Description Check Sort Code Amount
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/09/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 1 of 17 10/9/2025 3:49:36 PM
Packet Page. 131
.
237649535 09/25/2025 TELEPROMPTER 3,714.56
Check 10/09/2025 922148 Accounts Payable ROBERTO BARTON 846.08
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement 846.08
Check 10/09/2025 922149 Accounts Payable BEST BEST & KRIEGER LLP 14,029.30
Invoice Date Description Check Sort Code Amount.
1004376 08/27/2024 BB&K - PEOPLE V. CITY (CIVSB 2401420)712.00
1037593 08/22/2025 BB&K - ECONOMIC DEVELOPMENT 1,510.50
1037597 08/22/2025 BB&K - TELECOMMUNICATIONS 1,438.20
1032553 06/30/2025 BB&K - ECONOMIC DEVELOPMENT 2,253.40
1035248 07/29/2025 BB&K - TELECOMMUNICATIONS 3,681.60
1037599 08/22/2025 BB&K - WATERMAN LANDFILL DEVELOPMENT 452.00
1029716 05/29/2025 BB&K - VERDEMONT HEIGHTS 1 LLC 302.40
1032591 06/30/2025 BB&K - VERDEMONT HEIGHTS 1 LLC 3,679.20
Check 10/09/2025 922150 Accounts Payable GENOVA BULLARD 463.62
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement 463.62
Check 10/09/2025 922151 Accounts Payable CALIFORNIA PUBLIC POLICY GROUP
INC
8,500.00
Invoice Date Description Check Sort Code Amount.
1394 09/30/2025 September 2025 Professional Grant Writing Services 8,500.00
Check 10/09/2025 922152 Accounts Payable CAPITAL EDGE ADVOCACY INC 7,500.00
Invoice Date Description Check Sort Code Amount.
25130 10/01/2025 OCT 2025 PROF SVC FOR FEDERAL FUNDING, LEGISLATION OR
REGS
7,500.00
Check 10/09/2025 922153 Accounts Payable CARAHSOFT TECHNOLOGY
CORPORATION
8,728.13
Invoice Date Description Check Sort Code Amount.
51946160 09/23/2025 INSEYETS ONLINE PRO 8,728.13
Check 10/09/2025 922154 Accounts Payable CARIBBEAN PACIFIC BUS 8,320.00
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/09/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 2 of 17 10/9/2025 3:49:36 PM
Packet Page. 132
Invoice Date Description Check Sort Code Amount.
3704 06/23/2025 Camp Elk Bus Rental June 2025 5,200.00
3788 08/24/2025 Back to Nature Malibu Family Camping Trip Bus 2025 3,120.00
Check 10/09/2025 922155 Accounts Payable CARPENTER ROTHANS & DUMONT LLP 4,436.09
Invoice Date Description Check Sort Code Amount.
49753 06/15/2025 CR&D - MARTINEZ - FLORES 389.20
50304 08/15/2025 CR&D - RAMIREZ 1,351.50
50494 09/15/2025 CR&D - RAMIREZ 2,695.39
Check 10/09/2025 922156 Accounts Payable ETTA CASH 109.24
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement 109.24
Check 10/09/2025 922157 Accounts Payable TRAVIS CHAMPION 301.00
Invoice Date Description Check Sort Code Amount.
7/25 WATSONVILLE 09/25/2025 TACTICAL OPERATIONS MJ TASK FORCE REIMBURSEMENT 301.00
Check 10/09/2025 922158 Accounts Payable TIME WARNER CABLE 650.18
Invoice Date Description Check Sort Code Amount.
3200638061925 06/19/2025 TELEPHONE CHARGES JUNE 2025 325.09
3200638071925 07/19/2025 TELEPHONE CHARGES JULY 2025 325.09
Check 10/09/2025 922159 Accounts Payable CHARTER COMMUNICATIONS 325.09
Invoice Date Description Check Sort Code Amount.
3200638091925 09/19/2025 CA THEATRE TELEPHONE CHARGES SEPT 2025 325.09
Check 10/09/2025 922160 Accounts Payable CHARTER COMMUNICATIONS 3,910.51
Invoice Date Description Check Sort Code Amount.
187887301092125 09/21/2025 09/22/25-10/21/25 PD Cable TV/DIA CHARGES ACCT 187887301 3,910.51
Check 10/09/2025 922161 Accounts Payable CHEMCO PRODUCTS COMPANY 1,081.25
Invoice Date Description Check Sort Code Amount.
242494 08/18/2025 WATER TREATMENT SERVICES JULY 2025 1,081.25
Check 10/09/2025 922162 Accounts Payable CITY OF SAN BERNARDINO WATER 83,004.14
Invoice Date Description Check Sort Code Amount.
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/09/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 3 of 17 10/9/2025 3:49:36 PM
Packet Page. 133
7846 09/03/2025 FY 25-26 WATER CHARGES 83,004.14
Check 10/09/2025 922163 Accounts Payable ANNIE A CLARK 6,958.00
Invoice Date Description Check Sort Code Amount.
202526003 10/01/2025 SEPTEMBER 2025 FINANCIAL CONSULTING SERVICES 6,958.00
Check 10/09/2025 922164 Accounts Payable COSTCO WHOLESALE 1,406.47
Invoice Date Description Check Sort Code Amount.
47881382 09/26/2025 HEALTH FAIR ITEMS FOR OCTOBER 3, 2025 1,406.47
Check 10/09/2025 922165 Accounts Payable COUNTY OF SAN BERNARDINO INFO
SVCS DEPT
44,957.40
Invoice Date Description Check Sort Code Amount.
31156 06/30/2025 JUNE 2025 DISPATCH/RADIO ACCESS MAINTENANCE 44,950.38
31157 06/30/2025 CPU ACCESS JUNE 2025 7.02
Check 10/09/2025 922166 Accounts Payable DAILY JOURNAL CORPORATION 2,502.66
Invoice Date Description Check Sort Code Amount.
3883678 01/06/2025 Benevolence Health 2025 Notice of Hearing 1/5/25 426.00
3943870 07/18/2025 Dev Permit D23-19 Notice of Hearing 7/5/25 326.94
3943904 07/15/2025 Display Ad Amendments 7/16/25 415.84
3947566 07/21/2025 GPU NOP Notice of Hearing 7/18/25 685.08
3953640 08/04/2025 DERC Notice of Hearing 8/13/25 382.82
3954427 08/11/2025 Appeal 24-06 Notice of Hearing 8/9/25 265.98
Check 10/09/2025 922167 Accounts Payable DEPARTMENT OF HEALTH CARE
SERVICES
428.49
Invoice Date Description Check Sort Code Amount.
8192025 08/19/2025 FONSECA - SETTLEMENT - DHCS ACCT. NO. C95968322G-001 428.49
Check 10/09/2025 922168 Accounts Payable DEPARTMENT OF HOUSING &
COMMUNITY DEVELOPMENT
199,094.90
Invoice Date Description Check Sort Code Amount.
9192025 09/19/2025 Return Funds HCD SRA2 Block Grant Fund (Agreement 21-ERAP-20084)199,094.90
Check 10/09/2025 922169 Accounts Payable DOCU TRUST 1,865.38
Invoice Date Description Check Sort Code Amount.
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/09/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 4 of 17 10/9/2025 3:49:36 PM
Packet Page. 134
56761 10/01/2025 CAO - STORAGE / SHRED 1,094.76
56850 10/01/2025 MONTHLY STORAGE/RETRIEVAL 9-25 PRO-RATE / 10-1 TO 10-31-25 770.62
Check 10/09/2025 922170 Accounts Payable EVERON LLC 155.40
Invoice Date Description Check Sort Code Amount.
159514080 08/21/2025 201 BLDG FIRE ALARM MONITORING SEPT 2025 77.70
159723284 09/22/2025 201 BLDG FIRE ALARM MONITORING OCT 2025 77.70
Check 10/09/2025 922171 Accounts Payable FEDEX 135.42
Invoice Date Description Check Sort Code Amount.
898893888 09/12/2025 DETINNE - POSTAGE 9.77
899890634 09/19/2025 PEPE'S INC.- POSTAGE 9.77
899779930 09/19/2025 9/10/25 FED EX SERVICES 115.88
Check 10/09/2025 922172 Accounts Payable JOSEPH FERNANDEZ 9,700.00
Invoice Date Description Check Sort Code Amount.
536808 10/06/2025 SPORTS WEEKLY & SPORTS WEEKLY LIVE 9,700.00
Check 10/09/2025 922173 Accounts Payable FORD PRO 4,245.69
Invoice Date Description Check Sort Code Amount.
35124433 05/31/2025 FORD TELEMATICS AND FLEET MANAGEMENT 2,798.35
38786877 09/30/2025 FORD TELEMATICS AND COMMERCIAL MULTI-MAKE 1,447.34
Check 10/09/2025 922174 Accounts Payable FRONTIER CALIFORNIA INC 3,106.61
Invoice Date Description Check Sort Code Amount.
6062025 06/06/2025 TELEPHONE CHARGES JUNE 2025 1,528.82
9062025 09/06/2025 CA THEATRE PHONE BILL SEPT 2025 1,577.79
Check 10/09/2025 922175 Accounts Payable GOTO COMMUNICATIONS INC 17,679.50
Invoice Date Description Check Sort Code Amount.
7104285623 10/01/2025 10/1/25-10/31/25 PHONE CHARGES 12,043.84
7104298789 10/02/2025 Poly Edge E500 IP Phone w/Power qty 60 5,635.66
Check 10/09/2025 922176 Accounts Payable GRAVES & KING LLP 25,059.26
Invoice Date Description Check Sort Code Amount.
4906 08/29/2025 G&K - DETINNE 18,641.11
5781 07/31/2025 G&K - RAMIREZ 2,916.50
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/09/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 5 of 17 10/9/2025 3:49:36 PM
Packet Page. 135
5757 07/31/2025 G&K - ERICKSON 597.50
5763 07/31/2025 G&K - FREDERICK 489.95
5764 07/31/2025 G&K - MERGIL 2,414.20
Check 10/09/2025 922177 Accounts Payable GREAT AMERICA FINANCIAL
CORPORATION
10,798.08
Invoice Date Description Check Sort Code Amount.
40283671 10/06/2025 COPIER RENTAL OCTOBER 2025 - AGREEMENT #020-1683297-001 6,032.00
40283670 10/06/2025 COPIER RENTAL OCTOBER 2025 - AGREEMENT #021-1683297-002 4,766.08
Check 10/09/2025 922178 Accounts Payable HIGH TECH SECURITY LLC 5,661.01
Invoice Date Description Check Sort Code Amount.
146865 09/03/2025 CONTROL PANEL KEYPAD WRECVR WIRELESS DOOR 1,101.01
146472 07/01/2025 Central station monitoring 08/01/25 to 08/31/25 115.00
146298 06/01/2025 Central station monitoring 07/01/25 to 07/31/25 115.00
146555 07/31/2025 ENCANTO ALARM INSTALL 950.00
146603 08/01/2025 ALARM MONITORING - 9/1/25 TO 9/30/25 850.00
146264 06/01/2025 ALARM MONITORING - 7/1/25 TO 7/31/25 830.00
146765 09/01/2025 ALARM MONITORING - 10/1/2025 TO 10/31/2025 850.00
146432 07/01/2025 ALARM MONITORING - 8/1/2025 TO 8/31/2025 850.00
Check 10/09/2025 922179 Accounts Payable HOME DEPOT CREDIT SERVICES 921.46
Invoice Date Description Check Sort Code Amount.
9010329 09/29/2025 SUPPLIES FOR INTERGENERATIONAL AND SR. PROGRAMS 921.46
Check 10/09/2025 922180 Accounts Payable IE ALARM SYSTEMS 180.00
Invoice Date Description Check Sort Code Amount.
248121 07/01/2025 THEATRE SQUARE FIRE MONITORING JULY 2025 45.00
248890 08/01/2025 THEATRE SQUARE FIRE MONITORING AUGUST 2025 45.00
249846 09/01/2025 THEATRE SQUARE FIRE MONITORING SEPT 2025 45.00
250066 10/01/2025 THEATRE SQUARE FIRE MONITORING OCT 2025 45.00
Check 10/09/2025 922181 Accounts Payable IMPERIAL COUNTY OFFICE OF
EDUCATION
8,203.77
Invoice Date Description Check Sort Code Amount.
2501075 06/30/2025 FY25 Q4 MRC Billing 8,203.77
Check 10/09/2025 922182 Accounts Payable INGRAM LIBRARY SERVICES 4,813.43
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/09/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 6 of 17 10/9/2025 3:49:36 PM
Packet Page. 136
Invoice Date Description Check Sort Code Amount.
90412021 09/10/2025 Library Books 1,318.80
90412022 09/10/2025 Library Books 85.21
90412023 09/10/2025 Library Books 102.09
90412024 09/10/2025 Library Books 25.16
90412025 09/10/2025 Library Books 21.51
90412026 09/10/2025 Library Books 33.69
90412027 09/10/2025 Library Books 1,966.70
90412028 09/10/2025 Library Books 30.78
90512733 09/15/2025 Library Books 25.12
90512734 09/15/2025 Library Books 77.98
90512735 09/15/2025 Library Books 37.30
90512736 09/15/2025 Library Books 24.25
90512737 09/15/2025 Library Books 24.36
90459041 09/12/2025 Library Books 280.36
90459042 09/12/2025 Library Books 15.22
90459043 09/12/2025 Library Books 31.35
90463675 09/12/2025 Library Books 16.41
90463676 09/12/2025 Library Books 65.73
90463677 09/12/2025 Library Books 21.30
90463678 09/12/2025 Library Books 14.86
90463679 09/12/2025 Library Books 463.13
90463680 09/12/2025 Library Books 22.44
90463681 09/12/2025 Library Books 109.68
Check 10/09/2025 922183 Accounts Payable INSIGHT PUBLIC SECTOR 6,402.27
Invoice Date Description Check Sort Code Amount.
1101190619 07/31/2024 OFFICE 365 A3 Qty 45 1,618.20
1101190673 07/31/2024 OFFICE 365 A3 Qty 45 1,278.73
1101200519 08/31/2024 CREDIT FOR INV1101190619 OFFICE 365 A3 Qty 45 (1,608.30)
1101209986 09/30/2024 VISIO PLAN Qty 2/ INTUNE Qty 50 456.44
1101227597 11/30/2024 OFFICE 365 A3 Qty 45 1,241.00
1101298594 07/31/2025 OFFICE 365 A3 Qty 95 3,416.20
Check 10/09/2025 922184 Accounts Payable UNITED STATES TREASURY 1,118.00
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/09/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 7 of 17 10/9/2025 3:49:36 PM
Packet Page. 137
Invoice Date Description Check Sort Code Amount.
100925 09/22/2025 Fuel Excise Tax - ER ID 95-6000772 1,118.00
Check 10/09/2025 922185 Accounts Payable LAWRENCE BEACH ALLEN & CHOI PC 24,497.36
Invoice Date Description Check Sort Code Amount.
68678 08/18/2025 LBAC - ESCAMILLA 5,215.00
68759 09/16/2025 LBAC - SEGURA 294.00
68760 09/16/2025 LBAC - DEUSCHEL 563.50
68762 09/16/2025 LBAC - PANIAGUA 420.00
68763 09/16/2025 LBAC - SPENCE 3,156.39
68764 09/16/2025 LBAC - BROWN 605.00
68766 09/16/2025 LBAC - CHAIREZ-HELGUERA 3,707.50
68768 09/16/2025 LBAC - ESCAMILLA 3,129.00
68772 09/16/2025 LBAC - ANDRADE 5,352.00
68774 09/16/2025 LBAC - DIAZ-GOMEZ 1,752.62
68761 09/16/2025 LBAC - PARRA 302.35
Check 10/09/2025 922186 Accounts Payable LEXISNEXIS RISK SOLUTIONS 4,011.17
Invoice Date Description Check Sort Code Amount.
1300186269 09/30/2025 9/1/25-8/31/26 TRAX SUBSCRIPTION 4,011.17
Check 10/09/2025 922187 Accounts Payable STAN LIM 400.00
Invoice Date Description Check Sort Code Amount.
10012025 10/01/2025 STATE OF THE CITY EVENT - OCT 14, 2025 400.00
Check 10/09/2025 922188 Accounts Payable ELENA LOERA 315.80
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement 315.80
Check 10/09/2025 922189 Accounts Payable LUTHERAN SOCIAL SERVICE OF
SOUTHERN CALIFORNIA
254,331.70
Invoice Date Description Check Sort Code Amount.
3A 07/23/2025 FY 25/26 ARPA Lutheran DEC 2024 28,173.86
4A 08/14/2025 FY 25/26 ARPA Lutheran JAN 2025 21,543.25
5A 08/20/2025 FY 25/26 ARPA Lutheran FEB 2025 40,863.19
6A 09/03/2025 FY 25/26 ARPA Lutheran MAR 2025 36,538.34
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/09/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 8 of 17 10/9/2025 3:49:36 PM
Packet Page. 138
7A 09/24/2025 FY25/26 LSSSC ARPA April 2025 68,251.53
8A 10/02/2025 FY25/26 LSSSC ARPA May 2025 58,961.53
Check 10/09/2025 922190 Accounts Payable MATICH CORPORATION 617,010.23
Invoice Date Description Check Sort Code Amount.
82525019 09/10/2025 8/1 - 8/31/25 PAVEMENT REHABILITATION @ FOURTEEN LOCATIONS 649,484.45
82525019RET 09/10/2025 8/1 - 8/31/25 PAVEMENT REHABILITATION @ FOURTEEN LOCATIONS (32,474.22)
Check 10/09/2025 922191 Accounts Payable WILLSCOT MOBILE MINI 190.04
Invoice Date Description Check Sort Code Amount.
9024594796 09/16/2025 CONTAINER RENTAL - 9-16-25 TO 10-13-25 190.04
Check 10/09/2025 922192 Accounts Payable OBELISK ACHIEVEMENT LLC 6,200.00
Invoice Date Description Check Sort Code Amount.
25032 09/02/2025 AUGUST 2025 PRINCIPAL CONSULTANT HOURS 3,100.00
25034 10/01/2025 SEPTEMBER 2025 PRINCIPAL CONSULTANT HOURS 3,100.00
Check 10/09/2025 922193 Accounts Payable PACIFIC COAST BUSINESS INTERIORS
LLC
4,075.80
Invoice Date Description Check Sort Code Amount.
32437 08/22/2025 CALL CENTER WORKSTATION TASK CHAIR BLACK 4,075.80
Check 10/09/2025 922194 Accounts Payable PC-CITY OF SAN BERNARDINO 89.14
Invoice Date Description Check Sort Code Amount.
9112025 09/11/2025 Petty Cash Shortage - Replenishment 89.14
Check 10/09/2025 922195 Accounts Payable PIONEER SUPPORT SERVICES INC 314.53
Invoice Date Description Check Sort Code Amount.
30736 09/30/2025 TRANSCRIPTION SERVICES 09/25 314.53
Check 10/09/2025 922196 Accounts Payable PRUDENTIAL OVERALL SUPPLY 1,507.82
Invoice Date Description Check Sort Code Amount.
23844676 08/21/2025 UNIFORM RENTAL FORESTRY 88.46
23844677 08/21/2025 UNIFORM RENTAL STREETS 203.80
23844678 08/21/2025 UNIFORM RENTAL PARKS 43.56
23847686 08/28/2025 UNIFORM RENTAL LIGHTING 52.97
23847687 08/28/2025 UNIFORM RENTAL STORM DRAINS 17.77
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/09/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 9 of 17 10/9/2025 3:49:36 PM
Packet Page. 139
23847688 08/28/2025 UNIFORM RENTAL SIGNS 17.05
23847689 08/28/2025 UNIFORM RENTAL GRAFFITI 35.17
23847690 08/28/2025 UNIFORM RENTAL FORESTRY 100.35
23847691 08/28/2025 UNIFORM RENTAL STREETS 187.52
23847692 08/28/2025 UNIFORM RENTAL PARKS 43.56
23850709 09/04/2025 BUILD MAINT UNIFORM RENTAL 117.83
23847693 08/28/2025 CUSTODIAL SUPPLY RENTAL 103.00
23847694 08/28/2025 CUSTODIAL UNIFORM RENTAL 226.94
23850717 09/04/2025 CUSTODIAL SUPPLY RENTAL 103.00
23850718 09/04/2025 CUSTODIAL UNIFORM RENTAL 145.60
23847684 08/28/2025 AQUATICS UNIFORM RENTAL 18.12
23850708 09/04/2025 AQUATICS UNIFORM RENTAL 3.12
Check 10/09/2025 922197 Accounts Payable QUADIENT LEASING USA INC 1,408.81
Invoice Date Description Check Sort Code Amount.
1997787 08/31/2025 LEASE PAYMENT FOR OCT TO DEC 31 2025 1,408.81
Check 10/09/2025 922198 Accounts Payable REDWOOD PRIVATE SECURITY LP 6,224.85
Invoice Date Description Check Sort Code Amount.
72 10/01/2025 REDWOOD INVOICE - REGAL THEATRE SEPTEMBER 2025 6,224.85
Check 10/09/2025 922199 Accounts Payable LUPITA RENDON 245.20
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement 245.20
Check 10/09/2025 922200 Accounts Payable ROBERT WINDLE LABOR CONSULTANT 14,400.00
Invoice Date Description Check Sort Code Amount.
5 08/21/2025 LABOR NEGOTIATIONS - JULY 2025 14,400.00
Check 10/09/2025 922201 Accounts Payable ERICA RODRIGUEZ 207.69
Invoice Date Description Check Sort Code Amount.
202521 10/09/2025 Payroll Vendors 9/15-9/28/25 207.69
Check 10/09/2025 922202 Accounts Payable SAN BERNARDINO PAINT 110.65
Invoice Date Description Check Sort Code Amount.
75016 08/01/2025 EGGSHELL ENAMEL 110.65
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/09/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 10 of 17 10/9/2025 3:49:36 PM
Packet Page. 140
Check 10/09/2025 922203 Accounts Payable SAN BERNARDINO POOL SUPPLY 678.50
Invoice Date Description Check Sort Code Amount.
12564 08/28/2025 ALGI OUT CITY FOUNTAIN 369.70
12580 09/10/2025 TABS PHOSPHATE REMOVER CITY FOUNTAIN 308.80
Check 10/09/2025 922204 Accounts Payable SATCOM GLOBAL INC 171.63
Invoice Date Description Check Sort Code Amount.
10250238 10/01/2025 SEPTEMBER 25 SIM CARD 171.63
Check 10/09/2025 922205 Accounts Payable SAN BERNARDINO COUNTY
RECORDER 1ST FLOOR
40.00
Invoice Date Description Check Sort Code Amount.
25219079 09/10/2025 CAO - ACP RELEASES 20.00
25219095 09/10/2025 CAO - ACP RELEASES 20.00
Check 10/09/2025 922206 Accounts Payable SEHI COMPUTER PRODUCTS INC 16,371.92
Invoice Date Description Check Sort Code Amount.
257231 09/19/2025 NETWORK CABLING FOR PD TO SUPPORT DESKTOP COMPUTERS 5,028.72
257254 09/22/2025 VIDEO SERVER 11,343.20
Check 10/09/2025 922207 Accounts Payable SERVICE SCAPE 4,250.00
Invoice Date Description Check Sort Code Amount.
92025 09/24/2025 SEPTEMBER 2025 LANDSCAPING SERVICES 2,650.00
8125 09/24/2025 TRIM SERVICE AND HORNET NEST REMOVAL 1,600.00
Check 10/09/2025 922208 Accounts Payable SHERWIN WILLIAMS CO 159.24
Invoice Date Description Check Sort Code Amount.
2940 09/05/2025 SWISS COFFEE PAINT CA THEATRE 159.24
Check 10/09/2025 922209 Accounts Payable SOLUTIONS SIMPLIFIED 44,360.00
Invoice Date Description Check Sort Code Amount.
13943 10/03/2025 DOCUSIGN SOFTWARE FY 25-26 44,360.00
Check 10/09/2025 922210 Accounts Payable SOUTHERN CALIFORNIA EDISON 5,684.70
Invoice Date Description Check Sort Code Amount.
7849 09/03/2025 FY 25-26 ELECTRIC CHARGES 5,684.70
Check 10/09/2025 922211 Accounts Payable ALLEGION ACCESS TECHNOLOGIES 710.00
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/09/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 11 of 17 10/9/2025 3:49:36 PM
Packet Page. 141
LLC
Invoice Date Description Check Sort Code Amount.
90058854 08/29/2025 AUTO DOOR MAINTENANCE AT FELDHEYM LIBRARY 284.00
90058858 08/29/2025 OVERTIME TRAVEL CHARGE FELDHEYM LIBRARY 426.00
Check 10/09/2025 922212 Accounts Payable STAPLES BUSINESS ADVANTAGE 2,187.17
Invoice Date Description Check Sort Code Amount.
7007108133 10/01/2025 SEPTEMBER 2025 IT OFFICE SUPPLY ORDER 787.19
7007110989 10/01/2025 STAPLES ECON ORDER SEPTEMBER 2025 270.72
7006731319 09/01/2025 CDH August 2025 Staples Order 1,129.26
Check 10/09/2025 922213 Accounts Payable STAPLES TECHNOLOGY SOLUTIONS 1,839.52
Invoice Date Description Check Sort Code Amount.
SKC851 10/06/2025 HOUSING - PRINTER 537.78
SJR373 09/26/2025 CITY-WIDE TECH REPLACEMENT LOGITECH HD PRO WEBCAM 1,301.74
Check 10/09/2025 922214 Accounts Payable STATE WATER RESOURCES CONTROL
BOARD
1,873.00
Invoice Date Description Check Sort Code Amount.
320150 04/02/2025 ANNUAL PERMIT FEE - CITY CORP YARD 4/1/25-3/31/26 (INDEX
653818)
1,873.00
Check 10/09/2025 922215 Accounts Payable SYSCO FOOD SERVICES OF LOS
ANGELES INC
11,484.18
Invoice Date Description Check Sort Code Amount.
520777885 08/28/2025 FOOD AND CONSUMABLES FOR SENIOR NUTRITION 2,963.85
520795826 09/04/2025 FOOD AND CONSUMABLES FOR SENIOR NUTRITION 3,697.83
520808359 09/11/2025 FOOD AND CONSUMABLES FOR SENIOR NUTRITION 4,822.50
Check 10/09/2025 922216 Accounts Payable T MOBILE USA INC 115.00
Invoice Date Description Check Sort Code Amount.
2510025765 10/02/2025 6/12/25-6/18/25 PROSPECTIVE PRECISION LOCATION 115.00
Check 10/09/2025 922217 Accounts Payable THE COUNSELING TEAM 3,325.96
Invoice Date Description Check Sort Code Amount.
105270 07/07/2025 EMPLOYEE ASSISTANCE PROGRAM- JUNE 2025 1,432.50
105581 07/31/2025 EMPLOYEE ASSISTANCE PROGRAM - PD - 7/14/25 INCIDENT 614.65
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/09/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 12 of 17 10/9/2025 3:49:36 PM
Packet Page. 142
105783 08/08/2025 EMPLOYEE ASSISTANCE PROGRAM - JULY 2025 1,278.81
Check 10/09/2025 922218 Accounts Payable ISMAEL FONSECA AND 18,571.51
Invoice Date Description Check Sort Code Amount.
9082025 09/08/2025 FONSECA - FULL & FINAL SETTLEMENT 18,571.51
Check 10/09/2025 922219 Accounts Payable TRANSUNION RISK AND ALTERNATIVE 150.00
Invoice Date Description Check Sort Code Amount.
8603562025091 10/01/2025 9/1/25-9/30/25 INVESTIGATIVE DATABASE 150.00
Check 10/09/2025 922220 Accounts Payable VOLKSWAGEN SAN BERNARDINO 38,552.09
Invoice Date Description Check Sort Code Amount.
9012025 09/01/2025 2025 VOLKSWAGEN ATLAS CROSS SPORT 38,552.09
Check 10/09/2025 922221 Accounts Payable WIRZ AND COMPANY PRINTING INC 1,264.22
Invoice Date Description Check Sort Code Amount.
143770 09/08/2025 Poster Prints 42.41
144090 09/22/2025 INVEST SAN BERNARDINO COMMUNITY PROFILE CATALOG 653.59
144116 09/23/2025 COMMERCIAL OPPORTUNITIES BOOKLET 274.59
144175 09/23/2025 Business Cards-10 people-Building and Safety 293.63
Check 10/09/2025 922222 Accounts Payable ZOHO CORPORATION 16,530.00
Invoice Date Description Check Sort Code Amount.
50101113563 10/03/2025 Mobile Device Manager 16,530.00
Check 10/09/2025 922223 Accounts Payable AFSCME DC 36 1,590.00
Invoice Date Description Check Sort Code Amount.
202521 10/09/2025 Payroll Vendors 9/15 - 9/28/25 PPP - Payroll 1,590.00
Check 10/09/2025 922224 Accounts Payable ARROWHEAD UNITED WAY 143.59
Invoice Date Description Check Sort Code Amount.
202521 10/09/2025 Payroll Vendors 9/15 - 9/28/25 PPP - Payroll 143.59
Check 10/09/2025 922225 Accounts Payable FRANCHISE TAX BOARD 992.20
Invoice Date Description Check Sort Code Amount.
202521 10/09/2025 Payroll Vendors 9/15 - 9/28/25 PPP - Payroll 992.20
Check 10/09/2025 922226 Accounts Payable FRANCHISE TAX BOARD 166.17
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/09/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 13 of 17 10/9/2025 3:49:36 PM
Packet Page. 143
Invoice Date Description Check Sort Code Amount.
202521 10/09/2025 Payroll Vendors 9/15 - 9/28/25 PPP - Payroll 166.17
Check 10/09/2025 922227 Accounts Payable INTERNAL REVENUE SERVICE 92.31
Invoice Date Description Check Sort Code Amount.
202521 10/09/2025 Payroll Vendors 9/15 - 9/28/25 PPP - Payroll 92.31
Check 10/09/2025 922228 Accounts Payable UNITED STATES TREASURY 11.04
Invoice Date Description Check Sort Code Amount.
100925 09/22/2025 Additional Payment - ER ID 95-6000772 PPP - Payroll 11.04
Check 10/09/2025 922229 Accounts Payable POLICE MANAGEMENT ASSOCIATION 800.00
Invoice Date Description Check Sort Code Amount.
202521 10/09/2025 Payroll Vendors 9/15 - 9/28/25 PPP - Payroll 800.00
Check 10/09/2025 922230 Accounts Payable SAN BERNARDINO MANAGEMENT
ASSOCIATION
510.00
Invoice Date Description Check Sort Code Amount.
202521 10/09/2025 Payroll Vendors 9/15 - 9/28/25 PPP - Payroll 510.00
Check 10/09/2025 922231 Accounts Payable SAN BERNARDINO POLICE DISPATCH
ASSOCIATION
600.00
Invoice Date Description Check Sort Code Amount.
202521 10/09/2025 Payroll Vendors 9/15 - 9/28/25 PPP - Payroll 600.00
Check 10/09/2025 922232 Accounts Payable SAN BERNARDINO POLICE OFFICERS
ASSOC PR DEDUC
32,203.37
Invoice Date Description Check Sort Code Amount.
202521 10/09/2025 Payroll Vendors 9/15 - 9/28/25 PPP - Payroll 32,203.37
Check 10/09/2025 922233 Accounts Payable TEAMSTERS LOCAL 1932 3,735.11
Invoice Date Description Check Sort Code Amount.
20252130 10/09/2025 Payroll Vendors 9/15-9/28/25 PPP - Payroll 3,735.11
Check 10/09/2025 922234 Accounts Payable TEAMSTERS LOCAL 1932 1,371.43
Invoice Date Description Check Sort Code Amount.
20252120 10/09/2025 Payroll Vendors 9/15-9/28/25 PPP - Payroll 1,371.43
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/09/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 14 of 17 10/9/2025 3:49:36 PM
Packet Page. 144
Check 10/09/2025 922235 Accounts Payable RAMONA ACEVEDO 321.20
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 321.20
Check 10/09/2025 922236 Accounts Payable XINIA BERRIOS 418.06
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 418.06
Check 10/09/2025 922237 Accounts Payable VERONICA COLLIER 634.82
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 634.82
Check 10/09/2025 922238 Accounts Payable CYNTHIA FORREST 431.96
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 431.96
Check 10/09/2025 922239 Accounts Payable LORI ANNETTE GARDNER 1,253.40
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 1,253.40
Check 10/09/2025 922240 Accounts Payable FLORENCE HUGHES 921.36
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 921.36
Check 10/09/2025 922241 Accounts Payable JOHN JORDAN 465.38
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 465.38
Check 10/09/2025 922242 Accounts Payable MATT LOPEZ 415.70
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 415.70
Check 10/09/2025 922243 Accounts Payable ASCENCION ZEPEDA MARTINEZ 739.90
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 739.90
Check 10/09/2025 922244 Accounts Payable STEPHANIE MC CRAY 917.00
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/09/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 15 of 17 10/9/2025 3:49:36 PM
Packet Page. 145
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 917.00
Check 10/09/2025 922245 Accounts Payable SANDRA DEE MOSS 388.68
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 388.68
Check 10/09/2025 922246 Accounts Payable SHIRLEY ROBINSON 360.40
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 360.40
Check 10/09/2025 922247 Accounts Payable JOHN ROBLEDO 38.24
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 38.24
Check 10/09/2025 922248 Accounts Payable LEE RUSHING 841.40
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 841.40
Check 10/09/2025 922249 Accounts Payable DELLA DELORES SPURLOCK 251.10
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 251.10
Check 10/09/2025 922250 Accounts Payable DENISE THOMPSON 267.42
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 267.42
Check 10/09/2025 922251 Accounts Payable LINDA WALKER 845.70
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 845.70
Check 10/09/2025 922252 Accounts Payable LENELLE WASHINGTON 269.20
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 269.20
Check 10/09/2025 922253 Accounts Payable TANYA WASHINGTON 962.08
Invoice Date Description Check Sort Code Amount.
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/09/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 16 of 17 10/9/2025 3:49:36 PM
Packet Page. 146
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 962.08
Check 10/09/2025 922254 Accounts Payable DEBRA WHITE 176.00
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 176.00
Check 10/09/2025 922255 Accounts Payable HAROLD WHITE 937.86
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 937.86
Check 10/09/2025 922256 Accounts Payable GUADALUPE ZAVALA 188.17
Invoice Date Description Check Sort Code Amount.
9/25 10/07/2025 SCP-September 2025 Reimbursement SCP - Senior Companion Program 188.17
City Commercial City Commercial - A/P, P/R taxes Totals:Transactions: 117 $1,698,991.10
Checks:117 $1,698,991.10
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/09/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 17 of 17 10/9/2025 3:49:36 PM
Packet Page. 147
Fund 001 - General $1,087,052.11
Fund 007 - Measure S $141,222.50
Fund 008 - American Rescue Plan Fund $106,832.48
Fund 101 - City of SB State of the City $11,245.75
Fund 119 - Community Developmnt Block Grant $184,109.09
Fund 123 - Federal Grant Programs $35,656.00
Fund 124 - Animal control $97,685.65
Fund 126 - Gas Tax Fund $129,315.13
Fund 130 - State And Other Grant Programs $87,090.52
Fund 141 - Local Grants $350,496.66
Fund 247 - Cultural Developmnt Construction $49,608.92
Fund 254 - Assessment district $116,474.78
Fund 255 - Community Facilities Districts $2,407.64
Fund 527 - Integrated waste management $160.36
Fund 629 - Liability insurance fund $5,000.00
Fund 635 - Fleet services fund $116,175.18
Fund 678 - Workers compensation $33,016.00
Fund 679 - Information technology $61,835.70
Fund 784 - Payroll Clearing Fund $43,843.70
$2,659,228.17
City of San Bernardino
Accounts Payable Warrant Register
Summary by Fund
Register #23 October 23, 2025
Packet Page. 148
Bank Account:City Commercial - City Commercial - A/P, P/R taxes
Check 10/23/2025 922341 Accounts Payable ANAIS ACOSTA 70.38
Invoice Date Description Check Sort Code Amount.
10202025 10/21/2025 REIMBURSEMENT FOR NOTARY TRAINING CLASS 70.38
Check 10/23/2025 922342 Accounts Payable ADMINSURE INC 33,016.00
Invoice Date Description Check Sort Code Amount.
18318 10/15/2025 W.C CLAIMS ADMINISTRATION TPA - OCTOBER 2025 33,016.00
Check 10/23/2025 922343 Accounts Payable ALKEMISTS LABS 175.00
Invoice Date Description Check Sort Code Amount.
4632 10/07/2025 12 CANNABINOIDS 175.00
Check 10/23/2025 922344 Accounts Payable AMAZON CAPITAL SERVICES 831.05
Invoice Date Description Check Sort Code Amount.
11WDFTLN7GMT 09/16/2025 FINANCE-AMAZON SUPPLIES 153.90
1PC6CD643MV9 10/11/2025 AIIBE 10 PACK 128GB FLASH DRV (82.63)
1XX1TD466VV9 10/09/2025 AIIBE 10 PACK 64GB FLASH DRIVE (256.55)
1FHYKYXT3J1P 09/29/2025 CLOROX WIPES AND GLOVES 231.89
1FPDP746HDDJ 10/06/2025 BUILDER CAR WASH KIT W/ FOAM CANNON 195.74
1364KLLWDQ3P 09/29/2025 NITRILE AND WORK GLOVES 57.82
1XVL3GN994JJ 10/09/2025 STATE OF THE CITY SUPPLIES FOR OCT 14, 2025 44.75
1XPL6LV9FKQV 09/19/2025 Council Office Supplies 76.02
1DF71H6Y6DYR 09/29/2025 Council Office Supplies (ergo)317.98
1QPRL9XQG63D 10/08/2025 FINANCE-AMAZON SUPPLIES 92.13
Check 10/23/2025 922345 Accounts Payable ANIMAL CARE EQUIPMENT & SERVICES
LLC
2,297.74
Invoice Date Description Check Sort Code Amount.
135010 07/01/2025 Leashes 2,297.74
Check 10/23/2025 922346 Accounts Payable ANIMAL CARE WELLNESS CENTER INC 3,892.77
Invoice Date Description Check Sort Code Amount.
239879 06/10/2025 VETERINARY MEDICAL SERVICES 531.58
239937 06/16/2025 VETERINARY MEDICAL SERVICES 372.67
239954 06/17/2025 VETERINARY MEDICAL SERVICES 966.90
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/23/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 1 of 18 10/23/2025 4:37:30 PM
Packet Page. 149
239955 06/17/2025 VETERINARY MEDICAL SERVICES 432.06
240041 06/24/2025 VETERINARY MEDICAL SERVICES 514.00
240291 07/18/2025 VETERINARY MEDICAL SERVICES 259.50
240334 07/23/2025 VETERINARY MEDICAL SERVICES 816.06
Check 10/23/2025 922347 Accounts Payable ANIMAL EMERGENCY CLINIC 4,209.00
Invoice Date Description Check Sort Code Amount.
581563 09/20/2025 VETERINARY MEDICAL SERVICES 800.00
581773 10/08/2025 VETERINARY MEDICAL SERVICES 819.00
581962 10/08/2025 VETERINARY MEDICAL SERVICES 840.00
581974 10/08/2025 VETERINARY MEDICAL SERVICES 800.00
582008 10/08/2025 VETERINARY MEDICAL SERVICES 950.00
Check 10/23/2025 922348 Accounts Payable ATEL TECHNOLOGIES INC 1,785.00
Invoice Date Description Check Sort Code Amount.
6408A 08/04/2025 REISSUE CK 921529 - PBX MAINTENANCE 8/8/25-9/29/25 1,785.00
Check 10/23/2025 922349 Accounts Payable ATKINSON ANDELSON LOYA RUUD &
ROMO
52,753.75
Invoice Date Description Check Sort Code Amount.
761113 08/31/2025 AALR&R - BROWN 41,639.25
749511 04/30/2025 INVESTIGATIVE SERVICES - 04/01/25-04/30/25 3,242.50
752021 05/31/2025 INVESTIGATIVE SERVICES - 05/01/25-05/21/25 1,317.50
752010 05/31/2025 INVESTIGATIVE SERVICES - 05/01/25-05/28/25 5,492.00
756414 06/30/2025 INVESTIGATIVE SERVICES - 06/12/25-06/26/25 1,062.50
Check 10/23/2025 922350 Accounts Payable AUTO SMOG CHECK TEST ONLY 34.95
Invoice Date Description Check Sort Code Amount.
78828 09/11/2025 SMOG CHECK UNIT 393 34.95
Check 10/23/2025 922351 Accounts Payable NICHOLAS BAZENJANEH 75.00
Invoice Date Description Check Sort Code Amount.
24302180 11/12/2024 Spay Neuter Deposit Refund 75.00
Check 10/23/2025 922352 Accounts Payable BILBRO CONSTRUCTION COMPANY INC 350,496.66
Invoice Date Description Check Sort Code Amount.
6 09/01/2025 8/1 - 8/31/25 SPEICHER PARK BALLFIELD IMPROVEMENTS PROJECT 224,282.58
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/23/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 2 of 18 10/23/2025 4:37:30 PM
Packet Page. 150
6RET 09/01/2025 8/1 - 8/31/25 SPEICHER PARK BALLFIELD IMPROVEMENTS PROJECT (11,214.13)
7 10/01/2025 9/1 - 9/30/25 SPEICHER PARK BALLFIELD IMPROVEMENTS PROJECT 144,661.27
7RET 10/01/2025 9/1 - 9/31/25 SPEICHER PARK BALLFIELD IMPROVEMENTS PROJECT (7,233.06)
Check 10/23/2025 922353 Accounts Payable BIO TOX LABORATORIES INC 9,841.00
Invoice Date Description Check Sort Code Amount.
47941 09/22/2025 7/21/25- 9/15/25 TOXICOLOGY SERVICES 9,841.00
Check 10/23/2025 922354 Accounts Payable PAUL CARISSIMI 75.00
Invoice Date Description Check Sort Code Amount.
24303031 12/22/2024 Spay Neuter Deposit Refund 75.00
Check 10/23/2025 922355 Accounts Payable CARPENTER ROTHANS & DUMONT LLP 55,575.94
Invoice Date Description Check Sort Code Amount.
49760 06/15/2025 CR&D - SANCHEZ 1,484.00
50497 09/15/2025 CR&D - MOORER-BABY 2,312.70
50017 07/15/2025 CR&D - URENA 7,133.06
50303 09/15/2025 CR&D - URENA 16,235.19
50496 09/15/2025 CR&D - ORTIZ 28,410.99
Check 10/23/2025 922356 Accounts Payable CASA RAMONA INC 32,289.00
Invoice Date Description Check Sort Code Amount.
11 08/01/2025 AUGUST 2025 RENT @ 1543 W 8TH ST FOR ANIMAL SRVCS 10,763.00
10 07/01/2025 JULY 2025 RENT @ 1543 W 8TH ST FOR ANIMAL SRVCS 10,763.00
12 09/01/2025 SEPTEMBER 2025 RENT @ 1543 W 8TH ST FOR ANIMAL SRVCS 10,763.00
Check 10/23/2025 922357 Accounts Payable CASTLE CONSTRUCTION SERVICES
INC
48,584.76
Invoice Date Description Check Sort Code Amount.
250059 06/27/2025 Akoma Flooring 48,584.76
Check 10/23/2025 922358 Accounts Payable CHARTER COMMUNICATIONS 187.86
Invoice Date Description Check Sort Code Amount.
226703701100125 10/01/2025 10/01/25-10/31/25 Cable TV - IEMG ACCT 226703701 187.86
Check 10/23/2025 922359 Accounts Payable CHRISTOPHER EMON 204.95
Invoice Date Description Check Sort Code Amount.
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/23/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 3 of 18 10/23/2025 4:37:30 PM
Packet Page. 151
9232025 09/23/2025 TOTAL MEAL EXPENSES AND AIRPORT PARKING REIMBURSEMENT 204.95
Check 10/23/2025 922360 Accounts Payable CITY OF SAN BERNARDINO WATER 118,236.20
Invoice Date Description Check Sort Code Amount.
7865 09/25/2025 WATER CHARGES 54,161.28
7866 10/01/2025 WATER CHARGES 64,074.92
Check 10/23/2025 922361 Accounts Payable SHANNON CLARK 75.00
Invoice Date Description Check Sort Code Amount.
24299032 06/25/2024 Spay Neuter Deposit Refund 75.00
Check 10/23/2025 922362 Accounts Payable COMPASS PEST MANAGEMENT INC 654.00
Invoice Date Description Check Sort Code Amount.
303381 08/06/2025 Monthly Pest Control 08/06/25 78.00
306145 09/06/2025 Monthly Pest Control 09/06/25 78.00
307176 09/18/2025 Monthly Pest Control 09/18/25 Satellite 45.00
307842 09/26/2025 Quarterly Pest Control 09/26/25 375.00
308576 10/06/2025 Monthly Pest Control 10/06/25 78.00
Check 10/23/2025 922363 Accounts Payable COMPUTERIZED EMBROIDERY
COMPANY INC
490.94
Invoice Date Description Check Sort Code Amount.
59697 10/13/2025 STAFF SHIRTS, BLAZERS AND CARDIGANS 490.94
Check 10/23/2025 922364 Accounts Payable COSTAR 13,500.31
Invoice Date Description Check Sort Code Amount.
122827763 10/03/2025 COSTAR SUBSCRIPTION INVOICE FY 2025-2026 13,500.31
Check 10/23/2025 922365 Accounts Payable DANIELS TIRE SERVICE 29,522.23
Invoice Date Description Check Sort Code Amount.
230223356 09/02/2025 NEW TIRES FOR FLEET 16,901.86
230223501 09/12/2025 NEW TIRES FOR FLEET 7,026.74
230225996 10/03/2025 NEW TIRES FOR STOCK 5,593.63
Check 10/23/2025 922366 Accounts Payable DANS LAWNMOWER CENTER 387.56
Invoice Date Description Check Sort Code Amount.
321836 09/22/2025 CYLINDER HEAD GASKET EXHAUST VALVE INTAKE UNIT 560 387.56
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/23/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 4 of 18 10/23/2025 4:37:30 PM
Packet Page. 152
Check 10/23/2025 922367 Accounts Payable DATA TICKET INC 45.00
Invoice Date Description Check Sort Code Amount.
183675 09/29/2025 AUG 2025 BANKING SVCS & PROCESSING FEES 45.00
Check 10/23/2025 922368 Accounts Payable OLIVIA DIAZ 75.00
Invoice Date Description Check Sort Code Amount.
24302466 11/24/2024 Spay Neuter Deposit Refund 75.00
Check 10/23/2025 922369 Accounts Payable DIBS SAFE & LOCK SERVICE 333.93
Invoice Date Description Check Sort Code Amount.
1282675 09/15/2025 DUPLICATE KEY STAMP KEYS 24.24
1282787 09/22/2025 DUPLICATE KEY STAMP KEY 14.10
1282933 09/29/2025 PADLOCK DUPLICATE KEY STAMP KEYS 251.11
1282941 09/30/2025 DUPLICATE KEY STAMP KEYS 11.23
1282993 10/01/2025 DUPLICATE KEY STAMP KEYS 33.25
Check 10/23/2025 922370 Accounts Payable DIXON MUTADZAKUPA CONSULTING
LLC
6,360.00
Invoice Date Description Check Sort Code Amount.
6 10/13/2025 9/17/25-10/08/25 CONSULTING AND SUPPORT SERVICES 6,360.00
Check 10/23/2025 922371 Accounts Payable DUGGAN MCHUGH LAW CORPORATION 81.00
Invoice Date Description Check Sort Code Amount.
12120 09/12/2025 DM - ACCS&B 81.00
Check 10/23/2025 922372 Accounts Payable EAST VALLEY WATER DISTRICT 643.83
Invoice Date Description Check Sort Code Amount.
7867 09/25/2025 WATER CHARGES 643.83
Check 10/23/2025 922373 Accounts Payable EL CLASIFICADO 14,640.00
Invoice Date Description Check Sort Code Amount.
919178 07/07/2025 ADVERTISING SRVCS - RECYCLING PLASTIC, ALUMINUM, BOTTLES
& CANS
14,640.00
Check 10/23/2025 922374 Accounts Payable ENVIRONMENTAL PROJECT SERVICES
INC
106,788.85
Invoice Date Description Check Sort Code Amount.
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/23/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 5 of 18 10/23/2025 4:37:30 PM
Packet Page. 153
9217 09/29/2025 CONCRETE REPAIRS SERRANO RD 66,670.01
9218 10/03/2025 CONCRETE REPAIRS 2769 N PERSHING 13,807.92
9219 10/03/2025 CONCRETE REPAIRS 2784 PERSHING 14,693.70
9220 10/09/2025 CONCRETE REPAIRS 648 W 13TH 11,617.22
Check 10/23/2025 922375 Accounts Payable EVERON LLC 39.00
Invoice Date Description Check Sort Code Amount.
159721993 09/22/2025 OCTOBER 25 ALARM MONITORING 39.00
Check 10/23/2025 922376 Accounts Payable FACTORY MOTOR PARTS CO 24.58
Invoice Date Description Check Sort Code Amount.
106614489 09/03/2025 V BELT STRETCH KITP UNIT 0704 24.58
Check 10/23/2025 922377 Accounts Payable FACULTY PHYSICIANS AND SURGEONS
OF LLUSM
33,150.00
Invoice Date Description Check Sort Code Amount.
100325 10/03/2025 RABIES MEDICAL SERVICES 33,150.00
Check 10/23/2025 922378 Accounts Payable FAIRVIEW FORD SALES INC 5,374.70
Invoice Date Description Check Sort Code Amount.
34577 08/29/2025 OUTSIDE VEHICLE MAINT UNIT 0571 368.96
205467 08/20/2025 TUBE ASY GASKET SENSOR EXHAUST CONVERTER UNIT F1916 3,647.16
210333 09/11/2025 B17SHIELD UNIT F2306 74.61
208821 09/04/2025 307SHAFT UNIT F2227 133.98
208009 09/02/2025 BB14MOTOR ELE 104.55
207387 08/28/2025 TOOL TIMING TOOL CRANKS UNIT F2229 154.79
207481 08/28/2025 BB14MOTOR HOSE OIL RADI UNIT F2229 285.81
208284 09/03/2025 R1LAMP ASY UNIT 0404 178.24
208899 09/05/2025 SPOPIPE FUEL UNIT F1915 154.32
207143 08/27/2025 B41SEAT BELT UNIT F1808 154.87
209622 09/09/2025 701ARM ASY 1,015.42
207142 08/27/2025 D19 1 SENSOR UNIT F2002 265.80
207364 08/28/2025 B41BUCKLE ASY UNIT F1689 102.41
208233 09/03/2025 D3RETAINER UNIT 1602 2.65
209348 09/08/2025 B09BRACKET UNIT F2220 42.50
209467 09/08/2025 B09BRACKET UNIT F2220 48.03
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/23/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 6 of 18 10/23/2025 4:37:30 PM
Packet Page. 154
208677 09/04/2025 CREDIT ON ORIGINAL INV 204166 CORE CHG (271.88)
208676 09/04/2025 CREDIT ON ORIGINAL INV 169334 ONSTKCORE CHG (543.76)
208669 09/04/2025 CREDIT ON ORIGINAL INV 205467 ONSTKCORE CHG (543.76)
Check 10/23/2025 922379 Accounts Payable FASTENAL COMPANY 1,712.24
Invoice Date Description Check Sort Code Amount.
85218 09/02/2025 MOP HEAD CLEANER WMGRCMBO DISTILWATER FIXEDBASE 1,570.71
85021 08/18/2025 TABLE TOPBOLTGAGEMETRIC 141.53
Check 10/23/2025 922380 Accounts Payable FEDEX 9.77
Invoice Date Description Check Sort Code Amount.
901550016 10/03/2025 L. ORTIZ - POSTAGE 9.77
Check 10/23/2025 922381 Accounts Payable FIFTH ASSET INC DEBTBOOK 11,625.00
Invoice Date Description Check Sort Code Amount.
2007196B 03/21/2025 Lease & SBITA Management Complete 6 11,625.00
Check 10/23/2025 922382 Accounts Payable MATTHEW FISHER 312.93
Invoice Date Description Check Sort Code Amount.
5302025 05/30/2025 REIMBURSEMENT FOR CRRA 2025 CONFERENCE 312.93
Check 10/23/2025 922383 Accounts Payable FRONTIER CALIFORNIA INC 42,502.84
Invoice Date Description Check Sort Code Amount.
82825 08/28/2025 08/28/25-09/27/25 LANDLINE SERVICES 209-188-3190-060392-5 21,314.83
92825 09/28/2025 09/28/25-010/27/25 LANDLINE SERVICES 209-188-3190-060392-5 21,188.01
Check 10/23/2025 922384 Accounts Payable G M BUSINESS INTERIORS 35,656.00
Invoice Date Description Check Sort Code Amount.
306219 10/08/2025 HERMAN MILLER AERON CHAIRS FOR DISPATCH 35,656.00
Check 10/23/2025 922385 Accounts Payable GALLS LLC 74.92
Invoice Date Description Check Sort Code Amount.
32667391 09/26/2025 PD UNIFORMS WS 21.71
32667400 09/26/2025 PD UNIFORMS YV 21.71
32691081 09/29/2025 PD UNIFORMS YV 10.26
32691080 09/29/2025 PD UNIFORMS YV 21.24
Check 10/23/2025 922386 Accounts Payable GAMMILL LAW APC CLIENT TRUST 5,000.00
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/23/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 7 of 18 10/23/2025 4:37:30 PM
Packet Page. 155
Invoice Date Description Check Sort Code Amount.
9122025 09/12/2025 HARGROVE - SETTLEMENT 5,000.00
Check 10/23/2025 922387 Accounts Payable GLENN B DORNING INC 352.07
Invoice Date Description Check Sort Code Amount.
37701 09/26/2025 SLYDE KING ASM PUMP GASKET FUEL UNIT 823 352.07
Check 10/23/2025 922388 Accounts Payable GO CAR WASH MANAGEMENT CORP 1,860.00
Invoice Date Description Check Sort Code Amount.
3361 09/30/2025 MONTHLY WASHES- SEPTEMBER 2025 1,860.00
Check 10/23/2025 922389 Accounts Payable GRAVES & KING LLP 50,871.07
Invoice Date Description Check Sort Code Amount.
6044 08/31/2025 G&K - DOWNS 2,000.50
6045 08/31/2025 G&K - ERICKSON 1,525.00
6046 08/31/2025 G&K - FONSECA 2,042.45
6047 08/31/2025 G&K - MARIN 496.00
6049 08/31/2025 G&K - RAMIREZ 2,254.20
6050 08/31/2025 G&K - MARTINEZ 3,024.61
6051 08/31/2025 G&K - MERGIL 3,330.80
6052 08/31/2025 G&K - URIBE 2,715.90
6053 08/31/2025 G&K - AQUINO 1,548.10
6054 08/31/2025 G&K - GARCIA DE CANO 1,831.02
6056 08/31/2025 G&K - ALDRIDGE 2,317.16
6057 08/31/2025 G&K - CURTS 3,819.95
6058 08/31/2025 G&K - SERRANO 1,650.00
6059 08/31/2025 G&K - TRUJILLO 2,081.48
6064 09/25/2025 G&K - QUEZADA 291.50
6048 08/31/2025 G&K - ANDERSON 2,725.00
6063 08/31/2025 G&K - NUNEZ CAMACHO 6,645.10
6055 08/31/2025 G&K - QUINTERO 6,638.20
5780 07/31/2025 G&K - NUNEZ CAMACHO 3,934.10
Check 10/23/2025 922390 Accounts Payable NGOC HAN HUYNH 75.00
Invoice Date Description Check Sort Code Amount.
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/23/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 8 of 18 10/23/2025 4:37:30 PM
Packet Page. 156
24300386 08/22/2024 Spay Neuter Deposit Refund 75.00
Check 10/23/2025 922391 Accounts Payable NICHOLAS HEWITT 75.00
Invoice Date Description Check Sort Code Amount.
24299925 08/01/2024 Spay Neuter Deposit Refund 75.00
Check 10/23/2025 922392 Accounts Payable HORIZON LIGHTING INC 14,534.00
Invoice Date Description Check Sort Code Amount.
19497 06/11/2025 LIGHT REPAIRS JERRY LEWIS SWIM CENTER 5,638.90
19158 06/06/2025 LIGHT REPAIRS E ST PARKING GARAGE 8,895.10
Check 10/23/2025 922393 Accounts Payable INLAND EMPIRE LANDSCAPE INC 211,711.39
Invoice Date Description Check Sort Code Amount.
46577 07/31/2025 MEDIAN MAINTENANCE JULY 2025 32,378.87
46887 08/31/2025 MEDIAN MAINTENANCE AUGUST 2025 31,428.87
46888 08/31/2025 LMD MAINTENANCE AUGUST 2025 58,237.39
46576 07/31/2025 LMD MAINTENANCE JULY 2025 58,237.39
47089 09/30/2025 MEDIAN MAINTENANCE SEPTEMBER 31,428.87
Check 10/23/2025 922394 Accounts Payable INLAND EMPIRE LANDSCAPE INC 16,634.00
Invoice Date Description Check Sort Code Amount.
46212 07/01/2025 CENTER MEDIANS LANDSCAPE UPGRADE 7/1/25 16,634.00
Check 10/23/2025 922395 Accounts Payable INLAND OVERHEAD DOOR CO 1,250.00
Invoice Date Description Check Sort Code Amount.
59686 08/12/2025 FRONT LOBBY GATE MAINTENANCE 1,250.00
Check 10/23/2025 922396 Accounts Payable INSIGHT POLYGRAPH & PRIVATE
INVESTIGATIONS
350.00
Invoice Date Description Check Sort Code Amount.
531 10/11/2025 2 POLYGRAPH EXAMINATION 350.00
Check 10/23/2025 922397 Accounts Payable INTEGRITY SURVEILLANCE GROUP
AND TACTITRACK GPS
998.00
Invoice Date Description Check Sort Code Amount.
18823 10/07/2025 YEARLY TRACKER RENEWAL- SERVICE FOR GPS TRACKERS 998.00
Check 10/23/2025 922398 Accounts Payable JL GROUP LLC 16,741.00
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/23/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 9 of 18 10/23/2025 4:37:30 PM
Packet Page. 157
Invoice Date Description Check Sort Code Amount.
250072 09/22/2025 INVESTIGATIVE SERVICES - EST72125 16,741.00
Check 10/23/2025 922399 Accounts Payable JOE WONDERMENT MAGIC 600.00
Invoice Date Description Check Sort Code Amount.
1083 09/15/2025 Halloween Magic Show 2025 600.00
Check 10/23/2025 922400 Accounts Payable JONES & MAYER 9,115.91
Invoice Date Description Check Sort Code Amount.
132277 09/23/2025 J&M - SAN BERNARDINO PD - PITCHESS 1,120.00
132275 09/23/2025 J&M - HILL 3,865.91
131165 07/31/2025 J&M - HILL 4,005.00
131164 07/31/2025 J&M - COWSER 125.00
Check 10/23/2025 922401 Accounts Payable JTB SUPPLY COMPANY INC 1,890.00
Invoice Date Description Check Sort Code Amount.
115609 09/18/2025 12" GREEN BALL LED ITE 1,890.00
Check 10/23/2025 922402 Accounts Payable KYA SERVICES LLC 32,233.80
Invoice Date Description Check Sort Code Amount.
5 06/30/2025 RELEASE OF RETENTION - FUTSAL FIELD CONST @ LYTLE CREEK
PARK
32,233.80
Check 10/23/2025 922403 Accounts Payable L Y ENVIRONMENTAL INC 1,750.00
Invoice Date Description Check Sort Code Amount.
34448 07/08/2025 ASBESTOS CLEARANCE TEST 1,750.00
Check 10/23/2025 922404 Accounts Payable LAWRENCE BEACH ALLEN & CHOI PC 43,789.35
Invoice Date Description Check Sort Code Amount.
68771 09/16/2025 LBAC - SUBAIH 8,958.00
68770 09/16/2025 LBAC - WILLIAMS 7,800.50
68984 10/07/2025 LBAC - SEGURA 1,053.50
68985 10/07/2025 LBAC - SPENCE 954.00
68986 10/07/2025 LBAC - DIAZ-GOMEZ 5,436.00
68987 10/07/2025 LBAC - PARRA 2,075.00
68989 10/07/2025 LBAC - ANDRADE 3,762.00
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/23/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 10 of 18 10/23/2025 4:37:30 PM
Packet Page. 158
68990 10/07/2025 LBAC - WILLIAMS 5,024.95
68993 10/07/2025 LBAC - SUBAIH 8,725.40
Check 10/23/2025 922405 Accounts Payable PARKER LOPEZ 150.00
Invoice Date Description Check Sort Code Amount.
24298850 06/18/2024 Spay Neuter Deposit Refund 150.00
Check 10/23/2025 922406 Accounts Payable MERIT OIL COMPANY 46,746.82
Invoice Date Description Check Sort Code Amount.
920639 09/12/2025 UNLEADED FUEL 17,446.11
94792 09/19/2025 FUEL CREDIT CARDS 290.75
923827 10/03/2025 UNLEADED FUEL 28,836.31
95304 10/03/2025 FUEL CREDIT CARD 173.65
Check 10/23/2025 922407 Accounts Payable RANDII MONTANO 75.00
Invoice Date Description Check Sort Code Amount.
24301066 09/26/2024 Spay Neuter Deposit Refund 75.00
Check 10/23/2025 922408 Accounts Payable TIFFANY MONTEZ 142.93
Invoice Date Description Check Sort Code Amount.
9232025 09/23/2025 TRAVEL MEAL EXPENSE, FUEL, AND RENTAL CAR 142.93
Check 10/23/2025 922409 Accounts Payable OPERATION NEW HOPE 76,553.55
Invoice Date Description Check Sort Code Amount.
1368 08/20/2025 July 2025 - BSCC Professional Services for SB VIP 36,894.06
1382 09/18/2025 August 2025 - BSCC Professional Services for SB VIP 35,228.89
1363 08/11/2025 July 2025 - ARPA Professional Services for SB VIP 1,600.00
1383 09/18/2025 August 2025 - ARPA Professional Services for SB VIP 2,830.60
Check 10/23/2025 922410 Accounts Payable ESTEBAN ORTIZ 135.80
Invoice Date Description Check Sort Code Amount.
10072025 10/07/2025 ANNUAL ALARM PERMIT REIMBURSEMENT 135.80
Check 10/23/2025 922411 Accounts Payable PARKWOOD LANDSCAPE
MANTENANCE INC
297,878.46
Invoice Date Description Check Sort Code Amount.
110083 08/31/2025 IRRIGATION REPAIRS JUNE AUGUST 2025 6,699.29
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/23/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 11 of 18 10/23/2025 4:37:30 PM
Packet Page. 159
110020 08/31/2025 LANDSCAPE MAINTENANCE AUGUST 2025 84,401.29
109831 07/31/2025 LANDSCAPE MAINTENANCE JULY 2025 94,448.11
109821 07/24/2025 REGAL CINEMA CLEAN UP 10,720.00
109927 07/31/2025 IRRIGATION REPAIRS JULY 2025 6,795.25
110159 09/30/2025 LANDSCAPE MAINTENANCE SEPTEMBER 2025 94,814.52
Check 10/23/2025 922412 Accounts Payable PARTS AUTHORITY METRO LLC 9,026.43
Invoice Date Description Check Sort Code Amount.
065055613 08/29/2025 ANTI FREEZE OIL AUTOMATIC UNIT F2227 251.97
062699495 08/29/2025 TRANS FILTER UNIT 0625 7.57
062700237 08/29/2025 BCI GROUP 48 EAST PENN BATTS UNIT F2409 906.76
062700327 08/29/2025 DUPLI GLOSS BLS FOR STOCK 134.81
062706013 09/02/2025 12V PASS CAR S UNIT 0680 340.06
096751726 09/03/2025 CABIN AIR FOR STOCK 43.89
062709786 09/03/2025 CUT OFF WHEELS FOR STOCK 20.48
062711262 09/03/2025 OIL FILTER AIR FILTER CABIN AIR FOR STOCK 864.49
062711153 09/03/2025 OIL FILTER BEAM WIPER AIR FILTER PK WW32 FOR STOCK 407.95
065067212 09/03/2025 BCI GROUP 48 CABIN AIR FOR STOCK 847.29
062711275 09/03/2025 56W POWER ADAPT 326.25
062716083 09/04/2025 12V AGM SEALEDS UNIT F1109 265.70
062713861 09/04/2025 SERPENTINE BELS CV AXLE CONTROL ARM ASS UNIT F2227 557.38
062713849 09/04/2025 MOTOR AND PUMPS UNIT F1915 38.23
062713649 09/04/2025 REGULTOR ASYS UNIT 0704 86.21
065069264 09/04/2025 COMPRESSORASY UNIT F2227 874.22
062719158 09/05/2025 12V PASS CAR LT FOR STOCK 332.91
062733086 09/10/2025 27PC COOLING KT UNIT 833 417.06
062735042 09/11/2025 REM ALTERNATOR1 UNIT 625 150.53
062734860 09/11/2025 CABIN AIR AIR FILTER ROTOR ASY BRAS FOR STOCK 706.31
062735702 09/11/2025 JUMP STARTERS 347.99
062736223 09/11/2025 WIPER BLADE TIRE PRESSURE KIT TPMS SENSOR 649.96
250879748 09/11/2025 SENSOR ASM TIRE PRESSURE IND UNIT 0680 304.63
062738184 09/12/2025 MINI BULB UNIT 0258 2.69
062739635 09/12/2025 AIR FILTER CABIN AIR OW40 SYN L UNIT 0520 141.09
Check 10/23/2025 922413 Accounts Payable PARTY PLUS RENTALS INC 8,421.00
Invoice Date Description Check Sort Code Amount
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/23/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 12 of 18 10/23/2025 4:37:30 PM
Packet Page. 160
.
134864816 10/14/2025 STATE OF THE CITY - RENTAL EQUIPMENT 8,421.00
Check 10/23/2025 922414 Accounts Payable CHRISTOPHER NOEL POST 13,065.75
Invoice Date Description Check Sort Code Amount.
16 02/01/2025 DEA license monthly fee, surgical days Feb 2025 2,000.00
17 03/01/2025 DEA license monthly fee, surgical days Mar 2025 2,000.00
18 04/01/2025 DEA license monthly fee, surgical days Apr 2025 2,000.00
19 05/01/2025 DEA license monthly fee, surgical days May 2025 2,000.00
20 06/01/2025 DEA license monthly fee, surgical days Jun 2025 2,000.00
21 07/01/2025 DEA license monthly fee Jul 2025 500.00
22 08/01/2025 DEA license monthly fee, surgical days Aug 2025 2,565.75
Check 10/23/2025 922415 Accounts Payable PRUDENTIAL OVERALL SUPPLY 1,484.95
Invoice Date Description Check Sort Code Amount.
23856650 09/18/2025 UNIFORM RENTAL LIGHTING 50.70
23856651 09/18/2025 UNIFORM RENTAL STORM DRAINS 17.77
23856652 09/18/2025 UNIFORM RENTAL SIGNS 17.05
23856653 09/18/2025 UNIFORM RENTAL GRAFFITI 48.75
23856654 09/18/2025 UNIFORM RENTAL FORESTRY 74.14
23856655 09/18/2025 UNIFORM RENTAL STREETS 202.65
23856656 09/18/2025 UNIFORM RENTAL PARKS 57.11
23856657 09/18/2025 CUSTODIAL SUPPLY RENTAL 103.00
23856658 09/18/2025 CUSTODIAL UNIFORM RENTAL 111.96
23856648 09/18/2025 AQUATICS UNIFORM RENTAL 3.12
23856649 09/18/2025 BUILD MAINT UNIFORM RENTAL 46.33
23856646 09/18/2025 FLEET SUPPLY RENTAL 87.33
23856647 09/18/2025 FLEET UNIFORM RENTAL 42.83
23853714 09/11/2025 FLEET UNIFORM RENTAL 42.37
23853715 09/11/2025 AQUATICS UNIFORM RENTAL 3.12
23853716 09/11/2025 BUILD MAINT UNIFORM RENTAL 28.89
23853724 09/11/2025 CUSTODIAL SUPPLY RENTAL 103.00
23853725 09/11/2025 CUSTODIAL UNIFORM RENTAL 86.06
23865344 10/09/2025 FLEET SUPPLY RENTAL 87.33
23865345 10/09/2025 FLEET UNIFORM RENTAL 42.83
23865358 10/09/2025 10/9/25 WEEKLY TOWEL SERVICE 228.61
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/23/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 13 of 18 10/23/2025 4:37:30 PM
Packet Page. 161
Check 10/23/2025 922416 Accounts Payable RESOURCE ENVIRONMENTAL INC 96,368.00
Invoice Date Description Check Sort Code Amount.
250212 07/29/2025 7/1 - 7/31/25 SCHOOL OF HOPE DEMO 101,440.00
250212RET 07/29/2025 7/1 - 7/31/25 SCHOOL OF HOPE DEMO (5,072.00)
Check 10/23/2025 922417 Accounts Payable ERICA RODRIGUEZ 207.69
Invoice Date Description Check Sort Code Amount.
202522 10/23/2025 Payroll Vendors 9/29 - 10/12/25 207.69
Check 10/23/2025 922418 Accounts Payable RON TURLEY ASSOCIATES INC 20,627.00
Invoice Date Description Check Sort Code Amount.
69698 06/15/2025 RTA ANNUAL SOFTWARE RENEWAL 20,627.00
Check 10/23/2025 922419 Accounts Payable SAN BERNARDINO CITY POLICE DEPT
EXTRADITION FUND
12,500.00
Invoice Date Description Check Sort Code Amount.
9232025 09/23/2025 EXTRADITION FUND DRAW DOWN 12,500.00
Check 10/23/2025 922420 Accounts Payable SAN BERNARDINO PAINT 795.00
Invoice Date Description Check Sort Code Amount.
75143 09/02/2025 PAINT FOR POLICE DEPARTMENT 109.89
75159 09/05/2025 PAINT FOR CALIFORNIA THEATRE 75.65
75248 09/30/2025 SPEEDPRO INTER/EXTER FLAT 609.46
Check 10/23/2025 922421 Accounts Payable SAN BERNARDINO POLICE DISPATCH
ASSOCIATION
630.00
Invoice Date Description Check Sort Code Amount.
202522 10/23/2025 Payroll Vendors 9/29 - 10/12/25 630.00
Check 10/23/2025 922422 Accounts Payable OSCAR SANTANA 150.00
Invoice Date Description Check Sort Code Amount.
24298417 05/21/2024 Spay Neuter Deposit Refund 150.00
Check 10/23/2025 922423 Accounts Payable SBX SERVICES INC 1,337.21
Invoice Date Description Check Sort Code Amount.
2834 09/05/2025 CAR WASH FOR CITY VEHICLES AUGUST 2025 1,322.22
2853 10/05/2025 SEPTEMBER CAR WASH SERVICES 14.99
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/23/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 14 of 18 10/23/2025 4:37:30 PM
Packet Page. 162
Check 10/23/2025 922424 Accounts Payable SCG SPICER CONSULTING GROUP LLC 2,407.64
Invoice Date Description Check Sort Code Amount.
2006 09/01/2025 ADMIN - 2025 AUGUST FACILITIES 1,969.89
2007 09/01/2025 ADMIN - 2025 AUGUST NON-BOND 437.75
Check 10/23/2025 922425 Accounts Payable SIDEPATH INC 11,000.00
Invoice Date Description Check Sort Code Amount.
24842 09/12/2025 Commvault Remediation Process 11,000.00
Check 10/23/2025 922426 Accounts Payable NERMEEN SILWANIS 75.00
Invoice Date Description Check Sort Code Amount.
24299470 07/09/2024 Spay Neuter Deposit Refund 75.00
Check 10/23/2025 922427 Accounts Payable SOUTHERN CALIFORNIA EDISON 101,056.56
Invoice Date Description Check Sort Code Amount.
7869 10/02/2025 ELECTRIC CHARGES 101,056.56
Check 10/23/2025 922428 Accounts Payable SOUTHERN CALIFORNIA GAS
COMPANY
1,069.94
Invoice Date Description Check Sort Code Amount.
7868 09/30/2025 GAS CHARGES 875.87
6730A 02/12/2025 GAS BILL FOR 201 # A 194.07
Check 10/23/2025 922429 Accounts Payable STAPLES BUSINESS ADVANTAGE 16,433.76
Invoice Date Description Check Sort Code Amount.
7006731315 09/01/2025 MISC SUPPLIES FLEET ENVELOPE MECH PENCIL REPORT COVER
CALCULATOR
275.43
7006731327 09/01/2025 9/1 - 10/1/25 - ENGINEERING SUPPLIES ORDERED 683.72
7006304798 08/01/2025 8/1 - 8/31/25 - ENGINEERING SUPPLIES ORDERED 686.79
7005925464 07/01/2025 7/1 - 7/31/25 - ENGINEERING SUPPLIES ORDERED 604.57
7007108155 10/01/2025 PD OFFICE SUPLIES 7,050.96
7007108132 10/01/2025 FORKS, STAPLE REMOVER, PRINTING PAPER, SPOONS 162.47
7007108126 10/01/2025 CAO - OFFICE SUPPLIES 567.58
7007108125 10/01/2025 Office supplies 5,961.95
7007108130 10/01/2025 FINANCE-OFFICE SUPPLIES -Sept 2025 440.29
Check 10/23/2025 922430 Accounts Payable THEATRICAL ARTS INTERNATIONAL
FOUNDATION
2,780.00
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/23/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 15 of 18 10/23/2025 4:37:30 PM
Packet Page. 163
Invoice Date Description Check Sort Code Amount.
5243 10/15/2025 STATE OF THE CITY EVENT - OCT 14, 2025 2,780.00
Check 10/23/2025 922431 Accounts Payable TRI CITY TOWING INC 750.00
Invoice Date Description Check Sort Code Amount.
504067 09/20/2025 9/11/25 TOW AND STORAGE 750.00
Check 10/23/2025 922432 Accounts Payable TURF STAR INC 104.54
Invoice Date Description Check Sort Code Amount.
106460 08/11/2025 O RING UNIT 761 57.10
111564 09/04/2025 FILTER SPIN FILTER OIL UNIT 833 47.44
Check 10/23/2025 922433 Accounts Payable ULINE INC 1,173.35
Invoice Date Description Check Sort Code Amount.
197198594 08/27/2025 Umbrellas and bases 1,173.35
Check 10/23/2025 922434 Accounts Payable VERIZON WIRLESS 5,175.67
Invoice Date Description Check Sort Code Amount.
6124477301 09/25/2025 8/26-9/25/25 PD CELLULAR SERVICE 1,713.84
6121992469 08/25/2025 7/26-8/25/25 PD CELLULAR SERVICE 1,713.82
6119500782 07/25/2025 6/26-7/25/25 PD CELLULAR SERVICE 1,748.01
Check 10/23/2025 922435 Accounts Payable WIRZ AND COMPANY PRINTING INC 232.74
Invoice Date Description Check Sort Code Amount.
143839 09/08/2025 BUSINESS CARDS 176.18
144423 10/04/2025 500 BC CURTIS FORD 32.63
144378 10/04/2025 BUSINESS CARDS FOR TANYA ROMO 23.93
Check 10/23/2025 922436 Accounts Payable WM INLAND INVESTORS IV LP 61,502.00
Invoice Date Description Check Sort Code Amount.
10222025 10/22/2025 2024 JCP Sales Tax Agreement Payment #8 61,502.00
Check 10/23/2025 922437 Accounts Payable Z&K CONSULTANTS INC 213,999.50
Invoice Date Description Check Sort Code Amount.
2886 02/25/2025 PE: 1/31/25 - INSPECTION SERVICES NICHOLSON PARK
IMPROVEMENT
48,661.00
2887 03/15/2025 PE: 2/28/25 - INSPECTION SERVICES NICHOLSON PARK 41,666.50
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/23/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 16 of 18 10/23/2025 4:37:30 PM
Packet Page. 164
IMPROVEMENT
2888 05/26/2025 PE: 3/31/25 - INSPECTION SERVICES NICHOLSON PARK
IMPROVEMENT
43,119.00
2889 05/26/2025 PE: 4/30/25 - INSPECTION SERVICES NICHOLSON PARK
IMPROVEMENT
27,692.00
2890 07/08/2025 PE: 5/31/25 - INSPECTION SERVICES NICHOLSON PARK
IMPROVEMENT
26,031.50
2891 07/08/2025 PE: 6/30/25 - INSPECTION SERVICES NICHOLSON PARK
IMPROVEMENT
26,829.50
Check 10/23/2025 922438 Accounts Payable JESICA ZARAGOZA 642.46
Invoice Date Description Check Sort Code Amount.
202522 10/23/2025 Payroll Vendors 9/29 - 10/12/25 642.46
Check 10/23/2025 922439 Accounts Payable ZECO INC 183,623.64
Invoice Date Description Check Sort Code Amount.
1 09/29/2025 9/1 - 9/30/25 IMPROVEMENTS AT GUTIERREZ PARK 193,288.04
1RET 09/29/2025 9/1 - 9/30/25 IMPROVEMENTS AT GUTIERREZ PARK (9,664.40)
Check 10/23/2025 922440 Accounts Payable AFSCME DC 36 1,560.00
Invoice Date Description Check Sort Code Amount.
202522 10/23/2025 Payroll Vendors 9/29 - 10/12/25 PPP - Payroll 1,560.00
Check 10/23/2025 922441 Accounts Payable ARROWHEAD UNITED WAY 143.59
Invoice Date Description Check Sort Code Amount.
202522 10/23/2025 Payroll Vendors 9/29 - 10/12/25 PPP - Payroll 143.59
Check 10/23/2025 922442 Accounts Payable FRANCHISE TAX BOARD 689.64
Invoice Date Description Check Sort Code Amount.
202522 10/23/2025 Payroll Vendors 9/29 - 10/12/25 PPP - Payroll 689.64
Check 10/23/2025 922443 Accounts Payable FRANCHISE TAX BOARD 166.17
Invoice Date Description Check Sort Code Amount.
202522 10/23/2025 Payroll Vendors 9/29 - 10/12/25 PPP - Payroll 166.17
Check 10/23/2025 922444 Accounts Payable INTERNAL REVENUE SERVICE 92.31
Invoice Date Description Check Sort Code Amount.
202522 10/23/2025 Payroll Vendors 9/29 - 10/12/25 PPP - Payroll 92.31
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/23/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 17 of 18 10/23/2025 4:37:30 PM
Packet Page. 165
Check 10/23/2025 922445 Accounts Payable POLICE MANAGEMENT ASSOCIATION 800.00
Invoice Date Description Check Sort Code Amount.
202522 10/23/2025 Payroll Vendors 9/29 - 10/12/25 PPP - Payroll 800.00
Check 10/23/2025 922446 Accounts Payable SAN BERNARDINO MANAGEMENT
ASSOCIATION
500.00
Invoice Date Description Check Sort Code Amount.
202522 10/23/2025 Payroll Vendors 9/29 - 10/12/25 PPP - Payroll 500.00
Check 10/23/2025 922447 Accounts Payable SAN BERNARDINO MANAGEMENT
ASSOCIATION
390.00
Invoice Date Description Check Sort Code Amount.
202410A 05/08/2024 REISSUE CK 913526 - Payroll Vendors 04/15-04/28/24 PPP - Payroll 390.00
Check 10/23/2025 922448 Accounts Payable SAN BERNARDINO MANAGEMENT
ASSOCIATION
390.00
Invoice Date Description Check Sort Code Amount.
202409A 04/24/2024 REISSUE CK 913370 - Payroll Vendors 04/01-04/14/24 PPP - Payroll 390.00
Check 10/23/2025 922449 Accounts Payable SAN BERNARDINO POLICE OFFICERS
ASSOC PR DEDUC
32,287.20
Invoice Date Description Check Sort Code Amount.
202522 10/23/2025 Payroll Vendors 9/29 - 10/12/25 PPP - Payroll 32,287.20
Check 10/23/2025 922450 Accounts Payable TEAMSTERS LOCAL 1932 3,969.38
Invoice Date Description Check Sort Code Amount.
20252230 10/23/2025 Payroll Vendors 9/29 - 10/12/25 PPP - Payroll 3,969.38
Check 10/23/2025 922451 Accounts Payable TEAMSTERS LOCAL 1932 1,375.26
Invoice Date Description Check Sort Code Amount.
20252220 10/23/2025 Payroll Vendors 9/29 - 10/12/25 PPP - Payroll 1,375.26
City Commercial City Commercial - A/P, P/R taxes Totals:Transactions: 111 $2,659,228.17
Checks:111 $2,659,228.17
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/23/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 18 of 18 10/23/2025 4:37:30 PM
Packet Page. 166
Fund 001 - General $1,419,700.94
Fund 007 - Measure S $104,333.09
Fund 008 - American Rescue Plan Fund $496,433.51
Fund 101 - City of SB State of the City $4,507.66
Fund 107 - Cable Television Fund $3,400.00
Fund 117 - Home Improvement Part 14.239 $13,140.00
Fund 119 - Community Developmnt Block Grant $11,585.40
Fund 124 - Animal Control $648,781.86
Fund 125 - RMRA-GAS TAX $1,002,880.27
Fund 126 - Gas Tax Fund $1,481,031.13
Fund 130 - State And Other Grant Programs $7,838.66
Fund 141 - Local Grants $2,796.74
Fund 247 - Cultural Developmnt Construction $65,202.50
Fund 255 - Community Facilities Districts $4,875.00
Fund 629 - Liability insurance fund $150,000.00
Fund 635 - Fleet services fund $394,363.81
Fund 679 - Information technology $272,542.91
Fund 710 - Successor Agency $1,152.00
Fund 772 - Special deposits fund $5,879.75
Fund 784 - Payroll Clearing Fund $1,343.43
$6,091,788.66
City of San Bernardino
Accounts Payable Warrant Register
Summary by Fund
Register #24 October 30, 2025
Packet Page. 167
Bank Account:City Commercial - City Commercial - A/P, P/R taxes
Check 10/30/2025 922452 Accounts Payable ACCRUENT LLC 22,440.15
Invoice Date Description Check Sort Code Amount.
129073 06/18/2025 ANNUAL SOFTWARE RENEWAL BUILD MAINT 7/21/25 TO 7/20/2026 22,440.15
Check 10/30/2025 922453 Accounts Payable IMRAN AHMED 301.00
Invoice Date Description Check Sort Code Amount.
11/25 GARDEN GRO 10/22/2025 SUPERVISORY LEADERSHIP INSTITUTE 301.00
Check 10/30/2025 922454 Accounts Payable ALBA CANDACE 76.41
Invoice Date Description Check Sort Code Amount.
101425 10/14/2025 CANDACE - TRAVEL REIMBURSEMENT - IE PSHRA CONFERENCE 76.41
Check 10/30/2025 922455 Accounts Payable ALLIANT INSURANCE SERVICES INC 1,000.00
Invoice Date Description Check Sort Code Amount.
3279049 10/14/2025 STATE OF THE CITY EVENT - OCT 14, 2025 FOR SPARKY'S INS
POLICY
1,000.00
Check 10/30/2025 922456 Accounts Payable AMAZON CAPITAL SERVICES 9,632.56
Invoice Date Description Check Sort Code Amount.
14RFPPXJ7F4V 09/17/2025 VERDEMONT CENTER Supplies 2025 251.10
17MCKV7MC7LT 09/15/2025 TENNIS NET 301.42
1WPJMWHG747C 09/15/2025 UNIVERSAL TREE TIES 340.16
11Y3Y9PD67PG 08/20/2025 DOG FOOD 329.20
1X3L6CKNFYWW 10/07/2025 FY25/26 Amazon CDBG & ERF October 7, 2025 Invoice 957.46
1RTNWNY9HWD6 10/12/2025 FY25/26 Amazon CDBG October 12, 2025 Invoice 140.25
143PFT4T14T3 10/15/2025 FY25/26 Amazon ERF October 15, 2025 Invoice 60.89
1VYXFW6XDP64 10/14/2025 AIIBE 10 PACK 64GB AND 128GB FLASH DRIVES 256.60
1DR1W31CCHRN 09/22/2025 Citywide Events Supplies ROUTE 66 363.25
19FYCCY1DJYJ 10/06/2025 HERNANDEZ CENTER SUPPLIES 2025 HALLOWEEN 428.15
1TJQV6LJ4JKK 10/19/2025 AQUATICS Halloween Supplies 2025 481.18
1FQLW1PF7XH4 08/13/2025 External Drives for the Public Records Team 521.98
1RNXVFGD9PPK 08/20/2025 office supplies for Veronica Deleon recommended by Risk 53.14
17PLYNLJ7MG4 10/01/2025 Office Supplies for City Clerk Office 31.41
1YG761CJFTHN 10/02/2025 Office Supplies for City Clerk Office 103.91
1R6Q69KTCR41 08/20/2025 SURGICAL GOWNS 307.07
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 1 of 21 10/30/2025 3:41:05 PM
Packet Page. 168
1FJ77H6MJFPG 08/23/2025 ANIMAL FOOD 339.30
1DQ9YCW3DKTD 08/25/2025 VETERINARY LABELS 100.70
1MF7PD436FY7 09/02/2025 KITTEN FOOD 183.76
167Y3P3Y6JVG 09/02/2025 DOG FOOD 329.20
1HJ319LTC1GC 09/29/2025 ANIMAL FOOD AND CONTAINERS 798.23
1CDDNY7YVXC9 10/22/2025 CM OFFICE SUPPLIES 89.11
1HG1V4GKDHXX 10/23/2025 MOSISO LAPTOP CASE 22.82
1J6WRHKJ379D 10/04/2025 LEASHES 100.62
1MMPFFWY4M4W 10/19/2025 SUPPLIES FOR VET STAFF 203.91
1HLQ9JNJ1LR3 10/22/2025 Council Office Supplies 80.68
1KNKJRMD7YXG 10/05/2025 LEASHES 1,971.00
1G9C1JX3KXMH 10/27/2025 VERDEMONT CENTER Supplies 2025 404.95
1HYNKXV991XV 10/09/2025 AMAZON ECON OCTOBER 2025 ORDER 35.45
11NW4L3JGTQM 10/08/2025 AMAZON ECON OCTOBER 2025 ORDER 45.66
Check 10/30/2025 922457 Accounts Payable AMAZON SERVICES LLC 847.16
Invoice Date Description Check Sort Code Amount.
9100802468609 10/13/2025 Business Prime Membership Fee: Medium 847.16
Check 10/30/2025 922458 Accounts Payable AMERICAN LEGAL PUBLISHING CORP 220.00
Invoice Date Description Check Sort Code Amount.
43509 06/30/2025 American Legal Ordinance editing to Municipal Code in June 2025 220.00
Check 10/30/2025 922459 Accounts Payable ANGEL HEART BIO TRAUMA LLC 2,260.44
Invoice Date Description Check Sort Code Amount.
4240206 10/10/2025 CRIME SCENE CLEAN UP 4399 N SIERRA WAY 753.48
4240207 10/17/2025 CRIME SCENE CLEAN UP 4951 N STATE ST 753.48
4240208 10/23/2025 CRIME SCENE CLEAN UP MT VERNON 753.48
Check 10/30/2025 922460 Accounts Payable BALLET FOLKLORICO CULTURAL 250.00
Invoice Date Description Check Sort Code Amount.
11022025 10/15/2025 DEAD OF THE DEAD PERFORMER SHOW 2025 250.00
Check 10/30/2025 922461 Accounts Payable BOB HALL & ASSOCIATES 17,150.00
Invoice Date Description Check Sort Code Amount.
1036 10/14/2025 MILESTONE 2: ECON DEV DIR. AND ANIMAL SERVCS DIR 17,150.00
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 2 of 21 10/30/2025 3:41:05 PM
Packet Page. 169
Check 10/30/2025 922462 Accounts Payable BRINKS INC 799.64
Invoice Date Description Check Sort Code Amount.
7925720 08/31/2025 08/01-08/31/25 Transportation 799.64
Check 10/30/2025 922463 Accounts Payable BSN SPORTS LLC 3,806.25
Invoice Date Description Check Sort Code Amount.
931414564 09/29/2025 Sport Nets 3,806.25
Check 10/30/2025 922464 Accounts Payable OMARI BURRELL 76.41
Invoice Date Description Check Sort Code Amount.
101425 10/14/2025 OMARI - TRAVEL REIMBURSEMENT - IE PSHRA CONFERENCE 76.41
Check 10/30/2025 922465 Accounts Payable BURRTEC WASTE INDUSTRIES INC 559.10
Invoice Date Description Check Sort Code Amount.
4320744163 09/30/2025 ARMY NATIONAL GUARD SEPT 2025 365.35
4320743906 09/30/2025 CA THEATRE SEPT 2025 193.75
Check 10/30/2025 922466 Accounts Payable CAL INTERPRETING & TRANSLATION 17,749.90
Invoice Date Description Check Sort Code Amount.
66753 10/31/2023 Translating Services for MCC Meetings 1,210.00
66270 11/06/2023 Translating Services for MCC Meetings 25.90
53376 01/15/2025 Translating Services for MCC Meetings 1-15-25 1,025.00
53836 02/05/2025 Translating Services for MCC Meetings 2-5-25 1,232.00
53839 02/19/2025 Translating Services for MCC Meetings 2-19-25 1,036.00
56858 05/07/2025 Translating Services for MCC Meetings 05-07-25 1,359.00
56859 05/21/2025 Translating Services for MCC Meetings 5-21-25 1,242.00
57477 05/22/2025 Translating Services for MCC Meetings 5-22-25 234.00
56953 06/04/2025 Translating Services for MCC Meetings 6-4-25 2,466.00
172 08/05/2025 Translating Services for MCC Meetings 7/02, 07/16 2,718.00
195 09/04/2025 Translating Services for MCC Meetings 8/06 & 8/20 2,601.00
216 10/06/2025 Translating Services for MCC Meetings 2,601.00
Check 10/30/2025 922467 Accounts Payable KAREN CATES 192.00
Invoice Date Description Check Sort Code Amount.
112025 10/01/2025 SA ANNUITANT HEALTH NOVEMBER 2025 192.00
Check 10/30/2025 922468 Accounts Payable CHARTER COMMUNICATIONS 99.80
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 3 of 21 10/30/2025 3:41:05 PM
Packet Page. 170
Invoice Date Description Check Sort Code Amount.
187888401092125 09/21/2025 Account 187888401 9/22-10/21 99.80
Check 10/30/2025 922469 Accounts Payable CHEMCO PRODUCTS COMPANY 1,081.25
Invoice Date Description Check Sort Code Amount.
244974 10/14/2025 OCTOBER 2025 WATER TREATMENT SERVICES 1,081.25
Check 10/30/2025 922470 Accounts Payable COLTON PUBLIC UTILITIES 31.43
Invoice Date Description Check Sort Code Amount.
7880 10/08/2025 ELECTRIC CHARGES 31.43
Check 10/30/2025 922471 Accounts Payable CITY OF SAN BERNARDINO WATER 165,952.84
Invoice Date Description Check Sort Code Amount.
7870 10/02/2025 WATER CHARGES 49,948.17
7875 10/06/2025 WATER CHARGES 21,927.02
7878 10/08/2025 WATER CHARGES 4,970.78
7884 10/14/2025 WATER CHARGES 89,106.87
Check 10/30/2025 922472 Accounts Payable COMPASS PEST MANAGEMENT INC 9,123.00
Invoice Date Description Check Sort Code Amount.
309791 10/20/2025 OCTOBER 25 PEST CONTROL 112.00
307170 07/01/2025 JULY 2025 PEST SERVICES 1,169.00
300875 07/05/2025 AKOMA CENTER TERMITE FUME 3,360.00
307171 08/01/2025 AUGUST 2025 PEST SERVICES 1,099.00
304228 08/22/2025 201 BLDG EXTENSIVE INTERIOR TRAPPING 895.00
304926 08/22/2025 ADDITIONAL GLUE BOARDS 201 BLDG.195.00
307172 09/01/2025 SEPTEMBER 2025 PEST SERVICES 1,169.00
308445 10/03/2025 OCTOBER 2025 PEST SERVICES 1,079.00
300286 06/27/2025 R HERNANDEZ RODENT SERVICE 45.00
Check 10/30/2025 922473 Accounts Payable CULLIGAN OF ONTARIO 125.94
Invoice Date Description Check Sort Code Amount.
1472399 09/30/2025 FLEET WATER MONTHLY CHARGE OCT 2025 125.94
Check 10/30/2025 922474 Accounts Payable COURTNEY DAVIS 76.41
Invoice Date Description Check Sort Code Amount.
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 4 of 21 10/30/2025 3:41:05 PM
Packet Page. 171
101425 10/14/2025 COURTNEY - TRAVEL REIMBURSEMENT - IE PSHRA CONFERENCE 76.41
Check 10/30/2025 922475 Accounts Payable OSCAR GIOVANNI DE LEON-BAER 5,000.00
Invoice Date Description Check Sort Code Amount.
103 08/19/2025 Farmers Market Services 2025 5,000.00
Check 10/30/2025 922476 Accounts Payable ROSELLER DEJESUS 192.00
Invoice Date Description Check Sort Code Amount.
112025 10/01/2025 SA ANNUITANT HEALTH NOVEMBER 2025 192.00
Check 10/30/2025 922477 Accounts Payable DIBS SAFE & LOCK SERVICE 55.49
Invoice Date Description Check Sort Code Amount.
1283047 10/06/2025 Villa Brnach Keys 19.03
1283095 10/07/2025 DUPLICATE KEYS 27.75
1283330 10/22/2025 DUPLICATE KEYS 8.71
Check 10/30/2025 922478 Accounts Payable DICARLO INVESTMENT PROPERTIES
LLC
1,574.00
Invoice Date Description Check Sort Code Amount.
10142025 08/29/2025 Reimbursement for Repairs and Labor 1,574.00
Check 10/30/2025 922479 Accounts Payable EAGLE EYE DEMOLITION INC 9,175.00
Invoice Date Description Check Sort Code Amount.
2567 09/24/2025 180 N Waterman Ave 488.00
2568 09/27/2025 2132 Genevieve Ave 4,918.00
2569 10/02/2025 1709 E Highland Ave 1,753.00
2570 10/10/2025 457 W Highland Ave 2,016.00
Check 10/30/2025 922480 Accounts Payable EAST VALLEY WATER DISTRICT 15,338.70
Invoice Date Description Check Sort Code Amount.
7879 10/09/2025 WATER CHARGES 5,365.91
7882 10/16/2025 WATER CHARGES 9,972.79
Check 10/30/2025 922481 Accounts Payable EIDE BAILLY LLP 12,380.25
Invoice Date Description Check Sort Code Amount.
1938397 09/30/2025 Accounting and Advisory Services - September 2025 12,380.25
Check 10/30/2025 922482 Accounts Payable ENTERPRISE FLEET MANAGEMENT 256,154.94
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 5 of 21 10/30/2025 3:41:05 PM
Packet Page. 172
Invoice Date Description Check Sort Code Amount.
5449889 10/03/2025 LEASED VEHICLES OCT 2025 256,154.94
Check 10/30/2025 922483 Accounts Payable PAULA RAE ESPINOZA 192.00
Invoice Date Description Check Sort Code Amount.
112025 10/01/2025 SA ANNUITANT HEALTH NOVEMBER 2025 192.00
Check 10/30/2025 922484 Accounts Payable EUNA SOLUTIONS INC 92,150.00
Invoice Date Description Check Sort Code Amount.
132049 09/22/2025 Software Services - Grant Management System 92,150.00
Check 10/30/2025 922485 Accounts Payable EVERON LLC 40.00
Invoice Date Description Check Sort Code Amount.
159721990 09/22/2025 Alarm Monitoring (10/01/25 - 10/31/25)40.00
Check 10/30/2025 922486 Accounts Payable TYRA FAIMALO 1,380.00
Invoice Date Description Check Sort Code Amount.
6252647 08/28/2025 Summer Official 2025 Basketball 1,380.00
Check 10/30/2025 922487 Accounts Payable FAIRVIEW FORD SALES INC 214,733.43
Invoice Date Description Check Sort Code Amount.
35080 09/15/2025 OUTSIDE VEHICLE MAINT UNIT F2002 581.47
65580 03/11/2025 BODY REPAIRS UNIT F2407 15,832.23
65651 06/10/2025 BODY REPAIRS UNIT 608 20,247.10
65657 07/24/2025 BODY REPAIRS UNIT F2308 12,432.06
65663 07/24/2025 BODY REPAIRS UNIT 242 22,654.49
65669 08/21/2025 BODY REPAIRS F2105 2,508.61
65674 08/22/2025 BODY REPAIRS F2219 7,407.05
65678 08/25/2025 BODY REPAIRS UNIT F2306 6,283.53
65689 08/28/2025 BODY REPAIRS UNIT 0103 10,737.03
210712 09/12/2025 BB04ARM ASY UNIT 0258 40.07
211468 09/16/2025 315PAN ASY GASKET SCREEN ASY UNIT F2225 211.34
211556 09/17/2025 SPOINSULATOR UNIT F2305 988.32
211561 09/17/2025 SPOSHIELD UNIT F2225 16.45
212748 09/22/2025 EXHAUST MAN GASKET ONSTKCORE CHG UNIT F1691 1,221.33
212623 09/22/2025 345 FAN AND MOT UNIT F1707 219.63
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 6 of 21 10/30/2025 3:41:05 PM
Packet Page. 173
212700 09/22/2025 GB3HOSE OIL B41BUCKLE ASY UNIT F2210 215.26
212847 09/23/2025 SPOBUCKLE ASY UNIT F2210 109.60
214084 09/29/2025 SPOKIT FUEL UNIT 0571 207.91
214470 09/30/2025 BUCKLE ASY UNIT F2212 109.60
214678 09/30/2025 SPOPIPE FUEL UNIT 0571 289.49
214631 09/30/2025 MOUNTING AS HEX SHOCK ABSOR NUT BLIND UNIT F2309 319.80
214868 10/01/2025 DOOR REGULATOR MOTOR ASY UNIT F2107 534.51
215151 10/02/2025 B20HOSE UNIT F1801 169.75
215078 10/02/2025 SPOBUCKLE ASY UNIT F2227 109.60
215368 10/03/2025 SPOGLASS ASY UNIT 0411 92.95
215548 10/03/2025 B28GLASS ASY UNIT F2213 101.19
215829 10/06/2025 340 TUBE ASY UNIT F1707 68.82
216004 10/07/2025 SPOGLASS ASY UNIT F2213 303.58
251284 10/23/2025 2025 FORD POLICE INTERCEPTOR UTILITY
VIN#1FM5K8AB7SGC77412
55,360.33
251303 10/23/2025 2025 FORD POLICE INTERCEPTOR UTILITY
VIN#1FM5K8AB7SGC79807
55,360.33
Check 10/30/2025 922488 Accounts Payable JOSEPH FERNANDEZ 3,400.00
Invoice Date Description Check Sort Code Amount.
536809 10/20/2025 SPORTS WEEKLY & SPORTS WEEKLY LIVE 3,400.00
Check 10/30/2025 922489 Accounts Payable FLOWATER INCORPORATED 652.50
Invoice Date Description Check Sort Code Amount.
151915 10/17/2025 NEW FILTER KIT 652.50
Check 10/30/2025 922490 Accounts Payable FRANKLIN HAYNES MARIONETTES 650.00
Invoice Date Description Check Sort Code Amount.
56771 10/24/2025 DEAD OF THE DEAD PUPPET SHOW 2025 650.00
Check 10/30/2025 922491 Accounts Payable FRONTIER CALIFORNIA INC 1,556.43
Invoice Date Description Check Sort Code Amount.
10062025 10/06/2025 CALIFORNIA THEATER PHONE BILL 10-25 1,556.43
Check 10/30/2025 922492 Accounts Payable DEBBIE GONZALEZ 108.66
Invoice Date Description Check Sort Code Amount.
100925 10/13/2025 TOTES FOR STATE OF THE CITY SUPPLIES 108.66
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 7 of 21 10/30/2025 3:41:05 PM
Packet Page. 174
Check 10/30/2025 922493 Accounts Payable HAAKER EQUIPMENT CO 7,791.98
Invoice Date Description Check Sort Code Amount.
17597 09/25/2025 OUTSIDE VEHICLE MAINT UNIT 442 1,709.10
10972 06/26/2025 OUTSIDE VEHICLE MAINT UNIT 445 6,082.88
Check 10/30/2025 922494 Accounts Payable HARDY & HARPER INC 1,479,290.00
Invoice Date Description Check Sort Code Amount.
51655 10/02/2025 SEGMENT REPAIRS E DATE ST ROBERDS TO TURRILL 265,986.50
51656 10/02/2025 SEGMENT REPAIRS ROBERDS AT MARSHALL 144,350.95
51657 10/02/2025 SEGMENT REPAIRS N TURRILL FROM 19TH TO 21ST 125,073.85
51658 10/02/2025 SEGMENT REPAIRS N F ST BASELINE TO 13TH 138,365.00
51659 10/02/2025 SEGMENT REPAIRS N G ST RIALTO TO 2ND 194,158.95
51660 10/02/2025 SEGMENT REPAIRS MILL ST AC JOIN TO BRIDGE DECK 345,278.40
51661 10/02/2025 SEGMENT REPAIRS 5TH ST STERLING TO LANKERSHIM 266,076.35
Check 10/30/2025 922495 Accounts Payable HIRSCH PIPE & SUPPLY CO INC 3,020.41
Invoice Date Description Check Sort Code Amount.
1274047 06/27/2025 STA PU T PUTTY, SOLDER, GAL NIPPLE TRAY, SIZZLE SYSTEM
CLNR
2,429.60
1355773 08/12/2025 CS LAV W/GRID D WITH GRID DRAIN 151.53
1357633 08/13/2025 RED HOT & PURPLE PRIMER HANDY PACK, ELL SXS, TEE SXSXS
PVC PIPE
42.70
1364981 08/18/2025 CHR KITCHEN FCT, ISE CONTRACTOR DSP NXT-GEN 305.29
1341343 08/05/2025 PXP COUPLINGS, 3/4 PXP 90 D ELBOWS 91.29
Check 10/30/2025 922496 Accounts Payable HORIZON STRUCTURES LLC 628,897.00
Invoice Date Description Check Sort Code Amount.
23428 07/28/2025 30% PROGRESS PAYMENT FOR ANIMAL SHELTER KENNELS
PROJECT
628,897.00
Check 10/30/2025 922497 Accounts Payable HOUSTON & HARRIS PCS INC 2,288.75
Invoice Date Description Check Sort Code Amount.
2526809 08/21/2025 VIDEO INSPECTION OF STORM DRAINS - ORANGE ST 2,288.75
Check 10/30/2025 922498 Accounts Payable INGRAM LIBRARY SERVICES 1,541.78
Invoice Date Description Check Sort Code Amount.
90919832 10/01/2025 Library Books 18.29
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 8 of 21 10/30/2025 3:41:05 PM
Packet Page. 175
90919833 10/01/2025 Library Books 64.59
90919834 10/01/2025 Library Books 119.94
90919835 10/01/2025 Library Books 276.45
90919836 10/01/2025 Library Books 51.74
90919837 10/01/2025 Library Books 10.26
90919838 10/01/2025 Library Books 42.86
90919839 10/01/2025 Library Books 42.86
90919840 10/01/2025 Library Books 878.72
90919841 10/01/2025 Library Books 36.07
Check 10/30/2025 922499 Accounts Payable INLAND EMPIRE GLASS 4,917.00
Invoice Date Description Check Sort Code Amount.
3058 09/11/2025 FY26 PAYMENT FOR SPEAKERS AND INSTALLATION 4,917.00
Check 10/30/2025 922500 Accounts Payable INSIGHT PUBLIC SECTOR 242,156.41
Invoice Date Description Check Sort Code Amount.
1101321264 10/07/2025 MICROSOFT O365 242,156.41
Check 10/30/2025 922501 Accounts Payable INTERNATIONAL TIRE CENTER INC 365.00
Invoice Date Description Check Sort Code Amount.
65070 09/08/2025 FRONT WHEEL ALIGNMENT UNIT 1098 100.00
65072 09/08/2025 FOUR WHEEL ALIGNMENT UNIT 1602 100.00
65321 09/30/2025 ALIGNMENT CHECK 65.00
65365 10/03/2025 LABOR 3 F/WHEEL ALIGNMENT UNIT F2309 100.00
Check 10/30/2025 922502 Accounts Payable JL GROUP LLC 94,978.41
Invoice Date Description Check Sort Code Amount.
250071 09/18/2025 INVESTIGATIVE SERVICES - 09/09/24 - 8/10/25 94,978.41
Check 10/30/2025 922503 Accounts Payable JILK HEAVY CONSTRUCTION INC 509,467.56
Invoice Date Description Check Sort Code Amount.
250712 08/21/2025 PE: 7/31/25 - CROSS ST BRIDGE REPLACEMENT & FAIRFAX
RESTORATION
318,600.75
250712RET 08/21/2025 PE: 7/31/25 - CROSS ST BRIDGE REPLACEMENT & FAIRFAX
RESTORATION
(15,930.04)
250809RET 09/09/2025 PE: 8/31/25 - CROSS ST BRIDGE REPLACEMENT & FAIRFAX
RESTORATION
(10,884.05)
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 9 of 21 10/30/2025 3:41:05 PM
Packet Page. 176
250809 09/09/2025 PE: 8/31/25 - CROSS ST BRIDGE REPLACEMENT & FAIRFAX
RESTORATION
217,680.90
Check 10/30/2025 922504 Accounts Payable JEFF KRAUS 49.00
Invoice Date Description Check Sort Code Amount.
10272025 10/27/2025 REIMBURSEMENT FOR QR CODE FOR STATE OF THE CITY 49.00
Check 10/30/2025 922505 Accounts Payable L & S AUTO GLASS 340.00
Invoice Date Description Check Sort Code Amount.
2901 10/01/2025 WINDOW TINT SUR STRIP UNIT F1687 340.00
Check 10/30/2025 922506 Accounts Payable LANDSCAPE SUPPORT SERVICES 255,326.67
Invoice Date Description Check Sort Code Amount.
22320 09/30/2025 PE: 9/30/25 - SECCOMBE LAKE PARK 268,764.92
22320RET 09/30/2025 PE: 9/30/25 - SECCOMBE LAKE PARK (13,438.25)
Check 10/30/2025 922507 Accounts Payable LAW OFFICE OF SHARON J BRUNNER 150,000.00
Invoice Date Description Check Sort Code Amount.
9262025 09/26/2025 J. PARRA - SETTLEMENT 150,000.00
Check 10/30/2025 922508 Accounts Payable LINCOLN AQUATICS 2,984.32
Invoice Date Description Check Sort Code Amount.
29563360 07/23/2025 Swim Supplies 2,984.32
Check 10/30/2025 922509 Accounts Payable BARBARA JEAN LINDSETH 192.00
Invoice Date Description Check Sort Code Amount.
112025 10/01/2025 SA ANNUITANT HEALTH NOVEMBER 2025 192.00
Check 10/30/2025 922510 Accounts Payable ERNEST LUNA 1,589.86
Invoice Date Description Check Sort Code Amount.
9/25 APTOS CA 10/20/2025 SKYDIO ASCEND REIMBURSEMENT 1,589.86
Check 10/30/2025 922511 Accounts Payable MANHATTAN STITCHING INC 3,113.49
Invoice Date Description Check Sort Code Amount.
111378 10/02/2025 Youth Volleyball Jersey 2025 1,514.86
111379 10/02/2025 Youth Soccer Jersey 2025 1,259.33
111046 09/18/2025 Youth Sports 339.30
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 10 of 21 10/30/2025 3:41:05 PM
Packet Page. 177
Check 10/30/2025 922512 Accounts Payable MASTERS REFRESHMENT SERVICES
LLC
987.37
Invoice Date Description Check Sort Code Amount.
1284955 07/10/2025 July 10 2025 Water Cooler Rental 148.79
1291552 07/24/2025 July 24 2025 Water Cooler Rental 116.50
1300359 08/06/2025 Aug 06 2025 Water Cooler Rental 118.79
1308472 08/20/2025 Aug 20 2025 Water Cooler Rental 146.50
1314280 08/28/2025 Aug 28 2025 Water Cooler Rental 94.00
1322755 09/11/2025 Sep 11 2025 Water Cooler Rental 163.79
1332464 09/30/2025 Sep 30 2025 Water Cooler Rental 199.00
Check 10/30/2025 922513 Accounts Payable MATICH CORPORATION 1,000,591.52
Invoice Date Description Check Sort Code Amount.
92525019 10/07/2025 9/1 - 9/30/25 PAVEMENT REHABILITATION @ FOURTEEN LOCATIONS 1,053,254.23
92525019RET 10/07/2025 9/1 - 9/30/25 PAVEMENT REHABILITATION @ FOURTEEN LOCATIONS (52,662.71)
Check 10/30/2025 922514 Accounts Payable ANNA MCKENNA 851.98
Invoice Date Description Check Sort Code Amount.
GARDEN GROV 9/25 10/20/2025 SLI REIMBURSEMENT 550.98
11/25 EL SEGUNDO 10/22/2025 SUPERVISORY LEADERSHIP INSTITUTE 301.00
Check 10/30/2025 922515 Accounts Payable JULIA MELENDEZ 250.00
Invoice Date Description Check Sort Code Amount.
100 10/01/2025 DEAD OF THE DEAD PERFORMER SHOW 2025 250.00
Check 10/30/2025 922516 Accounts Payable MICHAEL PALUZZI 4,791.75
Invoice Date Description Check Sort Code Amount.
10132025 10/13/2025 ADPP PAYMENT 11/1/25 TO 11/30/25 4,791.75
Check 10/30/2025 922517 Accounts Payable MOBILE WIRELESS LCC 853.60
Invoice Date Description Check Sort Code Amount.
6426 10/14/2025 NetMotion Licenses QTY 10 853.60
Check 10/30/2025 922518 Accounts Payable TRISTANJE ULAT MONDRAGON 150.00
Invoice Date Description Check Sort Code Amount.
2025001 10/21/2025 STATE OF THE CITY EVENT - OCT 14, 2025 NATIONAL ANTHEM 150.00
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 11 of 21 10/30/2025 3:41:05 PM
Packet Page. 178
Check 10/30/2025 922519 Accounts Payable NAPA AUTO PARTS 1,232.17
Invoice Date Description Check Sort Code Amount.
402558 08/11/2025 DYE KIT AUTO F2226 249.02
402954 08/15/2025 COMP SHINE CAR CLEAN UNIT 0681 56.54
403199 08/19/2025 HVAC CONTROL MODULE UNIT 0212 706.86
403684 08/26/2025 MUD FLAPS UNIT 456 29.82
403680 08/26/2025 MUD FLAPS UNIT 456 29.82
404514 09/08/2025 BULB UNIT F1109 4.67
404557 09/08/2025 SAFETY BACK SUPPORT UNIT 968 34.25
404674 09/09/2025 RELAY UNIT 0986 15.54
404670 09/09/2025 NAPA QT SAE 30 UNIT 836 84.69
404791 09/11/2025 DOME INTERIOR LAMP UNIT 625 20.96
Check 10/30/2025 922520 Accounts Payable NATIONAL RECREATION AND PARK
ASSOCIATION
180.00
Invoice Date Description Check Sort Code Amount.
9302025 09/30/2025 NRPA Membership Vanessa 2025 180.00
Check 10/30/2025 922521 Accounts Payable NEIGHBORHOOD PARTNERSHIP
HOUSING SVCS INC
13,140.00
Invoice Date Description Check Sort Code Amount.
1 07/10/2025 FY2025/2026 NPHS HOME Infill Housing July 2025 13,140.00
Check 10/30/2025 922522 Accounts Payable NEIGHBORLY SOFTWARE 10,320.00
Invoice Date Description Check Sort Code Amount.
13925 08/20/2025 FY2025/2026 Subscription/Lic Fee DEC 2025 - NOV 2026 10,320.00
Check 10/30/2025 922523 Accounts Payable OVERDRIVE INC 75.00
Invoice Date Description Check Sort Code Amount.
294125309308 10/02/2025 EBooks and Audiobooks 75.00
Check 10/30/2025 922524 Accounts Payable PATRICIA PADILLA 239.00
Invoice Date Description Check Sort Code Amount.
11/25 SAN DIEGO 10/22/2025 CLEARS INFO & TECH SEMINAR 239.00
Check 10/30/2025 922525 Accounts Payable PARTS AUTHORITY METRO LLC 10,122.89
Invoice Date Description Check Sort Code Amount.
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 12 of 21 10/30/2025 3:41:05 PM
Packet Page. 179
062061938 09/30/2025 CREDIT ON ORIG INV 062749356 CERAMIC PAD (78.91)
062061943 09/30/2025 CREDIT ON ORIG INV 062735042 REM ALERNATOR (54.38)
064371156 09/24/2025 DRIVE BELT UNIT 0473 22.05
062774924 09/25/2025 CERAMIC PAD BRAKE ROTOR UNIT 0901 111.32
292553538 09/23/2025 WHEEL WT PK 25 UNIT 0625 7.47
060689868 09/23/2025 WHEEL WT PK 25 UNIT 0731 14.94
062768005 09/23/2025 1620 BATT DURAS UNIT F2210 10.18
062765180 09/22/2025 REFLECTOR UNIT 823 30.34
062765156 09/22/2025 12 VOLT PASS CS UNIT 823 107.35
093615907 09/17/2025 BLACK 14 FOR STOCK 97.68
064362737 09/17/2025 BLACK 14 FOR STOCK 32.56
060688959 09/17/2025 BLACK 14 FOR STOCK 32.56
062762097 09/20/2025 BEAM WIPER BLAD FOR STOCK 358.33
065113728 09/19/2025 DOOR LOCK KNOB UNIT 0731 19.44
062739360 09/12/2025 MINI BULB UNIT 0625 2.41
095449475 09/17/2025 BLACK 14 FOR STOCK 32.56
062799306 10/03/2025 WASHER PUMP 17.38
062749807 09/16/2025 BRAKE LINE KIT UNIT 253 64.59
062752593 09/17/2025 SHOCK ABSORBERS CERAMIC PAD JUMP STARTERS UNIT F2209 784.28
062788208 09/30/2025 HEGO SENSOR UNIT F2212 118.43
062787838 09/30/2025 SENSOR UNIT F2212 63.00
117603621 09/30/2025 SENSOR UNIT F2212 63.00
062791320 10/01/2025 OIL FILTER UNIT 1627 16.25
063817546 10/01/2025 ELEMENT A/CL UNIT 1623 40.39
062808382 10/07/2025 BK HARDWARE KIS UNIT F2209 13.41
060691423 10/01/2025 ELEMENT A/CL UNIT 1628 20.19
062794823 10/02/2025 AIR FILTER UNIT 0567 15.94
062798654 10/03/2025 AIR FILTER OIL FILTER FOR STOCK 31.60
062798615 10/03/2025 TRANS FILTER UNIT 0711 20.21
062800022 10/03/2025 TRANS FILTER UNIT 0711 20.06
065150265 10/03/2025 POWER BRK BOOST UNIT 0711 388.13
062804572 10/06/2025 TUBE ASY UNIT F1707 67.10
062799814 10/03/2025 AIR FILTER FUEL FILTER CABIN AIR OIL FILTER ROTOR ASY FOR
STOCK
1,895.15
062806623 10/06/2025 SAE30 CONV Q S UNIT 0473 43.20
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 13 of 21 10/30/2025 3:41:05 PM
Packet Page. 180
062805746 10/06/2025 AIR FILTER FOR UNIT 0442 30.29
062771914 09/24/2025 WHEEL WT INSERT STEEL BS UNIT F1691 515.02
062779354 09/26/2025 EXIDE BATTERY UNIT 0824 118.52
062772778 09/24/2025 CV AXLE SHAFT UNIT 1616 114.38
062772861 09/24/2025 AIR FILTER UNIT 0473 14.89
295245670 09/23/2025 MINI BULB UNIT 473 5.98
062776079 09/25/2025 PARKLAMP UNIT 0391 47.32
062771659 09/24/2025 AIR FILTER FUEL FILTER HYDRAULIC FILTS FOR STOCK 590.53
062771314 09/24/2025 IGN LOCK CYLINS UNIT 625 89.59
064369480 09/23/2025 WHEEL WT PK 25D UNIT 0731 7.47
062776237 09/25/2025 ROD TIE UNIT 1616 37.04
062751801 09/17/2025 AIR FILTER FOR STOCK 148.84
062759795 09/19/2025 WINDOW REG ASSS UNIT 0731 62.50
062758409 09/19/2025 BEAM WIPER BLAS WHEEL LUG NUT OIL DRAIN PLUGS FOR STOCK 679.61
062758981 09/19/2025 SHOCK ABSORBS UNIT 1612 156.53
062759364 09/19/2025 BEAM WIPER BLAD FOR STOCK 43.00
062749356 09/16/2025 WIPER BLADE CERAMIC PAD UNIT 0253 119.10
062749308 09/16/2025 NON CLR BRKCLNS 111.58
062745073 09/15/2025 BRAKE LINS UNIT 0704 78.59
065094173 09/12/2025 SPARK PLUG UNIT 1144 10.48
070162007 09/12/2025 0W40 SYN L UNIT 0520 16.37
092685057 09/29/2025 12VT AGM VALVE FOR STOCK 241.02
070165695 09/29/2025 12 VT AGM VALVE FOR STOCK 241.02
097475019 09/29/2025 12 VT AGM VALVE FOR STOCK 241.02
094381908 09/29/2025 12 VT AGM VALVE FOR STOCK 241.02
095450308 09/29/2025 12 VT AGM VALVE FOR STOCK 241.02
062778447 09/26/2025 CABIN AIR AIR FILTER FS AC KIT UNIT 2095 420.04
117603363 09/29/2025 TIRE PRESSURE SL FOR STOCK 148.54
062775115 09/25/2025 SHOCK ABSORBERS JUMP STARTERS UNIT 0253 631.96
062783939 09/29/2025 CABIN AIR TIRE PRESSURE AIR FILTER FOR STOCK 291.41
Check 10/30/2025 922526 Accounts Payable PERFECT FORM BUSINESS SERVICES
INC
59.53
Invoice Date Description Check Sort Code Amount.
10686 10/16/2025 PARKING CITATIONS 4 PART BOOKS OF 25 PRICE DIFFERENCE 59.53
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 14 of 21 10/30/2025 3:41:05 PM
Packet Page. 181
Check 10/30/2025 922527 Accounts Payable PET BENEFIT SOLUTIONS 1,343.43
Invoice Date Description Check Sort Code Amount.
221588 10/05/2025 October 2025 Pet Benefit/Insurance 297.50
221589 10/05/2025 October 2025 Pet Benefit/Insurance 1,045.93
Check 10/30/2025 922528 Accounts Payable JONATHAN PLUMMER 387.00
Invoice Date Description Check Sort Code Amount.
11/25 SAN DIEGO 10/22/2025 MANAGEMENT COURSE 387.00
Check 10/30/2025 922529 Accounts Payable POLICY CONFLUENCE INC 18,000.00
Invoice Date Description Check Sort Code Amount.
18154 09/25/2025 BA Bundle (Simulate, Prioritize & Taxpayer)18,000.00
Check 10/30/2025 922530 Accounts Payable PRESTIGE PAVING COMPANY INC 100,328.19
Invoice Date Description Check Sort Code Amount.
61530 09/30/2025 SEPTEMBER 2025 - RUBEN CAMPOS COMMUNITY CENTER PAVING 105,608.62
61530RET 09/30/2025 SEPTEMBER 2025 - RUBEN CAMPOS COMMUNITY CENTER PAVING (5,280.43)
Check 10/30/2025 922531 Accounts Payable PRUDENTIAL OVERALL SUPPLY 1,353.89
Invoice Date Description Check Sort Code Amount.
23862454 10/02/2025 UNIFORM RENTAL LIGHTING 42.90
23862455 10/02/2025 UNIFORM RENTAL STORM DRAINS 10.84
23862456 10/02/2025 UNIFORM RENTAL SIGNS 17.05
23862457 10/02/2025 UNIFORM RENTAL ENCAMPMENTS 88.08
23862458 10/02/2025 UNIFORM RENTAL GRAFFITI 80.69
23862459 10/02/2025 UNIFORM RENTAL FORESTRY 69.39
23862460 10/02/2025 UNIFORM RENTAL STREETS 103.79
23862461 10/02/2025 UNIFORM RENTAL PARKS 49.00
23798199 05/01/2025 CUSTODIAL UNIFORM RENTAL 75.79
23809925 05/29/2025 CUSTODIAL UNIFORM RENTAL 178.66
23865346 10/09/2025 AQUATICS UNIFORM RENTAL 3.12
23862463 10/02/2025 CUSTODIAL UNIFORM RENTAL 125.39
23865356 10/09/2025 CUSTODIAL SUPPLY RENTAL 103.00
23865357 10/09/2025 CUSTODIAL UNIFORM RENTAL 130.06
23862453 10/02/2025 BUILD MAINT UNIFORM RENTAL 23.76
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 15 of 21 10/30/2025 3:41:05 PM
Packet Page. 182
23865347 10/09/2025 BUILD MAINT UNIFORM RENTAL 23.76
23868150 10/16/2025 10/15/25 WEEKLY TOWEL SERVICE 228.61
Check 10/30/2025 922532 Accounts Payable RAILPROS FIELD SERVICES INC 4,004.90
Invoice Date Description Check Sort Code Amount.
468 10/21/2025 RIGHT OF WAY ENCROACHMENT PETMIT # SCRRA-0468 4,004.90
Check 10/30/2025 922533 Accounts Payable ELIAS REBOLLAR 240.00
Invoice Date Description Check Sort Code Amount.
102085309 09/27/2025 International Code Council Training-Elias Rebollar 240.00
Check 10/30/2025 922534 Accounts Payable RECREONICS 427.47
Invoice Date Description Check Sort Code Amount.
22097706001 07/22/2025 AQUATICS Supplies 427.47
Check 10/30/2025 922535 Accounts Payable RESOURCE ENVIRONMENTAL INC 8,860.00
Invoice Date Description Check Sort Code Amount.
250213 09/04/2025 RELEASE OF RETENTION - SCHOOL OF HOPE DEMO 8,860.00
Check 10/30/2025 922536 Accounts Payable RICK ENGINEERING COMPANY 23,682.90
Invoice Date Description Check Sort Code Amount.
111060 10/20/2025 PROFESSIONAL SERVICES AUGUST 30 2025 TO SEPTEMBER 26 202 23,682.90
Check 10/30/2025 922537 Accounts Payable ABRAHAM RICO 76.41
Invoice Date Description Check Sort Code Amount.
101425 10/14/2025 ABRAHAM - TRAVEL REIMBURSEMENT - IE PSHRA CONFERENCE 76.41
Check 10/30/2025 922538 Accounts Payable S&E WHOLESALE FLOWERS 2,500.00
Invoice Date Description Check Sort Code Amount.
49542 10/14/2025 STATE OF THE CITY EVENT - OCT 14, 2025 FLOWER
ARRANGEMENTS
2,500.00
Check 10/30/2025 922539 Accounts Payable DEVON SAKAGUCHI 240.00
Invoice Date Description Check Sort Code Amount.
102085386 09/28/2025 International Code Council Training-Devon Sakaguchi 240.00
Check 10/30/2025 922540 Accounts Payable SAN BERNARDINO & RIVERSIDE
COUNTIES FIRE EQUIPMENT
2,516.79
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 16 of 21 10/30/2025 3:41:05 PM
Packet Page. 183
Invoice Date Description Check Sort Code Amount.
937499 07/02/2025 FIRE EXTINGUISHER SERVICE - FLEET 1,476.15
934528 09/05/2025 FIRE EXTINGUISHER SERVICE - FLEET 322.79
937966 09/10/2025 FIRE EXTINGUISHER SERVICE - FLEET 717.85
Check 10/30/2025 922541 Accounts Payable SAN BERNARDINO CITY UNIFIED
SCHOOL DISTRICT
373.75
Invoice Date Description Check Sort Code Amount.
250002 09/11/2025 Summer Lunch Program July 2025 373.75
Check 10/30/2025 922542 Accounts Payable SAN BERNARDINO COUNTY FIRE DEPT 127.75
Invoice Date Description Check Sort Code Amount.
358091 09/30/2025 DELINQUENT FEE - HERNANDEZ CENTER 127.75
Check 10/30/2025 922543 Accounts Payable SAN BERNARDINO COUNTY SHERIFF 300.00
Invoice Date Description Check Sort Code Amount.
SAN BERNAR 11/25 10/28/2025 HOMICIDE INVESTIGATION REGISTRATION 300.00
Check 10/30/2025 922544 Accounts Payable SB COUNTY AUDITOR CONTROLLER 39,292.02
Invoice Date Description Check Sort Code Amount.
1800001852 07/01/2025 LAFCO'S 2025-2026 APPORTIONMENT 39,292.02
Check 10/30/2025 922545 Accounts Payable SBX SERVICES INC 630.63
Invoice Date Description Check Sort Code Amount.
2851 10/05/2025 CAR WASH SEPTEMBER 2025 630.63
Check 10/30/2025 922546 Accounts Payable SCG SPICER CONSULTING GROUP LLC 4,875.00
Invoice Date Description Check Sort Code Amount.
1991 08/01/2025 ADMIN - PROPERTY FINDER JULY 2,437.50
2008 09/01/2025 ADMIN - PROPERTY FINDER AUGUST 2,437.50
Check 10/30/2025 922547 Accounts Payable CASSANDRA SEARCY 236.00
Invoice Date Description Check Sort Code Amount.
9092025 09/09/2025 Advance - NLC City Summit Salt Lake City, UT - NOV 19 - 22, 2025 236.00
Check 10/30/2025 922548 Accounts Payable JOSHUA SIMPSON 349.13
Invoice Date Description Check Sort Code Amount.
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 17 of 21 10/30/2025 3:41:05 PM
Packet Page. 184
9/22 HERSEY PA 10/20/2025 VEHICLE CRIMES TRNG CONF REIMBURSEMENT 349.13
Check 10/30/2025 922549 Accounts Payable SOUTHERN CALIFORNIA EDISON 233,112.29
Invoice Date Description Check Sort Code Amount.
7871 10/03/2025 ELECTRIC CHARGES 940.87
7872 10/06/2025 ELECTRIC CHARGES 87,460.21
7873 10/03/2025 ELECTRIC CHARGES 11,024.22
7874 10/03/2025 ELECTRIC CHARGES 12,297.37
7876 10/10/2025 ELECTRIC CHARGES 6,160.47
7881 10/07/2025 ELECTRIC CHARGES 10,111.84
7885 10/14/2025 ELECTRIC CHARGES 37,526.67
7886 10/14/2025 ELECTRIC CHARGES 60,264.17
7887 10/16/2025 ELECTRIC CHARGES 7,326.47
Check 10/30/2025 922550 Accounts Payable SOUTHERN CALIFORNIA GAS
COMPANY
7,654.51
Invoice Date Description Check Sort Code Amount.
7877 10/13/2025 GAS CHARGES 415.32
7883 10/17/2025 GAS CHARGES 5,820.69
7769A 06/27/2025 REISSUE CK 920772 - FY 24-25 GAS CHARGES 477.81
7783A 06/30/2025 REISSUE CK - 920772 FY 24-25 GAS CHARGES 940.69
Check 10/30/2025 922551 Accounts Payable STAPLES BUSINESS ADVANTAGE 2,878.66
Invoice Date Description Check Sort Code Amount.
7007108134 10/01/2025 Library Office Supplies 1,118.99
7007110847 10/01/2025 NEIGHBORHOOD SERVICES OFFICE SUPPLIES FOR SEP 2025 658.87
7007108131 10/01/2025 FY26 PAYMENT FOR BUSINESS REGISTRATION OFFICE SUPPLIES 412.02
7007108128 10/01/2025 Council Office Supplies 688.78
Check 10/30/2025 922552 Accounts Payable STATE BOARD OF EQUALIZATION 1,088.00
Invoice Date Description Check Sort Code Amount.
52610930 10/22/2025 Sales and Use Tax for the Quarter Ending 09/30/2025 023-058886 1,088.00
Check 10/30/2025 922553 Accounts Payable SUPERIOR PAVEMENT MARKINGS INC 856.40
Invoice Date Description Check Sort Code Amount.
20996 08/25/2025 ROUTE 66 SIGN 856.40
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 18 of 21 10/30/2025 3:41:05 PM
Packet Page. 185
Check 10/30/2025 922554 Accounts Payable TALLEY & TALLEY LAW APC 1,228.50
Invoice Date Description Check Sort Code Amount.
1579 05/02/2025 PRA Request Legal Review 1,228.50
Check 10/30/2025 922555 Accounts Payable THE KEPLER GROUP INC 5,850.00
Invoice Date Description Check Sort Code Amount.
3707 08/19/2025 Support & Maintenance Services 2,730.00
3746 10/17/2025 Quarter 3 Support & Maintenance Services 7/1/25 - 9/30/25 3,120.00
Check 10/30/2025 922556 Accounts Payable TILDEN COIL CONSTRUCTORS INC 700.00
Invoice Date Description Check Sort Code Amount.
220059901 10/15/2025 STATE OF THE CITY EVENT - OCT 14, 2025 MARIACHI
PERFORMANCE
700.00
Check 10/30/2025 922557 Accounts Payable TKE ENGINEERING INC 65,202.50
Invoice Date Description Check Sort Code Amount.
20251328 10/07/2025 AUGUST 2025 - CM & INSPECTION FOR SPEICHER BALL FIELD 32,592.50
20251129 09/24/2025 JULY 2025 - CM & INSPECTION FOR SPEICHER BALL FIELD 32,610.00
Check 10/30/2025 922558 Accounts Payable TOM BELLS REDLANDS AUTO PLAZA 687.30
Invoice Date Description Check Sort Code Amount.
5286997 09/22/2025 SEAT BELT BUCKLE AS SPORD 687.30
Check 10/30/2025 922559 Accounts Payable ULINE INC 3,435.66
Invoice Date Description Check Sort Code Amount.
195915646 07/29/2025 Office supplies 447.99
197698199 09/09/2025 SQUEEGEES AND HANDLES 879.35
198470052 09/25/2025 STAPLE GUN AND STAPLES 1,328.86
198320509 09/23/2025 5 GALLON WHITE PLASTIC BUCKETS 779.46
Check 10/30/2025 922560 Accounts Payable URBAN HABITAT 241,106.84
Invoice Date Description Check Sort Code Amount.
412 07/31/2025 PE: 7/31/25 - NICHOLSON NEIGHBPRHOOD PARK IMPROVEMENTS 82,812.40
412RET 07/31/2025 PE: 7/31/25 - NICHOLSON NEIGHBORHOOD PARK IMPROVEMENTS (4,140.62)
451 08/31/2025 PE: 8/31/25 - NICHOLSON NEIGHBORHOOD PARK IMPROVEMENTS 170,984.27
451RET 08/31/2025 PE: 8/31/25 - NICHOLSON NEIGHBORHOOD PARK IMPROVEMENTS (8,549.21)
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 19 of 21 10/30/2025 3:41:05 PM
Packet Page. 186
Check 10/30/2025 922561 Accounts Payable GARY VAN OSDEL 192.00
Invoice Date Description Check Sort Code Amount.
112025 10/01/2025 SA ANNUITANT HEALTH NOVEMBER 2025 192.00
Check 10/30/2025 922562 Accounts Payable VOLVO CONSTRUCTION EQUIPMENT
AND SERVICES
185.14
Invoice Date Description Check Sort Code Amount.
504141171 09/18/2025 HANDLE DOOR CAB WEATHER STRIP DOOR CAB 185.14
Check 10/30/2025 922563 Accounts Payable VULCAN MATERIALS COMPANY 131.83
Invoice Date Description Check Sort Code Amount.
539085 07/31/2025 ASPHALT VULCAN 131.83
Check 10/30/2025 922564 Accounts Payable WATERLINE TECHNOLOGIES INC 4,334.24
Invoice Date Description Check Sort Code Amount.
5765187 10/02/2025 DELMANN HEIGHTS POOL CHEMICALS 536.68
5766262 10/09/2025 PERRIS HILL SWIM CTR POOL CHEMICALS 3,797.56
Check 10/30/2025 922565 Accounts Payable JAMES WILLMOTT 192.00
Invoice Date Description Check Sort Code Amount.
112025 10/01/2025 SA ANNUITANT HEALTH NOVEMBER 2025 192.00
Check 10/30/2025 922566 Accounts Payable WIRZ AND COMPANY PRINTING INC 2,241.35
Invoice Date Description Check Sort Code Amount.
143843 09/08/2025 Business Cards-Admin, Building and Safety, Housing 322.99
144439 10/06/2025 FALL EVENT BANNER 2025 1,301.74
144253 09/26/2025 Business Cards-10 People-Planning and Code 293.63
144492 10/09/2025 Business Cards-11 people-Code 322.99
Check 10/30/2025 922567 Accounts Payable WOMENS INSPIRATIONAL NETWORK 7,686.64
Invoice Date Description Check Sort Code Amount.
92025 09/01/2025 GRANT PROGRAM SEPTEMBER 2025 7,686.64
Check 10/30/2025 922568 Accounts Payable ANTHONY WRIGHT 1,380.00
Invoice Date Description Check Sort Code Amount.
6253758 08/28/2025 Summer Official 2025 Basketball 1,380.00
Check 10/30/2025 922569 Accounts Payable SAN BERNARDINO COUNTY 760.00
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 20 of 21 10/30/2025 3:41:05 PM
Packet Page. 187
RECORDER CLERK
Invoice Date Description Check Sort Code Amount.
25212716 09/03/2025 FY26 PYMT FOR DOCUMENT RECORDING FOR SEPTEMPBER 2025 CO OF SB - County of San
Bernardino
240.00
25189842 08/06/2025 FY26 PYMT FOR DOCUMENT RECORDING FOR AUGUST 2025 CO OF SB - County of San
Bernardino
220.00
25196231 08/13/2025 FY26 PYMT FOR DOCUMENT RECORDING FOR AUGUST 2025 CO OF SB - County of San
Bernardino
300.00
City Commercial City Commercial - A/P, P/R taxes Totals:Transactions: 118 $6,091,788.66
Checks:118 $6,091,788.66
City of San Bernardino
Payment Batch Register
Bank Account: City Commercial - City Commercial - A/P, P/R taxes
Batch Date: 10/30/2025
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Claudia Alvarez Pages: 21 of 21 10/30/2025 3:41:05 PM
Packet Page. 188
Packet Page. 189
Packet Page. 190
Packet Page. 191
Packet Page. 192
Packet Page. 193
Packet Page. 194
Packet Page. 195
Packet Page. 196
Packet Page. 197
Packet Page. 198
Packet Page. 199
Packet Page. 200
Packet Page. 201
Packet Page. 202
Packet Page. 203
Fund 001-General $221,318.90
Fund 678-Workers Compensation $5,749.20
Fund 710- EDA - RDA $464,575.50
Fund 784-Payroll Clearing Fund $1,805,604.22
$2,497,247.82
City of San Bernardino
Accounts Payable Warrant Register
Summary by Fund
Register # 1889-1896 09.25.25 - 09.30.25
Packet Page. 204
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Parent - Parent - deposits, trans, wires
EFT
1889 09/25/2025 Open Accounts Payable REDWOOD PRIVATE SECURITY LP $154,935.84
1890 09/25/2025 Open Accounts Payable VANIR TOWER BUILDING INC $59,793.76
1891 09/25/2025 Open Accounts Payable PACHECO, MAGGIE $192.00
1892 09/30/2025 Open Accounts Payable US BANK $464,383.50
1893 09/30/2025 Open Accounts Payable ACH CALPERS $792,077.44
1894 09/30/2025 Open Accounts Payable ACH CALPERS $6,263.06
1895 09/30/2025 Open Accounts Payable ACH DOLLAR BANK $1,726.76
1896 09/30/2025 Open Accounts Payable ACH DOLLAR BANK $1,017,875.46
Type EFT Totals:8 Transactions $2,497,247.82
Parent - Parent - deposits, trans, wires Totals
EFTs Status Count Transaction Amount Reconciled Amount
Open 8 $2,497,247.82 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Total 8 $2,497,247.82 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 8 $2,497,247.82 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 8 $2,497,247.82 $0.00
Grand Totals:
EFTs Status Count Transaction Amount Reconciled Amount
Open 8 $2,497,247.82 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Total 8 $2,497,247.82 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 8 $2,497,247.82 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 8 $2,497,247.82 $0.00
Tuesday, December 2, 2025Pages: 1 of 1user: Claudia Alvarez
Payment Register
City of San Bernardino
From Payment Date: 9/25/2025 - To Payment Date: 9/30/2025
Packet Page. 205
Fund Amount
001 - General $31,914
101 - City of SB State of the City $24,190
117 - Home Improvement Part 14.239 $155
119 - Community Development Block Grant $1,972
123 - Federal Grant Programs $1,208
124 - Animal Control $1,006
126 - Gas Tax Fund $1,327
130 - State And Other Grant Programs $7,337
635 - Fleet Services Fund $1,511
679 - Information Technology $1,370
Grand Total $71,990
City of San Bernardino
Purchasing Card Charges by Department
October 2025 Expenditures
Summary by Fund
Packet Page. 206
City of San Bernardino
Purchasing Card Charges by Department
October 2025 Expenditures
Fund/Department/Account/Description P-Card Charges
001 - General
Mayor
5122 - Dues And Subscriptions
10/16/25 - Sun Newspaper Subscription $14.00
5122 - Dues And Subscriptions Total $14.00
5132 - Meetings And Conferences
10/10/25 - Hotel on 10/08/25-10/9/25n for L $289.33
10/10/25- Gas for Rental Car for the League of Ca $41.43
10/10/25- Hotel for the League of Cal Cities Conf $314.33
10/10/25- Parking for the League of Cal Cities Co $71.00
10/10/25- Rental Car service fees for the League $46.60
10/110/25 - Hotel during League of Cal Cities C $578.66
10/15/15 - Meal for staff $63.30
10/23/25 - Card incorrectly charged. Uber voucher provided but r $57.97
10/24/25 - Card was incorrectly charged for Mayor. $37.11
10/3/25- Rental Car for the League of Cal Cities $193.98
10/9/25- Gas for Rental Car for the League of Cal $81.22
10/9/25- Parking ffor the League of Cal Cities Con $44.00
5132 - Meetings And Conferences Total $1,818.93
5133 - Education And Training
9/30/25 - Public Safety Communication and Leadership Course for $300.00
5133 - Education And Training Total $300.00
Mayor Total $2,132.93
City Clerk
5122 - Dues And Subscriptions
IIMC Annual Membership fee's $295.00
Monthly subscription dues for Marq for customization of template $15.00
5122 - Dues And Subscriptions Total $310.00
5132 - Meetings And Conferences
2025 City Clerks New Law and Elections Seminar $350.00
Nuts and Bolts Conference $350.00
One Day 2025 City Clerks New Law and Elections Seminar (Wednesda $350.00
5132 - Meetings And Conferences Total $1,050.00
City Clerk Total $1,360.00
City Council
5111 - Material And Supplies
09-30-2025 - $260.24- SAMS CLUB #6624 - MCC Meeting Supplies $260.24
Packet Page. 207
City of San Bernardino
Purchasing Card Charges by Department
October 2025 Expenditures
Fund/Department/Account/Description P-Card Charges
10-01-2025 - $69.87 - STATER BROS #101 - MCC Meeting Supplies $69.87
10-09-2025 - $166.28 - COSTCO #0478 - MCC Meeting Supplies $166.28
10-09-2025 - $93.05 - SAMS CLUB #6624 - MCC Meeting Supplies $93.05
10-15-2025 - $114.92 - WALMART #1879 - MCC Meeting Supplies $114.92
10-15-2025 - $130.50 - El Pollo Loco - MCC Meeting Meal Oct. 15 $130.50
10-22-2025 - $87.99 ubreakifix Assurion Redlands Phone Battery $87.99
10-30-2025 - $29.58 - WALMART #1692 - MCC Meeting Supplies $29.58
5111 - Material And Supplies Total $952.43
5122 - Dues And Subscriptions
10-08-2025 - $48.75 - COSTCO #1010 - Executive Membership Renewa $48.75
5122 - Dues And Subscriptions Total $48.75
5132 - Meetings And Conferences
10-01-2025 - $130.50 - El Pollo Loco - MCC Meeting Meal Oct. 1 $130.50
10-21-2025 - $75.00 - NOS Wine & Food Fall Affair Ticket #1 $75.00
10-29-2025 - $154.79 - Garcia Center Gala Dinner Ticket #1 $154.79
5132 - Meetings And Conferences Total $360.29
5142 - Meetings And Conferences - Ward 1
10-10-2025 - $532.28 - Courtyard Long Beach Downtown Folio (Cal $532.28
10-14-2025 - $160.00 - CAPSBC 60th Anniversary Gala Ticket #1 $160.00
5142 - Meetings And Conferences - Ward 1 Total $692.28
5145 - Meetings And Conferences - Ward 4
10-10-2025 - $620.28 - Courtyard Long Beach Downtown Folio (Cal $620.28
10-17-2025 - $160.00 - CAPSBC 60th Anniversary Gala Ticket #4 $160.00
10-21-2025 - $75.00 - NOS Wine & Food Fall Affair Ticket #4 $75.00
5145 - Meetings And Conferences - Ward 4 Total $855.28
5147 - Meetings And Conferences - Ward 6
10-17-2025 - $160.00 - CAPSBC 60th Anniversary Gala Ticket #6 $160.00
5147 - Meetings And Conferences - Ward 6 Total $160.00
5148 - Meetings And Conferences - Ward 7
10-07-2025 - $381.94 - Metropolitan Hotel Folio (Cal Cities Annu $381.94
10-21-2025 - $75.00 - NOS Wine & Food Fall Affair Ticket #7 $75.00
5148 - Meetings And Conferences - Ward 7 Total $456.94
5174 - Printing Charges
10-30-2025 - $69.70 - Im-Press Printing - City Clerk $69.70
5174 - Printing Charges Total $69.70
City Council Total $3,595.67
Packet Page. 208
City of San Bernardino
Purchasing Card Charges by Department
October 2025 Expenditures
Fund/Department/Account/Description P-Card Charges
City Manager
5111 - Material And Supplies
Costco - 10.09.2025 CM OFFICE SUPPLIES $123.07
Madison Seating - 10.21.2025 Two ergonomic chairs for staff per $1,138.00
Sam's Club - 09.30.25 CM OFFICE SUPPLIES $152.42
Sam's Club - 10.09.25 CM OFFICE SUPPLIES $65.75
WALMART - 10.30.25 CM OFFICE SUPPLIES $22.97
5111 - Material And Supplies Total $1,502.21
5122 - Dues And Subscriptions
California City Manager's Foundation membership dues for Deputy $400.00
Sun Newspaper Monthly Subscription charge for PIO in City Manage $26.00
5122 - Dues And Subscriptions Total $426.00
5132 - Meetings And Conferences
Del Taco - 10.14.25 Meal for Executive Ass for Conference $16.74
Highland Grocery Outlet - 10.14.25 Water for Executive Ass on w $14.25
League of Cal Cities Deputy City Manager $1,400.00
Lenwood Oil Co. - 10.14.25 Gas for Executive Ass to attend Conf $40.00
LUPE'S BAKERY - 10.02.25 Department Directors Meeting $36.39
LUPE'S BAKERY - 10.16.25 Department Directors Meeting $59.23
Meal purchase at the Office Dynamics Conference - October 14-17 $27.17
Office Dynamics Conference October 14-17, 2025. Fuel for the dri $40.00
Office Dynamics Conference October 14-17, 2025. Meals/dinner Thu $22.20
Office Dynamics Conference October 14-17, 2025. Refreshments on $7.48
Office Dynamics Conference October 14-17. Snacks on the return d $2.38
PANERA - 10.07.25 Regional Navigation Center Development & Discu $94.34
Red Rock Casino Resort Spa - 10.14.25 Hotel Credit from Conferen -$258.77
Red Rock Casino Resort Spa - Oct 14-17, 2025, Hotel for Exc Ass $913.04
Rubio's - 10.14.25 Meal for Executive Ass on trip to conference $32.16
Shell - 10.14.25 Snack for Excecutive Ass on drive to Conference $7.71
Superior Grocers - 10.02.25 Department Directors Meeting $5.94
The Westin Long Beach - LOCC Annual Conf & EXPO Oct 8-10, 2025, $76.01
5132 - Meetings And Conferences Total $2,536.27
City Manager Total $4,464.48
Community Development & Housing
5111 - Material And Supplies
Jackets to be used by Code Enforcement Officers $244.65
Supplies for the office first aid box $18.75
Packet Page. 209
City of San Bernardino
Purchasing Card Charges by Department
October 2025 Expenditures
Fund/Department/Account/Description P-Card Charges
Trash Bags to be used by code enforcement for vendor cleanup $58.67
White Board for Permit Supervisor's office $50.48
White Board to be used in Permit Supervisor's office for Building an $106.12
5111 - Material And Supplies Total $478.67
5112 - Small Tools And Equipment
Oven to replace broken oven in the office break room $779.69
5112 - Small Tools And Equipment Total $779.69
5122 - Dues And Subscriptions
CALED Membership Renewal for Director $120.00
Card charged in error, refunded and charged to the correct card $7.95
Charged in error, refunded -$7.95
5122 - Dues And Subscriptions Total $120.00
Community Development & Housing Total $1,378.36
Economic Development
5111 - Material And Supplies
Breakroom supplies for Economic Development $102.76
5111 - Material And Supplies Total $102.76
5121 - Advertising
Facade Program Google Ad $7.19
5121 - Advertising Total $7.19
5122 - Dues And Subscriptions
San Bernardino Sun Monthly Subscription.$14.00
5122 - Dues And Subscriptions Total $14.00
5132 - Meetings And Conferences
Gas Receipt for drive back from Fresno CALED Keys Course $32.51
Gas Receipt for drive to Fresno CALED Keys Course $12.92
Hotel Receipt Holiday Inn Express for CALED Keys Course Fresno -$1,260.90
5132 - Meetings And Conferences Total $1,306.33
5133 - Education And Training
ICSC Long Beach training for Econ Manager $97.50
ICSC Long Beach training for Econ Specialist $97.50
5133 - Education And Training Total $195.00
Economic Development Total $1,625.28
Packet Page. 210
City of San Bernardino
Purchasing Card Charges by Department
October 2025 Expenditures
Fund/Department/Account/Description P-Card Charges
Finance & Management Services
5111 - Material And Supplies
Supplies for treasury $432.83
5111 - Material And Supplies Total $432.83
5122 - Dues And Subscriptions
Barrons subscription $32.61
Bloomber annual subscription $399.00
The Economist subscription $349.00
The Sun subscription $34.00
The Wall Street subscription $59.80
5122 - Dues And Subscriptions Total $874.41
5132 - Meetings And Conferences
2 Finance Staff at City Council Meeting, 10/1/2025 $24.17
FY 2026 CMRTA ANNUAL CONFERENCE REGISTRATION FEE $475.00
League of Cal Cities conference- Budget $1,222.32
League of Cal Cities conference. Grants $1,072.32
League of Cal Cities Conference. Hotel. Admin $946.71
League of Cal Cities-Grants $150.00
5132 - Meetings And Conferences Total $3,890.52
5133 - Education And Training
CPA license renewal $340.00
5133 - Education And Training Total $340.00
Finance & Management Services Total $5,537.76
General Government
5111 - Material And Supplies
Power Monkey LLC - 10.08.25 NAC Pickle Ball Event on Oct 11, 202 $736.00
5111 - Material And Supplies Total $736.00
General Government Total $736.00
Human Resources & Risk Management
5105 - Employee Recognition
Employee Service Pins $1,126.25
Interview Panel breakfast $48.30
Interview Panel lunch $61.41
5105 - Employee Recognition Total $1,235.96
5132 - Meetings And Conferences
Deposit for the first night for employee's stay for conference $317.46
Flight to Conference for Executive Assistants to Las Vegas Dynam $324.00
Packet Page. 211
City of San Bernardino
Purchasing Card Charges by Department
October 2025 Expenditures
Fund/Department/Account/Description P-Card Charges
Partial Refund for Employee's flight - Monterey Bay -$109.00
Refund Credit from Red Rock Hotel for Conference for Executive A -$589.86
5132 - Meetings And Conferences Total -$57.40
5503 - Outside Legal Services
Courier service for packet deliver from ER $310.49
Courier service to deliver packet from ER $598.79
5503 - Outside Legal Services Total $909.28
Human Resources & Risk Management Total $2,087.84
Library
5111 - Material And Supplies
Library Barcodes $168.23
5111 - Material And Supplies Total $168.23
5132 - Meetings And Conferences
Hotel stay for 2 nights for California Library Association profe $450.74
5132 - Meetings And Conferences Total $450.74
5505 - Other Professional Services
Alarm Permit Fee $31.21
5505 - Other Professional Services Total $31.21
Library Total $650.18
Operations and Maintenance O&M
5111 - Material And Supplies
ISA ABORIST PANTS $328.58
5111 - Material And Supplies Total $328.58
Operations and Maintenance O&M Total $328.58
Packet Page. 212
City of San Bernardino
Purchasing Card Charges by Department
October 2025 Expenditures
Fund/Department/Account/Description P-Card Charges
Parks & Recreation
5111 - Material And Supplies
Bingo items for Senior Service bingo club at both Senior Facilit $461.39
Lunch for Senior Health and Resource Fair on 10/3/25 at Fifth St $978.74
Prize Baskets for the Trick or Treat Costume Contest $45.54
purchase of perishable and nonperishable food items for center c $151.76
purchase of supplies for admin office $123.39
purchase of supplies for center cooking program (VCC)$12.27
purchase of treats for CID anniversary celebration $95.92
Senior Movie Day: Eight seniors age participants had the the opp $47.92
5111 - Material And Supplies Total $1,916.93
5121 - Advertising
Facebook Marketing for Senior Health and Resource Fair on 10/3/2 $104.18
5121 - Advertising Total $104.18
5133 - Education And Training
American Red Cross Training for aquatics staff $188.00
aquatic adaptive training $100.00
5133 - Education And Training Total $288.00
5502 - Professional Contractual Services
Fire Permit for -Dia De Los Muertos $346.15
Fire Permit -Veterans Day Salute $346.15
5502 - Professional Contractual Services Total $692.30
Parks & Recreation Total $3,001.41
Police
5113 - Motor Fuel And Lubricants
Airport parking for IACP conference.$180.00
Fuel for Chief's city issued vehicle.$395.15
IACP CONFERENCE HOTEL REFUND -$1,093.80
5113 - Motor Fuel And Lubricants Total -$518.65
5122 - Dues And Subscriptions
Buzzsprout podcast subscription - october $12.00
5122 - Dues And Subscriptions Total $12.00
5133 - Education And Training
BWC VIDEO RELEASE & REDACTION REGISTRATION $189.00
IACP CONFERENCE HOTEL $1,093.83
IACP CONFERENCE HOTEL REFUND -$0.03
LEAGUE OF CA CITIES CONFERENCE HOTEL $929.56
Packet Page. 213
City of San Bernardino
Purchasing Card Charges by Department
October 2025 Expenditures
Fund/Department/Account/Description P-Card Charges
LEAGUE OF CA CITIES CONFERENCE HOTEL PARKING $40.00
SCAFO TRAINING CONFERENCE HOTEL $568.83
5133 - Education And Training Total $2,821.19
5134 - Training Post Reimburseable
ARIDE HOTEL $183.25
BASIC MOUNTED PATROL REFUND -$650.00
BASIC SCHOOL RESOURCE OFFICER REGISTRATION $396.00
OVERDOSE DEATH INVT REGISTRATION $136.99
POST EXECUTIVE SEMINAR HOTEL $897.45
POST MANAGEMENT COURSE HOTEL $1,216.45
SUPERVISORY LEADERSHIP INSTITUTE HOTEL $520.98
5134 - Training Post Reimburseable Total $2,701.12
Police Total $5,015.66
001 - General Total $31,914.15
101 - City of SB State of the City
City Manager
5111 - Material And Supplies
10/13/25 - Key the City given to Yuhavitaam $187.88
10/13/25 - Plants for stage - State of the City Event on 10/14/2 $127.05
10/13/25 - Plants for stage at State of the City Event on 10/14/$331.45
10/13/25 - Return of plants for stage - State of the City Event -$92.36
10-15-2025 - $6,391.00 - Elegante Catering INV-1097 and Invoice $6,391.00
Cancellation of Steel Stanchion Post and Velvet Rope for State o -$185.95
Canopies/Lighting for the State of the City Event.$8,182.71
Crestline - 10.01.25 Totes for State of the City $502.92
Deposit for Catering Service - State of the City Event held on $6,377.00
Environmental Health Services payment for State of the City even $225.57
Lapel Pin - 10.03.25 (Credit Memo & Adjustment) Pins for State o -$100.00
Lapel Pin - 10.03.25 Pins for State of the City on Oct 14, 2025 $1,078.53
Lolly's Tamales - 10.06.25 (1st DEPOSIT) Tamales, Appetizers, an $657.33
Lolly's Tamales - 10.09.25 (2nd DEPOSIT) Tamales, Appetizers and $320.87
PENS.com - 09.30.25 Totes for State of the City. The order was c $0.00
State of the City Event - Steel Stanchions Set of poles and vel $185.95
5111 - Material And Supplies Total $24,189.95
City Manager Total $24,189.95
Packet Page. 214
City of San Bernardino
Purchasing Card Charges by Department
October 2025 Expenditures
Fund/Department/Account/Description P-Card Charges
101 - City of SB State of the City Total $24,189.95
117 - Home Improvement Part 14.239
Community Development & Housing
5133 - Education And Training
Novogradac LIHTC Acquisition-Rehab Development Issues Webinar fo $155.00
5133 - Education And Training Total $155.00
Community Development & Housing Total $155.00
117 - Home Improvement Part 14.239 Total $155.00
119 - Community Development Block Grant
Community Development & Housing
5133 - Education And Training
Housing and Homelessness Division professional development train $400.00
5133 - Education And Training Total $400.00
5167 - Software Maintenance
Annual Survey Monkey account used for community engagement surve $468.00
5167 - Software Maintenance Total $468.00
Community Development & Housing Total $868.00
Police
5111 - Material And Supplies
work boots for PEACE Team outreach $1,103.83
5111 - Material And Supplies Total $1,103.83
Police Total $1,103.83
119 - Community Development Block Grant Total $1,971.83
123 - Federal Grant Programs
Police
5111 - Material And Supplies
FRIDGE IS TO BE USED BY FORENSICS DEPARTMENT. $731.37
5111 - Material And Supplies Total $731.37
5133 - Education And Training
OTS Grant - PAS class $477.00
5133 - Education And Training Total $477.00
Police Total $1,208.37
123 - Federal Grant Programs Total $1,208.37
124 - Animal Control
Animal Services
5111 - Material And Supplies
Packet Page. 215
City of San Bernardino
Purchasing Card Charges by Department
October 2025 Expenditures
Fund/Department/Account/Description P-Card Charges
100 Rapid distemper tests for dogs in our care. $353.28
Food trays and pan liners for animals $502.22
Refund for Kitten Milk Replacer -$150.36
Refund for unavailable product - 4oz food cups -$16.31
Wet food for underage kittens $136.98
5111 - Material And Supplies Total $825.81
5133 - Education And Training
Animal Control Officer CACO application + 3-year certification $180.00
5133 - Education And Training Total $180.00
Animal Services Total $1,005.81
124 - Animal Control Total $1,005.81
126 - Gas Tax Fund
Operations and Maintenance O&M
5111 - Material And Supplies
BOULEVARD BANNER BRACKET KITS FOR HANGING BANNERS DOWNTOWN $1,206.88
5111 - Material And Supplies Total $1,206.88
5133 - Education And Training
RETAKE OF WRITTEN ISA EXAM $120.00
5133 - Education And Training Total $120.00
Operations and Maintenance O&M Total $1,326.88
126 - Gas Tax Fund Total $1,326.88
Packet Page. 216
City of San Bernardino
Purchasing Card Charges by Department
October 2025 Expenditures
Fund/Department/Account/Description P-Card Charges
130 - State And Other Grant Programs
Parks & Recreation
5111 - Material And Supplies
purchase of food for Back 2 Nature Family Camping trip?$623.13
purchase of food for OEP Back 2 Nature Grant. Family Camping Tri $1,311.53
purchase of ice and dry ice for OEP Back 2 Nature Grant Family C $250.13
purchase of perishable and nonperishable food items for OEP Back $326.27
purchase of supplies for OEP Back 2 Nature $114.05
purchase of supplies for OEP Back 2 Nature Grant $38.04
5111 - Material And Supplies Total $2,663.15
Parks & Recreation Total $2,663.15
Police
5111 - Material And Supplies
EQUIPMENT NEEDED FOR SWORN OFFICERS.$593.20
Grant-related supplies for activities with you $2,375.26
Supplies for grant-related activities $167.00
Supplies for grant-related activities and give $450.91
Supplies for youth for grant-related event $266.49
Teaching Documents for grant-related activitie $721.02
5111 - Material And Supplies Total $4,573.88
5133 - Education And Training
Essential training for Management Analyst $100.00
5133 - Education And Training Total $100.00
Police Total $4,673.88
130 - State And Other Grant Programs Total $7,337.03
635 - Fleet Services Fund
Public Works
5113 - Motor Fuel And Lubricants
CNG FUEL TRUCK 423 MILEAGE 5059 $148.68
CNG FUEL TRUCK 423 MILEAGE 5132 $134.57
CNG FUEL TRUCK 445 MILEAGE 9010 $110.89
CNG FUEL TRUCK 445 MILEAGE 9049 $121.54
CNG FUEL TRUCK 445 MILEAGE 9067 $85.66
cng unit # 0397 $29.57
cng unit # 0398 $26.25
cng unit # 0415 $18.08
cng unit # 394 $19.72
Packet Page. 217
City of San Bernardino
Purchasing Card Charges by Department
October 2025 Expenditures
Fund/Department/Account/Description P-Card Charges
cng unit # 423 $68.70
cng unit # 445 $164.94
FUEL CHARGES TRUCK 423 MILEAGE 4888 $150.27
FUEL CHARGES TRUCK 445 MILEAGE 2117 $146.78
FUEL CHARGES TRUCK 445 MILEAGE 2135 $90.18
FUEL CHARGES TRUCK 445 MILEAGE 2140 $103.37
FUEL CHARGES TRUCK 445 MILEAGE 2145 $91.69
5113 - Motor Fuel And Lubricants Total $1,510.89
Public Works Total $1,510.89
635 - Fleet Services Fund Total $1,510.89
679 - Information Technology
Information Technology
5167 - Software Maintenance
Domain Renewal for Animal Services $69.57
Google workspace for collaboration of email and documents.$10.41
Reports is required to efficiently design, generate, and $990.00
VPN sbcity.org renewal certificate $299.97
5167 - Software Maintenance Total $1,369.95
Information Technology Total $1,369.95
679 - Information Technology Total $1,369.95
Grand Total $71,989.86
Packet Page. 218
2
9
5
1
CONSENT CALENDAR
January 21, 2026
Honorable Mayor and City Council Members
C. Jeannie Fortune, Interim Director of Finance & Management
Services
Finance & Management Services
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, receive and file the Monthly Investment Portfolio Report for October 2025.
No Comment
This action is to receive and file the Investment Portfolio for the month of October 2025.
This is regular business of the Mayor and City Council ensuring that City investments
are in compliance with the Mayor and Council approved Investment Policy.
The City’s Statement of Investment Policy requires that a monthly Investment Portfolio
Report be prepared and submitted to the Mayor and City Council. Section III, Chapter
N of the City’s approved 2025-26 Investment Policy reads as follows, “The Director of
Finance shall submit to the City Council, on a monthly basis, a report summarizing the
individual transactions executed within the month.” The Director of Finance will
prepare, review, and present the City’s Investment Portfolio Report and confirm that
the portfolio complies with the City’s Investment Policy.
On September 3, 2025 the Mayor and City Council were informed that the City has
chosen to engage the services of outside professionals for evaluation and advice
regarding the City’s investment program. After seeking quotes for fiduciary consulting
services, and based on qualifications, investment strategy, compliance record,
reporting capabilities, and fees, the Shuster Advisory Group was awarded the
professional services agreement to be the City’s fiduciary consultant.
Packet Page. 219
2
9
5
1
Discussion
The Investment Portfolio Report provides a synopsis of investment activity for the City’s
investment portfolio for the month ending October 31, 2025. This month represented
the transition from Wells Fargo and BNY Mellon acting as the City’s fiduciary trustees,
and engaging Shuster Advisory Group as the City’s consultant.
The City’s Investment Portfolio complies with California Government Code section
53601; and, there is sufficient cash flow from a combination of liquid and maturing
securities, bank deposits, and income to meet the City’s expenditure requirements.
Par Market BookInvestments
Value Value Value
% of
Portfolio
% per
City
Policy
Treasury $94,500,000 94,250,359 $93,836,237 30.14%no cap
Local Agency
Investment Fund (LAIF)$85,804,817 85,804,817 $85,305,670 27.40%24.09%
Asset-Backed & CMO
securities $45,125,000 44,651,194 $46,077,515 14.80%20.00%
Agency Securities $44,000,000 43,461,534 $43,275,504 13.90%no cap
Money Market Funds
(Wells Fargo)$33,052,849 33,052,849 $32,845,796 10.55%20.00%
Cash $6,803,014 6,803,014 $5,479,488 1.76%no cap
Supranationals $4,000,000 4,017,163 $4,016,216 1.29%30.00%
Certificates of Deposit $500,000 488,537 $498,135 0.16%30.00%
TOTAL Investments 313,785,681 312,529,466 $311,334,563 100.00%
Treasury
30.1%
Local Agency Investment
Fund (LAIF)
27.4%
Corporate Bonds
14.8%
Agency Securities
13.9%
Money Market Funds
10.6%
Cash
1.8%
Supranational
1.3%
Certificates of Deposit
0.2%
% of Portfolio
Treasury Local Agency Investment Fund (LAIF)Corporate Bonds
Agency Securities Money Market Funds Cash
Supranational Certificates of Deposit
Packet Page. 220
2
9
5
1
Description of Investment Type:
US Treasury instruments – these include United States Treasury notes, bonds,
bills, or certificates of indebtedness, or those for which the faith and credit of the
United States are pledged for the payment of principal and interest. There is no
limitation as to the percentage of the City's portfolio that may be invested in this
category (no cap). The current book value is $93.8m (30.1%).
State local Agency investment Fund (LAIF) – a State program created by statute
that offers local agencies the opportunity to participate in a major portfolio using
the investment expertise of the State Treasurer’s office. The City policy states
that the maximum investment amount permitted by California state law regular
LAIF accounts is $75m or 24.1% of total investments. Current value: $85.3m
(27.4%).
Asset-Backed securities & Collateralized Mortgage Obligations (CMOs) - these
include a mortgage passthrough security, collateralized mortgage obligation,
mortgage-backed or other pay-through bond, equipment lease-backed
certificate, consumer receivable passthrough certificate, or consumer
receivable-backed bond with a maximum remaining maturity of five years or less
as measured by Weighted-Average Life (WAL). No more than 20% of the
market value of the City's investment portfolio shall be invested in this category
($311m x 20% = $62.3m). Current value: $46.1m (14.8%).
Federal Agency securities – these include the purchase of debt securities issued
by either a U.S. federal agency (such as Federal Housing Administration (FHA),
Small business Administration (SBA), Government National Mortgage
Association (GNMA) – “Ginnie Mae,” or a government-sponsored enterprise
(GSE) such as Fannie Mae, Freddie Mac or the Federal Home Loan Bank
(FHLB). There is no maximum amount (cap) in the City policy for investing in
federal agency issues coupons. Current investment: $43.3m (13.9%).
Money Market Funds – type of mutual funds that invest in highly, liquid, short-
term debt securities, which typically include Treasury bills, municipal bonds, and
tax-exempt commercial paper. The City policy states that the maximum
investment amount permitted is 20% of the City’s portfolio ($311m x 20% =
$62.3m). Current value: $32.8m (10.5%).
Cash – Liquid cash received from investment maturities or interest within the
Bond Portfolio. There is no maximum amount in the City policy. Current
investment: $5.5m (1.76%).
Supranationals – a debt security issued by a supranational entity, an
organization formed by two or more governments to promote economic
Packet Page. 221
2
9
5
1
development for member countries (ex. World Bank or European Investment Bank).
These organizations issue bonds to fund operations and development projects, with the
expectation of repayment from operational revenue. The City policy states that the
maximum investment amount permitted is up to 10% of the City’s portfolio ($311m x 10%
= $31.1m). Current value: $4m (1.29%).
Certificates of Deposit – negotiable certificates of deposit offered by nationally
or state-chartered banks and credit unions offering a fixed interest rate for a
specific period of time (guaranteed interest rate). The City policy states that the
maximum investment amount permitted is up to 30% of the City’s portfolio
($311m x 30% = $93.4m). Current value: $498.1k (0.16%).
2021-2025 Strategic Targets and Goals
Fiscal Impact
Conclusion
Attachments
Ward:
Synopsis of Previous Council Actions:
CC: Eric Levitt, City Manager
Packet Page. 222
City of San Bernardino
Portfolio Summary
As of Date:10/31/2025
Bond Portfolio Characteristics Total Account Summary
Average Credit Quality AA
3.00
Investment Sector Breakout
Cols
Sector Avg YTM Avg Eff Dur
Treasury 3.84 0.91
Agency 4.01 1.01
Corporate 4.43 2.09
LAIF 4.12 N/A
Money Market 4.00 N/A
Supranational 4.13 1.74
"I certify that this report accurately reflects all pooled investments and is in conformity with the Investment Policy Statement approved by the Mayor and City Council."
CYNTHIA JEANNIE FORTUNE, INTERIM DIRECTOR OF FINANCE & MGMT
End Values as of 10/31/2025
$312,529,466.37
$1,891,905.60
$313,785,680.52
Monthly Interest Earned $474,828.30
Average Coupon 1.94%Market Value
Average Market YTM 4.03%YTD Interest Earned
$311,335,196.60
$311,334,562.59
Cost Value
Weighted Average Life 1.50 Book Value
Average Effective Duration 1.24 Par
0.16%
1.29%
1.76%
10.55%
13.91%
14.80%
27.40%
30.14%
CD
Supranational
Cash
Money Market
Agency
Corporate
LAIF
Treasury
Total Investment Allocation
43.75%
13.82%
9.50%
11.89%
8.16%
12.88%
0-.5 .5-1 1-2 2-3 3-4 4+
Bond Maturity Distribution
2%
74%
24%
Bond Credit Quality (Highest NRSRO Rating)
AAA AA A
Packet Page. 223
City of San Bernardino 1
53601 Cash Portfolio
As of Date:10/31/2025
Symbol/CUSIP Security Name Par Value Coupon Rate
Moody's/
S&P/Fitch
Rating 2,3
Purchase Date Maturity/
Called Date
Weighted
Average Life
Days to
Maturity
Yield to
Maturity 2
Adjusted
Cost Basis Market Value
Cash & Cash Equaivalents
Cash 6,803,014.01$ N/A N/A N/A $ 6,803,014.01 $ 6,803,014.01
Money Market 33,052,849.02$ N/A 0.003 4.00% $ 33,052,849.02 $ 33,052,849.02
LAIF 85,804,817.49$ N/A 0.71 4.12% $ 85,804,817.49 $ 85,804,817.49
125,660,680.52$ $ 125,660,680.52 $ 125,660,680.52
CDs
90348JT59 UBS BANK USA UT 0.95% CD 09/22/2026 250,000.00$ 0.950% N/R 1/0/1900 9/22/2026 326 N/R 250,000.00$ 244,081.25$
856285XL0 STATE BANK OF INDIA NY 1.15% CD 09/28/2026 250,000.00$ 1.150% N/R 1/0/1900 9/28/2026 332 N/R 250,000.00$ 244,455.25$
500,000.00$ 500,000.00$ 488,536.50$
US Treasury
912797QQ3 US TREASURY BILL 11/13/2025 12,500,000.00$ 0.000% Aa1 10/29/2025 11/13/2025 0.02 13 3.92% 12,481,304.45$ 12,486,545.00$
912797RP4 US TREASURY BILL 11/18/2025 25,000,000.00$ 0.000% Aa1 10/29/2025 11/18/2025 0.04 18 3.93% 24,948,914.52$ 24,959,635.00$
912797RQ2 US TREASURY BILL 11/25/2025 25,000,000.00$ 0.000% Aa1 10/30/2025 11/25/2025 0.06 25 3.94% 24,932,692.29$ 24,940,645.00$
91282CCF6 US TREASURY 0.75% 05/31/2026 1,000,000.00$ 0.750% Aa1 10/14/2025 5/31/2026 0.57 212 3.77% 981,495.68$ 982,773.40$
9128282A7 US TREASURY 1.5% 08/15/2026 2,500,000.00$ 1.500% Aa1 10/6/2025 8/15/2026 0.78 288 3.75% 2,453,769.77$ 2,456,347.50$
91282CMV0 US TREASURY 3.875% 03/31/2027 1,500,000.00$ 3.875% Aa1 10/23/2025 3/31/2027 1.40 516 3.66% 1,507,278.52$ 1,504,511.70$
91282CNV9 US TREASURY 3.625% 08/31/2027 4,000,000.00$ 3.625% Aa1 10/6/2025 8/31/2027 1.82 669 3.61% 4,003,153.72$ 4,000,781.20$
91282CPB1 US TREASURY 3.5% 09/30/2027 4,000,000.00$ 3.500% Aa1 10/10/2025 9/30/2027 1.90 699 3.60% 3,998,835.32$ 3,992,500.00$
91282CNU1 US TREASURY 3.625% 08/15/2028 4,000,000.00$ 3.625% Aa1 10/10/2025 8/15/2028 2.78 1019 3.60% 4,007,185.16$ 4,002,968.40$
91282CNY3 US TREASURY 3.375% 09/15/2028 4,000,000.00$ 3.375% Aa1 10/6/2025 9/15/2028 2.86 1050 3.60% 3,973,815.22$ 3,975,624.80$
91282CPC9 US TREASURY 3.5% 10/15/2028 2,500,000.00$ 3.500% Aa1 10/23/2025 10/15/2028 2.95 1080 3.60% 2,501,479.04$ 2,493,066.25$
91282CEV9 US TREASURY 3.25% 06/30/2029 1,500,000.00$ 3.250% Aa1 10/23/2025 6/30/2029 3.65 1338 3.65% 1,485,539.86$ 1,479,726.45$
91282CNX5 US TREASURY 3.625% 08/31/2030 2,500,000.00$ 3.625% Aa1 10/6/2025 8/31/2030 4.82 1765 3.70% 2,486,635.29$ 2,491,406.25$
91282CPA3 US TREASURY 3.625% 09/30/2030 4,500,000.00$ 3.625% Aa1 10/23/2025 9/30/2030 4.90 1795 3.71% 4,494,529.74$ 4,483,827.90$
94,500,000.00$ 94,256,628.58$ 94,250,358.85$
Agency Securities4
3135GA2N0 FEDERAL NTNL MORTGAG 0.55% 11/04/2025 CALLABLE 1,000,000.00$ 0.550% Aa1 11/4/2020 11/4/2025 0.00 4 1.73% 1,000,000.00$ 999,903.00$
3130AMLJ9 FHLB 0.81% 11/26/2025 CALLABLE 1,000,000.00$ 0.810% Aa1 5/26/2021 11/26/2025 0.06 26 3.84% 1,000,000.00$ 997,945.00$
3130AMTZ5 FHLB 0.75% 11/28/2025 CALLABLE 1,000,000.00$ 0.750% Aa1 6/28/2021 11/28/2025 0.07 28 3.71% 1,000,000.00$ 997,807.00$
3134GXHD9 FHLMC 0.7% 12/23/2025 CALLABLE 1,000,000.00$ 0.700% Aa1 3/24/2021 12/23/2025 0.13 53 4.00% 993,000.00$ 995,557.00$
3130AP4S1 FHLB 0.825% 12/30/2025 CALLABLE 1,000,000.00$ 0.825% Aa1 9/30/2021 12/30/2025 0.15 60 3.92% 1,000,000.00$ 995,134.00$
3130AKN85 FHLB 0.55% 01/20/2026 CALLABLE 1,000,000.00$ 0.550% Aa1 9/10/2021 1/20/2026 0.21 81 4.12% 992,090.00$ 992,911.00$
3130AL6L3 FHLB STEP 02/26/2026 CALLABLE 2,000,000.00$ 1.000% Aa1 2/26/2021 2/26/2026 0.31 118 3.96% 2,000,000.00$ 1,981,916.00$
3130ANJ35 FHLB 0.7% 02/26/2026 CALLABLE 1,000,000.00$ 0.700% Aa1 8/26/2021 2/26/2026 0.31 118 3.97% 1,000,000.00$ 990,165.00$
3130ALV68 FHLB 1.03% 03/30/2026 CALLABLE 1,000,000.00$ 1.030% Aa1 3/30/2021 3/30/2026 0.41 150 4.12% 1,000,000.00$ 988,600.00$
3130AMUD2 FHLB 0.85% 03/30/2026 CALLABLE 1,000,000.00$ 0.850% Aa1 7/13/2021 3/30/2026 0.41 150 4.12% 1,000,000.00$ 987,886.00$
3133EMB76 FFCB 0.95% 05/26/2026 CALLABLE 1,000,000.00$ 0.950% Aa1 5/26/2021 5/26/2026 0.56 207 3.85% 999,000.00$ 983,792.00$
3133ENGC8 FFCB 1.32% 06/01/2026 1,000,000.00$ 1.320% Aa1 12/1/2021 6/1/2026 0.57 213 3.86% 1,000,000.00$ 985,861.00$
3133EMH21 FFCB 0.9% 06/15/2026 CALLABLE 2,000,000.00$ 0.900% Aa1 11/22/2021 6/15/2026 0.61 227 4.00% 988,000.00$ 1,964,368.00$
3133ENHV5 FFCB 1.39% 06/22/2026 CALLABLE 1,000,000.00$ 1.390% Aa1 12/22/2021 6/22/2026 0.63 234 4.06% 1,000,000.00$ 984,717.00$
3130ANKG4 FHLB 1% 08/27/2026 CALLABLE 1,000,000.00$ 1.000% Aa1 1/11/2022 8/27/2026 0.81 300 4.10% 1,000,000.00$ 977,375.00$
3133EM3T7 FFCB 0.87% 09/01/2026 CALLABLE 1,000,000.00$ 0.870% Aa1 9/1/2021 9/1/2026 0.82 305 3.92% 998,500.00$ 975,944.00$
3130APCH6 FHLB 1.125% 09/29/2026 CALLABLE 1,000,000.00$ 1.125% Aa1 9/29/2021 9/29/2026 0.90 333 4.00% 1,000,000.00$ 976,013.00$
3130AP6D2 FHLB 1% 09/30/2026 CALLABLE 1,000,000.00$ 1.000% Aa1 9/30/2021 9/30/2026 0.90 334 4.12% 1,000,000.00$ 974,755.00$
3130APHT5 FHLB 1.2% 10/26/2026 CALLABLE 1,000,000.00$ 1.200% Aa1 10/26/2021 10/26/2026 0.97 360 4.04% 1,000,000.00$ 974,803.00$
3130APGP4 FHLB 1.15% 10/28/2026 CALLABLE 1,000,000.00$ 1.150% Aa1 10/28/2021 10/28/2026 0.98 362 4.04% 1,000,000.00$ 974,193.00$
Packet Page. 224
City of San Bernardino 1
53601 Cash Portfolio
As of Date:10/31/2025
Symbol/CUSIP Security Name Par Value Coupon Rate
Moody's/
S&P/Fitch
Rating 2,3
Purchase Date Maturity/
Called Date
Weighted
Average Life
Days to
Maturity
Yield to
Maturity 2
Adjusted
Cost Basis Market Value
3130APHA6 FHLB STEP 10/28/2026 CALLABLE 1,000,000.00$ 1.250% Aa1 10/28/2021 10/28/2026 0.98 362 4.05% 1,000,000.00$ 976,223.00$
3133ENDC1 FFCB 1.33% 11/03/2026 CALLABLE 1,000,000.00$ 1.330% Aa1 11/3/2021 11/3/2026 1.00 368 3.97% 1,000,000.00$ 975,513.00$
3130APWE1 FHLB 1.5% 11/25/2026 CALLABLE 1,000,000.00$ 1.500% Aa1 11/30/2021 11/25/2026 1.06 390 4.03% 1,000,000.00$ 975,928.00$
3133ENFN5 FFCB 1.54% 11/30/2026 CALLABLE 1,000,000.00$ 1.540% Aa1 11/30/2021 11/30/2026 1.07 395 4.02% 1,000,000.00$ 975,858.00$
3133ENJC5 FFCB 1.29% 12/22/2026 CALLABLE 1,000,000.00$ 1.290% Aa1 12/22/2021 12/22/2026 1.13 417 4.01% 1,000,000.00$ 971,890.00$
3130AQBE2 FHLB 1.65% 12/30/2026 CALLABLE 1,000,000.00$ 1.650% Aa1 12/30/2021 12/30/2026 1.15 425 4.09% 1,000,000.00$ 975,652.00$
3130AQET6 FHLB 1.4% 12/30/2026 CALLABLE 1,000,000.00$ 1.400% Aa1 12/30/2021 12/30/2026 1.15 425 4.00% 1,000,000.00$ 972,849.00$
3133ENKG4 FFCB 1.47% 01/11/2027 CALLABLE 1,000,000.00$ 1.470% Aa1 8/27/2021 1/11/2027 1.19 437 4.04% 1,000,000.00$ 973,252.00$
3134HBT43 FHLMC 4.125% 09/26/2028 CALLABLE 5,000,000.00$ 4.125% Aa1 10/7/2025 9/26/2028 2.89 1061 4.13% 5,000,010.00$ 4,994,870.00$
3134HBV65 FHLMC 4.25% 10/08/2030 CALLABLE 5,000,000.00$ 4.250% Aa1 10/7/2025 10/8/2030 4.93 1803 4.40% 5,000,010.00$ 4,986,410.00$
3134HBW31 FHLMC 4% 10/08/2030 CALLABLE 4,000,000.00$ 4.000% Aa1 10/7/2025 10/8/2030 4.93 1803 4.04% 4,000,010.00$ 3,983,444.00$
44,000,000.00$ 42,970,620.00$ 43,461,534.00$
Municipal Bonds
-$ -$ -$
-$ -$ -$
Corporate Bonds
06048WK66 BANK OF AMERICA CORP STEP 12/23/2025 CALLABLE 2,000,000.00$ 1.000% A1 1/25/2021 12/23/2025 0.13 53 4.81% 1,995,000.00$ 1,988,994.00$
06048WK82 BANK OF AMERICA CORP STEP 01/26/2026 CALLABLE 1,500,000.00$ 1.000% A1 4/14/2021 1/26/2026 0.23 87 5.86% 1,450,650.00$ 1,486,731.00$
14913R2K2 CATERPILLAR FINL SER 0.9% 03/02/2026 1,625,000.00$ 0.900% A2 8/9/2021 3/2/2026 0.32 122 4.01% 1,628,055.00$ 1,607,983.00$
48128G3G3 JPMORGAN CHASE & CO. 1.2% 04/30/2026 CALLABLE 2,000,000.00$ 1.200% A1 4/30/2021 4/30/2026 0.48 181 4.11% 2,000,000.00$ 1,966,392.00$
023135BX3 AMAZON.COM, INC. 1% 05/12/2026 CALLABLE 1,000,000.00$ 1.000% AA 5/13/2021 5/12/2026 0.52 193 3.95% 996,840.00$ 985,268.00$
91324PEC2 UNITEDHEALTH GROUP I 1.15% 05/15/2026 CALLABLE 1,000,000.00$ 1.150% A+ 5/20/2021 5/15/2026 0.53 196 4.06% 1,002,380.00$ 981,689.00$
06048WM31 BANK OF AMERICA CORP 1.25% 05/28/2026 CALLABLE 1,000,000.00$ 1.250% A1 5/28/2021 5/28/2026 0.56 209 4.71% 1,000,000.00$ 978,926.00$
38150AG82 THE GOLDMAN SACHS GR 1.4% 06/16/2026 CALLABLE 1,000,000.00$ 1.400% A2 6/16/2021 6/16/2026 0.61 228 5.02% 1,000,000.00$ 979,749.00$
24422EVR7 JOHN DEERE CAPITAL C 1.05% 06/17/2026 2,000,000.00$ 1.050% A1 6/17/2021 6/17/2026 0.62 229 3.99% 1,001,600.00$ 1,962,112.00$
38150AGW9 THE GOLDMAN SACHS GR 1.45% 07/30/2026 CALLABLE 1,000,000.00$ 1.450% A2 7/30/2021 7/30/2026 0.73 272 5.07% 1,000,000.00$ 976,239.00$
48128G4R8 JPMORGAN CHASE & CO. 1.15% 08/17/2026 CALLABLE 1,000,000.00$ 1.150% A1 8/17/2021 8/17/2026 0.78 290 4.99% 1,000,000.00$ 972,792.00$
931142ER0 WALMART INC. 1.05% 09/17/2026 CALLABLE 1,000,000.00$ 1.050% Aa2 9/17/2021 9/17/2026 0.87 321 3.79% 1,003,300.00$ 975,848.00$
24422EVW6 JOHN DEERE CAPITAL C 1.3% 10/13/2026 1,000,000.00$ 1.300% A1 10/13/2021 10/13/2026 0.94 347 3.79% 1,000,250.00$ 976,790.00$
025816DT3 AMERICAN EXPRESS CO VAR 04/23/2027 CALLABLE 1,000,000.00$ 5.645% A2 10/6/2025 4/23/2027 0.47 539 4.52% 1,007,835.59$ 1,005,948.00$
172967LD1 CITIGROUP INC. VAR 01/10/2028 CALLABLE 750,000.00$ 3.887% A3 10/14/2025 1/10/2028 1.18 801 4.88% 747,812.50$ 747,279.00$
61747YER2 MORGAN STANLEY VAR 04/20/2028 CALLABLE 750,000.00$ 4.210% A1 10/23/2025 4/20/2028 1.46 902 4.66% 751,997.50$ 750,792.00$
02209SBQ5 ALTRIA GROUP, INC. 6.2% 11/01/2028 CALLABLE 1,500,000.00$ 6.200% A3 10/29/2025 11/1/2028 2.90 1097 4.24% 1,585,210.00$ 1,580,058.00$
17327CAW3 CITIGROUP INC. VAR 03/04/2029 CALLABLE 1,750,000.00$ 4.786% A3 10/6/2025 3/4/2029 2.33 1220 4.37% 1,775,685.00$ 1,771,630.00$
14040HCZ6 CAPITAL ONE FINL COR VAR 06/08/2029 CALLABLE 750,000.00$ 6.312% A- 10/23/2025 6/8/2029 2.59 1316 4.90% 788,792.50$ 784,623.00$
91159HJM3 U.S. BANCORP VAR 06/12/2029 CALLABLE 750,000.00$ 5.775% A 10/23/2025 6/12/2029 2.60 1320 4.63% 781,795.00$ 777,249.00$
95000U3E1 WELLS FARGO & CO VAR 07/25/2029 CALLABLE 750,000.00$ 5.574% A1 10/23/2025 7/25/2029 2.72 1363 4.55% 779,042.50$ 776,088.00$
06406YAA0 THE BANK OF NEW YORK 3.3% 08/23/2029 CALLABLE 1,750,000.00$ 3.300% A2 10/6/2025 8/23/2029 3.80 1392 4.20% 1,699,502.50$ 1,694,173.25$
06051GLS6 BANK OF AMERICA CORP VAR 09/15/2029 CALLABLE 1,000,000.00$ 5.819% A1 10/30/2025 9/15/2029 2.86 1415 4.48% 1,044,470.00$ 1,042,467.00$
00287YBX6 ABBVIE INC. 3.2% 11/21/2029 CALLABLE 1,000,000.00$ 3.200% A3 10/10/2025 11/21/2029 4.05 1482 4.14% 967,900.00$ 965,703.00$
20826FBJ4 CONOCOPHILLIPS CO 4.7% 01/15/2030 CALLABLE 1,750,000.00$ 4.700% A2 10/6/2025 1/15/2030 4.11 1537 4.17% 1,787,577.50$ 1,781,997.00$
91324PFG2 UNITEDHEALTH GROUP I 4.8% 01/15/2030 CALLABLE 1,000,000.00$ 4.800% A+ 10/14/2025 1/15/2030 4.11 1537 4.20% 1,025,400.00$ 1,021,824.00$
61747YFK6 MORGAN STANLEY VAR 01/16/2030 CALLABLE 1,000,000.00$ 5.173% A1 10/6/2025 1/16/2030 3.20 1538 4.50% 1,027,950.00$ 1,025,976.00$
91159HJQ4 U.S. BANCORP VAR 01/23/2030 CALLABLE 1,000,000.00$ 5.384% A 10/6/2025 1/23/2030 3.22 1545 4.53% 1,035,000.00$ 1,031,282.00$
95000U3J0 WELLS FARGO & CO VAR 01/23/2030 CALLABLE 1,500,000.00$ 5.198% A1 10/6/2025 1/23/2030 3.22 1545 4.49% 1,030,930.00$ 1,028,748.00$
89788MAR3 TRUIST FINL CORP SR VAR 01/24/2030 CALLABLE 1,000,000.00$ 5.435% A- 10/14/2025 1/24/2030 3.22 1546 4.58% 1,036,550.00$ 1,033,502.00$
036752BB8 ELEVANCE HEALTH, INC 4.75% 02/15/2030 CALLABLE 750,000.00$ 4.750% A- 10/23/2025 2/15/2030 4.20 1568 4.27% 767,980.00$ 762,726.75$
20030NDG3 COMCAST CORP 3.4% 04/01/2030 CALLABLE 1,000,000.00$ 3.400% A3 10/10/2025 4/1/2030 4.41 1613 4.24% 970,590.00$ 966,185.00$
Packet Page. 225
City of San Bernardino 1
53601 Cash Portfolio
As of Date:10/31/2025
Symbol/CUSIP Security Name Par Value Coupon Rate
Moody's/
S&P/Fitch
Rating 2,3
Purchase Date Maturity/
Called Date
Weighted
Average Life
Days to
Maturity
Yield to
Maturity 2
Adjusted
Cost Basis Market Value
38141GA87 THE GOLDMAN SACHS GR VAR 04/25/2030 CALLABLE 1,000,000.00$ 5.727% A2 10/6/2025 4/25/2030 3.47 1637 4.45% 1,046,830.40$ 1,044,908.00$
718172DT3 PHILIP MORRIS INTERN 4.375% 04/30/2030 CALLABLE 2,000,000.00$ 4.375% A2 10/29/2025 4/30/2030 4.41 1642 4.28% 2,014,570.00$ 2,007,328.00$
693475BX2 THE PNC FINL SERVICE VAR 05/14/2030 CALLABLE 1,000,000.00$ 5.492% A3 10/6/2025 5/14/2030 3.53 1656 4.45% 1,042,140.00$ 1,038,817.00$
65339KBR0 NEXTERA ENERGY CAPIT 2.25% 06/01/2030 CALLABLE 750,000.00$ 2.250% A- 10/23/2025 6/1/2030 4.57 1674 4.28% 690,160.00$ 686,236.50$
46647PDF0 JPMORGAN CHASE & CO. VAR 06/14/2030 CALLABLE 1,000,000.00$ 4.565% A1 10/6/2025 6/14/2030 3.61 1687 4.50% 1,012,360.00$ 1,010,833.00$
38141GB29 THE GOLDMAN SACHS GR VAR 07/23/2030 CALLABLE 750,000.00$ 5.049% A2 10/23/2025 7/23/2030 3.72 1726 4.50% 771,317.50$ 765,837.75$
46647PBE5 JPMORGAN CHASE & CO. VAR 10/15/2030 CALLABLE 750,000.00$ 2.739% A1 10/29/2025 10/15/2030 3.95 1810 4.48% 710,170.00$ 709,469.25$
45,125,000.00$ 43,977,643.49$ 44,651,193.50$
CMO & Asset Backed Securities
-$ -$ -$
-$ -$ -$
Supranationals
459058JS3 INTERNTNL BANK FOR R 0.65% 02/10/2026 CALLABLE 1,000,000.00$ 0.650% Aaa 8/31/2021 2/10/2026 0.27 102 4.80% 991,730.00$ 990,152.00$
45950VPY6 INTERNTNL FIN CORP 0.5% 05/15/2026 CALLABLE 1,000,000.00$ 0.500% Aaa 5/28/2021 5/15/2026 0.53 196 4.41% 1,000,000.00$ 997,781.00$
4581X0EN4 INTER-AMERICAN DEVEL 4.125% 02/15/2029 2,000,000.00$ 4.125% Aaa 2/26/2024 2/15/2029 3.28 1203 3.67% 1,977,260.00$ 2,029,230.00$
4,000,000.00$ 3,968,990.00$ 4,017,163.00$
Totals 313,785,680.52$ 311,334,562.59$ 312,529,466.37$
1 Account adjusted cost basis, ending value, and other information reflects the market value of your cash and investments provided by Charles Schwab & Co., Inc (Schwab). It does not include pending transactions, unpriced securities or assets held outside Schwab's custody. Values may not reflect all of your
gains/losses and may be rounded up to the nearest dollar; Schwab has provided accurate gain and loss information wherever possible for most investments. Cost basis may be incomplete or unavailable for some of your holdings and may change or be adjusted in certain cases.
2 Portfolio Manager provides bond ratings from Fitch, Moody, and Standard & Poor, and the highest of these ratings is reported for each bond. Portfolio Manager also also provides weighted-average-life and yield-to-maturity as of the month-end's valuation.
3 See acompanying Moody's, Standard and Poor's, and Fitch ratings descriptions and further details on the rating process from the rating agencies.
4 Agency Mortgage Pool Investments, such as bonds issued from the Federal Home Loan Mortgage Corporation (FHLMC), Federal National Mortgage Association (FNMA), or Government National Mortgage Association (GNMA), are amortizing bonds whose principal is paid down over time. As such, performance
should be evaluated relative to the Cost Basis of the Investment, not the Par Value.
Packet Page. 226
City of San Bernardino
Rating Agency Disclosures
As of Date:10/31/2025
Rater
Moody's1 Aaa Aa1 Aa2 Aa3 A1 A2 A3 Baa1 Baa2 Baa3 Ba1 Ba2 Ba3 B1 B2 B3 Below
S&P/Fitch 2,3 AAA AA+ AA AA- A+ A A- BBB+ BBB BBB- BB+ BB BB- B+ B B- Below
1 - Moody’s Official Rating Descriptor/Definition: Credit Ratings are assigned on Moody’s global long-term and short-term rating scales and are forward-looking opinions of the relative credit risks of financial obligations
issued by non-financial corporates, financial institutions, structured finance vehicles, project finance vehicles, and public sector entities. Moody’s defines credit risk as the risk that an entity may not meet its contractual
financial obligations as they come due and any estimated financial loss in the event of default or impairment. The contractual financial obligations addressed by Moody’s ratings are those that call for, without regard to
enforceability, the payment of an ascertainable amount, which may vary based upon standard sources of variation (e.g., floating interest rates), by an ascertainable date. Moody’s rating addresses the issuer’s ability to obtain
sufficient cash to service the obligation, and its willingness to pay. Moody’s ratings do not address non-standard sources of variation in the amount of the principal obligation (e.g., equity indexed), absent an express statement
to the contrary in a press release accompanying an initial rating. Long-term ratings are assigned to issuers or obligations with an original maturity of eleven months or more and reflect both on the likelihood of a default or
impairment on contractual financial obligations and the expected financial loss suffered in the event of default or impairment. Short-term ratings are assigned to obligations with an original maturity of thirteen months or less
and reflect both on the likelihood of a default or impairment on contractual financial obligations and the expected financial loss suffered in the event of default or impairment. Moody’s issues ratings at the issuer level and
instrument level on both the long-term scale and the short-term scale. Typically, ratings are made publicly available although private and unpublished ratings may also be assigned. Source: Moody's "Rating Symbols and
Definitions”, 2025 edition. https://ratings.moodys.com/api/rmc-documents/53954
2 - Standard & Poor’s Official Rating Descriptor/Definition: An S&P Global Ratings issue credit rating is a forward-looking opinion about the creditworthiness of an obligor with respect to a specific financial obligation, a
specific class of financial obligations, or a specific financial program (including ratings on medium-term note programs and commercial paper programs). It takes into consideration the creditworthiness of guarantors, insurers,
or other forms of credit enhancement on the obligation and considers the currency in which the obligation is denominated. The opinion reflects S&P Global Ratings' view of the obligor's capacity and willingness to meet its
financial commitments as they come due, and this opinion may assess terms, such as collateral security and subordination, which could affect ultimate payment in the event of default. Source: “S&P Global Ratings Definitions”
last updated 12/02/2024. https://www.spglobal.com/ratings/en/research/articles/190705-s-p-global-ratings-definitions-504352
Investment Grade Rating Non-Investment Grade Rating
3 - Fitch’s Official Rating Descriptor/Definition: Fitch Ratings publishes credit ratings that are forward-looking opinions on the relative ability of an entity or obligation to meet financial commitments. Issuer default ratings
(IDRs) are assigned to corporations, sovereign entities, financial institutions such as banks, leasing companies and insurers, and public finance entities (local and regional governments). Issue level ratings are also assigned,
often include an expectation of recovery and may be notched above or below the issuer level rating. Issue ratings are assigned to secured and unsecured debt securities, loans, preferred stock and other instruments,
Structured finance ratings are issue ratings to securities backed by receivables or other financial assets that consider the obligations’ relative vulnerability to default. Credit ratings are indications of the likelihood of repayment
in accordance with the terms of the issuance. In limited cases, Fitch may include additional considerations (i.e., rate to a higher or lower standard than that implied in the obligation’s documentation). Please see the section
Specific Limitations Relating to Credit Rating Scales for details. Credit ratings express risk in relative rank order, which is to say they are ordinal measures of credit risk and are not predictive of a specific frequency of default or
loss. Fitch’s credit ratings do not directly address any risk other than credit risk. Credit ratings do not deal with the risk of market value loss due to changes in interest rates, liquidity and/or other market considerations.
However, market risk may be considered to the extent that it influences the ability of an issuer to pay or refinance a financial commitment. Ratings nonetheless do not reflect market risk to the extent that they influence the
size or other conditionality of the obligation to pay upon a commitment (for example, in the case of payments linked to performance of an equity index). Source: Fitch's "Rating Definitions" last updated 9/19/2025.
https://www.fitchratings.com/research/banks/rating-definitions-19-09-2025
Packet Page. 227
CITY OF
SAN BERNARDINO
INVESTMENT POLICY
Fiscal Year 2025/26
Adopted November 5, 2025
Jeannie Fortune
Interim Director of Finance & Management Services
Packet Page. 228
I. PURPOSE
To establish guidelines for the prudent investment of public funds in a manner that will
protect City funds, meet daily cash flow expenditures, and comply with all federal, state,
and local laws and ordinances governing the investment of public funds.
II. POLICY & ADOPTION
It shall be the policy of the City of San Bernardino to annually review and adopt an
Investment Policy by resolution of the City Council. This Policy applies to all financial assets
and funds held by the City of San Bernardino and the Successor Agency to the San Bernardino
Redevelopment Agency. The funds covered by this policy include:
*General Fund
*Special Revenue Funds
*Capital Project Funds
*Proprietary Funds
*Other funds that may be created
Any modifications to the Policy must be approved by the City Council.
III. PROCEDURES
The Director of Finance shall annually review the City's Investment Policy, and incorporate
any changes in state law, recommendations from the City's Investment Advisor,
recommendations from the various national and state organizations of municipal finance
officers, or other changes recommended by City staff. The revised Investment Policy shall be
presented to the Finance Committee and the City Council for review and approval.
(A) Responsibilities
No person may engage in investment activities except as provided under the terms of
this Policy and the procedures established by the Director of Finance.
1. Responsibilities of the City Council
The City Council shall annually consider and adopt a written Investment Policy. As
provided in this Policy, the Council shall receive monthly Investment Reports.
2. Responsibilities of the Director of Finance
The Director of Finance is appointed by and serves at the pleasure of the City
Manager and is subject to his/her direction and supervision. The Director of
Packet Page. 229
Finance is charged with responsibility for the conduct of all Finance
Department operations. The City Charter places the "City Treasurer"
responsibilities amongst the duties of the Director of Finance. That individual
is charged with responsibility for carrying out all investment actions. He/she
may delegate the day-to-day investment activities to their designee(s) but not
the responsibility for the overall investment program. If authorized by the City
Council, the Director of Finance may also utilize the services of an external
investment advisor to assist with the investment program.
The Director of Finance, through supporting staff members, is responsible to
manage all public funds and securities belonging to or under the control of the
City and the Successor Agency, including the deposit and investment of those
funds in accordance with principles of sound treasury management and
applicable laws and ordinances. Appropriate internal controls designed to
ensure that assets of the City are protected from loss, theft, or misuse,
including but not limited to separation of duties and multiple approvers for
transactions, shall be maintained at all times in order to safeguard the City's
assets.
3. Responsibilities of the City's Investment Advisor (if applicable)
The City may engage in the services of outside professionals for evaluation and
advice regarding the City's investment program. An authorized Investment
Advisor may provide investment management services, which may also include
facilitating trade executions under the direction of the Director of Finance or
designee. Any Investment Advisor shall be registered by the Securities and
Exchange Commission and licensed to do business in the State of California. An
authorized Investment Advisor shall invest the City's funds in investments that
are in compliance with this policy and provide accurate and timely reports of
its investment activities to City staff. The Investment Advisor shall never take
possession of the City's funds or assets.
4. Internal Controls
The Director of Finance is responsible for establishing and maintaining an
internal control structure designed to ensure that the assets of the City are
protected from loss, theft, fraud or misuse.
The City's external independent auditing firm shall perform an annual analysis
and review of internal controls, account activity and compliance with policies and
procedures.
Packet Page. 230
(B) Prudent Investor Rule
The standard of prudence to be used by the Director of Finance shall be the "prudent
investor" standard. This shall be applied in the context of managing an overall portfolio.
The "Prudent Investor Rule" provides, pursuant to California Government Code
Section 53600.3, that investments shall be made with judgment and care-under
circumstances then prevailing - which persons of prudence, discretion and
intelligence exercise in the management of their own affairs, not for speculation, but
for investment, considering the probable safety of their capital as well as the probable
income to be derived. The Director of Finance and any designee of the Director of
Finance, as investment officers acting in accordance with written
procedures and the investment policy and exercising due diligence, shall be relieved of
personal responsibility for any individual security's credit risk or market price changes,
provided deviations from expectations are reported to the City Council in a timely
fashion and appropriate action is taken to control adverse developments.
(C) Ethics and Conflicts of Interest
In addition to state and local statutes relating to conflicts of interest, all persons involved
in the investment process shall refrain from personal business activity that conflicts with
proper execution of the investment program or impairs their ability to make impartial
investment decisions. Employees and investment officers are required to annually file
applicable financial disclosures as required for “public officials who manage public
investments” by the Fair Political Practices Commission (FPPC) and are subject to
California law relative to conflicts of interest.
(D) Level of Investment
The City strives to maintain the level of investment of all investable cash as near to 100
percent as possible through current and projected cash flow management. The Director
of Finance shall maintain a system to monitor and forecast revenues and expenditures
so that City funds can be invested to the fullest extent possible while providing sufficient
liquidity to meet the City's reasonably anticipated cash flow requirements. Maturities
of investments will be selected to provide necessary liquidity, manage interest rate
risk, and optimize earnings. Because of inherent difficulties in accurately forecasting
cash flow requirements, a portion of the portfolio should be continuously invested in
readily available funds.
(E) Investment Objectives
The City seeks safety and liquidity in all of its investments followed by yield. Safety,
liquidity, and yield are defined as follows:
1. Safety. Safety of principal is the foremost objective of the investment program.
Investments shall be undertaken in a manner that seeks to ensure the
Packet Page. 231
preservation of capital in the overall portfolio.
2. Liquidity. The investment portfolio shall remain sufficiently liquid to meet
operating requirements that may be reasonably anticipated. This is
accomplished by structuring the portfolio so that securities mature concurrent
with cash needs to meet anticipated demands.
3. Yield. The investment portfolio shall be designed with the objective of attaining
a market rate of return, taking into account the investment risk constraints and
liquidity needs. Return on investment is of secondary importance compared to
the safety and liquidity objectives described above.
(F) Allowable Investments
The investments listed in this Policy are authorized investments pursuant to Sections
53601 and 53635 of the California Government Code and are authorized investments for
the City subject, however, to the restrictions set forth in Section "K" of this Investment
Policy. In the event that an apparent discrepancy is found between this Policy and the
Government Code, the more restrictive parameters will take precedence.
(G) Collateralization
If collateral is required for a particular investment type, it will be provided in compliance
with California Government Code requirements.
(H) Investment Pools/Mutual Funds
Prior to investing in any pooled investment program (e.g., LAIF, money market funds),
the Director of Finance will review the program's documentation (e.g., investment
policy, policies for participation, fees) to determine the appropriateness of the pool for
City funds. Whenever the City has funds invested in a pooled investment program, the
Director of Finance should periodically review the pool's investment holdings. The
review shall, at a minimum, obtain the following information:
• A description of eligible investment securities, and a written statement of
investment policy and objectives.
• A description of interest calculations and how it is distributed, and how gains
and losses are treated.
• A description of how the securities are safeguarded (including the settlement
processes), and how often the securities are priced and the program audited.
• A description of who may invest in the program, how often, and what size of
deposits and withdrawals are allowed.
• A schedule for receiving statements and portfolio listings.
• A description of how the pool/fund utilizes reserves, retained earnings, etc.
Packet Page. 232
• A fee schedule, including when and how fees are assessed.
• The eligibility of the pool/fund to invest in bond proceeds and special district
funds, and a description of its practices.
(I) Diversification
The City shall diversify the investments within the portfolio to avoid incurring
unreasonable risks inherent in over-investing in specific instruments, individual financial
institutions, or maturities. To promote diversification, no more than 5% of the portfolio
may be invested in the securities of any one issuer, regardless of security type; excluding
U.S. Treasuries, federal agencies, supranationals, medium-term notes, asset-
backed/mortgage backed/CMO securities, and pooled investments such as LAIF, money
market funds, or local government investment pools.
(J) Maximum Maturities
For those investment types for which this Policy does not specify a maturity limit, no
individual investment shall exceed a maturity of five years from the date of purchase
unless the City Council has granted express authority to make that investment either
specifically or as a part of an investment program approved by the City Council no less
than three months prior to the investment. Both Agency and Non-Agency Mortgage-
Backed Securities and Asset-Backed Securities may be measured by their Weighted-
Average-Life when determining allowable maturity limits. The weighted average
duration of the investment portfolio shall not exceed 3.0 years.
(K) Authorized Investments of the City
The following types of investments are authorized by this Policy
1. U.S. Treasury Instruments. United States Treasury notes, bonds, bills, or certificates
of indebtedness, or those for which the faith and credit of the United States are
pledged for the payment of principal and interest. There is no limitation as to the
percentage of the City's portfolio that may be invested in this category. The
maximum maturity for this investment is five years from the time of purchase.
2. State of California's Local Agency Investment Fund (LAIF). A State of California-
managed investment pool. The maximum amount invested in this category may not
exceed the limit set by LAIF for operating accounts. For 2025, that deposit limit is
$75 million.
3. Local Government Investment Pools ("LGIP''). Shares of beneficial interest issued
by joint powers authority organized pursuant to Section 6509.7 that invests in the
securities and obligations authorized in Government Code (e.g. Cal Trust, CAMP,
CLASS). The City will limit investments to LGIPs that seek to maintain a stable net
asset value. There is no limitation as to the percentage of the City's portfolio that
Packet Page. 233
may be invested in this category.
4. Municipal Bonds. Registered state warrants or treasury notes or bonds of this state,
including bonds payable solely out of the revenues from a revenue-producing
property owned, controlled, or operated by the state or by a department, board,
agency, or authority of the state.
Registered treasury notes or bonds of any of the other 49 states in addition to
California, including bonds payable solely out of the revenues from a revenue-
producing property owned, controlled, or operated by a state or by a department,
board, agency, or authority of any of the other 49 states, in addition to California.
Bonds, notes, warrants, or other evidences of indebtedness of a local agency within
this state, including bonds payable solely out of the revenues from a revenue
producing property owned, controlled, or operated by the local agency, or by a
department, board, agency, or authority of the local agency.
Purchases are limited to securities rated in a rating category of "A" (long- term) or
"A-1" (short-term) or their equivalents or better by a Nationally Recognized
Statistical Rating Organization (NRSRO). A maximum of 30% of the City's portfolio
may be invested in this category. The maximum maturity for this investment is five
years from the time of purchase.
5. Federal Agency Securities. Federal agency or United States government- sponsored
enterprise obligations, participations, or other instruments, including those issued
by or fully guaranteed as to principal and interest by federal agencies or United
States government-sponsored enterprises. There is no limitation as to the
percentage of the City's portfolio that may be invested in this category. The
maximum maturity for this investment is five years from the time of purchase. The
maturity of Agency mortgage-backed or asset-backed securities shall measured by
Weighted-Average-Life (WAL), which is not to exceed 5 years.
6. Negotiable Certificates of Deposit. Negotiable certificates of deposit issued by a
nationally or state-chartered bank, a savings association or a federal association, a
state or federal credit union, or by a federally licensed or state-licensed branch of a
foreign bank. Securities in this category shall be limited to the maximum amount
covered by federal deposit insurance currently set at $250,000. A maximum of 30%
of the City's portfolio may be invested in this category. The maximum maturity for
this investment is five years from the time of purchase.
7. Commercial Paper. Commercial paper of "prime" quality of the highest ranking or
of the highest letter and number rating as provided for by a NRSRO. The entity that
issues the commercial paper shall meet all of the following conditions in either
paragraph (1) or (2):
1. The entity meets the following criteria: (A) Is organized and operating
Packet Page. 234
in the United States as a general corporation; (B) Has total assets in
excess of five hundred million dollars ($500,000,000), and (C) Has debt
other than commercial paper, if any, that is rated in a rating category of
"A" or its equivalent or better by an NRSRO.
2. The entity meets the following criteria: (A) is organized within the United
States as a special purpose corporation, trust, or limited liability
company, (B) Has program-wide credit enhancements including but not
limited to, overcollateralization, letters of credit, or a surety bond, and
(C) Has commercial paper that is rated “A-1” or better, or the equivalent,
by an NRSRO.
Purchases are limited to securities that have a maximum maturity of 270 days. A
maximum of 25% of the City’s portfolio may be invested in this category with a
maximum of 5% per issuer.
8. Corporate or Medium-Term Notes. Corporate or medium-term notes, defined as all
corporate and depository institution debt securities with a maximum remaining
maturity of five years or less, issued by corporations organized and operating within
the United States or by depository institutions licensed by the United States or any
state and operating within the United States. Purchases are limited to securities
rated in a rating category of "A" or its equivalent or better by an NRSRO. A maximum
of 30% of the City's portfolio may be invested in this category with a maximum of
10% per issuer.
9. Money Market Funds ("MMF"). Purchases are restricted to Government Money
Market Funds. Furthermore, these Money Market Funds must have met either of the
following criteria: (A) Attained the highest ranking or the highest letter and
numerical rating provided by not less than two NRSROs, or (B) Retained an
investment advisor with not less than five years' experience and registered or
exempt from registration with the SEC, with assets under management in excess of
five hundred million dollars ($500,000,000). A maximum of 20% of the City's portfolio
may be invested in this category.
10. Supranational Obligations. United States dollar denominated senior unsecured
unsubordinated obligations issued or unconditionally guaranteed by the
International Bank for Reconstruction and Development, International Finance
Corporation, or Inter-American Development Bank, with a maximum remaining
maturity of five years or less, and eligible for purchase and sale within the United
States. Investments under this subdivision shall be rated in a rating category of "AA"
or its equivalent or better by a NRSRO. A maximum of 10% the City's portfolio may
be invested in this category with a maximum of 5% per issuer. State law limits the
percentage to 30% of the portfolio.
11. Bankers Acceptances. Bankers’ acceptances are short-term debt instruments issued
by a company that is guaranteed by a commercial bank. Banker Acceptances are
Packet Page. 235
limited to institutions with short-term debt obligations of A-1 or higher and have
long term debt obligations rated “A” or higher, or the equivalent by an NRSRO. The
maturity shall not exceed 180 days and no more than 30% of the total portfolio may
be invested in Bankers’ Acceptances and no more than 5% per issuer.
12. Deposits Placed Through a Private Sector Entity. The City may invest in
Certificates of Deposit placed through a deposit placement service that uses a
private sector entity to place deposits with eligible depository institutions. These
placements are subject to the following limitations:
• All deposits must be fully insured by the Federal Deposit Insurance
Corporation (FDIC) or the National Credit Union Share Insurance Fund
(NCUSIF).
• The City may invest up to 50% of its surplus funds in such deposits
through January 1, 2031.
• Beginning January 1, 2031, the investment limit will revert to 30% of
surplus funds, unless otherwise amended by law.
• The placement service and the participating financial institutions must
provide documentation verifying the full insurance of the deposits
13. Asset-Backed, Mortgage-Backed, Mortgage Pass-Through securities and
Collateralized Mortgage Obligations. A mortgage passthrough security,
collateralized mortgage obligation, mortgage- backed or other pay-through bond,
equipment lease-backed certificate, consumer receivable passthrough certificate,
or consumer receivable-backed bond with a maximum remaining maturity of five
years or less as measured by Weighted-Average Life (WAL). Securities shall be
rated in a rating category of “AA” or its equivalent or better by an NRSRO. No
more than 20 percent of the market value of the City's investment portfolio shall
be invested in this category.
Packet Page. 236
City of San Bernardino Authorized Investment Policy Stable
Packet Page. 237
(L) Prohibited Investments
Furthermore, the City will not invest in inverse floaters, range notes, interest-only
strips, or any security that could result in zero interest accrual if held to maturity.
In order to anticipate market changes and provide a level of security for all funds, the
collateralization level will 100% of market value for Certificate of Deposits and 102%
for reverse purchase agreements or principal and accrued interest. Collateral will
always be held by an independent third party with whom the entity has a current
custodial relationship
(M) Performance Standards
The investment portfolio shall be managed with the objective of obtaining a market-
average rate of return during budgetary and economic cycles, considering the City's
investment risk constraints and the cash flow needs.
Investment return is a consideration only after the core investment portfolio tenets
of safety and liquidity have been met. The Director of Finance will adopt a benchmark
which best approximates the composition and weighted average maturity of the
City's portfolio. The City will monitor the City's portfolio yield against the US Treasury
Constant Maturity and the performance yield presented by LAIF. However, the
benchmark will be used only as a reference tool and does not infer that the portfolio
will be managed in an attempt to attain or exceed the stated benchmark.
Benchmarks may change over time based on changes in market conditions or cash
flow requirements. The selected performance benchmarks shall be representative of
the City's overall investment objectives and liquidity requirements.
(N) Investment Reporting
The Director of Finance shall submit to the City Council, on a monthly basis, a report
summarizing the individual transactions executed within the month. The Director of
Finance shall submit to the City Council on a quarterly basis a report summarizing the
status of the current investment portfolio and the individual transactions executed
over the last quarter. The report shall be prepared in a manner which shall allow the
City Council to ascertain whether investment activities during the reporting period have
conformed to the Investment Policy.
The report will include the following elements:
• Type of investment
• Institution/Issuer
• Purchase Date
Packet Page. 238
• Date of maturity
• Amount of deposit or cost of the investment
• Face value of the investment
• Current market value of securities and source of valuation
• Rate of interest
• Interest earnings
• Statement relating the report to its compliance with the Statement of
Investment Policy or the manner in which the portfolio is not in compliance
• Statement on availability of funds to meet the next six months’ obligations
• Percentage of Portfolio by Investment Type
• Days to Maturity for all Investments
• Comparative report on Monthly Investment Balances & Interest Yields
• Monthly transactions
The Investment Advisor shall report to the City, on a monthly basis, the weighted-
average-life for each structured security to ensure compliance with the individual 5-
year weighted-average-life limitation. Weighted-Average-Life (WAL) measures the
average length of time for anticipated principal repayments to measure a bond's risk
and liquidity. In order to calculate a bond's WAL, assumptions must be made regarding
prepayment event probabilities, prepayment amounts, prepayment speed, underlying
asset leverage, and other collateral features as well as macroeconomic drivers such as,
but not limited to, interest rate expectations, home prices, and mortgage rates.
Institutionally, proprietary models use these various assumed inputs to estimate the
amount and timing of principal repayments in order to produce a WAL output that
functions as a useful metric to understand interest rate risk, prepayment risk, and
extension risk.
All data shall be maintained by the Investment Advisor for record-keeping purposes. If
a structured security is reported to have a weighted-average-life greater than 5 years,
it shall be flagged for immediate discussion with both the City and Investment Advisor
to determine if the security shall be held or liquidated, depending on underlying risk
and broader market conditions. Notwithstanding the aforementioned process, any
security with a weighted-average-life greater than 4 years shall be monitored on a
monthly basis to note any reporting trends.
(O) Portfolio Review
The Director of Finance shall continually monitor portfolio performance to ensure that
the securities in the portfolio are in compliance with this Policy. The Director of
Packet Page. 239
Finance shall report any issues of material non-compliance in the next monthly
Investment Report. Percentage holding limits and diversification requirements
listed in this Policy apply at the time a security is purchased. If a percentage holding
limit or diversification requirement is exceeded due to a subsequent change in the
portfolio, it is not a compliance violation, but no additional securities may be purchased
in that category or for that issuer until the holdings are back under the Policy limits.
Credit ratings, where shown, specify the minimum credit rating category required at
purchase. In the event a security held by the City is subject to a credit rating change
that brings it below the minimum credit ratings specified in this Policy, the Director
of Finance will notify the City Council of the change in the next monthly Investment
Report. The course of action to be followed will then be decided on a case-by-case
basis, considering such factors as the reason for the change, prognosis for recovery or
further rating downgrades, and the market price of the security. If a security is
determined to be out of compliance with this Policy due to a subsequent change
in this Policy or the Government Code, it may be held to maturity unless there is a
requirement that the security be sold.
(P) Debt Proceeds
Debt proceeds and bond reserve funds are to be invested in accordance with their
respective bond indenture. If the indenture is silent as to the permitted
investments, the bond proceeds will be invested in the securities permitted by this
Policy. Notwithstanding the other provisions of this Policy, the percentage
limitations listed elsewhere in this Policy do not apply to bond proceeds and bond
proceeds may be invested beyond five years if the maturities of such investments do
not exceed the expected use of the funds, the investments are deemed prudent in
the opinion of the Director of Finance, and the investments are not prohibited by
the applicable bond documents. Tax and Revenue Anticipation Notes or other
temporary financing proceeds shall not be invested for a term that exceeds the term
of the debt.
(Q) Safe Keeping
To protect against potential losses by collapse of individual securities dealers, all
deliverable securities owned by the City, including collateral on repurchase agreements,
shall be held in safekeeping by a third party bank trust department acting as agent for
the City under the terms of a custody agreement executed by the bank and by the City.
All deliverable securities will be received and delivered using standard delivery-versus-
payment procedures.
(R) Qualified Financial Institutions and Broker/Dealers
Packet Page. 240
The Director of Finance shall maintain a list of approved financial institutions
authorized to provide investment related services to the City. In addition, the City shall
maintain a list of approved security broker/dealers selected by conducting a process of
due diligence. These may include 'primary' dealers or regional dealers that qualify
under Securities and Exchange Commission ("SEC") Rule 15C3-1 (uniform net capital
rule). A copy of this Investment Policy shall be sent annually to all firms with which the
City executes investments.
Additionally, all financial institutions and broker/dealers who desire to become
qualified bidders of investment transactions must provide the Director of Finance with
the following:
• Audited Financial Statements
• Proof of State Registration
• Copy of most recently filed Financial Industry Regulated Authority (FINRA)
documentation
• Certification of having read the Investment Policy and depository contracts of
the City of San Bernardino
The Director of Finance will review the existing list of either qualified broker/dealers
or qualified bidders for investment transactions on an annual basis. At the
discretion of the Director of Finance, and with the due diligence noted above, add
or delete either broker/dealers or qualified bidders.
(S) Continuing Education and Training
To ensure the highest level of professional standards for the execution of the investment
program, investment staff responsible for the day-to-day management of the portfolio
are encouraged to engage in continuing education in the areas of cash and investment
management.
Packet Page. 241
GLOSSARY
AGENCIES: Federal agency securities
BANKERS’ ACCEPTANCE (BA): A draft or bill of exchange accepted by a bank or trust
company. The accepting institution guarantees payment of the bill, as well as the issuer. The
drafts are drawn on a bank by an exporter or importer to obtain funds to pay for specific
merchandise. An acceptance is a high grade negotiable instrument.
BENCHMARK: A comparative base for measuring the performance or risk tolerance of the
investment portfolio. A benchmark should represent a close correlation to the level of
risk and the average duration of the portfolio's investments
BROKER: A broker brings buyers and sellers together for a commission. He/she does not take
a position.
CERTIFICATE OF DEPOSIT (CD): A time deposit with a specific maturity evidenced by a certificate.
Large-denomination CD's are typically negotiable.
COLLATERAL: Securities, evidence of deposit or other property, which a borrower pledges to
secure repayment of a loan. Also refers to securities pledged by a bank to secure
deposits of public monies.
COMMERCIAL PAPER: Short term unsecured promissory note issued by a corporation
(including limited liability companies) to raise working capital. These negotiable instruments
are purchased at a discount to par value or at par value with interest bearing. Commercial
paper is issued by corporations such as General Motors Acceptance Corporation, IBM, Banik
of America, etc.
COUPON: a) The annual interest that a bond’s issuer promises to pay the bondholder on the
bond’s face value. b) A certificate attached to a bond evidencing interest due on a payment
date.
DEALER: A dealer, as opposed to a broker, acts as a principal in all transactions; buying and
selling for his/her own account.
DELIVERY VERSUS PAYMENT: There are two methods of delivery of securities: delivery versus
payment and delivery versus receipt. Delivery versus payment is delivery of securities with an
exchange of money for the securities. Delivery versus receipt is delivery of securities with an
exchange of a signed receipt for the securities.
Packet Page. 242
DIVERSIFICATION: Dividing investment funds among a variety of securities offering
independent returns.
FEDERAL CREDIT AGENCIES: Agencies of the Federal government set up to supply credit to
various classes of institutions (e.g. S&L’s, small business firms, students, farmers, farm
cooperatives, and exporters).
FEDERAL DEPOSIT INSURANCE CORPORATION (FDIC): A Federal agency that insures bank
deposits, currently up to $250,00 per deposit.
LIQUIDITY: A liquid asset is one that can be converted easily and rapidly into cash without a
substantial loss of value. In the money market, a security is said to be liquid if the spread
between the bid and asked prices is narrow and a reasonable size can be done at those
quotes.
LOCAL GOVERNMENT INVESTMENT POOL (LGIP): The aggregate of all funds from political
subdivisions that are placed in the custody of the State Treasurer for investment and
reinvestment.
MARKET VALUE: The price at which a security is trading and could presumably be purchased
or sold.
MATURITY: The date upon which the principal or stated value of an investment becomes due
and payable.
MONEY MARKET: The market in which short-term debt instruments (bills, commercial paper,
bankers’ acceptances, etc.) are issued and traded.
NATIONALL RECOGNIZED STATISTICAL RATING ORGANIZATION (“NRSRO”): Firms that
review and assess the creditworthiness of an obligor as an entity or with respect to specific
securities or money market instruments and express their opinion in the form of a letter
rating. A credit rating agency may apply to the SEC fore registration as a nationally recognized
statistical rating organization (“NRSRO”). The primary rating agencies are Standard & Poor’s
Corporation, Moody’s Investor Services, Inc. and Fitch, Inc.
NEGOTIABLE CERTIFICATES OF DEPOSIT: Generally, short-term debt instruments that usually
pays interest and is used by a bank, savings or federal association, state or federal credit
union, or state-licensed branch of a foreign bank. Negotiable CDs are traded in a secondary
Packet Page. 243
market and are payable upon order to the bearer or initial depositor (investor). Negotiable
CDs are insured by FDIC up to $250,000, but they are not collateralized beyond that amount.
NON-NEGOTIABEL CERTIFICATE OF DEPOSIT: CDs that carry a penalty if redeemed prior to
maturity. Non-negotiable CDs issued by banks and savings and loans are insured by the
Federal Deposit Insurance Corporation up to the amount of $250,000, including principal and
interest. Amounts deposited above this amount may be secured with other forms of collateral
through an agreement between the investor and issuer. Collateral may include other
securities including Treasuries or agency securities such as those issued by the Federal
National Mortgage Association.
PORTFOLIO: Collection of securities held by an investor.
PRIMARY DEALER: A group of government securities dealers who submit daily reports of
market activity and positions and monthly financials statements to the Federal Reserve Bank
of New York and are subject to its informal oversight. Primary dealers include Securities and
Exchange Commission (SEC)-registered securities brokers/dealers, banks and a few
unregulated firms.
PRUDENT PERSON RULE: An investment standard. In some states, the law requires that a
fiduciary, such as a trustee, may invest money only in a list of securities selected by the
custody state – the so-called “legal list”. In other states, the trustee may invest in a security if
it is one that would be bought by a prudent person of discretion and intelligence who is
seeking a reasonable income and preservation of capital.
RATE OF RETURN: The yield obtainable on a security based on its purchase price or its current
market price. This may be the amortized yield to maturity; on a bond, the current income
return.
SAFEKEEPING: The service provided by banks and trust companies for clients when the bank
or trust company stores the securities, takes in coupon payments, and redeems issues at
maturity.
SECURITIES & EXCHANGE COMMISSION: Agency created by Congress to protected investors
in securities transactions by administrating securities legislation.
SEC RULE 150-1: See “Uniform Net Capital Rule”.
Packet Page. 244
SUPRANATIONAL SECURITIES: United States dollar denominated senior unsecured
unsubordinated obligations issued or unconditionally guaranteed by the International Bank
for Reconstruction and Development (IBRD), International Finance Corporate (IFC), or Inter-
American Development Bank (DB), with a maximum remaining maturity of five years or less,
and eligible for purchase and sale within the United States. Investments under this subdivision
shall be rated “AA” or better by an NRSRO and shall not exceed 10 percent of the agency’s
moneys that may be invested pursuant to this section.
TREASURY BILLS: A non-interest bearing discount security issued by the U.S. Treasury to
finance the national debt. Most bills are issued to mature in three months, six months, or one
year.
TREASURY BOND: Long-term U.S. Treasury securities having initial maturities of more than 10
years.
TREASURY NOTES: Intermediate-term coupon bearing U.S. Treasury having initial maturities
from one year to ten years.
UNIFORM NET CAPITAL RULE: Securities and Exchange Commission requirement that
member firms as well as nonmember broker/dealers in securities maintain a maximum ratio
of indebtedness to liquid capital of 15 to 1; also called the net capital rule and net capital
ratio. Indebtedness covers all money owed to a firm, including margin loans and
commitments to purchase securities, one reason new public issues are spread among
members of underwriting syndicates. Liquid capital includes cash and assets easily converted
into cash.
YIELD: The rate of annual income return on an investment, expressed as a percentage. (a)
Income Yield is obtained by dividing the current dollar income by the current market price for
the security. (b) Net Yield or Yield to Maturity is the current income yield minus any premium
above par or plus any discount from par in purchase price, with the adjustment spread over
the period from the date of purchase to the date of maturity of the bond.
Packet Page. 245
3
0
7
0
CONSENT CALENDAR
January 21, 2026
Honorable Mayor and City Council Members
Andrea Russell, Director of Human Resources
Human Resources
It is recommended that the Mayor and City Council of the City of San Bernardino,
California,
1. Adopt Resolution No. 2026-001 of the Mayor and City Council of the City of San
Bernardino, California, approving the Executive Compensation and Benefits
Plan and repealing Resolution No. 2022-59; and
2. Amend the Executive Group Salary Schedule effective 7/7/2025 and the
Citywide Salary Schedule for Full-Time, Part-Time, Temporary, and Seasonal
Employees effective 1/5/2026
No comments
As of September 3, 2025, the City successfully completed labor negotiations with all
eight (8) bargaining groups and finalized all applicable MOU’s/Resolutions. Following
the approval of the final MOU, staff began working on the update to the Executive
Group Compensation and Benefits Plan Resolution, as the terms of Resolution No.
2022-59 also expired on June 30, 2025.
The actions requested within this item will correct language included in the original
resolution to accurately reflect the intent and application of the language, bring it into
compliance with CalPERS and IRS guidelines, ensure that the Executive Group
Compensation and Benefits Plan addresses inconsistencies among the application of
benefits to some Group members, addresses compaction between the Public Safety
Executive and subordinate classifications; and streamlines the transition between
other City bargaining groups and the Executive Group.
Packet Page. 246
3
0
7
0
Background
Until 2022, unrepresented at-will executive classifications were part of the San
Bernardino Confidential and Management Association (SBCMA). As a result of
SBCMA’s agreement to release the City's executive team, Mayor and City Council
approved Resolution No. 2022-59 – Executive Compensation and Benefits Plan on
March 16, 2022. The term of this resolution expired on June 30, 2025. In preparation
for the expiration of this resolution, staff began making updates in consultation with
CalPERS, and Shuster Investment Group, our deferred compensation fiduciary. Staff
was informed by CalPERS that language contained in Section 6 of Resolution No.
2022-59 was not compliant and would result in certain compensation being non-
reportable for the Public Safety Executive; and staff was informed by Shuster that
language in the original resolution regarding Executive Leave cash out was not
compliant with IRS regulations.
Discussion
After finalizing all bargaining group MOU’s/Resolutions, staff began working on the
update to the Executive Compensation and Benefits Plan, which also expired on June
30, 2025. In the efforts to update this resolution, it was discovered that language
included in Section 6 of the original resolution related to Peace Officers Standards and
Training (POST) Executive Certificate compensation was not CalPERS compliant,
making the compensation allocated non-compensable. Staff worked with the
CalPERS MOU Review Team to correct this language, and it was recommended that
we include the recommended language in the updated resolution.
Also, the language in Section 11 of the original resolution related to Executive Leave
voluntary cash out and cash out at separation was found to be non-compliant with IRS
regulations. The cash out provisions allow Executives to sell back Executive leave in
excess of 660 hours with 30% being paid directly to the Executive and 70% being
deposited into the City’s 457(b), 401(a), Retiree Health Plan, or if not available to an
account of the Executive’s choice. IRS regulations related to the administration of a
401(a) plan require a mandatory contribution in order for Executive Group members to
have access to such a plan. This language has been replaced with standard cash out
language for non-Public Safety Executives, and includes IRS compliant language
reviewed by Shuster which legally allows participation in the City’s 401(a) plan for the
Public Safety Executive (Chief of Police).
With the ratification of the Police Management Association MOU, a total compensation
analysis was conducted to identify and address compaction between the Chief of
Police and Assistant Chief of Police as a result of the new terms of the MOU. The
base salary and other special compensation for the Chief of Police has been adjusted
to address this issue.
Finally, when the original resolution was adopted, it established a tiered benefit
structure within the Executive Group. The executives who were already employed with
Packet Page. 247
3
0
7
0
the City would continue to receive the same benefits under the existing structure that
was previously provided through the SBCMA resolution, and any new executive who
was hired on or after the adoption of Resolution 2022-59 would receive enhanced
benefits. These enhanced benefits included higher vacation accrual rates and a new
Executive Leave benefit, which was done to put the City in a stronger position to recruit
and retain talent. At the time, five (5) Department Directors and the Assistant City
Manager were covered under the existing benefits structure, and two new incoming
directors and the Chief of Police would be covered under the enhanced benefits. As a
result of time and executive turnover, there is now currently one (1) Executive Group
member that is impacted by this tiered benefit structure where they receive less
benefits than their peers. This update to the Executive Compensation and Benefits
Plan will remove the tiered benefit structure within the Executive Group and ensure
that all Executives receive the same enhanced benefits. We also identified an
opportunity to support the utilization of talent that exists within the City when
promotional opportunities occur by realigning vacation accruals to ensure that City
employees who are promoted into the Executive group from another bargaining group
do not experience a decrease in their vacation accrual rate due to their promotion. The
vacation accrual rates in the original resolution increase at five (5) and ten (10) years,
where SBCMA accrual rates have an additional tier at twenty (20) years that is higher
than the Executive group 10 year accrual rate. With this, a member of SBCMA with 20
years of service who promotes into the Executive group would experience a decrease
in vacation accrual with their promotion. To address this, we added another accrual
tier at fifteen (15) years that matches the SBCMA twenty (20) year accrual rate to
ensure a smooth transition when promoting from within.
All other compensation and benefits for the Executive group were aligned with
SBCMA as follows:
Compensation:
3% cost of living adjustment (COLA) effective the first full pay period following
July 1, 2025 (retroactive);
2% COLA effective the first full pay period following January 1, 2026;
3% COLA effective the first full pay period following July 1, 2026, unless
revenues fall below 3.75%. In which case the 3% would be split, 1.5% COLA
the first full pay period following July 1, 2026, and 1.5% COLA the first full pay
period following January 1, 2027.
Class & Comp Study: Implement the Fiscal Year 2025/26 Classification and
Compensation Study in Fiscal Year 2027/28 based on competitiveness,
recruitment and retention, and availability of funds. If no money is allocated to
equity adjustments, then a 3% COLA will go into effect the first full pay period
following July 1, 2027.
Health Benefits:
City contribution of $1,125.00 per month toward health premiums for Employee
Only, $1,450.00 per month for Employee Plus One Dependent, and $1,939.00
per month for Employee Plus Family.
Packet Page. 248
3
0
7
0
Employee contribution towards health insurance premium increases of up to
$30 per month for Employee + 1 coverage and up to $55 per month for Family
coverage annually.
$4,000.00 Health Insurance Waiver Stipend for employees who chose not to
enroll in any health care plan offered by the City.
Other:
Updated language to clarify terms and ensure legal and CalPERS compliance.
As changes are made to salaries or classifications, the City is required to adopt a
revised salary schedule in a public meeting. The attached salary schedule meets the
California Public Employees Retirement Systems (CalPERS) pay rate reporting
requirements in accordance with Government Code Section 20636 defining
“Compensation Earnable” and the California Code of Regulations (CCR) Section
570.5.
2021-2025 Strategic Targets and Goals
Adopting Resolution No. 2026-001 approving the Executive Compensation and
Benefits Plan and repealing Resolution No. 2022-59 aligns with Key Target No. 2a:
Focused, Aligned Leadership and Unified Community by building a culture that
attracts, retains, and motivates the highest quality talent.
Fiscal Impact
The Executive Compensation and Benefits Plan will be funded by extending the
approved hiring deferral for an additional five (5) months in FY 2025/26.
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino,
California,
1. Adopt Resolution No. 2026-001 of the Mayor and City Council of the City of San
Bernardino, California, approving the Executive Compensation and Benefits
Plan and repealing Resolution No. 2022-59; and
2. Amend the Executive Group Salary Schedule effective 7/7/2025 and the
Citywide Salary Schedule for Full-Time, Part-Time, Temporary, and Seasonal
Employees effective 1/5/2026.
Attachments
Attachment 1 Resolution 2026-0001 – Executive Compensation and
Benefits Plan
Attachment 2 Executive Group Salary Schedule
Attachment 3 Citywide Salary Schedule for Full-Time, Part-Time,
Temporary, and Seasonal Employees.
Packet Page. 249
3
0
7
0
Ward:
All Wards
Synopsis of Previous Council Actions:
September 3, 2025 Mayor and City Council amended the Citywide Salary
Schedule for Full-Time, Part-Time and Temporary
Employees.
July 15, 2025 Mayor and City Council amended the Citywide Salary
Schedule for Full-Time, Part-Time and Temporary
Employees.
June 18, 2025 Mayor and City Council amended the Citywide Salary
Schedule for Full-Time, Part-Time and Temporary
Employees.
March 16, 2022 Mayor and City Council adopted Resolution No. 2022-59
approving the Executive Compensation and Benefits Plan
CC: Eric Levitt, City Manager
Packet Page. 250
Resolution 2026-001
January 21, 2026
Resolution 2026-001
RESOLUTION NO. 2026-001
RESOLUTION OF THE MAYOR AND CITY COUNCIL
OF THE CITY OF SAN BERNARDINO, CALIFORNIA,
APPROVING THE EXECUTIVE COMPENSATION AND
BENEFITS PLAN; AND REPEALING RESOLUTION NO.
2022-59
WHEREAS, on March 16, 2022, City Council approved Resolution No. 2022-59
approving the Executive Compensation and Benefits Plan effective through June 30, 2025; and
the compensation and benefits plan remains in effect until a new resolution is adopted by the
Mayor and City Council; and
WHEREAS, it is necessary to codify the compensation and benefits provided to the
City's Executives, an unrepresented group of employees of the City of San Bernardino; and
WHEREAS, services provided by Executives shall be subject to the terms and
conditions set forth herein.
BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF
SAN BERNARDINO AS FOLLOWS:
SECTION 1. The City Council of the City of San Bernardino (City) hereby adopts a
compensation and benefits plan for Executive employees an unrepresented at-will group as
follows:
1. Terms. The term of this Resolution extend through June 30, 2028.
2. At-will/Unclassified (U). In accordance with Chapter 2.040.030 of the San Bernardino
Municipal Code, Executive employees are not included in the classified service of the
City and shall serve at the will and pleasure of the City Manager. They may be
appointed, controlled, ordered and directed by the City Manager in any manner which is
in compliance with applicable law, and may be disciplined or removed from city
employment by the City Manager without proof of cause or other justification and
without the right of appeal.
3. Classifications. The following classifications are recognized as at-will unclassified (U)
Executives:
• Assistant City Manager (U)
• Chief of Police (U)
• Deputy City Manager (U)
• Director of Animal Services (U)
• Director of Community Development & Housing (U)
Packet Page. 251
Resolution 2026-001
January 21, 2026
Resolution 2026-001
• Director of Economic Development (U)
• Director of Finance (U)
• Director of Human Resources & Risk Management (U)
• Director of Information Technology (U)
• Director of Parks, Recreation, and Community Services (U)
• Director of Public Works, Operations & Maintenance (U)
4. Compensation. Unless salary is provided for separately by employment contract,
effective the first full pay period following July 1, 2025, the salary ranges for all
Executives shall be increased by three percent (3%) to reflect a cost-of-living
adjustment (COLA). Effective the first full pay period following January 1, 2026,
the salary ranges for all Executives shall be increased by two percent (2%). Effective
the first full pay period following July 1, 2026, the salary ranges for all Executives
shall be increased by three and one half percent (3.5%), unless, increases to the
City’s revenue fall below 3.75%, in which case the COLA would be split in half and
paid out as follows: effective the first full pay period following July 1, 2026, the
salary ranges for all Executives shall be increased by one and seventy-five
hundredths percent (1.75%), and effective the first full pay period following January
1, 2027, the salary ranges for all Executives shall be increased by one and seventy-
five hundredths percent (1.75%). All salary ranges for Executives shall be amended
by the Mayor and City Council in accordance with this provision.
On or about April/May 2027 the City will review the recommendations of the
classification and compensation study (“Study”) currently being conducting, and
expected to be completed before the start of the 2027-28 fiscal year. Any salary equity
adjustments to individual classifications will be considered alongside any across-the-
board salary adjustments and other increases in compensation, taking into account such
factors as the total cost of compensation, market competitiveness, recruitment/retention,
and the availability of financial resources. Annual salary adjustments will be contingent
upon available funding and evaluated within the City’s long-term financial plan.
If the City fails to allocate any funds to address pay equity issues, then a three percent
(3%) across-the-board increase will go into effect the first full pay period following July
1, 2027. However, if funds are allocated by the City to address pay equity, there shall
be no automatic or guaranteed across-the-board increase.
5. Higher Acting Pav. An Executive may temporarily perform in the capacity of City
Manager, Assistant City Manager, or assume the role of another Executive position
while performing the duties of their current position. An Executive temporarily acting
in a higher classification during periods of absence of an incumbent or during a vacancy
in a budgeted position for more than ten (10) consecutive days shall receive the bottom
step of the higher classification or 5% above their current base pay, whichever is greater.
Packet Page. 252
Resolution 2026-001
January 21, 2026
Resolution 2026-001
In no event shall higher acting pay exceed the top step of the classification in which the
Executive is acting.
6. POST Executive Pay. Employees in the Executive Group who obtain Peace Officer
Standards and Training (POST) Executive Certification shall receive an additional one
thousand seven hundred seven dollars and seventy-five cents ($1,707.75) per month.
This payment is available to all employees in the group or class who meet the
requirements for POST Certification.
7. Insurance (Medical, Dental & Vision). Effective the first pay period of the following
month upon hire, the City will contribute: a) $1,125.00 per month towards the purchase
of health care benefits for Employee Only; b) $1,450.00 per month towards the purchase
of health care benefits for Employee Plus One Dependent; and c) $1,939.00 per month
towards the purchase of health care benefits for Employee Plus Two or More
Dependents. For the term of this agreement only, health contributions shall be
benchmarked at the Kaiser rates.
Employee Only Coverage. Effective at the beginning of the next health insurance
premium adjustment following July 1, 2025, and each premium adjustment annually
thereafter, the City shall continue to pay up to 100% of the cost of Employee Only
coverage for the lowest cost plan (currently Kaiser) for the duration of the Resolution.
The City shall continue to contribute the amount of the lowest cost plan towards health
premiums for employees who choose a higher cost plan for Employee Only coverage.
The employee shall continue to be responsible for paying the difference in premium
costs for the higher cost plan.
Employee Plus One Coverage. Effective at the beginning of the next health insurance
premium adjustment following July 1, 2025, and each premium adjustment annually
thereafter, employees enrolled in Employee Plus One coverage shall pay up to the first
$30 per month in premium increase of the lowest cost plan (currently Kaiser) each year
that this Resolution is in effect. The same amount of increase shall apply each year to
employees who choose the higher cost plan. That is, employees who choose the higher
cost plan for Employee +1 coverage shall also pay the same amount of increase, up to
the maximum $30 per year increase, as employees in the lowest cost plan, in addition to
any difference in cost between the higher cost plan and the lowest cost plan they are
currently contributing.
Employee Plus Family Coverage. Effective at the beginning of the next health insurance
premium adjustment following July 1, 2025, and each premium adjustment annually
thereafter, employees enrolled in Employee Plus Family coverage shall pay up to the
first $55 per month in premium increases of the lowest cost plan each year that this
Resolution is in effect. The same amount of increase each year shall apply to employees
who choose the higher cost plan. That is, employees who choose the higher cost plan
Packet Page. 253
Resolution 2026-001
January 21, 2026
Resolution 2026-001
for Employee + Family coverage shall also pay the same amount of increase, up to the
maximum $55 per year increase, as employees in the lowest cost plan in addition to any
difference in cost between the higher cost plan and the lowest cost plan they are
currently contributing.
The City's contributions for health care benefits are available to Executives for the
purchase of medical, dental, vision, life and accidental death and dismemberments
through City selected plans. The amount of the City's contributions is based upon the
"medical" enrollment category, i.e., Employee Only, Employee Plus One or Employee
Plus Family For example, if an employee elects "employee only" medical coverage,
then the "employee only" allowance will be contributed. Any City contributions not
used by an employee for health benefits will revert to the City; however, if an employee
selects a medical plan (Employee Only, Employee Plus One or Employee Plus Family),
any additional contributions beyond the amounts identified above may be contributed
toward additional life insurance or a City-provided deferred compensation plan.
Health Insurance Waiver Stipend: Any Executive who does not want to enroll in any
health care plan offered by the City must provide evidence of health care insurance
coverage and execute a “Waiver of Benefits and Release Agreement” releasing the City
from any responsibility or liability to provide health care insurance coverage on an
annual basis. Employees who elect to waive the City’s health care insurance may receive
a stipend of $4,000 on the first pay period in December. Employees must be employed
through the end of the last payroll period in November to qualify for this benefit. Unless
hired during the benefit year, employees must participate in the program for the full 12
months to receive the full stipend. Employees on payroll on November 30th who were
hired during the benefit year and did not work the entire 12-month period shall earn the
stipend on a pro-rata basis. Employees who waived insurance benefits during Open
Enrollment, but later requested to enroll in benefits prior to November 30th, will not be
eligible for any portion of the stipend. Employees who elect to drop coverage mid-year
are not eligible to participate in the stipend program.
8. Life and Accidental Death & Dismemberment (AD&D} Insurance. The City shall
provide Term Life and Accidental Death & Dismemberment Insurance of one time the
employees' annual salary.
9. Holidays. Executives shall be entitled to holiday leave equivalent to one hundred
thirty-five (135) holiday hours each year for those Executives working a 5/8 or 9/80
work schedule and one hundred forty-eight (148) holiday hours each year for those
Executives working on a 4/10 work schedule. Thirteen (13) City designated holidays
shall include:
Packet Page. 254
Resolution 2026-001
January 21, 2026
Resolution 2026-001
New Year's Day
Martin Luther King, Jr. Day
Presidents’ Day
Memorial Day
Juneteenth
Independence Day
Labor Day
Traditional Veteran's Day (November 11)
Thanksgiving Day
Day after Thanksgiving
Christmas Eve
Christmas Day
New Year's Eve
On January 1st of each year that this Resolution is in effect, all Executives will receive an
additional eighteen (18) hours of holiday leave ("Floating Holidays"). Executives who
are hired by the City after January 1 of the calendar year shall receive a prorated number
of floating holiday leave hours, at the rate of 1.5 hours per month, based on their hire
date. For example, a new employee hired on July 1 of a calendar year shall receive nine
(9) hours of floating holiday leave.
A maximum of 126 hours may be carried over annually for Executives working a 5/8
or 9/80 work schedule; or 138 hours for Executives working a 4/10 work schedule.
On June 30th any holiday bank hours exceeding 126 or 138 hours will be eligible for sell
back.
On or about November 30th of each calendar year, the City Manager shall determine,
and the Human Resources Director will distribute the schedule of specific days that the
thirteen (13) designated holidays will be observed for the next calendar year. At the
time of separation from employment, Executives will receive a payout of 100% for all
accrued but unused post-petition holiday pay.
10. Jury Duty. The City will pay for all working days in a calendar year of a covered
employee who is required to serve on jury duty.
11. Administrative Leave. Non-Public Safety Executives shall receive 80 hours of
Administrative Leave each fiscal year that this Resolution is in effect. Public Safety
Executive shall receive one hundred twenty (120) hours of Administrative Leave each
fiscal year that this Resolution is in effect. On June 30th of each year, any unused
Administrative Leave up to twenty (20) hours will be automatically carried over to the
Packet Page. 255
Resolution 2026-001
January 21, 2026
Resolution 2026-001
following fiscal year. Additional administrative leave may be granted at any time during
a fiscal year, up to a maximum of twenty (20) hours, with a request in writing, including
justification, recommended by the City Manager. Administrative Leave has no cash
value and shall not be paid out at any time.
Executives who are hired into this unit after July 1 of the fiscal year shall receive a
prorated number of Administrative Leave hours based on their hire date. For example,
a new non-public safety Executive hired on January 1 of that fiscal year shall receive
forty (40) hours of administrative leave. Executives who are promoted into this unit
from a unit that also receives administrative leave shall receive a prorated amount of
administrative leave based on their hire date into this unit. For example, an employee
who is in a unit that receives forty (40) hours of administrative leave and is hired into
this unit on January 1 shall receive an additional twenty (20) hours of administrative
leave for a total of sixty (60) hours that fiscal year.
12. Sick and Vacation Hours Upon Hire. To attract highly qualified and experienced
staff, Executives shall receive one hundred twenty (120) hours of Vacation and eighty
(80) hours of Sick Leave upon hire.
13. Vacation Leave.
Executives shall accrue vacation each pay period based on the following chart:
Continuous Per Pay Period Hours Per Year
1 Year 4.615 hours 120 hours
5 Years 5.769 hours 150 hours
10 Years 7.307 hours 190 hours
15 Years+ 7.6923 hours 200 hours
*Vacation may be used upon completion of 1040 paid hours.
**Vacation accrual rate is based on total years of continuous service with the City.
Executives may accrue a maximum of 540 hours of vacation. Once the maximum
accrual has been reached, Executives may not accrue any additional hours until their
vacation balance falls below 540 hours.
In the event an employee works less than fifty percent (50%) of the total normal work
Packet Page. 256
Resolution 2026-001
January 21, 2026
Resolution 2026-001
hours in a pay period, he/she shall not be credited with any vacation leave for such
pay period. Approved vacation, sick, holiday, and administrative leave shall be
considered as time worked for this item only.
When an employee resigns or otherwise leaves the service of the City, payment shall
be made to the employee for the earned portion of their post-petition vacation hours
at the hourly rate of pay on the date of separation
Vacation Sell Back. Executives may sell back up to eighty (80) hours of post-
petition vacation time annually providing the following conditions have been met:
1. Employees must have a minimum of one hundred twenty (120)
hours remaining in their vacation balance after the sell back occurs;
2. Employees must complete a Sell Back form, which must include the
signature of the City Manager or designee;
3. Sell Back Forms must be submitted to the Finance Department on or
before November 1st each year this Resolution is in effect; and,
4. Payment for vacation sell back hours will be made (using the current
Council approved salary rates in the Salary Resolution) on the
employee's first paycheck in December each year.
14. Executive Leave.
To attract and retain highly qualified and experienced level employees, Executives
shall accrue Executive Leave at the rate of 8.46 hours per pay period (220 hours or
5.5 weeks annually). Maximum accrual shall not exceed a total of 880 hours.
When an Executive resigns or otherwise leaves the service of the City, payment
shall be made to the employee for the earned portion of their Executive Leave at the
hourly rate of pay on the date of separation.
Executive Leave Sell Back. Executives may sell back up to one hundred ten (110)
hours of Executive Leave annually providing the following conditions have been
met:
1. Executives must have a minimum of one hundred ten (110) hours
remaining in their Executive Leave balance after the sell back occurs;
2. Executives must complete a sell back form, which includes the signature
of the City Manager's approving the sell back; and
Packet Page. 257
Resolution 2026-001
January 21, 2026
Resolution 2026-001
3. Forms must be submitted to the Finance Department within the first quarter
of each year this Resolution is in effect.
Payment for Executive Leave sell back hours will be paid based on the Council
approved salary rates at the time of the sell back on the first available pay date.
Public Safety Executive Leave Sell Back. Upon completion of three (3) years of
service with the City, Executives will sell back all Executive Leave in excess of 440
hours, which will be contributed to the City’s 401(a) plan. The sell back will occur
within the first quarter of each year for all accrued hours in excess of 440 hours.
Payment for Executive Leave sell back hours will be paid based on the Council
approved salary rates at the time of the sell back.
When a Public Safety Executive resigns or otherwise leaves the service of the City,
payment shall be made to the employee for the earned portion of their executive
Leave as follows: 30% paid in cash; and 70% shall be contributed to the City’s
401(a) plan at the hourly rate of pay on the date of separation.
15. Sick Leave.
a. Executives who are covered by this Resolution shall accrue paid sick leave at a
rate of ninety-six (96) hours per year, 3.6923 hours per pay period. Such paid sick
leave may be used for employee or family illness or for medical reasons or other
reasons provided under the City's Paid Sick Leave Policy (AB 1522), adopted by
the Mayor and City Council on June 18, 2015, by Resolution 2015-116. Executives
may accrue a maximum of 1040 hours of sick leave.
b. In the event an employee works less than fifty percent (50%) of the total normal
work hours in the pay period, he/she shall not be credited with any sick leave for
such pay period. Approved vacation, sick leave, holiday, or administrative leave
shall be considered as time worked for the purpose of computing sick leave
benefits only. Whenever an employee uses all allowable sick leave, further
absences may be charged against accrued vacation or with department head
approval, the employee may take loss of pay rather than vacation.
c. Sick leave means the absence from duty of an employee because of illness or
injury, exposure to contagious disease, attendance upon a member of their
immediate family who is seriously ill and requires the care of or attendance of an
employee, or death in the immediate family of the employee. Immediate family
means: husband, wife, grandmother, grandfather, mother, father, sister, brother,
Packet Page. 258
Resolution 2026-001
January 21, 2026
Resolution 2026-001
son or daughter, mother-in-law, father-in-law, sister-in-law, brother-in-law, son-
in-law or daughter-in-law, stepmother, stepfather, or domestic partner.
d. Upon the City Manager's request, an employee must provide a physician's
statement to justify sick leave usage of five (5) consecutive days or longer.
Employees suspected of abuse of excessive use of sick leave may also be required
to furnish a written statement from their health care provider supporting the use of
sick leave and/or the ability to return to work.
e. No absence due to illness or injury in excess of five (5) working days shall be
approved except after the presentation of satisfactory evidence of illness or injury;
namely a certificate from a practicing physician or an authorized practicing
chiropractor approved by the City Manager or their designee. The City Manager
or their designee shall have the power to require that any person claiming the sick
leave benefits of this resolution be examined at any reasonable time or intervals
by the City's designated physician, and in the event of an adverse report to reject
such claim for sick leave, in whole or in part, and to terminate sick leave
compensation. In the event of the refusal of any person to submit to such
examination after notification, the City Manager or their designees may terminate
sick leave compensation and reject any claim thereof. The City Manager or their
designee shall have the right to require the presentation of a certificate.
f. At the time of separation, any employee having six (6) or more years of service,
may cash out unused post-petition sick leave as follows: 1) 288 hours or less, no
cash out; 2) 289-479 hours= 20% of the total accrued hours; 3) 480-959 hours=
25% of the total accrued hours; and, 4) 960 or more accrued hours= 35%.
16. CalPERS Retirement.
Executives are provided retirement benefits under the California Public Employees'
Retirement System (CalPERS) as follows:
Non-Safetv Emplovees:
Tier I: Employees hired on or before October 3, 2011 shall receive a 2.7% @ 55
retirement benefit;
Tier II: CalPERS "Classic Members" hired on or after October 4, 2011 shall
receive a 2%@ 55 retirement benefit;
Tier III: CalPERS "New Members" hired on or after January 1, 2013 shall receive a
2% @ 62 retirement benefit in accordance with the Public Employees'
Pension Reform Act of 2013 (PEPRA).
Packet Page. 259
Resolution 2026-001
January 21, 2026
Resolution 2026-001
Employee Share. Effective 2/1/2013, all Tier I and Tier II employees shall pay the
employee's share of the retirement contribution, either 8% for the 2.7@ 55 formula or
7% for the 2%@ 55 formula. Effective 1/1/2013, Tier III employees shall pay the
employee contribution required by the PEPRA, calculated at 50% of the normal cost.
Employer Share. Effective 2/1/2013, all employees shall contribute 9.304% (either
1.304% or 2.304% depending on whether the employee rate is 8% or 7%) of their salary
toward the employer cost of retirement in accordance with Section 20516 of the
California Government Code.
The City will pay the employer contribution for the Fourth Level 1959 Survivor Benefit.
For Tier I and II employees, the final compensation retirement calculation shall be based
upon their single highest year of compensation earnable as provided under Section
20042 of the California Government Code. The compensation earnable period for Tier
III PEPRA employees will be three years.
PEPRA laws and regulations shall govern a determination of whether employees are
hired as "new members" or "classic or legacy" members.
Safety Employees:
Tier I: Employees hired prior to September 1, 2011 shall receive a 3% @ 50
retirement benefit;
Tier II: CalPERS “Classic Members” hired on or after September 1, 2011 shall
receive a 3% @ 55 retirement benefit;
Tier III: CalPERS "New Members" hired between January 1, 2013 and December
31, 2015 shall receive a 2.7%@ 57 retirement benefit in accordance with
the Public Employees' Pension Reform Act of 2013 (PEPRA);
Tier IV: CalPERS ''New Members" hired on or after January 1, 2016 shall receive a
2.5% @ 57 retirement benefit in accordance with PEPRA.
CalPERS ''New Members" hired on or after January 1, 2016 shall receive a 2.5% @ 57
retirement benefit in accordance with PEPRA.
Contributions/Cost Sharing. Classic employees as defined under CalPERS law shall
contribute 12% (9% employee share and 3% employer share). PEPRA employees shall
contribute 50% of the normal cost as defined under the Act.
17. Personnel Rules.
Packet Page. 260
Resolution 2026-001
January 21, 2026
Resolution 2026-001
Executives shall be subject to the City's Personnel Rules unless such provisions conflict
with at-will status.
18. Wellness Benefit.
Executives are eligible to receive a taxable wellness/physical benefit of $250.00/year
during each calendar year that this Resolution is in effect. This amount does not roll
over to the next calendar year and any amounts not used by December 31st shall be
forfeited. Employees have until March 31st of the following calendar year to turn in
receipts from the prior year. Employees who make an authorized expense in a calendar
year that exceeds the maximum amount in that year, such as, but limited to, a multi-year
gym membership, may utilize that receipt in the following year(s) to justify the expense
in that successive year(s), provided the excess amount does not exceed the maximum
amount. All reimbursement requests must follow the guidelines and shall be made on
forms provided by the Human Resources Department.
19. Performance Evaluations.
Performance evaluations and any corresponding merit pay increases will be
administered through the provisions of the City's Employee Evaluation Uniform
Policy.
20. Department Head Allowance.
An Executive may be reimbursed up to fifty dollars ($50) per month to cover work
related employee events such as lunches, department celebrations, employee
recognitions, and other events and functions. The allowance shall not accumulate from
month to month. Requests for reimbursement shall be submitted to the Finance
Department on prescribed forms.
21. Bankruptcy Provisions/Release of Claims/Pre-Petition Leave Balances.
Section 9 of Resolution No. 2015-242 Pre-Petition Leave Balances and Appendix A to
Resolution No. 2015-242 Bankruptcy Provisions and Release of Claims shall continue
to be in effect and are incorporated herein to this Resolution.
22. Termination/Severance.
If the City Manager desires to terminate employment of an Executive without cause,
during which time the Executive is willing and able to perform the functions and duties
set forth in the respective Job Classification, then the City Manager agrees to provide
Executive with severance pay representing six (6) months' base salary or the monthly
base salary multiplied by the number of months remaining on Executive's term of
employment, whichever is less. This severance payment shall be the only form of
severance available to such executives. Receipt of any severance payment is
conditioned upon the Executive executing a release and waive of any and all potential
claims against the City in a form similar to the release contained in Exhibit 'A'.
23. Separation for Cause.
Packet Page. 261
Resolution 2026-001
January 21, 2026
Resolution 2026-001
As "at will" employees, nothing within this resolution can be construed to create a
property interest in the respective positions. Executives will be disqualified from
receiving Severance Pay if: (1) Executive refuses or fails to act in accordance with any
specific direction or lawful order of the City Manager; (2) Executive commits an illegal
act; or (3) Executive commits an act involving moral turpitude.
24. Voluntarv Separation of Citv Service.
Executives may voluntarily resign from their positions after: (1) Giving the City
Manager at least thirty (30) days written notice prior to the effective date of such
resignation; or (2) Executives shall provide at least ninety (90) days written notice prior
to the effective date of resignation to qualify for any portion of the Executive Leave at
separation from City service; and (3) In the event of resignation, the Executive shall not
be entitled to any Severance Pay.
25. Cellular Phone.
The City shall provide Executives with a cellular phone for City business. All data and
information stored on the phone, including but not limited to records of calls made and
received, voice mail messages, and text message may be considered public records
pursuant to the California Public Records Act.
26. Indemnification.
The City shall defend, hold harmless and indemnify Executive against any tort,
professional liability claim or demand or other legal action, whether groundless or
otherwise, arising out of any alleged act or omission occurring in the performance of
City Manager's duties or resulting from the exercise of his judgment or discretion in
connection with the performance of their respective duties, unless the act or omission
involved unlawful conduct. The City shall not unreasonably refuse to provide for legal
representation at City's expense. Legal representation, provided by the City, shall extend
until a final determination of the legal action including any and all losses, damages,
judgment, interests, settlements, fines, court costs, and the reasonable costs and
expenses of legal proceedings, including appeals, and including attorneys' fees, and
expert witness fees and all other trial and appellate costs, and other liabilities incurred,
imposed upon, or suffered by such Executive in connection with or resulting from any
claim, action, suit, or proceeding, actual or threatened, arising out of or in connection
with the performance of Executive's duties.
The City agrees to pay all reasonable litigation expenses of City Manager throughout
pendency of any City-related litigation to which the Executive is a party, witness or
advisor to the City. Such expense payments shall continue beyond Executive's
employment with the City as long as litigation is pending. Post-employment, City agrees
to pay Executive for reasonable consulting fees, travel expenses and other costs, when
City Manager serves as a witness, advisor or consultant to City regarding pending
litigation.
Packet Page. 262
Resolution 2026-001
January 21, 2026
Resolution 2026-001
SECTION 2. The above recitals are true and correct and are incorporated herein by this
reference.
SECTION 3. The wages, hours and working conditions for Executive employees, as
incorporated in the Compensation and Benefits Plan is hereby approved through June 30, 2028.
SECTION 4. The City Manager is authorized to implement the terms and conditions of
the resolution for Executive employees and amend the employment agreement with the Chief
of Police subject to the terms and conditions set forth herein.
SECTION 5. The Mayor and City Council finds this Resolution is not subject to the
California Environmental Quality Act (CEQA) in that the activity is covered by the general
rule that CEQA applies only to projects which have the potential for causing a significant effect
on the environment. Where it can be seen with certainty, as in this case, that there is no
possibility that the activity in question may have a significant effect on the environment, the
activity is not subject to CEQA.
SECTION 6. Severability. If any provision of this Resolution or the application thereof
to any person or circumstance is held invalid, such invalidity shall not affect other provisions
or applications, and to this end the provisions of this Resolution are declared to be severable.
SECTION 7. Effective Date. This Resolution shall become effective immediately.
APPROVED and ADOPTED by the City Council and signed by the Mayor and
attested by the City Clerk this 21st day of January 2026.
_____________________________________
Helen Tran, Mayor
City of San Bernardino
Attest:
________________________________
Telicia Lopez, CMC, City Clerk
Packet Page. 263
Resolution 2026-001
January 21, 2026
Resolution 2026-001
Approved as to form:
___________________________________
Sonia Carvalho, City Attorney
Packet Page. 264
Resolution 2026-001
January 21, 2026
Resolution 2026-001
CERTIFICATION
STATE OF CALIFORNIA)
COUNTY OF SAN BERNARDINO) ss
CITY OF SAN BERNARDINO)
I, Telicia, CMC, City Clerk, hereby certify that the attached is a true copy of Resolution
No. 2025-001, adopted at a regular meeting held on the 21st day of January 2026, by the following
vote:
Council Members: AYES NAYS ABSTAIN ABSENT
SANCHEZ _____ _____ _______ _______
IBARRA _____ _____ _______ _______
FIGUEROA _____ _____ _______ _______
SHORETT _____ _____ _______ _______
KNAUS _____ _____ _______ _______
FLORES _____ _____ _______ _______
ORTIZ _____ _____ _______ _______
WITNESS my hand and official seal of the City of San Bernardino this 21st day of January 2026.
_____________________________________
Telicia Lopez, CMC, City Clerk
Packet Page. 265
Resolution 2026-001
January 21, 2026
Resolution 2026-001
Exhibit "A"
GENERAL WAIVER AND RELEASE.
I, the undersigned, do hereby acknowledge and attest that I have read and understood my
Executive Agreement with the City of San Bernardino and hereby agree that by accepting
Severance Pay, I agree to waive all rights to further claims, remedies, or legal action against the
City of San Bernardino its officers and employees.
In exchange for receipt of the Severance Pay, and all other salary and benefits owing, I and
my representatives, heirs, successors, and assigns do hereby completely release and forever
discharge the City of San Bernardino and its related entities and their present and former officers,
directors, council members, agents, employees, attorneys, and successors (collectively, "Release
Parties") from all claims, rights, demands, actions, obligations, liabilities, and causes of action of
every kind and character, known and unknown, mature or unmatured, which I may have now or in
the future arising from any act or omission or condition occurring on or prior to the date this General
Waiver and Release is signed whether based on tort, contract (express or implied), or any federal,
state, or local law, statute, or regulations (collectively, the "Released Claims"). Released Claims
shall also include, but not be limited to, claims for wages or other compensation due, severance
pay, bonuses, sick leave, vacation pay, life or health insurance, or any other fringe benefit. This
General Waiver and Release specifically releases and waives any and all claims arising out of my
employment and separation from employment with the City of San Bernardino, including but not
limited to claims arising under the California Family Rights Act ("CFRA"), the California
Constitution, federal Title VII of the Civil Rights Act of 1964, as amended, the federal Age
Discrimination in Employment Act ("ADEA''), the federal Equal Pay Act ("EPA"), the federal
Americans with Disabilities Act ("ADA"), the federal Fair Labor Standards Act ("FLSA"), the
federal Family and Medical Leave Act ("FMLA"), tort and contract claims, privacy claims, and any
other applicable local, state, federal or other laws that may apply.
I knowingly and voluntarily waive any and all rights or benefits that I may now have, or in the
future may have, under the terms of Section 1542 of the California Civil Code, which provides as
follows:
A GENERAL RELEASE DOES NOT EXTEND TO CLAIMS WHICH THE CREDITOR
DOES NOT KNOW OR SUSPECT TO EXIST IN HIS OR HER FAVOR AT THE TIME
OF EXECUTING THE RELEASE, WHICH IF KNOWN BY HIM OR HER MUST HAVE
MATERIALLY AFFECTED HIS OR HER SETTLEMENT WITH THE DEBTOR.
I acknowledge that I have read and understand this waiver and voluntarily and knowingly am
waiving rights under Section 1542 to pursue unknown or unanticipated claims, rights, demands,
actions, obligations, liabilities, and causes of action of any kind that may have materially affected
this General Waiver and Release.
Unless otherwise required by law, I shall not file any claim, sue or initiate an action against any
Released Party or participate in any compliance review, action, or proceeding, individually or as a
Packet Page. 266
Resolution 2026-001
January 21, 2026
Resolution 2026-001
member of a class, under any contract (express or implied), or any local, state, federal law, state,
or regulation pertaining in any manner to the Released Claims.
By signing this Agreement, I certify that Executive has read all of this Agreement, understands its
terms and conditions, and knowingly and voluntarily consents to such terms. Employee
acknowledges that the Company has advised Executive in writing to consult with an attorney before
signing this Agreement. Employee certifies that Employee has been given at least twenty- one (21)
days to consider this Agreement, and that Employee's signature below indicates either that
Employee has taken twenty-one (21) days to consider this Agreement or has knowingly and
voluntarily waived some or all of this consideration period. In addition, Employee has seven (7)
days from the date of signing this Agreement to revoke the Agreement, after which the Agreement
will become final and binding (which shall be deemed the "Effective Date" of this Agreement). If
Employee does not execute and return this Agreement upon expiration of the twenty-one (21) day
period, the Agreement and any severance payment offer it contains shall be deemed rescinded and
no longer offered to Employee.
Approved and Agreed to by:
City Manager Date:
City of San Bernardino Date:
Packet Page. 267
Resolution 2026-001
January 21, 2026
Resolution 2026-001
Exhibit "B"
Wellness/Fitness Benefits Table (All Require Pre-Approval for Reimbursement)
Benefit Description Notes
Health club memberships to
pursue or maintain personal
health and physical fitness
Offsite health clubs
Physical fitness/exercise classes
Locations within San Bernardino
County or county of residence
Recreational classes, sport
lessons, nutrition
Includes personal training and
entire individual coaching
Fees for individual employee
Fee for team or family members
excluded
Entry, registration, participation
and league fees
Includes fees for participation in
group, team or league sporting
activities
Fees for individual employee
participating on a team only
Fee for entire team or family
members excluded
Physical fitness products and
equipment
For use outside the workplace
Reimbursement based on
current accrued balance
No advance on excess costs
Weight reduction programs to
improve general health or as
treatment for a specific disease
Exercise programs
Diet management programs
Stress reduction programs
Excludes food, food preparation
equipment and food and
nutritional supplements,
medications and residential
Smoking cessation programs
Smoking cessation programs
Patches
Stress reduction programs
Coverage is for programs not
covered or offered by your
health plan.
No electronic cigarettes or
similar options
Health and wellness promotion
and education
Classes and educational
programs with primary focus to
improve health and wellness
Wellness workshops, on-line
training; includes meditation,
massage and acupuncture
Classes and educational
programs may include family
members if attending with
employee; family members
excluded from fees for services
Packet Page. 268
Executive Group Salary Schedule
Effective 07.7.2025
CLASS
CODE CLASSIFICATION TITLE FLSA STATUS UNIT SALARY
RANGE
BOTTOM
STEP (Step 1)
TOP
STEP
(Step 21)
Monthly/
Hourly
09644 ASSISTANT CITY MANAGER (U)EXEMPT EXECUTIVE 705 $17,119.81 $20,807.07 Monthly
09372 DEPUTY CITY MANAGER (U)EXEMPT EXECUTIVE 700 $16,698.13 $20,296.03 Monthly
09685 DIRECTOR OF ANIMAL SERVICES (U)EXEMPT EXECUTIVE 660 $13,677.74 $16,624.80 Monthly
09526 DIRECTOR OF COMMUNITY DEVELOPMENT AND HOUSING (U)EXEMPT EXECUTIVE 662 $13,815.24 $16,792.09 Monthly
09527 DIRECTOR OF ECONOMIC DEVELOPMENT (U)EXEMPT EXECUTIVE 662 $13,815.24 $16,792.09 Monthly
09701 DIRECTOR OF FINANCE & MANAGEMENT SERVICES (U)EXEMPT EXECUTIVE 692 $16,045.01 $19,501.98 Monthly
09665 DIRECTOR OF HUMAN RESOURCES & RISK MANAGEMENT (U)EXEMPT EXECUTIVE 660 $13,677.74 $16,624.80 Monthly
09625 DIRECTOR OF INFORMATION TECHNOLOGY (U)EXEMPT EXECUTIVE 660 $13,677.74 $16,624.80 Monthly
09731 DIRECTOR OF PARKS/REC/COMMUNITY SERVICES (U)EXEMPT EXECUTIVE 662 $13,815.25 $16,792.10 Monthly
09753 DIRECTOR OF PUBLIC WORKS, OPERATIONS AND MAINTENANCE (U)EXEMPT EXECUTIVE 692 $16,045.01 $19,501.98 Monthly
09280 CHIEF OF POLICE (U) #EXEMPT EXECUTIVE NA $33,540.81 $33,540.81 Monthly
Note: Executive Group received retro COLA effective 7.7.2025
REVISION ADOPTED BY MCC 7/20/22
REVISION ADOPTED BY MCC 8/17/22
REVISION ADOPTED BY MCC 6/19/17 REVISION ADOPTED BY MCC 9/21/22
REVISION ADOPTED BY MCC 6/20/18 REVISION ADOPTED BY MCC 10/19/22
REVISION ADOPTED BY MCC 06/19/19 REVISION ADOPTED BY MCC 11/2/22
REVISION ADOPTED BY MCC 8/21/19 REVISION ADOPTED BY MCC 11/16/22
REVISION ADOPTED BY MCC 1/15/20 REVISION ADOPTED BY MCC 12/7/22
REVISION ADOPTED BY MCC 6/24/20 REVISION ADOPTED BY MCC 1/18/23
REVISION ADOPTED BY MCC 9/2/20 REVISION ADOPTED BY MCC 6/21/23
REVISION ADOPTED BY MCC 12/16/20 REVISION ADOPTED BY MCC 8/16/23
REVISION ADOPTED BY MCC 2/17/21 REVISION ADOPTED BY MCC 10/4/23
REVISION ADOPTED BY MCC 7/21/21 REVISION ADOPTED BY MCC 10/18/23
REVISION ADOPTED BY MCC 6/16/21 REVISION ADOPTED BY MCC 12/6/23
REVISION ADOPTED BY MCC 7/21/21 REVISION ADOPTED BY MCC 3/6/24
REVISION ADOPTED BY MCC 8/4/21 REVISION ADOPTED BY MCC 4/17/24
REVISION ADOPTED BY MCC 9/15/21 REVISION ADOPTED BY MCC 6/26/24
REVISION ADOPTED BY MCC 10/20/21 REVISION ADOPTED BY MCC 1/15/25
REVISION ADOPTED BY MCC 11/3/21 REVISION ADOPTED BY MCC 2/19/25
REVISION ADOPTED BY MCC 2/2/22 REVISION ADOPTED BY MCC 4/2/25
REVISION ADOPTED BY MCC 2/16/22 REVISION ADOPTED BY MCC 6/18/25
REVISION ADOPTED BY MCC 3/16/22 REVISION ADOPTED BY MCC 7/15/25
REVISION ADOPTED BY MCC 4/6/22 REVISION ADOPTED BY MCC 08/06/2025
REVISION ADOPTED BY MCC 5/18/22 REVISION ADOPTED BY MCC 9/3/2025
REVISION ADOPTED BY MCC 6/15/22 REVISION ADOPTED BY MCC 01/21/2026
Packet Page. 269
Executive Group Salary Schedule
Effective 07.7.2025
Packet Page. 270
City of San Bernardino - Citywide Salary Schedule
Effective 1.5.2026
CLASS
CODE CLASSIFICATION TITLE FLSA STATUS UNIT SALARY
RANGE
BOTTOM
STEP (Step 1)
TOP
STEP
(Step 21)
Monthly/
Hourly
MANAGEMENT & CONFIDENTIAL
10012 ACCOUNTANT II - PAYROLL NON-EXEMPT CONFIDENTIAL 485 $5,828.52 $7,084.92 Monthly
10683
City of San Bernardino - Citywide Salary Schedule
Version Date: 1.5.2026
1
Packet Page. 271
City of San Bernardino - Citywide Salary Schedule
Effective 1.5.2026
10385 SENIOR INFORMATION TECHNOLOGY TECHNICIAN NON-EXEMPT CONFIDENTIAL 488 $5,916.18 $7,191.28 Monthly
10529 SENIOR NETWORK SYSTEMS ADMINISTRATOR EXEMPT CONFIDENTIAL 592 $9,938.99 $12,080.13 Monthly
10223 SENIOR OFFICE ASSISTANT (U)NON-EXEMPT CONFIDENTIAL 375 $3,367.15 $4,092.94 Monthly
10689 SUPERVISING HUMAN RESOURCES ANALYST EXEMPT CONFIDENTIAL 559 $8,430.15 $10,246.37 Monthly
10860 ACCOUNTING DIVISION MANAGER (U) EXEMPT MANAGEMENT 608 $10,764.13 $13,084.08 Monthly
10979 ADMINISTRATIVE SUPERVISOR & EXECUTIVE ASSISTANT TO THE CITY MANAGER (U) EXEMPT MANAGEMENT 535 $7,478.79 $9,090.49 Monthly
10492 ASSISTANT BUILDING OFFICIAL EXEMPT MANAGEMENT 583 $9,501.88 $11,549.52 Monthly
10216 ASSISTANT TO THE CITY MANAGER (U) EXEMPT MANAGEMENT 580 $9,361.63 $11,378.89 Monthly
10104 ASSISTANT TO THE MAYOR I (U)MANAGEMENT
City of San Bernardino - Citywide Salary Schedule
Version Date: 1.5.2026
2
Packet Page. 272
City of San Bernardino - Citywide Salary Schedule
Effective 1.5.2026
10699 HOMELESS SOLUTIONS MANAGER (U) EXEMPT MANAGEMENT 601 $10,394.80 $12,635.28 Monthly
10121 HOUSING COMPLIANCE SPECIALIST EXEMPT MANAGEMENT 500 $6,280.83 $7,634.23 Monthly
10129 HOUSING DIVISION MANAGER (U) EXEMPT MANAGEMENT 601 $10,394.80 $12,635.28 Monthly
10672 HUMAN RESOURCES DIVISION MANAGER (U) EXEMPT MANAGEMENT 590 $9,839.65 $11,960.92 Monthly
10637 INFORMATION TECHNOLOGY MANAGER EXEMPT MANAGEMENT 599 $10,291.95 $12,509.06 Monthly
10159 LAND DEVELOPMENT ENGINEER EXEMPT MANAGEMENT 590 $9,839.65 $11,960.92 Monthly
10233 LEGISLATIVE & GOVERNMENTAL AFFAIRS MANAGER (U) EXEMPT MANAGEMENT 593 $9,988.08 $12,140.91 Monthly
10401 LIBRARY DIRECTOR (U) EXEMPT MANAGEMENT 635 $11,957.50 $14,533.27 Monthly
10530 MANAGEMENT ANALYST I (FLEX) EXEMPT MANAGEMENT 476 $5,572.57 $6,774.04 Monthly
10531 MANAGEMENT ANALYST I (FLEX)(U) EXEMPT MANAGEMENT 476 $5,572.57 $6,774.04 Monthly
10533 MANAGEMENT ANALYST II (U) EXEMPT MANAGEMENT 506 $6,472.50 $7,866.81 Monthly
10532 MANAGEMENT ANALYST II EXEMPT MANAGEMENT 506 $6,472.50 $7,866.81 Monthly
10503 MAYOR'S CHIEF OF STAFF (U)NON-EXEMPT MANAGEMENT 580 $9,361.63 $11,378.89 Monthly
10190 NEIGHBORHOOD & CUSTOMER SERVICE MANAGER (U) EXEMPT MANAGEMENT 561 $8,514.30 $10,349.22 Monthly
10868 OPERATIONS & MAINTENANCE DIVISION MANAGER (U) EXEMPT MANAGEMENT 591 $9,888.74 $12,020.53 Monthly
10064 PAYROLL SUPERVISOR EXEMPT MANAGEMENT 521 $6,975.06 $8,478.06 Monthly
10713 PLANNING DIVISION MANAGER (U) EXEMPT MANAGEMENT 594 $10,038.34 $12,201.68 Monthly
10765 POLICE DISPATCH MANAGER EXEMPT MANAGEMENT 574 $9,084.64 $11,043.46 Monthly
10761 POLICE RECORDS MANAGER EXEMPT MANAGEMENT 574 $9,084.64 $11,043.46 Monthly
10509 PRINCIPAL ADMINISTRATIVE ANALYST (U) NON-EXEMPT MANAGEMENT 598 $10,240.53 $12,447.12 Monthly
10182 PRINCIPAL CIVIL ENGINEER EXEMPT MANAGEMENT 600 $10,343.38 $12,572.17 Monthly
10243 PRINCIPAL PLANNER EXEMPT MANAGEMENT 613 $11,036.44 $13,413.67 Monthly
10132 PROJECT MANAGER OF COMMUNITY DEVELOPMENT PROGRAMS (U) EXEMPT MANAGEMENT 550 $8,059.65 $9,797.58 Monthly
10212 PUBLIC INFORMATION OFFICER (U) EXEMPT MANAGEMENT 593 $9,988.08 $12,140.91 Monthly
10900 PUBLIC WORKS SAFETY AND TRAINING OFFICER EXEMPT MANAGEMENT 510 $6,602.23 $8,025.76 Monthly
10863 PURCHASING DIVISION MANAGER (U) EXEMPT MANAGEMENT 598 $10,240.53 $12,447.12 Monthly
10440 REAL PROPERTY MANAGER EXEMPT MANAGEMENT 580 $9,361.63 $11,378.89 Monthly
10690 RISK DIVISION MANAGER (U) EXEMPT MANAGEMENT 590 $9,839.65 $11,960.92 Monthly
10154 SENIOR CIVIL ENGINEER EXEMPT MANAGEMENT 581 $9,408.38 $11,434.99 Monthly
10118 SENIOR ECONOMIC DEVELOPMENT MANAGER EXEMPT MANAGEMENT 600 $10,343.38 $12,572.17 Monthly
10514 SENIOR MANAGEMENT ANALYST (U) EXEMPT MANAGEMENT 556 $8,305.09 $10,094.44 Monthly
10513 SENIOR MANAGEMENT ANALYST EXEMPT MANAGEMENT 556 $8,305.09 $10,094.44 Monthly
10300 SHELTER VETERINARIAN EXEMPT MANAGEMENT 678 $15,261.45 $18,550.30 Monthly
10443 TRAFFIC ENGINEER EXEMPT MANAGEMENT 573 $9,040.23 $10,988.53 Monthly
10740 TREASURY MANAGER EXEMPT MANAGEMENT 598 $10,240.53 $12,447.12 Monthly
09644 ASSISTANT CITY MANAGER (U)EXEMPT EXECUTIVE 705 $17,462.20 $21,223.21 Monthly
09280 CHIEF OF POLICE (U) #EXEMPT EXECUTIVE NA $34,211.63 $34,211.63 Monthly
09372 DEPUTY CITY MANAGER (U)EXEMPT EXECUTIVE 700 $17,032.10 $20,701.95 Monthly
09685 DIRECTOR OF ANIMAL SERVICES (U)EXEMPT EXECUTIVE 660 $13,951.30 $16,957.29 Monthly
09526 DIRECTOR OF COMMUNITY DEVELOPMENT AND HOUSING (U)EXEMPT EXECUTIVE 662 $14,091.54 $17,127.93 Monthly
09527 DIRECTOR OF ECONOMIC DEVELOPMENT (U)EXEMPT EXECUTIVE 662 $14,091.54 $17,127.93 Monthly
09701 DIRECTOR OF FINANCE & MANAGEMENT SERVICES (U)EXEMPT EXECUTIVE 692 $16,365.91 $19,892.02 Monthly
09665 DIRECTOR OF HUMAN RESOURCES & RISK MANAGEMENT (U)EXEMPT EXECUTIVE 660 $13,951.30 $16,957.29 Monthly
09625 DIRECTOR OF INFORMATION TECHNOLOGY (U)EXEMPT EXECUTIVE 660 $13,951.30 $16,957.29 Monthly
09731 DIRECTOR OF PARKS/REC/COMMUNITY SERVICES (U)EXEMPT EXECUTIVE 662 $14,091.55 $17,127.94 Monthly
Packet Page. 273
City of San Bernardino - Citywide Salary Schedule
Effective 1.5.2026
09753 DIRECTOR OF PUBLIC WORKS, OPERATIONS AND MAINTENANCE (U)EXEMPT EXECUTIVE 692 $16,365.91 $19,892.02 Monthly
09399 CITY CLERK (U) #EXEMPT NA N/A $13,684.99 $13,684.99 Monthly
00601 CITY COUNCIL EXEMPT NA NA $3,394.91 $3,394.91 Monthly
09370 CITY MANAGER (U) #EXEMPT NA NA $28,582.50 $28,582.50 Monthly
00502 MAYOR EXEMPT NA NA $4,166.67 $4,166.67 Monthly
30011 ACCOUNTANT I (FLEX)NON-EXEMPT GENERAL 465 $5,383.88 $6,544.64 Monthly
30012 ACCOUNTANT II NON-EXEMPT GENERAL 485 $5,949.35 $7,231.79 Monthly
30017 ACCOUNTING TECHNICIAN I (FLEX)NON-EXEMPT GENERAL 399 $3,874.77 $4,708.66 Monthly
30018 ACCOUNTING TECHNICIAN II NON-EXEMPT GENERAL 419 $4,280.38 $5,202.55 Monthly
30030 ACCOUNTING TECHNICIAN III EXEMPT GENERAL 437 $4,682.41 $5,691.66 Monthly
30709 ADMINISTRATIVE ASSISTANT NON-EXEMPT GENERAL 400 $3,893.86 $4,732.52 Monthly
30140 ANIMAL CONTROL OFFICER I (FLEX)NON-EXEMPT GENERAL 411 $4,113.36 $4,999.74 Monthly
30141 ANIMAL CONTROL OFFICER II NON-EXEMPT GENERAL 424 $4,388.94 $5,334.97 Monthly
30092 ANIMAL LICENSE INSPECTOR NON-EXEMPT GENERAL 370 $3,352.25 $4,075.19 Monthly
30130 ANIMAL SERVICES REPRESENTATIVE NON-EXEMPT GENERAL 370 $3,352.25 $4,075.19 Monthly
30119 ANIMAL SHELTER ATTENDANT NON-EXEMPT GENERAL 370 $3,352.25 $4,075.19 Monthly
30400 ARBORIST NON-EXEMPT GENERAL 452 $5,046.27 $6,134.26 Monthly
30894 ASSESSMENT DISTRICT/REAL PROP SPECIALIST NON-EXEMPT GENERAL 500 $6,411.03 $7,792.49 Monthly
30271 ASSISTANT BUYER NON-EXEMPT GENERAL 430 $4,522.55 $5,496.02 Monthly
30312 ASSISTANT LITERACY PROGRAM COORDINATOR NON-EXEMPT GENERAL 365 $3,269.93 $3,974.98 Monthly
30168 ASSISTANT PLANNER (FLEX)NON-EXEMPT GENERAL 502 $6,475.45 $7,871.22 Monthly
30072 BUILDING INSPECTOR I (FLEX)NON-EXEMPT GENERAL 460 $5,251.46 $6,383.59 Monthly
30073 BUILDING INSPECTOR II NON-EXEMPT GENERAL 487 $6,008.99 $7,303.37 Monthly
30074 BUILDING INSPECTOR III NON-EXEMPT GENERAL 511 $6,772.50 $8,232.69 Monthly
30502 BUSINESS REGISTRATION INSPECTOR NON-EXEMPT GENERAL 459 $5,225.21 $6,351.38 Monthly
30650 BUSINESS REGISTRATION REPRESENTATIVE I NON-EXEMPT GENERAL 419 $4,280.38 $5,202.55 Monthly
30651 BUSINESS REGISTRATION REPRESENTATIVE II NON-EXEMPT GENERAL 429 $4,499.89 $5,468.58 Monthly
30292 CEMETERY CARETAKER NON-EXEMPT GENERAL 395 $3,797.23 $4,615.60 Monthly
30450 CODE ENFORCEMENT OFFICER I (FLEX)NON-EXEMPT GENERAL 441 $4,776.66 $5,806.19 Monthly
30455 CODE ENFORCEMENT OFFICER II NON-EXEMPT GENERAL 472 $5,575.95 $6,777.27 Monthly
30135 COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG)/HOUSING PROGRAM ASSISTANT NON-EXEMPT GENERAL 420 $4,301.85 $5,228.79 Monthly
30890 COMMUNITY DEVELOPMENT TECHNICIAN NON-EXEMPT GENERAL 446 $4,897.15 $5,952.92 Monthly
30120 COMMUNITY INTERVENTION PROGRAM COORDINATOR NON-EXEMPT GENERAL 438 $4,706.27 $5,720.29 Monthly
30754 COMMUNITY POLICING SPECIALIST NON-EXEMPT GENERAL 470 $5,519.88 $6,710.46 Monthly
30821 COMMUNITY RECREATION PROGRAM COORDINATOR NON-EXEMPT GENERAL 388 $3,667.19 $4,458.13 Monthly
30990 COMMUNITY SERVICES PROGRAM COORDINATOR NON-EXEMPT GENERAL 438 $4,706.27 $5,720.29 Monthly
30621 CUSTODIAN NON-EXEMPT GENERAL 368 $3,318.84 $4,034.63 Monthly
30222 CUSTOMER SERVICE REPRESENTATIVE NON-EXEMPT GENERAL 386 $3,631.40 $4,413.99 Monthly
30226 CUSTOMER SERVICE REPRESENTATIVE (BILINGUAL)NON-EXEMPT GENERAL 396 $3,816.31 $4,639.46 Monthly
30227 CUSTOMER SERVICE REPRESENTATIVE (BILINGUAL) (U)NON-EXEMPT GENERAL 396 $3,816.31 $4,639.46 Monthly
30224 CUSTOMER SERVICE REPRESENTATIVE (U)NON-EXEMPT GENERAL 386 $3,631.40 $4,413.99 Monthly
30100 DATA ANALYST NON-EXEMPT GENERAL 444 $4,849.43 $5,894.47 Monthly
30831 ELECTRICIAN I (FLEX)NON-EXEMPT GENERAL 445 $4,873.29 $5,923.10 Monthly
30841 ELECTRICIAN II NON-EXEMPT GENERAL 465 $5,383.88 $6,544.64 Monthly
30432 ENGINEERING ASSISTANT I (FLEX)NON-EXEMPT GENERAL 450 $4,996.16 $6,073.41 Monthly
Packet Page. 274
City of San Bernardino - Citywide Salary Schedule
Effective 1.5.2026
30434 ENGINEERING ASSISTANT II NON-EXEMPT GENERAL 475 $5,659.45 $6,879.86 Monthly
30436 ENGINEERING ASSISTANT III NON-EXEMPT GENERAL 511 $6,772.50 $8,232.69 Monthly
30445 ENGINEERING TECHNICIAN NON-EXEMPT GENERAL 446 $4,897.15 $5,952.92 Monthly
30420 ENVIRONMENTAL PROGRAMS COORDINATOR NON-EXEMPT GENERAL 464 $5,357.63 $6,512.43 Monthly
30921 EQUIPMENT MECHANIC I (FLEX)NON-EXEMPT GENERAL 431 $4,544.03 $5,523.45 Monthly
30902 EQUIPMENT MECHANIC II NON-EXEMPT GENERAL 450 $4,996.16 $6,073.41 Monthly
30943 EQUIPMENT SERVICE WORKER NON-EXEMPT GENERAL 408 $4,052.52 $4,925.78 Monthly
30707 EXECUTIVE ASSISTANT NON-EXEMPT GENERAL 430 $4,522.55 $5,496.02 Monthly
30623 FACILITIES MAINTENANCE MECHANIC NON-EXEMPT GENERAL 420 $4,301.85 $5,228.79 Monthly
30506 FLEET PARTS STOREKEEPER NON-EXEMPT GENERAL 398 $3,854.49 $4,685.99 Monthly
30944 FLEET PARTS TECHNICIAN NON-EXEMPT GENERAL 438 $4,706.27 $5,720.29 Monthly
30133 GRANTS ANALYST NON-EXEMPT GENERAL 476 $5,688.08 $6,914.46 Monthly
30136 GRANTS ASSISTANT NON-EXEMPT GENERAL 390 $3,704.17 $4,502.27 Monthly
30098 GROUNDWORKER ARBORIST NON-EXEMPT GENERAL 392 $3,741.16 $4,547.60 Monthly
30516 HAZMAT TECHNICIAN NON-EXEMPT GENERAL 452 $5,046.27 $6,134.26 Monthly
30698 HOMELESS OUTREACH SPECIALIST NON-EXEMPT GENERAL 464 $5,357.63 $6,512.43 Monthly
30699 HOMELESS SERVICES ASSISTANT NON-EXEMPT GENERAL 420 $4,301.85 $5,228.79 Monthly
30207 HUMAN RESOURCES TECHNICIAN NON-EXEMPT GENERAL 418 $4,258.91 $5,177.49 Monthly
30101 HVAC MECHANIC NON-EXEMPT GENERAL 460 $5,251.46 $6,383.59 Monthly
30638 LANDSCAPE & IRRIGATION INSPECTOR I (FLEX)NON-EXEMPT GENERAL 447 $4,922.20 $5,982.75 Monthly
30639 LANDSCAPE & IRRIGATION INSPECTOR II NON-EXEMPT GENERAL 467 $5,438.75 $6,610.25 Monthly
30113 LEAD ANIMAL CONTROL OFFICER NON-EXEMPT GENERAL 437 $4,682.41 $5,691.66 Monthly
30080 LEAD BUILDING INSPECTOR NON-EXEMPT GENERAL 526 $7,298.60 $8,872.12 Monthly
30463 LEAD CODE ENFORCEMENT OFFICER NON-EXEMPT GENERAL 498 $6,347.80 $7,716.14 Monthly
30311 LEAD CUSTODIAN NON-EXEMPT GENERAL 397 $3,835.40 $4,662.13 Monthly
30932 LEAD EQUIPMENT MECHANIC NON-EXEMPT GENERAL 470 $5,519.88 $6,710.46 Monthly
30490 LEAD MAINTENANCE WORKER NON-EXEMPT GENERAL 452 $5,046.27 $6,134.26 Monthly
30593 LEAD PARKS CONSTRUCTION AND MAINTENANCE WORKER NON-EXEMPT GENERAL 471 $5,548.51 $6,743.86 Monthly
30335 LIBRARIAN I (FLEX)NON-EXEMPT GENERAL 450 $4,996.16 $6,073.41 Monthly
30366 LIBRARIAN II NON-EXEMPT GENERAL 479 $5,773.98 $7,018.25 Monthly
30341 LIBRARY ASSISTANT NON-EXEMPT GENERAL 370 $3,352.25 $4,075.19 Monthly
30380 LIBRARY NETWORK TECHNICIAN NON-EXEMPT GENERAL 422 $4,344.80 $5,281.28 Monthly
30391 LIBRARY TECHNICIAN I (FLEX)NON-EXEMPT GENERAL 380 $3,524.04 $4,283.96 Monthly
30392 LIBRARY TECHNICIAN II NON-EXEMPT GENERAL 402 $3,932.03 $4,780.23 Monthly
30215 LITERACY PROGRAM COORDINATOR NON-EXEMPT GENERAL 470 $5,519.88 $6,710.46 Monthly
30486 MAINTENANCE WORKER I (FLEX)NON-EXEMPT GENERAL 393 $3,760.24 $4,570.27 Monthly
30487 MAINTENANCE WORKER II NON-EXEMPT GENERAL 415 $4,195.68 $5,099.95 Monthly
30488 MAINTENANCE WORKER III NON-EXEMPT GENERAL 425 $4,410.41 $5,361.21 Monthly
30425 NPDES INSPECTOR I (FLEX)NON-EXEMPT GENERAL 461 $5,277.70 $6,415.80 Monthly
City of San Bernardino - Citywide Salary Schedule
Version Date: 1.5.2026
5
Packet Page. 275
City of San Bernardino - Citywide Salary Schedule
Effective 1.5.2026
30585 POOL MAINTENANCE COORDINATOR NON-EXEMPT GENERAL 421 $4,323.33 $5,255.04 Monthly
10360 PROGRAMMING/TRAFFIC ASSISTANT NON-EXEMPT GENERAL 400 $3,893.86 $4,732.52 Monthly
30580 PUBLIC WORKS INSPECTOR I (FLEX)NON-EXEMPT GENERAL 476 $5,688.08 $6,914.46 Monthly
30583 PUBLIC WORKS INSPECTOR II NON-EXEMPT GENERAL 499 $6,380.01 $7,754.31 Monthly
30584 PUBLIC WORKS INSPECTOR III NON-EXEMPT GENERAL 529 $7,409.54 $9,005.74 Monthly
30825 RECREATION THERAPIST NON-EXEMPT GENERAL 468 $5,465.00 $6,643.65 Monthly
30115 REGISTERED VETERINARY TECHNICIAN NON-EXEMPT GENERAL 450 $4,996.16 $6,073.41 Monthly
30708 SENIOR ADMINISTRATIVE ASSISTANT NON-EXEMPT GENERAL 420 $4,301.85 $5,228.79 Monthly
30229 SENIOR ANIMAL SERVICES REPRESENTATIVE NON-EXEMPT GENERAL 390 $3,704.17 $4,502.27 Monthly
30410 SENIOR ARBORIST NON-EXEMPT GENERAL 502 $6,475.45 $7,871.22 Monthly
30228 SENIOR CUSTOMER SERVICE REPRESENTATIVE NON-EXEMPT GENERAL 435 $4,635.88 $5,635.59 Monthly
30230 SENIOR CUSTOMER SERVICE REPRESENTATIVE (BILINGUAL)NON-EXEMPT GENERAL 445 $4,873.29 $5,923.10 Monthly
30232 SENIOR CUSTOMER SERVICE REPRESENTATIVE (BILINGUAL)(U)NON-EXEMPT GENERAL 445 $4,873.29 $5,923.10 Monthly
30710 SENIOR OFFICE ASSISTANT NON-EXEMPT GENERAL 375 $3,436.95 $4,177.78 Monthly
30978 SOLID WASTE FIELD INSPECTOR NON-EXEMPT GENERAL 450 $4,996.16 $6,073.41 Monthly
30447 TRAFFIC SIGNAL TECHNICIAN I (FLEX)NON-EXEMPT GENERAL 450 $4,996.16 $6,073.41 Monthly
30448 TRAFFIC SIGNAL TECHNICIAN II NON-EXEMPT GENERAL 484 $5,919.52 $7,194.81 Monthly
30449 TRAFFIC SIGNAL TECHNICIAN III NON-EXEMPT GENERAL 513 $6,840.49 $8,315.01 Monthly
30667 TREASURY ASSISTANT NON-EXEMPT GENERAL 399 $3,874.77 $4,708.66 Monthly
MIDDLE MANAGEMENT
City of San Bernardino - Citywide Salary Schedule
Version Date: 1.5.2026
6
Packet Page. 276
City of San Bernardino - Citywide Salary Schedule
Effective 1.5.2026
20060 FOOD SERVICE SUPERVISOR EXEMPT MIDDLE MANAGEMENT 478 $5,771.19 $7,015.06 Monthly
20160 FORENSICS SUPERVISOR NON-EXEMPT MIDDLE MANAGEMENT 543 $7,980.92 $9,700.53 Monthly
20490 FORESTRY SUPERVISOR NON-EXEMPT MIDDLE MANAGEMENT 542 $7,941.38 $9,652.60 Monthly
20100 GRANTS MANAGER (U) EXEMPT MIDDLE MANAGEMENT 506 $6,636.39 $8,066.00 Monthly
20170 LEAD FORENSICS SPECIALIST NON-EXEMPT MIDDLE MANAGEMENT 516 $6,975.52 $8,478.23 Monthly
20388 LIBRARY CIRCULATION SUPERVISOR EXEMPT MIDDLE MANAGEMENT 460 $5,275.08 $6,412.30 Monthly
20385 LIBRARY NETWORK ADMINISTRATOR EXEMPT MIDDLE MANAGEMENT 492 $6,188.21 $7,521.96 Monthly
20387 LIBRARY PROGRAM COORDINATOR EXEMPT MIDDLE MANAGEMENT 450 $5,018.63 $6,100.73 Monthly
20484 MAINTENANCE SUPERVISOR NON-EXEMPT MIDDLE MANAGEMENT 522 $7,187.62 $8,735.87 Monthly
20555 NPDES MANAGER NON-EXEMPT MIDDLE MANAGEMENT 525 $7,295.47 $8,867.69 Monthly
20178 PARK RANGER SUPERVISOR NON-EXEMPT MIDDLE MANAGEMENT 480 $5,828.71 $7,084.57 Monthly
20603 PARKS AND LANDSCAPE MAINTENANCE SUPERVISOR NON-EXEMPT MIDDLE MANAGEMENT 534 $7,629.81 $9,275.12 Monthly
20400 PERMIT SERVICES SUPERVISOR NON-EXEMPT MIDDLE MANAGEMENT 494 $6,250.52 $7,597.45 Monthly
20772 POLICE DISPATCH SUPERVISOR NON-EXEMPT MIDDLE MANAGEMENT 514 $6,906.01 $8,394.35 Monthly
20765 POLICE RECORDS SUPERVISOR NON-EXEMPT MIDDLE MANAGEMENT 464 $5,381.73 $6,541.72 Monthly
20019 PRINCIPAL ACCOUNTANT EXEMPT MIDDLE MANAGEMENT 550 $8,263.73 $10,045.66 Monthly
20864 PROCUREMENT CONTRACT SPECIALIST EXEMPT MIDDLE MANAGEMENT 520 $7,115.72 $8,649.59 Monthly
20949 PROPERTY AND EVIDENCE SUPERVISOR EXEMPT MIDDLE MANAGEMENT 494 $6,250.52 $7,597.45 Monthly
20243 SENIOR PLANNER *EXEMPT MIDDLE MANAGEMENT 567 $8,995.91 $10,933.62 Monthly
20995 STATION MANAGER EXEMPT MIDDLE MANAGEMENT 490 $6,127.09 $7,447.66 Monthly
20336 TECHNOLOGY LIBRARIAN EXEMPT MIDDLE MANAGEMENT 502 $6,504.57 $7,906.62 Monthly
20437 TRAFFIC ENGINEERING ASSOCIATE EXEMPT MIDDLE MANAGEMENT 532 $7,554.31 $9,182.85 Monthly
20438 TRAFFIC OPERATIONS AND SYSTEMS ANALYST EXEMPT MIDDLE MANAGEMENT 552 $8,347.61 $10,146.32 Monthly
20370 TRAFFIC SIGNAL AND LIGHTING SUPERVISOR NON-EXEMPT MIDDLE MANAGEMENT 533 $7,592.66 $9,228.39 Monthly
00300 APPRENTICE (PT)NON-EXEMPT NA 381 $17.65 $21.44 Hourly
00194 BACKGROUND INVESTIGATOR (PT)NON-EXEMPT NA 493 $29.94 $36.39 Hourly
00605 CRIME DATA TECHNICIAN (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00054 CUSTODIAL AIDE (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00083 EXTRA RELIEF HEAVY LABORER (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00259 FOOD SERVICE PROGRAM SPECIALIST (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00308 LAW ENFORCEMENT TRAINEE NON-EXEMPT NA NA $34.77 $34.77 Hourly
00361 LIBRARY PAGE (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00133 LIFEGUARD (PT)NON-EXEMPT NA 377 $16.96 $20.61 Hourly
00192 POLICE CADET (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00520 POLICE CALL TAKER (PT)NON-EXEMPT NA 396 $19.85 $24.14 Hourly
00331 POOL MANAGER I (PT)NON-EXEMPT NA 421 $20.91 $25.41 Hourly
00333 POOL MANAGER II (PT)NON-EXEMPT NA 443 $23.33 $28.36 Hourly
00222 RECREATION AIDE (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00244 RECREATION LEADER (PT)NON-EXEMPT NA 375 $16.96 $20.61 Hourly
00230 RECREATION SPECIALIST (PT)NON-EXEMPT NA 400 $18.83 $22.89 Hourly
00256 RECREATION SUPERVISOR (AQUATICS) (PT)NON-EXEMPT NA 481 $28.20 $34.28 Hourly
00266 SECURITY OFFICER I (PT)NON-EXEMPT NA 378 $17.04 $20.71 Hourly
00265 SECURITY OFFICER II (PT)NON-EXEMPT NA 402 $19.02 $23.12 Hourly
00283 SENIOR LIFEGUARD (PT)NON-EXEMPT NA 396 $18.46 $22.44 Hourly
00294 SENIOR RECREATION LEADER (PT)NON-EXEMPT NA 382 $17.74 $21.56 Hourly
Packet Page. 277
City of San Bernardino - Citywide Salary Schedule
Effective 1.5.2026
00019 STUDENT INTERN (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00301 VETERINARIAN - PER DIEM NON-EXEMPT NA NA $187.50 $187.50 Hourly
50141 ASSISTANT CHIEF OF POLICE EXEMPT POLICE MANAGEMENT P6 $25,879.15 $25,879.15 Monthly
50283 POLICE CAPTAIN (U) EXEMPT POLICE MANAGEMENT P5 $21,138.74 $21,138.74 Monthly
50402 POLICE LIEUTENANT EXEMPT POLICE MANAGEMENT P4 $17,961.41 $17,961.41 Monthly
40466 DETECTIVE/CORPORAL NON-EXEMPT POLICE SAFETY P2 $9,456.11 $12,401.26 Monthly
40751 POLICE OFFICER NON-EXEMPT POLICE SAFETY P1 $8,143.38 $10,875.40 Monthly
40332 POLICE SERGEANT NON-EXEMPT POLICE SAFETY P3 $10,700.93 $14,013.77 Monthly
33017 ACCOUNTING TECHNICIAN I (FLEX) - POLICE NON-EXEMPT POLICE CIVILIAN 399 $3,887.99 $4,724.72 Monthly
33018 ACCOUNTING TECHNICIAN II - POLICE NON-EXEMPT POLICE CIVILIAN 419 $4,294.99 $5,220.30 Monthly
33709 ADMINISTRATIVE ASSISTANT - POLICE NON-EXEMPT POLICE CIVILIAN 400 $3,907.15 $4,748.66 Monthly
33758 COMMUNITY SERVICES OFFICER NON-EXEMPT POLICE CIVILIAN 427 $4,469.76 $5,433.37 Monthly
33603 CRIME ANALYST NON-EXEMPT POLICE CIVILIAN 493 $6,212.65 $7,550.94 Monthly
33602 CRIMINAL INVESTIGATION OFFICER NON-EXEMPT POLICE CIVILIAN 493 $6,212.65 $7,550.94 Monthly
33707 EXECUTIVE ASSISTANT - POLICE NON-EXEMPT POLICE CIVILIAN 430 $4,537.99 $5,514.77 Monthly
33165 FORENSICS SPECIALIST I (FLEX)NON-EXEMPT POLICE CIVILIAN 448 $4,964.14 $5,975.65 Monthly
33166 FORENSICS SPECIALIST II NON-EXEMPT POLICE CIVILIAN 478 $5,764.96 $7,007.49 Monthly
33515 MARKETING & PUBLIC RELATIONS SPECIALIST NON-EXEMPT POLICE CIVILIAN 461 $5,295.71 $6,437.70 Monthly
30178 PARK RANGER NON-EXEMPT POLICE CIVILIAN 397 $3,848.49 $4,678.05 Monthly
33581 PARKING ENFORCEMENT OFFICER NON-EXEMPT POLICE CIVILIAN 380 $3,536.06 $4,298.58 Monthly
33848 POLICE FLEET MAINTENANCE EXPEDITOR NON-EXEMPT POLICE CIVILIAN 398 $3,867.64 $4,701.98 Monthly
33218 POLICE PERSONNEL AND TRAINING TECHNICIAN NON-EXEMPT POLICE CIVILIAN 457 $5,191.58 $6,310.81 Monthly
33219 POLICE RECORDS TECHNICIAN I (FLEX)NON-EXEMPT POLICE CIVILIAN 369 $3,346.93 $4,068.75 Monthly
33220 POLICE RECORDS TECHNICIAN II NON-EXEMPT POLICE CIVILIAN 390 $3,716.81 $4,517.65 Monthly
33947 PROPERTY AND EVIDENCE TECHNICIAN I (FLEX)NON-EXEMPT POLICE CIVILIAN 411 $4,127.41 $5,016.81 Monthly
33948 PROPERTY AND EVIDENCE TECHNICIAN II NON-EXEMPT POLICE CIVILIAN 472 $5,594.98 $6,800.40 Monthly
33770 RANGEMASTER NON-EXEMPT POLICE CIVILIAN 465 $5,402.26 $6,566.98 Monthly
33710 SENIOR OFFICE ASSISTANT - POLICE NON-EXEMPT POLICE CIVILIAN 375 $3,448.67 $4,192.05 Monthly
32767 POLICE DISPATCHER I (FLEX)NON-EXEMPT POLICE DISPATCH 433 $4,822.33 $5,861.92 Monthly
32768 POLICE DISPATCHER II NON-EXEMPT POLICE DISPATCH 464 $5,628.44 $6,841.52 Monthly
City Clerk contract and pay effective 10.13.25
REVISION ADOPTED BY MCC 6/19/17 REVISION ADOPTED BY MCC 7/20/22
REVISION ADOPTED BY MCC 6/20/18 REVISION ADOPTED BY MCC 8/17/22
REVISION ADOPTED BY MCC 06/19/19 REVISION ADOPTED BY MCC 9/21/22
REVISION ADOPTED BY MCC 8/21/19 REVISION ADOPTED BY MCC 10/19/22
REVISION ADOPTED BY MCC 1/15/20 REVISION ADOPTED BY MCC 11/2/22
REVISION ADOPTED BY MCC 6/24/20 REVISION ADOPTED BY MCC 11/16/22
Packet Page. 278
City of San Bernardino - Citywide Salary Schedule
Effective 1.5.2026
REVISION ADOPTED BY MCC 9/2/20 REVISION ADOPTED BY MCC 12/7/22
REVISION ADOPTED BY MCC 12/16/20 REVISION ADOPTED BY MCC 1/18/23
REVISION ADOPTED BY MCC 2/17/21 REVISION ADOPTED BY MCC 6/21/23
REVISION ADOPTED BY MCC 7/21/21 REVISION ADOPTED BY MCC 8/16/23
REVISION ADOPTED BY MCC 6/16/21 REVISION ADOPTED BY MCC 10/4/23
REVISION ADOPTED BY MCC 7/21/21 REVISION ADOPTED BY MCC 10/18/23
REVISION ADOPTED BY MCC 8/4/21 REVISION ADOPTED BY MCC 12/6/23
REVISION ADOPTED BY MCC 9/15/21 REVISION ADOPTED BY MCC 3/6/24
REVISION ADOPTED BY MCC 10/20/21 REVISION ADOPTED BY MCC 4/17/24
REVISION ADOPTED BY MCC 11/3/21 REVISION ADOPTED BY MCC 6/26/24
REVISION ADOPTED BY MCC 2/2/22 REVISION ADOPTED BY MCC 1/15/25
REVISION ADOPTED BY MCC 2/16/22 REVISION ADOPTED BY MCC 2/19/25
REVISION ADOPTED BY MCC 3/16/22 REVISION ADOPTED BY MCC 4/2/25
REVISION ADOPTED BY MCC 4/6/22 REVISION ADOPTED BY MCC 6/18/25
REVISION ADOPTED BY MCC 5/18/22 REVISION ADOPTED BY MCC 7/15/25
REVISION ADOPTED BY MCC 6/15/22 REVISION ADOPTED BY MCC 08/06/2025
REVISION ADOPTED BY MCC 9/3/2025
REVISION ADOPTED BY MCC 12/17/2025
REVISION ADOPTED BY MCC 01/21/2026
Packet Page. 279
3
1
3
9
CONSENT CALENDAR
January 21, 2026
Honorable Mayor and City Council Members
Andrea Russell, Director of Human Resources
Human Resources
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, adopt Resolution No. 2026-002:
1. Approving a basic compensation plan for part-time, temporary and seasonal
employees, and
2. Amending the City-wide salary schedule for full-time, part-time, temporary, and
seasonal positions.
No Comment
On April 4, 2016, Senate Bill 3 was signed into law. This legislation amended Section
1182.12 of the California Labor Code and requires an employer with 26 or more
employees to implement new minimum wages pursuant to the schedule listed below.
Per California Labor Code section 1182.12 (c)(3)(A), the California minimum wage will
increase to $16.90 per hour beginning January 1, 2026.
The City of San Bernardino currently has one adopted salary schedule establishing
compensation for full-time, part-time, temporary, and seasonal classifications. On April
4, 2016, Senate Bill 3 was signed into law. This legislation amended Section 1182.12
of the California Labor Code and requires an employer with 26 or more employees to
implement new minimum wages pursuant to the following schedule:
Packet Page. 280
3
1
3
9
January 1, 2017 – December 31, 2017 = $10.50/hour
January 1, 2018 – December 31, 2018 = $11.00/hour
January 1, 2019 – December 31, 2019 = $12.00/hour
January 1, 2020 – December 31, 2020 = $13.00/hour
January 1, 2021 – December 31, 2021 = $14.00/hour
January 1, 2022 – December 31, 2022 = $15.00/hour
January 1, 2023 – December 31, 2023 = $15.50/hour
January 1, 2024 – December 31, 2024 = $16.00/hour
January 1, 2025 – December 31, 2025 = $16.50/hour
Per California Labor Code section 1182.12 (c)(3)(A), the California minimum wage will
increase to $16.90 per hour beginning January 1, 2026. This will immediately affect all
employees who now earn less than $16.90 per hour.
Discussion
The proposed compensation plan would incorporate the minimum wage increase
effective January 1, 2026, as well as increases for positions that will be affected by
compaction due to the implementation of the minimum wage increase. Additionally,
part-time classifications with full-time equivalent classifications receive the full-time
classifications salary.
Part-time, temporary, and seasonal employment is restricted to 1,000 hours within a
fiscal year (July 1st to June 30th) and employees in these positions do not qualify to
receive City benefits, except those required by law. Further restrictions apply to
California Public Employees’ Retirement System (CalPERS) retired annuitants.
The proposed compensation adjustments reflect the January 1, 2026, minimum wage
increase and related equity adjustments for certain part-time classifications. Finance
estimated the fiscal impact by applying the approved rate increases to actual hours
worked by affected part-time classifications during the January - June period of the
prior fiscal year, which serves as a baseline for January - June 2026. The analysis
assumes no change in staffing levels or hours worked.
2021-2025 Strategic Targets and Goals
Approving a basic compensation plan for part-time, temporary and seasonal
employees aligns with Goal 2: Focused, Aligned Leadership and Unified Community
by ensuring that employees are fairly compensated.
Fiscal Impact
The estimated impact on General Fund of the proposed action is approximately
$18,000 in FY 2025/26. Actual costs may vary based on part-time hours worked.
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, adopt Resolution No. 2026-002:
Packet Page. 281
3
1
3
9
1. Approving a basic compensation plan for part-time, temporary and seasonal
employees.
2. Amending the City-wide salary schedule for full-time, part-time, temporary, and
seasonal positions.
Attachments
Attachment 1 Resolution 2026-002;
Attachment 2 Exhibit A – Part-Time, Temporary, and Seasonal
Employees Salary Schedule Effective 1/1/2026
Attachment 3 Exhibit B – Citywide Salary Schedule for Full-Time,
Part-Time, Temporary, and Seasonal Employees
Effective 1/5/2026.
Ward:
All Wards
Synopsis of Previous Council Actions:
January 17, 2024 Mayor and City Council adopted Resolution No. 2024-015
amending the City-wide Salary Schedule for Full-Time, Part-
Time, Temporary, and Seasonal Employees.
CC: Eric Levitt, City Manager
Packet Page. 282
Resolution No. 2026-002
Resolution 2026-002
January 21, 2026
Page 1 of 3
RESOLUTION NO. 2026-002
RESOLUTION OF THE MAYOR AND CITY COUNCIL OF
THE CITY OF SAN BERNARDINO, CALIFORNIA,
APPROVING THE BASIC COMPENSATION PLAN FOR
PART-TIME, TEMPORARY, AND SEASONAL
EMPLOYEES; AND AMEN DING THE CITY-WIDE
SALARY SCHEDULE FOR FULL-TIME, PART-TIME,
TEMPORARY, AND SEASONAL POSITIONS
WHEREAS, on April 4, 2016, Senate Bill 3 was signed into law. This legislation amended
Section 1182.12 of the California Labor Code and requires an employer with 26 or more employees
to implement new minimum wages
WHEREAS, per California Labor Code section 1182.12 (c)(3)(A), the California
minimum wage will increase to $16.90 per hour beginning January 1, 2026.
WHEREAS, the salary schedule for part-time, temporary, and seasonal employees
reflects the minimum wage increase and incorporates the part-time salaries of positions that have
full-time equivalents effective January 1, 2026.
WHEREAS, the city-wide salary schedule includes all adopted and approved
classification and salaries including cost of living adjustments for all bargaining groups effective
January 5, 2026; and
WHEREAS, the salary schedule meets the California Public Employees Retirement
Systems (CalPERS) pay rate reporting requirements in accordance to Government Code Section
20636 defining “Compensation Earnable” and the California Code of Regulations (CCR) Section
570.5.
BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF
SAN BERNARDINO AS FOLLOWS:
SECTION 1. The above recitals are true and correct and are incorporated herein by this
reference.
SECTION 2. The salary schedules for part-time, temporary, and seasonal employees
effective January 1, 2026 and the city-wide salary schedule effective January 5, 2026 incorporated
herein as Exhibit A and Exhibit B, are hereby approved.
SECTION 3. The Mayor and City Council finds this Resolution is not subject to the
California Environmental Quality Act (CEQA) in that the activity is covered by the general rule
that CEQA applies only to projects which have the potential for causing a significant effect on the
environment. Where it can be seen with certainty, as in this case, that there is no possibility that
the activity in question may have a significant effect on the environment, the activity is not subject
to CEQA.
Packet Page. 283
Resolution No. 2026-002
Resolution 2026-002
January 21, 2026
Page 2 of 3
SECTION 4. Severability. If any provision of this Resolution or the application thereof
to any person or circumstance is held invalid, such invalidity shall not affect other provisions or
applications, and to this end the provisions of this Resolution are declared to be severable.
SECTION 5. Effective Date. This Resolution shall become effective immediately.
APPROVED and ADOPTED by the City Council and signed by the Mayor and attested
by the City Clerk this 21st day of January 2026.
Helen Tran, Mayor
City of San Bernardino
Attest:
Telicia Lopez, CMC, City Clerk
Approved as to form:
Sonia Carvalho, City Attorney
Packet Page. 284
Resolution No. 2026-002
Resolution 2026-002
January 21, 2026
Page 3 of 3
CERTIFICATION
STATE OF CALIFORNIA )
COUNTY OF SAN BERNARDINO) ss
CITY OF SAN BERNARDINO )
I, Telicia Lopez, CMC, City Clerk, hereby certify that the attached is a true copy of
Resolution No. 2026-002, adopted at a regular meeting held on the 21st day of January 2026 by
the following vote:
Council Members: AYES NAYS ABSTAIN ABSENT
SANCHEZ _____ _____ _______ _______
IBARRA _____ _____ _______ _______
FIGUEROA _____ _____ _______ _______
SHORETT _____ _____ _______ _______
KNAUS _____ _____ _______ _______
FLORES _____ _____ _______ _______
ORTIZ _____ _____ _______ _______
WITNESS my hand and official seal of the City of San Bernardino this ___ day of ____________
2025.
Telicia Lopez, CMC, City Clerk
Packet Page. 285
Part-time Salary Schedule
Effective 1.1.2026
CLASS
CODE CLASSIFICATION TITLE FLSA STATUS UNIT SALARY
RANGE
BOTTOM
STEP (Step 1)
TOP
STEP
(Step 21)
Monthly/
Hourly
00300 APPRENTICE (PT)NON-EXEMPT NA 381 $17.65 $21.44 Hourly
00194 BACKGROUND INVESTIGATOR (PT)NON-EXEMPT NA 493 $29.94 $36.39 Hourly
00605 CRIME DATA TECHNICIAN (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00054 CUSTODIAL AIDE (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00083 EXTRA RELIEF HEAVY LABORER (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00259 FOOD SERVICE PROGRAM SPECIALIST (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00308 LAW ENFORCEMENT TRAINEE NON-EXEMPT NA NA $34.77 $34.77 Hourly
00361 LIBRARY PAGE (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00133 LIFEGUARD (PT)NON-EXEMPT NA 377 $16.96 $20.61 Hourly
00192 POLICE CADET (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00520 POLICE CALL TAKER (PT)NON-EXEMPT NA 396 $19.85 $24.14 Hourly
00331 POOL MANAGER I (PT)NON-EXEMPT NA 421 $20.91 $25.41 Hourly
00333 POOL MANAGER II (PT)NON-EXEMPT NA 443 $23.33 $28.36 Hourly
00222 RECREATION AIDE (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00244 RECREATION LEADER (PT)NON-EXEMPT NA 375 $16.96 $20.61 Hourly
00230 RECREATION SPECIALIST (PT)NON-EXEMPT NA 400 $18.83 $22.89 Hourly
00256 RECREATION SUPERVISOR (AQUATICS) (PT)NON-EXEMPT NA 481 $28.20 $34.28 Hourly
00266 SECURITY OFFICER I (PT)NON-EXEMPT NA 378 $17.04 $20.71 Hourly
00265 SECURITY OFFICER II (PT)NON-EXEMPT NA 402 $19.02 $23.12 Hourly
00283 SENIOR LIFEGUARD (PT)NON-EXEMPT NA 396 $18.46 $22.44 Hourly
00294 SENIOR RECREATION LEADER (PT)NON-EXEMPT NA 382 $17.74 $21.56 Hourly
00019 STUDENT INTERN (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00301 VETERINARIAN - PER DIEM NON-EXEMPT NA NA $187.50 $187.50 Hourly
REVISION ADOPTED BY MCC 6/19/17 REVISION ADOPTED BY MCC 7/20/22
REVISION ADOPTED BY MCC 6/20/18 REVISION ADOPTED BY MCC 8/17/22
REVISION ADOPTED BY MCC 06/19/19 REVISION ADOPTED BY MCC 9/21/22
REVISION ADOPTED BY MCC 8/21/19 REVISION ADOPTED BY MCC 10/19/22
REVISION ADOPTED BY MCC 1/15/20 REVISION ADOPTED BY MCC 11/2/22
REVISION ADOPTED BY MCC 6/24/20 REVISION ADOPTED BY MCC 11/16/22
REVISION ADOPTED BY MCC 9/2/20 REVISION ADOPTED BY MCC 12/7/22
REVISION ADOPTED BY MCC 12/16/20 REVISION ADOPTED BY MCC 1/18/23
REVISION ADOPTED BY MCC 2/17/21 REVISION ADOPTED BY MCC 6/21/23
REVISION ADOPTED BY MCC 7/21/21 REVISION ADOPTED BY MCC 8/16/23
REVISION ADOPTED BY MCC 6/16/21 REVISION ADOPTED BY MCC 10/4/23
REVISION ADOPTED BY MCC 7/21/21 REVISION ADOPTED BY MCC 10/18/23
REVISION ADOPTED BY MCC 8/4/21 REVISION ADOPTED BY MCC 12/6/23
Packet Page. 286
Part-time Salary Schedule
Effective 1.1.2026
REVISION ADOPTED BY MCC 9/15/21 REVISION ADOPTED BY MCC 3/6/24
REVISION ADOPTED BY MCC 10/20/21 REVISION ADOPTED BY MCC 4/17/24
REVISION ADOPTED BY MCC 11/3/21 REVISION ADOPTED BY MCC 6/26/24
REVISION ADOPTED BY MCC 2/2/22 REVISION ADOPTED BY MCC 1/15/25
REVISION ADOPTED BY MCC 2/16/22 REVISION ADOPTED BY MCC 2/19/25
REVISION ADOPTED BY MCC 3/16/22 REVISION ADOPTED BY MCC 4/2/25
REVISION ADOPTED BY MCC 4/6/22 REVISION ADOPTED BY MCC 6/18/25
REVISION ADOPTED BY MCC 5/18/22 REVISION ADOPTED BY MCC 7/15/25
REVISION ADOPTED BY MCC 6/15/22 REVISION ADOPTED BY MCC 08/06/2025
REVISION ADOPTED BY MCC 9/3/2025
REVISION ADOPTED BY MCC 01/21/2026
Packet Page. 287
City of San Bernardino - Citywide Salary Schedule
Effective 1.5.2026
CLASS
CODE CLASSIFICATION TITLE FLSA STATUS UNIT SALARY
RANGE
BOTTOM
STEP (Step 1)
TOP
STEP
(Step 21)
Monthly/
Hourly
MANAGEMENT & CONFIDENTIAL
10012 ACCOUNTANT II - PAYROLL NON-EXEMPT CONFIDENTIAL 485 $5,828.52 $7,084.92 Monthly
10683
City of San Bernardino - Citywide Salary Schedule
Version Date: 1.5.2026
1
Packet Page. 288
City of San Bernardino - Citywide Salary Schedule
Effective 1.5.2026
10385 SENIOR INFORMATION TECHNOLOGY TECHNICIAN NON-EXEMPT CONFIDENTIAL 488 $5,916.18 $7,191.28 Monthly
10529 SENIOR NETWORK SYSTEMS ADMINISTRATOR EXEMPT CONFIDENTIAL 592 $9,938.99 $12,080.13 Monthly
10223 SENIOR OFFICE ASSISTANT (U)NON-EXEMPT CONFIDENTIAL 375 $3,367.15 $4,092.94 Monthly
10689 SUPERVISING HUMAN RESOURCES ANALYST EXEMPT CONFIDENTIAL 559 $8,430.15 $10,246.37 Monthly
10860 ACCOUNTING DIVISION MANAGER (U) EXEMPT MANAGEMENT 608 $10,764.13 $13,084.08 Monthly
10979 ADMINISTRATIVE SUPERVISOR & EXECUTIVE ASSISTANT TO THE CITY MANAGER (U) EXEMPT MANAGEMENT 535 $7,478.79 $9,090.49 Monthly
10492 ASSISTANT BUILDING OFFICIAL EXEMPT MANAGEMENT 583 $9,501.88 $11,549.52 Monthly
10216 ASSISTANT TO THE CITY MANAGER (U) EXEMPT MANAGEMENT 580 $9,361.63 $11,378.89 Monthly
10104 ASSISTANT TO THE MAYOR I (U)MANAGEMENT
City of San Bernardino - Citywide Salary Schedule
Version Date: 1.5.2026
2
Packet Page. 289
City of San Bernardino - Citywide Salary Schedule
Effective 1.5.2026
10699 HOMELESS SOLUTIONS MANAGER (U) EXEMPT MANAGEMENT 601 $10,394.80 $12,635.28 Monthly
10121 HOUSING COMPLIANCE SPECIALIST EXEMPT MANAGEMENT 500 $6,280.83 $7,634.23 Monthly
10129 HOUSING DIVISION MANAGER (U) EXEMPT MANAGEMENT 601 $10,394.80 $12,635.28 Monthly
10672 HUMAN RESOURCES DIVISION MANAGER (U) EXEMPT MANAGEMENT 590 $9,839.65 $11,960.92 Monthly
10637 INFORMATION TECHNOLOGY MANAGER EXEMPT MANAGEMENT 599 $10,291.95 $12,509.06 Monthly
10159 LAND DEVELOPMENT ENGINEER EXEMPT MANAGEMENT 590 $9,839.65 $11,960.92 Monthly
10233 LEGISLATIVE & GOVERNMENTAL AFFAIRS MANAGER (U) EXEMPT MANAGEMENT 593 $9,988.08 $12,140.91 Monthly
10401 LIBRARY DIRECTOR (U) EXEMPT MANAGEMENT 635 $11,957.50 $14,533.27 Monthly
10530 MANAGEMENT ANALYST I (FLEX) EXEMPT MANAGEMENT 476 $5,572.57 $6,774.04 Monthly
10531 MANAGEMENT ANALYST I (FLEX)(U) EXEMPT MANAGEMENT 476 $5,572.57 $6,774.04 Monthly
10533 MANAGEMENT ANALYST II (U) EXEMPT MANAGEMENT 506 $6,472.50 $7,866.81 Monthly
10532 MANAGEMENT ANALYST II EXEMPT MANAGEMENT 506 $6,472.50 $7,866.81 Monthly
10503 MAYOR'S CHIEF OF STAFF (U)NON-EXEMPT MANAGEMENT 580 $9,361.63 $11,378.89 Monthly
10190 NEIGHBORHOOD & CUSTOMER SERVICE MANAGER (U) EXEMPT MANAGEMENT 561 $8,514.30 $10,349.22 Monthly
10868 OPERATIONS & MAINTENANCE DIVISION MANAGER (U) EXEMPT MANAGEMENT 591 $9,888.74 $12,020.53 Monthly
10064 PAYROLL SUPERVISOR EXEMPT MANAGEMENT 521 $6,975.06 $8,478.06 Monthly
10713 PLANNING DIVISION MANAGER (U) EXEMPT MANAGEMENT 594 $10,038.34 $12,201.68 Monthly
10765 POLICE DISPATCH MANAGER EXEMPT MANAGEMENT 574 $9,084.64 $11,043.46 Monthly
10761 POLICE RECORDS MANAGER EXEMPT MANAGEMENT 574 $9,084.64 $11,043.46 Monthly
10509 PRINCIPAL ADMINISTRATIVE ANALYST (U) NON-EXEMPT MANAGEMENT 598 $10,240.53 $12,447.12 Monthly
10182 PRINCIPAL CIVIL ENGINEER EXEMPT MANAGEMENT 600 $10,343.38 $12,572.17 Monthly
10243 PRINCIPAL PLANNER EXEMPT MANAGEMENT 613 $11,036.44 $13,413.67 Monthly
10132 PROJECT MANAGER OF COMMUNITY DEVELOPMENT PROGRAMS (U) EXEMPT MANAGEMENT 550 $8,059.65 $9,797.58 Monthly
10212 PUBLIC INFORMATION OFFICER (U) EXEMPT MANAGEMENT 593 $9,988.08 $12,140.91 Monthly
10900 PUBLIC WORKS SAFETY AND TRAINING OFFICER EXEMPT MANAGEMENT 510 $6,602.23 $8,025.76 Monthly
10863 PURCHASING DIVISION MANAGER (U) EXEMPT MANAGEMENT 598 $10,240.53 $12,447.12 Monthly
10440 REAL PROPERTY MANAGER EXEMPT MANAGEMENT 580 $9,361.63 $11,378.89 Monthly
10690 RISK DIVISION MANAGER (U) EXEMPT MANAGEMENT 590 $9,839.65 $11,960.92 Monthly
10154 SENIOR CIVIL ENGINEER EXEMPT MANAGEMENT 581 $9,408.38 $11,434.99 Monthly
10118 SENIOR ECONOMIC DEVELOPMENT MANAGER EXEMPT MANAGEMENT 600 $10,343.38 $12,572.17 Monthly
10514 SENIOR MANAGEMENT ANALYST (U) EXEMPT MANAGEMENT 556 $8,305.09 $10,094.44 Monthly
10513 SENIOR MANAGEMENT ANALYST EXEMPT MANAGEMENT 556 $8,305.09 $10,094.44 Monthly
10300 SHELTER VETERINARIAN EXEMPT MANAGEMENT 678 $15,261.45 $18,550.30 Monthly
10443 TRAFFIC ENGINEER EXEMPT MANAGEMENT 573 $9,040.23 $10,988.53 Monthly
10740 TREASURY MANAGER EXEMPT MANAGEMENT 598 $10,240.53 $12,447.12 Monthly
09644 ASSISTANT CITY MANAGER (U)EXEMPT EXECUTIVE 705 $17,462.20 $21,223.21 Monthly
09280 CHIEF OF POLICE (U) #EXEMPT EXECUTIVE NA $34,211.63 $34,211.63 Monthly
09372 DEPUTY CITY MANAGER (U)EXEMPT EXECUTIVE 700 $17,032.10 $20,701.95 Monthly
09685 DIRECTOR OF ANIMAL SERVICES (U)EXEMPT EXECUTIVE 660 $13,951.30 $16,957.29 Monthly
09526 DIRECTOR OF COMMUNITY DEVELOPMENT AND HOUSING (U)EXEMPT EXECUTIVE 662 $14,091.54 $17,127.93 Monthly
09527 DIRECTOR OF ECONOMIC DEVELOPMENT (U)EXEMPT EXECUTIVE 662 $14,091.54 $17,127.93 Monthly
09701 DIRECTOR OF FINANCE & MANAGEMENT SERVICES (U)EXEMPT EXECUTIVE 692 $16,365.91 $19,892.02 Monthly
09665 DIRECTOR OF HUMAN RESOURCES & RISK MANAGEMENT (U)EXEMPT EXECUTIVE 660 $13,951.30 $16,957.29 Monthly
09625 DIRECTOR OF INFORMATION TECHNOLOGY (U)EXEMPT EXECUTIVE 660 $13,951.30 $16,957.29 Monthly
09731 DIRECTOR OF PARKS/REC/COMMUNITY SERVICES (U)EXEMPT EXECUTIVE 662 $14,091.55 $17,127.94 Monthly
Packet Page. 290
City of San Bernardino - Citywide Salary Schedule
Effective 1.5.2026
09753 DIRECTOR OF PUBLIC WORKS, OPERATIONS AND MAINTENANCE (U)EXEMPT EXECUTIVE 692 $16,365.91 $19,892.02 Monthly
09399 CITY CLERK (U) #EXEMPT NA N/A $13,684.99 $13,684.99 Monthly
00601 CITY COUNCIL EXEMPT NA NA $3,394.91 $3,394.91 Monthly
09370 CITY MANAGER (U) #EXEMPT NA NA $28,582.50 $28,582.50 Monthly
00502 MAYOR EXEMPT NA NA $4,166.67 $4,166.67 Monthly
30011 ACCOUNTANT I (FLEX)NON-EXEMPT GENERAL 465 $5,383.88 $6,544.64 Monthly
30012 ACCOUNTANT II NON-EXEMPT GENERAL 485 $5,949.35 $7,231.79 Monthly
30017 ACCOUNTING TECHNICIAN I (FLEX)NON-EXEMPT GENERAL 399 $3,874.77 $4,708.66 Monthly
30018 ACCOUNTING TECHNICIAN II NON-EXEMPT GENERAL 419 $4,280.38 $5,202.55 Monthly
30030 ACCOUNTING TECHNICIAN III EXEMPT GENERAL 437 $4,682.41 $5,691.66 Monthly
30709 ADMINISTRATIVE ASSISTANT NON-EXEMPT GENERAL 400 $3,893.86 $4,732.52 Monthly
30140 ANIMAL CONTROL OFFICER I (FLEX)NON-EXEMPT GENERAL 411 $4,113.36 $4,999.74 Monthly
30141 ANIMAL CONTROL OFFICER II NON-EXEMPT GENERAL 424 $4,388.94 $5,334.97 Monthly
30092 ANIMAL LICENSE INSPECTOR NON-EXEMPT GENERAL 370 $3,352.25 $4,075.19 Monthly
30130 ANIMAL SERVICES REPRESENTATIVE NON-EXEMPT GENERAL 370 $3,352.25 $4,075.19 Monthly
30119 ANIMAL SHELTER ATTENDANT NON-EXEMPT GENERAL 370 $3,352.25 $4,075.19 Monthly
30400 ARBORIST NON-EXEMPT GENERAL 452 $5,046.27 $6,134.26 Monthly
30894 ASSESSMENT DISTRICT/REAL PROP SPECIALIST NON-EXEMPT GENERAL 500 $6,411.03 $7,792.49 Monthly
30271 ASSISTANT BUYER NON-EXEMPT GENERAL 430 $4,522.55 $5,496.02 Monthly
30312 ASSISTANT LITERACY PROGRAM COORDINATOR NON-EXEMPT GENERAL 365 $3,269.93 $3,974.98 Monthly
30168 ASSISTANT PLANNER (FLEX)NON-EXEMPT GENERAL 502 $6,475.45 $7,871.22 Monthly
30072 BUILDING INSPECTOR I (FLEX)NON-EXEMPT GENERAL 460 $5,251.46 $6,383.59 Monthly
30073 BUILDING INSPECTOR II NON-EXEMPT GENERAL 487 $6,008.99 $7,303.37 Monthly
30074 BUILDING INSPECTOR III NON-EXEMPT GENERAL 511 $6,772.50 $8,232.69 Monthly
30502 BUSINESS REGISTRATION INSPECTOR NON-EXEMPT GENERAL 459 $5,225.21 $6,351.38 Monthly
30650 BUSINESS REGISTRATION REPRESENTATIVE I NON-EXEMPT GENERAL 419 $4,280.38 $5,202.55 Monthly
30651 BUSINESS REGISTRATION REPRESENTATIVE II NON-EXEMPT GENERAL 429 $4,499.89 $5,468.58 Monthly
30292 CEMETERY CARETAKER NON-EXEMPT GENERAL 395 $3,797.23 $4,615.60 Monthly
30450 CODE ENFORCEMENT OFFICER I (FLEX)NON-EXEMPT GENERAL 441 $4,776.66 $5,806.19 Monthly
30455 CODE ENFORCEMENT OFFICER II NON-EXEMPT GENERAL 472 $5,575.95 $6,777.27 Monthly
30135 COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG)/HOUSING PROGRAM ASSISTANT NON-EXEMPT GENERAL 420 $4,301.85 $5,228.79 Monthly
30890 COMMUNITY DEVELOPMENT TECHNICIAN NON-EXEMPT GENERAL 446 $4,897.15 $5,952.92 Monthly
30120 COMMUNITY INTERVENTION PROGRAM COORDINATOR NON-EXEMPT GENERAL 438 $4,706.27 $5,720.29 Monthly
30754 COMMUNITY POLICING SPECIALIST NON-EXEMPT GENERAL 470 $5,519.88 $6,710.46 Monthly
30821 COMMUNITY RECREATION PROGRAM COORDINATOR NON-EXEMPT GENERAL 388 $3,667.19 $4,458.13 Monthly
30990 COMMUNITY SERVICES PROGRAM COORDINATOR NON-EXEMPT GENERAL 438 $4,706.27 $5,720.29 Monthly
30621 CUSTODIAN NON-EXEMPT GENERAL 368 $3,318.84 $4,034.63 Monthly
30222 CUSTOMER SERVICE REPRESENTATIVE NON-EXEMPT GENERAL 386 $3,631.40 $4,413.99 Monthly
30226 CUSTOMER SERVICE REPRESENTATIVE (BILINGUAL)NON-EXEMPT GENERAL 396 $3,816.31 $4,639.46 Monthly
30227 CUSTOMER SERVICE REPRESENTATIVE (BILINGUAL) (U)NON-EXEMPT GENERAL 396 $3,816.31 $4,639.46 Monthly
30224 CUSTOMER SERVICE REPRESENTATIVE (U)NON-EXEMPT GENERAL 386 $3,631.40 $4,413.99 Monthly
30100 DATA ANALYST NON-EXEMPT GENERAL 444 $4,849.43 $5,894.47 Monthly
30831 ELECTRICIAN I (FLEX)NON-EXEMPT GENERAL 445 $4,873.29 $5,923.10 Monthly
30841 ELECTRICIAN II NON-EXEMPT GENERAL 465 $5,383.88 $6,544.64 Monthly
30432 ENGINEERING ASSISTANT I (FLEX)NON-EXEMPT GENERAL 450 $4,996.16 $6,073.41 Monthly
Packet Page. 291
City of San Bernardino - Citywide Salary Schedule
Effective 1.5.2026
30434 ENGINEERING ASSISTANT II NON-EXEMPT GENERAL 475 $5,659.45 $6,879.86 Monthly
30436 ENGINEERING ASSISTANT III NON-EXEMPT GENERAL 511 $6,772.50 $8,232.69 Monthly
30445 ENGINEERING TECHNICIAN NON-EXEMPT GENERAL 446 $4,897.15 $5,952.92 Monthly
30420 ENVIRONMENTAL PROGRAMS COORDINATOR NON-EXEMPT GENERAL 464 $5,357.63 $6,512.43 Monthly
30921 EQUIPMENT MECHANIC I (FLEX)NON-EXEMPT GENERAL 431 $4,544.03 $5,523.45 Monthly
30902 EQUIPMENT MECHANIC II NON-EXEMPT GENERAL 450 $4,996.16 $6,073.41 Monthly
30943 EQUIPMENT SERVICE WORKER NON-EXEMPT GENERAL 408 $4,052.52 $4,925.78 Monthly
30707 EXECUTIVE ASSISTANT NON-EXEMPT GENERAL 430 $4,522.55 $5,496.02 Monthly
30623 FACILITIES MAINTENANCE MECHANIC NON-EXEMPT GENERAL 420 $4,301.85 $5,228.79 Monthly
30506 FLEET PARTS STOREKEEPER NON-EXEMPT GENERAL 398 $3,854.49 $4,685.99 Monthly
30944 FLEET PARTS TECHNICIAN NON-EXEMPT GENERAL 438 $4,706.27 $5,720.29 Monthly
30133 GRANTS ANALYST NON-EXEMPT GENERAL 476 $5,688.08 $6,914.46 Monthly
30136 GRANTS ASSISTANT NON-EXEMPT GENERAL 390 $3,704.17 $4,502.27 Monthly
30098 GROUNDWORKER ARBORIST NON-EXEMPT GENERAL 392 $3,741.16 $4,547.60 Monthly
30516 HAZMAT TECHNICIAN NON-EXEMPT GENERAL 452 $5,046.27 $6,134.26 Monthly
30698 HOMELESS OUTREACH SPECIALIST NON-EXEMPT GENERAL 464 $5,357.63 $6,512.43 Monthly
30699 HOMELESS SERVICES ASSISTANT NON-EXEMPT GENERAL 420 $4,301.85 $5,228.79 Monthly
30207 HUMAN RESOURCES TECHNICIAN NON-EXEMPT GENERAL 418 $4,258.91 $5,177.49 Monthly
30101 HVAC MECHANIC NON-EXEMPT GENERAL 460 $5,251.46 $6,383.59 Monthly
30638 LANDSCAPE & IRRIGATION INSPECTOR I (FLEX)NON-EXEMPT GENERAL 447 $4,922.20 $5,982.75 Monthly
30639 LANDSCAPE & IRRIGATION INSPECTOR II NON-EXEMPT GENERAL 467 $5,438.75 $6,610.25 Monthly
30113 LEAD ANIMAL CONTROL OFFICER NON-EXEMPT GENERAL 437 $4,682.41 $5,691.66 Monthly
30080 LEAD BUILDING INSPECTOR NON-EXEMPT GENERAL 526 $7,298.60 $8,872.12 Monthly
30463 LEAD CODE ENFORCEMENT OFFICER NON-EXEMPT GENERAL 498 $6,347.80 $7,716.14 Monthly
30311 LEAD CUSTODIAN NON-EXEMPT GENERAL 397 $3,835.40 $4,662.13 Monthly
30932 LEAD EQUIPMENT MECHANIC NON-EXEMPT GENERAL 470 $5,519.88 $6,710.46 Monthly
30490 LEAD MAINTENANCE WORKER NON-EXEMPT GENERAL 452 $5,046.27 $6,134.26 Monthly
30593 LEAD PARKS CONSTRUCTION AND MAINTENANCE WORKER NON-EXEMPT GENERAL 471 $5,548.51 $6,743.86 Monthly
30335 LIBRARIAN I (FLEX)NON-EXEMPT GENERAL 450 $4,996.16 $6,073.41 Monthly
30366 LIBRARIAN II NON-EXEMPT GENERAL 479 $5,773.98 $7,018.25 Monthly
30341 LIBRARY ASSISTANT NON-EXEMPT GENERAL 370 $3,352.25 $4,075.19 Monthly
30380 LIBRARY NETWORK TECHNICIAN NON-EXEMPT GENERAL 422 $4,344.80 $5,281.28 Monthly
30391 LIBRARY TECHNICIAN I (FLEX)NON-EXEMPT GENERAL 380 $3,524.04 $4,283.96 Monthly
30392 LIBRARY TECHNICIAN II NON-EXEMPT GENERAL 402 $3,932.03 $4,780.23 Monthly
30215 LITERACY PROGRAM COORDINATOR NON-EXEMPT GENERAL 470 $5,519.88 $6,710.46 Monthly
30486 MAINTENANCE WORKER I (FLEX)NON-EXEMPT GENERAL 393 $3,760.24 $4,570.27 Monthly
30487 MAINTENANCE WORKER II NON-EXEMPT GENERAL 415 $4,195.68 $5,099.95 Monthly
30488 MAINTENANCE WORKER III NON-EXEMPT GENERAL 425 $4,410.41 $5,361.21 Monthly
30425 NPDES INSPECTOR I (FLEX)NON-EXEMPT GENERAL 461 $5,277.70 $6,415.80 Monthly
City of San Bernardino - Citywide Salary Schedule
Version Date: 1.5.2026
5
Packet Page. 292
City of San Bernardino - Citywide Salary Schedule
Effective 1.5.2026
30585 POOL MAINTENANCE COORDINATOR NON-EXEMPT GENERAL 421 $4,323.33 $5,255.04 Monthly
10360 PROGRAMMING/TRAFFIC ASSISTANT NON-EXEMPT GENERAL 400 $3,893.86 $4,732.52 Monthly
30580 PUBLIC WORKS INSPECTOR I (FLEX)NON-EXEMPT GENERAL 476 $5,688.08 $6,914.46 Monthly
30583 PUBLIC WORKS INSPECTOR II NON-EXEMPT GENERAL 499 $6,380.01 $7,754.31 Monthly
30584 PUBLIC WORKS INSPECTOR III NON-EXEMPT GENERAL 529 $7,409.54 $9,005.74 Monthly
30825 RECREATION THERAPIST NON-EXEMPT GENERAL 468 $5,465.00 $6,643.65 Monthly
30115 REGISTERED VETERINARY TECHNICIAN NON-EXEMPT GENERAL 450 $4,996.16 $6,073.41 Monthly
30708 SENIOR ADMINISTRATIVE ASSISTANT NON-EXEMPT GENERAL 420 $4,301.85 $5,228.79 Monthly
30229 SENIOR ANIMAL SERVICES REPRESENTATIVE NON-EXEMPT GENERAL 390 $3,704.17 $4,502.27 Monthly
30410 SENIOR ARBORIST NON-EXEMPT GENERAL 502 $6,475.45 $7,871.22 Monthly
30228 SENIOR CUSTOMER SERVICE REPRESENTATIVE NON-EXEMPT GENERAL 435 $4,635.88 $5,635.59 Monthly
30230 SENIOR CUSTOMER SERVICE REPRESENTATIVE (BILINGUAL)NON-EXEMPT GENERAL 445 $4,873.29 $5,923.10 Monthly
30232 SENIOR CUSTOMER SERVICE REPRESENTATIVE (BILINGUAL)(U)NON-EXEMPT GENERAL 445 $4,873.29 $5,923.10 Monthly
30710 SENIOR OFFICE ASSISTANT NON-EXEMPT GENERAL 375 $3,436.95 $4,177.78 Monthly
30978 SOLID WASTE FIELD INSPECTOR NON-EXEMPT GENERAL 450 $4,996.16 $6,073.41 Monthly
30447 TRAFFIC SIGNAL TECHNICIAN I (FLEX)NON-EXEMPT GENERAL 450 $4,996.16 $6,073.41 Monthly
30448 TRAFFIC SIGNAL TECHNICIAN II NON-EXEMPT GENERAL 484 $5,919.52 $7,194.81 Monthly
30449 TRAFFIC SIGNAL TECHNICIAN III NON-EXEMPT GENERAL 513 $6,840.49 $8,315.01 Monthly
30667 TREASURY ASSISTANT NON-EXEMPT GENERAL 399 $3,874.77 $4,708.66 Monthly
MIDDLE MANAGEMENT
City of San Bernardino - Citywide Salary Schedule
Version Date: 1.5.2026
6
Packet Page. 293
City of San Bernardino - Citywide Salary Schedule
Effective 1.5.2026
20060 FOOD SERVICE SUPERVISOR EXEMPT MIDDLE MANAGEMENT 478 $5,771.19 $7,015.06 Monthly
20160 FORENSICS SUPERVISOR NON-EXEMPT MIDDLE MANAGEMENT 543 $7,980.92 $9,700.53 Monthly
20490 FORESTRY SUPERVISOR NON-EXEMPT MIDDLE MANAGEMENT 542 $7,941.38 $9,652.60 Monthly
20100 GRANTS MANAGER (U) EXEMPT MIDDLE MANAGEMENT 506 $6,636.39 $8,066.00 Monthly
20170 LEAD FORENSICS SPECIALIST NON-EXEMPT MIDDLE MANAGEMENT 516 $6,975.52 $8,478.23 Monthly
20388 LIBRARY CIRCULATION SUPERVISOR EXEMPT MIDDLE MANAGEMENT 460 $5,275.08 $6,412.30 Monthly
20385 LIBRARY NETWORK ADMINISTRATOR EXEMPT MIDDLE MANAGEMENT 492 $6,188.21 $7,521.96 Monthly
20387 LIBRARY PROGRAM COORDINATOR EXEMPT MIDDLE MANAGEMENT 450 $5,018.63 $6,100.73 Monthly
20484 MAINTENANCE SUPERVISOR NON-EXEMPT MIDDLE MANAGEMENT 522 $7,187.62 $8,735.87 Monthly
20555 NPDES MANAGER NON-EXEMPT MIDDLE MANAGEMENT 525 $7,295.47 $8,867.69 Monthly
20178 PARK RANGER SUPERVISOR NON-EXEMPT MIDDLE MANAGEMENT 480 $5,828.71 $7,084.57 Monthly
20603 PARKS AND LANDSCAPE MAINTENANCE SUPERVISOR NON-EXEMPT MIDDLE MANAGEMENT 534 $7,629.81 $9,275.12 Monthly
20400 PERMIT SERVICES SUPERVISOR NON-EXEMPT MIDDLE MANAGEMENT 494 $6,250.52 $7,597.45 Monthly
20772 POLICE DISPATCH SUPERVISOR NON-EXEMPT MIDDLE MANAGEMENT 514 $6,906.01 $8,394.35 Monthly
20765 POLICE RECORDS SUPERVISOR NON-EXEMPT MIDDLE MANAGEMENT 464 $5,381.73 $6,541.72 Monthly
20019 PRINCIPAL ACCOUNTANT EXEMPT MIDDLE MANAGEMENT 550 $8,263.73 $10,045.66 Monthly
20864 PROCUREMENT CONTRACT SPECIALIST EXEMPT MIDDLE MANAGEMENT 520 $7,115.72 $8,649.59 Monthly
20949 PROPERTY AND EVIDENCE SUPERVISOR EXEMPT MIDDLE MANAGEMENT 494 $6,250.52 $7,597.45 Monthly
20243 SENIOR PLANNER *EXEMPT MIDDLE MANAGEMENT 567 $8,995.91 $10,933.62 Monthly
20995 STATION MANAGER EXEMPT MIDDLE MANAGEMENT 490 $6,127.09 $7,447.66 Monthly
20336 TECHNOLOGY LIBRARIAN EXEMPT MIDDLE MANAGEMENT 502 $6,504.57 $7,906.62 Monthly
20437 TRAFFIC ENGINEERING ASSOCIATE EXEMPT MIDDLE MANAGEMENT 532 $7,554.31 $9,182.85 Monthly
20438 TRAFFIC OPERATIONS AND SYSTEMS ANALYST EXEMPT MIDDLE MANAGEMENT 552 $8,347.61 $10,146.32 Monthly
20370 TRAFFIC SIGNAL AND LIGHTING SUPERVISOR NON-EXEMPT MIDDLE MANAGEMENT 533 $7,592.66 $9,228.39 Monthly
00300 APPRENTICE (PT)NON-EXEMPT NA 381 $17.65 $21.44 Hourly
00194 BACKGROUND INVESTIGATOR (PT)NON-EXEMPT NA 493 $29.94 $36.39 Hourly
00605 CRIME DATA TECHNICIAN (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00054 CUSTODIAL AIDE (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00083 EXTRA RELIEF HEAVY LABORER (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00259 FOOD SERVICE PROGRAM SPECIALIST (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00308 LAW ENFORCEMENT TRAINEE NON-EXEMPT NA NA $34.77 $34.77 Hourly
00361 LIBRARY PAGE (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00133 LIFEGUARD (PT)NON-EXEMPT NA 377 $16.96 $20.61 Hourly
00192 POLICE CADET (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00520 POLICE CALL TAKER (PT)NON-EXEMPT NA 396 $19.85 $24.14 Hourly
00331 POOL MANAGER I (PT)NON-EXEMPT NA 421 $20.91 $25.41 Hourly
00333 POOL MANAGER II (PT)NON-EXEMPT NA 443 $23.33 $28.36 Hourly
00222 RECREATION AIDE (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00244 RECREATION LEADER (PT)NON-EXEMPT NA 375 $16.96 $20.61 Hourly
00230 RECREATION SPECIALIST (PT)NON-EXEMPT NA 400 $18.83 $22.89 Hourly
00256 RECREATION SUPERVISOR (AQUATICS) (PT)NON-EXEMPT NA 481 $28.20 $34.28 Hourly
00266 SECURITY OFFICER I (PT)NON-EXEMPT NA 378 $17.04 $20.71 Hourly
00265 SECURITY OFFICER II (PT)NON-EXEMPT NA 402 $19.02 $23.12 Hourly
00283 SENIOR LIFEGUARD (PT)NON-EXEMPT NA 396 $18.46 $22.44 Hourly
00294 SENIOR RECREATION LEADER (PT)NON-EXEMPT NA 382 $17.74 $21.56 Hourly
Packet Page. 294
City of San Bernardino - Citywide Salary Schedule
Effective 1.5.2026
00019 STUDENT INTERN (PT)NON-EXEMPT NA 368 $17.03 $20.68 Hourly
00301 VETERINARIAN - PER DIEM NON-EXEMPT NA NA $187.50 $187.50 Hourly
50141 ASSISTANT CHIEF OF POLICE EXEMPT POLICE MANAGEMENT P6 $25,879.15 $25,879.15 Monthly
50283 POLICE CAPTAIN (U) EXEMPT POLICE MANAGEMENT P5 $21,138.74 $21,138.74 Monthly
50402 POLICE LIEUTENANT EXEMPT POLICE MANAGEMENT P4 $17,961.41 $17,961.41 Monthly
40466 DETECTIVE/CORPORAL NON-EXEMPT POLICE SAFETY P2 $9,456.11 $12,401.26 Monthly
40751 POLICE OFFICER NON-EXEMPT POLICE SAFETY P1 $8,143.38 $10,875.40 Monthly
40332 POLICE SERGEANT NON-EXEMPT POLICE SAFETY P3 $10,700.93 $14,013.77 Monthly
33017 ACCOUNTING TECHNICIAN I (FLEX) - POLICE NON-EXEMPT POLICE CIVILIAN 399 $3,887.99 $4,724.72 Monthly
33018 ACCOUNTING TECHNICIAN II - POLICE NON-EXEMPT POLICE CIVILIAN 419 $4,294.99 $5,220.30 Monthly
33709 ADMINISTRATIVE ASSISTANT - POLICE NON-EXEMPT POLICE CIVILIAN 400 $3,907.15 $4,748.66 Monthly
33758 COMMUNITY SERVICES OFFICER NON-EXEMPT POLICE CIVILIAN 427 $4,469.76 $5,433.37 Monthly
33603 CRIME ANALYST NON-EXEMPT POLICE CIVILIAN 493 $6,212.65 $7,550.94 Monthly
33602 CRIMINAL INVESTIGATION OFFICER NON-EXEMPT POLICE CIVILIAN 493 $6,212.65 $7,550.94 Monthly
33707 EXECUTIVE ASSISTANT - POLICE NON-EXEMPT POLICE CIVILIAN 430 $4,537.99 $5,514.77 Monthly
33165 FORENSICS SPECIALIST I (FLEX)NON-EXEMPT POLICE CIVILIAN 448 $4,964.14 $5,975.65 Monthly
33166 FORENSICS SPECIALIST II NON-EXEMPT POLICE CIVILIAN 478 $5,764.96 $7,007.49 Monthly
33515 MARKETING & PUBLIC RELATIONS SPECIALIST NON-EXEMPT POLICE CIVILIAN 461 $5,295.71 $6,437.70 Monthly
30178 PARK RANGER NON-EXEMPT POLICE CIVILIAN 397 $3,848.49 $4,678.05 Monthly
33581 PARKING ENFORCEMENT OFFICER NON-EXEMPT POLICE CIVILIAN 380 $3,536.06 $4,298.58 Monthly
33848 POLICE FLEET MAINTENANCE EXPEDITOR NON-EXEMPT POLICE CIVILIAN 398 $3,867.64 $4,701.98 Monthly
33218 POLICE PERSONNEL AND TRAINING TECHNICIAN NON-EXEMPT POLICE CIVILIAN 457 $5,191.58 $6,310.81 Monthly
33219 POLICE RECORDS TECHNICIAN I (FLEX)NON-EXEMPT POLICE CIVILIAN 369 $3,346.93 $4,068.75 Monthly
33220 POLICE RECORDS TECHNICIAN II NON-EXEMPT POLICE CIVILIAN 390 $3,716.81 $4,517.65 Monthly
33947 PROPERTY AND EVIDENCE TECHNICIAN I (FLEX)NON-EXEMPT POLICE CIVILIAN 411 $4,127.41 $5,016.81 Monthly
33948 PROPERTY AND EVIDENCE TECHNICIAN II NON-EXEMPT POLICE CIVILIAN 472 $5,594.98 $6,800.40 Monthly
33770 RANGEMASTER NON-EXEMPT POLICE CIVILIAN 465 $5,402.26 $6,566.98 Monthly
33710 SENIOR OFFICE ASSISTANT - POLICE NON-EXEMPT POLICE CIVILIAN 375 $3,448.67 $4,192.05 Monthly
32767 POLICE DISPATCHER I (FLEX)NON-EXEMPT POLICE DISPATCH 433 $4,822.33 $5,861.92 Monthly
32768 POLICE DISPATCHER II NON-EXEMPT POLICE DISPATCH 464 $5,628.44 $6,841.52 Monthly
City Clerk contract and pay effective 10.13.25
REVISION ADOPTED BY MCC 6/19/17 REVISION ADOPTED BY MCC 7/20/22
REVISION ADOPTED BY MCC 6/20/18 REVISION ADOPTED BY MCC 8/17/22
REVISION ADOPTED BY MCC 06/19/19 REVISION ADOPTED BY MCC 9/21/22
REVISION ADOPTED BY MCC 8/21/19 REVISION ADOPTED BY MCC 10/19/22
REVISION ADOPTED BY MCC 1/15/20 REVISION ADOPTED BY MCC 11/2/22
REVISION ADOPTED BY MCC 6/24/20 REVISION ADOPTED BY MCC 11/16/22
Packet Page. 295
City of San Bernardino - Citywide Salary Schedule
Effective 1.5.2026
REVISION ADOPTED BY MCC 9/2/20 REVISION ADOPTED BY MCC 12/7/22
REVISION ADOPTED BY MCC 12/16/20 REVISION ADOPTED BY MCC 1/18/23
REVISION ADOPTED BY MCC 2/17/21 REVISION ADOPTED BY MCC 6/21/23
REVISION ADOPTED BY MCC 7/21/21 REVISION ADOPTED BY MCC 8/16/23
REVISION ADOPTED BY MCC 6/16/21 REVISION ADOPTED BY MCC 10/4/23
REVISION ADOPTED BY MCC 7/21/21 REVISION ADOPTED BY MCC 10/18/23
REVISION ADOPTED BY MCC 8/4/21 REVISION ADOPTED BY MCC 12/6/23
REVISION ADOPTED BY MCC 9/15/21 REVISION ADOPTED BY MCC 3/6/24
REVISION ADOPTED BY MCC 10/20/21 REVISION ADOPTED BY MCC 4/17/24
REVISION ADOPTED BY MCC 11/3/21 REVISION ADOPTED BY MCC 6/26/24
REVISION ADOPTED BY MCC 2/2/22 REVISION ADOPTED BY MCC 1/15/25
REVISION ADOPTED BY MCC 2/16/22 REVISION ADOPTED BY MCC 2/19/25
REVISION ADOPTED BY MCC 3/16/22 REVISION ADOPTED BY MCC 4/2/25
REVISION ADOPTED BY MCC 4/6/22 REVISION ADOPTED BY MCC 6/18/25
REVISION ADOPTED BY MCC 5/18/22 REVISION ADOPTED BY MCC 7/15/25
REVISION ADOPTED BY MCC 6/15/22 REVISION ADOPTED BY MCC 08/06/2025
REVISION ADOPTED BY MCC 9/3/2025
REVISION ADOPTED BY MCC 12/17/2025
REVISION ADOPTED BY MCC 01/21/2026
Packet Page. 296
CONSENT CALENDAR
January 21, 2026
Honorable Mayor and City Council Members
Rolland Kornblau, Director of Information Technology
Information Technology
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, authorize the Director of Finance & Management Services to amend the
Fiscal Year (FY) 2025/26 Operating Budget to increase expenditures by $4,172,551.87,
reflecting the carryover of unspent Enterprise Resource Planning (ERP) funds from the
Fiscal Year 2024/25.
No comments
This item requests City Council approval for a technical budget amendment to carry
forward $4,172,551.87 in unspent ERP project funds from FY 2025/26 into the FY
2025/26 Operating Budget. The funds were previously appropriated by Council but
were inadvertently not carried over during the carryover process. Approval of this item
aligns the FY 2025/26 budget with prior Council authorization and ensures sufficient
funding to support ongoing ERP and Land Management System (LMS)
implementation, including approved supplemental staffing needs. This action does not
increase overall project cost, does not require new funding, and has no impact on the
General Fund.
In Fiscal Year (FY) 2024/25, the Information Technology Department was appropriated
$6,864,591.87 for the Enterprise Resource Planning (ERP) project under the
professional contractual services account, as previously approved by City Council.
During FY 2024/25, $692,040.00 of this appropriation was expended, leaving an
unspent balance of $6,172,551.87 at year-end. When the FY 2025/26 Operating
Packet Page. 297
Budget was adopted, $2,000,000 of ERP funding was already included. In Fiscal Year
(FY) 2024/25, the Information Technology Department was appropriated
$6,864,591.87 for the Enterprise Resource Planning (ERP) project under the
professional contractual services account, as previously approved by City Council.
Due to an administrative oversight during the budget transition process, the carryover
request for this remaining $4,172,551.87 was not submitted, and the funds were not
included in the FY 2025/26 amended budget. This item corrects that omission by
formally carrying forward the unspent balance, ensuring continuity of funding for
ongoing ERP and Land Management System (LMS) implementation activities.
Discussion
Approval of this item will amend the FY 2025/26 Operating Budget to increase
expenditure appropriations by $4,172,551.87, representing the un-carried portion of
previously approved ERP funds from FY 2024/25.
This action is a technical correction only. It does not authorize new spending beyond
prior Council approvals, does not expand the scope of the ERP project, and does not
require additional revenue sources. The amendment ensures that budgetary authority
aligns with the City’s existing contractual obligations and planned implementation
timeline, including approved supplemental staffing necessary to support ERP and LMS
deployment.
Without this correction, the current FY 2025/26 budget understates available ERP
project funding and limits the City’s ability to execute work already authorized.
2021-2025 Strategic Targets and Goals
This action supports Strategic Goal 3: Improved Quality of Life, by advancing the goal
to develop a customer service initiative through the implementation of Enterprise
Resource Planning and Land Management Systems that streamline City operations and
improve customer service.
Fiscal Impact
There is no impact to the General Fund. The proposed budget amendment increases
FY 2025/26 expenditures by $4,172,551.87, fully funded by the carryover of unspent
ERP project appropriations from FY 2024/25. No additional revenues or fund transfers
are required.
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino,
California, authorize the Director of Finance & Management Services to amend the
Fiscal Year (FY) 2025/26 Operating Budget to increase expenditures by
$4,172,551.87, reflecting the carryover of unspent Enterprise Resource Planning
(ERP) funds from the Fiscal Year 2024/25.
Packet Page. 298
Attachments
Attachment 1 – FY 24-25 Budget Report
Ward:
All Wards
Synopsis of Previous Council Actions:
N/A
CC: Eric Levitt, City Manager
Packet Page. 299
Adopted Budget Amended Current Month YTD YTD Budget - YTD % Used/
Account Account Description Budget Amendments Budget Transactions Encumbrances Transactions Transactions Rec'd
Fund 679 - Information Technology
EXPENSE
Department 250 - Information Technology
Program 8934 - ERP Project (SA)
5502 Professional Contractual Services 2,000,000.00 4,864,591.87 6,864,591.87 84,787.50 .00 692,040.00 6,172,551.87 10
Program 8934 - ERP Project (SA) Totals $2,000,000.00 $4,864,591.87 $6,864,591.87 $84,787.50 $0.00 $692,040.00 $6,172,551.87 10%
Department 250 - Information Technology Totals $2,000,000.00 $4,864,591.87 $6,864,591.87 $84,787.50 $0.00 $692,040.00 $6,172,551.87 10%
EXPENSE TOTALS $2,000,000.00 $4,864,591.87 $6,864,591.87 $84,787.50 $0.00 $692,040.00 $6,172,551.87 10%
Fund 679 - Information Technology Totals
REVENUE TOTALS .00 .00 .00 .00 .00 .00 .00 +++
EXPENSE TOTALS 2,000,000.00 4,864,591.87 6,864,591.87 84,787.50 .00 692,040.00 6,172,551.87 10%
Fund 679 - Information Technology Totals ($2,000,000.00)($4,864,591.87)($6,864,591.87)($84,787.50)$0.00 ($692,040.00)($6,172,551.87)
Grand Totals
REVENUE TOTALS .00 .00 .00 .00 .00 .00 .00 +++
EXPENSE TOTALS 2,000,000.00 4,864,591.87 6,864,591.87 84,787.50 .00 692,040.00 6,172,551.87 10%
Grand Totals ($2,000,000.00)($4,864,591.87)($6,864,591.87)($84,787.50)$0.00 ($692,040.00)($6,172,551.87)
Run by Denise Martinez on 12/02/2025 04:04:27 PM Page 1 of 1
Budget Performance Report
Date Range 07/01/24 - 06/30/25
Include Rollup Account and Rollup to Object
Packet Page. 300
3
0
4
2
CONSENT CALENDAR
City of San Bernardino
Request for Council Action
Date:January 21, 2026
To:Honorable Mayor and City Council Members
From:Lynn Merrill, Director of Public Works
Department:Public Works
Subject:Award of Agreement for University Parkway Extension –
Median & Streetscape Improvements in the amount of
$1,011,835 to H L Hitchcock Construction Inc. (Ward 6)
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Approve the award of an Agreement with H L Hitchcock Construction Inc. in the
amount of $1,011,835.00 for the construction cost of the University Parkway
Extension – Median & Streetscape Improvements (Project); and
2. Authorize the construction contingencies, construction management, and
administrative costs in the total amount of $118,000 for the Project, bringing the
total project budget to $1,129,835.00; and
3. Authorize the City Manager or designee to execute all documents with H L
Hitchcock Construction Inc; and
4. Authorize the City Manager or designee to expend the contingency fund, if
necessary, to complete the project.
City Manager's Comments
With this construction the ongoing maintenance cost will be $65,000 annually.
Executive Summary
Awarding the agreement for construction of the University Parkway Extension –
Median & Streetscape Improvements will improve the City’s appearance, cleanliness
and attractiveness. The agreement will allow the City to issue a Notice to Proceed to
H L Hitchcock Construction Inc., initiating the process to construct the project.
The project will be funded by Regional Circulation Fund.
Packet Page. 301
3
0
4
2
Background
University Parkway is identified as a major arterial roadway in the City’s General Plan
Circulation Element. Previously terminating 16th Street, it has recently been extended
south to Baseline Street as part of the first phase of a larger, four-phase project. The
goal is to extend University Parkway further south to connect with Foothill Boulevard.
However, the total cost of completing all phases exceeds the City’s available
resources, and future grant funding will be essential to fully implement the project.
The budget for the University Parkway Extension (Phase 1) was previously established
through the adopted Fiscal Year 2021/22 Capital Improvement Plan using Regional
Circulation System Funds. Additional funds were added during the Fiscal Year 2022/23
budget adoption process, bringing the total allocated funds to $8,500,000.
The remaining funds from the construction of University Parkway Extension (Phase 1)
is $1,181,374.92, which is recommended to be used for the Median and Streetscape
Improvements.
On December 5, 2018, the Mayor and City Council adopted Resolution No. 2018-310
approving an agreement with ERSC to provide Environmental Clearance under the
California Environmental Quality Act (CEQA) and preparation of Plans, Specifications,
and Estimates (PS&E) for University Parkway extension between Baseline Street and
16th Street. This agreement and the subsequent 5 amendments which also included
design and construction support for the Median and Streetscape Improvements total
$384,977.00.
Discussion
The University Parkway Extension – Median & Streetscape Improvements project
involves building a median from Hanford Street to 16th Street; landscaping and
automatic irrigation of the median and both sides of the parkway from 16th street to
Baseline Street and changing the streetlights to solar along this segment of the
roadway. The landscape component is a key visual and functional element of the
median design for this stretch of the roadway, enhancing aesthetics, safety, and long-
term corridor identity.
Furthermore, Staff recommends authorizing the City Manager or their designee to
execute all necessary documents with H L Hitchcock Construction Inc., and to manage
the project, including the expenditure of contingency funds if needed. These actions
are necessary to ensure the successful completion of the University Parkway
Extension – Median & Streetscape Improvements project, which will provide a valuable
circulation route. The recommended actions are aimed at facilitating the timely and
efficient progress of this project.
The Project was advertised for public bidding on August 5, 2025 on PlanetBids.
Nine sealed bids were received and opened on September 23, 2025. The total base
Packet Page. 302
3
0
4
2
bid prices are as follows:
Staff has reviewed all bid packages and determined HL Hitchcock Construction Inc. of
Rancho Cucamonga, CA the lowest responsive bidder with a total base bid amount of
$1,011,835.00. The City is recommending approval to award an agreement to H L
Hitchcock Construction Inc. with the amount of $1,011,835.00 for the project.
Additionally, Staff are requesting authorization for the allocation of construction
contingencies, management, and administrative costs to ensure the project is fully
funded and can proceed without delays.
The total project budget will be supported by the Regional Circulation Fund. The
available budget is $1,130,450.86 for construction after deducting the Amendment No.
5 with Engineering Resource of Southern California for design services and some
administrative costs. The construction agreement with H L Hitchcock Construction, Inc.
totals $1,011,835.00, and a contingency of $118,000.00 is included to cover any
unforeseen conditions or necessary changes during construction. The total estimated
project cost, including contingency, is $1,129,835.00, which is fully funded within the
available budget.
Details of Budget Below:
Project Regional Circulation Funds $1,181,374.92
Engineering Resources of Southern CA
Design Amendment No. 5 -$42,459.84
Staff and Administrative Cost -$8,464.22
Remaining Project Funds $1,130,450.86
Project Cost $1,011,835.00
Contingency $118,000.00
Total Project Cost $1,129,835.00
Bidder City Base Bid
HL Hitchcock Construction, Inc.Rancho Cucamonga, CA $1,011,835.00
1st California Construction, Inc.Pasadena, CA $1,154,474.00
Leonida Builders, Inc.Acton, CA $1,348,155.00
Gentry General Engineering, Inc. Colton, CA $1,426,786.00
Urban Habitat, Inc. Palm Desert, CA $1,476,883.97
Environmental Construction, Inc. Woodland Hills, CA $1,538,341.00
Landscape Support Services North Hollywood, CA $1,879,433.70
Marina Landscape, Inc. Orange, CA $1,898,440.00
Los Angeles Engineering, Inc. Covina, CA $1,950,420.00
Packet Page. 303
3
0
4
2
The landscape and irrigation improvements included as part of the University
Parkway Extension project will be installed by the contractor and maintained for a
standard 90-day establishment period as required under the construction contract.
Once this period concludes, ongoing landscape maintenance responsibilities will be
transferred to the City’s landscape maintenance vendor as part of the regular
contract scope. The annual cost provided by the vendor to maintain the new
landscaped median is estimated at $66,000. To support this transition, staff will
return to the City Council with a contract amendment to increase the vendor’s
agreement and incorporate this corridor into the monthly maintenance schedule.
Environmental Impact
The Project is categorically exempt from the California Environmental Quality Act
(“CEQA”) pursuant to State CEQA Guidelines Section 15303, New Construction or
Conversion of Small Structures (“Class 3”). The Class 3 exemptions allows for the
conversion of existing facilities from one use to another where only minor modifications
are made to the facility. Here, the project involves landscaping the existing median
and the sides of the parkway, and building a median on an existing road.
The City has also considered whether the proposed Project is subject to any
exception to the Class 3 exemption, as set forth in State CEQA Guidelines section
15300.2. No exception applies for the following reasons:
a) The location exception only applies to Class 3, 4, 5, 6, and 11
exemptions, none of which are being utilized here.
b) The proposed Project would not result in any significant
cumulative impacts on the environment. The cumulative impacts
exception does not apply because the Project has no
incrementally significant impacts on the environment.
c) A categorical exemption may be subject to an exception where
there is a reasonable possibility that the activity will have a
significant effect on the environment due to unusual
circumstances. The proposed Project does not involve any
unusual circumstances and has no potential to result in a
significant impact on the environment.
d) Under the “scenic highways” exception, a categorical exemption
may be subject to an exception where the project may result in
damage to scenic resources within a highway officially designated
as a state scenic highway. The exception does not apply here as
the Project would not damage any scenic resources within a state
scenic highway.
e) The Project is not located on a site which is included on any list
Packet Page. 304
3
0
4
2
compiled pursuant to Section 65962.5 of the Government Code.
f) The Project site does not contain a historical resource.
2021-2025 Strategic Targets and Goals
Authorizing the execution of this agreement aligns with the Key Target No. 3d:
Improved Quality of Life. The completion of this project will improve the City’s
appearance, cleanliness and attractiveness.
Fiscal Impact
There is sufficient budget in the FY25/26 CIP budget within the Regional Circulation
Fund to fund the agreement.
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Approve the award of an Agreement with H L Hitchcock Construction Inc. in the
amount of $1,011,835.00 for the construction cost of the University Parkway
Extension – Median & Streetscape Improvements (Project); and
2. Authorize the construction contingencies, construction management, and
administrative costs in the total amount of $118,000 for the Project, bringing the
total cost of the project to $1,129,835.00; and
3. Authorize the City Manager or designee to execute all documents with H L
Hitchcock Construction Inc; and
4. Authorize the City Manager or designee to expend the contingency fund, if
necessary, to complete the project.
Attachments
Attachment 1 Agreement with H L Hitchcock Construction Inc.
Attachment 2 Bid Tabulation
Attachment 3 Bid Proposal from H L Hitchcock Construction Inc.
Attachment 4 Location Map
Ward:
Sixth Ward
Synopsis of Previous Council Actions:
August 17, 2022, Mayor and City Council adopted Resolution No. 2022-185
Authorizing construction, construction contingencies and
inspection costs in the total amount of $8,500,000 for University
Parkway Extension project (Phase 1).
Packet Page. 305
3
0
4
2
December 5, 2018 Mayor and City Council adopted Resolution No. 2018-310
approving an agreement with ERSC to provide Environmental
Clearance under the California Environmental Quality Act
(CEQA) and preparation of Plans, Specifications, and Estimates
(PS&E) for University Parkway extension between Baseline
Street and 16th Street in the amount of $204,533.
December 4, 2019 Mayor and City Council adopted Resolution 2019-347 approving
the First Amendment to the Professional Services Agreement
with ERSC to increase compensation by $24,681 for University
Parkway extension.
September 2, 2020 Mayor and City Council adopted Resolution 2020-214 approving
the Second Amendment to the Professional Services
Agreement with ERSC to increase compensation by $6,048 for
University Parkway extension.
June 1, 2022 Mayor and City Council Approved Resolution 2020-214
approved the Third Amendment to the Professional Services
Agreement with ERSC to increase compensation by $31,248 for
University Parkway extension.
August 16, 2023 Mayor and City Council authorized the City Manager to
execute Amendment No. 4 to the Professional Services
Agreement with ERSC, adding engineering and construction
support services in the amount of $83,485 to the agreement.
August 6, 2025 Mayor and City Council authorized the City Manager to
execute Amendment No. 5 to the Professional Engineering
Services Agreement with Engineering Resources of Southern
California (ERSC), adding design and construction support
services, including surveying in the amount of $34,982.00
CC
Eric Levitt, City Manager
Packet Page. 306
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -1-00 52 13 – CONTRACT FOR CONSTRUCTION
7
8
9
5
00 52 13 – CONTRACT FOR CONSTRUCTION
This Contract for Construction (“Contract”), No. SS04-009B is made and entered into this 21st
day of January, 2026 by and between the CITY OF SAN BERNARDINO , with its principal
place of business at Vanir Tower, 290 North D Street, San Bernardino, California 92401,
sometimes hereinafter called the “City” and H L Hitchcock Construction Inc. sometimes
hereinafter called “Contractor.”
: That the parties hereto have mutually covenanted and agreed, and by these
presents do covenant and agree with each other as follows:
The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide
all labor, materials, equipment, tools, utility services, and transportation to complete all of the
Work required in strict compliance with the Contract Documents as specified in Article 5, below,
for the following Project:
Contractor is an independent contractor and not an agent of the City. The Contractor and its
surety shall be liable to the City for any damages arising as a result of the Contractor’s failure to
comply with this obligation.
Time is of the essence in the performance of the Work. The Work shall be commenced on the
date stated in the City’s Notice to Proceed. The Contractor shall complete all Work required by
the Contract Documents within 180 Calendar Days from the commencement date stated in the
Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set forth
above is adequate and reasonable to complete the Work.
The City shall pay to the Contractor as full compensation for the performance of the Contract,
subject to any additions or deductions as provided in the Contract Documents, and including all
applicable taxes and costs, the sum of One Million Eleven Thousand Eight Hundred Thirty-Five
Dollars ($1,011,835.00) Payment shall be made as set forth in the General Conditions. The City
will pay to Contractor compensation based upon the prices set forth in the Bid Schedule.
Contractor acknowledges that the City will sustain actual damages for each and every Day
completion of the Project is delayed beyond the Contract Time. Because of the nature of the
Project, it would be impracticable or extremely difficult to determine the City’s actual damages.
Accordingly, in accordance with Government Code section 53069.85, it is agreed that the
Contractor will pay the City the sum of One Thousand ($1,000.00) for each and every calendar
day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as
Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, the Contractor
agrees the City may deduct that amount from any money due or that may become due the
Packet Page. 307
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -2-00 52 13 – CONTRACT FOR CONSTRUCTION
7
8
9
5
00 52 13 – CONTRACT FOR CONSTRUCTION
Contractor under the Contract. This Section does not exclude recovery of other damages
specified in the Contract Documents. Liquidated damages may be deducted from progress
payments due Contractor, Project retention or may be collected directly from Contractor, or from
Contractor's surety. These provisions for liquidated damages shall not prevent the City, in case
of Contractor's default, from terminating the Contractor.
ARTICLE 5. COMPONENT PARTS OF THE CONTRACT.
The “Contract Documents” include the following:
Notice Inviting Bids
Instructions to Bidders
Bid Forms
Bid Acknowledgement
Bid Schedule
Bid Guarantee
Designation of Subcontractors
Information Required of Bidders
Non-Collusion Declaration Form
Iran Contracting Act Certification
Public Works Contractor DIR Registration Certification
Performance Bond
Payment (Labor and Materials) Bond
Contract for Construction
General Conditions
Special Conditions
Specifications
Addenda
Construction Plans and Drawings
Standard Specifications for Public Works Construction “Greenbook”, latest edition, Except
Sections 1-9
Applicable Local Agency Standards and Specifications, as last revised
Reference Specifications
Approved and fully executed Change Orders
Permits
Any other documents contained in or incorporated into the Contract
The Contractor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the
Contract Documents and not by others shall be done as if required by all. In the event of conflict,
the various Contract Documents will be given effect in the order set forth in the General
Conditions. This Contract shall supersede any prior agreement of the parties.
ARTICLE 6. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE.
Each and every provision of law required to be included in these Contract Documents shall be
deemed to be included in these Contract Documents. The Contractor shall comply with all
requirements of applicable federal, state and local laws, rules and regulations, including, but not
Packet Page. 308
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -3-00 52 13 – CONTRACT FOR CONSTRUCTION
7
8
9
5
00 52 13 – CONTRACT FOR CONSTRUCTION
limited to, the provisions of the California Labor Code and California Public Contract Code which
are applicable to this Work.
ARTICLE 7. INDEMNIFICATION.
Contractor shall provide indemnification and defense as set forth in the General Conditions.
ARTICLE 8. PREVAILING WAGES.
Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor
Code which such rates shall be made available at the City’s Office or may be obtained online at
http://www.dir.ca.gov and which must be posted at the job site.
ARTICLE 9. FALSE CLAIMS.
Contractor acknowledges that if a false claim is submitted to the City, it may be considered fraud
and Contractor may be subject to criminal prosecution. Contractor acknowledges that the False
Claims Act, California Government Code sections 12650, et seq., provides for civil penalties
where a person knowingly submits a false claim to a public entity. These provisions include within
their scope false claims made with deliberate ignorance of the false information or in reckless
disregard of the truth or falsity of the information. In the event the City seeks to recover penalties
pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorneys’
fees. Contractor hereby acknowledges that the filing of a false claim may the Contractor to an
administrative debarment proceeding wherein Contractor may be prevented from further bidding
on public contracts for a period of up to five (5) years.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
Packet Page. 309
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -3-00 52 13 – CONTRACT FOR CONSTRUCTION
7
8
9
5
Packet Page. 310
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -4-00 52 13 – CONTRACT FOR CONSTRUCTION
7
8
9
5
00 52 13 – CONTRACT FOR CONSTRUCTION
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on
the day and year above written.
CITY OF SAN BERNARDINO
By:
Eric Levitt
City Manager
ATTEST:
By:
Telicia Lopez,
City Clerk
APPROVED AS TO FORM:
By:
Best Best & Krieger LLP
City Attorney
H L Hitchcock Construction Inc.
[IF CORPORATION, TWO SIGNATURES,
PRESIDENT OR VICE PRESIDENT AND
SECRETARY OR TREASURER REQUIRED]
By:
Its:
Printed Name:
[DELETE THE FOLLOWING SIGNATURE
LINE IF NOT REQUIRED]
By:
Its:
Printed Name:
____________________________________
Contractor’s License Number and
Classification
____________________________________
DIR Registration Number
(CONTRACTOR’S SIGNATURE MUST BE
NOTARIZED AND CORPORATE
SEAL AFFIXED, IF APPLICABLE)
[END OF CONTRACT]
Packet Page. 311
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -4-00 52 13 – CONTRACT FOR CONSTRUCTION
7
8
9
5
Packet Page. 312
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -5-ACKNOWLEDGEMENT OF INSURANCE
REQUIREMENTS
ACKNOWLEDGEMENT OF INSURANCE REQUIREMENTS
The Proposer shall demonstrate the willingness and ability to provide the required insurance
coverage as set forth in the City requirements within ten (10) calendar days of notification of
selection for contract award. The insurance requirements are detailed below:
Commercial General Liability $2,000,000 per occurrence/$4,000,000
aggregate
Automobile Liability $1,000,000 per occurrence for bodily injury
and property damage
Employer’s Liability $1,000,000 per occurrence
Contractor’s Pollution Liability (if applicable)$1,000,000 per occurrence / $2,000,000
aggregate
By signing below, the Proposer acknowledges that they have reviewed the City’s insurance
requirements and confirm their ability to meet these requirements within the specified timeframe.
: DATE: ___________________
(Authorized Representative Signature)
: TITLE: ___________________
Packet Page. 313
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -5-ACKNOWLEDGEMENT OF INSURANCE
REQUIREMENTS
Packet Page. 314
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -6-00 61 13 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER
Individual
DESCRIPTION OF ATTACHED DOCUMENT
Corporate Officer
Title(s)Title or Type of Document
Partner(s)Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
Packet Page. 315
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -6-00 61 13 – BOND FORMS
Packet Page. 316
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -7-00 61 13 – BOND FORMS
00 61 13 – BOND FORMS
Performance Bond
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, the CITY OF SAN BERNARDINO , with its principal place of business at
Vanir Tower, 290 North D Street, San Bernardino, California 92401, (hereinafter referred to as
the “City”) has awarded to _________________________, (hereinafter referred to as the
“Contractor”) an agreement for Contract No._________, (hereinafter referred to as the
“Project”).
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the
Contract Documents for the Project dated ________________, (hereinafter referred to as
“Contract Documents”), the terms and conditions of which are expressly incorporated herein by
reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof
and to furnish a bond for the faithful performance of said Contract Documents.
NOW, THEREFORE, we, ______________________, the undersigned Contractor and
________________________________________________ as Surety, a corporation organized
and duly authorized to transact business under the laws of the State of California, are held and
firmly bound unto the City in the sum of ___________________________ DOLLARS,
($____________), said sum being not less than one hundred percent (100%) of the total
amount of the Contract, for which amount well and truly to be made, we bind ourselves, our
heirs, executors and administrators, successors and assigns, jointly and severally, firmly by
these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs,
executors, administrators, successors or assigns, shall in all things stand to and abide by, and
well and truly keep and perform the covenants, conditions and agreements in the Contract
Documents and any alteration thereof made as therein provided, on its part, to be kept and
performed at the time and in the manner therein specified, and in all respects according to their
intent and meaning; and shall faithfully fulfill all obligations including the one (1) year guarantee
of all materials and workmanship; and shall indemnify and save harmless the City, its officials,
officers, employees, and authorized volunteers, as stipulated in said Contract Documents, then
this obligation shall become null and void; otherwise it shall be and remain in full force and
effect.
As a part of the obligation secured hereby and in addition to the face amount specified
therefore, there shall be included costs and reasonable expenses and fees including reasonable
attorney’s fees, incurred by the City in enforcing such obligation.
As a condition precedent to the satisfactory completion of the Contract Documents, unless
otherwise provided for in the Contract Documents, the above obligation shall hold good for a
period of one (1) year after the acceptance of the work by the City, during which time if
Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally
protect the City from loss or damage resulting from or caused by defective materials or faulty
Packet Page. 317
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -8-00 61 13 – BOND FORMS
00 61 13 – BOND FORMS
workmanship. The obligations of Surety hereunder shall continue so long as any obligation of
Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s
obligations under the Contract, law or equity, including, but not limited to, California Code of
Civil Procedure Section 337.15.
Whenever Contractor shall be, and is declared by the City to be, in default under the Contract
Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall
promptly, at the City’s option:
i. Take over and complete the Project in accordance with all terms and conditions in
the Contract Documents; or
ii. Obtain a bid or bids for completing the Project in accordance with all terms and
conditions in the Contract Documents and upon determination by Surety of the
lowest responsive and responsible bidder, arrange for a Contract between such
bidder, the Surety and the City, and make available as work progresses sufficient
funds to pay the cost of completion of the Project, less the balance of the contract
price, including other costs and damages for which Surety may be liable. The term
“balance of the contract price” as used in this paragraph shall mean the total
amount payable to Contractor by the City under the Contract and any modification
thereto, less any amount previously paid by the City to the Contractor and any
other set offs pursuant to the Contract Documents.
iii. Permit the City to complete the Project in any manner consistent with California
law and make available as work progresses sufficient funds to pay the cost of
completion of the Project, less the balance of the contract price, including other
costs and damages for which Surety may be liable. The term “balance of the
contract price” as used in this paragraph shall mean the total amount payable to
Contractor by the City under the Contract and any modification thereto, less any
amount previously paid by the City to the Contractor and any other set offs
pursuant to the Contract Documents.
Surety expressly agrees that the City may reject any contractor or subcontractor which may be
proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.
Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from
Contractor for completion of the Project if the City, when declaring the Contractor in default,
notifies Surety of the City’s objection to Contractor’s further participation in the completion of the
Project.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract Documents or to the Project to be performed
thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice
of any such change, extension of time, alteration or addition to the terms of the Contract
Documents or to the Project.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
Packet Page. 318
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -8-00 61 13 – BOND FORMS
Packet Page. 319
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -9-00 61 13 – BOND FORMS
00 61 13 – BOND FORMS
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of
______________, 20___.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
The rate of premium on this bond is ____________ per thousand. The total amount of premium
charges is $_______________________________.
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________
___________________________________________
___________________________________________
(Name and Address of Agent or ___________________________________________
Representative for service of ___________________________________________
process in California, if different ___________________________________________
from above)
(Telephone number of Surety ___________________________________________
and Agent or Representative for
service of process in California)
Packet Page. 320
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -9-00 61 13 – BOND FORMS
Packet Page. 321
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -10-00 61 13 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER
Individual
DESCRIPTION OF ATTACHED DOCUMENT
Corporate Officer
Title(s)Title or Type of Document
Partner(s)Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
00 61 13 – BOND FORMSNOTE: This acknowledgment is to be completed for Contractor/Principal.
Packet Page. 322
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -10-00 61 13 – BOND FORMS
Packet Page. 323
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -11-00 61 13 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER
Individual
DESCRIPTION OF ATTACHED DOCUMENT
Corporate Officer
Title(s)Title or Type of Document
Partner(s)Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
00 61 13 – BOND FORMS
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of Attorney to
local representatives of the bonding company must also be attached.
END OF PERFORMANCE BOND
Packet Page. 324
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -11-00 61 13 – BOND FORMS
Packet Page. 325
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -12-00 61 13 – BOND FORMS
00 61 13 – BOND FORMS
Payment Bond (Labor and Materials).
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the CITY OF SAN BERNARDINO , with its principal place of business at Vanir
Tower, 290 North D Street, San Bernardino, California 92401 (hereinafter designated as the
“City”), by action taken or a resolution passed ___________________ , 20_____, has awarded
to ________________________ hereinafter designated as the “Principal,” a contract for the
work described as follows: Contract No.____________ (the “Project”); and
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the
Contract Documents for the Project dated ________________, (hereinafter referred to as
“Contract Documents”), the terms and conditions of which are expressly incorporated herein by
reference; and
WHEREAS, said Principal is required to furnish a bond in connection with said contract;
providing that if said Principal or any of its Subcontractors shall fail to pay for any materials,
provisions, provender, equipment, or other supplies used in, upon, for or about the performance
of the work contracted to be done, or for any work or labor done thereon of any kind, or for
amounts due under the Unemployment Insurance Code or for any amounts required to be
deducted, withheld, and paid over to the Employment Development Department from the wages
of employees of said Principal and its Subcontractors with respect to such work or labor the
Surety on this bond will pay for the same to the extent hereinafter set forth.
NOW THEREFORE, we, the Principal and __________________________ as Surety, are held
and firmly bound unto the City in the penal sum of ______________ Dollars ($___________)
lawful money of the United States of America, for the payment of which sum well and truly to be
made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its
subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of
the persons named in Civil Code Section 9100, fail to pay for any materials, provisions or other
supplies, used in, upon, for or about the performance of the work contracted to be done, or for
any work or labor thereon of any kind, or amounts due under the Unemployment Insurance
Code with respect to work or labor performed under the contract, or for any amounts required to
be deducted, withheld, and paid over to the Employment Development Department or Franchise
Tax Board from the wages of employees of the contractor and his subcontractors pursuant to
Revenue and Taxation Code Section 18663, with respect to such work and labor the Surety or
Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and
also, in case suit is brought upon this bond, all litigation expenses incurred by the City in such
suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation
expenses.
This bond shall inure to the benefit of any of the persons named in Civil Code Section 9100 so
as to give a right of action to such persons or their assigns in any suit brought upon this bond.
It is further stipulated and agreed that the Surety on this bond shall not be exonerated or
released from the obligation of this bond by any change, extension of time for performance,
Packet Page. 326
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -13-00 61 13 – BOND FORMS
addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement
pertaining or relating to any scheme or work of improvement herein above described, or
Packet Page. 327
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -13-00 61 13 – BOND FORMS
00 61 13 – BOND FORMS
pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any
change or modification of any terms of payment or extension of the time for any payment
pertaining or relating to any scheme or work of improvement herein above described, nor by any
rescission or attempted rescission or attempted rescission of the contract, agreement or bond,
nor by any conditions precedent or subsequent in the bond attempting to limit the right of
recovery of claimants otherwise entitled to recover under any such contract or agreement or
under the bond, nor by any fraud practiced by any person other than the claimant seeking to
recover on the bond and that this bond be construed most strongly against the Surety and in
favor of all persons for whose benefit such bond is given, and under no circumstances shall
Surety be released from liability to those for whose benefit such bond has been given, by
reason of any breach of contract between the owner or the City and original contractor or on the
part of any obligee named in such bond, but the sole conditions of recovery shall be that
claimant is a person described in Civil Code Section 9100, and has not been paid the full
amount of his claim.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract to be performed thereunder, shall in any way
affect its obligations on this bond, and it does hereby waive notice of any such change,
extension of time, alteration or addition to the terms of Contract, including but not limited to, the
provisions of Sections 2819 and 2845 of the California Civil Code.
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of
______________, 20__.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
Packet Page. 328
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -13-00 61 13 – BOND FORMS
Packet Page. 329
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -14-00 61 13 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER
Individual
DESCRIPTION OF ATTACHED DOCUMENT
Corporate Officer
Title(s)Title or Type of Document
Partner(s)Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
00 61 13 – BOND FORMS
NOTE: This acknowledgment is to be completed for Contractor/Principal.
Packet Page. 330
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -14-00 61 13 – BOND FORMS
Packet Page. 331
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -15-00 61 13 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER
Individual
DESCRIPTION OF ATTACHED DOCUMENT
Corporate Officer
Title(s)Title or Type of Document
Partner(s)Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
00 61 13 – BOND FORMS
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to local
representatives of the bonding company must also be attached.
END OF PAYMENT BOND
Packet Page. 332
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -15-00 61 13 – BOND FORMS
Packet Page. 333
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -16-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
1.1 Defined Terms
A. Whenever used in the Contract Documents and printed with initial capital letters, the
terms listed below will have the meanings indicated which are applicable to both the
singular and plural thereof. In addition to terms specifically defined below, terms with
initial capital letters in the Contract Documents include references to identified
articles and paragraphs, and the titles of other documents or forms.
1. Act of God – An earthquake of magnitude of 3.5 or higher on the Richter scale or
a tidal wave.
2. Addenda -- Written or graphic instruments issued prior to the submission of Bids
which clarify, correct, or change the Contract Documents.
3. Additional Work -- New or unforeseen work will be classified as “Additional Work”
when the Engineer determines that it is not covered by the Contract.
4. Applicable Laws -- The laws, statutes, ordinances, rules, codes, regulations,
permits, and licenses of any kind, issued by local, state or federal governmental
authorities or private authorities with jurisdiction (including utilities), to the extent
they apply to the Work.
5. Bid -- The offer or proposal of a Bidder submitted on the prescribed form setting
forth the prices and other terms for the Work to be performed.
6. Bid Guarantee -- The Bid Bond, cashier’s check, or certified check to be made by
the Bidder, which is to accompany the Bid as a guaranty of good faith to enter into
a written contract.
7. Bidder -- The individual or entity who submits a Bid directly to the City.
8. Change Order (“CO”) -- A document that authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Times,
issued on or after the Effective Date of the Contract, in accordance with the
Contract Documents and in the form contained in the Contract Documents.
9. Change Order Request (“COR”) -- A request made by the Contractor for an
adjustment in the Contract Price and/or Contract Times as the result of a
Contractor-claimed change to the Work. This term may also be referred to as a
Change Order Proposal (“COP”), or Request for Change (“RFC”).
10. City’s Representative – The City Engineer, and acting through properly authorized
agents, such as the Engineer or such other agents acting within the scope of the
particular duties entrusted to them. Also sometimes referred to as the “City’s
Representative” or “Representative” in the Contract Documents. The terms the
City and Owner may be used interchangeably
Packet Page. 334
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -17-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
11. Claim -- A demand or assertion by the City or Contractor seeking an adjustment of
Contract Price or Contract Times, or both, or other relief with respect to the terms
of the Contract. A demand for money or services by a third party is not a Claim.
12. Contract -- The entire integrated written agreement between the City and
Contractor concerning the Work. “Contract” may be used interchangeably with
“Agreement” in the Contract Documents. The Contract supersedes prior
negotiations, representations, or agreements, whether written or oral, and includes
all Contract Documents.
13. Contract Documents -- The documents listed in Section 00 52 13, Article 5 of the
Contract for Construction. Some documents provided by the City to the Bidders
and Contractor, including but not limited to reports and drawings of subsurface and
physical conditions are not Contract Documents.
14. Contract Price -- Amount to be paid by the City to the Contractor as full
compensation for the performance of the Contract and completion of the Work,
subject to any additions or deductions as provided in the Contract Documents, and
including all applicable taxes and costs.
15. Contract Time -- The number of days or the dates stated in the Contract
Documents to: achieve defined milestones, if any; and to complete the Work so
that it is ready for final payment.
16. Contractor -- The individual or entity with which the City has contracted for
performance of the Work.
17. Contractor’s Designated On-Site Representative -- The Contractor’s Designated
On-Site Representative will be identified by the Contractor and shall not be
changed without prior written consent of the City.
18. Critical Supply Shortage -- An unusual shortage in materials that is (a) supported
by documented proof that Contractor made every effort to obtain such materials
from all available sources; (b) such shortage is due to the fact that such materials
are not physically available from single or multiple sources or could have been
obtained only at exorbitant prices entirely inconsistent with current and standard
rates taking into account the quantities involved and the usual industry practices
in obtaining such quantities; and (c) such shortages and the difficulties in obtaining
alternate sources of materials could not have been known or anticipated by
Contractor at the time it submitted its bid or entered the Contract. Market
fluctuations in prices of materials, whether or not resulting from a Force Majeure
Event, does not constitute a Critical Supply Shortage.
19. Daily Rate -- The Daily Rate stipulated in the Contract Documents as full
compensation to the Contractor due to the City’s unreasonable delay to the Project
that was not contemplated by the parties.
20. Day -- A calendar day of 24 hours measured from midnight to the next midnight.
21. Defective Work -- Work that is unsatisfactory, faulty, or deficient; or that does not
conform to the Contract Documents; or that does not meet the requirements of any
Packet Page. 335
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -18-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
inspection, reference standard, test, or approval referenced in the Contract
Documents.
22. Demobilization -- The complete dismantling and removal by the Contractor of all
of the Contractor’s temporary facilities, equipment, and personnel at the Site.
23. Drawings -- That part of the Contract Documents prepared by of the Engineer of
Record which graphically shows the scope, extent, and character of the Work to
be performed by Contractor. Shop Drawings and other Contractor Submittals are
not Drawings as so defined.
24. Effective Date of the Contract -- The date indicated in the Contract on which it
becomes effective, but if no such date is indicated, it means the date on which the
Contract is signed and delivered by the last of the two parties to sign and deliver.
25. Engineer -- Whenever not qualified, shall mean the City Engineer or the Engineer
authorized to act for and in behalf of the City, acting either directly or through
properly authorized agents, such agents acting severally within the scope of the
particular duties entrusted to them.
26. Force Majeure Event -- An event that materially affects a party’s performance and
is one or more of the following: (1) Acts of God or other natural disasters occurring
at the Site; (2) terrorism or other acts of a public enemy; (3) orders of governmental
authorities (including, without limitation, unreasonable and unforeseeable delay in
the issuance of permits or approvals by governmental authorities that are required
for the Work); (4) pandemics, epidemics or quarantine restrictions; (5) strikes and
other organized labor action occurring at the Site and the effects thereof on the
Work, only to the extent such strikes and other organized labor action are beyond
the control of Contractor and its Subcontractors, of every Tier, and to the extent
the effects thereof cannot be avoided by use of replacement workers; and (6) a
Critical Supply Shortage. For purposes of this section, “orders of governmental
authorities,” includes ordinances, emergency proclamations and orders, rules to
protect the public health, welfare and safety, and other actions of the City in its
capacity as a municipal authority.
27. Hazardous Waste -- The term “Hazardous Waste” shall have the meaning provided
in Section 104 of the Solid Waste Disposal Act (42 U.S.C. § 6903) as amended
from time to time, or any substance or material identified as hazardous under any
state or federal statute governing handling, disposal and/or cleanup of any such
substance or material, whichever is more restrictive.
28. Holiday – Holidays occur on:
New Year’s Day - January 1
President’s Day – Third Monday in February
Memorial Day - Last Monday in May
Independence Day - July 4
Labor Day - First Monday in September
Veteran’s Day - November 11
Thanksgiving Day - Fourth Thursday in November
Packet Page. 336
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -19-00 72 00 – GENERAL CONDITIONS
Friday after Thanksgiving
Packet Page. 337
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -19-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
Christmas Eve – December 24
Christmas Day - December 25
Day After Christmas – December 26
New Year’s Eve – December 31
If any Holiday listed above falls on a Saturday, Saturday and the preceding Friday are
both Holidays. If the Holiday should fall on a Sunday, Sunday and the following Monday
are both Holidays.
29. Notice of Award -- The written notice by the City to the Successful Bidder stating
that upon timely compliance by the Successful Bidder with the conditions
precedent listed therein, the City will sign and deliver the Contract.
30. Notice of Completion -- The form which may be executed by the City constituting
final acceptance of the Project.
31. Notice to Proceed -- A written notice given by the City to Contractor fixing the date
on which the Contractor may proceed with the Work and when Contract Times will
commence to run.
32. Project -- The total construction of which the Work to be performed under the
Contract Documents may be the whole, or a part.
33. Record Drawings – The record set of as-builts prepared by the Contractor during
the Work in accordance with the requirements of the General Conditions.
34. Recyclable Waste Materials -- Materials removed from the Site which are required
to be diverted to a recycling center rather than an area landfill. Recyclable Waste
Materials include, but are not limited to, asphalt, concrete, brick, concrete block,
and rock.
35. Sample -- A physical example furnished by the Contractor to illustrate materials,
equipment or workmanship; to establish standards by which the Work will be
judged.
36. Schedule of Submittals -- A schedule, prepared and maintained by Contractor, of
required submittals and the time requirements to facilitate scheduled performance
of related construction activities.
37. Shop Drawings -- All drawings, diagrams, illustrations, schedules, and other data
or information which are specifically prepared or assembled by or for Contractor
and submitted by Contractor to illustrate some portion of the Work.
38. Site -- Lands or areas indicated in the Contract Documents as being furnished by
the City upon which the Work is to be performed, including rights-of-way and
easements for access thereto, and such other lands furnished by the City which
are designated for the use of Contractor.
39. Specifications -- That part of the Contract Documents consisting of written
requirements for materials, equipment, systems, standards and workmanship as
Packet Page. 338
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -20-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
applied to the Work, and certain administrative requirements and procedural
matters applicable thereto.
40. Stop Payment Notice -- A written notice as defined in Civil Code section 8044.
41. Subcontractor -- An individual or entity other than a Contractor having a contract
with any other entity than the City for performance of any portion of the Work at
the Site.
42. Submittal -- Written and graphic information and physical samples prepared and
supplied by the Contractor demonstrating various portions of the Work.
43. Successful Bidder -- The responsible Bidder submitting a responsive Bid to whom
the City makes an award.
44. Supplier -- A manufacturer, fabricator, supplier, distributor, material man, or vendor
having a direct contract with Contractor or with any Subcontractor to furnish
materials or equipment used in the performance of the Work or to be incorporated
in the Work.
45. Underground Facilities -- All underground pipelines, conduits, ducts, cables, wires,
manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any
encasements containing such facilities, including those that convey electricity,
gases, steam, liquid petroleum products, telephone or other communications,
cable television, water, wastewater, storm water, other liquids or chemicals, or
traffic or other control systems.
46. Unit Price Work -- Work to be paid for on the basis of unit prices as provided by
the Contractor in its Bid or as adjusted in accordance with the Contract Documents.
47. Warranty -- A guarantee provided to the City by the Contractor that the Work will
remain free of defects and suitable for its intended use for the period required by
the Contract Documents or the longest period permitted by the law of this state,
whichever is longer.
48. Work -- The entire construction or the various separately identifiable parts thereof
required to be provided under the Contract Documents. Work includes and is the
result of performing or providing all labor, services, and documentation necessary
to produce such construction, and furnishing, installing, and incorporating all
materials and equipment into such construction, all as required by the Contract
Documents.
1.2 Terminology.
A. The words and terms below are not defined but, when used in the Contract
Documents, have the indicated meaning.
1. The word “furnish,” when used in connection with services, materials, or
equipment, shall mean to supply and deliver said services, materials, or equipment
to the Site (or some other specified location) ready for use or installation and in
usable or operable condition.
Packet Page. 339
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -21-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
2. The word “install,” when used in connection with services, materials, or equipment,
shall mean to put into use or place in final position said services, materials, or
equipment complete and ready for intended use.
3. The words “perform” or “provide,” when used in connection with services,
materials, or equipment, shall mean to furnish and install said services, materials,
or equipment complete and ready for intended use.
4. Regardless of whether “furnish,” “install,” “perform,” or “provide” is used in
connection with services, materials, or equipment, an obligation of Contractor is
implied.
B. Unless stated otherwise in the Contract Documents, words or phrases that have a
well-known technical or construction industry or trade meaning are used in the
Contract Documents in accordance with such recognized meaning.
ARTICLE 2 -PRELIMINARY MATTERS
2.1 Delivery of Contract Documents
A. Within ten (10) Days after receipt of the Notice of Award and before the City will
execute the Contract, the Contractor shall furnish and file with the City a signed
Contract and the necessary Performance Bond, Payment Bond, and Certificates of
Insurance and Endorsements, as well as any other documents specified in the
Contract Documents.
2.2 Bonds
A. Contractor shall submit the bonds on the forms provided with the Contract
Documents, duly executed by a responsible corporate surety admitted to transact
surety business in the State of California, as defined in Code of Civil Procedure
section 995.120, and listed in the United States Department of the Treasury circular
entitled "Companies Holding Certificates of Authority as Acceptable Sureties on
Federal Bonds and as Acceptable Reinsuring Companies," authorized to do
business in the State of California and acceptable to the City conditioned upon the
faithful performance by the Contractor of all requirements of the Contract
Documents. Each of the bonds shall be in a sum no less than one hundred percent
(100%) of the Contract Price. Bonds shall be delivered to the City within ten (10)
Days after receipt of the Notice of Award and before execution of the Contract by
the City.
2.3 Evidence of Insurance
A. Prior to commencing any Work but no later than ten (10) Days after receipt of the
Notice of Award, the Contractor shall submit or cause to be submitted any and all
Certificates of Insurance and Endorsements, showing that the Contractor has the
required insurance, to the attention of the City. Such insurance is to be provided at
the sole cost and expense of the Contractor. No Work shall be performed until all of
the required insurance has been received and approved.
Packet Page. 340
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -22-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
2.4 Execution of the Contract
A. Upon receipt of the required Contract Documents, the City will execute the Contract,
establishing the Effective Date of the Contract.
2.5 Contractor’s Failure to Perform
A. Should Contractor fail to comply with timelines provided above, the City shall retain
the right to enforce and collect on the Contractor’s Bid Guarantee, rescind award to
the Contractor and award the Contract to the next lowest responsive, responsible
bidder as determined by the City. If the City elects to accept bonds and insurance
submitted late, the Contract Times will begin to run as of the date stated in the Notice
to Proceed. However, the number of days beyond the original ten (10) Days it took
to receive the properly executed Contract and related items may be deducted from
the Contract Times.
2.6 Commencement of Contract Times; Notice to Proceed
A. The City will not issue a Notice to Proceed until after the Effective Date of the Contract.
Work shall commence within ten (10) Days of the date stated in the Notice to Proceed.
The Contract Times begin to run on the date specified in the Notice to Proceed. No
Work shall be done at the Site prior to the issuance of the Notice to Proceed.
2.7 Copies of Documents
A. Contractor will be furnished, free of charge, five (5) copies of the Contract
Documents. Additional copies may be obtained at cost of reproduction. Contractor
shall maintain a clean, undamaged set of Contract Documents, including Submittals,
at the Project site.
2.8 Substitution Requests, Schedule of Submittals, and Schedule
A. Substitution Requests. Within fifteen (15) Days after Notice of Award (unless
otherwise specified in the Contract Documents), Contractor shall provide all
substitution requests as further described in Section 00 72 00, Article 6.5.
B. Schedule of Submittals. Within five (5) Days after the issuance of the Notice of
Proceed (unless otherwise specified in the Contract Documents), Contractor shall
submit to the City a Schedule of Submittals that conforms with the requirements of
Section 00 72 00, Article 5.21.
C. Schedule. Within ten (10) days after the issuance of the Notice of Proceed (unless
otherwise specified in the Contract Documents), the Contractor shall submit a
construction schedule that conforms with the requirements of Section 00 72 00,
Article 8.2.
2.9 Preconstruction Conference; Designation of Authorized Representatives.
A. Before any Work at the Site is started, a conference attended by the City, Contractor,
Engineer, and others as appropriate will be held to establish a working
understanding among the parties as to the Work and to discuss the schedules
Packet Page. 341
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -23-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
referred to herein, procedures for handling Submittals and Shop Drawings,
processing applications for payment, and maintaining required records.
B. At this conference the City and Contractor each shall designate, in writing, a specific
individual to act as its authorized representative with respect to the services and
responsibilities under the Contract. Such individuals shall have the authority to
transmit instructions, receive information, render decisions relative to the Contract,
and otherwise act on behalf of each respective party.
2.10 Subcontractor Mobilization Meeting.
A. Prior to the start of each major Subcontractor’s Site Work, the Contractor, the
involved Subcontractor, and Engineer shall attend a pre-start meeting to discuss the
schedule, coordination, procedures, and other administrative issues.
2.11 Authority of Board; Engineer
A. The Board has the final authority in all matters affecting the Work. Within the scope
of the Contract, the Engineer has the authority to enforce compliance with the
Contract Documents. The Contractor shall promptly comply with instructions from
the Engineer.
B. The decision of the Engineer is final and binding on all questions relating to:
1. quantities;
2. acceptability of material, equipment, or work;
3. execution, progress or sequence of work;
4. interpretation of the Plans, Specifications, or other Contract Documents; and
5. Any other areas specifically identified in the Contract Documents or under the law.
C. Compliance with instructions from the Engineer shall be a condition precedent to any
payment under the Contract, unless otherwise ordered by the Board.
2.12 Mobilization
A. When a Bid item is included in the Bid Schedule for mobilization, the costs of Work
in advance of construction operations and not directly attributable to any specific bid
item will be included in the progress estimate. When no bid item is provided for
mobilization payment for such costs will be deemed to be included in the other items
of the Work.
B. Payment for mobilization based on the lump sum provided in the Bid Schedule, shall
constitute full compensation for all such Work. No payment for mobilization will be
made until all of the listed items have been completed to the satisfaction of the
Engineer. The scope of the Work included under mobilization shall include, but shall
not be limited to, the following principal items:
Packet Page. 342
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -24-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
1. Obtaining and paying for all bonds, insurance, and permits.
2. Moving on to the Project Site of all Contractor’s plant and equipment required for
the first month’s operations.
3. Installing temporary construction power, wiring, and lighting facilities, as
applicable.
4. Establishing fire protection system, as applicable.
5. Developing and installing a construction water supply, as applicable.
6. Providing and maintaining the field office trailers for the Contractor, if necessary,
and the Engineer (if specified), complete, with all specified furnishings and utility
services.
7. Providing on-site sanitary facilities and potable water facilities as specified per Cal-
OSHA and these Contract Documents.
8. Furnishing, installing, and maintaining all storage buildings or sheds required for
temporary storage of products, equipment, or materials that have not yet been
installed in the Work. All such storage shall meet manufacturer’s specified storage
requirements, and the specific provisions of the specifications, including
temperature and humidity control, if recommended by the manufacturer, and for
all security.
9. Arranging for and erection of Contractor’s work and storage yard.
10. Posting all OSHA required notices and establishment of safety programs per Cal-
OSHA.
11. Full-time presence of Contractor’s superintendent at the job Site as required
herein.
12. Submittal of construction schedule as required by the Contract Documents.
ARTICLE 3 -CONTRACT DOCUMENTS; INTENT
3.1 Examination of Drawings, Specifications, and Site of Work
A. Examination of Contract Documents; Site. Before commencing any portion of the
Work, Contractor shall again carefully examine all applicable Contract Documents,
the Project Site, and other information given to Contractor as to materials and
methods of construction and other Project requirements. Contractor shall
immediately notify the Engineer of any potential error, inconsistency, ambiguity,
conflict, or lack of detail or explanation. If Contractor performs, permits, or causes
the performance of any Work which is in error, inconsistent or ambiguous, or not
sufficiently detailed or explained, Contractor shall bear any and all resulting costs,
including, without limitation, the cost of correction. In no case shall the Contractor
or any Subcontractor proceed with Work if uncertain as to the applicable
requirements.
Packet Page. 343
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -25-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
B. Additional Instructions. After notification of any error, inconsistency, ambiguity,
conflict, or lack of detail or explanation, the Engineer will provide any required
additional instructions, by means of drawings or other written direction, necessary
for proper execution of Work.
C. Quality of Parts, Construction and Finish. All parts of the Work shall be of the best
quality of their respective kinds and the Contractor must use all diligence to inform
itself fully as to the required construction and finish.
D. Contractor’s Variation from Contract Document Requirements. If it is found that the
Contractor has varied from the requirements of the Contract Documents including
the requirement to comply with all Applicable Laws, the Engineer may at any time,
before or after completion of the Work, order the improper Work removed, remade
or replaced by the Contractor at the Contractor’s expense.
3.2 Intent of Contract Documents
A. The Contract Documents are complementary; what is required by any one will be
binding as if required by all. It is the intent of the Contract Documents to describe a
functionally complete Project (or part thereof) to be constructed in accordance with
the Contract Documents. Any labor, documentation, services, materials, or
equipment that reasonably may be inferred from the Contract Documents or from
prevailing custom or trade usage as being required to produce the indicated result
will be provided whether or not specifically called for, at no additional cost to the City.
B. The Contractor shall furnish, unless otherwise provided in the Contract Documents,
all materials, implements, machinery, equipment, tools, supplies and labor
necessary to the prosecution and completion of the Project.
C. Clarifications and interpretations of the Contract Documents shall be issued by the
Engineer as provided in these General Conditions.
D. If utilities to equipment/fixtures are not shown but are necessary to operate the
equipment/fixtures, the utilities service installation is considered to be part of the
Work. The implied Work will conform to the appropriate sections of the Contract
Documents.
E. Organization of the Contract Documents into divisions, sections, and articles, and
arrangement of drawings shall not control the Contractor in dividing Work among
Subcontractors or in establishing the extent of Work to be performed by any trade.
3.3 Reference Standards.
A. Standards, Specifications, Codes, Laws, and Regulations.
1. Reference to federal specifications, federal standards, other standards,
specifications, manuals, or codes of any technical society, organization, or
association, or to Applicable Laws, whether such reference be specific or by
implication, shall mean the standard, specification, manual, code, or Applicable
Laws in effect at the time of opening of Bids (or on the Effective Date of the
Packet Page. 344
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -26-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
Contract if there were no Bids), except as may be otherwise specifically stated in
the Contract Documents.
2. No provision of any such standard, specification, manual, or code, or any
instruction of a Supplier, shall be effective to change the duties or responsibilities
of the City, Contractor, or any of their Subcontractors, consultants, agents, or
employees, from those set forth in the Contract Documents. No such provision or
instruction shall be effective to assign to the City, or any of their officers, directors,
members, partners, employees, agents, consultants, or subcontractors, any duty
or authority to supervise or direct the performance of the Work or any duty or
authority to undertake responsibility inconsistent with the provisions of the Contract
Documents.
3.4 Reporting and Resolving Discrepancies; Order of Precedence.
A. Reporting Discrepancies.
1. The Contract Documents are intended to be fully cooperative and complementary.
Before undertaking each part of the Work, Contractor shall carefully study and
compare the Contract Documents and check and verify pertinent figures therein
and all applicable field measurements. Contractor shall promptly report in writing
to the City any conflict, error, ambiguity, or discrepancy which Contractor
discovers, should have discovered, or has actual knowledge of, and shall obtain a
written interpretation or clarification from the City before proceeding with any Work
affected thereby. If, during the performance of the Work, Contractor discovers any
conflict, error, ambiguity, or discrepancy within the Contract Documents, or
between the Contract Documents and (i) any Applicable Law, (ii) any standard,
specification, manual, or code, or (iii) any instruction of any Supplier, then
Contractor shall promptly submit a written Request for Information (RFI) to the City.
Contractor shall not proceed with the Work affected thereby (except in an
emergency) until an amendment or supplement to the Contract Documents has
been issued by one of the methods indicated in the Contract Documents, and any
Work performed by Contractor before receipt of an amendment or supplement
shall be at Contractor’s own risk.
B. Order of Precedence.
1. In case of conflicts between the Contract Documents, the order of precedence
shall be as follows:
a. Permits from other agencies as may be required by law
b. Change Orders, most recent first
c. Contract
d. Addenda, most recent first
e. Special Conditions
f. Specifications
Packet Page. 345
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -27-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
g. Construction Plans and Drawings(Contract Drawings)
h. General Conditions
i. Instructions to Bidders
j. Notice Inviting Bids
k. Contractor’s Bid (Bid Forms)
l. Standard Specifications for Public Works Construction “Greenbook” latest
edition (Sections 1-9 Excluded)
m. Applicable Local Agency Standards and Specifications
n. Standard Drawings
o. Reference Documents
2. With reference to the Drawings the order of precedence shall be as follows:
a. Figures govern over scaled dimensions
b. Detail drawings govern over general drawings
c. Addenda/Change Order drawings govern over Drawings
d. Contract Drawings govern over Standard Drawings
e. Contract Drawings govern over Shop Drawings
3. Notwithstanding the orders of precedence established above, in the event of
conflicts, the higher standard, higher quality and most expensive shall always
apply.
3.5 Amending and Supplementing Contract Documents.
A. The Contract Documents may be amended to provide for additions, deletions, and
revisions in the Work or to modify the terms and conditions thereof only by Change
Order or written amendment to the Contract duly executed by the parties.
B. The requirements of the Contract Documents may be supplemented, and minor
variations and deviations in the Work may be authorized at no cost to the City, by
one or more of the following ways:
1. The City’s review of a Submittal, Shop Drawing, Sample or substitution request
without exception (subject to the provisions of the Contract Documents); or
2. The City’s issuance of a response to an RFI.
C. However, no review or RFI response will reduce or modify the Contractor’s obligation
to fully satisfy and comply with the requirements of the Contract Documents.
Packet Page. 346
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -28-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
3.6 Reuse of Documents.
A. Contractor and any Subcontractor or Supplier shall not:
1. have or acquire any title to or ownership rights in any of the Drawings,
Specifications, or other documents (or copies of any thereof) prepared by or
bearing the seal of Engineer of Record or its consultants, including electronic
media editions; or
2. reuse any such Drawings, Specifications, other documents, or copies thereof on
extensions of the Project or any other project without written consent of the City
and Engineer of Record and specific written verification or adaptation by Engineer
of Record.
B. The prohibitions of this Article will survive final payment, or termination of the
Contract. Nothing herein shall preclude Contractor from retaining copies of the
Contract Documents for record purposes.
ARTICLE 4 - INDEMNIFICATION; INSURANCE
4.1 Indemnification
A. To the fullest extent permitted by law, Contractor shall immediately defend (with
counsel of the City’s choosing), indemnify and hold harmless the City, its officials,
officers, agents, employees, and representatives, and each of them from and
against:
1. Any and all claims, demands, causes of action, costs, expenses, injuries, losses
or liabilities, in law or in equity, of every kind or nature whatsoever, but not limited
to, injury to or death, including wrongful death, of any person, and damages to or
destruction of property of any person, arising out of, related to, or in any manner
directly or indirectly connected with the Work or this Contract, including claims
made by subcontractors for nonpayment, including without limitation the payment
of all consequential damages and attorney’s fees and other related costs and
expenses, however caused, regardless of whether the allegations are false,
fraudulent, or groundless, and regardless of any negligence of the City or its
officers, employees, or authorized volunteers (including passive negligence),
except the sole negligence or willful misconduct or active negligence of the City or
its officials, officers, employees, or authorized volunteers.
2. Contractor’s defense and indemnity obligation herein includes, but is not limited to
damages, fines, penalties, attorney’s fees and costs arising from claims under the
Americans with Disabilities Act (ADA) or other federal or state disability access or
discrimination laws arising from Contractor’s Work during the course of
construction of the improvements or after the Work is complete, as the result of
defects or negligence in Contractor’s construction of the improvements.
3. Any and all actions, proceedings, damages, costs, expenses, fines, penalties or
liabilities, in law or equity, of every kind or nature whatsoever, arising out of,
resulting from, or on account of the violation of any governmental law or regulation,
compliance with which is the responsibility of Contractor;
Packet Page. 347
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -29-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
4. Any and all losses, expenses, damages (including damages to the Work itself),
attorney’s fees, and other costs, including all costs of defense which any of them
may incur with respect to the failure, neglect, or refusal of Contractor to faithfully
perform the Work and all of Contractor’s obligations under Contract. Such costs,
expenses, and damages shall include all costs, including attorney’s fees, incurred
by the indemnified parties in any lawsuit to which they are a party.
B. Contractor shall immediately defend, at Contractor’s own cost, expense and risk,
with the counsel of the City choosing, any and all such aforesaid suits, actions or
other legal proceedings of every kind that may be brought or instituted against the
City, its officials, officers, agents, employees and representatives. Contractor shall
pay and satisfy any judgment, award or decree that may be rendered against the
City, its officials, officers, employees, agents, employees and representatives, in any
such suit, action or other legal proceeding. Contractor shall reimburse the City, its
officials, officers, agents, employees and representatives for any and all legal
expenses and costs incurred by each of them in connection therewith or in enforcing
the indemnity herein provided. The only limitations on this provision shall be those
imposed by Civil Code section 2782.
C. The provisions of this Article shall survive the termination of this Contract howsoever
caused, and no payment, partial payment, or acceptance of occupancy in whole or
part of the Work shall waive or release any of the provisions of this Article.
4.2 Insurance
The Contractor shall obtain, and at all times during performance of the Work of Contract, maintain
all of the insurance described in this Article. Contractor shall not commence Work under this
Contract until it has provided evidence satisfactory to the City that it has secured all insurance
required hereunder. Contractor shall not allow any Subcontractor to commence work on any
subcontract until it has provided evidence satisfactory to the City that the subcontractor has
secured all insurance required under this Article. Failure to provide and maintain all required
insurance shall be grounds for the City to terminate this Contract for cause. Contractor shall
furnish the City with original certificates of insurance and endorsements effective coverage
required by this Contract on forms satisfactory to the City. The certificates and endorsements for
each insurance policy shall be signed by a person authorized by that insurer to bind coverage on
its behalf, and shall be on forms acceptable to the City. All certificates and endorsements must
be received and approved by the City before Work commences.
A.Additional Insureds; Waiver of Subrogation. The City, its officials, officers,
employees, agents and authorized volunteers shall be named as Additional Insureds
on Contractor’s All Risk policy and on Contractor’s and its subcontractors’ policies
of Commercial General Liability and Automobile Liability insurance using, for
Contractor’s policy/ies of Commercial General Liability insurance, ISO CG forms 20
10 and 20 37 (or endorsements providing the exact same coverage, including
completed operations), and, for subcontractors’ policies of Commercial General
Liability insurance, ISO CG form 20 38 (or endorsements providing the exact same
coverage). Notwithstanding the minimum limits set forth in this Contract for any type
of insurance coverage, all available insurance proceeds in excess of the specified
minimum limits of coverage shall be available to the parties required to be named as
Additional Insureds hereunder. All insurance coverage maintained or procured
Packet Page. 348
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -30-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
pursuant to this Contract shall be endorsed to waive subrogation against the City, its
officers, officials, agents, employees or volunteers or shall specifically allow
Contractor - or others providing insurance evidence in compliance with these
specifications - to waive their right of recovery prior to a loss. Contractor hereby
waives its own right of recovery against the City, and shall require similar written
express waivers and insurance clauses from each of its subcontractors. Copies of
these waivers shall be submitted to the City prior to commencement of work.
B.Workers’ Compensation Insurance. The Contractor shall provide workers’
compensation insurance for all of the employees engaged in Work under this
Contract, on or at the Site, and, in case of any sublet Work, the Contractor shall
require the subcontractor similarly to provide workers’ compensation insurance for
all the latter’s employees as prescribed by State law. Any class of employee or
employees not covered by a subcontractor’s insurance shall be covered by the
Contractor’s insurance. In case any class of employees engaged in work under this
Contract, on or at the Site, is not protected under the Workers’ Compensation
Statutes, the Contractor shall provide or shall cause a subcontractor to provide,
adequate insurance coverage for the protection of such employees not otherwise
protected. The Contractor is required to secure payment of compensation to his
employees in accordance with the provisions of section 3700 of the Labor Code.
The Contractor shall file with the City certificates of his insurance protecting workers.
Company or companies providing insurance coverage shall be acceptable to the
City, if in the form and coverage as set forth in the Contract Documents.
C.Employer’s Liability Insurance. Contractor shall provide Employer’s Liability
Insurance, including Occupational Disease, in the amount of at least one million
dollars ($1,000,000.00) per person per accident. Contractor shall provide the City
with a certificate of Employer’s Liability Insurance. Such insurance shall comply with
the provisions of the Contract Documents. The policy shall be endorsed, if
applicable, to provide a Borrowed Servant/Alternate Employer Endorsement and
contain a Waiver of Subrogation in favor of the City.
D.Commercial General Liability Insurance. Contractor shall provide “occurrence”
form Commercial General Liability insurance coverage at least as broad as the most
current ISO CGL Form 00 01, including but not limited to, premises liability,
contractual liability, products/completed operations, personal and advertising injury
which may arise from or out of Contractor’s operations, use, and management of the
Site, or the performance of its obligations hereunder. The policy shall not contain
any exclusion contrary to this Contract including but not limited to endorsements or
provisions limiting coverage for (1) contractual liability (including but not limited to
ISO CG 24 26 or 21 39); or (2) cross-liability for claims or suits against one insured
against another. Policy limits shall not be less than $2,000,000 per occurrence for
bodily injury, personal injury and property damage. If Commercial General Liability
Insurance or other form with a general aggregate limit is used, either the general
aggregate limit shall apply separately to this project/location or the general
aggregate limit shall be twice the required occurrence limit. Defense costs shall be
paid in addition to the limits.
1. Such policy shall comply with all the requirements of this Article. The limits set forth
herein shall apply separately to each insured against whom claims are made or
Packet Page. 349
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -31-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
suits are brought, except with respect to the limits of liability. Further the limits set
forth herein shall not be construed to relieve the Contractor from liability in excess
of such coverage, nor shall it limit Contractor’s indemnification obligations to the
City, and shall not preclude the City from taking such other actions available to the
City under other provisions of the Contract Documents or law.
2. All general liability policies provided pursuant to the provisions of this Article shall
comply with the provisions of the Contract Documents.
3. All general liability policies shall be written to apply to all bodily injury, including
death, property damage, personal injury, owned and non-owned equipment,
blanket contractual liability, completed operations liability, explosion, collapse,
under-ground excavation, removal of lateral support, and other covered loss,
however occasioned, occurring during the policy term, and shall specifically insure
the performance by Contractor of that part of the indemnification contained in these
General Conditions relating to liability for injury to or death of persons and damage
to property.
4. If the coverage contains one or more aggregate limits, a minimum of 50% of any
such aggregate limit must remain available at all times; if over 50% of any
aggregate limit has been paid or reserved, the City may require additional
coverage to be purchased by Contractor to restore the required limits. Contractor
may combine primary, umbrella, and as broad as possible excess liability coverage
to achieve the total limits indicated above. Any umbrella or excess liability policy
shall include the additional insured endorsement described in the Contract
Documents.
5. All policies of general liability insurance shall permit and Contractor does hereby
waive any right of subrogation which any insurer of Contractor may acquire from
Contractor by virtue of the payment of any loss.
E.Automobile Liability Insurance. Contractor shall provide Automobile Liability
Insurance at least as broad as ISO CA 00 01 (Any Auto) in the amount of, at least,
one million dollars ($1,000,000) per accident for bodily injury and property damage.
Such insurance shall provide coverage with respect to the ownership, operation,
maintenance, use, loading or unloading of any auto owned, leased, hired or
borrowed by Contractor or for which Contractor is responsible, in a form and with
insurance companies acceptable to the City. All policies of automobile insurance
shall permit and Contractor does hereby waive any right of subrogation which any
insurer of Contractor may acquire from Contractor by virtue of the payment of any
loss.
F.Builder’s Risk “All Risk”
1. It is the Contractor’s responsibility to maintain or cause to be maintained Builder’s
Risk [“All Risk”] extended coverage insurance on all work, material, equipment,
appliances, tools, and structures that are or will become part of the Work and
subject to loss or damage by fire, and vandalism and malicious mischief, in an
amount to cover 100% of the replacement cost. The City accepts no responsibility
for the Work until the Work is formally accepted by the City. The Contractor shall
Packet Page. 350
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -32-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
provide a certificate evidencing this coverage before commencing performance of
the Work.
2. The named insureds shall be Contractor, all Subcontractors of any tier (excluding
those solely responsible for design work), suppliers, and the City, its elected
officials, officers, employees, agents and authorized volunteers, as their interests
may appear. Contractor shall not be required to maintain property insurance for
any portion of the Work following acceptance by the City.
3. Policy shall be provided for replacement value on an “all risk” basis. There shall
be no coinsurance penalty provision in any such policy. Policy must include: (1)
coverage for any ensuing loss from faulty workmanship, nonconforming work,
omission or deficiency in design or specifications; (2) coverage against machinery
accidents and operational testing; (3) coverage for removal of debris, and insuring
the buildings, structures, machinery, equipment, materials, facilities, fixtures and
all other properties constituting a part of the Project; (4) transit coverage, including
ocean marine coverage (unless insured by the supplier), with sub-limits sufficient
to insure the full replacement value of any key equipment item; and (5) coverage
with sub-limits sufficient to insure the full replacement value of any property or
equipment stored either on or off the Site. Such insurance shall be on a form
acceptable to the City to ensure adequacy and sublimit.
4. In addition, the policy shall meet the following requirements:
a. Insurance policies shall be so conditioned as to cover the performance of any
extra work performed under the Contract.
b. Coverage shall include all materials stored on site and in transit.
c. Coverage shall include Contractor’s tools and equipment.
d. Insurance shall include boiler, machinery and material hoist coverage.
G.Contractor’s Pollution Liability Coverage. Contractor shall provide pollution
liability insurance in an amount not less than $1,000,000 per occurrence and
$2,000,000 aggregate.
H. Contractor shall require all tiers of Subcontractors working under this Contract to
provide the insurance required under this Article unless otherwise agreed to in
writing by the City. Contractor shall make certain that any and all Subcontractors
hired by Contractor are insured in accordance with this Contract. If any
Subcontractor’s coverage does not comply with the foregoing provisions, Contractor
shall indemnify and hold the City harmless from any damage, loss, cost, or expense,
including attorneys’ fees, incurred by the City as a result thereof.
I. Notwithstanding the minimum limits set forth in this Contract for any type of
insurance coverage, if Contractor maintains higher limits than the minimums shown
above, the City requires and shall be entitled to coverage for the higher limits
maintained by the Contractor. Any available insurance proceeds in excess of the
specified minimum limits of insurance and coverage shall be available to the City.
Packet Page. 351
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -33-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
J.Form and Proof of Carriage of Insurance
1. Any insurance carrier providing insurance coverage required by the Contract
Documents shall be admitted to and authorized to do business in the State of
California unless waived, in writing, by the City’s Risk Manager. Carrier(s) shall
have an A.M. Best rating of not less than an A:VII. Insurance deductibles or self-
insured retentions must be declared by the Contractor. At the election of the City
the Contractor shall either 1) reduce or eliminate such deductibles or self-insured
retentions, or 2) procure a bond which guarantees payment of losses and related
investigations, claims administration, and defense costs and expenses. If umbrella
or excess liability coverage is used to meet any required limit(s) specified herein,
the Contractor shall provide a “follow form” endorsement satisfactory to the City
indicating that such coverage is subject to the same terms and conditions as the
underlying liability policy.
2. Each insurance policy required by this Contract shall be endorsed to state that: (1)
coverage shall not be suspended, voided, reduced or cancelled except after thirty
(30) days prior written notice by certified mail, return receipt requested, has been
given to the City; and (2) any failure to comply with reporting or other provisions of
the policies, including breaches of warranties, shall not affect coverage provided
to the City, its officials, officers, agents, employees, and volunteers.
3. The Certificates(s) and policies of insurance shall contain or shall be endorsed to
contain the covenant of the insurance carrier(s) that it shall provide no less than
thirty (30) days written notice be given to the City prior to any material modification
or cancellation of such insurance. In the event of a material modification or
cancellation of coverage, the City may terminate the Contract or stop the Work in
accordance with the Contract Documents, unless the City receives, prior to such
effective date, another properly executed original Certificate of Insurance and
original copies of endorsements or certified original policies, including all
endorsements and attachments thereto evidencing coverage’s set forth herein and
the insurance required herein is in full force and effect. Contractor shall not take
possession, or use the Site, or commence operations under this Contract until the
City has been furnished original Certificate(s) of Insurance and certified original
copies of endorsements or policies of insurance including all endorsements and
any and all other attachments as required in this Article. The original
endorsements for each policy and the Certificate of Insurance shall be signed by
an individual authorized by the insurance carrier to do so on its behalf.
4. The Certificate(s) of Insurance, policies and endorsements shall so covenant and
shall be construed as primary, and the City’s insurance and/or deductibles and/or
self-insured retentions or self-insured programs shall not be construed as
contributory.
5. The City reserves the right to adjust the monetary limits and types of insurance
coverages during the term of this Contract including any extension thereof if, in the
City’s reasonable judgment, the amount or type of insurance carried by the
Contractor becomes inadequate.
Packet Page. 352
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -34-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
6. Contractor shall report to the City, in addition to the Contractor’s insurer, any and
all insurance claims submitted by the Contractor in connection with the Work under
this Contract.
7. Products/completed operations coverage shall extend a minimum of three years
after the project completion. Coverage shall be included on behalf of the insured
for covered claims arising out of the actions of independent contractors. If the
insured is using subcontractors, the policy must include work performed “by or on
behalf” of the insured. Policy shall contain no language that would invalidate or
remove the insurer’s duty to defend or indemnify for claims or suits expressly
excluded from coverage. Policy shall specifically provide for a duty to defend on
the part of the insurer. The City, its officers, officials, agents employees, and
volunteers shall be included as insureds under the policy.
ARTICLE 5 -CONTRACTOR RESPONSIBILITIES; REGULATORY REQUIREMENTS
5.1 Applicable Laws
A. Contractor shall give all notices required by and shall comply with all Applicable Laws
applicable to the performance of the Work. Except where otherwise expressly
required by Applicable Laws, neither the City nor the City’s Representative shall be
responsible for monitoring Contractor’s compliance with any Applicable Laws. If
Contractor performs any Work knowing or having reason to know that it is contrary
to Applicable Laws, Contractor shall bear all claims, costs, losses, and damages
(including but not limited to all fees and charges of engineers, architects, attorneys,
and other professionals and all court or arbitration or other dispute resolution costs)
arising out of or relating to such Work.
5.2 Permits and Licenses
A. Permits and licenses necessary for prosecution of the Work shall be secured and
paid for by Contractor, including, but not limited to, excavation permit, for plumbing,
mechanical and electrical work and for operations in or over public streets or right of
way under jurisdiction of public agencies other than the City, unless otherwise
specified in the Contract Documents.
B. The Contractor shall arrange and pay for all off-site inspection of the Work related to
permits and licenses, including certification, required by the specifications, drawings,
or by governing authorities, except for such off-site inspections delineated as the
City’s responsibility pursuant to the Contract Documents.
C. Before acceptance of the Work, the Contractor shall submit all licenses, permits,
certificates of inspection and required approvals to the City.
5.3 Taxes
A. Contractor shall pay all sales, consumer, use, and other similar taxes required to be
paid in accordance with the Applicable Laws of the place of the Project which are
applicable during the performance of the Work. In accordance with Revenue and
Taxation Code section 107.6, the Contract Documents may create a possessory
Packet Page. 353
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -35-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
interest subject to personal property taxation for which Contractor will be
responsible.
5.4 Traffic Control
A. Traffic control plans, if required, shall be prepared at Contractor’s expense. Traffic
control shall be performed at Contractor’s expense in accordance with the
requirements of the City and/or the local agency with jurisdiction. Costs for traffic
control plans, implementation of traffic control, or traffic signal services required by
the City shall be included in the Contractor’s Bid.
B. All warning signs and safety devices used by the Contractor to perform the Work
shall conform to the requirements contained in the State of California, Department
of Transportation’s current edition of “Manual of Traffic Controls for Construction and
Maintenance Work Zones” or to the requirements of the local agency. The Contractor
shall also be responsible for all traffic control required by the agency having
jurisdiction over the Project on the intersecting streets. Contractor must submit a
traffic control plan to the agency having jurisdiction over the Project for approval prior
to starting Work.
C. The Contractor’s representative on the site responsible for traffic control shall
produce evidence that he/she has completed training acceptable to the California
Department of Transportation for safety through construction zones. All of the streets
in which the Work will occur shall remain open to traffic and one lane of traffic
maintained at all times unless otherwise directed by the agency of jurisdiction.
Businesses and residences adjacent to the Work shall be notified forty-eight (48)
hours in advance of closing of driveways. The Contractor shall make every effort to
minimize the amount of public parking temporarily eliminated due to construction in
areas fronting businesses. No stockpiles of pipe or other material will be allowed in
traveled right-of-ways after working hours unless otherwise approved by the
Engineer.
5.5 Safety
A. Contractor shall be solely responsible for all safety precautions and programs in
connection with the Work. Such responsibility does not relieve Subcontractors of
their responsibility for the safety of persons or property in the performance of their
work, nor for compliance with applicable safety laws. Contractor shall comply with
all Applicable Laws relating to the safety of persons or property, or to the protection
of persons or property from damage, injury, or loss; and shall erect and maintain all
necessary safeguards for such safety and protection. Contractor shall notify owners
of adjacent property and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them in the
protection, removal, relocation, and replacement of their property.
B. The Contractor shall maintain emergency first aid treatment for his employees which
complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C. §
651 et seq.), and California Code of Regulations, Title 8, Industrial Relations Division
1, Department of Industrial Relations, Chapter 4. The Contractor shall ensure the
availability of emergency medical services for its employees in accordance with
Packet Page. 354
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -36-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
California Code of Regulations, Title 8, Section 1512. The Contractor shall submit
an Illness and Injury Prevention Program and a Project Site specific safety program
to the City prior to beginning Work. Contractor shall maintain a confined space
program that meets or exceeds the City’s standards. Contractor needs to make
themselves aware of the City’s safety policies and procedures, and shall meet or
exceed all City standards in areas where the City must enter to perform inspections.
C. Hazard Communication Programs. Contractor shall be responsible for coordinating
any exchange of material safety data sheets or other hazard communication
information required to be made available to or exchanged between or among
employers at the Site in accordance with Applicable Laws.
5.6 Hazardous Materials
A. The City shall not be responsible for any Hazardous Waste brought to the site by the
Contractor. If the Contractor: (i) introduces and/or discharges a Hazardous Waste
onto the site in a manner not specified by the Contract Documents; and/or (ii)
disturbs a Hazardous Material identified in the Contract Documents, the Contractor
shall hire a qualified remediation contractor at Contractor’s sole cost to eliminate the
condition as soon as possible. Under no circumstance shall the Contractor perform
Work for which it is not qualified. The City, in its sole discretion, may require the
Contractor to retain at Contractor’s cost an independent testing laboratory.
B. If the Contractor encounters a Hazardous Waste which may cause foreseeable injury
or damage, Contractor shall immediately: (i) secure or otherwise isolate such
condition; (ii) stop all Work in connection with such material or substance (except in
an emergency situation); and (iii) notify the City (and promptly thereafter confirm
such notice in writing).
C. Subject to Contractor’s compliance with this Article 5.6(B), the City shall verify the
presence or absence of the Hazardous Waste reported by the Contractor, except as
qualified under Article 5.6(A) and Article 5.6(B) in the event such material or
substance is found to be present, verify that the levels of the hazardous material are
below OSHA Permissible Exposure Levels and below levels which would classify
the material as a state of California or federal hazardous waste. When the material
falls below such levels, Work in the affected area shall resume upon direction by the
City.
D. Contractor shall indemnify and hold harmless the City from and against claims,
damages, losses and expenses, arising from a Hazardous Waste on the Project Site,
if such Hazardous Waste exceeded OSHA Permissible Exposure Levels or levels
which would classify the material as a state of California or federal hazardous waste,
and was either i) shown on the Contract Documents or information available to
bidders; or (ii) brought to the site by Contractor. Nothing in this paragraph shall
obligate the Contractor to indemnify the City in the event of the sole or active
negligence or willful misconduct of the City, its officers, agents, or employees.
Packet Page. 355
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -37-00 72 00 – GENERAL CONDITIONS
5.7 Sanitary Facilities.
A. Contractor shall provide sanitary temporary toilet buildings and hand washing
facilities for the use of all workers. All toilets and hand washing facilities shall comply
Packet Page. 356
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -37-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
with local codes and ordinances. Toilets shall be placed inside sealed secondary
containment devices installed on a flat, level surface. Accumulated liquids in the
secondary containment devices shall be properly removed and legally disposed
without spillage onto the ground. Toilets shall be kept supplied with toilet paper and
shall have workable door fasteners. Toilets and hand washing facilities shall be
serviced no less than once weekly and shall be present in a quantity of not less than
1 per 20 workers as required by Cal/OSHA regulations. The toilets and hand
washing facilities shall be maintained in a sanitary condition at all times. Use of toilet
and hand washing facilities in the Work under construction shall not be permitted.
Any other sanitary facilities required by Cal/OSHA shall be the responsibility of the
Contractor.
5.8 Dust Control
A. Contractor, at its expense, shall maintain all excavations, embankments, haul roads,
permanent access roads, plant sites, waste disposal areas, borrow areas, and all
other work areas free from dust. Industry accepted methods of dust control suitable
for the area involved, such as sprinkling, chemical treatment, light bituminous
treatment or similar methods, will be permitted.
5.9 Air Pollution Control
A. Contractor shall comply with all air pollution control rules, regulations, ordinances
and statutes. All containers of paint, thinner, curing compound, solvent or liquid
asphalt shall be labeled to indicate that the contents fully comply with the applicable
material requirements.
B. Without limiting the foregoing, Contractor must fully comply with all applicable laws,
rules and regulations in furnishing or using equipment and/or providing services,
including, but not limited to, emissions limits and permitting requirements imposed
by the Air Quality Management District with jurisdiction over the Project and/or
California Air Resources Board (CARB). Contractor shall specifically be aware of
the application of these limits and requirements to "portable equipment", which
definition includes any item of equipment with a fuel-powered engine. Contractor
shall indemnify the City against any fines or penalties imposed by the air quality
management district, CARB, or any other governmental or regulatory agency for its
violations of Applicable Laws as well as those of its subcontractors or others for
whom Contractor is responsible under its indemnity obligations provided for in the
Contract Documents.
5.10 Water Quality Management and Compliance
A. Storm, surface, ground, nuisance, or other waters may be encountered at various
times during construction of the Work. The Contractor hereby acknowledges that it
has investigated the risk arising from such waters, has prepared its Bid accordingly,
and assumes any and all risks and liabilities arising therefrom.
B. Contractor shall keep itself and all subcontractors, staff, and employees fully
informed of and in compliance with all local, state and federal laws, rules and
Packet Page. 357
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -38-00 72 00 – GENERAL CONDITIONS
regulations that may impact, or be implicated by the performance of the Work
including, without limitation, all applicable provisions regulating discharges of storm
Packet Page. 358
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -38-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
water; the Federal Water Pollution Control Act (33 U.S.C. § 13000 et seq.); the
California Porter-Cologne Water Quality Control Act (Cal Water Code §§ 13000-
14950); and any and all regulations, policies, or permits issued pursuant to any such
authority. These include, but are not limited to California State Water Resources
Control Board Order Number 2009-0009-DWQ (NPDES Permit No. CAS000002),
as amended by Order Numbers 2010-0014-DWQ, 2012-0006-DWQ, and any
subsequent amendment to or renewal thereof, State Water Resources Control
Board Order No. 2013-0001-DWQ (NPDES Order No. CAS000004), Santa Ana
Regional Water Quality Control Board No. R8-2010-0036 (NPDES No. CAS618036),
and any amendment or renewal thereof.
C. Contractor shall comply with all conditions of the State Water Resources Control
Board (“State Water Board”) National Pollutant Discharge Elimination System
General Permit for Waste Discharge Requirements for Discharges of Storm Water
Runoff Associated with Construction Activity (“Construction General Permit”) for all
construction activity which results in the disturbance of in excess of one acre of total
land area or which is part of a larger common area of development or sale.
Contractor shall comply with the lawful requirements of the City, and any other
applicable municipality, drainage district, or other local agency with jurisdiction over
the location where the Work is to be conducted, regarding discharges of storm water
to separate storm drain systems or other watercourses under their jurisdiction,
including applicable requirements in municipal storm water management programs.
D. Unless otherwise specified in the Special Conditions or other portion of the Contract
Documents, the City has not prepared a Storm Water Pollution Prevention Plan
(“SWPPP”) or other storm water compliance plan for the Project Site. Contractor
shall be responsible for filing the Notice of Intent (“NOI”) and for obtaining coverage
under the Construction General Permit. This includes filing all necessary
documentation including the Permit Registration Documents (“PRDs”) through the
Stormwater Multiple Applications and Report Tracking System (“SMARTS”);
preparing and implementing a SWPPP for the Work site; implementing all other
provisions, and monitoring and reporting requirements required by the Construction
General Permit; and providing a Qualified SWPPP Developer (“QSD”) and Qualified
SWPPP Practitioner (“QSP”), as necessary for all Work site activities, including but
not limited to preparation and submittal of all reports, plans, inspections, and
monitoring information in compliance with the Construction General Permit. All
submittals shall be coordinated with the City’s Legally Responsible Person and
Authorized Signatory as those terms are defined in the Construction General Permit.
Before any NOI, PRD, SWPPP, or other Construction General Permit-related
document may be submitted to the State Water Board or implemented on the Project
site, it must first be reviewed and approved by the City and/or City’s designee.
Contractor shall include all costs of compliance with specified requirements in the
Contract Price.
E. The City retains the right to develop its own documentation for the Project site,
including but not limited to the SWPPP, and in the alternative may require Contractor
to adopt and implement portions of the City developed SWPPP. The City expressly
reserves the right to procure coverage under the Construction General Permit for
the Work site if Contractor fails to draft satisfactory PRDs or SWPPP or otherwise
fails to proceed in a manner that complies with the requirements of the Construction
Packet Page. 359
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -39-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
General Permit. The City additionally reserves the right to hire additional contractors
to maintain compliance at the Work site. Whether Contractor has adequately
maintained compliance with the Construction General Permit shall be the City’s sole
determination. Any costs incurred by the City in procuring coverage under the
Construction General Permit, or drafting and/or implementing a SWPPP for the Work
site shall be paid by Contractor.
F. Notwithstanding the above, for those Work sites where construction activity results
in the disturbance of less than one acre of total land area and/or do not need
coverage under the Construction General Permit, the Contractor shall be
responsible for preparing and implementing an Erosion and Sediment Control Plan
in accordance with State Water Resources Control Board Order No. 2013-0001-
DWQ (NPDES Order No. CAS000004) and any amendment to or renewal thereof.
G. Failure to comply with the Construction General Permit, laws, regulations, and
ordinances listed in this Article is a violation of federal and state law.
Notwithstanding any other indemnity contained in these Contract Documents,
Contractor agrees to indemnify and hold harmless the City, its officials, officers,
agents, employees and authorized volunteers from and against any and all claims,
demands, fees, costs, expenses, or losses or liabilities of any kind or nature which
the City, its officials, officers, agents, employees and authorized volunteers may
sustain or incur for noncompliance with the Permit, laws, regulations, and ordinances
listed above, arising out of or in connection with the Work, except for liability resulting
from the sole established negligence, willful misconduct or active negligence of the
City, its officials, officers, agents, employees or authorized volunteers.
H. The City reserves the right to defend any enforcement action or civil action brought
against the City for Contractor’s failure to comply with any applicable water quality
law, regulation, or policy. Contractor hereby agrees to be bound by, and to
reimburse the City for the costs associated with, any settlement reached between
the City and any relevant enforcement entity.
5.11 Environmental Quality Protection
A. The Contractor shall comply with all requirements of applicable federal, state, and
local environmental rules and regulations. Any infractions of said rules and
regulations by the Contractor during the term of the Contract, which result in
penalties, will be the responsibility of the Contractor. The City operates under a
number of environmental permits issued by various agencies. If due to an action,
inaction, or negligence by the Contractor, the City becomes subject to non-
compliance penalties, the cost of such penalties shall be borne by the Contractor.
B. The Contractor shall exercise care to preserve the natural landscape and
vegetation, and shall conduct operations so as to prevent unnecessary destruction,
scarring, or defacing of the natural surroundings in the vicinity of the Work.
Movement of crews and equipment within the rights-of-way and over routes provided
for access to the Work shall be performed in a manner to prevent damage to
property. When no longer required, construction roads shall be restored to original
contours. Upon completion of the Work, and following removal of construction
facilities and required cleanup, land used for construction purposes and not required
Packet Page. 360
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -40-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
for the completed installation shall be scarified and regraded, as required, so that all
surfaces are left in a condition that will facilitate natural revegetation, provide for
proper drainage, and prevent erosion.
C. If, in the performance of the Work, evidence of the possible occurrence of any
Federally listed threatened or endangered plant or animal is discovered, the
Contractor shall notify the City Representative immediately, giving the location and
nature of the findings. Written confirmation of the evidence, location and nature of
the findings shall be forwarded to City within two (2) Days. The Contractor shall
immediately cease all construction activities in the immediate area of the discovery
to the extent necessary to protect the endangered plant or animal. If directed by the
City Representative, Contractor will refrain from working in the immediate area,
suspend the Work in its entirety, or alter its performance to ensure full compliance
with all applicable permits, laws and regulations. Any City directed changes to the
Work as a result of a siting will be pursuant to the Contract Documents. Any costs
or delays incurred by City or the Contractor due to unreasonable or false notification
of an endangered plant or animal will be borne by the Contractor.
D. If, in the performance of the Work, Contractor should unearth cultural resources (for
example, human remains, animal bones, stone tools, artifacts and/or midden
deposits) through excavation, grading, watering or other means, the Contractor shall
notify the construction/archeological monitor and/or the City Representative
immediately, giving the location and nature of the findings. Written confirmation of
the evidence, location and nature of the findings shall be forwarded to the
construction/archeological monitor and/or City within two (2) Days. The Contractor
shall immediately cease all construction activities in the immediate area of the
discovery to the extent necessary to protect the cultural resource. If directed by the
City Representative, Contractor will refrain from working in the immediate area,
suspend the Work in its entirety, or re-sequence and/or alter its performance to
ensure full compliance with all applicable permits, laws and regulations. Should the
presence of cultural resources be confirmed, the Contractor will assist the City
Representative and the construction/archeological monitor in the preparation and
implementation of a data recovery plan. The Contractor shall provide such
cooperation and assistance as may be necessary to preserve the cultural resources
for removal or other disposition. Any City directed changes to the Work as a result
of the cultural resource will be pursuant to the Contract Documents. Should
Contractor, without permission, injure, destroy, excavate, appropriate, or remove
any cultural resource on or adjacent to the Site, it will be subject to disciplinary action,
arrest and penalty under applicable law. The Contractor shall be principally
responsible for all costs of mitigation and/or restoration of cultural resources related
to the unauthorized actions identified above. Contractor shall be required to pay for
unauthorized damage and mitigation costs to cultural resources (historical and
archeological resources) as a result of unauthorized activities that damage cultural
resources and shall indemnify City pursuant to the Contract Documents.
5.12 Excessive Noise
A. Contractor shall use only such equipment on the Work and in such state of repair so
that the emission of sound therefrom is within the noise tolerance level of that
equipment as established by Cal/OSHA. Contractor shall comply with the most
Packet Page. 361
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -41-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
restrictive of the following: (1) local sound control and noise level rules, regulations
and ordinances and (2) the requirements contained in these Contract Documents,
including hours of operation requirements.
B. No internal combustion engine shall be operated on the Project without a muffler of
the type recommended by the manufacturer. Should any muffler or other control
device sustain damage or be determined to be ineffective or defective, the
Contractor shall promptly remove the equipment and shall not return said equipment
to the job until the device is repaired or replaced. Said noise and vibration level
requirements shall apply to all equipment on the job or related to the job, including
but not limited to, trucks, transit mixers or transit equipment that may or may not be
owned by the Contractor.
5.13 Diversion of Recyclable Waste Material
A. In compliance with the applicable City’s waste reduction and recycling efforts,
Contractor shall divert all Recyclable Waste Materials to appropriate recycling
centers as required for compliance with the local jurisdiction’s waste diversion
ordinances. Contractor will be required to submit weight tickets and written proof of
diversion with its monthly progress payment requests. Contractor shall complete
and execute any certification forms required by the City or other applicable agencies
to document Contractor’s compliance with these diversion requirements. All costs
incurred for these waste diversion efforts shall be the responsibility of the Contractor.
5.14 Inspector’s Field Office.
A. If required by the City, the Contractor shall be responsible for providing the
inspector’s field office. The office shall be a substantial waterproof construction with
adequate natural light and ventilation by means of stock design windows. Door shall
have a key type lock or padlock clasp. The office shall have heating and air
conditioning and shall be equipped with a telephone, a telephone answering
machine, an ability to connect to the internet, and a fax machine at Contractor’s
expense. The field office shall be provided within 20 Days of the Notice to Proceed.
B. A table satisfactory for the study of plans and two chairs shall be provided by
Contractor. Contractor shall provide and pay for adequate electric lights, local
telephone service, and adequate heat and air conditioning for the field office until
authorized removal.
5.15 Contractor’s Supervision.
A. Contractor shall continuously keep at the Project site, a competent and experienced
full-time Project superintendent acceptable to the City. Superintendent must be able
to proficiently speak, read and write in English and shall have the authority to make
decisions on behalf of the Contractor. Contractor shall continuously provide efficient
supervision of the Project.
Packet Page. 362
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -42-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
5.16 Workers.
A. Contractor shall at all times enforce strict discipline and good order among its
employees. Contractor shall not employ on the Project any unfit person or any one
not skilled in the Work assigned to him or her.
B. Any person in the employ of the Contractor whom the City may deem incompetent
or unfit shall be dismissed from the Work and shall not be employed on this Project.
5.17 Independent Contractors.
A. Contractor shall be an independent contractor for the City and not an employee.
Contractor understands and agrees that it and all of its employees shall not be
considered officers, employees, or agents of the City and are not entitled to benefits
of any kind normally provided employees of the City, including but not limited to,
state unemployment compensation or workers’ compensation. Contractor assumes
full responsibility for the acts and omissions of its employees or agents related to the
Work.
5.18 Verification of Employment Eligibility.
A. By executing the Contract, Contractor verifies that it fully complies with all
requirements and restrictions of state and federal law respecting the employment of
undocumented aliens, including, but not limited to, the Immigration Reform and
Control Act of 1986, as may be amended from time to time, and shall require all
subcontractors, sub-subcontractors and consultants to comply with the same. Each
person executing this Contract on behalf of Contractor verifies that he or she is a
duly authorized officer of Contractor and that any of the following shall be grounds
for the City to terminate the Contract for cause: (1) failure of the Contractor or its
Subcontractors, sub-subcontractors or consultants to meet any of the requirements
provided for in this Article; (2) any misrepresentation or material omission concerning
compliance with such requirements; or (3) failure to immediately remove from the
Work any person found not to be in compliance with such requirements.
5.19 Labor.
A. Hours of Work
1. As provided in Article 3 (commencing at section 1810), Chapter 1, Part 7, Division
2 of the Labor Code, Contractor stipulates that eight (8) hours of labor shall
constitute a legal day’s work. The time of service of any worker employed at any
time by the Contractor or by any subcontractor on any subcontract under this
Contract upon the Work or upon any part of the Work contemplated by this
Contract is limited and restricted to eight (8) hours during any one calendar day
and 40 hours during any one calendar week, except as hereinafter provided.
Notwithstanding the provisions herein above set forth, work performed by
employees of Contractor in excess of eight (8) hours per day, and 40 hours during
any one week, shall be permitted upon this public work upon compensation for all
hours worked in excess of eight (8) hours per day at not less than one and one-
half times the basic rate of pay.
Packet Page. 363
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -43-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
2. The Contractor and every Subcontractor shall keep an accurate record showing
the name of and actual hours worked each calendar day and each calendar week
by each worker employed in connection with the Work or any part of the Work
contemplated by this Contract. The record shall be kept open at all reasonable
hours to the inspection of the City and to the Division of Labor Law Enforcement,
Department of Industrial Relations of the State of California.
3. The Contractor shall pay to the City a penalty of twenty-five dollars ($25.00) for
each worker employed in the execution of this Contract by the Contractor or by
any subcontractor for each calendar day during which such worker is required or
permitted to work more than eight (8) hours in any calendar day and 40 hours in
any one calendar week in violation of the provisions of Article 3 (commencing at
section 1810), Chapter 1, Part 7, Division 2 of the Labor Code.
4. Any work necessary to be performed after regular working hours, or on Saturdays
and Sundays or other holidays, shall be performed without additional expense to
the City.
5. If Contractor gives notice of an inspection pursuant to the Contract Documents,
the City will provide inspection during normal working hours from 7:00 a.m. to 3:30
p.m. Monday through Friday. Requested inspections before or after this time will
be charged to the Contractor as reimbursable inspection time. Inspections on
weekends requires two (2) Days’ notice for review and approval. Upon written
request and approval the 8.5 hour working day may be changed to other limits
subject to city/county ordinance.
6. It shall be unlawful for any person to operate, permit, use, or cause to operate any
of the following at the Project Site, other than between the hours of 7:00 a.m. to
5:00 p.m., Monday through Friday, with no Work allowed on City-observed
Holidays, unless otherwise approved by the City:
a. Powered Vehicles
b. Construction Equipment
c. Loading and Unloading Vehicles
d. Domestic Power Tools
B. Payroll Records; Labor Compliance
1. Pursuant to Labor Code section 1776, Contractor and all subcontractors shall
maintain weekly certified payroll records, showing the names, addresses, Social
Security numbers, work classifications, straight time and overtime hours worked
each day and week, and the actual per diem wages paid to each journeyman,
apprentice, worker, or other employee employed by them in connection with the
Work under this Contract. Contractor shall certify under penalty of perjury that
records maintained and submitted by Contractor are true and accurate. Contractor
shall also require Subcontractor(s) to certify weekly payroll records under penalty
of perjury.
Packet Page. 364
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -44-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
2. In accordance with Labor Code section 1771.4, the Contractor and each
Subcontractor shall furnish the certified payroll records directly to the Department
of Industrial Relations (“DIR”) on the specified interval and format prescribed by
the DIR, which may include electronic submission. Contractor shall comply with
all requirements and regulations from the DIR relating to labor compliance
monitoring and enforcement. The requirement to submit certified payroll records
directly to the Labor Commissioner under Labor Code section 1771.4 shall not
apply to work performed on a public works project that is exempt pursuant to the
small project exemption specified in Labor Code Section 1771.4.
3. Any stop orders issued by the DIR against Contractor or any Subcontractor that
affect Contractor’s performance of Work, including any delay, shall be Contractor’s
sole responsibility. Any delay arising out of or resulting from such stop orders shall
be considered Contractor caused delay subject to any applicable liquidated
damages and shall not be compensable by the City. Contractor shall defend,
indemnify and hold the City, its officials, officers, employees and agents free and
harmless from any claim or liability arising out of stop orders issued by the DIR
against Contractor or any Subcontractor.
4. The payroll records described herein shall be certified and submitted by the
Contractor at a time designated by the City. The Contractor shall also provide the
following:
a. A certified copy of the employee’s payroll records shall be made available for
inspection or furnished to such employee or his or her authorized representative
on request.
b. A certified copy of all payroll records described herein shall be made available
for inspection or furnished upon request of the DIR.
5. Unless submitted electronically, the certified payroll records shall be on forms
provided by the Division of Labor Standards Enforcement (“DLSE”) of the DIR or
shall contain the same information as the forms provided by the DLSE.
6. Any copy of records made available for inspection as copies and furnished upon
request to the public or any public agency, the City, the Division of Apprenticeship
Standards or the Division of Labor Standards Enforcement shall be marked or
obliterated in such a manner as to prevent disclosure of an individual's name,
address and social security number. The name and address of the Contractor
awarded the Contract or performing the Contract shall not be marked or
obliterated.
7. In the event of noncompliance with the requirements of this Article, the Contractor
shall have ten (10) Days in which to comply subsequent to receipt of written notice
specifying in what respects the Contractor must comply with this Article. Should
noncompliance still be evident after such 10-day period, the Contractor shall pay
a penalty of one hundred dollars ($100.00) to the City for each calendar day, or
portion thereof, for each worker, until strict compliance is effectuated. Upon the
request of the Division of Apprenticeship Standards or the Division of Labor
Packet Page. 365
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -45-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
Standards Enforcement, such penalties shall be withheld from progress payment
then due.
8. The responsibility for compliance with this Article shall rest upon the Contractor.
C. Prevailing Rates of Wages
1. The Contractor is aware of the requirements of Labor Code sections 1720 et seq.
and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000
et seq. (“Prevailing Wage Laws”), which require the payment of prevailing wage
rates and the performance of other requirements on certain “public works” and
“maintenance” projects. Since this Project involves an applicable “public works” or
“maintenance” project, as defined by the Prevailing Wage Laws, and since the total
compensation is $1,000 or more, Contractor agrees to fully comply with such
Prevailing Wage Laws. The Contractor shall obtain a copy of the prevailing rates
of per diem wages at the commencement of this Contract from the website of the
Division of Labor Statistics and Research of the Department of Industrial Relations
located at www.dir.ca.gov. In the alternative, the Contractor may view a copy of
the prevailing rate of per diem wages which are on file at the City’s Administration
Office and shall be made available to interested parties upon request. Contractor
shall make copies of the prevailing rates of per diem wages for each craft,
classification, or type of worker needed to perform work on the Project available to
interested parties upon request, and shall post copies at the Contractor’s principal
place of business and at the Project site. Contractor shall defend, indemnify and
hold the City, its officials, officers, employees and authorized volunteers free and
harmless from any claims, liabilities, costs, penalties or interest arising out of any
failure or allege failure to comply with the Prevailing Wage Laws.
2. The Contractor shall forfeit as a penalty to the City not more than Two Hundred
Dollars ($200.00), pursuant to Labor Code section 1775, for each calendar day, or
portion thereof, for each worker paid less than the prevailing wage rate as
determined by the Director of the DIR for such work or craft in which such worker
is employed for any public work done under the Contract by it or by any
Subcontractor under it. The difference between such prevailing wage rate and the
amount paid to each worker for each calendar day or portion thereof, for which
each worker was paid less than the prevailing wage rate, shall be paid to each
worker by the Contractor.
3. Contractor shall post, at appropriate conspicuous points on the Project Site, a
schedule showing all determined general prevailing wage rates and all authorized
deductions, if any, from unpaid wages actually earned.
D. Public Works Contractor Registration
1. Pursuant to Labor Code sections 1725.5 and 1771.1, the Contractor and its
Subcontractors must be registered with the DIR prior to the execution of a contract
to perform public works. By entering into this Contract, Contractor represents that
it is aware of the registration requirement and is currently registered with the DIR.
Contractor shall maintain a current registration for the duration of the Project.
Contractor shall further include the requirements of Labor Code sections 1725.5
Packet Page. 366
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -46-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
and 1771.1 in any subcontract and ensure that all Subcontractors are registered
at the time this Contract is entered into and maintain registration for the duration
of the Project. Notwithstanding the foregoing, the contractor registration
requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not
apply to work performed on a public works project that is exempt pursuant to the
small project exemption specified in Labor Code Sections 1725.5 and 1771.1.
E. Employment of Apprentices
1. Contractor and all Subcontractors shall comply with the requirements of Labor
Code sections 1777.5 and 1777.6 in the employment of apprentices.
2. Information relative to apprenticeship standards, wage schedules, and other
requirements may be obtained from the Director of Industrial Relations, ex officio
the Administrator of Apprenticeship, San Francisco, California, or from the Division
of Apprenticeship Standards and its branch offices.
3. Knowing violations of Labor Code section 1777.5 will result in forfeiture not to
exceed one hundred dollars ($100.00) for each calendar day of non-compliance
pursuant to Labor Code section 1777.7.
F. Nondiscrimination/Equal Employment Opportunity
1. Pursuant to Labor Code section 1735 and other applicable provisions of law, the
Contractor and its Subcontractors shall not discriminate against any employee or
applicant for employment because of race, religious creed, color, national origin,
ancestry, physical disability, mental disability, medical condition, marital status,
sex, age, sexual orientation, or any other classifications protected by law on this
Project. The Contractor will take affirmative action to insure that employees are
treated during employment or training without regard to their race, religious creed,
color, national origin, ancestry, physical disability, mental disability, medical
condition, marital status, sex, age, sexual orientation, or any other classifications
protected by law.
G. Debarment of Contractors and Subcontractors
1. Contractors or Subcontractors may not perform work on a public works project with
a subcontractor who is ineligible to perform work on a public project pursuant to
Labor Code section 1777.1 or 1777.7. Any contract on a public works project
entered into between a contractor and a debarred subcontractor is void as a matter
of law. A debarred subcontractor may not receive any public money for performing
work as a subcontractor on a public works contract. Any public money that is paid,
or may have been paid to a debarred subcontractor by a contractor on the project
shall be returned to the City. The Contractor shall be responsible for the payment
of wages to workers of a debarred subcontractor who has been allowed to work
on the Project.
5.20 Subcontracts.
A. Contractor agrees to bind every Subcontractor to the terms of the Contract
Documents as far as such terms are applicable to Subcontractor’s portion of the
Packet Page. 367
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -47-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
Work. Contractor shall be as fully responsible to the City for the acts and omissions
of its subcontractors and of persons either directly or indirectly employed by its
subcontractors, as Contractor is for acts and omissions of persons directly employed
by Contractor. Nothing contained in these Contract Documents shall create any
contractual relationship between any subcontractor and the City.
B. The City reserves the right to accept all subcontractors. The City’s acceptance of
any Subcontractor under this Contract shall not in any way relieve Contractor of its
obligations in the Contract Documents.
C. Prior to substituting any Subcontractor listed in the Bid Forms, Contractor must
comply with the requirements of the Subletting and Subcontracting Fair Practices
Act pursuant to California Public Contract Code section 4100 et seq.
5.21 Progress Meetings
A. The Contractor shall schedule and hold regular progress meetings at least weekly
and at other times as requested by Engineer or as required by progress of the Work.
The Contractor, City, and all Subcontractors active on the Site shall attend each
meeting. Contractor may at its discretion request attendance by representatives of
its Suppliers, manufacturers, and other Subcontractors. The City will preside at the
progress meetings and will arrange for keeping and distributing the minutes. The
purpose of the meetings is to review the progress of the Work, maintain coordination
of efforts, discuss changes in scheduling, and resolve other problems which may
develop. During each meeting, the Contractor shall present any issues which may
impact its progress with a view to resolve these issues expeditiously.
5.22 Submittals
A. Schedule of Submittals. Within five (5) Days after the Notice to Proceed (unless
otherwise specified in the Contract Documents), Contractor will prepare and deliver
a Schedule of Submittals to the City that has been fully integrated with the progress
schedule and identifies each Submittal required by the Contract Documents as well
as the date on which Contractor will deliver each Submittal to the City. Each
Submittal must be delivered to the City at least thirty (30) Days prior to the date the
material or equipment is scheduled to be incorporated into the Work. The Contractor
is responsible for any schedule delays resulting from the Submittal process.
B. Submittal Procedures.
1. Contractor will follow the following procedures for each Submittal, Shop Drawing
and Sample required by the Contract Documents:
a. Submittals must be transmitted electronically.
b. Transmittals will be sequentially numbered. Contractor to mark revised
Submittals with original number and sequential alphabetic suffix.
c. Each Submittal will identify the Project, Contractor, Subcontractor and
Supplier, pertinent Drawing and detail number, and Specification Section
number appropriate to Submittal.
Packet Page. 368
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -48-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
d. By transmitting a Submittal, Contractor certifies it has reviewed and approved
each Submittal, verified products required, field dimensions, adjacent
construction Work, and that coordination of information is according to
requirements of the Work and Contract Documents.
e. Identify variations in Contract Documents and product or system limitations
that may differ and/or be detrimental to successful performance of completed
Work.
f. When Submittal is revised for resubmission, Contractor shall promptly address
the City’s comments and resubmit. Contractor shall identify changes made
since previous submission.
g. The City’s review of Shop Drawings shall not relieve Contractor from
responsibility for deviations from the Contract Documents unless Contractor
has, in writing, called the City’s attention to such deviations at time of
submission and the City has taken no exception to the deviation. The City’s
review of Shop Drawings shall not relieve Contractor from responsibility for
errors in Shop Drawings.
h. Submittals not required by the Contract Documents or requested by the City
will not be acknowledged or processed.
i. Incomplete Submittals will not be reviewed by the City. Delays resulting from
incomplete Submittals are not the responsibility of the City.
j. Contractor shall not be entitled to any extension of the Contract Times as a
result of the Submittal process.
k. Contractor shall allow a minimum of 20 working days for review of Submittals
unless otherwise specified in the Contract Documents.
2. Where a Submittal, Shop Drawing or Sample is required by the Contract
Documents or the Schedule of Submittals, any related Work performed prior to the
City review and approval of the pertinent submittal will be performed at the sole
risk and expense and responsibility of Contractor.
C. Schedule Milestone for Submittals. Contractor must submit all Submittals required
by the Contract Documents in accordance with the Schedule of Submittals. If
Contractor fails to submit the Submittals in accordance with the Schedule of
Submittals, Contractor will be solely liable for any delays or impacts caused by the
delayed Submittal, whether direct or indirect. Contractor will be liable for the time
calculated from the date the Submittal is due until the date a compliant Submittal is
made. A compliant Submittal will be one that is complete and satisfies the
requirements of the Contract Documents.
5.23 Shop Drawings and Sample Submittal Procedures.
A. Before submitting each Shop Drawing or Sample, Contractor shall have:
Packet Page. 369
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -49-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
1. Reviewed and coordinated each Shop Drawing or Sample with other Shop
Drawings and Samples and with the requirements of the Work and the Contract
Documents;
2. Determined and verified all field measurements, quantities, dimensions, specified
performance and design criteria, installation requirements, materials, catalog
numbers, and similar information with respect thereto;
3. Determined and verified the suitability of all materials offered with respect to the
indicated application, fabrication, shipping, handling, storage, assembly, and
installation pertaining to the performance of the Work; and
4. Determined and verified all information relative to Contractor’s responsibilities for
means, methods, techniques, sequences, and procedures of construction, and
safety precautions and programs incident thereto.
B. With each Submittal, Contractor shall give the City specific written notice of any
variations that the Shop Drawing or Sample may have from the requirements of the
Contract Documents. This notice shall be both a written communication separate
from the Shop Drawings or Sample Submittal and, in addition, a specific notation
made on each Shop Drawing or Sample submitted to the City for review and
approval of each such variation.
C. Shop Drawings.
1. Data shown on the Shop Drawings will be complete with respect to quantities,
dimensions, specified performance and design criteria, materials, and similar data
to show the City the services, materials, and equipment Contractor proposes to
provide and to enable the City to review the information for assessing conformance
with information given and design concept expressed in Contract Documents.
2. When required by individual Specification sections, provide Shop Drawings signed
and sealed by a professional engineer responsible for designing components
shown on Shop Drawings. Shop Drawings must include signed and sealed
calculations to support design in a form suitable for submission to and approval by
authorities having jurisdiction.
3. Shop Drawings for steel structures shall consist of shop details, erection and other
working Drawings showing details, dimensions, sizes of members and other
information necessary for the complete fabrication and erection of the metal work.
4. Shop Drawings of concrete structures shall consist of such detailed drawings as
may reasonably be required for the successful prosecution of the Work and which
are not included in the Drawings furnished by the Engineer. These may include
drawings for false work, bracing, centering and form work, masonry layout
diagrams, and diagrams for bent reinforcement.
5. Contractor shall make revisions and provide additional information when required
by authorities having jurisdiction.
Packet Page. 370
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -50-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
D. Samples. Clearly identify each Sample as to material, Supplier, pertinent data such
as catalog numbers, the use for which intended and other data as required to enable
the City to review the submittal for assessing conformance with information given
and design concept expressed in Contract Documents. Samples should be of
appropriate size and detail to assess functional, aesthetic, color, texture, patterns
and finish selection.
E. City’s Review.
1. The City will review Shop Drawings and Samples in accordance with the Schedule
of Submittals. The City’s review and acceptance will be only to determine if the
items covered by the Submittals will, after installation or incorporation in the Work,
conform to the information given in the Contract Documents and be compatible
with the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents.
2. The City review and approval will not extend to means, methods, techniques,
sequences, or procedures of construction (except where a particular means,
method, technique, sequence, or procedure of construction is specifically and
expressly called for by the Contract Documents) or to safety precautions or
programs incident thereto. The review and approval of a separate item as such
will not indicate approval of the assembly in which the item functions.
3. The City’s review and acceptance shall not relieve Contractor from responsibility
for any variation from the requirements of the Contract Documents unless the City
has given written approval of each such variation by specific written notation
thereof incorporated in or accompanying the Shop Drawing or Sample.
F. Resubmittal Procedures. Contractor shall make corrections required by the City and
shall return corrected Shop Drawings and submit, as required, new Samples for
review and approval. Contractor shall direct specific attention in writing to revisions
other than the corrections called for by the City on previous Submittals.
5.24 Record (“As-Built”) Drawings.
A. The Contractor shall maintain one record set of Contract Documents at the Site or
digitally in an acceptable format. On these, it shall mark all Project conditions,
locations, configurations, and any other changes or deviations which may vary from
the information represented in the original Contract Documents, including buried or
concealed construction and utility features which are revealed during the course of
construction. Special attention shall be given to recording the horizontal and vertical
location of all buried utilities that differ from the locations indicated, or which were
not indicated on the Drawings. For all Projects involving the installation of any
pipeline, Contractor shall survey and record the top of the pipe at a minimum of every
100 linear feet, and at each bend, recording both the horizontal and vertical
locations. Said Drawings shall be supplemented by any detailed sketches as
necessary or directed to fully indicate the Work as actually constructed. Any required
as-built drawings of civil engineering elements of the Work shall be prepared by a
registered civil engineer.
Packet Page. 371
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -51-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
B. These master Record Drawings of the as-built conditions, including all revisions
made necessary by Addenda and Change Orders, shall be maintained up-to-date
during the progress of the Project. Red ink shall be used for alterations and notes.
Notes shall identify relevant Change Orders by number and date. Record Drawings
shall be accessible to the Engineer at all times during the construction period.
Failure on the Contractor’s part to keep Record Drawings current could result in
withholding partial payment.
C. Upon completion of the Project and as a condition of final acceptance, the Contractor
shall finalize and deliver a complete set of Record Drawings to the Engineers. The
information submitted by the Contractor will be assumed to be correct, and the
Contractor shall be responsible for, and liable to the City, for the accuracy of such
information, and for any errors or omissions which may or may not appear on the
Record Drawings.
D. Unless otherwise called for by the Contract Documents, the cost of all material,
equipment, and labor required to complete the Record Drawings shall be included in
Contractor’s bid and distributed in the Bid Schedule. No additional compensation
shall be made to the Contractor for this Work.
5.25 Layout and Field Engineering.
A. The Contractor shall utilize a properly licensed surveyor to perform all layout surveys
required for the control and completion of the Work, and all necessary surveys to
compute quantities of Work performed.
5.26 Separate Contracts and Cooperation.
A. Separate Contracts. The City reserves the right to let other contracts in connection
with this Work or on the Project site. Contractor shall permit other contractors
reasonable access and storage of their materials and execution of their work and
shall properly connect and coordinate its Work with theirs. To ensure proper
execution of its subsequent Work, Contractor shall immediately inspect work already
in place and shall at once report to the Engineer any problems with the Work in place
or discrepancies with the Contract Documents.
B. Cooperation. Contractor shall ascertain to its own satisfaction the scope of the
Project and nature of any other contracts that have been or may be awarded by the
City in prosecution of the Project to the end that Contractor may perform this
Contract in the light of such other contracts, if any. Nothing herein contained shall
be interpreted as granting to Contractor exclusive occupancy at site of the Project.
Contractor shall not cause any unnecessary hindrance or delay to any other
contractor working on the Project. If simultaneous execution of any contract for the
Project is likely to cause interference with performance of some other contract or
contracts, the Engineer shall decide which Contractor shall cease Work temporarily
and which contractor shall continue or whether work can be coordinated so that
contractors may proceed simultaneously. The City shall not be responsible for any
damages suffered or for extra costs incurred by Contractor resulting directly or
indirectly from award, performance, or attempted performance of any other contract
or contracts on the Project Site.
Packet Page. 372
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -52-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
5.27 Work Site.
A. Limitation of Use of Site and Other Areas. Rights-of-way, easements, or rights-of-
entry for the Work will be provided by the City. Unless otherwise specified in the
Special Provisions, the Contractor shall make arrangements, pay for, and assume
all responsibility for acquiring, using, and disposing of additional work areas and
facilities temporarily required. The Contractor shall indemnify and hold the City
harmless from all claims for damages caused by such actions. Contractor shall
confine construction equipment, the storage of materials and equipment, and the
operations of workers to the Site and other areas permitted by Applicable Laws, and
shall not unreasonably encumber the Site and other areas with construction
equipment or other materials or equipment. Contractor shall assume full
responsibility for any damage to any such land or area, or to City or occupant thereof,
or of any adjacent land or areas resulting from the performance of the Work.
B. Site Maintenance. During the progress of the Work, Contractor shall keep the Site
and other areas free from accumulations of waste materials, rubbish, and other
debris. Removal and disposal of such waste materials, rubbish, and other debris
shall conform to Applicable Laws. The Contractor shall furnish trash bins for all
debris from construction. All debris shall be placed in trash bins daily. Forms and
false-work that are to be re-used shall be stacked neatly concurrently with their
removal. Forms and false-work that are not to be re-used shall be disposed of
concurrently with their removal.
C. Cleaning. Prior to Completion of the Work, Contractor shall clean the Site and make
it ready for utilization by the City. At the completion of the Work Contractor shall
remove from the Site all tools, appliances, construction equipment and machinery,
and surplus materials and shall restore to original condition all property not
designated for alteration by the Contract Documents.
5.28 Utility Usage.
A. All temporary utilities, including but not limited to electricity, water, gas, and
telephone, used on the Work shall be furnished and paid for by Contractor.
Contractor shall provide necessary temporary distribution systems, including meters,
if necessary, from distribution points to points on the Work where the utility is
needed. Upon completion of the Work, Contractor shall remove all temporary
distribution systems. Contractor shall provide necessary and adequate utilities and
pay all costs for water, electricity, gas, oil, and sewer charges required for completion
of the Work, including but not limited to startup and testing required in the Contract
Documents. All permanent meters installed shall be listed in the Contractor’s name
until the Work is accepted. For Work to be performed in existing City facilities,
Contractor may use the City’s existing utilities, provided such use is reasonable
under the circumstances. If Contractor uses the City utilities, it will not need to
compensate the City for reasonably consumption of utilities, but Contractor will be
responsible for any excessive, unreasonable or wasteful utility usage. Amounts due
the City under this section may be deducted from progress payments.
Packet Page. 373
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -53-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
5.29 Protection of Work and Property.
A. The Contractor shall digitally record video and take photographs of the Project site
and adjacent improvements in a manner and quality that clearly depicts the existing
condition of the Project Site and adjacent improvements immediately prior to the
start of Work (minimum 1080p video and 4MP photo). All videos and photographs
shall be date and time stamped. The Contractor shall submit the video and photos
in digital format on a memory stick before the commencement of Work, along with a
map outlining the route and locations of the videos and/or photographs. The
Contractor shall be responsible for all damages to persons or property that occur as
a result of the Work. Contractor shall be responsible for the proper care and
protection of all materials delivered and Work performed until completion and final
acceptance by the City. All Work shall be solely at the Contractor’s risk.
B. Contractor shall adequately protect adjacent property from settlement or loss of
lateral support as necessary. Contractor shall comply with all applicable safety laws
and building codes to prevent accidents or injury to persons on, about, or adjacent
to the Project site where Work is being performed. Contractor shall erect and
properly maintain at all times, as required by field conditions and progress of work,
all necessary safeguards, signs, barriers, lights, and watchmen for protection of
workers and the public, and shall post danger signs warning against hazards created
in the course of construction.
C. Contractor shall provide such heat, covering, and enclosures as are necessary to
protect all Work, materials, equipment, appliances, and tools against damage by
weather conditions.
D. Contractor shall take adequate precautions to protect existing sidewalks, curbs,
pavements, utilities, and other adjoining property and structures, and to avoid
damage thereto, and Contractor shall repair any damage thereto caused by the Work
operations. Contractor shall:
1. Enclose the working area with a substantial barricade, and arrange work to cause
minimum amount of inconvenience and danger to the public.
2. Provide substantial barricades around any shrubs or trees indicated to be
preserved.
3. Deliver materials to the Site over a route designated by the City.
4. Provide any and all dust control required and follow the applicable air quality
regulations as appropriate. If the Contractor does not comply immediately with a
notice from the City or a public agency responsible for air quality, the City shall
have the authority to provide dust control and deduct the cost from payments to
the Contractor.
5. Confine Contractor’s apparatus, the storage of materials, and the operations of its
workers to limits required by law, ordinances, permits, or directions of the City.
Contractor shall not unreasonably encumber the Site with its materials.
Packet Page. 374
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -54-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
6. Take care to prevent disturbing or covering any survey markers, monuments, or
other devices marking property boundaries or corners. If such markers are
disturbed by accident, they shall be replaced by a civil engineer or land surveyor
acceptable to the City, at no cost to the City.
7. Ensure that existing facilities, fences and other structures are all adequately
protected and that, upon completion of all Work, all facilities that may have been
damaged are restored to a condition acceptable to the City.
8. Preserve and protect from injury all buildings, pole lines and all directional, warning
and mileage signs that have been placed within the right-of-way.
9. At the completion of work each day, leave the Work and the Site in a clean, safe
condition.
10. Comply with any stage construction and/or traffic handling plans. Access to
residences and businesses shall be maintained at all times, except with the City’s
written approval. Any request for approval to reduce or restrict access to
residences and business must be submitted to the City at least seven (7) Days in
advance, and the City may issue or withhold approval in its sole discretion.
E. These precautionary measures will apply continuously and not be limited to normal
working hours. Full compensation for the work involved in the protection and
preservation of life, safety and property as above specified shall be considered as
included in the prices paid for the various contract items of Work, and no additional
allowance will be made therefor.
F. Should damage to persons or property occur as a result of the Work, Contractor shall
promptly notify the City, in writing. Contractor shall be responsible for proper
investigation, documentation, including video or photography, to adequately
memorialize and make a record of what transpired. The City shall be entitled to
inspect and copy any such documentation, video, or photographs.
G. Contractor shall maintain all investigation documentation including video and/or
photographs for a minimum of four (4) years following completion of the Project.
5.30 Emergencies.
A. In emergencies affecting the safety or protection of persons or the Work or Property
at the Site or adjacent thereto, the Contractor, without special instruction or
authorization from the City or the Engineer, is obligated to act to prevent threatened
damage, injury or loss. The Contractor shall give the Engineer prompt written notice
if the Contractor believes that any significant changes in the Work or variations from
the Contract Documents have been caused thereby.
ARTICLE 6 -MATERIALS; INSPECTION
6.1 Access to Work.
A. The City, Engineer, their consultants and other representatives and personnel,
independent testing laboratories, and governmental agencies with jurisdictional
Packet Page. 375
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -55-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
interests will have access to the Site and the Work at reasonable times for their
observation, inspection, and testing. Contractor shall provide them proper and safe
conditions for such access and advise them of Contractor’s safety procedures and
programs.
6.2 Materials.
A. Except as otherwise specifically stated in the Contract Documents, Contractor shall
provide and pay for all materials, labor, tools, equipment, water, lights, power,
transportation, superintendence, temporary constructions of every nature, and all
other services and facilities whatsoever necessary to execute and complete this
Contract within the Contract Time. Unless otherwise specified, all materials, parts,
and equipment furnished by the Contractor in the Work shall be new, the best of their
respective kinds and grades as noted and/or specified, and workmanship shall be of
good quality.
B. No materials, supplies, or equipment for Work under this Contract shall be
purchased subject to any chattel mortgage or under a conditional sale or other
agreement by which an interest therein or in any part thereof is retained by the seller
or supplier. Contractor warrants good title to all material, supplies, and equipment
installed or incorporated in the Work and agrees upon completion of all work to
deliver the Project, to the City free from any claims, liens, or charges.
C. Materials shall be furnished in ample quantities and at such times as to ensure
uninterrupted progress of the Work and shall be stored properly and protected as
required by the Contract Documents. Contractor shall be entirely responsible for
damage or loss by weather or other causes to materials or Work. Materials shall be
stored on the Project Site in such manner so as not to interfere with any operations
of the City or any independent contractor.
D. Contractor shall verify all measurements, dimensions, elevations, and quantities
before ordering any materials or performing any Work, and the City shall not be liable
for Contractor’s failure to so. Except for an adjustment to Unit Price Work for item
overruns and underruns in accordance with the Contract Documents, no additional
compensation, over and above payment for the actual quantities at the prices set
out in the Bid Schedule, will be allowed because of differences between actual
measurements, dimension, elevations and quantities and those indicated on the
Plans and in the Specifications. Any difference therein shall be submitted to the
Engineer for consideration before proceeding with the Work.
6.3 Test and Inspections.
A. Inspection and Testing of Work and Materials
1. If the Contract Documents, the Engineer, or any instructions, laws, ordinances, or
public authority requires any part of the Work to be tested or approved, Contractor
shall provide the Engineer at least two (2) working days’ notice of its readiness for
observation or inspection. If inspection is by a public authority other than the City,
Contractor shall promptly inform the City of the date fixed for such inspection.
Required certificates of inspection (or similar) shall be secured by Contractor.
Packet Page. 376
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -56-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
Costs for City testing and inspection shall be paid by the City. Costs of tests for
Work found not to be in compliance shall be paid by the Contractor.
2. The Contractor shall pay for the cost of any minimum “show up” costs of a materials
testing technician that was called for by the Contractor but ultimately the Contractor
work was not ready for the inspection. Any such costs shall be deducted from any
amounts due to the Contractor.
3. If any Work is done or covered up without the required testing or approval, the
Contractor shall uncover or deconstruct the Work, and the Work shall be redone
after completion of the testing at the Contractor’s cost in compliance with the
Contract Documents.
4. Where inspection and testing are to be conducted by an independent laboratory
or agency, materials or samples of materials to be inspected or tested shall be
selected by such laboratory or agency, or by the City, and not by Contractor.
Unless otherwise stated and as provided by the Contract Documents, the City shall
employ and pay for the services of an independent testing laboratory to perform
all inspections, tests, or approvals required by the Contract Documents. All tests
or inspections of materials shall be made in accordance with the commonly
recognized standards of national organizations.
5. Reexamination of Work may be ordered by the City. If so ordered, Work must be
uncovered or deconstructed by Contractor. If Work is found to be in accordance
with the Contract Documents, the City shall pay the costs of reexamination and
reconstruction. If such work is found not to be in accordance with the Contract
Documents, Contractor shall pay all costs.
B. Testing of Materials
1. In advance of manufacture of materials to be supplied by Contractor which must
be tested or inspected, Contractor shall notify the City so that the City may arrange
for testing at the source of supply. Any materials which have not satisfactorily
passed such testing and inspection shall not be incorporated into the Work.
2. If the manufacture of materials to be inspected or tested will occur in a plant or
location greater than sixty (60) miles from the City, the Contractor shall pay for any
excessive or unusual costs associated with such testing or inspection, including
but not limited to excessive travel time, standby time and required lodging.
3. Unless otherwise specified in the Special Provisions, all initial testing and a
reasonable amount of retesting will be performed under the direction of the
Engineer, and at no expense to the Contractor. The Contractor shall notify the
Engineer in writing, at least 15 days in advance, of its intention to use materials for
which tests are specified, to allow sufficient time to perform the tests. The notice
shall name the proposed supplier and source of material. If the notice of intent to
use is sent before the materials are available for testing or inspection, or is sent so
far in advance that the materials on hand at the time will not last but will be replaced
by a new lot prior to use on the Work, it will be the Contractor's responsibility to re-
notify the Engineer when samples which are representative may be obtained.
Packet Page. 377
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -57-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
4. A Certificate of Compliance shall be furnished to the Engineer prior to the use of
any material or assembled material for which these Specifications so require or if
so required by the Engineer. The Engineer may waive the materials testing
requirements and accept a Certificate of Compliance. Material test data may be
required by the Engineer to be included with the submittal. Materials used on the
basis of a Certificate of Compliance may be sampled and tested at any time. The
submission of a Certificate of Compliance shall not relieve the Contractor of
responsibility for incorporating material into the Work which conforms to the
requirements of the Contract Documents, and any material not conforming to the
requirements will be subject to rejection by the Engineer whether in place or not.
5. Copies of mill certificates of composition and quality of all component materials
(reinforcing steel, structural steel, lumber, etc.) incorporated in the construction of
the Work shall be provided to the City at the time of delivery. City shall retain the
right to reject any raw material not provided with a mill certificate at the time of
delivery.
6. If, after incorporating such materials into the Work, it is found that sources of supply
that have been approved do not furnish a uniform product, or if the product from
any source proves unacceptable at any time, the Contractor shall furnish approved
material from other approved sources. If any product proves unacceptable after
improper storage, handling or for any other reason it shall be rejected, not
incorporated into the Work, and shall be removed from the Project Site all at the
Contractor’s expense.
6.4 Requests for Substitutions.
A. For the purposes of this provision, the term “substitution” shall mean the substitution
of any material, method or service substantially equal to or better in every respect to
that indicated in the Standard Specifications or otherwise referenced herein.
B. Pursuant to Public Contract Code section 3400(b), the City may make a finding that
is described in the Notice Inviting Bids that designates certain products, things, or
services by specific brand or trade name.
C. Unless specifically designated in the Special Conditions, whenever any material,
process, or article is indicated or specified by grade, patent, or proprietary name or
by name of manufacturer, such specifications shall be deemed to be used for the
purpose of facilitating the description of the material, process, or article desired and
shall be deemed to be followed by the words “or equal.” Contractor may, unless
otherwise stated, offer for substitution any material, process, or article which may be
substantially equal to or better in every respect to that so indicated or specified in
the Contract Documents. However, the City has adopted uniform standards for
certain materials, processes, and articles.
D. The Contractor shall submit substitution requests, together with substantiating data,
for substitution of any “or equal” material, process, or article no later than thirty-five
(35) calendar days after award of Contract. Provisions regarding submission of
substitution requests shall not in any way authorize an extension of time for the
performance of this Contract. If a substitution request is rejected by the City, the
Packet Page. 378
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -58-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
Contractor shall provide the material, method or service specified herein. The City
shall not be responsible for any costs incurred by the Contractor associated with
substitution requests. The burden of proof as to the equality of any material,
process, or article shall rest with the Contractor. The Engineer has the complete
and sole discretion to determine if a material, process, or article is substantially equal
to or better than that specified and to approve or reject all substitution requests.
E. Substantiating data as described above shall include, at a minimum, the following
information:
1. A signed affidavit from the Contractor stating that the material, process, or article
proposed as a substitution is substantially equal to or better than that specified in
every way except as may be listed on the affidavit.
2. Illustrations, specifications, catalog cut sheets, and any other relevant data
required to prove that the material, process, or article is substantially equal to or
better than that specified.
3. A statement of the cost implications of the substitution being requested, indicating
whether and why the proposed substitution will reduce or increase the amount of
the contract.
4. Information detailing the durability and lifecycle costs of the proposed substitution.
F. Failure to submit all the required substantiating data detailed above in a timely
manner so that the substitution request can be adequately reviewed may result in
rejection of the substitution request. The Engineer is not obligated to review multiple
submittals related the same substitution request resulting from the Contractor’s
failure to initially submit a complete package.
G. Time limitations within this Article shall be strictly complied with and in no case will
an extension of time for completion of the contract be granted because of
Contractor’s failure to provide substitution requests at the time and in the manner
described herein.
H. The Contractor shall bear the costs of all the City work associated with the review of
substitution requests.
I. If substitution requests approved by the Engineer require that Contractor furnish
materials, methods or services more expensive than that specified, the increased
costs shall be borne by Contractor.
ARTICLE 7 -SUBSURFACE AND PHYSICAL CONDITIONS; UTILITIES
7.1 Soils Investigations.
A. When a soils investigation report for the Site is available, such report is provided for
informational purposes only. Any information obtained from such report as to
subsurface soil condition, or to elevations of existing grades or elevations of
underlying rock, is approximate only and is not guaranteed. Contractor
acknowledges that any soils investigation report (including any borings) was
Packet Page. 379
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -59-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
prepared for purposes of design only and Contractor is required to examine the Site
before submitting its Bid and must make whatever tests it deems appropriate to
determine the condition of the soil.
7.2 Ownership of Site Materials Found.
A. The title to water, soil, rock, gravel, sand, minerals, timber and any other materials
developed or obtained in the excavation or other operations of Contractor or any of
its Subcontractors in the performance of the Contract, and the right to use said items
in carrying out the Contract, or to dispose of same, is hereby expressly reserved by
the City. Neither Contractor nor any of its Subcontractors nor any of their
representatives or employees shall have any right, title, or interest in said materials,
nor shall they assert or make any claim thereto. Contractor will, as determined by
the City’s Representative, be permitted to use in the Work without charge, any such
materials which meet the requirements of the Contract Documents, provided the City
shall have the right to use or consume these materials without payment to a third
party.
7.3 Existence of Utilities at the Work Site.
A. Existing Utilities
1. The location of known existing utilities and pipelines are shown on the Plans in
their approximate locations. However, nothing herein shall be deemed to require
the City to indicate the presence of existing service laterals or appurtenances
whenever the presence of such utilities on the site of the project can be inferred
from the presence of other visible facilities, such as buildings, cleanouts, meter
and junction boxes, on or adjacent to the Site of the Project.
2. The City will assume the responsibility for the timely removal, relocation, or
protection of existing main or trunk line utility facilities located on the Project site if
such utilities are not identified by the City in the Contract Documents or which
cannot reasonably be inferred from the presence of other visible facilities.
B. Utility Location
1. It shall be the Contractor’s responsibility to determine the exact location and depth
of all utilities, including service connections, which have been marked by the
respective utility owners and which the Contractor believes may affect or be
affected by the Contractor’s operations. The Contractor shall not be entitled to
additional compensation nor time extensions for work necessary to avoid
interferences nor for repair to damaged utilities if the Contractor does not expose
all such existing utilities as required by this Article.
2. The locating of utilities shall be in conformance with Government Code Section
4216 et seq. except for the City’s utilities located on the City’s property and not on
public right-of-way.
3. A “High Priority Subsurface Installation” is defined in Government Code Section
4216 (j) as “high-pressure natural gas pipelines with normal operating pressures
greater than 415kPA gauge (60psig) or greater than six inches nominal pipe
Packet Page. 380
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -60-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
diameter, petroleum pipelines, pressurized sewage pipelines, high-voltage electric
supply lines, conductors, or cables that have a potential to ground of greater than
or equal to 60kv, or hazardous materials pipelines that are potentially hazardous
to workers or the public if damaged.”
4. A “Subsurface Installation” is defined in Government Code Section 4216 (s) as
“any underground pipeline, conduit, duct, wire, or other structure, except
nonpressurized sewer lines, nonpressurized storm drains, or other nonpressurized
drain lines.”
5. Pursuant to Government Code Section 4216.2 the Contractor shall contact the
appropriate regional notification center at least two (2) working days but not more
than 14 Days before performing any excavation. The date of the notification shall
not count as part of the two-working-day notice. Before notifying the appropriate
regional notification center, the Contractor shall delineate the area to be
excavated. The Contractor shall request that the utility owners conduct a utility
survey and mark or otherwise indicate the location of their service. The Contractor
shall furnish to the Engineer written documentation of its contact(s) with the
regional notification center prior to commencing excavation at such locations.
6. After the utility survey is completed, the Contractor shall commence “potholing” or
hand digging to determine the actual location of the pipe, duct, or conduit and in
accordance with Government Code Section 4216.4 if the excavation within the
“tolerance zone” of a subsurface installation. The Engineer shall be given notice
prior to commencing potholing operations. The Contractor shall uncover all piping
and conduits, to a point one (1) foot below the pipe, where crossings, interferences,
or connections are shown on the Drawings, prior to trenching or excavating for any
pipe or structures, to determine actual elevations. New pipelines shall be laid to
such grade as to clear all existing facilities, which are to remain in service for any
period subsequent to the construction of the run of pipe involved.
7. The Contractor's attention is directed to the requirements of Government Code
Section 4216.2 (c) which provides: “When the excavation is proposed within 10
feet of a high priority subsurface installation, the operator of the high priority
subsurface installation shall notify the excavator of the existence of the high priority
subsurface installation to set up an onsite meeting prior to the legal excavation
start date and time or at a mutually agreed upon time to determine actions or
activities required to verify the location and prevent damage to the high priority
subsurface installation. As part of the meeting, the excavator shall discuss with the
operator the method and tools that will be used during the excavation and the
information the operator will provide to assist in verifying the location of the
subsurface installation. The excavator shall not begin excavating until after the
completion of the onsite meeting.” The Contractor shall notify the Engineer in
advance of this meeting.
C. Utility Relocation and Repair
1. If interferences occur at locations other than those indicated in the Contract
Documents with reasonable accuracy, the Contractor shall notify the Engineer in
writing. The Engineer will supply a method for correcting said interferences in
Packet Page. 381
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -61-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
accordance with the responsibilities of this section and Government Code Section
4215. To the extent any delay is caused thereby, Contractor shall submit a notice
of delay within five (5) Days of discovery of the circumstances giving rise to the
delay in accordance with Article 9.1 Change Orders and Time Extensions.
2. Care shall be exercised by the Contractor to prevent damage to adjacent existing
facilities and public or private works; where equipment will pass over these
obstructions, suitable planking shall be placed. If high priority subsurface
installations are damaged and the operator cannot be contacted, the Contractor
shall call 911 emergency services.
3. The City will compensate the Contractor for the costs of locating and repairing
damage not due to the failure of the Contractor to exercise reasonable care, and
for removing or relocating such main or trunk line utility facilities not indicated in
the Contract Documents with reasonable accuracy, and for the cost of equipment
on the Project necessarily idled during such work. The payment for such costs will
be made as provided in Article 9.1 Change Orders and Time Extensions. The
Contractor shall not be assessed liquidated damages for delay in completion of the
Project, when such delay is caused by the failure of the City or utility company to
provide for removal or relocation of such utility facilities. Requests for extensions
of time arising out of utility relocation or repair delays shall be filed in accordance
with Article 9.1 Change Orders and Time Extensions and Article 9.3 Time for
Completion and Liquidated Damages.
4. The public utility, where it is the owner of the affected utility, shall have the sole
discretion to perform repairs or relocation work or permit the Contractor to do such
repairs or relocation work at a reasonable price. The right is reserved to the City
and the owners of utilities or their authorized agents to enter upon the Work area
for the purpose of making such changes as are necessary for the rearrangement
of their facilities or for making necessary connections or repairs to their properties.
The Contractor shall cooperate with forces engaged in such work and shall
conduct its operations in such a manner as to avoid any unnecessary delay or
hindrance to the work being performed by such forces and shall allow the
respective utilities time to relocate their facility.
5. When the Contract Documents indicate that a utility is to be relocated, altered or
constructed by others, the City will conduct all negotiations with the utility company
and the work will be done at no cost to the Contractor, unless otherwise stipulated
in the Contract Documents.
6. Temporary or permanent relocation or alteration of utilities desired by the
Contractor for its own convenience shall be the Contractor’s responsibility and it
shall make arrangements and bear all costs for such work.
D. Construction at Existing Utilities
1. Where the Work to be performed crosses or otherwise interferes with water, sewer,
gas, or oil pipelines; buried cable; or other public or private utilities, the Contractor
shall perform construction in such a manner so that no damage will result to either
Packet Page. 382
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -62-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
public or private utilities. It shall be the responsibility of the Contractor to determine
the actual locations of, and make accommodates to maintain, all utilities.
2. Before any utility is taken out of service, permission shall be obtained by the
Contractor from the owner. The owner, any impacted resident or business owner
and the City Representative will be advised of the nature and duration of the utility
outage as well as the Contractor’s plan for providing temporary utilities if required
by the owner. The Contractor shall be liable for all damage which may result from
its failure to maintain utilities during the progress of the Work, and the Contractor
shall indemnify City as required by the Contract Documents from all claims arising
out of or connected with damage to utilities encountered during construction;
damages resulting from disruption of service; and injury to persons or damage to
property resulting from the negligent, accidental, or intentional breaching of
utilities.
3. Unless otherwise called for by the Contract Documents, the cost of all material,
equipment, and labor required to complete this work, shall be included in
Contractor’s bid and distributed in the schedule of pay Items. No additional
compensation shall be made to the Contractor for this work.
7.4 Trenches
A. Trenches Five Feet or More in Depth.
1. Contractor shall submit to the Engineer at the preconstruction meeting, a detailed
plan showing the design of shoring, bracing, sloping or other provisions to be made
for worker protection from hazards of caving ground during the excavation of any
trench or trenches five feet or more in depth. If such plan varies from shoring
system standards established by the Construction Safety Orders of the California
Code of Regulations, Department of Industrial Relations, the plan shall be
prepared by a California registered civil or structural engineer. The plan shall not
be less effective than the shoring, bracing, sloping, or other provisions of the
Construction Safety Orders, as defined in the California Code of Regulations. The
Contractor shall designate in writing the “competent person” as defined in Title 8,
California Code of Regulations, who shall be present at the Work Site each day
that trenching/excavation is in progress. The “competent person” shall prepare
and provide daily trenching/excavation inspection reports to the Engineer.
Contractor shall also submit a copy of its annual California Occupational Safety
and Health Administration (Cal/OSHA) trench/excavation permit.
B. Excavations Deeper than Four Feet.
1. If the Work involves excavating trenches or other excavations that extend deeper
than four (4) feet below the surface, Contractor shall promptly within three (3)
Days, and before the excavation is further disturbed, notify the City in writing of
any of the following conditions:
a. Material that the Contractor believes may be material that is hazardous waste,
as defined in section 25117 of the Health and Safety Code, that is required to
Packet Page. 383
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -63-00 72 00 – GENERAL CONDITIONS
be removed to a Class I, Class II, or Class III disposal site in accordance with
provisions of existing law.
Packet Page. 384
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -63-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
b. Subsurface or latent physical conditions at the site differing from those
indicated.
c. Unknown physical conditions at the site of any unusual nature, different
materially from those ordinarily encountered and generally recognized as
inherent in work of the character provided for in the Contract.
2. The City shall promptly investigate the conditions, and if it finds that the conditions
do so materially differ, or do involve hazardous waste, and cause a decrease or
increase in Contractor’s cost of, or the time required for, performance of any part
of the Work, shall issue a Change Order under the procedures described in Article
9.1 Change Orders and Time Extensions.
3. In the event that a dispute arises between the City and the Contractor as to whether
the conditions materially differ, or involve hazardous waste, or cause a decrease
or increase in the Contractor’s cost of, or time required for, performance of any
part of the Work, the Contractor shall not be excused from any scheduled
completion date provided for by the Contract, but shall proceed with all Work to be
performed under the Contract. Contractor shall retain any and all rights provided
either by contract or by law which pertain to the resolution of disputes and protests
between the parties.
ARTICLE 8 -PROSECUTION OF THE WORK
8.1 Contractor’s Means and Methods.
A. Contractor is solely responsible for the means and methods utilized to perform the
Work. In no case shall the Contractor’s means and methods deviate from commonly
used industry standards.
8.2 Construction Schedule.
A. General Requirements. The schedule shall be prepared in a Critical Path Method
(“CPM”) format and in an electronic scheduling program acceptable to the City and
as specified in the Contract Documents. Contractor shall deliver the schedule and
all updates to the City in both paper and electronic form. The electronic versions
shall be in the format and include all data used to prepare the schedule. Copies are
not acceptable.
B. Schedule. The receipt or approval of any schedules by the City shall not in any way
relieve the Contractor of its obligations under the Contract Documents. The
Contractor is fully responsible to determine and provide for any and all staffing and
resources at levels which allow for good quality and timely completion of the Project.
Contractor’s failure to incorporate all elements of Work required for the performance
of the Contract or any inaccuracy in the schedule shall not excuse the Contractor
from performing all Work required for a completed Project within the specified
Contract Time. If the required schedule is not received by the time the first payment
under the Contract is due, Contractor shall not be paid until the schedule is received,
reviewed and accepted by the City.
Packet Page. 385
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -64-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
C. Schedule Contents. The schedule shall allow enough time for inclement weather.
The schedule shall indicate the beginning and completion dates of all phases of
construction; critical path for all critical, sequential time related activities; and “float
time” for all “slack” or “gaps” in the non-critical activities. The schedule shall include
appropriate time allowances and constraints for submittals, items of interface with
Work performed by others, and specified construction, start-up and performance
tests. All float shall be owned by the Project. Schedules indicating early or late
completion shall not modify or have any effect on the Contract Time, regardless of
whether the schedules are reviewed and/or accepted by the City. For purposes of
determining Liquidated Damages, the Contract Time shall control and may only be
altered by a duly authorized Change Order.
D. Schedule Updates. Contractor shall continuously update its construction schedule.
Contractor shall submit an updated and accurate construction schedule to the City:
(1) prior to the start of construction, if there are any changes to the initial schedule;
(2) with each progress payment request; and (3) whenever requested to do so by
the City. The City may withhold progress payments or other amounts due under the
Contract Documents if Contractor fails to submit an updated and accurate
construction schedule. Upon the City’s request, Contractor shall submit any
schedules or updates to the City in the native electronic format of the software used
to create the schedule. Contractor shall also submit schedules showing a two-week
detailed look-ahead at weekly meetings conducted with the City. The two-week look-
ahead schedule shall clearly identify all staffing and other resources which in the
Contractor’s judgment are needed to complete the Work within the Contract Time,
and it shall clearly state the number of staff to be used on each daily segment of the
Work.
E. Acceptance. Acceptance of the schedules by the City will not impose on
responsibility for accuracy, for sequencing, scheduling, or progress of the Work, or
compliance with the Contract Documents. Acceptance will not interfere with or
relieve Contractor from Contractor’s full responsibility therefor.
F. Recovery Schedule.
1. Should any of the following conditions exist, City may require Contractor to
prepare, at no extra cost to City, a plan of action and a recovery schedule for
completing the Work and achieving all contractual milestones within the allotted
Contract Time:
a. The Contractor's monthly progress report indicates delays that are, in the
opinion of City, of sufficient magnitude that City questions the Contractor's
ability to complete the Work;
b. The schedule shows the Contractor to be thirty (30) or more days behind the
critical path at any time during construction;
c. The Contractor desires to make changes in the logic or the planned duration
of future activities of the schedule which, in the opinion of City, are major in
nature.
Packet Page. 386
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -65-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
2. The recovery schedule shall include proposed revisions to the Construction
Schedule, demonstrating how Contractor intends to achieve all contractual
milestones including Contract completion within the allotted Contract Time. The
submittal shall include a narrative describing the actions planned by the Contractor
to recover the schedule.
3. Contractor shall submit the Recovery Schedule within seven (7) Days of City’s
request. If Contractor asserts that City is responsible for the delay, failure to submit
the recovery schedule within seven (7) Days of City’s request, will be considered
a concurrent delay event attributable to Contractor, and Contractor shall only be
entitled to non-compensable adjustments to Contract Times. If Contractor is
responsible for the delay, this provision will not limit or affect Contractor's liability
and failure to submit the recovery schedule with seven (7) Days of City’s request
may result in City withholding progress payments or other amounts due under the
Contract Documents.
4. Contractor is responsible for all costs associated with the preparation and
execution of the recovery schedule, including any necessary recovery actions,
which may include, but are not limited to, assignment of additional labor, and/or
equipment, shift or overtime work, expediting of submittals or deliveries,
overlapping of activities or sequencing changes to increase activity concurrence.
Regardless of whether City directs Contractor to prepare a recovery schedule
pursuant to this Section, Contractor shall promptly undertake appropriate action at
no additional cost to City to recover the schedule whenever the current
construction schedule shows that the Contractor will not achieve a milestone
and/or complete the Work within the allotted Contract Time.
8.3 Time for Completion and Liquidated Damages
A. Time for Completion. The time for completion set forth in Article 2 of the Contract
for Construction shall commence: (1) on the date stated in the Notice to Proceed, or
(2) if the Notice to Proceed does not specify a commencement date, then on the
date of the Notice to Proceed and shall be completed by Contractor in the time
specified in the Contract Documents. The City is under no obligation to consider
early completion of the Project; and the Contract completion date shall not be
amended by the City’s receipt or acceptance of the Contractor’s proposed earlier
completion date. Any difference in time between the Contractor’s early completion
and the Contract Time shall be considered a part of the Project float. Contractor
shall not be entitled to compensation, and the City will not compensate Contractor,
for delays which impact early completion. Contractor shall not, under any
circumstances, receive additional compensation from the City (including but not
limited to indirect, general, administrative or other forms of overhead costs) for the
period between the time of earlier completion proposed by the Contractor and the
Contract completion date.
B. Liquidated Damages. If the Work is not completed within the Contract Time(s), it is
understood that the City will suffer damage. In accordance with Government Code
section 53069.85 and Public Contract Code section 7102, being impractical and
infeasible to determine the amount of actual damage, it is agreed that Contractor
shall pay to the City as fixed and liquidated damages, and not as a penalty, the sum
Packet Page. 387
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -66-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
stipulated in the Contract for each calendar day of delay until the Work is fully
completed. Contractor and its surety shall be liable for any liquidated damages. Any
money due or to become due the Contractor may be retained to cover liquidated
damages.
C. Inclement Weather. Contractor shall abide by the Engineer’s determination of what
constitutes inclement weather. Time extensions for inclement weather shall only be
granted when the Work stopped during inclement weather is on the critical path of
the Project schedule. Contractor shall not be entitled to reverse liquidated damages
for time extensions resulting from inclement weather.
D. Extension of Time. Contractor’s entitlement to an extension of the Contract Time is
limited to a City-caused extension of the critical path, reduced by the Contractor’s
concurrent delays, and established by a proper time impact analysis. Contractor
shall not be charged liquidated damages because of any delays in completion of the
Work due to unforeseeable causes beyond the control and without the fault or
negligence of Contractor (or its Subcontractors or Suppliers). The City shall
ascertain the facts and extent of delay and grant extension of time for completing
the Work when, in its judgment, the facts justify such an extension. Contractor shall
not be entitled to an adjustment in the Contract Times for delays within the control
of Contractor. Delays attributable to and within the control of a Subcontractor or
Supplier shall be deemed to be delays within the control of Contractor.
E. Reverse Liquidated Damages. Consistent with Public Contract Code Section 7102,
Contractor will be compensated for damages incurred due to unreasonable delays
to the critical path for which the City is responsible. The parties agree that
determining Contractor’s exact delay damages are and will continue to be
impracticable and extremely difficult. As such, for each calendar day in excess of
the time for completion set forth in Article 2 of the Contract for Construction, the City
shall pay to the Contractor the sum stipulated in the Contract per day. Such amount
shall constitute the only payment allowed for any City-caused delays and shall
necessarily include all overhead, all profits, all administrative costs, all bond costs,
all labor, materials, equipment and rental costs and any other costs, expenses and
fees incurred or sustained as a result of such delays. Contractor shall not be entitled
to reverse liquidated damages for any change in the Work in which Contractor is
compensated for overhead and profit through a change in Unit Price Work or a
Change Order resulting in a lump sum or allowed mark-up for the additional Work.
The amount of reverse liquidated damages shall be reduced by Contractor’s
concurrent delays.
F. Force Majeure. In accordance with subparagraphs “D” and “E” above, the
Contractor shall not be charged liquidated damages, and the City shall not be
responsible, for any delays resulting from a Force Majeure Event. If a delay to the
critical path results from a Force Majeure Event, the Contractor will be entitled to a
time extension but will not receive an adjustment to the Contract Price or any other
compensation. Such a non-compensable adjustment shall be Contractor’s sole and
exclusive remedy for such delays.
G. No Damages for Reasonable Delay. The City’s liability to Contractor for delays for
which the City is responsible shall be limited to only an extension of time unless such
Packet Page. 388
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -67-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
delays were unreasonable under the circumstances. In no case shall the City be
liable for any costs which are borne by the Contractor in the regular course of
business, including, but not limited to, home office overhead and other ongoing
costs. Damages caused by unreasonable City delay shall be based on actual costs
only, no proportions or formulas shall be used to calculate any delay damages.
H. Procedure for Time Extensions and Delay Damages. Contractor shall not be entitled
to any extension of time or any reverse liquidated damages unless Contractor
properly notices the delay and adjustment to compensation and requests a Change
Order in accordance with Article 9.1 Change Orders and Time Extensions.
Contractor’s failure to timely and fully comply with the Change Order procedures in
the Contract Documents shall constitute a waiver of Contractor’s right to a time
extension or reverse liquidated damages.
8.4 Contractor’s Responsibility for Work.
A. Until the acceptance of the Work by the Engineer as evidenced in writing, it shall be
under the charge and care of the Contractor. The Contractor shall take every
necessary precaution against injury or damage to any part thereof by the action of
the elements or from any cause whether arising from the execution or non-execution
of the Work. The Contractor shall rebuild, repair, restore and make good at its own
expense all injuries or damages to any portion of the Work before its completion and
acceptance. In the event of damage proximately caused by an Act of God, as
defined by Section 7105 of the Public Contract Code, the City will pay for repair or
restoration to damaged Work in excess of 5% of the total Bid.
8.5 Occupancy.
A. The City reserves the right to occupy or utilize any portion of the Work at any time
before completion, and such occupancy or use shall not constitute acceptance of
any part of Work covered by this Contract. This use shall not relieve the Contractor
of its responsibilities under the Contract.
8.6 Securities for Money Withheld
A. Pursuant to section 22300 of the Public Contract Code of the State of California,
Contractor may request the City to make retention payments directly to an escrow
agent or may substitute securities for any money withheld by the City to ensure
performance under the contract. At the request and expense of Contractor,
securities equivalent to the amount withheld shall be deposited with the City or with
a state or federally chartered bank as the escrow agent who shall return such
securities to Contractor upon satisfactory completion of the contract. Deposit of
securities with an escrow agent shall be subject to a written agreement substantially
in the form provided in section 22300 of the Public Contract Code.
8.7 The City’s Right to Suspend/Terminate the Contract
A. Suspension of Work by the City
1. The City may, at its sole option, decide to suspend at any time the performance of
all or any portion of the Work by notice in writing to Contractor. Such notice of
Packet Page. 389
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -68-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
suspension of Work will designate the amount and type of plant, labor, and
equipment to be committed to the Project during the period of suspension.
Contractor shall use its best efforts to utilize its plant, labor, and equipment in such
a manner as to minimize costs associated with suspension.
2. Upon receipt of any such notice, Contractor shall, unless the notice requires
otherwise:
a. Immediately discontinue Work on the date and to the extent
specified in the notice;
b. Place no further orders or subcontracts for material, services, or
facilities with respect to suspended Work other than to the extent required
in the notice;
c. Promptly make every reasonable effort to obtain suspension upon
terms satisfactory to the City’s Representative of all orders, subcontracts,
and rental agreements to the extent they relate to performance of Work
suspended; and
d. Continue to protect and maintain the Work including those portions
on which Work has been suspended.
3. Except as provided by this Article, as full and complete compensation for such
suspension, Contractor shall be granted an adjustment in the Contract Price based
on a negotiated daily rate that reflects the Contractor’s actual costs associated with
the demobilized condition of the Site and an extension of the Contract Times equal
to the number of days performance of Work is suspended; provided, however, that
no adjustment of Contract Price or extension of Contract Times shall be granted if
the suspension results from Contractor's non-compliance with the requirements of
the Contract.
B. Termination for Cause by the City:
1. In the sole estimation of the City, if the Contractor refuses or fails to prosecute the
Work or any separable part thereof with such diligence as will insure its completion
within the time specified by the Contract Documents, or any extension thereof, or
fails to complete such Work within such time, or if the Contractor should be
adjudged a bankrupt, or if it should make a general assignment for the benefit of
its creditors, or if a receiver should be appointed on account of its insolvency, or
the Contractor or any of its subcontractors should violate any of the provisions of
this Contract, the City may serve written notice upon the Contractor and its surety
of the City's intention to terminate this Contract. This notice of intent to terminate
shall contain the reasons for such intention to terminate this Contract, and a
statement to the effect that the Contractor's right to perform this Contract shall
cease and terminate upon the expiration of ten (10) Days unless such violations
have ceased and arrangements satisfactory to the City have been made for
correction of said violations.
2. After expiration of the ten (10) Day period, the City may terminate the Contract by
providing a Notice of Termination to the Contractor. The City may take over and
Packet Page. 390
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -69-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
complete the Work by any method it may deem appropriate, including enforcement
of the Project performance bond. Contractor and its surety shall be liable to the
City for any excess costs or other damages incurred by the City to complete the
Work. If the City takes over the Work, the City may, without liability for so doing,
take possession of and utilize in completing the Work such materials, appliances,
plant, and other property belonging to the Contractor as may be on the Site.
3. Upon termination, Contractor shall not be entitled to receive any further payment
from the City, except for Work which was duly performed prior to the effective date
of the Notice of Termination. Contractor shall submit an invoice for final payment
within thirty (30) Days of the effective date of the Notice of Termination. The City
may withhold from final payment up to 150% of any disputed amounts, including
any amounts which may be necessary to repair defective Work, complete
unfinished Work, or are otherwise occasioned by Contractor’s failure to perform its
duties under the Contract.
C. Termination for Convenience by the City:
1. The City may terminate performance of the Work called for by the Contract
Documents in whole or, from time to time, in part, upon ten (10) Days written notice
if the City determines that a termination is in the City's interest.
2. The Contractor shall terminate all or any part of the Work upon delivery to the
Contractor of a Notice of Termination specifying that the termination is for the
convenience of the City, the extent of termination, and the effective date of such
termination.
3. After receipt of Notice of Termination, and except as directed by the City's
Representative, the Contractor shall, regardless of any delay in determining or
adjusting any amounts due under this termination for convenience clause,
immediately proceed with the following obligations:
a. Stop Work as specified in the Notice.
b. Complete any Work specified in the Notice of Termination in a least
cost/shortest time manner while still maintaining the quality called for under
the Contract Documents.
c. Leave the property upon which the Contractor was working and
upon which the facility (or facilities) forming the basis of the Contract
Document is situated in a safe and sanitary manner such that it does not
pose any threat to the public health or safety.
d. Terminate all subcontracts to the extent that they relate to the
portions of the Work terminated.
e. Place no further subcontracts or orders, except as necessary to
complete the continued portion of the Contract.
f. Submit to the City's Representative, within ten (10) Days from the
effective date of the Notice of Termination, all of the usual documentation
Packet Page. 391
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -70-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
called for by the Contract Documents to substantiate all costs incurred by
the Contractor for labor, materials and equipment through the effective date
of the Notice of Termination. Any documentation substantiating costs
incurred by the Contractor solely as a result of the City's exercise of its right
to terminate this Contract pursuant to this clause, which costs the
contractor is authorized under the Contract documents to incur, shall: (1)
be submitted to and received by the Engineer no later than 30 Days after
the effective date of the Notice of Termination; (2) describe the costs
incurred with particularity; and (3) be conspicuously identified as
“Termination Costs occasioned by the City's Termination for Convenience.”
If the City rejects any costs, Contractor shall be deemed to waive the
rejected costs unless Contractor files a Claim within thirty (30) Days of the
rejection pursuant to Article 9.2.
g. Contractor shall be entitled to receive only the amounts payable
under this Article, and Contractor specifically waives any claim for any other
amounts or damages, including, but not limited to, any claim for
consequential damages or lost profits. The provisions in this Article are in
addition to and not in limitation of any other rights or remedies available to
the City.
4. Termination of the Contract shall not relieve surety of its obligation for any just
claims arising out of or relating to the Work performed.
5. Notwithstanding any other provision of this Article, when immediate action is
necessary to protect life and safety or to reduce significant exposure or liability, the
City may immediately order Contractor to cease Work on the Project until such
safety or liability issues are addressed to the satisfaction of the City or the Contract
is terminated.
6. If the City terminates Contractor for cause, and if it is later determined that the
termination was wrongful, such default termination shall automatically be
converted to and treated as a termination for convenience. In such event,
Contractor shall be entitled to receive only the amounts payable under this section,
and Contractor specifically waives any claim for any other amounts or damages,
including, but not limited to, any claim for consequential damages or lost profits.
8.8 Completion and Acceptance of Work
A. Final Inspection. Upon written notice from Contractor that the entire Work is
complete, the Engineer will promptly make a final inspection with the City and
Contractor and will notify Contractor in writing of all particulars in which this
inspection reveals that the Work is incomplete or defective. Contractor shall
immediately take such measures as are necessary to complete such Work or
remedy such deficiencies.
B. Final Acceptance. The acceptance of the Work on behalf of the City will be made
by the Engineer. Such acceptance by the City shall not constitute a waiver of
defects. After Contractor has, in the opinion of the Engineer, satisfactorily completed
all corrections identified during the final inspection and has delivered, in accordance
Packet Page. 392
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -71-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
with the Contract Documents, all maintenance and operating instructions,
schedules, guarantees, bonds, certificates or other evidence of insurance,
certificates of inspection, Record Documents, and other documents required by the
Contract Documents, the City shall execute a Notice of Completion, constituting final
acceptance and completion of the Project, except as may be expressly noted.
8.9 Warranty and Guaranty of Work.
A. Contractor hereby warrants that materials and Work shall be completed in
conformance with the Contract Documents and that the materials and Work provided
will fulfill the requirements of this Warranty. Contractor hereby agrees to repair or
replace, at the discretion of the City, any or all Work that may prove to be defective
in its workmanship, materials furnished, methods of installation or fail to conform to
the Contract Document requirements together with any other Work which may be
damaged or displaced by such defect(s) within a period of one (1) year (or as
otherwise indicated in the Contract Documents or in any guarantee or warranty
provided by any manufacturer or supplier of equipment or materials incorporated into
the Work, whichever is later) from the date of the Notice of Completion of the Project
without any expense whatever to the City, ordinary wear and tear and unusual abuse
and neglect excepted. Contractor shall be required to promptly repair or replace
defective equipment or materials, at Contractor’s option. All costs associated with
such corrective actions and testing, including the removal, replacement, and
reinstitution of equipment and materials necessary to gain access, shall be the sole
responsibility of the Contractor.
B. For any Work so corrected, Contractor’s obligation hereunder to correct defective
Work shall be reinstated for an additional one (1) year period, commencing with the
date of acceptance of such corrected Work. The reinstatement of the one (1) year
warranty shall apply only to that portion of work that was corrected. Contractor shall
perform such tests as the City may require to verify that any corrective actions,
including, without limitation, redesign, repairs, and replacements comply with the
requirements of the Contract. In the event of Contractor’s failure to comply with the
above-mentioned conditions within ten (10) Days after being notified in writing of
required repairs, to the reasonable satisfaction of the City, the City shall have the
right to correct and replace any defective or non-conforming Work and any work
damaged by such work or the replacement or correction thereof at Contractor’s sole
expense. Contractor shall be obligated to fully reimburse the City for any expenses
incurred hereunder immediately upon demand.
C. In addition to the warranty set forth in this Article, Contractor shall obtain for the City
all warranties that would be given in normal commercial practice and assign to the
City any and all manufacturer’s or installer’s warranties for equipment or materials
not manufactured by Contractor and provided as part of the Work, to the extent that
such third-party warranties are assignable and extend beyond the warranty period
set forth in this Article. Contractor shall furnish the City with all warranty and
guarantee documents prior to final acceptance of the Project by the City as required.
D. When specifically indicated in the Contract Documents or when directed by the
Engineer, the City may furnish materials or products to the Contractor for installation.
In the event any act or failure to act by Contractor shall cause a warranty applicable
Packet Page. 393
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -72-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
to any materials or products purchased by the City for installation by the Contractor
to be voided or reduced, Contractor shall indemnify the City from and against any
cost, expense, or other liability arising therefrom, and shall be responsible to the City
for the cost of any repairs, replacement or other costs that would have been covered
by the warranty but for such act or failure to act by Contractor.
E. The Contractor shall remedy at its expense any damage to City-owned or controlled
real or personal property.
F. The City shall notify the Contractor, in writing, within a reasonable time after the
discovery of any failure, defect, or damage. The Contractor shall within ten (10)
Days after being notified commence and perform with due diligence all necessary
Work. If the Contractor fails to promptly remedy any defect or damage, the City shall
have the right to replace, repair or otherwise remedy the defect, or damage at the
Contractor’s expense.
G. In the event of any emergency constituting an immediate hazard to health, safety,
property, or licensees, when caused by Work of the Contractor not in accordance
with the Contract requirements, the City may undertake at Contractor’s expense,
and without prior notice, all Work necessary to correct such condition.
H. Acceptance of Defective Work.
1. If, instead of requiring correction or removal and replacement of defective Work,
the City prefers to accept it, the City may do so. Contractor shall pay all claims,
costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or arbitration
or other dispute resolution costs) attributable to the City’s evaluation of and
determination to accept such defective Work and for the diminished value of the
Work. If any acceptance of Defective Work occurs prior to release of the Project
retention, a Change Order will be issued incorporating the necessary revisions in
the Contract Documents with respect to the Work, and the City shall be entitled to
an appropriate decrease in the Contract Price, reflecting the diminished value of
Work and all costs incurred by the City. If the acceptance of defective occurs after
release of the Project retention, an appropriate amount will be paid by Contractor
to the City.
I. The City May Correct Defective Work
1. If Contractor fails within a reasonable time after written notice from the City to
correct Defective Work, or to remove and replace rejected Work as required by the
City, or if Contractor fails to perform the Work in accordance with the Contract
Documents, or if Contractor fails to comply with any other provision of the Contract
Documents, the City may, after seven (7) Days written notice to Contractor,
correct, or remedy any such deficiency.
2. In connection with such corrective or remedial action, the City may exclude
Contractor from all or part of the Site, take possession of all or part of the Work
and suspend Contractor’s services related thereto, take possession of Contractor’s
Packet Page. 394
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -73-00 72 00 – GENERAL CONDITIONS
tools, appliances, construction equipment and machinery at the Site, and
incorporate in the Work all materials and equipment stored at the Site or for which
Packet Page. 395
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -73-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
the City has paid Contractor but which are stored elsewhere. Contractor shall allow
the City, and the agents, employees, other contractors, and consultants of each of
them, access to the Site to enable the City to exercise the rights and remedies to
correct the Defective Work.
3. All claims, costs, losses, and damages (including but not limited to all fees and
charges of engineers, architects, attorneys, and other professionals and all court
or arbitration or other dispute resolution costs) incurred or sustained by the City
correcting the Defective Work will be charged against Contractor, and a Change
Order will be issued incorporating the necessary revisions in the Contract
Documents with respect to the Work; and the City shall be entitled to an
appropriate decrease in the Contract Price. Such claims, costs, losses and
damages will include but not be limited to all costs of repair, or replacement of work
of others destroyed or damaged by correction, removal, or replacement of
defective Work.
4. If the Change Order is executed after all payments under the Contract have been
paid by the City and the Project Retention is held in an escrow account as
permitted by the Contract Documents, Contractor will promptly alert the escrow
holder, in writing, of the amount of Retention to be paid to the City. If the Change
Order is executed after release of the Project retention, an appropriate amount will
be paid by Contractor to the City. Contractor shall not be allowed an extension of
the Contract Times because of any delay in the performance of the Work
attributable to the City correcting Defective Work.
J. Nothing in the warranty or in the Contract Documents shall be construed to limit the
rights and remedies available to the City at law or in equity, including, but not limited
to, Code of Civil Procedure section 337.15.
ARTICLE 9 - CHANGE ORDERS; DISPUTE RESOLUTION
9.1 Change Orders and Time Extensions
All changes to the Contract, including compensation increases and time extensions, shall be
through a written Change Order in accordance with this Article. The City, without invalidating the
Contract, may order changes in the Work consisting of additions, deletions or other revisions, and
Contractor’s compensation and the time for completion shall be adjusted accordingly. Whenever
any change is made as provided for herein, such change shall be considered and treated as
though originally included in the Contract, and shall be subject to all terms, conditions, and
provisions of the original Contract. Contractor shall not be entitled to claim or bring suit for
damages, whether for loss of profits or otherwise, on account of any decrease or omission of any
item or portion of Work to be done. No dispute, disagreement, or failure of the parties to reach
agreement on the terms of the Change Order shall relieve the Contractor from the obligation to
proceed with performance of the Work, including Additional Work, promptly and expeditiously.
Any alterations, extensions of time, Additional Work, or any other changes may be made without
securing consent of the Contractor’s surety or sureties.
A. Change in Contract Procedures
Packet Page. 396
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -74-00 72 00 – GENERAL CONDITIONS
1. City Directive. The City may direct changes in the Work by delivering a written
directive. To the extent the work directive results in a change to compensation or
Packet Page. 397
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -74-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
time, Contractor must timely request a Change Order and comply with all Change
Order procedures in accordance with this Article. Notwithstanding issuance of a
work directive, Contractor’s failure to timely request a Change Order shall
constitute a waiver by Contractor of any adjustment to compensation or time
extension for Work performed under the directive. The City shall not be liable to
Contractor for Work performed or omitted by Contractor in reliance on verbal
orders.
2. Contractor’s Notice of Change/Delay. If Contractor intends to initiate a Change
Order Request, then Contractor shall provide the City with written notice of the
underlying facts and circumstances that gave rise to the proposed change within
the following times:
a. If due to unknown subsurface or latent physical conditions, within three (3) days
from the discovery date or prior to the alterations of the conditions, whichever
is earlier.
b. If due to a Force Majeure Event, as soon as reasonably practicable under the
conditions, which shall be no longer than three (3) days from the date the
Contractor discovers that the Force Majeure Event gives rise to a change,
unless that the conditions are such that notice within three (3) days is not
possible or practicable.
c. If due to any other matter that may involve an adjustment to the Contract Time
or the Contract Price, within seven (7) days from the discovery date.
To be considered valid and complete, the notice of change/delay shall include
a general statement of the circumstances giving rise to the notice of
change/delay and a reasonable order of magnitude estimate of the additional
costs and/or time. If the circumstances give rise to both a cost adjustment and
time extension, Contractor shall submit the notice of change and notice of delay
concurrently.
3. Request for Change in Compensation and/or Extension of Time. Contractor shall
submit a Change Order Request for any adjustment to Contractor’s compensation
and/or any extension of time. The Change Order Request shall be made prior to
incurring any expense and within fourteen (14) Days from either Contractor’s
notice of change/delay or the City’s directive ordering the change. The Change
Order Request shall include all of the following information (unless inapplicable to
the change):
a. A detailed description of the circumstances giving rise to the
request;
b. A complete itemized cost proposal, including itemized pricing for
first tier Subcontractors;
c. Supporting documentation for all costs;
d. A time impact analysis showing the impact of the delay to the critical
path to completion;
Packet Page. 398
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -75-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
e. If any added costs or information cannot be determined at the time
of the Change Order Request, the reason the costs or information cannot
be determined at the time; and
f. Certification to the accuracy of the Change Order Request under
penalty of perjury.
The time impact analysis shall be in the critical path method format
and shall show the sequencing of all critical and non-critical new
activities and/or activity revisions affected by the delay, with logic
ties to all affected existing activities noted on the schedule.
The City may demand, and Contractor shall provide, any additional
information supporting the Change Order Request, including but
not limited to native electronic format version of schedules and time
impact analyses. Contractor shall provide the requested additional
information within five (5) Days of the request.
For any costs or information that cannot be determined at the time
Contractor submits the Change Order Request, Contractor shall
submit to the City notice of the costs or information and all
supporting documentation within five (5) Days of when the costs or
other information become subject to determination.
4. City’s Final Decision on Change Order; Ordered Changes. If the City denies the
Change Order Request or disagrees with the proposal submitted by Contractor, it
will notify the Contractor, and the City will provide its opinion of the appropriate
price and/or time extension. If no agreement can be reached, the City shall have
the right to order the Work performed on a time and materials basis or to issue a
unilateral Change Order setting forth the City’s determination of the reasonable
additions or savings in costs and time attributable to the extra or deleted work. The
City shall also have the right to order changes in the Work to be performed
promptly by the Contractor on a time and materials basis or to issue a unilateral
Change Order setting forth the City’s determination of the reasonable additions or
savings in costs and time attributable to the extra or deleted work. The City’s
determination shall become final and binding if the Contractor fails to submit a
Claim in writing to the City within fourteen (14) Days of the issuance of the
unilateral Change Order, disputing the terms of the unilateral Change Order and
providing such supporting documentation for its position as the City may
reasonably require.
5. Contractor’s Waiver of Further Relief. CONTRACTOR’S FAILURE TO PROVIDE
A COMPLETE AND TIMELY NOTICE OF CHANGE/DELAY AND/OR CHANGE
ORDER REQUEST, OR TO COMPLY WITH ANY OTHER REQUIREMENT OF
THIS ARTICLE, SHALL CONSTITUTE A WAIVER BY CONTRACTOR OF THE
RIGHT TO A CONTRACT ADJUSTMENT ON ACCOUNT OF SUCH
CIRCUMSTANCES AND A WAIVER OF ANY RIGHT TO FURTHER RECOURSE
OR RECOVERY BY REASON OF OR RELATED TO SUCH CHANGE BY
MEANS OF THE CLAIMS DISPUTE RESOLUTION PROCESS OR BY ANY
Packet Page. 399
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -76-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
OTHER LEGAL PROCESS OTHERWISE PROVIDED FOR UNDER
APPLICABLE LAWS.
Contractor recognizes and acknowledges that timely submission of a formal written
notice of change/delay and Change Order Request, whether or not the
circumstances of the change may be known to the City or available to the City
through other means, is not a mere formality but is of crucial importance to the
ability of the City to promptly identify, prioritize, evaluate and mitigate the potential
effects of changes. Any form of informal notice, whether verbal or written
(including, without limitation, statements in requests for information, statements in
Submittals, statements at any job meeting or entries on monthly reports, daily logs
or job meeting minutes), that does not strictly comply with the formal requirements
of this Article, shall accordingly be insufficient.
6. Change Order Format
a. A Change Order signed by the Contractor indicates the Contractor's agreement
therewith, including any adjustment in compensation or extension of time, and
the full and final settlement of all costs (direct, indirect and overhead) related
to the Work authorized by the Change Order.
b. The City may designate the forms to be used for notices, requests, and Change
Orders. If so designated, Contractor may only use such forms. Contractor
shall not reserve a right to assert impact costs, extended job site costs,
extended overhead, constructive acceleration and/or actual acceleration
beyond what is stated in the Change Order. No Claims shall be allowed for
impact, extended overhead costs, constructive acceleration and/or actual
acceleration due to a multiplicity of changes and/or clarifications. The
Contractor may not change or modify the City’s Change Order form in an
attempt to reserve additional rights.
B. Determining Adjustments to Compensation.
1. Limitation on Costs. Contractor shall not be entitled to any compensation for Work
subject to a Change Order except as expressly set forth in this Article. The mark-
up added in instances of Additional Work shall constitute the entire amount of
profit, any mark-ups, any field or home office overhead costs, including personnel,
equipment or office space, any materials, or any costs of equipment idle time for
such Work.
2. Unit Price Change Orders. When the actual quantity of a Unit Price Work item
varies from the Bid Schedule, compensation for the change in quantity will be
calculated by multiplying the actual quantity by the unit price. This calculation may
result in either an additive or deductive Change Order. Bid items included on the
Bid Schedule may be deducted from the Work in their entirety without any
negotiated extra costs. Because Unit Price Work includes overhead and profit as
determined by Contractor at the time of its Bid submission, no mark up or deduction
for overhead and profit will be allowed.
Packet Page. 400
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -77-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
3. Lump Sum Change Orders. Whenever possible, any changes affecting
compensation shall be in a lump sum mutually agreed by the Contractor and the
City.
4. Time and Materials Change Orders. The City may direct the Contractor to proceed
with the Additional Work with payment to be made on the basis of actual cost of
the labor and materials required to complete the Additional Work. If the Project is
federally funded, a time and materials Change Order shall only be issued after a
determination that no other Change Order is suitable and the Change Order shall
include a ceiling price that the Contractor exceeds at its own risk.
5. Federally Funded Projects. For any change in price to the Contract, general and
administrative expenses shall be negotiated and must conform to the cost
principles set forth under at 2 C.F.R. Part 200, subpart E, and profit shall be
negotiated as a separate element of the cost. To establish a fair and reasonable
profit, consideration must be given to the complexity of the Additional Work to be
performed, the risk borne by the Contractor, the Contractor's investment, the
amount of subcontracting, the quality of its record of past performance, and
industry profit rates in the surrounding geographical area for similar work.
6. Allowed Costs. Estimates for lump sum quotations and accounting for time-and-
material work shall be limited to direct expenditures necessitated specifically by
the change and shall be segregated as follows:
a. Labor. The costs of labor will be the actual cost for wages prevailing locally for
each craft or type of worker at the time the Additional Work is done, plus
employer payments of payroll taxes and insurance, health and welfare,
pension, vacation, apprenticeship funds, and other direct costs resulting from
federal, state or local laws, as well as assessment or benefits required by lawful
collective bargaining agreements. The use of a labor classification which
would increase the Additional Work cost will not be permitted unless the
Contractor establishes the necessity for such additional costs. Labor costs for
equipment operators and helpers shall be reported only when such costs are
not included in the invoice for equipment rental.
b. Materials. The cost of materials reported shall be at the lowest current price at
which such materials are locally available in the quantities involved, plus sales
tax, freight and delivery. Materials costs shall be based upon supplier or
manufacturer’s invoice.
c. Tool and Equipment Use. Regardless of ownership, the rates to be used in
determining equipment use shall not exceed listed rates prevailing locally at
equipment rental agencies, or distributors, at the time the work is performed.
The Contractor shall furnish cost data supporting the establishment of the
rental rate. The rental rate to be applied for use of each items of equipment
shall be the rate resulting in the least total cost to the City for the total period
of use. The City shall the make the final determination as to an equitable rental
rate for the equipment. No payment will be made for the use of small tools,
which have a replacement value of $1,000 or less.
Packet Page. 401
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -78-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
(i) The rental time to be paid for equipment shall be the time the equipment
is in productive operation on the Additional Work being performed.
Rental time will not be allowed while equipment is inoperative due to
breakdowns.
(ii) All equipment shall, in the opinion of the City, be in good working
condition and suitable for the purpose for which the equipment is to be
used. Equipment with no direct power unit shall be powered by a unit
of at least the minimum rating recommended by the manufacturer.
(iii) Before construction equipment is used on any Additional Work, the
Contractor shall plainly stencil or stamp an identifying number thereon
at a conspicuous location, and shall furnish to the City, in duplicate, a
description of the equipment and its identifying number.
(iv) When hourly rates are listed, any part of an hour less than 30 minutes
of operation shall be considered to be 1/2-hour of operation, and any
part of an hour greater than 30 minutes will be considered one hour of
operation. When daily rates are listed, any part of a day less than 4
hours operation shall be considered to be 1/2-day of operation.
d. Allowed Mark-up. The allowed mark-up for any and all overhead (including
supervision and home and field office costs) and profit on work added to the
Contract shall be determined in accordance with the following provisions:
(i) “Net Cost” is defined as the actual costs of labor, materials and tools
and equipment only, excluding overhead and profit. The costs of
applicable insurance and bond premium will be reimbursed to the
Contractor and Subcontractors at cost only, without mark-up.
Contractor shall provide the City with documentation of the costs,
including but not limited to payroll records, invoices, and such other
information as the City may reasonably request.
(ii) For Work performed by the Contractor’s forces the allowed mark-up
shall not exceed fifteen (15%) percent of labor costs, ten percent (10%)
of material costs, and ten percent (10%) of the cost of tools and
equipment use.
(iii) For Work performed by a Subcontractor, the added cost for overhead
and profit shall not exceed fifteen percent (15%) of the Subcontractor’s
Net Cost of the Work to which the Contractor may add up to five percent
(5%) of the Subcontractor’s Net Cost.
(iv) For Work performed by a sub-subcontractor, the added cost for
overhead and profit shall not exceed fifteen percent (15%) of the sub-
subcontractor’s Net Cost for Work to which the Subcontractor and
Contractor may each add up to an additional five percent (5%) of the
Net Cost of the lower tier subcontractor.
(v) No additional mark-up will be allowed for lower tier subcontractors, and
in no case shall the added cost for overhead and profit payable by the
Packet Page. 402
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -79-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
City exceed twenty-five percent (25%) of the Net Cost as defined
herein, of the party that performs the Work.
(vi) Calculation of the mark-up will be subject to the limitations above and
to calculation as further detailed in (b)(B)(5) above.
e. Documentation of Time-and-Material Costs.
(i) T&M Daily Sheets. Contractor must submit timesheets, materials
invoices, records of equipment hours, and records of rental equipment
hours to the City’s for an approval signature each day that Work is
performed on a time-and-material basis. The Engineer’s signature on
time sheets only serves as verification that the Work was performed
and is not indicative of the City’s agreement to Contractor’s entitlement
to the cost.
(ii) T&M Summary Sheet. Contractor shall submit a T&M Summary Sheet,
which shall include total actual costs, within five (5) Days following
completion of Additional Work on a time-and-material basis.
Contractor’s total actual cost shall be presented in a summary table in
an electronic spreadsheet file by labor, material, equipment, and any
other costs, along with documentation supporting the costs.
Contractor’s failure to submit the T&M Summary Sheet within five (5)
Days of completion of the Additional Work will result in Contractor’s
waiver for any reimbursement of any costs associated with the
Additional Work.
f. Excluded Costs. The following costs or any other home or field office overhead
costs, all of which are to be considered administrative costs covered by the
Contractor’s mark-up, shall not be allowed costs and shall not be included in
any lump sum proposals or time-and-materials invoices:
(i) Overhead Cost. Payroll costs and other compensation of Contractor’s
officers, executives, principals, general managers, engineers,
architects, estimators, attorneys, auditors, accountants, purchasing
and contracting agents, timekeepers, clerks, and other personnel
employed by Contractor whether at the Site or in Contractor’s principal
office or any branch office, material yard, or shop for general
administration of the Work;
(ii) Office Expenses. Expenses of Contractor’s principal and branch
offices;
(iii) Capital Expenses. Any part of Contractor’s capital expenses, including
interest on Contractor’s capital employed for the Additional Work and
charges against Contractor for delinquent payments;
(iv) Negligence. Costs due to the negligence of Contractor or any
Subcontractor or Supplier, or anyone directly or indirectly employed by
any of them or for whose acts any of them may be liable, including
without limitation the correction of Defective Work, disposal of materials
Packet Page. 403
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -80-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
or equipment wrongly supplied, and making good any damage to
property;
(v) Small Tools. Cost of small tools valued at less than $1,000 and that
remain the property of Contractor;
(vi) Administrative Costs. Costs associated with the preparation of Change
Orders (whether or not ultimately authorized), cost estimates, or the
preparation or filing of Claims;
(vii) Anticipated Lost Profits. Expenses of Contractor associated with
anticipated lost profits or lost revenues, lost income or earnings, lost
interest on earnings, or unpaid retention;
(viii) Home Office Overhead. Costs derived from the computation of a
“home office overhead” rate by application of the Eichleay, Allegheny,
burden fluctuation, or other similar methods;
(ix) Special Consultants and Attorneys. Costs of special consultants or
attorneys, whether or not in the direct employ of Contractor, employed
for services specifically related to the resolution of a Claim, dispute, or
other matter arising out of or relating to the performance of the
Additional Work.
(x) Other. Other overhead or general expense costs of any kind and the
cost of any item not specifically and expressly included in the Contract
Documents; including but not limited to: submittals, drawings, field
drawings, shop drawings, including submissions of drawings; field
inspection; general superintendence; computer services; reproduction
services; salaries of project engineer, superintendent, timekeeper,
storekeeper, and secretaries; janitorial services; small tools, incidentals
and consumables; temporary on-site facilities (offices, telephones, high
speed internet access, plumbing, electrical power, lighting; platforms,
fencing, water); surveying; estimating; protection of work; handling and
disposal fees; final cleanup; other incidental work; related warranties;
insurance and bond premiums.
(xi) Compliance with Federal Cost Principles. If the Project is federally
funded, any costs that are not allowable, reasonable and allocable to
the Project, under generally accepted accounting principles and the
applicable federal requirements.
9.2 Procedure for Resolving Claims.
Contractor shall timely comply with any and all requirement of the Contract Documents pertaining
to notices and requests for changes to the Contract Time or Contract Price, including but not
limited to all requirements of Article 9.1, as a prerequisite to filing any claim governed by this
Article. The failure to timely submit a notice of delay or notice of change, or to timely request a
change to the time for completion or Contractor’s compensation, or to timely provide any other
notice or request required herein shall constitute a waiver of the right to further pursue the claim
under the Contract or at law.
Packet Page. 404
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -81-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
A. Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public
Contract Code prescribes a process utilizing informal conferences, non-binding
judicial supervised mediation, and judicial arbitration to resolve disputes on
construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of
the Public Contract Code prescribes a process for negotiation and mediation to
resolve disputes on construction claims. The intent of this Article is to implement
Sections 20104 et seq. and Section 9204 of the California Public Contract Code.
This Article shall be construed to be consistent with all applicable law, including but
not limited to these statutes.
B. Claims. For purposes of this Article, “Claim” means a separate demand by the
Contractor for:
1. An adjustment to the time for completion including, without limitation, for relief from
damages or penalties for delay assessed by the City;
2. Payment by the City of money or damages arising from Work done by or on behalf
of the Contractor pursuant to the Contract, payment for which is not otherwise
expressly provided or to which the Contractor is not otherwise entitled; or
3. An amount the payment of which is disputed by the City.
A “Claim” does not include any demand for payment for which the Contractor has
failed to provide notice, request a Change Order, or otherwise failed to follow any
procedures contained in the Contract Documents.
C. Filing Claims. Claims governed by this Article may not be filed unless and until the
Contractor completes any and all requirements of the Contract Documents
pertaining to notices and requests for changes to the Contract Time or Contract
Price, and Contractor’s request for a change has been denied in whole or in part.
Claims governed by this Article must be filed no later than thirty (30) Days after a
request for change has been denied in whole or in part or after any other event giving
rise to the Claim. The Claim shall be submitted in writing to the City and shall include
on its first page the following words in 16 point capital font: “THIS IS A CLAIM.” The
Claim shall include the all information and documents necessary to substantiate the
Claim, including but not limited to those identified below. Nothing in this Article is
intended to extend the time limit or supersede notice requirements otherwise
provided by Contract Documents. Failure to follow such contractual requirements
shall bar any Claims or subsequent proceedings for compensation or payment
thereon.
D.Documentation. The Contractor shall submit all Claims in the following format:
1. Summary description of Claim including basis of entitlement, merit and amount of
time or money requested, with specific reference to the Contract Document
provisions pursuant to which the Claim is made
2. List of documents relating to Claim:
a. Specifications
Packet Page. 405
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -82-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
b. Drawings
c. Clarifications (Requests for Information)
d. Schedules
e. Other
3. Chronology of events and correspondence
4. Narrative analysis of Claim merit
5. Analysis of Claim cost, including calculations and supporting documents
6. Time impact analysis in the form required by the Contract Documents or, if the
Contract Documents do not require a particular format, CPM format, if an
adjustment of the Contract Time is requested
E. City’s Response. Upon receipt of a Claim pursuant to this Article, the City shall
conduct a reasonable review of the Claim and, within a period not to exceed 45 Days,
shall provide the Contractor a written statement identifying what portion of the Claim
is disputed and what portion is undisputed. Any payment due on an undisputed
portion of the Claim will be processed and made within 60 Days after the City issues
its written statement.
1. If the City needs approval from its governing body to provide the Contractor a
written statement identifying the disputed portion and the undisputed portion of the
Claim, and the City’s governing body does not meet within the 45 Days or within
the mutually agreed to extension of time following receipt of a Claim sent by
registered mail or certified mail, return receipt requested, the City shall have up to
three (3) Days following the next duly publicly noticed meeting of the City’s
governing body after the 45-Day period, or extension, expires to provide the
Contractor a written statement identifying the disputed portion and the undisputed
portion.
2. Within 30 Days of receipt of a Claim, the City may request in writing additional
documentation supporting the Claim or relating to defenses or Claims the City may
have against the Contractor. If additional information is thereafter required, it shall
be requested and provided pursuant to this subdivision, upon mutual agreement
of the City and the Contractor. The City’s written response to the Claim, as further
documented, shall be submitted to the Contractor within 30 Days (if the Claim is
less than $50,000, within 15 Days) after receipt of the further documentation, or
within a period of time no greater than that taken by the Contractor in producing
the additional information or requested documentation, whichever is greater.
F. Meet and Confer. If the Contractor disputes the City’s written response, or the City
fails to respond within the time prescribed, the Contractor may so notify the City, in
writing, either within 15 Days of receipt of the City’s response or within 15 Days of
the City’s failure to respond within the time prescribed, respectively, and demand in
writing an informal conference to meet and confer for settlement of the issues in
Packet Page. 406
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -83-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
dispute. Upon receipt of a demand, the City shall schedule a meet and confer
conference within 30 Days for settlement of the dispute.
G. Mediation. Within 10 business days following the conclusion of the meet and confer
conference, if the Claim or any portion of the Claim remains in dispute, the City shall
provide the Contractor a written statement identifying the portion of the Claim that
remains in dispute and the portion that is undisputed. Any payment due on an
undisputed portion of the Claim shall be processed and made within 60 Days after
the City issues its written statement. Any disputed portion of the Claim, as identified
by the Contractor in writing, shall be submitted to nonbinding mediation, with the City
and the Contractor sharing the associated costs equally. The public entity and
Contractor shall mutually agree to a mediator within 10 business days after the
disputed portion of the Claim has been identified in writing, unless the parties agree
to select a mediator at a later time.
1. If the parties cannot agree upon a mediator, each party shall select a mediator and
those mediators shall select a qualified neutral third party to mediate with regard
to the disputed portion of the Claim. Each party shall bear the fees and costs
charged by its respective mediator in connection with the selection of the neutral
mediator.
2. For purposes of this Article, mediation includes any nonbinding process, including,
but not limited to, neutral evaluation or a dispute review board, in which an
independent third party or board assists the parties in dispute resolution through
negotiation or by issuance of an evaluation. Any mediation utilized shall conform
to the timeframes in this Article.
3. Unless otherwise agreed to by the City and the Contractor in writing, the mediation
conducted pursuant to this section shall excuse any further obligation under
Section 20104.4 to mediate after litigation has been commenced.
4. The mediation shall be held no earlier than the date the Contractor completes the
Work or the date that the Contractor last performs Work, whichever is earlier. All
unresolved Claims shall be considered jointly in a single mediation, unless a new
unrelated Claim arises after mediation is completed.
H. Procedures After Mediation. If following the mediation, the Claim or any portion
remains in dispute, the Contractor must file a Claim pursuant to Chapter 1
(commencing with Section 900) and Chapter 2 (commencing with Section 910) of
Part 3 of Division 3.6 of Title 1 of the Government Code prior to initiating litigation.
For purposes of those provisions, the running of the period of time within which a
Claim must be filed shall be tolled from the time the Contractor submits his or her
written Claim pursuant to subdivision (a) until the time the Claim is denied, including
any period of time utilized by the meet and confer conference.
I. Civil Actions. The following procedures are established for all civil actions filed to
resolve Claims of $375,000 or less:
Packet Page. 407
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -84-00 72 00 – GENERAL CONDITIONS
1. Within 60 Days, but no earlier than 30 Days, following the filing or responsive
pleadings, the court shall submit the matter to non-binding mediation unless
waived by mutual stipulation of both parties or unless mediation was held prior to
Packet Page. 408
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -84-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
commencement of the action in accordance with Public Contract Code section
9204 and the terms of this Contract. The mediation process shall provide for the
selection within 15 Days by both parties of a disinterested third person as mediator,
shall be commenced within 30 Days of the submittal, and shall be concluded within
15 Days from the commencement of the mediation unless a time requirement is
extended upon a good cause showing to the court.
2. If the matter remains in dispute, the case shall be submitted to judicial arbitration
pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of
the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The
Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter
3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding
brought under this subdivision consistent with the rules pertaining to judicial
arbitration. In addition to Chapter 2.5 (commencing with Section 1141.10) of Title
3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be
experienced in construction law, and (B) any party appealing an arbitration award
who does not obtain a more favorable judgment shall, in addition to payment of
costs and fees under that chapter, also pay the attorney’s fees on appeal of the
other party.
J. Government Code Claim Procedures.
1. This Article does not apply to tort claims and nothing in this Article is intended nor
shall be construed to change the time periods for filing tort claims or actions
specified by Chapter 1 (commending with Section 900) and Chapter 2
(commencing with Section 910) of Part 3 of Division 3.5 of Title 1 of the
Government Code.
2. In addition to any and all requirements of the Contract Documents pertaining to
notices of and requests for adjustment to the Contract Time, Contract Price, or
compensation or payment for Additional Work, disputed Work, construction claims
and/or changed conditions, the Contractor must comply with the claim procedures
set forth in Government Code Section 900, et seq. prior to filing any lawsuit against
the City.
3. Such Government Code claims and any subsequent lawsuit based upon the
Government Code claims shall be limited to those matters that remain unresolved
after all procedures pertaining to adjustment of the Contract Time or Contract Price
for Additional Work, disputed Work, construction claims, and/or changed
conditions have been followed by Contractor. If Contractor does not comply with
the Government Code claim procedure or the prerequisite contractual
requirements, Contractor may not file any action against the City.
4.A Government Code claim must be filed no earlier than the date the Work is
completed or the date the Contractor last performs Work on the Project,
whichever occurs first. A Government Code claim shall be inclusive of all
unresolved Claims known to Contractor or that should reasonably by known
to Contractor excepting only new unrelated Claims that arise after the
Government Code claim is submitted.
Packet Page. 409
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -85-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
K. Non-Waiver. The City’s failure to respond to a Claim from the Contractor within the
time periods described in this Article or to otherwise meet the time requirements of
this Article shall result in the Claim being deemed rejected in its entirety, and shall
not constitute a waiver of any rights under this Article.
ARTICLE 10 - MEASUREMENT; PAYMENT
10.1 Cost Breakdown.
A. Lump Sum Work.
1. Contractor shall furnish on forms approved by the City within ten (10) Days of the
Notice to Proceed, a schedule of values allocating the entire Contract Price to the
various portions of the Work and prepared in such a form and supported by such
data to substantiate its accuracy as the Engineer may require. This schedule of
values, unless objected to by the Engineer, shall be used as a basis for reviewing
the Contractor’s applications for payment. Contractor shall submit the schedule of
values prior to submitting its first application for payment, and the City will not issue
any payment until it receives and approves the schedule of values.
B. Unit Price Work.
1. Where the Contract Documents provide that all or part of the Work is to be Unit
Price Work, initially the Contract Price will be deemed to include for all Unit Price
Work an amount equal to the sum of the unit price for each separately identified
item of Unit Price Work multiplied by the estimated quantity of each item as
indicated in the Contract. The estimated quantities of items of Unit Price Work are
not guaranteed and are solely for the purpose of comparison of Bids and
determining an initial Contract Price. Each unit price will be deemed to include an
amount considered by Contractor to be adequate to cover Contractor’s overhead
and or profit for each separately identified item.
2. Unless otherwise specified, payment will be based on the actual quantities of Work
as verified and approved by the Engineer, based on the price per unit as set forth
in the Bid.
3. The City or Contractor may initiate a Change Order or Change Order Request to
adjust the Contract Price in accordance with Contractor Documents based on
actual quantities of Unit Price Work. The City or Contractor may make a claim for
an adjustment in the Unit Price in accordance with the Contract Documents if:
a. the quantity of any item of Unit Price Work performed by Contractor
differs by twenty-five percent (25%) or more from the estimated quantity of
such item indicated in the Contract; and
b. there is no corresponding adjustment with respect to any other item
of Work; and
c. Contractor believes that Contractor is entitled to an increase in unit
price as a result of having incurred additional expense or the City believes
Packet Page. 410
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -86-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
that the City is entitled to a decrease in unit price and the parties are unable
to agree as to the amount of any such increase or decrease.
10.2 Progress Estimates and Payment.
A. By the tenth (10th) Day of the following calendar month, Contractor shall submit to
Engineer a payment request which shall set forth in detail the value of the Work done
for the period beginning with the date Work was first commenced and ending on the
end of the calendar month for which the payment request is prepared. Contractor
shall include an adjusted list of actual quantities, verified by the Engineer, for unit
price items listed, if any, in the Bid. Contractor shall include any amount earned for
authorized Additional Work. Contractor shall certify under penalty of perjury, that all
cost breakdowns and periodic estimates accurately reflect the Work on the Project.
B. From the total thus computed, a deduction shall be made in the amount of five
percent (5%) for retention, except where the City has adopted a finding that the Work
done under the Contract is substantially complex, and then the amount withheld as
retention shall be the percentage specified in the Notice Inviting Bids. From the
remainder a further deduction may be made in accordance with Section C below.
The amount computed, less the amount withheld for retention and any amounts
withheld as set forth below, shall be the amount of the Contractor’s payment request.
C. The City may withhold a sufficient amount or amounts of any payment or payments
otherwise due to Contractor, as in its judgment may be necessary to cover:
1. Payments which may be past due and payable for just claims against Contractor
or any Subcontractors for labor or materials furnished in and about the
performance of work on the Project under this Contract.
2. Defective work not remedied.
3. Failure of Contractor to make proper payments to his Subcontractor or for material
or labor.
4. Completion of the Contract if there is a reasonable doubt that the Work can be
completed for balance then unpaid.
5. Damage to another contractor or a third party.
6. Amounts which may be due the Count for claims against Contractor.
7. Failure of Contractor to keep the Record Drawings up to date.
8. Failure to provide update on construction schedule as required herein.
9. Site cleanup.
10. Failure to comply with Contract Documents.
11. Liquidated damages.
Packet Page. 411
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -87-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
12. Legally permitted penalties.
D. The City may apply such withheld amount or amounts to payment of such claims or
obligations at its discretion with the exception of subsections (C)(1), (3), and (5) of
this Article, which must be retained or applied in accordance with applicable law. In
so doing, the City shall be deemed the agent of Contractor and any payment so
made by the City shall be considered as a payment made under contract by the City
to Contractor and the City shall not be liable to Contractor for such payments made
in good faith. Such payments may be made without prior judicial determination of
claim or obligations. The City will render Contractor a proper accounting of such
funds disbursed on behalf of Contractor.
E. Upon receipt, the Engineer shall review the payment request to determine whether
it is undisputed and suitable for payment. If the payment request is determined to
be unsuitable for payment, it shall be returned to Contractor as soon as practicable
but not later than seven (7) Days after receipt, accompanied by a document setting
forth in writing the reasons why the payment request is not proper. The City shall
make the progress payment within 30 Days after the receipt of an undisputed and
properly submitted payment request from Contractor, provided that a release of liens
and claims has been received from the Contractor pursuant to Civil Code section
8132. The number of days available to the City to make a payment without incurring
interest pursuant to this paragraph shall be reduced by the number of Days by which
the Engineer exceeds the seven (7) Day requirement.
F. A payment request shall be considered properly executed if funds are available for
payment of the payment request and payment is not delayed due to an audit inquiry
by the financial officer of the City.
G. The City shall have the right to adjust any estimate of quantity and to subsequently
correct any error made in any estimate for payment.
10.3 Final Acceptance and Payment
A. Following the City’s acceptance of the Work, the Contractor shall submit to the City
a written statement of the final quantities of unit price items for inclusion in the final
payment request. The City shall have the right to adjust any estimate of quantity
and to correct any error made in any estimate for payment.
B. When the Work has been accepted there shall be paid to Contractor a sum equal to
the Contract Price less any amounts previously paid Contractor and less any
amounts withheld by the City from Contractor under the terms of the Contract. The
final five percent (5%), or the percentage specified in the Notice Inviting Bids where
the City has adopted a finding of substantially complete, shall not become due and
payable until as required by Public Contract Code section 7107. If the Contractor
has placed securities with the City as described herein, the Contractor shall be paid
a sum equal to one hundred percent (100%) of the Contract Price less any amounts
due the City under the terms of the Contract.
Packet Page. 412
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -88-00 72 00 – GENERAL CONDITIONS
C. Unless Contractor advises the City in writing prior to acceptance of the final five
percent (5%) or the percentage specified in the Notice Inviting Bids where the City
has adopted a finding of completion, or the return of securities held as described
Packet Page. 413
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -88-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
herein, said acceptance shall operate as a release to the City of all claims and all
liability to Contractor for all things done or furnished in connection with this Work and
for every act of negligence of the City and for all other claims relating to or arising
out of this Work. If Contractor advises the City in writing prior to acceptance of final
payment or return of the securities that there is a dispute regarding the amount due
the Contractor, the City may pay the undisputed amount contingent upon the
Contractor furnishing a release of all undisputed claims against the City with the
disputed claims in stated amounts being specifically excluded by Contractor from the
operation of the release. No payments, however, final or otherwise, shall operate to
release Contractor or its sureties from the Faithful Performance Bond, Labor and
Material Payment Bond, or from any other obligation under this Contract.
D. In case of suspension of the Contract any unpaid balance shall be and become the
sole and absolute property of the City to the extent necessary to repay the City any
excess in the cost of the Work above the Contract Price.
E. Final payment shall be made no later than 60 Days after the date of acceptance of
the Work by the City or the date of occupation, beneficial use and enjoyment of the
Work by the City including any operation only for testing, start-up or commissioning
accompanied by cessation of labor on the Work, provided that a release of liens and
claims has been received from the Contractor pursuant to Civil Code section 8136.
In the event of a dispute between the City and the Contractor, the City may withhold
from the final payment an amount not to exceed 150% of the disputed amount.
F. Within ten (10) Days from the time that all or any portion of the retention proceeds
are received by Contractor, Contractor shall pay each of its Subcontractors from
whom retention has been withheld each Subcontractor’s share of the retention
received. However, if a retention payment received by Contractor is specifically
designated for a particular Subcontractor, payment of the retention shall be made to
the designated Subcontractor if the payment is consistent with the terms of the
subcontract.
ARTICLE 11 - MISCELLANEOUS
11.1 Patents.
A. Contractor shall hold and save the City, officials, officers, employees, and authorized
volunteers harmless from liability of any nature or kind of claim therefrom including
costs and expenses for or on account of any patented or unpatented invention,
article or appliance manufactured, furnished or used by Contractor in the
performance of this Contract.
11.2 Document Retention & Examination
A. In accordance with Government Code section 8546.7, records of both the City and
the Contractor shall be subject to examination and audit by the State Auditor General
for a period of three (3) years after final payment.
B. Contractor shall make available to the City any of the Contractor’s other documents
related to the Project immediately upon request of the City.
Packet Page. 414
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -89-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
C. In addition to the State Auditor rights above, the City shall have the right to examine
and audit all books, estimates, records, contracts, documents, bid documents,
subcontracts, and other data of the Contractor (including computations and
projections) related to negotiating, pricing, or performing the modification in order to
evaluate the accuracy and completeness of the cost or pricing data at no additional
cost to the City, for a period of four (4) years after final payment.
11.3 Notice.
A. All notices shall be in writing and either served by personal delivery or mailed to the
other party. Written notice to the Contractor shall be addressed to Contractor’s
principal place of business unless Contractor designates another address in writing
for service of notice. Notice to the City shall be addressed to the City as designated
in the Notice Inviting Bids unless the City designates another address in writing for
service of notice. Notice shall be effective upon receipt or five (5) Days after being
sent by first class mail, whichever is earlier. Notice given by facsimile shall not be
effective unless acknowledged in writing by the receiving party.
11.4 Notice of Third Party Claims
A. Pursuant to Public Contract Code section 9201, the City shall provide the Contractor
with timely notification of the receipt of any third-party claims relating to the Contract.
The City is entitled to recover reasonable costs incurred in providing such
notification.
11.5 State License Board Notice
A. Contractors are required by law to be licensed and regulated by the Contractors’
State License Board which has jurisdiction to investigate complaints against
contractors if a complaint regarding a patent act or omission is filed within four (4)
years of the date of the alleged violation. A complaint regarding a latent act or
omission pertaining to structural defects must be filed within ten (10) years of the
date of the alleged violation. Any questions concerning a contractor may be referred
to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento,
California 95826.
11.6 Assignment of Contract
A. Contractor shall not assign, transfer, convey, sublet or otherwise dispose of the
rights or title of interest of any or all of this contract without the prior written consent
of the City. Any assignment or change of Contractor’s name of legal entity without
the written consent of the City shall be void. Any assignment of money due or to
become due under this Contract shall be subject to a prior lien for services rendered
or material supplied for performance of Work called for under the Contract
Documents in favor of all persons, firms, or corporations rendering such services or
supplying such materials to the extent that claims are filed pursuant to the Civil Code,
the Code of Civil Procedure or the Government Code.
Packet Page. 415
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -90-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
11.7 Change In Name And Nature Of Contractor’s Legal Entity.
A. Should a change be contemplated in the name or nature of the Contractor’s legal
entity, the Contractor shall first notify the City in order that proper steps may be taken
to have the change reflected on the Contract and all related documents. No change
of Contractor’s name or nature will affect the City’s rights under the Contract,
including but not limited to the bonds.
11.8 Prohibited Interests
A. No City official or representative who is authorized in such capacity and on behalf of
City to negotiate, supervise, make, accept, or approve, or to take part in negotiating,
supervising, making, accepting or approving any engineering, inspection,
construction or material supply contract or any subcontract in connection with
construction of the project, shall be or become directly or indirectly interested
financially in the Contract.
11.9 Controlling Law
A. Notwithstanding any subcontract or other contract with any subcontractor, supplier,
or other person or organization performing any part of the Work, this Contract shall
be governed by the law of the State of California excluding any choice of law
provisions.
11.10 Jurisdiction; Venue
A. Contractor and any subcontractor, supplier, or other person or organization
performing any part of the Work agrees that any action or suits at law or in equity
arising out of or related to the bidding, award, or performance of the Work shall be
maintained in the Superior Court of San Bernardino County, California, and
expressly consent to the jurisdiction of said court, regardless of residence or
domicile, and agree that said court shall be a proper venue for any such action.
11.11 Cumulative Remedies.
A. The duties and obligations imposed by these General Conditions and the rights and
remedies available hereunder to the parties hereto are in addition to, and are not to
be construed in any way as a limitation of, any rights and remedies available to any
or all of them which are otherwise imposed or available by Applicable Laws, by
special warranty or guarantee, or by other provisions of the Contract Documents.
The provisions of this Article will be as effective as if repeated specifically in the
Contract Documents in connection with each particular duty, obligation, right, and
remedy to which they apply.
11.12 Survival of Obligations.
A. All representations, indemnifications, warranties, and guarantees made in, required
by, or given in accordance with the Contract Documents, as well as all continuing
obligations indicated in the Contract Documents, will survive final payment,
completion, and acceptance of the Work or termination or completion of the Contract
or termination of the services of Contractor.
Packet Page. 416
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -91-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
11.13 Headings.
A. Article and paragraph headings are inserted for convenience only and do not
constitute parts of these General Conditions.
11.14 Assignment of Antitrust Actions
A. In accordance with §7103.5(b) of the California Public Contract Code, Contractor
and Subcontractors must conform to the following requirements:
1. In entering into a public works contract or a subcontract to supply goods, services,
or materials pursuant to a public works contract, Contractor or Subcontractor offer
and agree to assign to the awarding body all rights, title, and interest in and to all
causes of action it may have under §4 of the Clayton Act (15 U.S.C. Sec. 15) or
under the Cartwright Act (Chapter 2 (commencing with §16700) of Part 2 of
Division 7 of the Business and Professions Code) arising from purchases of goods,
services, or materials pursuant to the public works contract or the subcontract.
2. This assignment must be made and become effective at the time the awarding
body tenders to Contractor, without further acknowledgment by the parties.
11.15 All Legal Provisions Included
A. Contractor shall give all notices and comply with all federal, state and local laws,
ordinances, rules and regulations bearing on conduct of work as indicated and
specified by their terms. References to specific laws, rules or regulations in this
Contract are for reference purposes only, and shall not limit or affect the applicability
of provisions not specifically mentioned. If Contractor observes that drawings and
specifications are at variance therewith, he shall promptly notify City in writing and
any necessary changes shall be adjusted as provided for in this Contract for changes
in Work. If Contractor performs any Work knowing it to be contrary to such laws,
ordinances, rules and regulations, and without such notice to City, he shall bear all
costs arising therefrom.
B. Contractor shall be responsible for familiarity with the Americans with Disabilities Act
(“ADA”) (42 U.S.C. § 12101 et seq.). The Work will be performed in compliance with
ADA laws, rules and regulations. Contractor shall comply with the Historic Building
Code, including, but not limited to, as it relates to the ADA, whenever applicable.
C. Contractor acknowledges and understands that, pursuant to Public Contract Code
section 20676, sellers of "mined material" must be on an approved list of sellers
published pursuant to Public Resources Code section 2717(b) in order to supply
mined material for this Contract.
D. No City official or representative who is authorized in such capacity and on behalf of
City to negotiate, supervise, make, accept, or approve, or to take part in negotiating,
supervising, making, accepting or approving any engineering, inspection,
construction or material supply contract or any subcontract in connection with
construction of the Work, shall be or become directly or indirectly interested
financially in the Contract.
Packet Page. 417
UNIVERSITY PARKWAY EXTENSION – MEDIAN &
STREETSCAPE IMPROVEMENTS -92-00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
E. All provisions of law required to be inserted in the Contract or Contract Documents
pursuant to any Applicable Laws shall be and are inserted herein. If through mistake,
neglect, oversight, or otherwise, any such provision is not herein inserted or inserted
in improper form, upon the application of either party, the Contract or Contract
Documents shall be changed by City, at no increase in Contract Price or extension
in Contract Times, so as to strictly comply with the Applicable Laws and without
prejudice to the rights of either party hereunder.
11.16 Electronic Signature. Each Party acknowledges and agrees that this Agreement may be
executed by electronic or digital signature, which shall be considered as an original
signature for all purposes and shall have the same force and effect as an original signature
Packet Page. 418
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -93-
SPECIAL CONDITIONS
Packet Page. 419
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -93-
Packet Page. 420
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -94-
00 73 13 – SPECIAL CONDITIONS
1.1 Location of the Project.
A.University Parkway (formerly State Street) from Base Line Street to 16th Street.
1.2 Scope of Work.
A. The Scope of Work consists of but not limited to installation of a concrete raised median
from Hanford Street to 16th Street and installation of landscape and irrigation within
parkway and median of newly constructed University Parkway (formerly State Street)
from Base Line Street to 16th Street, and solar light fixtures.
2.1 Section 2.12 Mobilization
Paragraph B.8 add the following:
No storage of equipment or materials will be allowed on private property, unless written permission
has been provided to City, or in street right-of-way.
2.2 Section 5.5 Safety
Section 5.5.A states, “Contractor to notify owners of adjacent property and of Underground
Facilities and other utility owners when prosecution of the work may affect them.” The following
requirements will be added to Section 5.5.A. The following list of individuals or entities, which are
known to have facilities in the area to be improved is merely for the Contractor's information and
may or may not be complete or inclusive:
City of San Bernardino (Engineering)------------------------------------(909) 384-5019
Southern California Edison, Ben Murguia-------------------------------(909) 307-6788
Southern California Gas Company, Devry Jennings-------------------(909) 335-7772
San Bernardino Municipal Water Department, Mike Nevarez------(909) 384-5092
Verizon Communications, Control Desk--------------------------------(909) 784-6655
AT&T, Rosemary Hamill--------------------------------------------------(916) 799-4642
Underground Service Alert------------------------------------------------(800) 227-2600
California Department of Transportation-------------------------------(909) 383-6920
.
The following amendments, additions and deletions shall be incorporated into the Green Book:
SECTION 3- CONTROL OF THE WORK
3-10 Surveying
Packet Page. 421
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -95-
3-10.2 Survey Service: The Contractor shall provide construction survey and
construction staking to establish grades per plans, furnish all labor, materials,
equipment to complete the surveying task at no extra cost to the Agency.
All costs involved in construction survey shall be included in the various contract
items of work and no additional compensation will be allowed therefore.
2.3 Section 5.27 Work Site
Section 5.27 Work Site, shall add the following requirements:
The contractor shall notify all residents and business owners, in writing (both in English and in
Spanish), of his proposed operations and schedule. Notice shall be delivered at least ten (10)
working days prior to start of construction. The contractor shall prepare a letter for this purpose
and submit the letter to the Engineer for approval at least five (5) working days prior to the date
needed for its circulation. The Contractor shall be responsible for reproduction and distribution of
the letters. The time to notify in advance shall be coordinated with the City inspector.
Project sign board shall be in-placed in advance (30 days after Notice to Proceed, NTP) prior to
any start of construction. Check with the City as to how far in advance to have the project signage
to be in-placed. See Attachment.
The Contractor shall follow: Greenbook 2024, Section 302-3.8, pages 317; Greenbook 2024,
Section 302-4.7, page 323, and Greenbook 2024, PART 6 TEMPORARY TRAFFIC CONTROL
SECTION 600-ACCESS, All of Sections 600 and 601, that apply to this project, pages 553 to 560.
Businesses and residences adjacent to the Work shall be notified forty-eight (48) hours in advance
of closing of driveways.
Re-notification will be required if the Contractor’s schedule is altered or other delays occur, which
significantly affects the scheduled work. Then, it shall be at Contractor’s expense.
2.4 Section 5.29 Protection of Work and Property
Add Paragraph H and add the following:
The Contractor shall provide sufficient barricades, delineators and ribbon at each location to
adequately protect the new and fresh concrete surfaces from vandalism and unauthorized
markings. Newly poured and finished concrete areas shall be delineated or cordoned off with tape
to inhibit and discourage pedestrians, bikers and skateboards from tracking across the fresh
sidewalk surfaces. Unauthorized markings (i.e. graffiti, footprints, bike tire marks, scuff marks) in
the new sidewalk surfaces are not acceptable, and may be cause for rejection. All such areas
rejected due to such cause shall be removed and replaced at the Contractor’s expense. All costs
for protecting the new concrete surfaces and any graffiti removal shall be considered as incidental
to the cost of the work and no additional compensation will be allowed therefore.
Modifications to the Standard Specifications for Public Works Construction.
The following amendments, additions and deletions shall be incorporated into the Green Book:
Packet Page. 422
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -96-
SECTION 2-SCOPE OF WORK-- [No Changes]
3-10.2 Survey Service: The Contractor shall provide construction survey and
construction staking to establish grades per plans, furnish all labor, materials,
equipment to complete the surveying task at no extra cost to the Agency.
All costs involved in construction survey shall be included in the various contract
items of work and no additional compensation will be allowed therefore.
The Contractor shall furnish, in accordance with the plans and specifications, all labor,
equipment, and materials required for all work as necessary for: UNIVERSITY PARKWAY
EXTENSION - MEDIAN & STREETSCAPE IMPROVEMENTS , 16TH STREEET TO
BASELINE STREET PROJECT.
The following list of individuals or entities, which are known to have facilities in the area to
be improved is merely for the Contractor's information and may or may not be complete or
inclusive:
City of San Bernardino (Engineering) .................................(909) 384-5019
Southern California Edison, Ben Murguia ...........................(909) 307-6788
Southern California Gas Company, Devry Jennings...........(909) 335-7772
San Bernardino Municipal Water Department, Engineering (909) 453-6175
Verizon Communications, Control Desk..............................(909) 784-6655
AT&T, Rosemary Hamill......................................................(916) 799-4642
Underground Service Alert..................................................(800) 227-2600
California Department of Transportation…………………….(909) 383-6920
San Bernardino Municipal Water Department, Sewer.........(909) 453-6175
Packet Page. 423
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -97-
CA Department of Water Resources...................................(661) 944-8600
3.0 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK
Prior to commencing any work, the Contractor shall submit for review and approval
by DWR the methods and procedures, excavation plans, schedules and type and
weight of the construction equipment to be used for crossing the State Water
Project’s (SWP) Pipeline.
Prior to construction, the condition of DWR’s roads, fences, and land areas adjacent to the
proposed project area shall be jointly inspected and documented by Contractor, City of San
Bernardino staff and DWR personnel.
4.0 NOTIFICATION OF RESIDENTS AND BUSINESSES
The contractor shall notify all residents and business owners, in writing, of his proposed
operations and schedule. Notice shall be delivered at least ten (10) working days prior to
start of construction. The contractor shall prepare a letter for this purpose and submit the
letter to the Engineer for approval at least five (5) working days prior to the date needed for
its circulation. The Contractor shall be responsible for reproduction and distribution of the
letters. The time to notify in advance shall be coordinated with the City inspector.
Re-notification will be required if the Contractor’s schedule is altered or other delays occur,
which significantly affects the scheduled work. Then, it shall be at Contractor’s expense.
The contractor shall furnish and install a Project Sign on the project site at the
location specified by the Engineer prior to any start of construction. A pictorial sample
of a project sign will be provided to the contractor by the Engineer. Full compensation for
furnishing all labor, materials, tools, equipment, and incidentals for doing all the work involved
in furnishing, installation and maintenance of a project notification sign for the duration of the
project shall be included in the Contract Bid Item “MOBILIZATION, DEMOBILIZATION,
INSURANCE, BONDS, PERMITS, AND MISCELLANEOUS.” The contractor shall furnish
the materials needed to install a 4’ x 8’ sign. Contractor shall take down signs when
construction is completed and return them to the Engineer. Contractor shall install sign on
two 4” x 4” x 12’ treated wood or steel posts, embedded 36” into ground, with 7’ clearance
from ground level to bottom of sign and mount the signs at sites designated by the City,
within City right of way. No additional payment shall be made therefore, regardless of weather,
changes in the scope of work or actual time required to complete the project.
5.0 TRAFFIC CONTROL DURING CONSTRUCTION
In accordance with Greenbook Part 6, traffic control, including but not limited to vehicular
and pedestrian traffic control, maintenance of vehicular and pedestrian access, detours and
street closures, shall be in accordance with the Greenbook, including all its subsequent
Packet Page. 424
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -98-
amendments; the latest edition of the Manual of Traffic Controls for Construction and
Maintenance Work Zones, as published by the Department of Transportation of the State
of California; and the following Special Provisions. In the event of conflict, the Special
Provisions shall take precedence over the Manual of Traffic Controls, and the Manual of
Traffic Controls shall take precedence over the Standard Specifications.
DWR’s ongoing operations and maintenance activities shall not be disrupted during
construction. The Contractor shall maintain DWR’s access through the worksite at
all times.
Ingress and egress to local residents, commercial and industrial properties
must accessible at all times.
Packet Page. 425
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -99-
3. The Contractor shall furnish and properly install, construct, erect, use and
continuously inspect and maintain, twenty-four (24) hours per day, seven (7) days
per week, all said devices, equipment and materials, and all temporary and
permanent pedestrian and driving surfaces as necessary to provide for the safety
and convenience of and to properly warn, guide, control, regulate and channelize
project workers and the public beyond said limits as necessary to include areas
affecting or affected by the work, from the start of work to the completion of the work.
4. High level warning devices (flag trees) are required at all times for any work being
performed within the roadway, unless otherwise specifically authorized by the City.
Flashing arrow boards will be required on all streets with four or more lanes as
deemed necessary by the Engineer or Inspector.
5. All barricades shall be equipped with flashing warning lights and all traffic cones shall
be no less than 28 inches in height except that shorter cones, 12 inches high of
higher, may be used during striping maintenance operation where the only function
of the cones is to protect the wet paint from traffic.
6. Contractor shall have exclusive control and responsibility for all flaggers at all times.
Properly trained and experienced flaggers shall be provided at all times when the
Contractor’s operations encroach into the public right of way. Flaggers shall also be
to direct traffic when said traffic is to be interrupted, when two-way traffic is to be
reduced to one-way traffic at such time as necessary to safely pass the traffic through
or around the work area, and when so directed by the City.
7. Any traffic control and safety devices and equipment being used which becomes
damaged, destroyed, faded, soiled, refurbished and/or replace, and any traffic control
and safety devices and equipment being used which are displaced or not in an
upright position from any cause, shall be promptly returned or retorted to their proper
position.
8. Contractor shall have exclusive control and responsibility for all signs and warning
devices, and all trucks, equipment and materials at all times. An unobstructed view
of all signs and warning devices including, but not limited to, stop signs, stop ahead
signs, street name signs and other regulatory, warning and constructions signs,
markers and warning devices shall be maintained at all times.
No trucks or other equipment or materials shall be stopped, parked or otherwise
placed from the view of vehicular and/or pedestrian traffic to which it applies.
9. When entering or leaving roadways carrying public traffic, the Contractor's
equipment, whether empty or loaded, shall yield to said public traffic at all times,
except where the traffic is being controlled by Police officers, Fire officers, or at traffic
signalized intersections or the aforementioned construction traffic signal.
Packet Page. 426
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -100-
10.Contractor shall have exclusive control and responsibility for stockpile and/or storage
areas at all times. Stockpiling and/or storage of materials on any public right of way
or parking areas, or immediately adjacent to all such areas, will not be allowed
without specific permission of the City.
Materials spilled along or on said right of way or parking area shall be removed
completely and promptly. All stockpile and/or storage areas shall be kept in a safe,
neat clean and orderly fashion, and shall be restored to equal or better than original
condition upon completion of the work.
11.On projects involving work on, closure of or partial closure of existing streets and
where vehicular access to the abutting property must be restricted, the work shall
be so selected, arranged and scheduled that the persons requiring access to said
abutting property and/or residents along said streets affected will be able to park
within a reasonable distance of not more than 500 feet from their homes and/or
destination; and in addition, no two (2) adjoining streets shall be closed at the same
time, except as otherwise authorized by the City.
12.When work has been completed on a particular street or has been suspended or
rescheduled and said street is to be opened to vehicular traffic, all equipment, "NO
PARKING" signs, other obstructions and unnecessary traffic control devices and
equipment shall be promptly removed from the street, except as otherwise
authorized or directed by the City Engineer. Temporary traffic striping shall be
applied prior to opening any newly paved area to traffic. This includes lane and
centerlines.
13.Should the Contractor be neglectful, negligent or refuse, fail or otherwise be
unavailable to promptly, satisfactorily and fully comply with the provisions specified
and referred to hereinabove, the City reserves the right to correct and/or mitigate any
situation, which in the sole opinion of the Engineer constitutes a serious deficiency
and/or serious case or non-compliance, by any means at its disposal at the
Contractor and/or permittee’s expense, and in the case of a contract City project, to
deduct the cost therefore from the Contractor’s progress and/or final payments. Such
corrective actions taken by the City shall not reduce or abrogate the Contractor’s
legal obligation and liability for proper traffic control and safety measures and shall
not serve to transfer said obligations and liability from the Contractor to the City of
the City’s agent.
14.Violations of any of the above provisions and/or provisions of the referenced
publications, unless promptly and completely corrected to the satisfaction of the
Engineer, shall, at the sole director of the City, be grounds for termination of the
Contract or shut down or partial shutdown of the work without compensation to the
Contractor and/or permittee, or liability to the City, all as prescribed by contractual
obligations or State law, whichever is applicable.
Packet Page. 427
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -101-
15.Pedestrians - A minimum walkway of 48 inches in width must be maintained at all
times for safe pedestrian passage through all parkway work areas. Crosswalks shall
remain unobstructed at all times. Obstructions within the walkway areas shall be
illuminated during the hours of darkness and marked with Type II barricades with
flashing warning lights.
Where construction prohibits pedestrian access, alternate crossing areas shall be
established with appropriate signing and other devices as required by the Engineer.
Pedestrian access facilities shall be provided through construction area within the
right-of-way. Pedestrian walkways shall be provided with surfacing as required to
maintain safe and accessible pathways. Surface shall be skid resistant and free of
irregularities.
The Contractor shall keep the areas adjacent to the project site clear of any objects
that may be hazardous to pedestrians and motorists. Provisions to reroute
pedestrians, including the disabled, around the work area must be clearly delineated
and maintained. If the Contractor’s operations require the closure of a walkway, then
another walkway shall be provided nearby, off the traveled roadway, along the
general path of travel.
16.Temporary Surfacing - Temporary A.C. paving shall be placed and maintained at
locations determined by the Engineer wherever excavation is made through
pavement, sidewalk or driveways.
To facilitate public access between the street and adjacent properties, the
Contractor shall construct temporary A.C. walkways/driveways between new
curbs and existing sidewalks/driveways, throughout the project limits.
The Contractor shall maintain the temporary surfacing throughout the duration of the
project until permanent pavement has been restored.
17.Steel Plating - The Contractor shall furnish, install and maintain steel plates as
necessary to obtain minimum lane requirements specified herein and/or to maintain
access to private property.
Steel trench plates shall be employed to bridge across open excavations and newly
poured concrete. The Contractor shall be responsible to ascertain the appropriate
size and placement of the steel plates and other devices to support vehicular traffic
loading across open excavations and newly poured concrete without sustaining
damage to the new improvements.
All steel plates shall be textured for skid-resistance. Steel plates shall be secured in
place with cleats to prevent their movement, sliding or shifting. The edges of steel
plates shall be ramped with temporary surfacing.
Packet Page. 428
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -102-
19. Pavement Transitions - The Contractor shall construct pavement transitions at all
lateral and transverse join lines, created by trenching, base paving, temporary paving
or any combination of each. A vertical drop-off or step between the lateral edges of
the pavement under construction and the adjacent pavement shall not be permitted
during non-working hours.
20. Driveways - Vehicular access to driveways shall be maintained at all times, except
when necessary construction precludes such access for temporary periods, as
follows:
Special attention is directed to constructing the stamped colored concrete driveways.
The Contractor shall evaluate all existing businesses as well as their driveways
(number and width), and develop a construction staging/sequencing plan to ensure
that two-way access to adjacent businesses are maintained to extent possible. The
plan shall be submitted to the City Engineer for review and approval at least five
working days prior to commencement of work.
Subject to the approval of the City Engineer, driveways may be closed for a maximum
of 3 days during the forming, pouring and curing of PCC curb, gutter and driveway
approaches (including decorative colored concrete), provided that alternate two-way
(ingress/egress) driveway(s) is available. Subject to the approval of the City
Engineer, one half of a driveway may be closed for a maximum of 3 days
during the forming, pouring and curing of PCC curb, gutter and driveway approaches
(including decorative colored concrete), provided that sufficient driveway width
remains available to accommodate ingress/egress access to adjacent business(s) in
a safe and orderly fashion.
Driveway approaches shall be poured within 48 hours of the adjacent curb and gutter.
Curb and gutter shall be poured within 24 hours from the time access is blocked by
formwork.
Driveway approaches shall cure for three days before being reopened to vehicular
access.
Driveways shall not be closed over weekends, except for curing of concrete.
Driveways closed due to placement of bituminous pavement shall be reopened as
the new pavement has cooled sufficiently to carry the traffic without damage.
The Contractor shall notify all residents and businesses at least 72 hours in advance
of driveway closure.
During the time driveways are closed, a minimum of two Type II barricades with
flashing warning lights shall be used to affect the closure.
Packet Page. 429
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -103-
Driveways shall be kept open at all other times, and if necessary, temporary
A.C. ramps and/or steel plates shall be provided.
21. Parking - On-street parking may be restricted within the project limits. Temporary
“NO PARKING – TOW AWAY” signs shall be provided and posted by the Contractor
not less than forty-eight (48) hours in advance of the start of construction.
22. Street Lighting – The Contractor shall maintain illumination of the traveled roadway
after the hours of darkness throughout the duration of the project, as follows:
The street lighting system shall be installed and removed in phases such that not
less than one-half of the street lights are operable each evening.
A minimum illumination level of 0.4 foot-candle with a 6:1 uniformity ratio shall be
provided, unless otherwise approved by the Engineer.
23. Lane Closures - The Contractor shall comply with the following general lane closure
requirements:
Flashing Arrow Signs (sequential arrow boards) shall be utilized for all closures of
through travel lanes on major roads and all signalized cross streets, as designated
by the Engineer.
Left turns shall be maintained at all times to the fullest extent possible. Under
extenuating circumstances and when permitted by the Engineer, left turn lanes may
be closed with R-17, “NO LEFT TURN,” signs placed both at the beginning and
end of each left turn lane closed.
Right turns shall be maintained at all times to the fullest extent possible. When
permitted by the Engineer, right-turn lanes may be closed with R-16, “NO RIGHT
TURN,” signs placed both at the beginning and end of each right turn lane closed.
To allow for equipment movement and cleanup during various construction
operations, momentary stoppage of traffic and turn movements will be permitted,
using flagging procedures.
24. Road Closures – Road closures shall be prohibited.
25. Temporary Striping – The Contractor shall provide temporary traffic restriping at the
conclusion of any working day for any centerline or lane line which is obliterated by
construction.
26. Shutdowns - Traffic signal shutdowns shall be restricted to two hours maximum
during one 24-hour period, unless otherwise approved by the Engineer.
Packet Page. 430
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -104-
Where traffic signal shutdowns are required, the Contractor shall furnish and install
temporary stop signs for each travel lane at 24”x24” in size securely mounted and
placed in clear view to all approaching traffic. See Traffic Signal specification section,
“Maintaining Existing and Temporary Electrical Systems.”
The presence of two uniform police officers to direct traffic during shutdown period is
required during any peak hour work and as directed by the engineer. All related
expenses and wages of the police officers shall be borne by the Contractor.
The Contractor shall provide the Engineer five (5) working days advance notice
prior to any traffic signal shutdown for the purpose of scheduling police traffic
control. All shutdowns shall be scheduled pursuant to Section 86-1.06 of the Caltrans
Standard Specifications. No signal shutdowns will be allowed on Fridays.
27. Emergency Response - The Contractor shall provide the Engineer with names and
telephone numbers of at least three people responsible for emergency service
response. Upon notification, Contractor shall respond to City emergency requests.
In the event these people do not promptly respond when notified, or it becomes
necessary to call other forces to accomplish emergency service, the Contractor will
be held liable for any costs incurred. A $400/hour at 4 hours minimum will be charged
to the Contractor.
A. During Working Hours:
In case of an emergency that threatens loss or injury of property, and/or safety of life
during working hours, the Contractor shall act, without previous instructions from the
City, as the situation may warrant. He/she shall notify the Engineer of the emergency
and the action taken immediately thereafter. Any compensation claimed by the
Contractor, together with substantiating documents in regard to expense, shall be
submitted to the Engineer within 15 calendar days after the emergency.
Compensation, if allowed, will be paid for as extra work.
B. Outside of Working Hours:
Whenever, in the opinion of the City, there relocate, and maintain warning devices
and shall furnish the shall arise outside of the regular working hours on the Contract
work of an emergency nature which threatens loss or injury of property, or danger to
public safety, the Contractor shall act, without previous instructions from the City as
the situation may warrant. He/she shall notify the Engineer of the emergency and the
action taken immediately thereafter. Any compensation claimed by the Contractor,
together with substantiating documents in regard to expense, shall be submitted to the
Engineer within 15 calendar days after the emergency. Compensation, if allowed, will
be paid for as extra work. In the event the Contractor is not able to respond to an
emergency outside of regular working hours, the City's forces will handle such
Packet Page. 431
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -105-
emergency work. If such emergency arises out of or is the result of operations by the
Contractor, the cost of the corrective measures will be billed to the Contractor and
deducted from his/her payment as provided in the Contract documents. The
performance of emergency work by City forces will not relieve the Contractor of any of
his/her responsibilities, obligations, or liabilities under the Contract.
Full compensation for compliance with the provisions specified and referred to hereinabove
and per Subsection 00 72 05.4 of the General Conditions shall be considered as included
in the Contract bid price for Bid Item “Traffic Control and Safety”, and no additional
compensation will be allowed therefor.
6.0 "RECORD DRAWINGS"
In accordance with Subsection 00 72 05.24 of the General Conditions, the Contractor shall
maintain, on the job site, a set of full-size reproducible contract
drawings, or a set of full-size blueline or blackline prints incorporating information from the
signed plan drawings.
7.0 PLANS AND STANDARD DRAWINGS
The standard drawings that apply to this contract and shall be considered as part of the
plans included in these Special Provisions are listed in Appendices.
8.0 PROTECTION OF UTILITIES AND EXISTING IMPROVEMENTS
8.1 - UTILITIES
COMMUNICATION AND CONTROL CABLES CONNECTED WITH THE OPERATION OF
THE STATE WATER PROJECT (SWP) ARE BURIED ALONG EITHER OR BOTH SIDES
OF THE AQUEDUCT/PIPELINE WITHIN DEPARTMENT OF WATER RESOURCES
RIGHT OF WAY, AS APPROXIMATELY DEPICTED ON THIS DRAWING. PRIOR TO ANY
EXCAVATION IN THIS AREA, THE CABLE(S) SHALL BE LOCATED AND EXPOSED BY
POTHOLING IN THE PRESENCE OF A DEPARTMENT OF WATER RESOURCES FIELD
DIVISION REPRESENTATIVE. CALL DWR SOUTHERN FIELD DIVISION (661) 944-
8600 AT LEAST SEVEN (7) DAYS IN ADVANCE FOR AN APPOINTMENT. ALL
EXCAVATIONS WITHIN THREE (3) FEET OF THE CABLE(S) SHALL BE DONE USING
HAND-HELD TOOLS ONLY.
The Contractor shall verify the existence and location of any underground utility pipes or
structures that may be affected during the course of work. The Contractor will take due
precautionary measures to protect the utilities shown and other utilities or structures not
shown on the plans that might be discovered during the process of the job.
The Contractor shall determine the exact location of all utilities prior to beginning
construction of the Contract Work which have potential conflicts with underground
Packet Page. 432
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -106-
utilities. If conflicts are discovered, the Contractor shall notify the Engineer
immediately.
In the event that a water service is damaged, the Contractor shall notify Water Operations
and the Engineering Division immediately. The Contractor shall also arrange for the
immediate repair of the water service by a licensed plumbing contractor, at no cost to the
City. In certain circumstances, the Contractor may encounter water services that are
entangled in roots. In these circumstances, it may be necessary to replace the water
service. Qualified personnel shall make all such replacements. In order to receive
compensation for this repair, the City Landscape Inspector shall be contacted prior to any
further root removals.
In certain circumstances, the Contractor may encounter water services that are entangled
in roots. In these circumstances, it may be necessary to replace the water service. Qualified
personnel shall make all such replacements. In order to receive compensation for this
repair, the City Landscape Inspector shall be contacted prior to any further root removals.
8.2 – EXISTING IMPROVEMENTS.
All existing improvements (except street pavement removal shown on the plans) including,
but not limited to AC pavement, curbs, gutters, cross gutters, spandrels, driveways and
driveway approaches, ADA bypass and sidewalks, walls, fences, sprinkler systems, lawns,
shrubs, trees, and traffic signs, traffic striping and traffic detector loops, which are damaged
or removed during the course of construction of the Project, shall be restored or replaced to
a condition equal to or better than, in all respects, the existing improvements removed or
damaged, unless otherwise specified or noted on the Plans.
The removal and restoration of existing improvements shall be in accordance with the
applicable provision of these Special Provisions, the Standard Specifications, Standard
Drawings and the following requirements:
1. In the event a portion of curb, gutter or monolithic curb and gutter is damaged by the
Contractor’s operations, a minimum of 10 feet of curb, gutter or curb and gutter shall
be removed and replaced regardless of how short a length is damaged. The
Contractor shall begin said 10-foot section, if possible, at an existing joint or scoring
line. If said 10-foot section ends within 3 feet of an existing joint or scoring line, then
the removal shall extend to said joint or scoring line.
2. If concrete cross gutter is damaged by the Contractor’s operations, the cross gutter
shall be removed in its entirety and replaced.
Packet Page. 433
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -107-
3. Concrete sidewalk, where noted on the plans, shall be removed in its entirety
between scoring lines or between scoring line and joint. Prior to removal, scoring
lines shall be saw-cut.
4. If a concrete driveway is damaged and is a single monolithic structure, it shall be
removed in its entirety and replaced.
5. If a concrete driveway is damaged and is monolithic with the sidewalk, it shall be
set off from the sidewalk by a saw cut along the edge of the sidewalk. The
driveway shall then be removed in its entirety and replaced.
6. If the roadside signs are damaged during the construction, they shall be restored or
replaced to a condition equal or better than the existing per the prior approval of the
City’s Traffic Section. New installation shall not impede into required ADA access
distance around obstacles. A minimum clearance of 48” shall be maintained.
7. If existing fence is in conflict with the new construction, fence shall be relocated by
the
8. Removal, salvage and reinstallation, of existing signs and posts, mailboxes and
other surface culture, as directed by the Engineer. Unless otherwise specified, all
excess excavation or removed material shall become the property of the Contractor
and shall be disposed of by him away from the site of work.
8.3 - Payment
Payment for protection of utilities and existing improvements shall be considered to be
included in other items of work and no additional compensation will be allowed.
9.0 FINAL CLEANUP
Upon completion of the proposed construction activities, the condition of the DWR features
identified prior to construction, shall be jointly re-inspected. Contractor shall be liable for all
costs associated with restoring these features to pre-construction conditions.
Prior to final acceptance, the Contractor shall restore the entire project site to a condition
equal or better than the pre-construction condition as evidenced by film, notes, sketches
and other construction records.
Clean up and dust control shall conform to the Standard Specifications. During execution
of work, the Contractor shall clean the site, adjacent properties, and public access roads,
and dispose of waste materials, debris, and rubbish to assure that all affected properties
are maintained free from accumulations of water, materials and rubbish. Contractor shall
provide for collection and for disposal of waste materials, spoils, debris, and rubbish.
Contractor shall cover all loads of excavated material leaving the site or of material being
Packet Page. 434
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -108-
imported, to prevent excessive dust from being created.
10.0 PERMITS
Packet Page. 435
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -108-
Packet Page. 436
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -109-
CONSTRUCTION BID ITEM DESCRIPTIONS
Each respective bid item and bid schedule as shown on the proposal form shall comply with
all respective sections of the most current edition of Standard Specifications for Public
Works Construction (Green Book), its supplements, and any other publications as specified.
If there is a conflict between these inclusions and the Standard Specifications, these
inclusions shall have precedence.
BID ITEM 1: MOBILIZATION, DEMOBILIZATION, INSURANCE, BONDS, PERMITS,
AND MISCELLANEOUS. FURNISH AND INSTALL 4’ X 8’ PROJECT SIGN.
This bid item shall comply with the requirements of Section 7-3.4, "Mobilization", of the
Standard Specifications.
Mobilization may include, but not be limited to, the following principal items:
1. Submittal and modification, as required, of the Construction Schedule.
3. Review of the Site.
4. Obtaining all required no-fee permits from the City of San Bernardino, and other
miscellaneous permits.
5. Submittal of all required insurance certificates and bonds as required by these
Specifications
6. Moving onto the site, including, but not limited to:
A. Equipment
B. Arranging for and erection of Contractor’s work and storage areas.
7. Installing construction fencing and temporary construction power and wiring.
8. Providing a minimum of one restroom facility for each twenty-five (25) workers
occupying the site. Facilities may include existing functioning restrooms, or
portable chemical facilities, or any combination thereof, and shall count as one
for each urinal or one for each water closet (as required).
9. Installing all temporary utilities (as required).
10. Establishing required fire protection provisions.
11. Posting all OSHA required notices and establishment of safety programs.
12. Posting of all Department of Labor notices.
13. Having the Contractor’s superintendent at the job site full-time and responding
24 hours per day.
14. Air and water quality protective measures, as necessary, and without limitation.
15. Verifying site conditions and existing utility locations.
16.Adhere to DWR Encroachment Permit Requirements (Permit Obtained By
City): In addition to the Encroachment Permit conditions and DWR notes on the
Project Plans, the Contractor must adhere to the following DWR requirements:
a) Pursuant to Regulations §610.1(d)(1), type and weight of the construction
equipment and the crossing location(s) over the SWP pipeline shall be
submitted for review and approval by DWR.
b) Pursuant to Regulations §610.9(b), a project schedule outlining the
anticipated duration of the project shall be submitted to DWR for review
and approval at least seven (7) calendar days prior to start of the project.
Packet Page. 437
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -110-
c) The Contractor shall contact USA Dig Alert prior to the start of construction
to locate lifeline cables, fiber optic cables, and any other utilities in the
area.
d) Communication and control cables connected with the operation of the
state water project are buried along either or both sides of the
aqueduct/pipeline within DWR right of way, as approximately depicted in
the construction plans. Prior to any excavation in this area, the cable(s)
shall be located and exposed by potholing in the presence of a DWR
field division representative. This bid item assumes 1 pothole will be
required for the existing Verizon/MCI Fiber Optic crossing under the
proposed 3” pressurized waterline at DWR Sta 295+72. Call (661)
944-8600 at least seven (7) days in advance for an appointment. All
excavations within three (3) feet of the cable(s) shall be done using
handheld tools only.
e) Contractor shall not impede DWR’s ability to enter/exit the DWR
driveways and access roads on either side of University Parkway. If
access must be temporarily impeded, City and/or Contractor shall
coordinate with the Southern Field Division at minimum seven (7) working
days prior to impeding the access. The Southern Field Division phone
number is (661) 944-8600.
f) If requested by DWR’s Southern Field Division, Contractor shall provide
traffic control crews during the project construction period for the safety of
DWR personnel performing scheduled maintenance activities in the area.
17. Furnishing materials and installation of Project Sign in accordance with Section
4 of these Special Provisions and as directed by the Engineer.
18. Demobilization of the Site.
19. Any other item as specified.
The cost of bonds, insurance, move in and move out costs, preparation and submission of
submittals, obtaining encroachment permits, and miscellaneous incidental costs, shall be
included in the Bid Item provided for mobilization and demobilization and incidental project
costs as a lump sum item, for which 75 percent (75%) will be eligible for inclusion in the first
progress payment, with the remaining 25 percent (25%) not eligible for inclusion until 100
percent (100%) of the work has been completed and if progress of the work is satisfactory.
No work shall be started without prior approval of the submittals. Failure to comply with the
preceding requirement will be sufficient ground for the Engineer to stop all work on the
project until the requirements are met.
Payment for this bid item shall be paid per lump Sum (LS) and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing
all work involved in Mobilization per project plans and specifications; no additional
compensation will be allowed.
BID ITEM 2: TRAFFIC CONTROL AND SAFETY:
Packet Page. 438
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -111-
This bid item shall include all traffic control operations and devices proposed for use on this
project shall conform to the latest edition of the 2014 CAMUTCD, and Subsections 00 72
05.4 and 00 72 05.5 of the General Conditions and Section 5 of the Special Provisions as
contained herein.
Lump Sum (LS) bid price paid for “TRAFFIC
CONTROL AND SAFETY,” per Bid Schedule, and no additional compensation will be
allowed therefor.
BID ITEM 3: STORMWATER POLLUTION PREVENTION PLAN AND BMPS:
Packet Page. 439
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -112-
(stop work order), civil and criminal fines, and termination of the Contract. By submitting a
Bid, the Contractor certifies to the City that the Contractor has trained its employees and
Subcontractors’ employees, if any, for Stormwater Pollution Prevention and has included
sufficient sums in the base bid price to cover such costs of said training.
Packet Page. 440
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -113-
7.2. Water pollution control practices associated with each construction phase
will be implemented
7.3. Soil stabilization and sediment control practices for disturbed soil areas will
be implemented
8. Include a copy of permits obtained by the Department, including California
Department of Fish and Wildlife (“CDFW”) permits, US Army Corps of Engineers
permits, RWQCB 401 certifications, aerially deposited lead variance from the
Department of Toxic Substance Control, aerially deposited lead variance
notification, and RWQCB waste discharge requirements for aerially deposited lead
reuse.
Full compensation for complying with the conditions of this section including furnishing all
labor, materials, tools, equipment and incidentals necessary to complete the work as
described herein, and as directed by the Engineer, or his or her authorized representative,
shall be considered as included in the lump sum contract price paid for “STORMWATER
POLLUTION PREVENTION PLAN AND BMPS” and no additional compensation will be
allowed therefore.
BID ITEM 4: CLEARING, GRUBBING, UNCLASSIFIED EXCAVATION AND
UNCLASSIFIED FILL:
This bid item shall comply with Section 300-1, "Clearing and Grubbing", Section 300-2,
"Unclassified Excavation", and Section 300-4, "Unclassified Fill", respectively, of the
Standard Specifications and these Special Provisions.
Clearing and grubbing shall consist of removing all vegetation and specified materials from
the demolition limits of the project and other such areas as may be shown in the documents.
This work shall be performed in accordance with the requirements herein specified, subject
to erosion control requirements. The area shall be cleared of all vegetation, such as palms;
trees; logs; stumps; bushes; hedges; roots, up to 12" below the existing ground surface;
brush; grass; weeds; concrete blocks, parkway concrete, mulch and all other objectionable
materials within the construction limits shown on the plans.
SEVEN (7) DAY ADVANCE NOTIFICATION IS REQUIRED PRIOR TO STARTING WORK
WITHIN THE DEPARTMENT OF WATER RESOURCES (DWR) RIGHT OF WAY.
CONTACT THE DEPARTMENT OF WATER RESOURCES, DIVISION OF
ENGINEERING, ENCROACHMENT PERMIT SECTION, SACRAMENTO, CALIFORNIA
AT (800) 600-4397. THE DWR SOUTHERN FIELD DIVISION SHALL BE
SIMULTANEOUSLY NOTIFIED AT (661) 944-8600 BY THE PERMITTEE.
COMMUNICATION AND CONTROL CABLES CONNECTED WITH THE OPERATION OF
THE STATE WATER PROJECT ARE BURIED ALONG EITHER OR BOTH SIDES OF THE
AQUEDUCT/PIPELINE WITHIN DWR RIGHT OF WAY, AS APPROXIMATELY DEPICTED
ON THIS PLAN. PRIOR TO ANY EXCAVATION IN THIS AREA, THE CABLE(S) SHALL BE
LOCATED AND EXPOSED BY POTHOLING IN THE PRESENCE OF A DWR FIELD
DIVISION REPRESENTATIVE. CALL (661) 944-8600 AT LEAST SEVEN (7) DAYS IN
Packet Page. 441
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -114-
ADVANCE FOR AN APPOINTMENT. ALL EXCAVATIONS WITHIN THREE (3) FEET OF
THE CABLE(S) SHALL BE DONE USING HANDHELD TOOLS ONLY.
Packet Page. 442
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -115-
Where unclassified fill is necessary in preparation for laying concrete, it shall be made with
clean material which shall be solidly compacted to avoid future settlement.
do not meet the required relative compaction shall be paid for by
the Contractor, as a deduction from his contract. CONTRACTOR shall pay the
price at the same rate that the CITY is charged by the Soils Testing Lab.
do meet the required relative compaction will be paid for by the CITY.
BID ITEM 5: REMOVE EXISTING AC PAVEMENT
Packet Page. 443
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -116-
a) Underground Service Alert regional notification center at 811 or (800) 422-
4133 at least two (2) days in advance.
b) DWR for the location(s) of the pipeline and the communication and control
cables. Contact Southern Field Division at (661) 944-8600.
c) MCI Telecommunications Corporation at (800) 624-9675 for information
regarding the location of the communication and control cables.
The presence of a DWR inspector will be required throughout the excavation process.
Contractor shall coordinate with the City to contact the Southern Field Division Office at
(661) 944-8501 for a Temporary Entry Agreement and an appointment to perform the
exposure of the pipeline and the cable(s).
Full compensation for all labor, materials, tools, and equipment and for doing all work
specified herein shall be considered as included in the Contract Cubic Yard (CY) bid price
paid for “REMOVE EXISTING AC PAVEMENT,” per Bid Schedule and no additional
compensation will be allowed therefore.
BID ITEM 6: REMOVE EXISTING PCC
This bid item shall conform to the provisions in Section 300-2 “UNCLASSIFIED
EXCAVATION”, of the Standard Specifications and these Special Provisions. This item of
work shall include sawcutting, excavating, loading, stockpiling, hauling, and disposing of
existing PCC material, aggregate base, and/or subgrade to the depth indicated on the plans
or as directed by the Engineer.
The areas and quantities shown on the plans or specifications are given only for the
Contractor's aid in planning the work and/or preparing bids. The Engineer shall designate
the limits to be removed and these designated areas shall be considered to take
precedence over the areas shown on the plans. No guarantee is made that areas or
quantities shown will equal the areas or quantities designated by the Engineer.
All work within three (3) feet of the DWR pipeline and the cable(s) shall be done using
hand-held tools only. The Contractor shall contact:
a) Underground Service Alert regional notification center at 811 or (800) 422-
4133 at least two (2) days in advance.
b) DWR for the location(s) of the pipeline and the communication and control
cables. Contact Southern Field Division at (661) 944-8600.
c) MCI Telecommunications Corporation at (800) 624-9675 for information
regarding the location of the communication and control cables.
The presence of a DWR inspector will be required throughout the excavation process.
Contractor shall coordinate with the City to contact the Southern Field Division Office at
(661) 944-8501 for a Temporary Entry Agreement and an appointment to perform the
exposure of the pipeline and the cable(s).
Packet Page. 444
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -117-
Full compensation for all labor, materials, tools, and equipment and for doing all work
specified herein shall be considered as included in the Contract SQUARE FOOT (SF) bid
price paid for “REMOVE EXISTING PCC,” per Bid Schedule and no additional
compensation will be allowed therefore.
BID ITEM 7: CONSTRUCT HMA PAVEMENT
Packet Page. 445
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -118-
Full compensation for all labor, materials, tools, and equipment and for doing all work
specified herein shall be considered as included in the Contract TON bid price paid for
“CONSTRUCT HMA PAVEMENT,” per Bid Schedule and no additional compensation will
be allowed therefore.
BID ITEM 8: CONSTRUCT AGGREGATE BASE
TON bid price paid for
“CONSTRUCT AGGREGATE BASE,” per Bid Schedule and no additional compensation
will be allowed therefore.
BID ITEM 9: CONSTRUCT CASE “A” PCC SIDEWALK PER CITY STD PLAN 200
CY (CY) bid price paid for
“CONSTRUCT CASE “A” PCC SIDEWALK PER CITY STD PLAN 200,” per Bid Schedule
and no additional compensation will be allowed therefore.
BID ITEM 10: CONSTRUCT 8” TYPE “A” PCC CURB PER CITY STD PLAN 200
BID ITEM 11: CONSTRUCT 6” MOW CURB PER DETAIL ON SHEET 21
Packet Page. 446
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -119-
Full compensation for all labor, materials, tools, and equipment and for doing all work
specified herein shall be considered as included in the Contract LINEAR FOOT (LF) bid
price paid for “CONSTRUCT 8” TYPE “A” PCC CURB PER CITY STD PLAN 200,” per
Bid Schedule and no additional compensation will be allowed therefore.
Full compensation for all labor, materials, tools, and equipment and for doing all work
specified herein shall be considered as included in the Contract LINEAR FOOT (LF) bid
price paid for “CONSTRUCT 6” MOW CURB PER DETAIL ON SHEET 21,” per Bid
Schedule and no additional compensation will be allowed therefore.
BID ITEM 12: FURNISH AND INSTALL 2” WATER SERVICE AND METER PER
SBMWD STD DWG NO. W1.2
This bid item shall conform to the provisions in Section 306 “OPEN TRENCH CONDUIT
CONSTRUCTION” of the Standard Specifications, San Bernardino Municipal Water
Department Std Dwg Nos. W1.2, W5.1, and W5.1A and these Special Provisions. This
item of work shall include water service connection to an existing water main, trenching,
excavation, compacting, installation of service lateral and meter, backfill and hauling and
disposing of excess material, as specified on the plans, Standard Specifications, Standard
Drawings, and these special provisions, and as directed by the Engineer. Work related to
AC pavement removal and reconstruction shall be included in other respective bid items.
Full compensation for all labor, materials, tools, and equipment and for doing all work
specified herein shall be considered as included in the Contract LUMP SUM (LS) bid price
paid for “FURNISH AND INSTALL 2” WATER SERVICE AND METER PER SBMWD STD
DWG NO. W1.2,” per Bid Schedule and no additional compensation will be allowed
therefore.
BID ITEM 13: 3” DECOMPOSED GRANITE MAINTENANCE BAND OVER 95%
COMPACTED SUBGRADE:
This bid item shall include importing DG material approved by the Engineer,
compaction of subgrade to 95% relative compaction, placing, fine grading,
compacting, and hauling and disposing of excess material, as specified on the plans,
Standard Specifications, and these special provisions, and as directed by the
Engineer. This bid item includes but is not limited to Sections 32 15 40, 32 84 00 and
32 90 00.
Full compensation for all labor, materials, tools, and equipment and for doing all work
specified herein shall be considered as included in the Contract CUBIC YARD (CY) bid
price paid for “3” DECOMPOSED GRANITE MAINTENANCE BAND OVER 95%
COMPACTED SUBGRADE,” per Bid Schedule and no additional compensation will be
allowed therefore.
BID ITEM 14: CONSTRUCT REDWOOD HEADER:
This bid item shall include layout and placement of 2x4 nominal dimension redwood
Packet Page. 447
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -120-
header boards, installation of anchor stakes, and any earthwork, fine grading, hauling
and disposing of excess material, as specified on the plans, Standard Specifications,
and these special provisions, and as directed by the Engineer. This bid item includes
but is not limited to provisions of Sections 204-1 and 302-5.5 of the Standard
Specifications.
LINEAR FOOT (LF) bid
price paid for “CONSTRUCT REDWOOD HEADER,” per Bid Schedule and no additional
compensation will be allowed therefore.
BID ITEM 15: IRRIGATION POC
Lump Sum and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing
all work per project plans and specifications; no additional compensation will be allowed.
BID ITEM 16: IRRIGATION SYSTEM CONTROL AND SOLAR POWER SYSTEM
Packet Page. 448
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -121-
Payment for this bid item shall be paid per Lump Sum and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing
all work per project plans and specifications; no additional compensation will be allowed.
BID ITEM 17: TRENCHING, SLEEVING, FOR MAINLINE AND COMMUNICATION
WIRING UNDER EXISTING IMPROVEMENTS
BID ITEM 18: IRRIGATION DISTRIBUTION AND APPLICATION IMPROVEMENTS
Packet Page. 449
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -122-
Payment for this bid item shall be paid per Square Foot and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing
all work per project plans and specifications; no additional compensation will be allowed.
BID ITEM 19: WEED AND PEST CONTROL MEASURES
Lump Sum and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing
all work per project plans and specifications; no additional compensation will be allowed.
BID ITEM 20: SOIL AMENDMENT AND FINISH GRADING
Square Foot and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing
all work per project plans and specifications; no additional compensation will be allowed.
BID ITEM 21: LANDSCAPE TREES
Packet Page. 450
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -123-
include but not limited to: Tree layout, Tree pit excavation, removal of Tree pit spoils, soil
preparation, amended backfill, planting tablets, tree installation, water basins, root
barriers, staking, tree box disposal, and for doing all the work involved, complete in place
as shown on the plans, as specified in these technical specifications, and as directed by
the Engineer. This bid item includes but is not limited to section 32 90 00.
EA (Each) and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing
all work per project plans and specifications; no additional compensation will be allowed.
BID ITEM 22: LANDSCAPE SHRUBS AND GROUND COVER
Lump Sum and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing
all work per project plans and specifications; no additional compensation will be allowed.
BID ITEM 23: 3” MULCH FOR ALL PLANTING AREAS
Packet Page. 451
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -124-
Payment for this bid item shall be paid per Square Foot and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing
all work per project plans and specifications; no additional compensation will be allowed.
BID ITEM 24: DECORATIVE CRUSHED STONE ¾”
BID ITEM 25: PLANT ESTABLISHMENT PERIOD
Lump Sum and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing
all work per project plans and specifications; no additional compensation will be allowed.
BID ITEM 26: REMOVE EXISTING STREETLIGHTS (ONLY THOSE ON CONCRETE
POLES); FURNISH AND INSTALL SOLAR LIGHTS.
EA (Each) and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing
all work per project plans and specifications; no additional compensation will be allowed.
Packet Page. 452
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -125-
BID ITEM 27: REMOVE EXISTING 4’ X 8’ PROJECT SIGN.
Payment for this bid item shall be paid per EA (Each) and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing
all work per project plans and specifications; no additional compensation will be allowed.
BID ITEM 28: SIGNING, STRIPING AND MARKINGS
This bid item shall include the removal and replacement of striping, markings, and RPMs
affected by the construction of the proposed raised landscape median and water meter
trenching and pavement restoration work.
This item shall also include the installation of the following signs:
Install post with OM2-1H and R4-7 signage on each end of the proposed raised median
nose per CAMUTCD Figure 2C-13(CA) Type K-1 (CA) and Figure 2B-17. Total of two
posts and 4 signs.
Existing conflicting traffic stripes that are not called out on the plans (including raised
pavement markers), shall be removed by wet sandblasting per Section 84-9.03B,
“Remove Traffic Stripes and Pavement Markings,” and Section 81-8.03B, “Remove
Pavement Markers” of the State Standard Specifications.
Contractor shall replace the affected striping, markings, and RPMs in-kind. Markings, such
as STOP bars and legends, word markings, and symbols that are partially covered or
obliterated shall be re-installed in their entirety.
ALL STRIPING, PAVEMENT MARKINGS, AND LEGENDS SHALL BE
THERMOPLASTIC.
All equipment, materials, and components for installation of signing, striping, pavement
markings and raised pavement markers (RPMs) shall conform to the 2024 Caltrans
Standard Plans, and 2024 Standard Specifications Section 81, “Pavement Markers”,
Section 82, “Signs and Markers,” and Section 84,“Markings.”
Full compensation for all labor, materials, tools, and equipment and for doing all work
specified herein shall be considered as included in the Contract Lump Sum bid price paid
per Bid Schedule and no additional compensation will be allowed therefore.
Packet Page. 453
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -125-
Packet Page. 454
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -126-
SPECIFICATIONS
THE FOLLOWING SPECIFICATIONS ARE INCORPORATED HEREIN BY REFERENCE AS IF
SET FORTH IN THEIR ENTIRETY:
DIVISION 32 – EXTERIOR IMPROVEMENTS
SECTION 32 15 40
CRUSHED STONE SURFACING
PART 1 - GENERAL
1.01 WORK INCLUDED
A.Subgrade preparation
B.Furnishing and installing decomposed granite with GraniteCrete admixture stabilizer as
specified within or approved Equal.
C.Contractor to supply documentation supporting the product delivered and installed
included the above stabilizer in the form of copies of actual material tickets and invoices.
1.02 SUBMITTALS
A.Submit 10-pound sample of decomposed granite for approval prior to ordering delivery.
Attach supplier's certification of testing.
B.Subgrade shall be approved prior to placing.
C.Layout of boundaries and any required forming shall be approved prior to placing.
1.03 REFERENCES
A.ASTM C136 – Sieve Analysis of Fine and Coarse Aggregates
1.04 QUALITY ASSURANCE
A.Installer qualifications: installer to provide evidence to indicate successful experience in
providing decomposed granite surfacing containing GraniteCrete admixture and/or ability
to follow installation instructions. Installer must have at least 3 years’ experience in similar
work.
B.Materials shall comply with manufactures specifications.
C.Decomposed granite paving shall meet US Department of Transportation/Federal
Highway Administration Standard rating for surface firmness of 0.3 inches or less and
surface stability of
0.5 inches or less as measured by a rotationalpenetrometer.
D.Stipulations:
1.At no point shall surface fail to drain.
2.Finish shall be smooth, continuous, firm and stable in accordance to the Americans
with Disabilities Act.
E.Copolymer treated decomposed granite can permanently stain concrete and other
masonry surfaces. Protect adjacent pavement, curbs, etc. from contact with decomposed
granite. Cover interface edge of decomposed granite and concrete with plastic sheeting
during placement. Remove any spillover immediately.
Packet Page. 455
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -127-
F.Do not install decomposed granted blended with GraniteCrete admixture surfacing when
sub- base is wet at saturated field capacity
G.Do not install GraniteCrete blended with decomposed granite during rainy conditions or
below 40 degrees Fahrenheit and falling.
PART 2 - MATERIALS
2.01 DECOMPOSED GRANITE
A.Decomposed granite shall be:
1.A crushed natural granite stone
2.Color: as directed by the Engineer
3.Free of shale, clay, friable materials and debris
4.Having a 3/8” maximum gradation in accordance with ASTM C136
Sieve Size Percent Passing
3/8” 100
#4 85-100
#8 70-80
#16 50-65
#30 40-50
#50 25-50
#100 15-25
#200 10-15
5.Distributed by Decorative Stone Solutions, 306 W El Norte Pkwy. #434 Escondido,
Ca 92026, PH: 909-356-1449; or approved equal.
2.02 SOIL STABILIZER
A.Soil Stabilizer shall be a non-toxic organic binder. It is a colorless, odorless concentrated
powder that naturally binds Crushed Aggregate Screenings creating a natural alternative
to concrete and asphalt surfaces.
B.Stabilizer shall be batch mixed at the original quarry or manufactures location
C.Binder Material: GraniteCrete as manufactured by GraniteCrete, Inc., Carmel Valley,
California, (800)670-0849, www.granitecrete.com, or approved equal.
PART 3 - INSTALLATION
3.01 SUBGRADE PREPARATION
A. Scarify any areas with erosion, rills, or depressions and work in approved imported fill
material to return them to a consistent level with the existing unaffected trail surface.
B. Plow or scarify entire width of tail subgrade to a depth of 6" below the final subgrade
elevation; and by harrowing, dry rolling and breaking clods, the earth shall be brought to
finely divided condition Remove boulders, hardened material, or rock encountered.
C. The earth shall be uniform for the full depth and width of the subgrade.
D. Water loose earth to a uniform depth of 4”.
E. Harrow the earth to mix thewetearthwith the dry beneath, until thewhole mass of loose
material is at the proper state of moisture for compaction.
F. Contractor to fully compact soil per soil report, applicable detail/ structural design, and or
local code/permit requirements whichever is more stringent.
Packet Page. 456
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -127-
Packet Page. 457
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPE IMPROVEMENTS -128-
G. Rough grade to 3-inch depth below finish grade. Subgrade shall be smooth and shall
follow the drainage planes as shown on the drawings.
H. Verify gradients and elevations of base are correct.
3.02 PRE-EMERGENT WEED CONTROL
A. Not required unless noted on plans
3.03 INSTALLATION
A. Prior to installation, dampen surface on which installation is to occur.
B. Mix stabilizing admixture and decomposed granite per manufacturer’s instructions at an
off-site location, to provide a uniform even mix. Use of an off-site cement mixer per City
Representative’s approval.
C. Decomposed granite with admixture shall be installed and compacted in two lifts.
D. Install three-and-three-quarter inches of decomposed granite with admixture and compact
using hand tamper, vibre roller, or vibre plate. The three-quarter additional inch allows for
a finish compaction of three inches of decomposed granite with admixture.
E. Compact with a vibratory plate to 95 percent optimum moisture content in accordance
with ASTM D1557.
F. Decomposed granite and stabilizing admixture blend must remain damp throughout
installation. Material may be misted with a showerhead type hose nozzle or covered with
a tarp to maintain dampness during installation. Do not allow material do dry out during
installation.
G. Level surfaces to elevation and gradients as indicated.
H. Compaction: After optimum moisture content is achieved for compaction, thus achieving
an 88% to 92% compaction. Hand-tamp around benches, sign posts, corners, boulders,
etc. Initially use a vibratory plate or a 1-3 ton smooth double drum roller in static position.
Follow with final compaction using a heavy lawn roller to obtain the final desired dense,
smooth, uniform finish. Take care while compacting to avoid damage to planting and
irrigation systems.
I. Completed Compacted thickness: 3”
J. Once material tamping is complete, sweep entire surface with a medium bristle broom.
K. Compact swept material surface with a water filled lawn roller.
L. Surface shall follow contours indicated in grading plan. Flat areas shall be sloped or
crowned for drainage as indicated in grading plan. Slope 1.5% maximum to drain away
from structures.
M. Completed, finished surface shall be of consistent quality and free of deleterious materials
such as organic materials, nails, stones, and loose material. Surface shall not have
depressions or humps greater than 1/4” in ten feet. Any loose material that creates a slip
hazard shall be required to be recompacted into the base to create a uniform compacted
surface.
N. Following compaction, mist the entire surface with a showerhead type hose nozzle. Mist
the entire surface every day for 5 days following installation.
O. There shall be no pedestrian or vehicular traffic on the finished surface for 5 days following
installation or until surface has fully cured.
Packet Page. 458
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 129 SPECIFICATIONS
3.04 TESTING AND PROTECTION
A. Test installed decomposed granite paving with a rotational penetrometer to meet
required USDOT/FWHA standards. Installations failing test shall be replaced and
reinstalled until satisfying standard.
B. Protect installed site furniture, if required, during the construction period toprevent
damage and wear
3.05 MAINTENANCE
A. Contractor to maintain all installations throughout the Landscape maintenance period
including:
1.Treating and removing weeds
2.Regrading, adding material to any areas where erosion or settling may have
taken place
3.Removing any rills, surface imperfections, and any damage from use during or
after wetting.
4.Re-compacting surface as needed to meet the finished surface requirements
of section 3.03 item M
END OF SECTION
Packet Page. 459
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 129 SPECIFICATIONS
Packet Page. 460
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 130 SPECIFICATIONS
SECTION 32 84 00
PART 1 GENERAL
1. GENERAL CONDITIONS
a. Provide all labor, materials, tools, transportation, equipment and incidentals necessary
to perform the work as indicated on the Irrigation Plans and as herein specified.
2. SCOPE OF WORK
a. Irrigation materials and equipment.
b. Installation standards.
c. System location and layout.
d. Excavation and backfill.
e. Installation of pipe, equipment, and appurtenances.
f. Water flow meters.
g. Field quality control – Coverage Tests.
h. Plant establishment period.
i. Clean up.
3. RELATED SECTIONS
a. Related work specified elsewhere:
1) 32 90 00 – Planting
4. REFERENCES
a. The Standard Specifications for Public Works Construction, “Greenbook”, latest edition,
is reference as if herein contained and the contractor shall keep a copy at the project
site. These Specifications shall supersede conflicts with information given in the
“Greenbook”, unless otherwise determined by the Owner or their designated
representative.
b. American Society for Testing and Materials (ASTM):
1) ASTM A53 Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-
Coated, Welded and Seamless
2) ASTM D1557 Test Method for Laboratory Compaction Characteristics of
Soil Using Modified Effort (56,000 ft-lbf/ft3 (2700 kN-m/m3))
3) ASTM D1784 Specification for Rigid Poly (Vinyl Chloride) (PVC)
Compounds and Chlorinated Poly (Vinyl Chloride) (CPVC)
Compounds
4) ASTM D1785 Specification for Poly (Vinyl Chloride) (PVC) Plastic Pipe,
Schedules 40, 80, and 120
5) ASTM D2241 Specification for Poly (Vinyl Chloride) (PVC) Pressure-Rated
Pipe (SDR-Series)
Packet Page. 461
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 131 SPECIFICATIONS
6) ASTM D2464 Specification for Threaded Poly (Vinyl Chloride) (PVC)
Plastic Pipe Fittings, Schedule 80
7) ASTM D2466 Specification for Poly (Vinyl Chloride) (PVC) Plastic Pipe
Fittings, Schedule 40
8. ASTM D2564 Specification for Solvent Cements for Poly (Vinyl Chloride)
(PVC) Plastic Piping Systems
c. California Code of Regulations, Title 24:
1) Part 3 California Electrical Code
d. Underwriters Laboratories Inc. (UL):
1) UL 651 Schedule 40 and 80 Rigid PVC Conduit.
5. VERIFICATION OF DIMENSIONS
a. Dimensions are approximate, before proceeding with any work, Contractor shall verify
all dimension and shall immediately inform the L.A. and owner of any discrepancies
between the drawings and/or specifications and actual field conditions. No work shall be
done in any area where there is such a discrepancy until approval has been given by
L.A. and owner. Any work done without notification and prior approval will be the sole
responsibility of the Contractor to remedy as required by L.A. and Owner.
6. SUBMITTALS
a. Contractor to supply submittals per contract documents, the following are required to be
submitted to the Owners Representative prior to start of work.
b. Existing Static water pressure/ Water service size verification:
Static water pressure on site shall be recorded with an accurate liquid filled gauge
capable of measuring 0-200 PSI (Winters PFQ806LF or equal). Measurements shall
be taken as early as possible per available source and at a time no other distribution
devices are actively running. Contractor to document readings in writing on
Contractors form that list time & date, reading in PSI, location, and type of gauge used
in addition to date stamped photographs of readings. Contractor to document all points
of service including both potable and recycled. Final results shall be submitted to the
Owners representative prior to purchase of equipment.
c. Materials List:
1) Complete material list shall be submitted prior to performing any work. Catalog
data and full descriptive literature must be submitted whenever the use of the item
is different than those specified is requested. Notarized certificate must be
submitted by plastic pipe and fitting manufacturer indicating that material complies
with specifications, unless material has been previously approved.
2) Material list shall be submitted using the following format (double spaced between
each item):
Item Description Manufacturer Model
1. Pressure Pipe Lasco Sch. 40
2. Lawn Head Rainbird 1804-SAM-PRS
Etc. Etc. Etc. Etc.
d. Record Drawings:
Packet Page. 462
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 132 SPECIFICATIONS
1) Record accurately on one set of contract drawings all changes in the work
constituting departures from the original contract drawings daily including noting
when work was done.
2) The changes and dimensions shall be recorded in a legible and workmanlike
manner to the satisfaction of the Owners Representative. Prior to final inspection
of work, submit record drawings to Owners Representative for approval.
3) Dimensions shall be from two permanent points of reference (buildings,
monuments, sidewalks, curbs, pavement, etc.). Data to be shown on record
drawing shall be recorded day to day as the project is being installed. All lettering
on drawings shall be minimum 1/8 inch in size.
4) Show locations and depths of the following items:
a) Point of connection.
b) Routing of sprinkler pressure lines (dimension maximum 100 feet along routing)
c) Gate valves/ Isolation valves.
d) Sprinkler control valves.
e) Quick coupling valves.
f) Routing of control wires.
g) Related equipment (as may be directed).
5) Maintain record drawings on-site at all times. Upon completion of work, transfer all
as-built information and dimensions to clean blackline prints for reproduction.
e. Operation and Maintenance Manual: Operation and Maintenance Data, for submittal
requirements. As a minimum, provide operation and maintenance instructions for the
following items:
1) Electric Remote-Control Valves (including master control valves);
2) Satellite Irrigation Controllers;
3) Water Flow Meters; and
4) Irrigation Controller Software.
7. QUALITY ASSURANCE
a. The landscape irrigation system shall consist of a completely automatic, electrically-
controlled bubbler, drip, and spray-irrigation system. The system shall be installed to
provide complete coverage with minimum maintenance. The irrigation system shall be
installed to prevent overspray onto walks and structures.
b. The irrigation system shall avoid conflicts with plant materials, lighting standards, sign
posts, architectural features, above and below ground utilities, and drainage system.
Contractor responsible for coordination with other trades to verify acceptable locations
to avoid conflicts.
c. Irrigation piping layout is schematic, showing location of pipes and fittings close to
landscape areas is not always possible graphically. All equipment shall be located inside
the landscape areas.
d. In some cases, Manufacturer standards/requirements may be in addition or supersede
those items shown via the plans and details. It is the Contractors responsibility to review
and verify with the manufacturer all the required and up to date equipment and
accessories are included in addition or in leu of items shown via the plans. At all times
Packet Page. 463
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 133 SPECIFICATIONS
the Manufactures requirements shall take precedence and as the installation expert the
Contractor shall be responsible for installing the most up to date and current equipment
per the manufacturers requirements to ensure full compliance with guarantee,
certification, and warrantee requirements as part of their bid.
e. Plant establishment period is specified in Section 32 93 00 – Plants.
8. SEQUENCING AND SCHEDULING
a. Contractor to coordinate layout and installation of irrigation sleeves, conduits, and piping
under paved areas and other features prior to their construction.
b. Coordinate installation of irrigation system with excavation of planting beds and
backfilling of planting beds with topsoil. Refer to Section 32 90 00, Planting, for
requirements. Typically, the irrigation system shall be installed after planting beds have
been excavated and backfilled with topsoil.
c. The irrigation system shall be installed and tested prior to installation of plant material.
Coordinate layout and installation of irrigation system with location and installation of
plant material to assure that there will be complete and uniform irrigation coverage of
planting as indicated.
d. Tree locations shall be staked in the field prior to installation of irrigation pipe and heads.
Refer to the plant list on the Contract Drawings for plant setbacks and spacing
requirements.
9. EXISTING UTILITIES
a. Existing utilities and conditions: Prior to cutting into the soil, locate all cables, conduits,
sewer lines, septic systems, and other utilities commonly encountered underground and
take proper precautions not to damage or disturb such improvements. If a conflict exists
between such obstacles and the proposed work, promptly notify the L.A. and Owner who
will give direction. Proceed in the same manner if a rock layer or any other conditions
encountered underground make changes advisable.
1) Where investigation of subsurface conditions has been made by a qualified body in
areas in which local materials may be obtained, the Contractor may request the use
of such information but will be solely responsible for its verification and accuracy
2) It is the Contractors sole responsibility to verify any located or demarked utilities via
pot holing or other method prior to start of excavation. Failure to do so will result in
all damages being the sole responsibility of the Contractor.
10. INSPECTIONS
a. Inspections will be required for:
1) Pressure test of irrigation main line.
2) Coverage test.
3) Manufacture certification, for warranty, verification of installation per manufacture
requirements.
4) Final inspection/start of maintenance. Final inspection shall be performed by the
Owners Representative and Landscape Architect
a) Final inspection shall include verification of complete installation per plans
Packet Page. 464
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 134 SPECIFICATIONS
b) All Sensors, gauges, grounding, and accessories must be installed and
functioning/ programed per manufacture requirements
c) Third party water audit of system per MWELO requirements, Contractor shall
be responsible for supplying water audit and results/ report to Owner’s
representative as completed by a Certified Landscape Irrigation Auditor(CLIA).
5) Completion of maintenance and owners’ Final acceptance.
b. Inspection Requests:
1) Contractor shall notify the Owners Representative and Landscape Architect in
advance for requesting all inspections as follows:
Pressure supply line installation and testing - 36 hours (1- 2 working days)
System layout - 36 hours (1- 2 working days)
Coverage Tests - 36 hours (1- 2 working days)
Final Inspection - 48 hours (2 working days)
2) When inspections have been conducted by other approved personnel, the
Contractor shall show evidence in writing of when and by whom these inspections
were made including a signature of the referenced Inspector.
3) No inspection will commence without "record" prints. In the event the Contractor
calls for an inspection without up to date "record" prints, without completing
previously noted corrections, or without preparing the system for inspection, the
inspection will be canceled and the Contractor back charged for the direct costs of
all Owners Representative time and consultant time lost.
c. Closing in Uninspected Work:
1) Do not allow or cause any of the work of this section to be covered up or enclosed
until it has been inspected, tested, and approved by the Owners Representative.
2) Any additional inspections required due to the Contractors actions, such as failing
to have work inspected or covering it prior will- result in additional inspections
charged by the current hourly rate of the Landscape Architect or Certified Irrigation
designer/Auditor including travel time and expenses.
d. Coverage Test and Adjustment:
1) When the sprinkler system is completed, Contractor shall perform a coverage test
in the presence of the Owners Representative and the Landscape Architect to
determine if the water coverage for planting areas is complete and adequate. This
test shall be accomplished before any planting.
2) Any adjustment required for proper coverage shall be the Contractors
Responsibility, and shall include field adjustments and additions as needed to head
layout as directed by the Landscape Architect. All additional cost associated with
final system tunning and adjustments shall be the Contractors Responsibility.
e. Hydrostatic Tests:
1) All pressure lines shall be tested under a hydrostatic pressure of 150 psi for a period
of not less than two hours or per local governing regulation- whichever is greater.
2) All hydrostatic tests shall be made in the presence of the Owners Representative.
No pressure line shall be backfilled until it has been inspected, tested, and
approved in writing.
f. Contractor shall furnish necessary force pump and all other test equipment.
Packet Page. 465
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 135 SPECIFICATIONS
11. TURNOVER ITEMS
Packet Page. 466
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 136 SPECIFICATIONS
one (1) year following the filing of the Notice of Completion. All materials used shall
carry a manufacturer's guarantee of one (1) year.
Should any problem with the irrigation system be discovered within the guarantee
period, it shall be corrected by the Contractor at no additional expense to the Owner
within ten (10) calendar days of receipt of written notice from the Owners
Representative. When the nature of the repairs as determined by the Owners
Representative constitute an emergency (e.g. broken pressure line) the Owner may
proceed to make repairs at the Contractor's expense. Any and all damages to existing
improvement resulting either from faulty materials or workmanship, or from the
necessary repairs to correct same, shall be repaired to the satisfaction of the Owners
Representative by the Contractor, all at no additional cost to the Owner.
b. Form of Guarantee: Guarantee shall be submitted on Contractors own letterhead as
follows:
Packet Page. 467
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 136 SPECIFICATIONS
Packet Page. 468
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 137 SPECIFICATIONS
FORM OF:
Packet Page. 469
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 138 SPECIFICATIONS
PART 2 PRODUCTS
1. GENERAL
a. Materials and or equipment installed or furnished shall be new and in pristine condition.
Materials that have faded, are dirty, or have been improperly stored will be rejected and
shall be removed from the site and replaced at no expense to the Owner.
b. All materials shall be stored per manufactures recommendation and protected from,
weather, construction activities, and vandalism/theft.
2. PIPE
a. Pressure supply line from point of connection through backflow prevention unit shall be
Type ‘K’ brass or copper pipe.
b. Pressure supply lines 2-1/2 inches in diameter and up to 6 inches in diameter
downstream of backflow prevention unit shall be Class 315 solvent weld PVC.
c. Pressure supply lines 2 inches in diameter and smaller downstream of the backflow
prevention unit shall be Schedule 40 solvent weld PVC.
d. Non-pressure lines shall be Schedule 40 solvent weld PVC.
3. COPPER PIPE AND FITTINGS
a. Copper pipe shall be Type 'K', hard tempered ASTM B 88 and fittings shall be wrought
solder joint type in accordance with ANSI B16.22.
b. Joints shall be soldered with silver solder, conforming to ASTM B206.
4. BRASS PIPE AND FITTINGS
a. Brass pipe shall be 85 percent red brass, ANSI, Schedule 40 screwed pipe.
b. Fittings shall be medium brass, screwed 125-pound class.
5. GALVANIZED STEEL PIPE AND FITTINGS
a. All galvanized steel pipe shall be Schedule 40, threaded, coupled, and hot-dipped
galvanized, and shall comply with the requirements of ASTM A 120-66 or ASTM A 53-
67.
b. All fittings for galvanized steel pipe shall be 150-pound rated galvanized malleable iron,
banded pattern.
c. Pipe sizes indicated on the drawings are nominal inside diameter, unless otherwise
noted.
6. CONDUIT
a. Conduit: Provide rigid non-metallic conduit conforming to UL Standard No. 651 for rigid
non- metallic conduit, such as Schedule 40 PVC conduit, unless otherwise indicated.
7. PLASTIC PIPE AND FITTINGS
a. All plastic pipe shall bear the following markings: manufacturer's name, nominal pipe
size, schedule or class, type of material, pressure rating in psi, NSF seal of approval,
and the date of extrusion.
b. All plastic pipe shall be extruded of an improved PVC virgin pipe compound.
Packet Page. 470
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 139 SPECIFICATIONS
c. Rubber gasket PVC pipe, couplings, and fittings shall conform to ASTM D 1784 Type I,
Grade I, 2,000-psi design stress. Couplings, rubber gaskets, and fittings shall be as
approved by the pipe manufacturer.
d. Ring-type rubber gasket couplings shall permit a 5-degree deflection of the pipe at each
coupling (2-1/2 degree each side) without exfiltration or infiltration, cracking or breaking.
e. All fittings shall be standard weight Schedule 40 and shall be injection molded of an
improved PVC fitting compound. Threaded plastic fittings shall be injection molded. All
tees and ells shall be side gated.
f. When connection is plastic to metal, male adapters shall be used. The male adapter
shall be hand tightened, plus one turn with a strap wrench. Joint compound shall be
nonhardening sealing compound compatible with plastics. Compound must not lubricate
the joint.
g. All threaded nipples shall be standard weight Schedule 80 with molded threads.
h. All solvent cementing of plastic pipe and fittings shall be a two-step process, using primer
and solvent cement applied per the manufacturer's recommendations. Cement shall be
of a fluid consistency, not gel-like or ropy.
8. BACKFLOW PREVENTION UNITS
a. The backflow prevention unit shall be as indicated on the drawings.
9. BACKFLOW PREVENTION ENCLOSURE
a. The backflow prevention device enclosure shall be as indicated on the drawings or
approved equal. Install one for each backflow device.
10. BOOSTER PUMP
a. The Pump unit shall be as indicated on the drawings if required.
11. VALVES
a. Gate and Ball Valves:
1) Ball valves 2 inches or smaller shall have screwed joints and brass bodies.
2) All gate valves larger than 3 inches in diameter shall have 2-inch-square operating
units and have an arrow cast in the metal indicating the direction of opening. Valves
shall have iron body and be bronze mounted.
3) All gate valves larger than 2 inches and up to 3 inches in diameter shall conform to
(1) or (2) above.
4) All gate valves shall have a minimum working pressure of not less than 150 psi and
shall conform to AWWA standards.
b. Quick Coupling Valves:
1) Body of valves shall be brass with a wall thickness guaranteed to withstand normal
working pressure of 150 psi without leakage. Valves shall have 3/4-inch female
threads opening at base, with two-piece body. Construct valves to be operated
only with a coupler, designed for that purpose. Coupler is inserted into valve and
a positive, watertight connection shall be made between coupler and valve. Hinge
cover shall be brass with a yellow rubber-like vinyl cover bonded to it.
Packet Page. 471
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 140 SPECIFICATIONS
c. Remote Control Valves:
1) Valves shall be spring-loaded, self-cleaning, packless diaphragm activated, of a
normally closed type.
12. VALVE BOXES
a. Valve boxes shall be fabricated from a durable, weather-resistant plastic material
resistant to sunlight and chemical action of soils.
b. The valve box cover shall be secured with a hidden latch mechanism or bolts.
c. The cover and box shall be capable of sustaining a load of 1,500 pounds.
d. Valve box extensions shall be by the same manufacturer as the valve box.
e. Gate valve boxes shall be round plastic boxes with bolt-down covers marked "GV," heat
branded in 2" high characters; AMETEK or approved equal.
f. Remote control valve boxes shall be rectangular plastic boxes with bolt-down covers
marked "RCV"; and with the valve identification number heat branded in 2" high
characters; AMETEK or approved equal.
g. Colors of boxes shall be green unless otherwise called out by the plans.
h. Valve boxes shall be sized to fit all equipment with ample room for operation and any
required maintenance tasks, Contractor to adjust as needed per field conditions and final
assembly of components at no additional cost.
13. AUTOMATIC CONTROLLER
a. Automatic controller shall be as called for on the plans and include all options and
accessories required to function independently and automatically, including receiving
updated climate information, flow sensing, and information for programming adjustments
as required by the model.
b. Contractor to include in bid all support items required by the manufacture for a fully
functional automatic irrigation control system, including if required:
1) All relays, pump starts
2) Flow sensors
3) Decoders
4) Coaches switch/Cool down controls
5) Remotes
6) Specialized wire connections per manufacturer
7) Grounding for accessories per manufacturer
14. ELECTRICAL
a. All electrical equipment shall be NEMA Type 3, waterproofed for exterior installation.
b. All electrical work shall conform to local codes and ordinances.
15. WIRING
a. Remote control wire shall be direct-burial AWG-UF type, sized according to
manufacturer's specifications per the drawings, and in no case smaller than 14 gauge.
Packet Page. 472
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 141 SPECIFICATIONS
b. Wire connectors shall be either Spears Dri-Splice, 3M DBR/Y, and or 3M 3570GN Direct
burial type water proof connectors per the details or the manufacturers requirement’s
which ever more stringent.
c. Common wires shall be white in color. (Where two or more controllers are used, the
common wires shall be white with a different color stripe for each controller.) Control
wires shall be black (where two or more controllers are used, the control wires shall be
a different color for each controller.) These colors shall be noted on as-built plans
located on controller door.
d. All wires shall be numbered and marked with 3M wire marking tape numbering system
or approved substitution at the controller and any pull boxes where more than 10 wires
are present.
16. SPRINKLERS
a. Sprinklers shall be as called for on the plans.
17. FERTIGATION
a. If called for on the plans shall be provided by Eco-Fert fertigation. Contractor shall
coordinate installation and programming with Eco-Fert. Eco-Fert System Number EFSS-
FP1. Coordinate Installation with Eco-Fert (949) 766-5800 and include all conduits and
electrical service for installation. Fertigation system shall include, but not be limited to
the following components as a minimum:
Walchem Pump
Signet 9900
Schedule 80 4” fittings
Extension Boxes
GF 2536
Saddle
Stainless Steel Cabinet/Pedestal
Tank
4 pin connectors
5 pin connectors
Madison Horz float
Valve Boxes
Fan.
PART 3 EXECUTION
1. GENERAL
a. Water Supply:
1) Connections to or for the installation of the water supply shall be at the locations
shown on the drawings. Any changes caused by actual site conditions shall be
made at no additional cost to the Owner.
Packet Page. 473
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 142 SPECIFICATIONS
b. Electrical Service:
1) Contractor shall make and supply all electrical connections including conduit,
wiring, and support breakers and switches to supply the irrigation controller, booster
pump, and fertigation system in addition to any required ancillary equipment.
c. Layout:
1) Layout irrigation system prior to excavation and make minor adjustments required
due to differences between site and diagrammatic drawings/plans. All equipment
to be located within planter areas. It is the Contractors responsibility to notify the
Landscape Architect of any items of concern prior to start of installation. Any
changes in layout or design by the Contractor not disclosed and approved prior by
the Landscape Architect are made at the Contractors sole liability.
d. Diagrammatic Intent:
1) The drawings are purposely diagrammatic, due to scale it is impossible to show all
items in their actual location on the plan. The size and location of equipment and
fixtures are drawn to scale where possible to show overall system makeup and
design. Provide offsets in piping and changes in equipment locations as necessary
to conform with structures, hardscape, and to avoid obstructions or conflicts with
other work. Contractor shall not willfully install any equipment that would be out of
place, cause issue/ interference with other work, or appear to be out of location per
industry standards. All equipment shall be located in landscape areas unless
specifically approved by the Owners Representative prior to installation for any non-
conforming circumstances.
e. Modifications:
1) Provide modifications to the irrigation system to avoid blockage of sprinkler
irrigation patterns, to prevent overspray and excessive runoff onto walkway and
parking areas, and to provide full irrigation coverage to the planted areas. Such
modifications also include adjusting locations and adding heads as required to
spray around trees, light poles, sign posts, other objects that obstruct spray pattern,
and any other adjustments required due to field conditions unknow at the time of
design. All cost’s associated with Modifications are the Contractors sole
responsibility as they shall be considered part of the bid.
f. Grades:
1) Before starting work, carefully check all grades to determine that the site is properly
graded and work may safely proceed, keeping within the specified material depths
with respect to finish grade.
g. Inspections:
1) Prior to all work of this section, carefully inspect the current work of all other trades
and verify that all such work is complete to the point where this installation may
properly commence. Any installation prior to the completion of other trades that
requires work to be adjusted or redone is the sole responsibility of the contractor.
2) Verify existing grades are correct and that proper coverage per the details and final
equipment locations and heights are correct. Any work installed that is found to be
incorrectly installed per the details that requires adjustment to equipment or pipe
relocation is the sole responsibility of the Contractor.
Packet Page. 474
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 143 SPECIFICATIONS
3) Verify that irrigation system may be installed in strict accordance with all pertinent
codes and regulations, the original design, the referenced standards, and the
manufacturer's recommendations.
h. Discrepancies:
1) In the event of discrepancy, notify the Owners Representative and the Landscape
Architect prior to starting work.
2) Do not proceed with installation in areas of discrepancy until all discrepancies have
been resolved and approval of solution has been granted in writing.
3) Failure of the Contractor to accurately lay out or knowingly install the system in a
way that creates design inadequacies without prior acknowledgement to the
Owners Representative will be the direct responsibility of the Contractor to remedy
without any additional costs or impact to the Owner.
i. Field Measurements:
1) Contractor shall be responsible to make all necessary measurements in the field to
ensure precise fit of items in accordance with the original design. Contractor shall
coordinate the installation of all irrigation materials with all other trades, including
the proper location of required sleeves, and support items that may involve other
trades.
2. INSTALLATION STANDARDS
a. The landscape irrigation system shall be installed in accordance with applicable
requirements of the California Plumbing Code and California Electrical Code, and the
requirements of the jurisdictional water company or utility district.
b. Manufactured materials and equipment shall be installed in accordance with the
respective manufacturer's instructions for the location and conditions.
3. TRENCHING
a. Dig trenches and support pipe continuously on bottom of ditch. Lay pipe to an even
grade. Trenching excavation shall follow layout indicated on drawings to the depths
below finished grade and as noted. Where lines occur under paved area, these
dimensions shall be considered below subgrade.
b. Contractor responsible for all trenching activities which shall be in accordance with
current safety and OSHA requirements.
c. Provide minimum cover of 24 inches, maximum 30 inches on pressure supply lines 3
inches and larger.
d. Provide minimum cover of 18 inches, maximum 24 inches on pressure supply lines 2
inches and smaller.
e. Provide minimum cover of 4” for subsurface drip lines, or as recommended by the
subsurface drip line manufacture.
f. Provide minimum cover of 18 inches, maximum 24 inches for control wires.
g. Provide minimum cover of 12 inches, maximum 16 inches for non-pressure lines.
h. Provide minimum cover of 24 inches, maximum 30 inches for all pipe sleeved under
paving.
Packet Page. 475
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 144 SPECIFICATIONS
i. Provide minimum cover of 36 inches in infiltration areas (6” minimum backfill cover over
pipe beneath gravel layer).
j. When two pipes are to be placed in the same trench, maintain a six-inch space between
pipes as a minimum. No pipe shall be installed directly over or next to another
k. For pressurized lines, snake as needed in the trench to allow for minor expansion and
contraction depending on the type of pipe used. Follow manufactures recommendations.
l. Where it is necessary to excavate adjacent to existing trees, the Contractor shall avoid
injury to trees and tree roots. Excavation in areas where 2-inch and larger roots occur
shall be done by hand. All roots 2 inches and larger in diameter shall be tunneled under
and shall be heavily wrapped with wet burlap to prevent scarring or drying. Where
trenching machine is run close to trees having roots smaller than 2 inches in diameter,
the wall of the trench adjacent to the tree shall be hand trimmed, making a clean cut
through the roots. Roots 1 inch and larger in diameter shall be painted with two coats
of Tree Seal or approved equal. Trenches adjacent to trees shall be closed within 24
hours. Any damage to tree root structure and resulting decline will be the sole
responsibility of the Contractor.
m. After trenches have been excavated, pipe shall be installed, tested, and inspected, and
the trench shall be backfilled without undue delay.
4. PIPING
a. Piping under existing pavement may be installed by jacking, boring, or hydraulic driving.
No hydraulic driving is permitted under asphaltic concrete pavement.
b. Cutting or breaking of existing pavement is not permitted.
c. Carefully inspect all pipe and fittings before installation, removing dirt, scale, and burrs
and reaming; install pipe with all markings up for visual inspection and verification.
d. Exercise care in handling, loading, unloading, and storing plastic pipe and fittings; store
plastic pipe and fittings under cover until ready to install; transport plastic pipe on a
vehicle with a bed long enough to allow the pipe to lay flat, avoid undue bending and
any concentrated external load.
e. Remove all dented, crushed, scratched, and damaged pipe sections.
f. Contractor shall install concrete thrust blocking at all changes of direction and terminal
points of pressure pipe per plans.
g. All lines shall have a minimum clearance of 6 inches from each other and 12 inches from
lines of other trades.
h. Parallel lines shall not be installed directly over one another.
i. In solvent cementing/welding, use only the specified primer and solvent cement and
make all joints in strict accordance with the manufacturer's recommended methods;
allow solvent welds at least 15 minutes setup time before moving or handling and 24
hours curing time before filling.
j. Solvent cementing/ welding shall be neat and demonstrate quality workmanship- Primer
and Glue shall not be used in excess or applied in a way to affect the portions of the
pipe that are not part of the actual connected joint. Any joints with excessive runs/drips,
trails, or globing of Glue and or Primer shall be cut out in whole and replaced at cost by
the Contractor until an acceptable professional product is completed and accepted by
the Owners Representative
Packet Page. 476
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 145 SPECIFICATIONS
k. 360-degree applicators shall be used to apply primer and solvent on sizes - 2 inches and
larger.
l. Center load all plastic pipe prior to pressure testing.
m. All threaded plastic-to-plastic connections shall be assembled using Teflon tape.
n. For plastic-to-metal connections, work the metal connections first. Use a nonhardening
pipe dope on all threaded plastic-to-metal connections, except where noted otherwise.
o. Snake all piping to allow for expansion and contraction due to environmental conditions.
5. ASSEMBLIES
a. Install all assemblies specified herein according to the respective detail drawings or
specifications, using best standard practice.
b. Install backflow assemblies at locations approved in the field and at height required by
local codes.
c. Valves shall be installed in Landscape areas whenever possible per Owners
Representative standards.
d. Each valve box shall be installed on a foundation of gravel backfill; 3 cubic feet minimum.
Place boxes on common bricks bedded in backfill per details. Valve boxes shall be
installed with their tops ½” inch above the surface of surrounding finish grade in lawn
areas and 2” inch above the surface of surrounding finish grade in shrub areas or per
details.
e. Valve box risers or extensions shall be installed as needed per field conditions at no
additional cost, they shall be by the same manufacture as the installed box.
f. Areas with burying rodents will require metal fabric or wire mesh installed under boxes
prior to gravel and shall be placed at all other possible entry points to protect the
equipment from damage. All cost associated with wire fabric installation shall be the
responsibility of the contractor.
6. BACKFILLING
a. Before pipeline trenches are backfilled, the irrigation system shall be pressure tested and
the location of irrigation heads modified as required to obtain complete and uniform
coverage of each plant's root ball. Refer to field quality control requirements specified
herein.
b. Initial backfill on all lines shall be of fine granular material with no foreign matter larger
than 2 inch in size. Reference section 217-1.1 of the “Greenbook” for further
requirements of bedding material. All protruding rocks or other material capable of
damaging pipe will shall be removed from trench walls or bottom prior to placement of
pipes or conduits.
c. Compaction of backfill in landscaped areas shall be not less than that of surrounding
ground as determined by ASTM D1557.
d. Backfill shall be tamped in 4-inch lifts under the pipe and uniformly on both sides for the
full width of the trench and the full length of the pipe. Materials shall be sufficiently damp
to permit thorough compaction, free of voids. Backfill shall be compacted to dry density
equal to adjacent undisturbed soil and shall conform to adjacent grades.
e. Flooding in lieu of tamping is not allowed without specific prior approval.
Packet Page. 477
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 146 SPECIFICATIONS
f. Under no circumstances shall truck wheels be used to compact soil.
g. Provide washed sand backfill a minimum of 6 inches over and under all piping under
paved areas.
7. CONTROLLER
a. The exact location of the controller shall be approved by the Owners Representative
before installation. The electrical service shall be coordinated to this location by the
Contractor.
b. Fertigation controller will be located next to fertigation unit per plan if included.
Maintenance access shall be provided.
c. Pump starter shall be connected to controller pump starter relay switch.
d. The irrigation system shall be programmed to operate during the periods of minimal use
of the design area, and for maximum efficiency.
e. Testing Requirements:
All manufacturer requirements for certification and or warranty release of the
system in addition to electrical code requirements are the Contractors
responsibility to meet and supply proof in the form of documentation of inspection
and compliance.
8. WIRING
a. Wiring shall occupy the same trench and shall be installed along the same route as the
pressure supply lines and shall be located below the supply lines wherever possible.
b. Where more than one wire is placed in a trench, the wiring shall be taped together at
intervals of 10 feet.
c. All connections shall be of an approved type and shall occur in a valve box. Provide an
18-inch service loop at each connection.
d. An expansion loop of 12 inches shall be provided at each wire connection and/or
directional turn, and one of 24 inches shall be provided at each remote-control valve.
e. A continuous run of wire shall be used between a controller and each remote-control
valve. Under no circumstances shall splices be used without prior approval.
9. FLUSHING THE SYSTEM
a. Prior to installation of sprinkler heads, the valves shall be opened and a full head of water
used to flush out the lines and risers.
b. Sprinkler heads shall be installed after flushing the system has been completed.
10. SPRINKLER HEADS
a. Sprinkler heads shall be installed as designated on the drawings and per Owners
Representative standards.
b. Spacing of heads shall not exceed maximum indicated on the drawings.
11. ADJUSTING THE SYSTEM
a. Contractor shall adjust valves, align heads, and verify coverage of each system prior to
coverage test.
Packet Page. 478
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 147 SPECIFICATIONS
b. If it is determined by the Owners Representative that additional adjustments, heads or
nozzle changes/ additions will be required to provide proper coverage, all necessary
changes or adjustments shall be made prior to acceptance and any planting. (See 3.01
section E)
c. The entire system shall be operating properly before any planting operations commence.
12. PLANT ESTABLISHMENT
a. Contractor to continually check and adjust the system for proper run times, coverage,
and function throughout the Plant Establishment Period listed in Section 32 93 00 –
Plants.
13. COMPLETION CLEANING
a. Upon completion of the work, Contractor shall smooth all ground surfaces; remove
excess materials, rubbish, debris, etc.; sweep adjacent streets, curbs, gutters,
walkways, and trails; and remove construction equipment from the premises. Contractor
is responsible for removing and cleaning any tracking, tire marking, or other visible signs
of damage to existing facilities.
END OF SECTION
Packet Page. 479
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 147 SPECIFICATIONS
Packet Page. 480
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 148 SPECIFICATIONS
SECTION 32 90 00
PLANTING
PART 1 – GENERAL
1.01 SCOPE
A.The work required is indicated on the drawings and includes but is not
necessarily limited to: soil preparation; finish grading; planting trees; guying and
staking trees; planting shrubs and ground cover; soil erosion control;
maintenance; plant establishment period; guarantees; and replacement.
1.02 RELATED SECTIONS
A.Related work specified elsewhere:
1.32 84 00 Planting Irrigation
2. 32 90 05 Planting Maintenance
1.03 GUARANTEE
A.All trees installed under the contract shall be guaranteed against any and all
poor, inadequate or inferior materials and/or workmanship of installation for a
period of one (1) year.
B.All plant material 15 gallon or larger shall be guaranteed against any and all
poor, inadequate or inferior materials and/or workmanship of installation for a
period of one (1) year.
C.During the guarantee period, any material found to be dead, in decline, missing,
or in poor condition shall be replaced by the Contractor within ten (10) days of
written notification. The Owners Representative/ Landscape Architect shall be
the sole judge as to the condition of the material.
D.Replacement shall be made in accordance with these specifications and the
plans and shall be material matching the current size and condition of the
existing material at the time of replacement.
E.Material and labor involved in replacing plant material shall be provided by the
Contractor at no additional cost to the Owner including any shipping, delivery,
and or specialized installation methods such as craning, rigging, or impact to
surrounding landscape.
1.04 REFERENCES
A.The Standard Specifications for Public Works Construction, “Greenbook”, latest
edition, is reference as if herein contained and the contractor shall keep a copy
at the project site. These Specifications shall supersede conflicts with
information given in the “Greenbook”, unless otherwise determined by the
Owner or their designated representative.
1.05 QUANTITIES AND TYPES
A.Plant materials shall be furnished in the quantities and/or spacing as shown and
noted for each location, and shall be the species, kinds, sizes, etc. as
symbolized and/or described in the “Plant Materials Legend”, as indicated by
the drawings. The Landscape Architect has provided this list and/or counts only
as a convenience to the Owner and Contractor and assumes no responsibility
for its accuracy. As part of his/her bid the Contractor shall be solely responsible
Packet Page. 481
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 149 SPECIFICATIONS
for accurately identifying the counts and species as shown on the plans by symbols. Any
questions or clarifications shall be brought up during the bidding process or shall be resolved as
solely directed by the Owners Representative or Landscape Architect.
1.06 VERIFICATION OF DIMENSIONS
B.Dimensions are approximate, before proceeding with any work, Contractor shall
verify all dimension and shall immediately inform the L.A. and owner of any
discrepancies between the drawings and/or specifications and actual field
conditions. Minor adjustments to planting locations for interference with
infrastructure or other site features shall be included in the bid by the contractor.
No work shall be done in any area where there is such a discrepancy until
approval has been given by L.A. and owner. Any work done without notification
and prior approval will be the sole responsibility of the Contractor to remedy as
directed by L.A. and Owner.
1.07 INSPECTIONS
A.Inspections will be required to observe and verify the work. The Contractor shall
contact the Owners Representative at least 48 hours (2 working days) in
advance of an anticipated inspection. An inspection will be required at each of
the steps listed below:
1.Upon completion of fine grading, and prior to commencement of soil
preparation, for acceptance of fine grading work and taking of soils
samples.
2.Inspection of completed finish grading work per this section following soil
amendment work.
3.Percolation test of selected planting tree locations.
4.On site delivery of plant material.
5.When trees and shrubs are spotted for planting, but before planting holes
are excavated.
6.When planting and all other indicated or specified work has been
completed.
7.During application of pre-emergent chemical.
8.At start of plant establishment and maintenance period.
9.At the end of the plant establishment period, concurrent with final
acceptance of the project for maintenance by the Owner. This acceptance
for maintenance will be confirmed in writing by the Landscape Architect or
Owners Representative.
1.08 SOILS TEST
A.Agronomic soil analysis shall be required with interpretation and
recommendations (include texture, organic matter, estimated nitrogen release,
Phosphorus (P 1, P 2), potassium, magnesium, calcium, soil pH, hydrogen,
cation exchange capacity, percent base saturation, soluble salts, excess lime
rate, sodium and boron at the acceptance of fine grading. Total amount of tests
required shall be as stated per the per plans or at a minimum of 1 test per
25,000 sq. ft. whichever is greater. The tests shall be individual to identify any
irregularities in soil types on site and amend them as necessary per plant or
area needs. Creating a single composite mix of all samples is not allowed. The
final approved recommendation shall take precedence over the minimums listed
Packet Page. 482
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 150 SPECIFICATIONS
herein or elsewhere in the plans. Recommendations shall be based on the plants listed per the
planting plans specifically. The recommendations shall call for any needed special requirements
for the listed trees, shrubs, ground covers, turf, and or any other special specie requirements.
Any additional costs due to recommendations of the soil test shall be the responsibility of the
Contractor who has reviewed the site during bidding and made their own observations and test
as needed to make an accurate bid based on the site conditions and their experience as a
Contractor. See plans for amount and locations of tests required based on project size. All costs
for testing shall be the responsibility of the Contractor and included in their bid as well as the
proper scheduling allowing for analysis and reporting lead times.
B.Any results or recommendations that require additional re-testing to verify
required mitigation or amendments performance shall be included by the
contractor at no cost to the owner.
C.Any Additional mitigation or amendments that may be required by as stated by
additional testing and are found to be a result of the Contractor failing to meet
the original requirements shall be corrected in full to the requirements of the
recommendations by the Contractor at no cost.
1.09 SUBMITTALS
A.Contractor to submit date stamped photos documenting current appearance of
each plant listed in the plant legend within 15 days of the Notice to Proceed.
Photos shall clearly document size and condition from the nursery, including
height, spread, and size of caliper noted for trees for approval by Landscape
Architect.
B.In addition to photos the Contractor shall supply documentation of the required
quantities available from the supplier at the time of submittal, it is the
Contractors responsibility to procure all plant material ahead of delivery once the
submittal is approved. Any additional cost as a result of scheduling or order of
operations for holding, growing, and caring for plant material shall be included In
the Contractors bid.
C.Contractor to submit written recommendations from a Certified Pest Control
Advisor for all herbicides and pesticides to be used on site for approval by
Landscape Architect.
D.Contractor to submit samples of Mulch or other listed ground cover material per
plan in a 1-gallon zip-lock type plastic bag for approval by Landscape Architect.
E.The following written certifications and or delivery tickets are required to be
submitted to the Landscape Architect upon delivery of the respective materials
to the job site:
1.Total Quantity of commercial fertilizers by type
2.Total Quantity of soil amendments and conditioners by type
3.Total Quantity of mulch
4.Total Quantity of iron sulphate
5.Also, all items per section 32 92 00 (turf seeding or sod if applicable)
F.All bagged products (fertilizers, etc.) shall stay on the site in a neat and orderly
manner until the final approval by the Landscape Architect.
1.11 SUBSTITUTIONS
Packet Page. 483
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 151 SPECIFICATIONS
A.Substitutions for any indicated plant material shall be permitted only if the
provided substituted materials are approved in advance at the start of work, and
if found to be acceptable by the L.A. with no additional costs to the owner. The
L.A. has final authority on the approval of substitutions based on their opinion of
overall impact to plant palette and the substitutions previous performance. No
substitutions shall be allowed based on failures of the Contractor to locate and
reserve plant quantities at the time of award. For any additional required
inspections, nursery visits, or staff time spent verifying additional plant material
after the original approval will be the responsibility of the Contractor and charged
at the Landscape Architects current rates at time of Design Award.
1.12 PROOF OF PLANT MATERIAL NURSERY DEPOSIT/PURCHASE
A.The Contractor shall be responsible for proof of plant material procurement prior
to submission of first Pay Application. Plant material must be located, have
submittals approved, and some form of either deposit or full payment for
reserving the plant material and any ongoing maintenance required by the seller
based on the Contractors approved schedule for plant delivery to the site.
Failure to provide the documentation of proof of purchase will result in a delay of
payment approval and processing. This is required due to supply chain issues
and limited availability of plant material in the current market conditions and
there affect on project timelines if not secured at the properly at start of the
project.
1.13 WARRANTY
A.General:
B.The Contractor shall guarantee all plant material against all defects and fault of
material and workmanship for the entire period of the plant
establishment/maintenance periods. The Contractor shall guarantee all trees
and plant material 15 gallon and larger for a period of one year from completion
of plant establishment. Any trees that fail or are found to be in decline shall be
replaced by the Contractor at no cost to the owner. The final decision on the
health and status of the material will be the sole discretion of the Landscape
Architect and or the Owners Representative.
C.Should any problem with the planting installation be discovered within the
guarantee period, it shall be corrected by the Contractor at no additional
expense to the Owner within ten (10) calendar days of receipt of written notice
from the Owners Representative. When the nature of the repairs as determined
by the Owners Representative constitute an emergency (I.E. Tree failures, Etc.)
the Owner may proceed to make repairs at the Contractor's expense. Any and
all damages to existing improvements resulting either from faulty materials or
workmanship, or from the necessary repairs to correct same, shall be repaired to
the satisfaction of the Owners Representative by the Contractor, all at no
additional cost to the Owner.
2 PART 2 - MATERIALS
2.01 SOIL AMENDMENTS, FERTILIZER, AND CONDITIONERS
Samples of soils amendments and plants shall be submitted for inspection and stored on the
site until furnishing of materials is completed. Photographs may be used for Plant Material if
Packet Page. 484
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 152 SPECIFICATIONS
they include the following: date of image, person or object for scale, nursery name and contact
info, multiple views of any items 24” or larger. Delivery may begin upon approval of samples and
completed grow and kill period, or as directed by the Owner’s Representative. Substitutions in
any material will not be permitted unless presented during bidding and specifically approved in
writing by the Owner’s Representative in the form of an official bid addendum.
A.
1.
2.
3.
4.
5.
6.
7.
B.
1.
•
•
•
2.
•
•
•
•
•
3.
•
•
Packet Page. 485
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 153 SPECIFICATIONS
•15 gal – 8 paks 48” box – 22 paks
4.Premium humate shall be incorporated at 50lbs. per 100 square feet
5.Myco Revival Plus shall be topically applied per manufacture and watered in accordance
with the manufacturer's instructions
C. Inorganic Conditioners:
Inorganic conditioners shall be agricultural grade gypsum, soil sulfur and iron sulphate. Iron
sulphate shall be ferric sulphate or ferrous sulphate in pelleted or granular form containing not
less than 18.5% iron, expressed as metallic iron, and shall be registered as an agricultural
mineral with the State Department of Agriculture in compliance with Article 2 "Fertilizing
Materials", Section 1030 of the Agriculture Code.
2.02 PLANTS
All plants shall be true to name, and one of each bundle or lot shall be tagged with the name
and size of plants in accordance with the standards of practice recommended by American
Standard for Nursery Stock ANSI Z60.1-2014. The root condition of plants furnished in
containers shall be determined by removal of earth from the roots of not less than two plants nor
more than 2% of the total number of plants of each species or variety except when container-
grown plants are from several different sources: in which case, the roots of not less than two
plants of each species or variety from each source shall be checked by the Owners
Representative / Landscape Architect at his option. The selection of plants to be checked will be
made by the Owners Representative / Landscape Architect. All plants rendered unsuitable for
planting shall be considered as samples, and replacements shall be provided at no additional
cost. In case the sample plants are found to be defective, the entire lot or lots of plants
represented by the defective samples will be rejected.
A.All trees and shrubs supplied by Contractor shall be of the specified standard
height and diameter set by the American Standard for Nursery Stock. The height
of the trees shall be measured from the root crown to the last division of the
terminal leader and the diameter shall be measured six (6) inches above the
crown roots. The trees shall stand erect without support.
B.No plants or trees shall be accepted with compromised root systems, including
girdling, root bound, and or recently up planted from smaller container stock.
C.
D.Container stock shall have grown in the container for at least 6 months, but not
over two years.
E.Do not prune any plants prior to delivery without specific prior approval.
F.Material that has been trimmed, damaged, or does not meet the standard
approved via photographs will be rejected.
G.All cost associated with returning and replacing rejected material shall be the
Contractors sole responsibility.
H.Substitutions shall not be permitted unless the contractor can prove in writing
that no specimens can be located within 100 miles of the project. A
minimum of 5 notices from suppliers stating the plant is not available are a
required.
I.At all times plants shall come from Nursery stock grown in similar conditions and
climate zones as associated with the project.
2.02 BACKFILL MATERIAL
Packet Page. 486
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 154 SPECIFICATIONS
A.Topsoil shall be free from noxious weed seed and shall be of a loam
characteristic, fertile and friable.
B.Wood shavings shall be leached nitrogen fortified and shall be free of foreign
matter.
C.Soil used for backfill of planting pits for bidding purposes shall be enriched using
the following blend per cubic yard (agronomic soil test recommendations shall
take precedence where these minimum amounts are exceeded):
60% site soil or approved import 40% wood shavings
17 lbs. soil condition/fertilizer (Gro-Power Plus) 1 lb. iron sulphate
All plant pits shall be backfilled with backfill mix as specified above.
D.All soil backfill shall be bulk mixed, not individually mixed at each plant pit.
2.03 STAKES AND TIES
A.Tree stakes shall be 3" dia. x 10-foot-long straight-grained copper naphthenate
treated lodgepole pine unless called for differently per the plans. Stakes shall be
free from knots, checks, splits, or disfigurement.
B.Tree ties shall be "Cinch-Tie Tree Support” supplied by V.I.T. Co., Escondido,
California, (760)
480-6702. For 5- 15-gallon trees, Model CT24; for 24”- 36" box trees, Model CT32. Total
amount of ties per tree shall be as called for by the Details.
C.Multi-stem trees and 48” box trees and larger shall require underground tree
guying/earth anchors system that include strapping of the root ball and soil
anchors. Duckbill Root Ball anchor sized per manufactures recommendations or
approved substitution shall be required.
D.Tall vertical growing specimens, similar to Italian Cypress or Brisbane Box trees
shall require special staking requirements designed to align and support their
long single leader growth habits. This shall include using 20’ length sch. 40 steel
pipe or similar staking devise that may require special installation and tie
methods. Contractor to include alternative staking methods based on tree types
as required by plans in the total cost of their bid.
3 PART 3 - EXECUTION
3.01 LANDSCAPE GRADING
A.The Contractor shall complete preliminary grading as required by adding soil,
removing surplus soil, removing rocks and debris over 1 inch in diameter within
the top 2" of soil in flat and slope areas, and removing rocks over 2" in diameter
within the top 6" of soil in areas with slopes less than 3:1. Bring all areas to be
landscaped to finish grade. All areas shall slope to drain. Flow lines shall be
established to drain inlets, existing road curbs, sidewalks, and or other drainage
conveyance structures as shown on the grading plans. Contractor shall notify
Owners Representative/ Landscape Architect of any areas that appear to have
drainage issues prior to soil preparation for complete mitigation and or
correction.
B.The Contractor shall key/cut and remove all soil for mulch, ground cover, turf
interfaces with hardscape per the details to retain minimum depth and final finish
alignment.
3.02 WEED AND PEST CONTROL MEASURES
Packet Page. 487
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 155 SPECIFICATIONS
A.Upon completion and acceptance of all fine grading work and prior to soil
preparation, the Contractor shall perform weed control (Grow/Kill) measures as
follows:
1.Irrigate all areas designated to be planted for a minimum of 10 minutes per
setting, two settings per day for 14 days continuously to germinate existing
seed bank.
•In instances of point source or drip irrigation it is the
Contractors responsibility to completely irrigate all planting
areas which may require additional or supplemental irrigation
above the designed system per plans. This may include adding
above ground temporary irrigation, watering from water
trucks/tanks, and or hand watering and shall be included in the
Contractors bid.
2.Apply a contact non selective herbicide per the written recommendations of
a Certified Pest Control Advisor specific to the site- allow 7 days or
sufficient time to pass to allow a complete kill of all weeds germinated.
3.Remove all weeds present including any viable root systems and above
ground vegetation.
4.Repeat step one for only 7 days and then follow steps 2-3 as above until
weed cover is less than 1%.
5.Contractor to indicate on master schedule total grow kill period as part of
submittals.
6.Contractor shall call for inspection and verification of the completion of the
Grow Kill Period prior to planting.
7.If the Contractor wants to phase the grow kill operation, the Contractor will
be responsible for providing plans documenting treatments including start
and stop dates, in addition to reporting and requesting additional
inspections for verification.
8.Any failure by the Contractor to continually irrigate or miss herbicide or
clean up windows as listed above would require the process starting over
from step one.
9.Contractor is responsible for the purchase and erection of all signs and
barriers required to prevent intrusion into treated areas in addition to all
required forms of public notice as required by the PCA responsible for the
recommendation, local governing organizations, and or manufacture
requirements for the safe and responsible use of products.
10.No material or method applied shall affect the success or ability of
hydroseeded or planted material to germinate/thrive.
11.During grow and kill operations the Contractor shall also re-access any
possible rodent or herbivore activity and continue removal and or treatment
programs to maintain a pest free site and a boundary or buffer zone. This
shall include areas outside of planting limits if within the project property to
create buffer zones.
3.03 SOIL PREPARATION
A.All fine grading and mounding and all weed control measures shall be
documented, completed, and approved prior to any soil preparation.
Packet Page. 488
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 156 SPECIFICATIONS
B.This work shall not commence until the agronomic soils tests have been
completed. Should 30 calendar days elapse between completion of soil
preparation and commencement of planting, all areas shall be prepared again.
C.In planting areas with gradients less than 3:1, a layer of soil amendments shall
be spread and rototilled into the soil to a minimum depth of 4 inches, or as
required by the soils report, so that the soils shall be loose, friable, and free from
all rocks, sticks, and other objects undesirable to planting.
D.The following soil amendments shall be used for estimating purposes if soil tests
are not provided a time of bid and be added per 1,000 square feet to all planting
areas with gradients less than 3:1 (agronomic soil test recommendations shall
take precedence where these minimum amounts are exceeded). Contractor
shall be responsible for any additional cost due to Soil report recommendations
and shall have inspected and understood the current soil conditions at time of
Bid. (Note: the following is for typical ornamental planting installation- they shall
not apply to Native plantings, see Soil Management report for further information
if included in plans)
1.3 cubic yards organic amendment
2.200 pounds soil conditioner/fertilizer (Gro-Power Plus)
3.25 pounds gypsum
All landscape areas shall be re-fine graded to "dress out", maintain, and/or reestablish grades
and flow lines as approved prior to amending the soil. Fine grades will be inspected upon
completion. Contractor shall not proceed with planting work until fine grades have been
inspected and accepted by the Landscape Architect
E.Moisture Content - The soils shall not be worked when the moisture content is
so great that excessive compaction will occur; and not when it is so dry that dust
will form in the air or that clods will not break easy. Water shall be applied, as
necessary, to provide ideal moisture content for tilling, planting, and required
dust control.
F.Note: Special soil preparation areas such as drainage basins or areas with
different agronomic requirements shall be per plan and or notes/details.
3.04 FINISH GRADING
A.After completion of all soil preparation work the Contractor shall finish grade all
planting areas filling as needed or removing surplus dirt, removing rocks and
debris over 1 inch in diameter, and floating to a smooth uniform grade. All areas
shall slope to drain. Flow lines shall be established to inlets, road curbs and/or
other drainage means as shown on the plans and as directed.
3.05 PLANTING
A.Prior to planting the Contractor shall dig test planting holes for percolation tests.
Per direction of the Landscape Architect, locations shall be selected to address
all soil types and situations on site, such as examples for slope, exposure, soil
type, etc. Holes will be dug to the depth per planting details and filled to 25%
capacity with water. Test start time will be documented and checked every half
hour until fully infiltrated to ensure proper drainage. Any areas found to not
infiltrate per the recommended time frame will require additional drains and
specialized planting techniques per the details for Trees and Shrubs in Wet
Soils, which require deeper pits, additional gravel sumps, and drain pipes.
Packet Page. 489
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 157 SPECIFICATIONS
B.Trees and Shrubs: Plant holes shall be dug to size as indicated in the drawings.
Before trees and shrubs are set in the holes, all holes shall be pre-watered as
follows:
All planting holes shall be filled to the brim with water and allowed to drain before any planting is
done. If water does not drain out of hole within 24 hours, this fact must be brought to the
attention of the Landscape Architect so that corrections can be made. Correctional work shall
not be considered an extra, as it will be the Contractors sole responsibility as part of soil
preparations to remedy any localized soil issues.
C.Soil surrounding planting pit shall be in a friable condition and moist to a depth
of 8".
D.Backfill using specified soil mix per the details to within 8" of finish grade. At this
depth, place the fertilizer tablets or Mycro packs/ tabs per details. Complete
backfilling to finish grade.
E.Plants and Trees shall be planted at such a depth that the crown roots bear the
same relative position to finish grade as they did to the soils where they were
grown. At no time shall the soil level be raised around the crown. Backfill after
planting shall be compacted carefully into place without injuring the roots of the
tree or breaking up the ball of earth surrounding the roots.
F.Contractor shall create and mound soil as required for water basins per the
details including adding slope guards, stones for root cover/ soil moisture
protection on southwestern exposures, trunk protection, and additional straw
wattles when required.
G.All excess soil spoils and excavated debris shall be removed from the site by the
Contractor.
3.06 GROUND COVER AND VINE PLANTING
A.Soil preparation and fine grading shall be completed prior to ground cover
planting.
B.Mulch and fertilize ground cover areas per Section 3.03, part D. of planting
specifications.
C.All rooted ground cover and bare dirt areas are to be treated with a pre-
emergent chemical (subject to approval by the Landscape Architect prior to
application). Chemicals are to be applied by a DPR Qualified or Certified
applicator. This treatment shall be applied at the following times during the
contract: a) before planting, b) at beginning of plant establishment period, and c)
at the end of plant establishment period. The Owners Representative /
Landscape Architect shall be given a minimum of 48 hours (2 working days)
notice prior to each application. No chemicals shall be applied other than in the
presence of the inspector.
D.Ground cover shall be planted below all shrubs and trees to within 12" of the
shrub main stem unless otherwise noted on the plans.
E.Ground cover and vines shall be planted in moist soil and spaced as indicated
on the plans.
F.Each plant shall be planted with its proportionate amount of flat soil to minimize
root disturbance. Soil moisture shall be such that the soil does not crumble
when removing plants.
G.Following planting, ground cover and vine areas shall be regraded to restore
smooth finish grade and to ensure proper surface drainage. All excess soil
spoils and excavated debris shall be removed from the site by the Contractor.
Packet Page. 490
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 158 SPECIFICATIONS
H.A 3-inch layer of mulch per plans shall be spread over the planted areas.
Watering shall begin immediately following mulching.
I.When necessary to prevent plant damage from pedestrian traffic during the
initial growing stage, the Contractor shall erect temporary protective fencing to
be removed at the end of the plant establishment period.
J.Vines shall be tied to walls, fences, etc., in the manner prescribed on the plans.
Temporary staking shall be removed at the beginning of the plant establishment
period.
3.07 TREE STAKING
A.Stake trees as per planting details. No bare metal wire shall circle any part of
any tree.
B.All nursery stakes shall be removed at the time of planting.
C.Contractor to adjust staking as needed for locations in high wind areas,
including adding more restraints and stakes per the plans and current ISA
guidelines at no additional cost.
3.08 WATERING
A.It shall be the Contractor's responsibility to maintain a balanced watering
program to ensure proper growth until final acceptance of the work.
B.Immediately after planting, apply water to each tree, shrub or vine. Apply water
using a gentle spray pattern via a water wand in the planting hole until the
material about the roots is completely saturated from the bottom of the hole to
the top of the ground.
C.Apply water in sufficient quantities and as often as seasonal conditions require
to keep the planted areas moist at all times per the plants requirements, well
below the root system of plants.
D.For hydroseed installation using Eco Mat or other subsurface irrigation the
contractor will be responsible for any head adjustments or hand watering
required to germinate the seeds against any hardscape buffer areas (typically
24”) at no additional cost.
E.Irrigation:
1.Contractor shall properly and completely maintain the irrigation system.
Contractor to program controller per watering schedule on irrigation plans
and adjust in the field as necessary. Overhead irrigation areas to have a
maximum run time of 15 minutes per cycle with additional cycles as
needed. At no time will run off or erosion be allowed.
3.09 MULCHING
A.Contractor to apply a 3" minimum mulch layer to all planting areas unless
specified as other ground cover treatment by the plans.
B.Contractor to keep mulch from plant trunks as follows:
1.Shrubs shall have 3" of clearance from trunks/main stems to mulch
2.Trees shall have 6" of clearance from crown/ base of the flare to mulch
3.10 PLANT PROTECTION
A.The Contractor is responsible for all aspects of protection of the installed
landscape from loss or damage through the Plant Establishment and
Maintenance periods until the final acceptance via written notice. This shall
Packet Page. 491
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 159 SPECIFICATIONS
include any additional materials or protection methodologies such as but not limited to ground
wire cages, shields, trunk covers, shading, herbivore protection above/below via product use or
trapping and or removal, application of deterrents, and Pest and Insect control.
3.11 PRUNING
A.All shrubs and trees shall be pinch pruned as necessary to encourage new
growth and to eliminate rank sucker growth. Old flowers, and dead foliage and
limbs shall be removed. No major pruning shall be done without the approval of
the L.A. Any damage to shrubs and trees that drastically changes structure and
or appearance shall require the Contractor to replace in kind with an approved
replacement at no additional cost per the direction of the Landscape Architect.
3.10 MAINTENANCE
A.All areas landscaped by Contractor under this contract shall be maintained by
said Contractor for a minimum plant establishment period of not less than
ninety (90) days or as called for by the Contract documents from the date of
written acceptance of initial installation and substantial completion per the
requirements of the plans, specifications, and contract documents.
3.11 START OF PLANT ESTABLISHMENT
A.Criteria for start of plant establishment period:
1.The plant establishment period shall not start until all elements of the
project that impact the landscape are completed in accordance with the
contract documents. Projects will not be segmented into phases.
2.Permanent Water and Power to remote controllers shall be established.
3.Fully automatic irrigation including acceptance of installation and as-
builts/controller charts.
4.Written acceptance of the Owners Representative must be obtained prior to
the start of the plant establishment period.
5.If the project maintenance fails to continuously meet standards required,
the plant establishment period "day count" will be suspended and will not
recommence until Contractor has corrected all deficiencies.
6.The 90-day establishment period is the minimum required and will be
extended as needed at no additional cost to remedy issues and bring the
project into compliance.
3.12 LANDSCAPE MAINTENANCE (PLANT ESTABLISHMENT)
A.Refer to section 32 90 05 Landscape Maintenance
3.13 CLEAN UP
A.Upon completion of the work, the Contractor shall smooth all ground surfaces;
remove excess materials, rubbish, debris, etc.; sweep adjacent streets, curbs,
gutters, walkways, and trails; and remove construction equipment from the
premises.
B.This shall include power washing all hardscape, site structures, site furnishings
to return them to a state of clean and unsoiled. If the finish has been soiled past
the ability to be washed off the Contractor shall be responsible to returning it to a
new finish state, including repainting, refinishing, and in extreme cases replacing
in whole.
Packet Page. 492
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 160 SPECIFICATIONS
END OF SECTION
Packet Page. 493
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 160 SPECIFICATIONS
Packet Page. 494
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 161 SPECIFICATIONS
SECTION 32 90 05
PART 4 GENERAL
1. SECTION INCLUDES
a. Furnishing and implementing a complete landscape maintenance program to maintain
all planting areas from time of Accepted plant installation through the (90) ninety-day or
per contract document Plant Establishment Period and accepted Final Completion.
Contractor shall note the (90) ninety-day period is the minimum for plant establishment
and that failures of plant performance/establishment and or Contractor failures to
properly meet all requirements shall extend the period as deemed necessary by the
Owner’s Representative.
2. SCOPE OF WORK
a. Furnish all supervision, labor, materials, equipment and transportation required to
maintain the landscape in a thriving condition as it establishes and take root, as specified
herein.
1) Care of all lawn and ground cover areas if present, including watering, cutting,
edging, trimming, fertilizing and pest control within all ground cover areas as
directed herein.
2) Care of all shrubs, trees, and groundcover areas, including watering, cultivation,
pruning, fertilization, debris removal, and pest control including but not limited to:
a) All cultivation and soil aeration as necessary to maintain optimum conditions
for plant growth.
b) Fertilization of all plant material on a regular schedule, including soil testing as
necessary to determine requirements and application methods with reference
to the project soil analysis.
c) All pruning, re-staking, tightening or adjustment of guy wires or straps and
trimming of plant material that is required in landscape areas to promote growth
and proper structure.
d) Control and/or prevention of diseases, insect and or rodent infestation using
methods and techniques approved by State Licensing Agency.
3) Supplemental watering of plant material on a regular basis through use of automatic
irrigation systems and/or hand watering as needed, while consistently monitoring
and adjusting water needs to maintain optimum conditions for plant growth per each
species/ hydrozones requirements.
4) Maintenance of irrigation systems, including adjustment of heads and valves and
regular controller program updating, cleaning of filters, and fertilizer injection
systems if included per plans.
5) General maintenance of the site and associated amenities including removal of litter
and debris, cleaning of site features, graffiti removal, and reapplication of any anti-
graffiti coatings as required.
Packet Page. 495
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 162 SPECIFICATIONS
6) Replacement of plantings, or other materials, that, in the Owner's Representatives
opinion, require replacement due to failure, decline or the Contractor's neglect in
care or maintenance at no cost to owner.
7) Protection of Property and Landscape During Inclement Weather: During periods
of inclement weather, Contractor shall provide supervisory inspections of the
project during regular hours to prevent of minimize possible damage from storms
or weather events. Contractor shall report any storm damage to Owner’s
Representative.
8) Protection of Existing Facilities and Structures: Contractor shall exercise due care
in protecting from damage all existing facilities, structures, and utilities both above
and below grade from maintenance activities- any damage from equipment or
personnel shall be repaired or replaced immediately to the original condition of a
new installation.
9) Project Inspection: Contractor will meet with Owners Representative per approved
schedule to verify compliance with specifications. Following each meeting,
Contractor will submit written reports noting problems cited during inspections and
any actions taken.
10) Work Schedule: A monthly schedule shall be prepared and submitted to the Owner
prior to the beginning of each month. Schedules shall indicate times, days of the
week and type of work to be performed including manpower for approval.
b. Section also includes notification and coordination with the Recreation & Park
Department if present prior to completion of the Plant Maintenance Period.
3. RELATED WORK
a. Section 32 84 00 – Planting Irrigation
b. Section 32 90 00 – Planting
4. REFERENCE STANDARDS
a. Plant Material Standards: “American Standard for Nursery Stock”, current edition,
American Association of Nurserymen.
b. Staking and Guying Procedures: "Staking Landscape Trees", University of California
Extension Publication #2576.
c. Pruning Procedures: "Pruning Landscape Trees", University of California Extension
Publication #2574.
d. ISA standards and BMP
5. WORK FORCE
a. Supervision: Contractor shall furnish competent supervisors, to be present on the job
site at all times during which work is being performed. Supervisors must possess
adequate technical background, preferably with formal education in ornamental
horticulture. Supervisors must be English speaking and preferably bilingual (in Spanish)
if crews are Spanish speaking.
b. General Personnel: In addition to Supervisors, Contractor shall supply sufficient working
personnel capable of promptly accomplishing, on schedule, all work required under this
contract during regular hours.
Packet Page. 496
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 163 SPECIFICATIONS
c. All such personnel shall be physically able to perform their assigned work. The
Contractor and his employees shall conduct themselves in a proper and efficient manner
at all times and shall cause the least possible annoyance to the public. They shall be
fully clothed in uniforms and suitable attire. All maintenance staff shall have ID badges
and the current PPE as required by OSHA. The Owner may require the Contractor to
remove from the work site any employee(s) deemed careless, incompetent, or otherwise
objectionable, whose continued employment on the job is considered to be contrary to
the best interest of the Owner. All personnel shall be U.S. citizens or legal residents.
6. WARRANTY
a. Refer to Section 32 90 00 – Planting.
7. SCHEDULE
a. Submit a proposed maintenance work schedule to the Owner’s Representative in writing
for review at least 10 days prior to commencement of maintenance work. All
maintenance work shall be done at times approved by the Owner’s Representative so
as not to conflict with the operation of the project.
b. Project site must be visited twice weekly for the first (30) days and once weekly as a
minimum thereafter until the end on establishment.
c. For Projects with extended maintenance periods over 90 days see below for a reference
of general required activities.
Frequency Per Month:
Operation JAN FEB MA
R
AP
R
MA
Y JUN JUL AU
G
SEP
T
OC
T
NO
V
DE
C
Site Check 4 4 4 4 4 4 4 4 4 4 4 4
Debris
Removal 2 2 3 3 4 4 4 4 3 3 2 2
Pruning 0 1 0 0 0 0 0 0 0 1 0 0
Weed
Control 0 2 3 3 4 4 4 4 3 2 2 0
Clean +
Sweep 2 2 3 3 4 4 4 4 4 4 2 2
Irrigation
Adjustment 1 1 1 1 2 2 2 2 2 1 1 1
Packet Page. 497
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 164 SPECIFICATIONS
8. TECHNICAL SPECIFICATIONS
a. Turf-Mow-Edge
1) Mowing
a) All turf areas shall be mowed once per week at a minimum- adjustments to
mowing’s per week may be directed dependent on turf and season.
b) Work shall be performed on the same day each week. Initial week schedule
and any changes must be approved by the Owner prior to implementation.
c) Mowing’s missed visits due to inclement weather or ground conditions from
such weather shall be rescheduled and completed within 3 work days on
weekly schedule and within 7 days on bi-weekly schedule.
d) Cutting heights shall be adjusted according to the type of grass in accordance
with the following:
TURF TYPE TIME OF YEAR
CUT
HEIGHT
Bluegrass and
Fescue
June through September 3”
Bluegrass and
Fescue
September through May 2”
St. Augustine Year-Round 2-1/4"
Bermuda Year-Round 3/4"
Buffalo Grass Year-Round 1-1/2”
e) All warm season grasses to include Bermuda, Buffalo and St. Augustine shall
be mowed with a power-driven reel type mower. Bluegrass and Fescue may
be mowed with either power-driven reel type or rotary type mowers. All
equipment shall be adjusted to the proper cutting heights and shall be
adequately sharpened.
f) All visible grass clippings shall be collected and removed from the site prior to
the completion of that day's mowing operations or the end of the day, whichever
occurs first.
g) All trash, leaves, paper and other debris shall be removed and disposed of off-
site prior to mowing.
h) All walkways, roadways, trails or other areas dirtied by mowing operations shall
be cleaned and all debris disposed of off-site prior to the completion of that
day's mowing operations or the end of the day, whichever occurs first.
2) Edging
a) All turf grass borders shall be neatly and uniformly edged or trimmed concurrent
with every mowing with bladed tools- no string trimmers will be allowed for
edging.
3) Turf Maintenance
a) All turf areas shall be irrigated as required to maintain adequate growth and
appearance.
b) Contractor shall monitor the requirements of the plant material, soil conditions,
seasonal temperature variations, wind conditions and rainfall and shall
recommend appropriate changes in duration of watering cycles. No actual
changes will be implemented without prior approval of the Owner.
Packet Page. 498
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 165 SPECIFICATIONS
c) Special areas of consideration:
(1) Special irrigation zones may exist such as, sub irrigation zones for turf
adjacent to hardscape. In some situations, for example in hydroseeded
applications, the Contractor shall hand water as required for initial
germination and establishment as part of the installation and
establishment period if deemed necessary. This will be included with the
contract price and no additional cost or charges will be allowed.
4) Weed Control
a) A regular program of approved chemical application shall be used to control
weed growth, supplemented by hand removal of noxious weeds or grasses as
necessary.
b) In areas of native planting, hand removal may ne the only method allowed.
5) Fertilization
a) All turf areas shall be fertilized in accordance with soils report, specific turf
requirements and or recommendations when granular fertilization is used; if no
soils report exists, the following criteria shall prevail.
TURF FORMULA RATE CYCLE
Bluegrass 16-6-8 w/trace elements 1 lb. actual nitrogen/
1,000 S.F.45 days
Bermuda
Ammonia Nitrate 33.5-0-
0
16-6-8 w/trace elements
1 lb. actual nitrogen/
1,000 S.F.45 days
Fescue 16-6-8 w/trace elements 1 lb. actual nitrogen/
1,000 S.F.45 days
St. Augustine Ammonia Nitrate 33.5-0-
0
1 lb. actual nitrogen/
1,000 S.F.45 days
Buffalo grass Manufacture approved
crab grass preventer Per manufacturer 45 days
b. Fallen Vegetation and Debris Removal
1) The contractor shall police the entire project area including all paved areas,
planters, lawn areas, sidewalks (including common area sidewalks) and trash
enclosures and collect fallen leaves, branches and limbs regardless of length or
diameter, dead vegetation, paper, trash, cigarette butts, garbage, rocks, and any
and all other debris to prevent unsightly and inordinate accumulations during
normal maintenance working hours. Sidewalks shall be swept or washed as
necessary to keep free of trash and graffiti. Collected items shall be promptly
removed and taken to a legal disposal site.
c. Removal of Dead Animals or animal waste
1) Removal and legal disposal of animal carcasses and animal waste are considered
a normal maintenance task for the duration of the maintenance period. Dead
carcasses shall be legally removed immediately when discovered by the contractor.
For areas that include dog parks all animal waste shall be immediately removed
once discovered by the contractor.
d. Erosion Control
Packet Page. 499
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 166 SPECIFICATIONS
1) Any installed erosion control measures such as straw wattles, silt fences,
sand/gravel bags, etc. are to be continually maintained throughout the project by
the Contractor. This shall include sediment/soil removal and replacement, BMP
maintenance and replacement to due to damage, failure, or end of life.
2) The contractor is responsible for daily visual inspection of landscape areas and
slopes and immediately reporting areas experiencing erosion to the landscape
architect and/or owner's representative on the same day noticed. If the contractor
fails to notify the landscape architect and/or owner's representative of areas
experiencing erosion on the same day noticed, then the contractor assumes full
responsibility for any erosion control measures and/or repairs as directed by the
landscape architect and/or owner's representative at no additional cost to the
owner.
3) The contractor is responsible for immediately repairing and correcting any
progressive rilling that may occur.
4) Erosion control measures may include but not be limited to:
a) Filling
b) Raking
c) Redirecting runoff
d) Properly programming irrigation operations
e) Replanting
f) Replacing mulch
g) Providing additional erosion control materials such as:
(1) Jute matting
(2) Filter Fabric
(3) Hay bales
(4) Hay rolls
(5) Silt fencing
(6) Sand Bags
(7) And/or other erosion control items as required to maintain healthy plant
material and stable slopes.
e. Additional erosion control measures required due to irrigation operations programmed
by the contractor that did not take into account cycle and soak functions of the controller
will be installed and/or repaired as directed by the landscape architect and/or owner's
representative at no additional cost to the owner.
f. Mulch replenishment
1) Contractor to replenish mulch levels as required to match installation levels with the
same type as listed in the documents
9. PROTECTION
a. Maintain all planting areas from time of plant installation, through the Plant Establishment
Period and final acceptance, in accordance with Standard Specifications.
b. Maintain weed levels to less than 5% of total area with a final goal of less than 3% at
completion of the establishment period.
c. Maintenance also includes temporary fences, barriers, and signs as required for
protection.
Packet Page. 500
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 167 SPECIFICATIONS
d. The Contractor shall treat or replace any plant that becomes damaged, fall in decline or
be injured, as directed by the Owner’s Representative at no additional cost to the Owner.
e. The Contractor shall be responsible for protecting the health and function of the soil
including;
1) Maintaining mulch cover
a) Using powered blowers in mulched areas is prohibited.
2) Stripping soil cover and exposing soil is prohibited.
3) Allowing soil to dry out or over watering causing an anaerobic conditions.
4) Compaction of soil due to equipment is prohibited.
If any of the above issues develop or occur during the maintenance period the
contractor shall be responsible to correct in full at no cost to the owner, this shall
include soil tillage, de-compaction, adding additional amendments, replacing
mulch, and removal and replacement of damage soil if mitigation is not feasible.
10. FERTILIZATION
a. Groundcover and all planting shall be fertilized in accordance with soils report
recommendations when granular fertilization is used; if no soils report exists, the
following criteria shall prevail: apply certified organic compost mulch at the rate of 3 cu
yards per 1000 square feet 30 days after installation. Repeat application every 60 days
if maintenance period is longer than 90 days. Organic Compost shall be Custom
Amendment Mix (WCP 33) by Earthworks Soil Amendments, Inc., 951-782-0260.
PART 5 PRODUCTS
Not used.
PART 6 EXECUTION
1. FIELD QUALITY CONTROL
a. Perform Site Observations: For the purpose of establishing the 90-day Maintenance
Period and observing completion of the work of this Section through final acceptance. A
minimum of (6) six separate field visits, occurring chronologically as follows:
1) Observation for Maintenance at Commencement
2) 15-day Progress Maintenance Observation
3) 30-day Progress Maintenance Observation
4) 60-day Coordinate Site Meeting with Client’s Site Maintenance Staff
5) 60-day Progress Maintenance Observation
6) 90-day Observation for Final Acceptance
b. Observation for Plant Establishment Period Commencement: Request observation and
acceptance by Owner’s Representative after all plant material is installed and after all
irrigation work and other work of this Section is completed. Plant Establishment Period
shall begin upon acceptance of final planting and review by the Owner’s Representative.
The Period shall continue for a minimum of 90-calendar days until Final Acceptance.
Packet Page. 501
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 168 SPECIFICATIONS
c. At any time, deficiencies are found such as underperforming plants or a lack of
maintenance, the Owner’s Representative will notify the Contractor immediately that the
90-day period has been suspended until such time as the deficiencies are fully corrected.
d. The Contractor has 3 days to respond to any notices of deficiencies and make
appropriate corrections including plant replacements.
2. PROGRESS MAINTENANCE OBSERVATION
a. General: Notify the Owner’s Representative 72 hours prior to a required scheduled
Progress Maintenance Observation. All items determined to be deficient during the
previous observation shall be completed prior to the meeting. FAILURE TO DO SO MAY
RESULT IN AN EXTENSION OF THE PLANT ESTABLISHMENT and MAINTENANCE
PERIOD. In addition, prior to first Progress Maintenance observation, furnish the
Owner’s Representative with the following information:
1) An “As-Built” irrigation plan, as specified.
2) All supplier invoices for the nursery stock, commercial fertilizers, soil amendments,
mulches and herbicides as shown and specified and as installed.
3) Maintenance schedule for fertilization, irrigation, and for all planting areas.
b. Failure to provide the above submittals may result in the re-scheduling of the Progress
Maintenance Observations and extend the Maintenance Period.
c. Notify the Owner’s Representative in writing, prior to any of the Progress Maintenance
Observations of any conditions, which may impede proper plant establishment and or
growth.
d. Final Maintenance Observation: Notify the Owner’s Representative at least 7 days
before the expiration of the Plant Establishment Period for Final Maintenance
Observation. Prior to this observation, all items determined to be deficient during the
Progress Maintenance Observations shall be completed and signed-off by the Owner’s
Representative.
3. FINAL COMPLETION
a. General: Work under this Section will be accepted by the Owner’s Representative upon
satisfactory completion of all work of this Section, Section 32 90 00 Planting, and Section
32 84 00 Planting Irrigation, including 90-Day Plant Establishment Period, exclusive of
replacement of plant material under the terms of the Warranty.
b. Termination of Observation: During any Observations, any landscape item previously
identified as deficient in the Progress Maintenance Observations and determined by the
Owner’s Representative to be still deficient, shall automatically terminate the Final
Completion and result in the extension of the Plant Establishment Period an additional
30 days. Additional costs associated with subsequent Observations that are a result of
the Contractor’s failure to correct deficient items shall be paid by the Contractor. There
shall be no conditional final completion agreement for any work.
4. NOTIFICATION TO OWNER FOR TRANSFER OF MAINTENANCE
a. At least one month prior to the end of the 90-Day “Plant Establishment Period,” the
Contractor shall notify the Owner’s Representative to coordinate a meeting between the
Recreation & Park Department staff and the Contractor to ensure a smooth transition for
turn-over of plant maintenance.
Packet Page. 502
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 169 SPECIFICATIONS
END OF SECTION
Packet Page. 503
UNIVERSITY PARKWAY EXTENSION - MEDIAN &
STREETSCAPING IMPROVEMENTS 169 SPECIFICATIONS
Packet Page. 504
UNIVERSITY PARKWAY EXTENSION –
LANDSCAPIN 170 PLANS AND DRAWINGS
PLANS AND DRAWINGS
1. STANDARD DRAWINGS
2. GEOTECHNICAL REPORT
3. APPROVED DWR ENCROACHMENT PERMIT AND CONDITIONS FOR
UNVERISTY PARKWAY EXTENSION PROJECT, WITH APPROVED PLANS
Packet Page. 505
UNIVERSITY PARKWAY EXTENSION –
LANDSCAPIN 170 PLANS AND DRAWINGS
Packet Page. 506
PROJECT SIGN
UNIVERSITY PARKWAY EXTENSION –
LANDSCAPIN
171 ROJECT SIGN
CITY OF SAN BERNARDINO
Building a Better San Bernardino
UNIVERSITY PARKWAY EXTENSION - MEDIAN AND
STREETSCAPING IMRPOVEMENTS
PROJECT No. SS04-009B
Estimated Completion: Spring 2026
Funding Provided By: Regional Circulation System
Council Ward: 6
Helen Tran, Mayor
Eric Levitt, City Manager
Council Members: Theodore Sanchez, Sandra Ibarra, Juan Figueroa,
Fred Shorett, Ben Reynoso, Kimberly Calvin, Damon Alexander
For more information, please call the Engineering Department (909) 384-5019
Size: 4’ Vertical by 8’ horizontal. Material: ½” Plywood with graffiti laminate. Colors: White background, blue and black graphics, full
color logo.
Packet Page. 507
PROJECT SIGN
UNIVERSITY PARKWAY EXTENSION –
LANDSCAPIN
171 ROJECT SIGN
Packet Page. 508
UNIVERSITY PARKWAY EXTENSION –
LANDSCAPIN
172
Packet Page. 509
Packet Page. 510
Packet Page. 511
Packet Page. 512
Packet Page. 513
Packet Page. 514
Packet Page. 515
Packet Page. 516
Packet Page. 517
Packet Page. 518
Packet Page. 519
Packet Page. 520
Packet Page. 521
Packet Page. 522
Packet Page. 523
Packet Page. 524
Packet Page. 525
Packet Page. 526
Packet Page. 527
Packet Page. 528
Packet Page. 529
Packet Page. 530
Packet Page. 531
Packet Page. 532
Packet Page. 533
Packet Page. 534
Packet Page. 535
Packet Page. 536
Packet Page. 537
Packet Page. 538
Packet Page. 539
Packet Page. 540
Packet Page. 541
Packet Page. 542
Packet Page. 543
2
4
7
0
CONSENT CALENDAR
January 21, 2026
Honorable Mayor and City Council Members
Lynn Merrill, Director of Public Works
Azzam Jabsheh, Deputy Director of Public Works/City Engineer
Public Works
It is recommended that the Mayor and City Council of the City of San Bernardino,
California;
1. Approve the award of a Construction Agreement with PowerTech Inc., in
the amount of $110,367.08 for the Rowe Library - Parking Lot Surfacing
(Project); and
2. Authorize the construction contingencies, construction management, and
administrative costs in the total amount of $109,632.92 for the Project,
bringing the total Project budget to $220,000; and
3. Authorize the City Manager or designee to execute all documents with
PowerTech Inc.; and
4. Authorize the City Manager or designee to expend the contingency fund,
if necessary, to complete the Project.
No comments
Awarding the agreement for the Rowe Library - Parking Lot Surfacing Project will
ensure continued safety, accessibility, and usability of the parking lot at 108 E Marshall
Blvd, San Bernardino, CA 92404, (Ward 7). Approval of this agreement will allow the
City to issue PowerTech Inc. a Notice to Proceed and begin construction activities to
Packet Page. 544
2
4
7
0
rehabilitate and improve the parking area. The Project consists of resurfacing and re-
striping the parking lot, upgrading ADA access and performing minor drainage and
lighting improvements necessary to bring the facility up to current standards and
enhance public access. The Project is funded through Measure S allocations as
adopted in the FY 2025–2026 Capital Improvement Program.
Background
The Rowe Branch Library, located at 108 E Marshall Blvd, San Bernardino, CA 92404
(Ward 7), serves as a vital community resource providing educational and cultural
programs to local residents. The library’s parking lot, which accommodates daily
visitors and staff, has experienced extensive surface wear over time due to weather
exposure and frequent use.
The existing asphalt pavement exhibits cracking, rutting, and uneven areas that create
trip hazards and drainage issues. In addition, the existing driveway approaches and
ADA markings no longer meet current Americans with Disabilities Act (ADA) standards.
Several lighting fixtures have also deteriorated, resulting in reduced illumination and
potential safety concerns for evening visitors.
To address these deficiencies, City staff developed the Rowe Library - Parking Lot
Surfacing Project to restore the facility’s parking area to a safe and functional condition.
The Project includes new asphalt paving and re-striping, removal and replacement of
existing driveway approaches, installation of ADA-compliant signages, striping, and
markings, and improvements to the accessible path of travel from the parking area to
the building’s ramp. The work also includes water-jetting two (2) drop inlets to improve
drainage performance and replacing the lighting bulbs and globes to enhance
nighttime safety and visibility. These improvements will extend the life of the pavement,
improve drainage, ensure compliance with ADA accessibility standards, and enhance
the overall safety and appearance of the library facility.
On June 04, 2025, the Mayor and City Council reviewed and approved funding for this
Project, which was adopted as part of the FY 25/26 budget under Measure S, with an
allocated budget of $250,000. This funding was allocated to address the needed
improvements to the Rowe Library - Parking Lot Surfacing Project.
Discussion
The proposed Rowe Library - Parking Lot Surfacing Project located at 108 E Marshall
Blvd, San Bernardino, CA 92404, includes asphalt paving, re-striping, ADA
improvements and minor site enhancements to improve safety and accessibility for
library users. The work will restore the parking lot surface, upgrade access routes, and
ensure the facility remains compliant with ADA accessibility and City Standards.
The Project was publicly advertised for competitive bidding through PlanetBids on
October 16, 2025, and bids were opened on November 06, 2025. A total of sixteen
(16) sealed bids were received. The total base bid plus additive alternate prices are as
follows:
Packet Page. 545
2
4
7
0
SN NAME OF BIDDER CITY TOTAL BID
1 PowerTech Inc.Yucaipa $110,367.08
2 Onyx Paving Company, Inc.Yorba Linda $122,000.00
3 Leonida Builders, Inc.Acton $135,450.00
4 Prestige Paving Company, Inc.La Mirada $144,003.26
5 Roadway Engineering & Construction
Corp.
Perris $148,618.00
6 Paveco Construction Inc.Baldwin Park $149,417.50
7 Horizons Construction Co. Int’l, Inc.Orange $150,420.00
8 Cali State Paving, Inc.Riverside $152,179.00
9 Copp Contracting, Inc.Buena Park $155,075.86
10 JB Bostick LLC Anaheim $162,784.00
11 PaveWest, LLC Artesia $168,025.98
12 Global Builders, Inc.Laguna Hills $169,888.00
13 Venture Construction & Management Corona $182,747.00
14 NoLimit Construction Hesperia $189,000.00
15 Guilherme Engineering Victorville $200,000.00
16 RBH Construction & Engineering Inc.Marina del
Rey
$236,050.00
After review, staff determined that PowerTech Inc., of Yucaipa, California, submitted
the lowest responsive and responsible bid in the amount of $110,367.08. Staff have
reviewed PowerTech Inc.’s bid documents, CSLB license, and DIR registration, and
confirmed that all requirements were met. Staff recommends awarding the construction
agreement to PowerTech Inc.
The total Project cost, including contingencies, construction management, and
administrative expenses, is estimated at $220,000. The Project is fully funded through
Measure S, adopted as part of the City’s FY 2025-2026 Capital Improvement Program
(CIP) budget.
Project Cost
Lowest Bid $110,367.08
Contingency & Administrative Cost $109,632.92
Total Construction Cost $220,000.00
The improvements will enhance the functionality, safety, and accessibility of the
library’s parking area, benefiting both patrons and staff, and supporting the City’s
continued commitment to maintaining high-quality public infrastructure and community
facilities.
Funding for this Project was adopted on June 04, 2025, under Measure S as part of
Packet Page. 546
2
4
7
0
the budget adoption process, with an allocated budget of $250,000. Of this amount,
$220,000 is needed for the construction and repaving of the asphalt, leaving a
remaining balance of $30,000 for future expenses or additional Project needs.
Budget
Rowe Library - Parking Lot Surfacing
Improvement Budget $250,000
Project Total Cost $220,000
Remaining Budget for
Rowe Library - Parking Lot Surfacing $30,000
Environmental Impact
The Project is categorically exempt from the California Environmental Quality Act
(“CEQA”) pursuant to State CEQA Guidelines Section 15302, Replacement or
Reconstruction (“Class 2”). The Class 2 exemptions allow for the replacement or
reconstruction of existing structures or facilities where the new structure will be
located on the same site as the structure replaced and will have substantially the
same purpose and capacity as the structure replaced. Here, the Project involves
minor improvements and reconstructing the parking facility located on the same site.
The City has also considered whether the proposed Project is subject to any
exception to the Class 2 exemption, as set forth in State CEQA Guidelines section
15300.2. No exception applies for the following reasons:
a) The location exception only applies to Class 3, 4, 5, 6, and 11
exemptions, none of which are being utilized here.
b) The proposed Project would not result in any significant
cumulative impacts on the environment. The cumulative impacts
exception does not apply because the Project has no
incrementally significant impacts on the environment.
c) A categorical exemption may be subject to an exception where
there is a reasonable possibility that the activity will have a
significant effect on the environment due to unusual
circumstances. The proposed Project does not involve any
unusual circumstances and has no potential to result in a
significant impact on the environment.
d) Under the “scenic highways” exception, a categorical exemption
may be subject to an exception where the Project may result in
damage to scenic resources within a highway officially
designated as a state scenic highway. The exception does not
apply here as the Project would not damage any scenic
resources within a state scenic highway.
e) The Project is not located on a site which is included on any list
compiled pursuant to Section 65962.5 of the Government Code.
f) The Project site does not contain a historical resource.
Packet Page. 547
2
4
7
0
2021-2025 Strategic Targets and Goals
Authorizing this agreement aligns with Key Target No. 3: Improved Quality of Life. The
completion of the Rowe Library - Parking Lot Surfacing Project will enhance the safety,
accessibility, and functionality of the library’s parking facilities, ensuring a more
welcoming and secure environment for all patrons and staff. These improvements
support the City’s goal of maintaining high-quality public spaces and community-
serving infrastructure.
Fiscal Impact
The total Project cost is $220,000 and will be funded through Measure S, which was
adopted as part of the City’s budget on June 4, 2025, with an allocation of $250,000.
There is sufficient budget within the department’s FY25-26 CIP budget to fund this
agreement.
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino,
California;
1. Approve the award of a Construction Agreement with PowerTech Inc., in
the amount of $110,367.08 for the Rowe Library - Parking Lot Surfacing
(Project); and
2. Authorize the construction contingencies, construction management, and
administrative costs in the total amount of $109,632.92 for the Project,
bringing the total Project budget to $220,000; and
3. Authorize the City Manager or designee to execute all documents with
PowerTech Inc.; and
4. Authorize the City Manager or designee to expend the contingency fund,
if necessary, to complete the Project.
Attachments
Attachment 1 Agreement with PowerTech Inc.
Attachment 2 Bid Tabulation
Attachment 3 Bid Proposal
Attachment 4 Location Map
Ward:
Ward 7
Synopsis of Previous Council Actions:
June 04, 2025, FY 2025/2026 Budget Presentation (All Wards)
CC: Eric Levitt, City Manager
Packet Page. 548
00 52 13 – CONTRACT FOR CONSTRUCTION
This Contract for Construction (“Contract”), CIP No. PR26-003, Contract - Specifications No.
13668 is made and entered into this 21st day of January, 2026 by and between the CITY OF
SAN BERNARDINO , with its principal place of business at Vanir Tower, 290 North D Street, San
Bernardino, California 92401, sometimes hereinafter called the “City” and PowerTech Inc.,
sometimes hereinafter called “Contractor.”
WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these
presents do covenant and agree with each other as follows:
ARTICLE 1. SCOPE OF WORK.
The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide
all labor, materials, equipment, tools, utility services, and transportation to complete all of the
Work required in strict compliance with the Contract Documents as specified in Article 5, below,
for the following Project:
Rowe Library – Parking Lot Surfacing, PR26-003, Specifications No. 13668
Contractor is an independent contractor and not an agent of the City. The Contractor and its
surety shall be liable to the City for any damages arising as a result of the Contractor’s failure to
comply with this obligation.
ARTICLE 2. TIME FOR COMPLETION.
Time is of the essence in the performance of the Work. The Work shall be commenced on the
date stated in the City’s Notice to Proceed. The Contractor shall complete all Work required by
the Contract Documents within 90 calendar days from the commencement date stated in the
Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set forth
above is adequate and reasonable to complete the Work.
ARTICLE 3. CONTRACT PRICE.
The City shall pay to the Contractor as full compensation for the performance of the Contract,
subject to any additions or deductions as provided in the Contract Documents, and including all
applicable taxes and costs, the sum of One Hundred Ten Thousand, Three Hundred Sixty-
Seven Dollars And Eight Cents ($110,367.08). Payment shall be made as set forth in the
General Conditions. The City will pay to Contractor compensation based upon the prices set forth
in the Bid Schedule.
ARTICLE 4. LIQUIDATED DAMAGES.
Contractor acknowledges that the City will sustain actual damages for each and every Day
completion of the Project is delayed beyond the Contract Time. Because of the nature of the
Project, it would be impracticable or extremely difficult to determine the City’s actual damages.
Accordingly, in accordance with Government Code section 53069.85, it is agreed that the
Contractor will pay the City the sum of $1,500 for each and every calendar day of delay beyond
the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages
and not as a penalty or forfeiture. In the event this is not paid, the Contractor agrees the City may
deduct that amount from any money due or that may become due the Contractor under the
Packet Page. 549
Contract. This Section does not exclude recovery of other damages specified in the Contract
Documents. Liquidated damages may be deducted from progress payments due Contractor,
Project retention or may be collected directly from Contractor, or from Contractor's surety. These
provisions for liquidated damages shall not prevent the City, in case of Contractor's default, from
terminating the Contractor.
ARTICLE 5. COMPONENT PARTS OF THE CONTRACT.
The “Contract Documents” include the following:
Notice Inviting Bids
Instructions to Bidders
Bid Forms
Bid Acknowledgement
Bid Schedule
Bid Guarantee
Designation of Subcontractors
Information Required of Bidders
Non-Collusion Declaration Form
Iran Contracting Act Certification
Public Works Contractor DIR Registration Certification
Performance Bond
Payment (Labor and Materials) Bond
Contract for Construction
General Conditions
Special Conditions
Specifications
Addenda
Appendices
Construction Plans and Drawings
Standard Specifications for Public Works Construction “Greenbook”, latest edition,
Except sections 1-9
Applicable Local Agency Standards and Specifications, as last revised
Reference Specifications
Approved and fully executed Change Orders
Permits
Any other documents contained in or incorporated into the Contract
The Contractor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the
Contract Documents and not by others shall be done as if required by all. In the event of conflict,
the various Contract Documents will be given effect in the order set forth in the General
Conditions. This Contract shall supersede any prior agreement of the parties.
ARTICLE 6. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE.
Each and every provision of law required to be included in these Contract Documents shall be
deemed to be included in these Contract Documents. The Contractor shall comply with all
requirements of applicable federal, state and local laws, rules and regulations, including, but not
Packet Page. 550
limited to, the provisions of the California Labor Code and California Public Contract Code which
are applicable to this Work.
ARTICLE 7. INDEMNIFICATION.
Contractor shall provide indemnification and defense as set forth in the General Conditions.
ARTICLE 8. PREVAILING WAGES.
Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor
Code which such rates shall be made available at the City’s Office or may be obtained online at
http://www.dir.ca.gov and which must be posted at the job site.
ARTICLE 9. FALSE CLAIMS.
Contractor acknowledges that if a false claim is submitted to the City, it may be considered fraud
and Contractor may be subject to criminal prosecution. Contractor acknowledges that the False
Claims Act, California Government Code sections 12650, et seq., provides for civil penalties
where a person knowingly submits a false claim to a public entity. These provisions include within
their scope false claims made with deliberate ignorance of the false information or in reckless
disregard of the truth or falsity of the information. In the event the City seeks to recover penalties
pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorneys’
fees. Contractor hereby acknowledges that the filing of a false claim may the Contractor to an
administrative debarment proceeding wherein Contractor may be prevented from further bidding
on public contracts for a period of up to five (5) years.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
Packet Page. 551
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on
the day and year above written.
By:
Eric Levitt
City Manager
ATTEST:
By:
Telicia Lopez, City Clerk
APPROVED AS TO FORM:
By:
Best Best & Krieger LLP
City Attorney
PowerTech Inc.
PRESIDENT OR VICE PRESIDENT AND
SECRETARY OR TREASURER REQUIRED]
By:
Its:
Printed Name:
By:
Its:
Printed Name:
____________________________________
Contractor’s License Number and
Classification
____________________________________
(CONTRACTOR’S SIGNATURE MUST BE
NOTARIZED AND CORPORATE
SEAL AFFIXED, IF APPLICABLE)
END OF CONTRACT
Packet Page. 552
Notary Acknowledgment
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Name Of Person(s) Or Entity(ies)
Packet Page. 553
ACKNOWLEDGEMENT OF INSURANCE REQUIREMENTS
VENDOR NAME: PHONE:
ADDRESS:
The Proposer shall demonstrate the willingness and ability to provide the required insurance
coverage as set forth in the City requirements within ten (10) calendar days of notification of
selection for contract award. The insurance requirements are detailed below:
MINIMUM INSURANCE REQUIREMENTS
RFQ F-25-4052 VILLASENOR LIBRARY PARKING LOT SURFACING CIP NO. PR26-002
CONTRACT SPECIFICATION NO. 13663
Commercial General Liability $2,000,000 per occurrence/$4,000,000
aggregate
and property damage
aggregate
By signing below, the Proposer acknowledges that they have reviewed the City’s insurance
requirements and confirm their ability to meet these requirements within the specified timeframe.
SUBMITTED BY: DATE: ___________________
(Authorized Representative Signature)
PRINT NAME: TITLE: ___________________
Packet Page. 554
00 61 13 – BOND FORMS
Performance Bond
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, the CITY OF SAN BERNARDINO , with its principal place of business at
Vanir Tower, 290 North D Street, San Bernardino, California 92401, (hereinafter referred to as
the “City”) has awarded to _________________________, (hereinafter referred to as the
“Contractor”) an agreement for Contract No._________, (hereinafter referred to as the
“Project”).
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the
Contract Documents for the Project dated ________________, (hereinafter referred to as
“Contract Documents”), the terms and conditions of which are expressly incorporated herein by
reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof
and to furnish a bond for the faithful performance of said Contract Documents.
NOW, THEREFORE, we, ______________________, the undersigned Contractor and
________________________________________________ as Surety, a corporation organized
and duly authorized to transact business under the laws of the State of California, are held and
firmly bound unto the City in the sum of ___________________________ DOLLARS,
($____________), said sum being not less than one hundred percent (100%) of the total
amount of the Contract, for which amount well and truly to be made, we bind ourselves, our
heirs, executors and administrators, successors and assigns, jointly and severally, firmly by
these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs,
executors, administrators, successors or assigns, shall in all things stand to and abide by, and
well and truly keep and perform the covenants, conditions and agreements in the Contract
Documents and any alteration thereof made as therein provided, on its part, to be kept and
performed at the time and in the manner therein specified, and in all respects according to their
intent and meaning; and shall faithfully fulfill all obligations including the one (1) year guarantee
of all materials and workmanship; and shall indemnify and save harmless the City, its officials,
officers, employees, and authorized volunteers, as stipulated in said Contract Documents, then
this obligation shall become null and void; otherwise it shall be and remain in full force and
effect.
As a part of the obligation secured hereby and in addition to the face amount specified
therefore, there shall be included costs and reasonable expenses and fees including reasonable
attorney’s fees, incurred by the City in enforcing such obligation.
As a condition precedent to the satisfactory completion of the Contract Documents, unless
otherwise provided for in the Contract Documents, the above obligation shall hold good for a
period of one (1) year after the acceptance of the work by the City, during which time if
Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally
protect the City from loss or damage resulting from or caused by defective materials or faulty
workmanship. The obligations of Surety hereunder shall continue so long as any obligation of
Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s
Packet Page. 555
obligations under the Contract, law or equity, including, but not limited to, California Code of
Civil Procedure Section 337.15.
Whenever Contractor shall be, and is declared by the City to be, in default under the Contract
Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall
promptly, at the City’s option:
i. Take over and complete the Project in accordance with all terms and conditions in
the Contract Documents; or
ii. Obtain a bid or bids for completing the Project in accordance with all terms and
conditions in the Contract Documents and upon determination by Surety of the
lowest responsive and responsible bidder, arrange for a Contract between such
bidder, the Surety and the City, and make available as work progresses sufficient
funds to pay the cost of completion of the Project, less the balance of the contract
price, including other costs and damages for which Surety may be liable. The term
“balance of the contract price” as used in this paragraph shall mean the total
amount payable to Contractor by the City under the Contract and any modification
thereto, less any amount previously paid by the City to the Contractor and any
other set offs pursuant to the Contract Documents.
iii. Permit the City to complete the Project in any manner consistent with California
law and make available as work progresses sufficient funds to pay the cost of
completion of the Project, less the balance of the contract price, including other
costs and damages for which Surety may be liable. The term “balance of the
contract price” as used in this paragraph shall mean the total amount payable to
Contractor by the City under the Contract and any modification thereto, less any
amount previously paid by the City to the Contractor and any other set offs
pursuant to the Contract Documents.
Surety expressly agrees that the City may reject any contractor or subcontractor which may be
proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.
Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from
Contractor for completion of the Project if the City, when declaring the Contractor in default,
notifies Surety of the City’s objection to Contractor’s further participation in the completion of the
Project.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract Documents or to the Project to be performed
thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice
of any such change, extension of time, alteration or addition to the terms of the Contract
Documents or to the Project.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
Packet Page. 556
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of
______________, 20___.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
The rate of premium on this bond is ____________ per thousand. The total amount of premium
charges is $_______________________________.
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________
___________________________________________
___________________________________________
(Name and Address of Agent or ___________________________________________
Representative for service of ___________________________________________
process in California, if different ___________________________________________
from above)
(Telephone number of Surety ___________________________________________
and Agent or Representative for
service of process in California)
Packet Page. 557
Notary Acknowledgment
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Name Of Person(s) Or Entity(ies)
NOTE: This acknowledgment is to be completed for Contractor/Principal.
Packet Page. 558
Notary Acknowledgment
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Name Of Person(s) Or Entity(ies)
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of Attorney to
local representatives of the bonding company must also be attached.
END OF PERFORMANCE BOND
Packet Page. 559
Payment Bond (Labor and Materials).
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the CITY OF SAN BERNARDINO , with its principal place of business at Vanir
Tower, 290 North D Street, San Bernardino, California 92401 (hereinafter designated as the
“City”), by action taken or a resolution passed ___________________ , 20_____, has awarded
to ________________________ hereinafter designated as the “Principal,” a contract for the
work described as follows: Contract No.____________ (the “Project”); and
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the
Contract Documents for the Project dated ________________, (hereinafter referred to as
“Contract Documents”), the terms and conditions of which are expressly incorporated herein by
reference; and
WHEREAS, said Principal is required to furnish a bond in connection with said contract;
providing that if said Principal or any of its Subcontractors shall fail to pay for any materials,
provisions, provender, equipment, or other supplies used in, upon, for or about the performance
of the work contracted to be done, or for any work or labor done thereon of any kind, or for
amounts due under the Unemployment Insurance Code or for any amounts required to be
deducted, withheld, and paid over to the Employment Development Department from the wages
of employees of said Principal and its Subcontractors with respect to such work or labor the
Surety on this bond will pay for the same to the extent hereinafter set forth.
NOW THEREFORE, we, the Principal and __________________________ as Surety, are held
and firmly bound unto the City in the penal sum of ______________ Dollars ($___________)
lawful money of the United States of America, for the payment of which sum well and truly to be
made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its
subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of
the persons named in Civil Code Section 9100, fail to pay for any materials, provisions or other
supplies, used in, upon, for or about the performance of the work contracted to be done, or for
any work or labor thereon of any kind, or amounts due under the Unemployment Insurance
Code with respect to work or labor performed under the contract, or for any amounts required to
be deducted, withheld, and paid over to the Employment Development Department or Franchise
Tax Board from the wages of employees of the contractor and his subcontractors pursuant to
Revenue and Taxation Code Section 18663, with respect to such work and labor the Surety or
Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and
also, in case suit is brought upon this bond, all litigation expenses incurred by the City in such
suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation
expenses.
This bond shall inure to the benefit of any of the persons named in Civil Code Section 9100 so
as to give a right of action to such persons or their assigns in any suit brought upon this bond.
It is further stipulated and agreed that the Surety on this bond shall not be exonerated or
released from the obligation of this bond by any change, extension of time for performance,
addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement
pertaining or relating to any scheme or work of improvement herein above described, or
Packet Page. 560
pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any
change or modification of any terms of payment or extension of the time for any payment
pertaining or relating to any scheme or work of improvement herein above described, nor by any
rescission or attempted rescission or attempted rescission of the contract, agreement or bond,
nor by any conditions precedent or subsequent in the bond attempting to limit the right of
recovery of claimants otherwise entitled to recover under any such contract or agreement or
under the bond, nor by any fraud practiced by any person other than the claimant seeking to
recover on the bond and that this bond be construed most strongly against the Surety and in
favor of all persons for whose benefit such bond is given, and under no circumstances shall
Surety be released from liability to those for whose benefit such bond has been given, by
reason of any breach of contract between the owner or the City and original contractor or on the
part of any obligee named in such bond, but the sole conditions of recovery shall be that
claimant is a person described in Civil Code Section 9100, and has not been paid the full
amount of his claim.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract to be performed thereunder, shall in any way
affect its obligations on this bond, and it does hereby waive notice of any such change,
extension of time, alteration or addition to the terms of Contract, including but not limited to, the
provisions of Sections 2819 and 2845 of the California Civil Code.
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of
______________, 20__.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
Packet Page. 561
Notary Acknowledgment
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Name Of Person(s) Or Entity(ies)
NOTE: This acknowledgment is to be completed for Contractor/Principal.
Packet Page. 562
Notary Acknowledgment
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Name Of Person(s) Or Entity(ies)
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to local
representatives of the bonding company must also be attached.
END OF PAYMENT BOND
Packet Page. 563
00 72 00 – GENERAL CONDITIONS
ARTICLE 1 -TERMS; DEFINITIONS
1.1 Defined Terms
A. Whenever used in the Contract Documents and printed with initial capital letters, the
terms listed below will have the meanings indicated which are applicable to both the
singular and plural thereof. In addition to terms specifically defined below, terms with
initial capital letters in the Contract Documents include references to identified
articles and paragraphs, and the titles of other documents or forms.
1. Act of God – An earthquake of magnitude of 3.5 or higher on the Richter scale or
a tidal wave.
2. Addenda -- Written or graphic instruments issued prior to the submission of Bids
which clarify, correct, or change the Contract Documents.
3. Additional Work -- New or unforeseen work will be classified as “Additional Work”
when the Engineer determines that it is not covered by the Contract.
4. Applicable Laws -- The laws, statutes, ordinances, rules, codes, regulations,
permits, and licenses of any kind, issued by local, state or federal governmental
authorities or private authorities with jurisdiction (including utilities), to the extent
they apply to the Work.
5. Bid -- The offer or proposal of a Bidder submitted on the prescribed form setting
forth the prices and other terms for the Work to be performed.
6. Bid Guarantee -- The Bid Bond, cashier’s check, or certified check to be made by
the Bidder, which is to accompany the Bid as a guaranty of good faith to enter into
a written contract.
7. Bidder -- The individual or entity who submits a Bid directly to the City.
8. Change Order (“CO”) -- A document that authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Times,
issued on or after the Effective Date of the Contract, in accordance with the
Contract Documents and in the form contained in the Contract Documents.
9. Change Order Request (“COR”) -- A request made by the Contractor for an
adjustment in the Contract Price and/or Contract Times as the result of a
Contractor-claimed change to the Work. This term may also be referred to as a
Change Order Proposal (“COP”), or Request for Change (“RFC”).
10. City’s Representative – The City Engineer, and acting through properly authorized
agents, such as the Engineer or such other agents acting within the scope of the
particular duties entrusted to them. Also sometimes referred to as the “City’s
Representative” or “Representative” in the Contract Documents. The terms the
City and Owner may be used interchangeably
Packet Page. 564
11. Claim -- A demand or assertion by the City or Contractor seeking an adjustment of
Contract Price or Contract Times, or both, or other relief with respect to the terms
of the Contract. A demand for money or services by a third party is not a Claim.
12. Contract -- The entire integrated written agreement between the City and
Contractor concerning the Work. “Contract” may be used interchangeably with
“Agreement” in the Contract Documents. The Contract supersedes prior
negotiations, representations, or agreements, whether written or oral, and includes
all Contract Documents.
13. Contract Documents -- The documents listed in Section 00 52 13, Article 5 of the
Contract for Construction. Some documents provided by the City to the Bidders
and Contractor, including but not limited to reports and drawings of subsurface and
physical conditions are not Contract Documents.
14. Contract Price -- Amount to be paid by the City to the Contractor as full
compensation for the performance of the Contract and completion of the Work,
subject to any additions or deductions as provided in the Contract Documents, and
including all applicable taxes and costs.
15. Contract Time -- The number of days or the dates stated in the Contract
Documents to: achieve defined milestones, if any; and to complete the Work so
that it is ready for final payment.
16. Contractor -- The individual or entity with which the City has contracted for
performance of the Work.
17. Contractor’s Designated On-Site Representative -- The Contractor’s Designated
On-Site Representative will be identified by the Contractor and shall not be
changed without prior written consent of the City.
18. Critical Supply Shortage -- An unusual shortage in materials that is (a) supported
by documented proof that Contractor made every effort to obtain such materials
from all available sources; (b) such shortage is due to the fact that such materials
are not physically available from single or multiple sources or could have been
obtained only at exorbitant prices entirely inconsistent with current and standard
rates taking into account the quantities involved and the usual industry practices
in obtaining such quantities; and (c) such shortages and the difficulties in obtaining
alternate sources of materials could not have been known or anticipated by
Contractor at the time it submitted its bid or entered the Contract. Market
fluctuations in prices of materials, whether or not resulting from a Force Majeure
Event, does not constitute a Critical Supply Shortage.
19. Daily Rate -- The Daily Rate stipulated in the Contract Documents as full
compensation to the Contractor due to the City’s unreasonable delay to the Project
that was not contemplated by the parties.
20. Day -- A calendar day of 24 hours measured from midnight to the next midnight.
21. Defective Work -- Work that is unsatisfactory, faulty, or deficient; or that does not
conform to the Contract Documents; or that does not meet the requirements of any
Packet Page. 565
inspection, reference standard, test, or approval referenced in the Contract
Documents.
22. Demobilization -- The complete dismantling and removal by the Contractor of all
of the Contractor’s temporary facilities, equipment, and personnel at the Site.
23. Drawings -- That part of the Contract Documents prepared by of the Engineer of
Record which graphically shows the scope, extent, and character of the Work to
be performed by Contractor. Shop Drawings and other Contractor Submittals are
not Drawings as so defined.
24. Effective Date of the Contract -- The date indicated in the Contract on which it
becomes effective, but if no such date is indicated, it means the date on which the
Contract is signed and delivered by the last of the two parties to sign and deliver.
25. Engineer -- Whenever not qualified, shall mean the City Engineer or the Engineer
authorized to act for and in behalf of the City, acting either directly or through
properly authorized agents, such agents acting severally within the scope of the
particular duties entrusted to them.
26. Force Majeure Event -- An event that materially affects a party’s performance and
is one or more of the following: (1) Acts of God or other natural disasters occurring
at the Site; (2) terrorism or other acts of a public enemy; (3) orders of governmental
authorities (including, without limitation, unreasonable and unforeseeable delay in
the issuance of permits or approvals by governmental authorities that are required
for the Work); (4) pandemics, epidemics or quarantine restrictions; (5) strikes and
other organized labor action occurring at the Site and the effects thereof on the
Work, only to the extent such strikes and other organized labor action are beyond
the control of Contractor and its Subcontractors, of every Tier, and to the extent
the effects thereof cannot be avoided by use of replacement workers; and (6) a
Critical Supply Shortage. For purposes of this section, “orders of governmental
authorities,” includes ordinances, emergency proclamations and orders, rules to
protect the public health, welfare and safety, and other actions of the City in its
capacity as a municipal authority.
27. Hazardous Waste -- The term “Hazardous Waste” shall have the meaning provided
in Section 104 of the Solid Waste Disposal Act (42 U.S.C. § 6903) as amended
from time to time, or any substance or material identified as hazardous under any
state or federal statute governing handling, disposal and/or cleanup of any such
substance or material, whichever is more restrictive.
28. Holiday – Holidays occur on:
New Year’s Day - January 1
Martin Luther King Jr Day – January 20
President’s Day – Third Monday in February
Memorial Day - Last Monday in May
Juneteenth – June 19
Independence Day - July 4
Labor Day - First Monday in September
Veteran’s Day - November 11
Packet Page. 566
Thanksgiving Day - Fourth Thursday in November
Friday after Thanksgiving
Christmas Eve – December 24
Christmas Day - December 25
Day After Christmas – December 26
New Year’s Eve – December 31
If any Holiday listed above falls on a Saturday, Saturday and the preceding Friday are
both Holidays. If the Holiday should fall on a Sunday, Sunday and the following Monday
are both Holidays.
29. Notice of Award -- The written notice by the City to the Successful Bidder stating
that upon timely compliance by the Successful Bidder with the conditions
precedent listed therein, the City will sign and deliver the Contract.
30. Notice of Completion -- The form which may be executed by the City constituting
final acceptance of the Project.
31. Notice to Proceed -- A written notice given by the City to Contractor fixing the date
on which the Contractor may proceed with the Work and when Contract Times will
commence to run.
32. Project -- The total construction of which the Work to be performed under the
Contract Documents may be the whole, or a part.
33. Record Drawings – The record set of as-builts prepared by the Contractor during
the Work in accordance with the requirements of the General Conditions.
34. Recyclable Waste Materials -- Materials removed from the Site which are required
to be diverted to a recycling center rather than an area landfill. Recyclable Waste
Materials include, but are not limited to, asphalt, concrete, brick, concrete block,
and rock.
35. Sample -- A physical example furnished by the Contractor to illustrate materials,
equipment or workmanship; to establish standards by which the Work will be
judged.
36. Schedule of Submittals -- A schedule, prepared and maintained by Contractor, of
required submittals and the time requirements to facilitate scheduled performance
of related construction activities.
37. Shop Drawings -- All drawings, diagrams, illustrations, schedules, and other data
or information which are specifically prepared or assembled by or for Contractor
and submitted by Contractor to illustrate some portion of the Work.
38. Site -- Lands or areas indicated in the Contract Documents as being furnished by
the City upon which the Work is to be performed, including rights-of-way and
easements for access thereto, and such other lands furnished by the City which
are designated for the use of Contractor.
Packet Page. 567
39. Specifications -- That part of the Contract Documents consisting of written
requirements for materials, equipment, systems, standards and workmanship as
applied to the Work, and certain administrative requirements and procedural
matters applicable thereto.
40. Stop Payment Notice -- A written notice as defined in Civil Code section 8044.
41. Subcontractor -- An individual or entity other than a Contractor having a contract
with any other entity than the City for performance of any portion of the Work at
the Site.
42. Submittal -- Written and graphic information and physical samples prepared and
supplied by the Contractor demonstrating various portions of the Work.
43. Successful Bidder -- The responsible Bidder submitting a responsive Bid to whom
the City makes an award.
44. Supplier -- A manufacturer, fabricator, supplier, distributor, material man, or vendor
having a direct contract with Contractor or with any Subcontractor to furnish
materials or equipment used in the performance of the Work or to be incorporated
in the Work.
45. Underground Facilities -- All underground pipelines, conduits, ducts, cables, wires,
manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any
encasements containing such facilities, including those that convey electricity,
gases, steam, liquid petroleum products, telephone or other communications,
cable television, water, wastewater, storm water, other liquids or chemicals, or
traffic or other control systems.
46. Unit Price Work -- Work to be paid for on the basis of unit prices as provided by
the Contractor in its Bid or as adjusted in accordance with the Contract Documents.
47. Warranty -- A guarantee provided to the City by the Contractor that the Work will
remain free of defects and suitable for its intended use for the period required by
the Contract Documents or the longest period permitted by the law of this state,
whichever is longer.
48. Work -- The entire construction or the various separately identifiable parts thereof
required to be provided under the Contract Documents. Work includes and is the
result of performing or providing all labor, services, and documentation necessary
to produce such construction, and furnishing, installing, and incorporating all
materials and equipment into such construction, all as required by the Contract
Documents.
1.2 Terminology.
A. The words and terms below are not defined but, when used in the Contract
Documents, have the indicated meaning.
1. The word “furnish,” when used in connection with services, materials, or
equipment, shall mean to supply and deliver said services, materials, or equipment
Packet Page. 568
to the Site (or some other specified location) ready for use or installation and in
usable or operable condition.
2. The word “install,” when used in connection with services, materials, or equipment,
shall mean to put into use or place in final position said services, materials, or
equipment complete and ready for intended use.
3. The words “perform” or “provide,” when used in connection with services,
materials, or equipment, shall mean to furnish and install said services, materials,
or equipment complete and ready for intended use.
4. Regardless of whether “furnish,” “install,” “perform,” or “provide” is used in
connection with services, materials, or equipment, an obligation of Contractor is
implied.
5. The word “work” that which is proposed to be constructed or done under the
Contract or permit, including the furnishing of all labor, materials, equipment, and
services.
B. Unless stated otherwise in the Contract Documents, words or phrases that have a
well-known technical or construction industry or trade meaning are used in the
Contract Documents in accordance with such recognized meaning.
ARTICLE 2 -PRELIMINARY MATTERS
2.1 Delivery of Contract Documents
A. Within ten (10) Days after receipt of the Notice of Award and before the City will
execute the Contract, the Contractor shall furnish and file with the City a signed
Contract and the necessary Performance Bond, Payment Bond, and Certificates of
Insurance and Endorsements, as well as any other documents specified in the
Contract Documents.
2.2 Bonds
A. Contractor shall submit the bonds on the forms provided with the Contract
Documents, duly executed by a responsible corporate surety admitted to transact
surety business in the State of California, as defined in Code of Civil Procedure
section 995.120, and listed in the United States Department of the Treasury circular
entitled "Companies Holding Certificates of Authority as Acceptable Sureties on
Federal Bonds and as Acceptable Reinsuring Companies," authorized to do
business in the State of California and acceptable to the City conditioned upon the
faithful performance by the Contractor of all requirements of the Contract
Documents. Each of the bonds shall be in a sum no less than one hundred percent
(100%) of the Contract Price. Bonds shall be delivered to the City within ten (10)
Days after receipt of the Notice of Award and before execution of the Contract by
the City.
Packet Page. 569
2.3 Evidence of Insurance
A. Prior to commencing any Work but no later than ten (10) Days after receipt of the
Notice of Award, the Contractor shall submit or cause to be submitted any and all
Certificates of Insurance and Endorsements, showing that the Contractor has the
required insurance, to the attention of the City. Such insurance is to be provided at
the sole cost and expense of the Contractor. No Work shall be performed until all of
the required insurance has been received and approved.
2.4 Execution of the Contract
A. Upon receipt of the required Contract Documents, the City will execute the Contract,
establishing the Effective Date of the Contract.
2.5 Contractor’s Failure to Perform
A. Should Contractor fail to comply with timelines provided above, the City shall retain
the right to enforce and collect on the Contractor’s Bid Guarantee, rescind award to
the Contractor and award the Contract to the next lowest responsive, responsible
bidder as determined by the City. If the City elects to accept bonds and insurance
submitted late, the Contract Times will begin to run as of the date stated in the Notice
to Proceed. However, the number of days beyond the original ten (10) Days it took
to receive the properly executed Contract and related items may be deducted from
the Contract Times.
2.6 Commencement of Contract Times; Notice to Proceed
A. The City will not issue a Notice to Proceed until after the Effective Date of the Contract.
Work shall commence within ten (10) Days of the date stated in the Notice to Proceed.
The Contract Times begin to run on the date specified in the Notice to Proceed. No
Work shall be done at the Site prior to the issuance of the Notice to Proceed.
2.7 Copies of Documents
A. Contractor will be furnished, free of charge, five (5) copies of the Contract
Documents. Additional copies may be obtained at cost of reproduction. Contractor
shall maintain a clean, undamaged set of Contract Documents, including Submittals,
at the Project site.
2.8 Substitution Requests, Schedule of Submittals, and Schedule
A. Substitution Requests. Within fifteen (15) Days after Notice of Award (unless
otherwise specified in the Contract Documents), Contractor shall provide all
substitution requests as further described in Section 00 72 00, Article 6.5.
B. Schedule of Submittals. Within five (5) Days after the issuance of the Notice of
Proceed (unless otherwise specified in the Contract Documents), Contractor shall
submit to the City a Schedule of Submittals that conforms with the requirements of
Section 00 72 00, Article 5.21.
Packet Page. 570
C. Schedule. Within ten (10) days after the issuance of the Notice of Proceed (unless
otherwise specified in the Contract Documents), the Contractor shall submit a
construction schedule that conforms with the requirements of Section 00 72 00,
Article 8.2.
2.9 Preconstruction Conference; Designation of Authorized Representatives.
A. Before any Work at the Site is started, a conference attended by the City, Contractor,
Engineer, and others as appropriate will be held to establish a working
understanding among the parties as to the Work and to discuss the schedules
referred to herein, procedures for handling Submittals and Shop Drawings,
processing applications for payment, and maintaining required records.
B. At this conference the City and Contractor each shall designate, in writing, a specific
individual to act as its authorized representative with respect to the services and
responsibilities under the Contract. Such individuals shall have the authority to
transmit instructions, receive information, render decisions relative to the Contract,
and otherwise act on behalf of each respective party.
2.10 Subcontractor Mobilization Meeting.
A. Prior to the start of each major Subcontractor’s Site Work, the Contractor, the
involved Subcontractor, and Engineer shall attend a pre-start meeting to discuss the
schedule, coordination, procedures, and other administrative issues.
2.11 Authority of Board; Engineer
A. The Board has the final authority in all matters affecting the Work. Within the scope
of the Contract, the Engineer has the authority to enforce compliance with the
Contract Documents. The Contractor shall promptly comply with instructions from
the Engineer.
B. The decision of the Engineer is final and binding on all questions relating to:
1. quantities;
2. acceptability of material, equipment, or work;
3. execution, progress or sequence of work;
4. interpretation of the Plans, Specifications, or other Contract Documents; and
5. Any other areas specifically identified in the Contract Documents or under the law.
C. Compliance with instructions from the Engineer shall be a condition precedent to any
payment under the Contract, unless otherwise ordered by the Board.
2.12 Mobilization
A. When a Bid item is included in the Bid Schedule for mobilization, the costs of Work
in advance of construction operations and not directly attributable to any specific bid
Packet Page. 571
item will be included in the progress estimate. When no bid item is provided for
mobilization payment for such costs will be deemed to be included in the other items
of the Work.
B. Payment for mobilization based on the lump sum provided in the Bid Schedule, shall
constitute full compensation for all such Work. No payment for mobilization will be
made until all of the listed items have been completed to the satisfaction of the
Engineer. The scope of the Work included under mobilization shall include, but shall
not be limited to, the following principal items:
1. Obtaining and paying for all bonds, insurance, and permits.
2. Moving on to the Project Site of all Contractor’s plant and equipment required for
the first month’s operations.
3. Installing temporary construction power, wiring, and lighting facilities, as
applicable.
4. Establishing fire protection system, as applicable.
5. Developing and installing a construction water supply, as applicable.
6. Providing and maintaining the field office trailers for the Contractor, if necessary,
and the Engineer (if specified), complete, with all specified furnishings and utility
services.
7. Providing on-site sanitary facilities and potable water facilities as specified per Cal-
OSHA and these Contract Documents.
8. Furnishing, installing, and maintaining all storage buildings or sheds required for
temporary storage of products, equipment, or materials that have not yet been
installed in the Work. All such storage shall meet manufacturer’s specified storage
requirements, and the specific provisions of the specifications, including
temperature and humidity control, if recommended by the manufacturer, and for
all security.
9. Arranging for and erection of Contractor’s work and storage yard.
10. Posting all OSHA required notices and establishment of safety programs per Cal-
OSHA.
11. Full-time presence of Contractor’s superintendent at the job Site as required
herein.
12. Submittal of construction schedule as required by the Contract Documents.
Packet Page. 572
ARTICLE 3 -CONTRACT DOCUMENTS; INTENT
3.1 Examination of Drawings, Specifications, and Site of Work
A. Examination of Contract Documents; Site. Before commencing any portion of the
Work, Contractor shall again carefully examine all applicable Contract Documents,
the Project Site, and other information given to Contractor as to materials and
methods of construction and other Project requirements. Contractor shall
immediately notify the Engineer of any potential error, inconsistency, ambiguity,
conflict, or lack of detail or explanation. If Contractor performs, permits, or causes
the performance of any Work which is in error, inconsistent or ambiguous, or not
sufficiently detailed or explained, Contractor shall bear any and all resulting costs,
including, without limitation, the cost of correction. In no case shall the Contractor
or any Subcontractor proceed with Work if uncertain as to the applicable
requirements.
B. Additional Instructions. After notification of any error, inconsistency, ambiguity,
conflict, or lack of detail or explanation, the Engineer will provide any required
additional instructions, by means of drawings or other written direction, necessary
for proper execution of Work.
C. Quality of Parts, Construction and Finish. All parts of the Work shall be of the best
quality of their respective kinds and the Contractor must use all diligence to inform
itself fully as to the required construction and finish.
D. Contractor’s Variation from Contract Document Requirements. If it is found that the
Contractor has varied from the requirements of the Contract Documents including
the requirement to comply with all Applicable Laws, the Engineer may at any time,
before or after completion of the Work, order the improper Work removed, remade
or replaced by the Contractor at the Contractor’s expense.
3.2 Intent of Contract Documents
A. The Contract Documents are complementary; what is required by any one will be
binding as if required by all. It is the intent of the Contract Documents to describe a
functionally complete Project (or part thereof) to be constructed in accordance with
the Contract Documents. Any labor, documentation, services, materials, or
equipment that reasonably may be inferred from the Contract Documents or from
prevailing custom or trade usage as being required to produce the indicated result
will be provided whether or not specifically called for, at no additional cost to the City.
B. The Contractor shall furnish, unless otherwise provided in the Contract Documents,
all materials, implements, machinery, equipment, tools, supplies and labor
necessary to the prosecution and completion of the Project.
C. Clarifications and interpretations of the Contract Documents shall be issued by the
Engineer as provided in these General Conditions.
D. If utilities to equipment/fixtures are not shown but are necessary to operate the
equipment/fixtures, the utilities service installation is considered to be part of the
Packet Page. 573
Work. The implied Work will conform to the appropriate sections of the Contract
Documents.
E. Organization of the Contract Documents into divisions, sections, and articles, and
arrangement of drawings shall not control the Contractor in dividing Work among
Subcontractors or in establishing the extent of Work to be performed by any trade.
3.3 Reference Standards.
A. Standards, Specifications, Codes, Laws, and Regulations.
1. Reference to federal specifications, federal standards, other standards,
specifications, manuals, or codes of any technical society, organization, or
association, or to Applicable Laws, whether such reference be specific or by
implication, shall mean the standard, specification, manual, code, or Applicable
Laws in effect at the time of opening of Bids (or on the Effective Date of the
Contract if there were no Bids), except as may be otherwise specifically stated in
the Contract Documents.
2. No provision of any such standard, specification, manual, or code, or any
instruction of a Supplier, shall be effective to change the duties or responsibilities
of the City, Contractor, or any of their Subcontractors, consultants, agents, or
employees, from those set forth in the Contract Documents. No such provision or
instruction shall be effective to assign to the City, or any of their officers, directors,
members, partners, employees, agents, consultants, or subcontractors, any duty
or authority to supervise or direct the performance of the Work or any duty or
authority to undertake responsibility inconsistent with the provisions of the Contract
Documents.
3.4 Reporting and Resolving Discrepancies; Order of Precedence.
A. Reporting Discrepancies.
1. The Contract Documents are intended to be fully cooperative and complementary.
Before undertaking each part of the Work, Contractor shall carefully study and
compare the Contract Documents and check and verify pertinent figures therein
and all applicable field measurements. Contractor shall promptly report in writing
to the City any conflict, error, ambiguity, or discrepancy which Contractor
discovers, should have discovered, or has actual knowledge of, and shall obtain a
written interpretation or clarification from the City before proceeding with any Work
affected thereby. If, during the performance of the Work, Contractor discovers any
conflict, error, ambiguity, or discrepancy within the Contract Documents, or
between the Contract Documents and (i) any Applicable Law, (ii) any standard,
specification, manual, or code, or (iii) any instruction of any Supplier, then
Contractor shall promptly submit a written Request for Information (RFI) to the City.
Contractor shall not proceed with the Work affected thereby (except in an
emergency) until an amendment or supplement to the Contract Documents has
been issued by one of the methods indicated in the Contract Documents, and any
Work performed by Contractor before receipt of an amendment or supplement
shall be at Contractor’s own risk.
Packet Page. 574
B. Order of Precedence.
1. In case of conflicts between the Contract Documents, the order of precedence
shall be as follows:
a. Permits from other agencies as may be required by law
b. Change Orders, most recent first
c. Contract
d. Addenda, most recent first
e. Special Conditions
f. Specifications
g. Construction Plans and Drawings(Contract Drawings)
h. General Conditions
i. Instructions to Bidders
j. Notice Inviting Bids
k. Contractor’s Bid (Bid Forms)
l. Standard Specifications for Public Works Construction “Greenbook” latest
edition (Sections 1-9 Excluded)
m. Applicable Local Agency Standards and Specifications
n. Standard Drawings
o. Reference Documents
2. With reference to the Drawings the order of precedence shall be as follows:
a. Figures govern over scaled dimensions
b. Detail drawings govern over general drawings
c. Addenda/Change Order drawings govern over Drawings
d. Contract Drawings govern over Standard Drawings
e. Contract Drawings govern over Shop Drawings
3. Notwithstanding the orders of precedence established above, in the event of
conflicts, the higher standard, higher quality and most expensive shall always
apply.
Packet Page. 575
3.5 Amending and Supplementing Contract Documents.
A. The Contract Documents may be amended to provide for additions, deletions, and
revisions in the Work or to modify the terms and conditions thereof only by Change
Order or written amendment to the Contract duly executed by the parties.
B. The requirements of the Contract Documents may be supplemented, and minor
variations and deviations in the Work may be authorized at no cost to the City, by
one or more of the following ways:
1. The City’s review of a Submittal, Shop Drawing, Sample or substitution request
without exception (subject to the provisions of the Contract Documents); or
2. The City’s issuance of a response to an RFI.
C. However, no review or RFI response will reduce or modify the Contractor’s obligation
to fully satisfy and comply with the requirements of the Contract Documents.
3.6 Reuse of Documents.
A. Contractor and any Subcontractor or Supplier shall not:
1. have or acquire any title to or ownership rights in any of the Drawings,
Specifications, or other documents (or copies of any thereof) prepared by or
bearing the seal of Engineer of Record or its consultants, including electronic
media editions; or
2. reuse any such Drawings, Specifications, other documents, or copies thereof on
extensions of the Project or any other project without written consent of the City
and Engineer of Record and specific written verification or adaptation by Engineer
of Record.
B. The prohibitions of this Article will survive final payment, or termination of the
Contract. Nothing herein shall preclude Contractor from retaining copies of the
Contract Documents for record purposes.
ARTICLE 4 -INDEMNIFICATION; INSURANCE
4.1 Indemnification
A. To the fullest extent permitted by law, Contractor shall immediately defend (with
counsel of the City’s choosing), indemnify and hold harmless the City, its officials,
officers, agents, employees, and representatives, and each of them from and
against:
1. Any and all claims, demands, causes of action, costs, expenses, injuries, losses
or liabilities, in law or in equity, of every kind or nature whatsoever, but not limited
to, injury to or death, including wrongful death, of any person, and damages to or
destruction of property of any person, arising out of, related to, or in any manner
directly or indirectly connected with the Work or this Contract, including claims
made by subcontractors for nonpayment, including without limitation the payment
Packet Page. 576
of all consequential damages and attorney’s fees and other related costs and
expenses, however caused, regardless of whether the allegations are false,
fraudulent, or groundless, and regardless of any negligence of the City or its
officers, employees, or authorized volunteers (including passive negligence),
except the sole negligence or willful misconduct or active negligence of the City or
its officials, officers, employees, or authorized volunteers.
2. Contractor’s defense and indemnity obligation herein includes, but is not limited to
damages, fines, penalties, attorney’s fees and costs arising from claims under the
Americans with Disabilities Act (ADA) or other federal or state disability access or
discrimination laws arising from Contractor’s Work during the course of
construction of the improvements or after the Work is complete, as the result of
defects or negligence in Contractor’s construction of the improvements.
3. Any and all actions, proceedings, damages, costs, expenses, fines, penalties or
liabilities, in law or equity, of every kind or nature whatsoever, arising out of,
resulting from, or on account of the violation of any governmental law or regulation,
compliance with which is the responsibility of Contractor;
4. Any and all losses, expenses, damages (including damages to the Work itself),
attorney’s fees, and other costs, including all costs of defense which any of them
may incur with respect to the failure, neglect, or refusal of Contractor to faithfully
perform the Work and all of Contractor’s obligations under Contract. Such costs,
expenses, and damages shall include all costs, including attorney’s fees, incurred
by the indemnified parties in any lawsuit to which they are a party.
B. Contractor shall immediately defend, at Contractor’s own cost, expense and risk,
with the counsel of the City choosing, any and all such aforesaid suits, actions or
other legal proceedings of every kind that may be brought or instituted against the
City, its officials, officers, agents, employees and representatives. Contractor shall
pay and satisfy any judgment, award or decree that may be rendered against the
City, its officials, officers, employees, agents, employees and representatives, in any
such suit, action or other legal proceeding. Contractor shall reimburse the City, its
officials, officers, agents, employees and representatives for any and all legal
expenses and costs incurred by each of them in connection therewith or in enforcing
the indemnity herein provided. The only limitations on this provision shall be those
imposed by Civil Code section 2782.
C. The provisions of this Article shall survive the termination of this Contract howsoever
caused, and no payment, partial payment, or acceptance of occupancy in whole or
part of the Work shall waive or release any of the provisions of this Article.
4.2 Insurance
The Contractor shall obtain, and at all times during performance of the Work of Contract, maintain
all of the insurance described in this Article. Contractor shall not commence Work under this
Contract until it has provided evidence satisfactory to the City that it has secured all insurance
required hereunder. Contractor shall not allow any Subcontractor to commence work on any
subcontract until it has provided evidence satisfactory to the City that the subcontractor has
secured all insurance required under this Article. Failure to provide and maintain all required
insurance shall be grounds for the City to terminate this Contract for cause. Contractor shall
Packet Page. 577
furnish the City with original certificates of insurance and endorsements effective coverage
required by this Contract on forms satisfactory to the City. The certificates and endorsements for
each insurance policy shall be signed by a person authorized by that insurer to bind coverage on
its behalf, and shall be on forms acceptable to the City. All certificates and endorsements must
be received and approved by the City before Work commences.
A. Additional Insureds; Waiver of Subrogation. The City, its officials, officers,
employees, agents and authorized volunteers shall be named as Additional Insureds
on Contractor’s All Risk policy and on Contractor’s and its subcontractors’ policies
of Commercial General Liability and Automobile Liability insurance using, for
Contractor’s policy/ies of Commercial General Liability insurance, ISO CG forms 20
10 and 20 37 (or endorsements providing the exact same coverage, including
completed operations), and, for subcontractors’ policies of Commercial General
Liability insurance, ISO CG form 20 38 (or endorsements providing the exact same
coverage). Notwithstanding the minimum limits set forth in this Contract for any type
of insurance coverage, all available insurance proceeds in excess of the specified
minimum limits of coverage shall be available to the parties required to be named as
Additional Insureds hereunder. All insurance coverage maintained or procured
pursuant to this Contract shall be endorsed to waive subrogation against the City, its
officers, officials, agents, employees or volunteers or shall specifically allow
Contractor - or others providing insurance evidence in compliance with these
specifications - to waive their right of recovery prior to a loss. Contractor hereby
waives its own right of recovery against the City, and shall require similar written
express waivers and insurance clauses from each of its subcontractors. Copies of
these waivers shall be submitted to the City prior to commencement of work.
B. Workers’ Compensation Insurance. The Contractor shall provide workers’
compensation insurance for all of the employees engaged in Work under this
Contract, on or at the Site, and, in case of any sublet Work, the Contractor shall
require the subcontractor similarly to provide workers’ compensation insurance for
all the latter’s employees as prescribed by State law. Any class of employee or
employees not covered by a subcontractor’s insurance shall be covered by the
Contractor’s insurance. In case any class of employees engaged in work under this
Contract, on or at the Site, is not protected under the Workers’ Compensation
Statutes, the Contractor shall provide or shall cause a subcontractor to provide,
adequate insurance coverage for the protection of such employees not otherwise
protected. The Contractor is required to secure payment of compensation to his
employees in accordance with the provisions of section 3700 of the Labor Code.
The Contractor shall file with the City certificates of his insurance protecting workers.
Company or companies providing insurance coverage shall be acceptable to the
City, if in the form and coverage as set forth in the Contract Documents.
C. Employer’s Liability Insurance. Contractor shall provide Employer’s Liability
Insurance, including Occupational Disease, in the amount of at least one million
dollars ($1,000,000.00) per person per accident. Contractor shall provide the City
with a certificate of Employer’s Liability Insurance. Such insurance shall comply with
the provisions of the Contract Documents. The policy shall be endorsed, if
applicable, to provide a Borrowed Servant/Alternate Employer Endorsement and
contain a Waiver of Subrogation in favor of the City.
Packet Page. 578
D. Commercial General Liability Insurance. Contractor shall provide “occurrence”
form Commercial General Liability insurance coverage at least as broad as the most
current ISO CGL Form 00 01, including but not limited to, premises liability,
contractual liability, products/completed operations, personal and advertising injury
which may arise from or out of Contractor’s operations, use, and management of the
Site, or the performance of its obligations hereunder. The policy shall not contain
any exclusion contrary to this Contract including but not limited to endorsements or
provisions limiting coverage for (1) contractual liability (including but not limited to
ISO CG 24 26 or 21 39); or (2) cross-liability for claims or suits against one insured
against another. Policy limits shall not be less than $2,000,000 per occurrence for
bodily injury, personal injury and property damage. If Commercial General Liability
Insurance or other form with a general aggregate limit is used, either the general
aggregate limit shall apply separately to this project/location or the general
aggregate limit shall be twice the required occurrence limit. Defense costs shall be
paid in addition to the limits.
1. Such policy shall comply with all the requirements of this Article. The limits set forth
herein shall apply separately to each insured against whom claims are made or
suits are brought, except with respect to the limits of liability. Further the limits set
forth herein shall not be construed to relieve the Contractor from liability in excess
of such coverage, nor shall it limit Contractor’s indemnification obligations to the
City, and shall not preclude the City from taking such other actions available to the
City under other provisions of the Contract Documents or law.
2. All general liability policies provided pursuant to the provisions of this Article shall
comply with the provisions of the Contract Documents.
3. All general liability policies shall be written to apply to all bodily injury, including
death, property damage, personal injury, owned and non-owned equipment,
blanket contractual liability, completed operations liability, explosion, collapse,
under-ground excavation, removal of lateral support, and other covered loss,
however occasioned, occurring during the policy term, and shall specifically insure
the performance by Contractor of that part of the indemnification contained in these
General Conditions relating to liability for injury to or death of persons and damage
to property.
4. If the coverage contains one or more aggregate limits, a minimum of 50% of any
such aggregate limit must remain available at all times; if over 50% of any
aggregate limit has been paid or reserved, the City may require additional
coverage to be purchased by Contractor to restore the required limits. Contractor
may combine primary, umbrella, and as broad as possible excess liability coverage
to achieve the total limits indicated above. Any umbrella or excess liability policy
shall include the additional insured endorsement described in the Contract
Documents.
5. All policies of general liability insurance shall permit and Contractor does hereby
waive any right of subrogation which any insurer of Contractor may acquire from
Contractor by virtue of the payment of any loss.
E. Automobile Liability Insurance. Contractor shall provide Automobile Liability
Insurance at least as broad as ISO CA 00 01 (Any Auto) in the amount of, at least,
Packet Page. 579
one million dollars ($1,000,000) per accident for bodily injury and property damage.
Such insurance shall provide coverage with respect to the ownership, operation,
maintenance, use, loading or unloading of any auto owned, leased, hired or
borrowed by Contractor or for which Contractor is responsible, in a form and with
insurance companies acceptable to the City. All policies of automobile insurance
shall permit and Contractor does hereby waive any right of subrogation which any
insurer of Contractor may acquire from Contractor by virtue of the payment of any
loss.
F. Privacy/Network Security (Cyber). Contractor shall provide Cyber Liability
Insurance, in a form and with insurance companies acceptable to City, in the amount
of, at least, one million dollars ($1,000,000) per occurrence and aggregate. Such
insurance shall provide coverage for: (1) privacy breaches, (2) system breaches, (3)
denial or loss of service, and (4) the introduction, implantation or spread of malicious
software code.
G. Aviation and/or Drone Liability. If Contractor shall utilize drones as part of the Work,
Contractor shall provide Aviation and/or Drone Liability Insurance, in a form and with
insurance companies acceptable to City, in the amount of, at least, one million dollars
($1,000,000) per occurrence limit. Such insurance shall provide coverage for bodily
injury and property damage.
H. Builder’s Risk [“All Risk”]
1. It is the Contractor’s responsibility to maintain or cause to be maintained Builder’s
Risk [“All Risk”] extended coverage insurance on all work, material, equipment,
appliances, tools, and structures that are or will become part of the Work and
subject to loss or damage by fire, and vandalism and malicious mischief, in an
amount to cover 100% of the replacement cost. The City accepts no responsibility
for the Work until the Work is formally accepted by the City. The Contractor shall
provide a certificate evidencing this coverage before commencing performance of
the Work.
2. The named insureds shall be Contractor, all Subcontractors of any tier (excluding
those solely responsible for design work), suppliers, and the City, its elected
officials, officers, employees, agents and authorized volunteers, as their interests
may appear. Contractor shall not be required to maintain property insurance for
any portion of the Work following acceptance by the City.
3. Policy shall be provided for replacement value on an “all risk” basis. There shall
be no coinsurance penalty provision in any such policy. Policy must include: (1)
coverage for any ensuing loss from faulty workmanship, nonconforming work,
omission or deficiency in design or specifications; (2) coverage against machinery
accidents and operational testing; (3) coverage for removal of debris, and insuring
the buildings, structures, machinery, equipment, materials, facilities, fixtures and
all other properties constituting a part of the Project; (4) transit coverage, including
ocean marine coverage (unless insured by the supplier), with sub-limits sufficient
to insure the full replacement value of any key equipment item; and (5) coverage
with sub-limits sufficient to insure the full replacement value of any property or
equipment stored either on or off the Site. Such insurance shall be on a form
acceptable to the City to ensure adequacy and sublimit.
Packet Page. 580
4. In addition, the policy shall meet the following requirements:
a. Insurance policies shall be so conditioned as to cover the performance of any
extra work performed under the Contract.
b. Coverage shall include all materials stored on site and in transit.
c. Coverage shall include Contractor’s tools and equipment.
d. Insurance shall include boiler, machinery and material hoist coverage.
I. NOT USED.
J. Contractor shall require all tiers of Subcontractors working under this Contract to
provide the insurance required under this Article unless otherwise agreed to in
writing by the City. Contractor shall make certain that any and all Subcontractors
hired by Contractor are insured in accordance with this Contract. If any
Subcontractor’s coverage does not comply with the foregoing provisions, Contractor
shall indemnify and hold the City harmless from any damage, loss, cost, or expense,
including attorneys’ fees, incurred by the City as a result thereof.
K. Notwithstanding the minimum limits set forth in this Contract for any type of
insurance coverage, if Contractor maintains higher limits than the minimums shown
above, the City requires and shall be entitled to coverage for the higher limits
maintained by the Contractor. Any available insurance proceeds in excess of the
specified minimum limits of insurance and coverage shall be available to the City.
L. Form and Proof of Carriage of Insurance
1. Any insurance carrier providing insurance coverage required by the Contract
Documents shall be admitted to and authorized to do business in the State of
California unless waived, in writing, by the City’s Risk Manager. Carrier(s) shall
have an A.M. Best rating of not less than an A:VII. Insurance deductibles or self-
insured retentions must be declared by the Contractor. At the election of the City
the Contractor shall either 1) reduce or eliminate such deductibles or self-insured
retentions, or 2) procure a bond which guarantees payment of losses and related
investigations, claims administration, and defense costs and expenses. If umbrella
or excess liability coverage is used to meet any required limit(s) specified herein,
the Contractor shall provide a “follow form” endorsement satisfactory to the City
indicating that such coverage is subject to the same terms and conditions as the
underlying liability policy.
2. Each insurance policy required by this Contract shall be endorsed to state that: (1)
coverage shall not be suspended, voided, reduced or cancelled except after thirty
(30) days prior written notice by certified mail, return receipt requested, has been
given to the City; and (2) any failure to comply with reporting or other provisions of
the policies, including breaches of warranties, shall not affect coverage provided
to the City, its officials, officers, agents, employees, and volunteers.
3. The Certificates(s) and policies of insurance shall contain or shall be endorsed to
contain the covenant of the insurance carrier(s) that it shall provide no less than
Packet Page. 581
thirty (30) days written notice be given to the City prior to any material modification
or cancellation of such insurance. In the event of a material modification or
cancellation of coverage, the City may terminate the Contract or stop the Work in
accordance with the Contract Documents, unless the City receives, prior to such
effective date, another properly executed original Certificate of Insurance and
original copies of endorsements or certified original policies, including all
endorsements and attachments thereto evidencing coverage’s set forth herein and
the insurance required herein is in full force and effect. Contractor shall not take
possession, or use the Site, or commence operations under this Contract until the
City has been furnished original Certificate(s) of Insurance and certified original
copies of endorsements or policies of insurance including all endorsements and
any and all other attachments as required in this Article. The original
endorsements for each policy and the Certificate of Insurance shall be signed by
an individual authorized by the insurance carrier to do so on its behalf.
4. The Certificate(s) of Insurance, policies and endorsements shall so covenant and
shall be construed as primary, and the City’s insurance and/or deductibles and/or
self-insured retentions or self-insured programs shall not be construed as
contributory.
5. The City reserves the right to adjust the monetary limits and types of insurance
coverages during the term of this Contract including any extension thereof if, in the
City’s reasonable judgment, the amount or type of insurance carried by the
Contractor becomes inadequate.
6. Contractor shall report to the City, in addition to the Contractor’s insurer, any and
all insurance claims submitted by the Contractor in connection with the Work under
this Contract.
7. Products/completed operations coverage shall extend a minimum of three years
after the project completion. Coverage shall be included on behalf of the insured
for covered claims arising out of the actions of independent contractors. If the
insured is using subcontractors, the policy must include work performed “by or on
behalf” of the insured. Policy shall contain no language that would invalidate or
remove the insurer’s duty to defend or indemnify for claims or suits expressly
excluded from coverage. Policy shall specifically provide for a duty to defend on
the part of the insurer. The City, its officers, officials, agents employees, and
volunteers shall be included as insureds under the policy.
ARTICLE 5 -CONTRACTOR RESPONSIBILITIES; REGULATORY REQUIREMENTS
5.1 Applicable Laws
A. Contractor shall give all notices required by and shall comply with all Applicable Laws
applicable to the performance of the Work. Except where otherwise expressly
required by Applicable Laws, neither the City nor the City’s Representative shall be
responsible for monitoring Contractor’s compliance with any Applicable Laws. If
Contractor performs any Work knowing or having reason to know that it is contrary
to Applicable Laws, Contractor shall bear all claims, costs, losses, and damages
(including but not limited to all fees and charges of engineers, architects, attorneys,
Packet Page. 582
and other professionals and all court or arbitration or other dispute resolution costs)
arising out of or relating to such Work.
5.2 Permits and Licenses
A. Permits and licenses necessary for prosecution of the Work shall be secured and
paid for by Contractor, including, but not limited to, excavation permit, for plumbing,
mechanical and electrical work and for operations in or over public streets or right of
way under jurisdiction of public agencies other than the City, unless otherwise
specified in the Contract Documents.
B. The Contractor shall arrange and pay for all off-site inspection of the Work related to
permits and licenses, including certification, required by the specifications, drawings,
or by governing authorities, except for such off-site inspections delineated as the
City’s responsibility pursuant to the Contract Documents.
C. Before acceptance of the Work, the Contractor shall submit all licenses, permits,
certificates of inspection and required approvals to the City.
5.3 Taxes
A. Contractor shall pay all sales, consumer, use, and other similar taxes required to be
paid in accordance with the Applicable Laws of the place of the Project which are
applicable during the performance of the Work. In accordance with Revenue and
Taxation Code section 107.6, the Contract Documents may create a possessory
interest subject to personal property taxation for which Contractor will be
responsible.
5.4 Traffic Control
A. Traffic control plans, if required, shall be prepared at Contractor’s expense. Traffic
control shall be performed at Contractor’s expense in accordance with the
requirements of the City and/or the local agency with jurisdiction. Costs for traffic
control plans, implementation of traffic control, or traffic signal services required by
the City shall be included in the Contractor’s Bid.
B. All warning signs and safety devices used by the Contractor to perform the Work
shall conform to the requirements contained in the State of California, Department
of Transportation’s current edition of “Manual of Traffic Controls for Construction and
Maintenance Work Zones” or to the requirements of the local agency. The Contractor
shall also be responsible for all traffic control required by the agency having
jurisdiction over the Project on the intersecting streets. Contractor must submit a
traffic control plan to the agency having jurisdiction over the Project for approval prior
to starting Work.
C. The Contractor’s representative on the site responsible for traffic control shall
produce evidence that he/she has completed training acceptable to the California
Department of Transportation for safety through construction zones. All of the streets
in which the Work will occur shall remain open to traffic and one lane of traffic
maintained at all times unless otherwise directed by the agency of jurisdiction.
Businesses and residences adjacent to the Work shall be notified forty-eight (48)
Packet Page. 583
hours in advance of closing of driveways. The Contractor shall make every effort to
minimize the amount of public parking temporarily eliminated due to construction in
areas fronting businesses. No stockpiles of pipe or other material will be allowed in
traveled right-of-ways after working hours unless otherwise approved by the
Engineer.
5.5 Safety
A. Contractor shall be solely responsible for all safety precautions and programs in
connection with the Work. Such responsibility does not relieve Subcontractors of
their responsibility for the safety of persons or property in the performance of their
work, nor for compliance with applicable safety laws. Contractor shall comply with
all Applicable Laws relating to the safety of persons or property, or to the protection
of persons or property from damage, injury, or loss; and shall erect and maintain all
necessary safeguards for such safety and protection. Contractor shall notify owners
of adjacent property and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them in the
protection, removal, relocation, and replacement of their property.
B. The Contractor shall maintain emergency first aid treatment for his employees which
complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C. §
651 et seq.), and California Code of Regulations, Title 8, Industrial Relations Division
1, Department of Industrial Relations, Chapter 4. The Contractor shall ensure the
availability of emergency medical services for its employees in accordance with
California Code of Regulations, Title 8, Section 1512. The Contractor shall submit
an Illness and Injury Prevention Program and a Project Site specific safety program
to the City prior to beginning Work. Contractor shall maintain a confined space
program that meets or exceeds the City’s standards. Contractor needs to make
themselves aware of the City’s safety policies and procedures, and shall meet or
exceed all City standards in areas where the City must enter to perform inspections.
C. Hazard Communication Programs. Contractor shall be responsible for coordinating
any exchange of material safety data sheets or other hazard communication
information required to be made available to or exchanged between or among
employers at the Site in accordance with Applicable Laws.
5.6 Hazardous Materials
A. The City shall not be responsible for any Hazardous Waste brought to the site by the
Contractor. If the Contractor: (i) introduces and/or discharges a Hazardous Waste
onto the site in a manner not specified by the Contract Documents; and/or (ii)
disturbs a Hazardous Material identified in the Contract Documents, the Contractor
shall hire a qualified remediation contractor at Contractor’s sole cost to eliminate the
condition as soon as possible. Under no circumstance shall the Contractor perform
Work for which it is not qualified. The City, in its sole discretion, may require the
Contractor to retain at Contractor’s cost an independent testing laboratory.
B. If the Contractor encounters a Hazardous Waste which may cause foreseeable injury
or damage, Contractor shall immediately: (i) secure or otherwise isolate such
condition; (ii) stop all Work in connection with such material or substance (except in
Packet Page. 584
an emergency situation); and (iii) notify the City (and promptly thereafter confirm
such notice in writing).
C. Subject to Contractor’s compliance with this Article 5.6(B), the City shall verify the
presence or absence of the Hazardous Waste reported by the Contractor, except as
qualified under Article 5.6(A) and Article 5.6(B) in the event such material or
substance is found to be present, verify that the levels of the hazardous material are
below OSHA Permissible Exposure Levels and below levels which would classify
the material as a state of California or federal hazardous waste. When the material
falls below such levels, Work in the affected area shall resume upon direction by the
City.
D. Contractor shall indemnify and hold harmless the City from and against claims,
damages, losses and expenses, arising from a Hazardous Waste on the Project Site,
if such Hazardous Waste exceeded OSHA Permissible Exposure Levels or levels
which would classify the material as a state of California or federal hazardous waste,
and was either i) shown on the Contract Documents or information available to
bidders; or (ii) brought to the site by Contractor. Nothing in this paragraph shall
obligate the Contractor to indemnify the City in the event of the sole or active
negligence or willful misconduct of the City, its officers, agents, or employees.
5.7 Sanitary Facilities.
A. Contractor shall provide sanitary temporary toilet buildings and hand washing
facilities for the use of all workers. All toilets and hand washing facilities shall comply
with local codes and ordinances. Toilets shall be placed inside sealed secondary
containment devices installed on a flat, level surface. Accumulated liquids in the
secondary containment devices shall be properly removed and legally disposed
without spillage onto the ground. Toilets shall be kept supplied with toilet paper and
shall have workable door fasteners. Toilets and hand washing facilities shall be
serviced no less than once weekly and shall be present in a quantity of not less than
1 per 20 workers as required by Cal/OSHA regulations. The toilets and hand
washing facilities shall be maintained in a sanitary condition at all times. Use of toilet
and hand washing facilities in the Work under construction shall not be permitted.
Any other sanitary facilities required by Cal/OSHA shall be the responsibility of the
Contractor.
5.8 Dust Control
A. Contractor, at its expense, shall maintain all excavations, embankments, haul roads,
permanent access roads, plant sites, waste disposal areas, borrow areas, and all
other work areas free from dust. Industry accepted methods of dust control suitable
for the area involved, such as sprinkling, chemical treatment, light bituminous
treatment or similar methods, will be permitted.
5.9 Air Pollution Control
A. Contractor shall comply with all air pollution control rules, regulations, ordinances
and statutes. All containers of paint, thinner, curing compound, solvent or liquid
asphalt shall be labeled to indicate that the contents fully comply with the applicable
material requirements.
Packet Page. 585
B. Without limiting the foregoing, Contractor must fully comply with all applicable laws,
rules and regulations in furnishing or using equipment and/or providing services,
including, but not limited to, emissions limits and permitting requirements imposed
by the Air Quality Management District with jurisdiction over the Project and/or
California Air Resources Board (CARB). Contractor shall specifically be aware of
the application of these limits and requirements to "portable equipment", which
definition includes any item of equipment with a fuel-powered engine. Contractor
shall indemnify the City against any fines or penalties imposed by the air quality
management district, CARB, or any other governmental or regulatory agency for its
violations of Applicable Laws as well as those of its subcontractors or others for
whom Contractor is responsible under its indemnity obligations provided for in the
Contract Documents.
5.10 Water Quality Management and Compliance
A. Storm, surface, ground, nuisance, or other waters may be encountered at various
times during construction of the Work. The Contractor hereby acknowledges that it
has investigated the risk arising from such waters, has prepared its Bid accordingly,
and assumes any and all risks and liabilities arising therefrom.
B. Contractor shall keep itself and all subcontractors, staff, and employees fully
informed of and in compliance with all local, state and federal laws, rules and
regulations that may impact, or be implicated by the performance of the Work
including, without limitation, all applicable provisions regulating discharges of storm
water; the Federal Water Pollution Control Act (33 U.S.C. § 13000 et seq.); the
California Porter-Cologne Water Quality Control Act (Cal Water Code §§ 13000-
14950); and any and all regulations, policies, or permits issued pursuant to any such
authority. These include, but are not limited to California State Water Resources
Control Board Order Number 2009-0009-DWQ (NPDES Permit No. CAS000002),
as amended by Order Numbers 2010-0014-DWQ, 2012-0006-DWQ, and any
subsequent amendment to or renewal thereof, State Water Resources Control
Board Order No. 2013-0001-DWQ (NPDES Order No. CAS000004), Santa Ana
Regional Water Quality Control Board No. R8-2010-0036 (NPDES No. CAS618036),
and any amendment or renewal thereof.
C. Contractor shall comply with all conditions of the State Water Resources Control
Board (“State Water Board”) National Pollutant Discharge Elimination System
General Permit for Waste Discharge Requirements for Discharges of Storm Water
Runoff Associated with Construction Activity (“Construction General Permit”) for all
construction activity which results in the disturbance of in excess of one acre of total
land area or which is part of a larger common area of development or sale.
Contractor shall comply with the lawful requirements of the City, and any other
applicable municipality, drainage district, or other local agency with jurisdiction over
the location where the Work is to be conducted, regarding discharges of storm water
to separate storm drain systems or other watercourses under their jurisdiction,
including applicable requirements in municipal storm water management programs.
D. Unless otherwise specified in the Special Conditions or other portion of the Contract
Documents, the City has not prepared a Storm Water Pollution Prevention Plan
(“SWPPP”) or other storm water compliance plan for the Project Site. Contractor
shall be responsible for filing the Notice of Intent (“NOI”) and for obtaining coverage
Packet Page. 586
under the Construction General Permit. This includes filing all necessary
documentation including the Permit Registration Documents (“PRDs”) through the
Stormwater Multiple Applications and Report Tracking System (“SMARTS”);
preparing and implementing a SWPPP for the Work site; implementing all other
provisions, and monitoring and reporting requirements required by the Construction
General Permit; and providing a Qualified SWPPP Developer (“QSD”) and Qualified
SWPPP Practitioner (“QSP”), as necessary for all Work site activities, including but
not limited to preparation and submittal of all reports, plans, inspections, and
monitoring information in compliance with the Construction General Permit. All
submittals shall be coordinated with the City’s Legally Responsible Person and
Authorized Signatory as those terms are defined in the Construction General Permit.
Before any NOI, PRD, SWPPP, or other Construction General Permit-related
document may be submitted to the State Water Board or implemented on the Project
site, it must first be reviewed and approved by the City and/or City’s designee.
Contractor shall include all costs of compliance with specified requirements in the
Contract Price.
E. The City retains the right to develop its own documentation for the Project site,
including but not limited to the SWPPP, and in the alternative may require Contractor
to adopt and implement portions of the City developed SWPPP. The City expressly
reserves the right to procure coverage under the Construction General Permit for
the Work site if Contractor fails to draft satisfactory PRDs or SWPPP or otherwise
fails to proceed in a manner that complies with the requirements of the Construction
General Permit. The City additionally reserves the right to hire additional contractors
to maintain compliance at the Work site. Whether Contractor has adequately
maintained compliance with the Construction General Permit shall be the City’s sole
determination. Any costs incurred by the City in procuring coverage under the
Construction General Permit, or drafting and/or implementing a SWPPP for the Work
site shall be paid by Contractor.
F. Notwithstanding the above, for those Work sites where construction activity results
in the disturbance of less than one acre of total land area and/or do not need
coverage under the Construction General Permit, the Contractor shall be
responsible for preparing and implementing an Erosion and Sediment Control Plan
in accordance with State Water Resources Control Board Order No. 2013-0001-
DWQ (NPDES Order No. CAS000004) and any amendment to or renewal thereof.
G. Failure to comply with the Construction General Permit, laws, regulations, and
ordinances listed in this Article is a violation of federal and state law.
Notwithstanding any other indemnity contained in these Contract Documents,
Contractor agrees to indemnify and hold harmless the City, its officials, officers,
agents, employees and authorized volunteers from and against any and all claims,
demands, fees, costs, expenses, or losses or liabilities of any kind or nature which
the City, its officials, officers, agents, employees and authorized volunteers may
sustain or incur for noncompliance with the Permit, laws, regulations, and ordinances
listed above, arising out of or in connection with the Work, except for liability resulting
from the sole established negligence, willful misconduct or active negligence of the
City, its officials, officers, agents, employees or authorized volunteers.
H. The City reserves the right to defend any enforcement action or civil action brought
against the City for Contractor’s failure to comply with any applicable water quality
Packet Page. 587
law, regulation, or policy. Contractor hereby agrees to be bound by, and to
reimburse the City for the costs associated with, any settlement reached between
the City and any relevant enforcement entity.
5.11 Environmental Quality Protection
A. The Contractor shall comply with all requirements of applicable federal, state, and
local environmental rules and regulations. Any infractions of said rules and
regulations by the Contractor during the term of the Contract, which result in
penalties, will be the responsibility of the Contractor. The City operates under a
number of environmental permits issued by various agencies. If due to an action,
inaction, or negligence by the Contractor, the City becomes subject to non-
compliance penalties, the cost of such penalties shall be borne by the Contractor.
B. The Contractor shall exercise care to preserve the natural landscape and
vegetation, and shall conduct operations so as to prevent unnecessary destruction,
scarring, or defacing of the natural surroundings in the vicinity of the Work.
Movement of crews and equipment within the rights-of-way and over routes provided
for access to the Work shall be performed in a manner to prevent damage to
property. When no longer required, construction roads shall be restored to original
contours. Upon completion of the Work, and following removal of construction
facilities and required cleanup, land used for construction purposes and not required
for the completed installation shall be scarified and regraded, as required, so that all
surfaces are left in a condition that will facilitate natural revegetation, provide for
proper drainage, and prevent erosion.
C. If, in the performance of the Work, evidence of the possible occurrence of any
Federally listed threatened or endangered plant or animal is discovered, the
Contractor shall notify the City Representative immediately, giving the location and
nature of the findings. Written confirmation of the evidence, location and nature of
the findings shall be forwarded to City within two (2) Days. The Contractor shall
immediately cease all construction activities in the immediate area of the discovery
to the extent necessary to protect the endangered plant or animal. If directed by the
City Representative, Contractor will refrain from working in the immediate area,
suspend the Work in its entirety, or alter its performance to ensure full compliance
with all applicable permits, laws and regulations. Any City directed changes to the
Work as a result of a siting will be pursuant to the Contract Documents. Any costs
or delays incurred by City or the Contractor due to unreasonable or false notification
of an endangered plant or animal will be borne by the Contractor.
D. If, in the performance of the Work, Contractor should unearth cultural resources (for
example, human remains, animal bones, stone tools, artifacts and/or midden
deposits) through excavation, grading, watering or other means, the Contractor shall
notify the construction/archeological monitor and/or the City Representative
immediately, giving the location and nature of the findings. Written confirmation of
the evidence, location and nature of the findings shall be forwarded to the
construction/archeological monitor and/or City within two (2) Days. The Contractor
shall immediately cease all construction activities in the immediate area of the
discovery to the extent necessary to protect the cultural resource. If directed by the
City Representative, Contractor will refrain from working in the immediate area,
suspend the Work in its entirety, or re-sequence and/or alter its performance to
Packet Page. 588
ensure full compliance with all applicable permits, laws and regulations. Should the
presence of cultural resources be confirmed, the Contractor will assist the City
Representative and the construction/archeological monitor in the preparation and
implementation of a data recovery plan. The Contractor shall provide such
cooperation and assistance as may be necessary to preserve the cultural resources
for removal or other disposition. Any City directed changes to the Work as a result
of the cultural resource will be pursuant to the Contract Documents. Should
Contractor, without permission, injure, destroy, excavate, appropriate, or remove
any cultural resource on or adjacent to the Site, it will be subject to disciplinary action,
arrest and penalty under applicable law. The Contractor shall be principally
responsible for all costs of mitigation and/or restoration of cultural resources related
to the unauthorized actions identified above. Contractor shall be required to pay for
unauthorized damage and mitigation costs to cultural resources (historical and
archeological resources) as a result of unauthorized activities that damage cultural
resources and shall indemnify City pursuant to the Contract Documents.
5.12 Excessive Noise
A. Contractor shall use only such equipment on the Work and in such state of repair so
that the emission of sound therefrom is within the noise tolerance level of that
equipment as established by Cal/OSHA. Contractor shall comply with the most
restrictive of the following: (1) local sound control and noise level rules, regulations
and ordinances and (2) the requirements contained in these Contract Documents,
including hours of operation requirements.
B. No internal combustion engine shall be operated on the Project without a muffler of
the type recommended by the manufacturer. Should any muffler or other control
device sustain damage or be determined to be ineffective or defective, the
Contractor shall promptly remove the equipment and shall not return said equipment
to the job until the device is repaired or replaced. Said noise and vibration level
requirements shall apply to all equipment on the job or related to the job, including
but not limited to, trucks, transit mixers or transit equipment that may or may not be
owned by the Contractor.
5.13 Diversion of Recyclable Waste Material
A. In compliance with the applicable City’s waste reduction and recycling efforts,
Contractor shall divert all Recyclable Waste Materials to appropriate recycling
centers as required for compliance with the local jurisdiction’s waste diversion
ordinances. Contractor will be required to submit weight tickets and written proof of
diversion with its monthly progress payment requests. Contractor shall complete
and execute any certification forms required by the City or other applicable agencies
to document Contractor’s compliance with these diversion requirements. All costs
incurred for these waste diversion efforts shall be the responsibility of the Contractor.
5.14 Inspector’s Field Office.
A. If required by the City, the Contractor shall be responsible for providing the
inspector’s field office. The office shall be a substantial waterproof construction with
adequate natural light and ventilation by means of stock design windows. Door shall
have a key type lock or padlock clasp. The office shall have heating and air
Packet Page. 589
conditioning and shall be equipped with a telephone, a telephone answering
machine, an ability to connect to the internet, and a fax machine at Contractor’s
expense. The field office shall be provided within 20 Days of the Notice to Proceed.
B. A table satisfactory for the study of plans and two chairs shall be provided by
Contractor. Contractor shall provide and pay for adequate electric lights, local
telephone service, and adequate heat and air conditioning for the field office until
authorized removal.
5.15 Contractor’s Supervision.
A. Contractor shall continuously keep at the Project site, a competent and experienced
full-time Project superintendent acceptable to the City. Superintendent must be able
to proficiently speak, read and write in English and shall have the authority to make
decisions on behalf of the Contractor. Contractor shall continuously provide efficient
supervision of the Project.
5.16 Workers.
A. Contractor shall at all times enforce strict discipline and good order among its
employees. Contractor shall not employ on the Project any unfit person or any one
not skilled in the Work assigned to him or her.
B. Any person in the employ of the Contractor whom the City may deem incompetent
or unfit shall be dismissed from the Work and shall not be employed on this Project.
5.17 Independent Contractors.
A. Contractor shall be an independent contractor for the City and not an employee.
Contractor understands and agrees that it and all of its employees shall not be
considered officers, employees, or agents of the City and are not entitled to benefits
of any kind normally provided employees of the City, including but not limited to,
state unemployment compensation or workers’ compensation. Contractor assumes
full responsibility for the acts and omissions of its employees or agents related to the
Work.
5.18 Verification of Employment Eligibility.
A. By executing the Contract, Contractor verifies that it fully complies with all
requirements and restrictions of state and federal law respecting the employment of
undocumented aliens, including, but not limited to, the Immigration Reform and
Control Act of 1986, as may be amended from time to time, and shall require all
subcontractors, sub-subcontractors and consultants to comply with the same. Each
person executing this Contract on behalf of Contractor verifies that he or she is a
duly authorized officer of Contractor and that any of the following shall be grounds
for the City to terminate the Contract for cause: (1) failure of the Contractor or its
Subcontractors, sub-subcontractors or consultants to meet any of the requirements
provided for in this Article; (2) any misrepresentation or material omission concerning
compliance with such requirements; or (3) failure to immediately remove from the
Work any person found not to be in compliance with such requirements.
Packet Page. 590
5.19 Labor.
A. Hours of Work
1. As provided in Article 3 (commencing at section 1810), Chapter 1, Part 7, Division
2 of the Labor Code, Contractor stipulates that eight (8) hours of labor shall
constitute a legal day’s work. The time of service of any worker employed at any
time by the Contractor or by any subcontractor on any subcontract under this
Contract upon the Work or upon any part of the Work contemplated by this
Contract is limited and restricted to eight (8) hours during any one calendar day
and 40 hours during any one calendar week, except as hereinafter provided.
Notwithstanding the provisions herein above set forth, work performed by
employees of Contractor in excess of eight (8) hours per day, and 40 hours during
any one week, shall be permitted upon this public work upon compensation for all
hours worked in excess of eight (8) hours per day at not less than one and one-
half times the basic rate of pay.
2. The Contractor and every Subcontractor shall keep an accurate record showing
the name of and actual hours worked each calendar day and each calendar week
by each worker employed in connection with the Work or any part of the Work
contemplated by this Contract. The record shall be kept open at all reasonable
hours to the inspection of the City and to the Division of Labor Law Enforcement,
Department of Industrial Relations of the State of California.
3. The Contractor shall pay to the City a penalty of twenty-five dollars ($25.00) for
each worker employed in the execution of this Contract by the Contractor or by
any subcontractor for each calendar day during which such worker is required or
permitted to work more than eight (8) hours in any calendar day and 40 hours in
any one calendar week in violation of the provisions of Article 3 (commencing at
section 1810), Chapter 1, Part 7, Division 2 of the Labor Code.
4. Any work necessary to be performed after regular working hours, or on Saturdays
and Sundays or other holidays, shall be performed without additional expense to
the City.
5. If Contractor gives notice of an inspection pursuant to the Contract Documents,
the City will provide inspection during normal working hours from 7:00 a.m. to 3:30
p.m. Monday through Friday. Requested inspections before or after this time will
be charged to the Contractor as reimbursable inspection time. Inspections on
weekends requires two (2) Days’ notice for review and approval. Upon written
request and approval the 8.5 hour working day may be changed to other limits
subject to city/county ordinance.
6. It shall be unlawful for any person to operate, permit, use, or cause to operate any
of the following at the Project Site, other than between the hours of 7:00 a.m. to
5:00 p.m., Monday through Friday, with no Work allowed on City-observed
Holidays, unless otherwise approved by the City:
a. Powered Vehicles
b. Construction Equipment
Packet Page. 591
c. Loading and Unloading Vehicles
d. Domestic Power Tools
B. Payroll Records; Labor Compliance
1. Pursuant to Labor Code section 1776, Contractor and all subcontractors shall
maintain weekly certified payroll records, showing the names, addresses, Social
Security numbers, work classifications, straight time and overtime hours worked
each day and week, and the actual per diem wages paid to each journeyman,
apprentice, worker, or other employee employed by them in connection with the
Work under this Contract. Contractor shall certify under penalty of perjury that
records maintained and submitted by Contractor are true and accurate. Contractor
shall also require Subcontractor(s) to certify weekly payroll records under penalty
of perjury.
2. In accordance with Labor Code section 1771.4, the Contractor and each
Subcontractor shall furnish the certified payroll records directly to the Department
of Industrial Relations (“DIR”) on the specified interval and format prescribed by
the DIR, which may include electronic submission. Contractor shall comply with
all requirements and regulations from the DIR relating to labor compliance
monitoring and enforcement. The requirement to submit certified payroll records
directly to the Labor Commissioner under Labor Code section 1771.4 shall not
apply to work performed on a public works project that is exempt pursuant to the
small project exemption specified in Labor Code Section 1771.4.
3. Any stop orders issued by the DIR against Contractor or any Subcontractor that
affect Contractor’s performance of Work, including any delay, shall be Contractor’s
sole responsibility. Any delay arising out of or resulting from such stop orders shall
be considered Contractor caused delay subject to any applicable liquidated
damages and shall not be compensable by the City. Contractor shall defend,
indemnify and hold the City, its officials, officers, employees and agents free and
harmless from any claim or liability arising out of stop orders issued by the DIR
against Contractor or any Subcontractor.
4. The payroll records described herein shall be certified and submitted by the
Contractor at a time designated by the City. The Contractor shall also provide the
following:
a. A certified copy of the employee’s payroll records shall be made available for
inspection or furnished to such employee or his or her authorized representative
on request.
b. A certified copy of all payroll records described herein shall be made available
for inspection or furnished upon request of the DIR.
5. Unless submitted electronically, the certified payroll records shall be on forms
provided by the Division of Labor Standards Enforcement (“DLSE”) of the DIR or
shall contain the same information as the forms provided by the DLSE.
Packet Page. 592
6. Any copy of records made available for inspection as copies and furnished upon
request to the public or any public agency, the City, the Division of Apprenticeship
Standards or the Division of Labor Standards Enforcement shall be marked or
obliterated in such a manner as to prevent disclosure of an individual's name,
address and social security number. The name and address of the Contractor
awarded the Contract or performing the Contract shall not be marked or
obliterated.
7. In the event of noncompliance with the requirements of this Article, the Contractor
shall have ten (10) Days in which to comply subsequent to receipt of written notice
specifying in what respects the Contractor must comply with this Article. Should
noncompliance still be evident after such 10-day period, the Contractor shall pay
a penalty of one hundred dollars ($100.00) to the City for each calendar day, or
portion thereof, for each worker, until strict compliance is effectuated. Upon the
request of the Division of Apprenticeship Standards or the Division of Labor
Standards Enforcement, such penalties shall be withheld from progress payment
then due.
8. The responsibility for compliance with this Article shall rest upon the Contractor.
C. Prevailing Rates of Wages
1. The Contractor is aware of the requirements of Labor Code sections 1720 et seq.
and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000
et seq. (“Prevailing Wage Laws”), which require the payment of prevailing wage
rates and the performance of other requirements on certain “public works” and
“maintenance” projects. Since this Project involves an applicable “public works” or
“maintenance” project, as defined by the Prevailing Wage Laws, and since the total
compensation is $1,000 or more, Contractor agrees to fully comply with such
Prevailing Wage Laws. The Contractor shall obtain a copy of the prevailing rates
of per diem wages at the commencement of this Contract from the website of the
Division of Labor Statistics and Research of the Department of Industrial Relations
located at www.dir.ca.gov. In the alternative, the Contractor may view a copy of
the prevailing rate of per diem wages which are on file at the City’s Administration
Office and shall be made available to interested parties upon request. Contractor
shall make copies of the prevailing rates of per diem wages for each craft,
classification, or type of worker needed to perform work on the Project available to
interested parties upon request, and shall post copies at the Contractor’s principal
place of business and at the Project site. Contractor shall defend, indemnify and
hold the City, its officials, officers, employees and authorized volunteers free and
harmless from any claims, liabilities, costs, penalties or interest arising out of any
failure or allege failure to comply with the Prevailing Wage Laws.
2. The Contractor shall forfeit as a penalty to the City not more than Two Hundred
Dollars ($200.00), pursuant to Labor Code section 1775, for each calendar day, or
portion thereof, for each worker paid less than the prevailing wage rate as
determined by the Director of the DIR for such work or craft in which such worker
is employed for any public work done under the Contract by it or by any
Subcontractor under it. The difference between such prevailing wage rate and the
amount paid to each worker for each calendar day or portion thereof, for which
Packet Page. 593
each worker was paid less than the prevailing wage rate, shall be paid to each
worker by the Contractor.
3. Contractor shall post, at appropriate conspicuous points on the Project Site, a
schedule showing all determined general prevailing wage rates and all authorized
deductions, if any, from unpaid wages actually earned.
D. Public Works Contractor Registration
1. Pursuant to Labor Code sections 1725.5 and 1771.1, the Contractor and its
Subcontractors must be registered with the DIR prior to the execution of a contract
to perform public works. By entering into this Contract, Contractor represents that
it is aware of the registration requirement and is currently registered with the DIR.
Contractor shall maintain a current registration for the duration of the Project.
Contractor shall further include the requirements of Labor Code sections 1725.5
and 1771.1 in any subcontract and ensure that all Subcontractors are registered
at the time this Contract is entered into and maintain registration for the duration
of the Project. Notwithstanding the foregoing, the contractor registration
requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not
apply to work performed on a public works project that is exempt pursuant to the
small project exemption specified in Labor Code Sections 1725.5 and 1771.1.
E. Employment of Apprentices
1. Contractor and all Subcontractors shall comply with the requirements of Labor
Code sections 1777.5 and 1777.6 in the employment of apprentices.
2. Information relative to apprenticeship standards, wage schedules, and other
requirements may be obtained from the Director of Industrial Relations, ex officio
the Administrator of Apprenticeship, San Francisco, California, or from the Division
of Apprenticeship Standards and its branch offices.
3. Knowing violations of Labor Code section 1777.5 will result in forfeiture not to
exceed one hundred dollars ($100.00) for each calendar day of non-compliance
pursuant to Labor Code section 1777.7.
F. Nondiscrimination/Equal Employment Opportunity
1. Pursuant to Labor Code section 1735 and other applicable provisions of law, the
Contractor and its Subcontractors shall not discriminate against any employee or
applicant for employment because of race, religious creed, color, national origin,
ancestry, physical disability, mental disability, medical condition, marital status,
sex, age, sexual orientation, or any other classifications protected by law on this
Project. The Contractor will take affirmative action to insure that employees are
treated during employment or training without regard to their race, religious creed,
color, national origin, ancestry, physical disability, mental disability, medical
condition, marital status, sex, age, sexual orientation, or any other classifications
protected by law.
G. Debarment of Contractors and Subcontractors
Packet Page. 594
1. Contractors or Subcontractors may not perform work on a public works project with
a subcontractor who is ineligible to perform work on a public project pursuant to
Labor Code section 1777.1 or 1777.7. Any contract on a public works project
entered into between a contractor and a debarred subcontractor is void as a matter
of law. A debarred subcontractor may not receive any public money for performing
work as a subcontractor on a public works contract. Any public money that is paid,
or may have been paid to a debarred subcontractor by a contractor on the project
shall be returned to the City. The Contractor shall be responsible for the payment
of wages to workers of a debarred subcontractor who has been allowed to work
on the Project.
5.20 Subcontracts.
A. Contractor agrees to bind every Subcontractor to the terms of the Contract
Documents as far as such terms are applicable to Subcontractor’s portion of the
Work. Contractor shall be as fully responsible to the City for the acts and omissions
of its subcontractors and of persons either directly or indirectly employed by its
subcontractors, as Contractor is for acts and omissions of persons directly employed
by Contractor. Nothing contained in these Contract Documents shall create any
contractual relationship between any subcontractor and the City.
B. The City reserves the right to accept all subcontractors. The City’s acceptance of
any Subcontractor under this Contract shall not in any way relieve Contractor of its
obligations in the Contract Documents.
C. Prior to substituting any Subcontractor listed in the Bid Forms, Contractor must
comply with the requirements of the Subletting and Subcontracting Fair Practices
Act pursuant to California Public Contract Code section 4100 et seq.
5.21 Progress Meetings
A. The Contractor shall schedule and hold regular progress meetings at least weekly
and at other times as requested by Engineer or as required by progress of the Work.
The Contractor, City, and all Subcontractors active on the Site shall attend each
meeting. Contractor may at its discretion request attendance by representatives of
its Suppliers, manufacturers, and other Subcontractors. The City will preside at the
progress meetings and will arrange for keeping and distributing the minutes. The
purpose of the meetings is to review the progress of the Work, maintain coordination
of efforts, discuss changes in scheduling, and resolve other problems which may
develop. During each meeting, the Contractor shall present any issues which may
impact its progress with a view to resolve these issues expeditiously.
5.22 Submittals
A. Schedule of Submittals. Within five (5) Days after the Notice to Proceed (unless
otherwise specified in the Contract Documents), Contractor will prepare and deliver
a Schedule of Submittals to the City that has been fully integrated with the progress
schedule and identifies each Submittal required by the Contract Documents as well
as the date on which Contractor will deliver each Submittal to the City. Each
Submittal must be delivered to the City at least thirty (30) Days prior to the date the
Packet Page. 595
material or equipment is scheduled to be incorporated into the Work. The Contractor
is responsible for any schedule delays resulting from the Submittal process.
B. Submittal Procedures.
1. Contractor will follow the following procedures for each Submittal, Shop Drawing
and Sample required by the Contract Documents:
a. Submittals must be transmitted electronically.
b. Transmittals will be sequentially numbered. Contractor to mark revised
Submittals with original number and sequential alphabetic suffix.
c. Each Submittal will identify the Project, Contractor, Subcontractor and
Supplier, pertinent Drawing and detail number, and Specification Section
number appropriate to Submittal.
d. By transmitting a Submittal, Contractor certifies it has reviewed and approved
each Submittal, verified products required, field dimensions, adjacent
construction Work, and that coordination of information is according to
requirements of the Work and Contract Documents.
e. Identify variations in Contract Documents and product or system limitations
that may differ and/or be detrimental to successful performance of completed
Work.
f. When Submittal is revised for resubmission, Contractor shall promptly address
the City’s comments and resubmit. Contractor shall identify changes made
since previous submission.
g. The City’s review of Shop Drawings shall not relieve Contractor from
responsibility for deviations from the Contract Documents unless Contractor
has, in writing, called the City’s attention to such deviations at time of
submission and the City has taken no exception to the deviation. The City’s
review of Shop Drawings shall not relieve Contractor from responsibility for
errors in Shop Drawings.
h. Submittals not required by the Contract Documents or requested by the City
will not be acknowledged or processed.
i. Incomplete Submittals will not be reviewed by the City. Delays resulting from
incomplete Submittals are not the responsibility of the City.
j. Contractor shall not be entitled to any extension of the Contract Times as a
result of the Submittal process.
k. Contractor shall allow a minimum of 20 working days for review of Submittals
unless otherwise specified in the Contract Documents.
2. Where a Submittal, Shop Drawing or Sample is required by the Contract
Documents or the Schedule of Submittals, any related Work performed prior to the
Packet Page. 596
City review and approval of the pertinent submittal will be performed at the sole
risk and expense and responsibility of Contractor.
C. Schedule Milestone for Submittals. Contractor must submit all Submittals required
by the Contract Documents in accordance with the Schedule of Submittals. If
Contractor fails to submit the Submittals in accordance with the Schedule of
Submittals, Contractor will be solely liable for any delays or impacts caused by the
delayed Submittal, whether direct or indirect. Contractor will be liable for the time
calculated from the date the Submittal is due until the date a compliant Submittal is
made. A compliant Submittal will be one that is complete and satisfies the
requirements of the Contract Documents.
5.23 Shop Drawings and Sample Submittal Procedures.
A. Before submitting each Shop Drawing or Sample, Contractor shall have:
1. Reviewed and coordinated each Shop Drawing or Sample with other Shop
Drawings and Samples and with the requirements of the Work and the Contract
Documents;
2. Determined and verified all field measurements, quantities, dimensions, specified
performance and design criteria, installation requirements, materials, catalog
numbers, and similar information with respect thereto;
3. Determined and verified the suitability of all materials offered with respect to the
indicated application, fabrication, shipping, handling, storage, assembly, and
installation pertaining to the performance of the Work; and
4. Determined and verified all information relative to Contractor’s responsibilities for
means, methods, techniques, sequences, and procedures of construction, and
safety precautions and programs incident thereto.
B. With each Submittal, Contractor shall give the City specific written notice of any
variations that the Shop Drawing or Sample may have from the requirements of the
Contract Documents. This notice shall be both a written communication separate
from the Shop Drawings or Sample Submittal and, in addition, a specific notation
made on each Shop Drawing or Sample submitted to the City for review and
approval of each such variation.
C. Shop Drawings.
1. Data shown on the Shop Drawings will be complete with respect to quantities,
dimensions, specified performance and design criteria, materials, and similar data
to show the City the services, materials, and equipment Contractor proposes to
provide and to enable the City to review the information for assessing conformance
with information given and design concept expressed in Contract Documents.
2. When required by individual Specification sections, provide Shop Drawings signed
and sealed by a professional engineer responsible for designing components
shown on Shop Drawings. Shop Drawings must include signed and sealed
Packet Page. 597
calculations to support design in a form suitable for submission to and approval by
authorities having jurisdiction.
3. Shop Drawings for steel structures shall consist of shop details, erection and other
working Drawings showing details, dimensions, sizes of members and other
information necessary for the complete fabrication and erection of the metal work.
4. Shop Drawings of concrete structures shall consist of such detailed drawings as
may reasonably be required for the successful prosecution of the Work and which
are not included in the Drawings furnished by the Engineer. These may include
drawings for false work, bracing, centering and form work, masonry layout
diagrams, and diagrams for bent reinforcement.
5. Contractor shall make revisions and provide additional information when required
by authorities having jurisdiction.
D. Samples. Clearly identify each Sample as to material, Supplier, pertinent data such
as catalog numbers, the use for which intended and other data as required to enable
the City to review the submittal for assessing conformance with information given
and design concept expressed in Contract Documents. Samples should be of
appropriate size and detail to assess functional, aesthetic, color, texture, patterns
and finish selection.
E. City’s Review.
1. The City will review Shop Drawings and Samples in accordance with the Schedule
of Submittals. The City’s review and acceptance will be only to determine if the
items covered by the Submittals will, after installation or incorporation in the Work,
conform to the information given in the Contract Documents and be compatible
with the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents.
2. The City review and approval will not extend to means, methods, techniques,
sequences, or procedures of construction (except where a particular means,
method, technique, sequence, or procedure of construction is specifically and
expressly called for by the Contract Documents) or to safety precautions or
programs incident thereto. The review and approval of a separate item as such
will not indicate approval of the assembly in which the item functions.
3. The City’s review and acceptance shall not relieve Contractor from responsibility
for any variation from the requirements of the Contract Documents unless the City
has given written approval of each such variation by specific written notation
thereof incorporated in or accompanying the Shop Drawing or Sample.
F. Resubmittal Procedures. Contractor shall make corrections required by the City and
shall return corrected Shop Drawings and submit, as required, new Samples for
review and approval. Contractor shall direct specific attention in writing to revisions
other than the corrections called for by the City on previous Submittals.
Packet Page. 598
5.24 Record (“As-Built”) Drawings.
A. The Contractor shall maintain one record set of Contract Documents at the Site or
digitally in an acceptable format. On these, it shall mark all Project conditions,
locations, configurations, and any other changes or deviations which may vary from
the information represented in the original Contract Documents, including buried or
concealed construction and utility features which are revealed during the course of
construction. Special attention shall be given to recording the horizontal and vertical
location of all buried utilities that differ from the locations indicated, or which were
not indicated on the Drawings. For all Projects involving the installation of any
pipeline, Contractor shall survey and record the top of the pipe at a minimum of every
100 linear feet, and at each bend, recording both the horizontal and vertical
locations. Said Drawings shall be supplemented by any detailed sketches as
necessary or directed to fully indicate the Work as actually constructed. Any required
as-built drawings of civil engineering elements of the Work shall be prepared by a
registered civil engineer.
B. These master Record Drawings of the as-built conditions, including all revisions
made necessary by Addenda and Change Orders, shall be maintained up-to-date
during the progress of the Project. Red ink shall be used for alterations and notes.
Notes shall identify relevant Change Orders by number and date. Record Drawings
shall be accessible to the Engineer at all times during the construction period.
Failure on the Contractor’s part to keep Record Drawings current could result in
withholding partial payment.
C. Upon completion of the Project and as a condition of final acceptance, the Contractor
shall finalize and deliver a complete set of Record Drawings to the Engineers. The
information submitted by the Contractor will be assumed to be correct, and the
Contractor shall be responsible for, and liable to the City, for the accuracy of such
information, and for any errors or omissions which may or may not appear on the
Record Drawings.
D. Unless otherwise called for by the Contract Documents, the cost of all material,
equipment, and labor required to complete the Record Drawings shall be included in
Contractor’s bid and distributed in the Bid Schedule. No additional compensation
shall be made to the Contractor for this Work.
5.25 Layout and Field Engineering.
A. The Contractor shall utilize a properly licensed surveyor to perform all layout surveys
required for the control and completion of the Work, and all necessary surveys to
compute quantities of Work performed.
5.26 Separate Contracts and Cooperation.
A. Separate Contracts. The City reserves the right to let other contracts in connection
with this Work or on the Project site. Contractor shall permit other contractors
reasonable access and storage of their materials and execution of their work and
shall properly connect and coordinate its Work with theirs. To ensure proper
execution of its subsequent Work, Contractor shall immediately inspect work already
Packet Page. 599
in place and shall at once report to the Engineer any problems with the Work in place
or discrepancies with the Contract Documents.
B. Cooperation. Contractor shall ascertain to its own satisfaction the scope of the
Project and nature of any other contracts that have been or may be awarded by the
City in prosecution of the Project to the end that Contractor may perform this
Contract in the light of such other contracts, if any. Nothing herein contained shall
be interpreted as granting to Contractor exclusive occupancy at site of the Project.
Contractor shall not cause any unnecessary hindrance or delay to any other
contractor working on the Project. If simultaneous execution of any contract for the
Project is likely to cause interference with performance of some other contract or
contracts, the Engineer shall decide which Contractor shall cease Work temporarily
and which contractor shall continue or whether work can be coordinated so that
contractors may proceed simultaneously. The City shall not be responsible for any
damages suffered or for extra costs incurred by Contractor resulting directly or
indirectly from award, performance, or attempted performance of any other contract
or contracts on the Project Site.
5.27 Work Site.
A. Limitation of Use of Site and Other Areas. Rights-of-way, easements, or rights-of-
entry for the Work will be provided by the City. Unless otherwise specified in the
Special Provisions, the Contractor shall make arrangements, pay for, and assume
all responsibility for acquiring, using, and disposing of additional work areas and
facilities temporarily required. The Contractor shall indemnify and hold the City
harmless from all claims for damages caused by such actions. Contractor shall
confine construction equipment, the storage of materials and equipment, and the
operations of workers to the Site and other areas permitted by Applicable Laws, and
shall not unreasonably encumber the Site and other areas with construction
equipment or other materials or equipment. Contractor shall assume full
responsibility for any damage to any such land or area, or to City or occupant thereof,
or of any adjacent land or areas resulting from the performance of the Work.
B. Site Maintenance. During the progress of the Work, Contractor shall keep the Site
and other areas free from accumulations of waste materials, rubbish, and other
debris. Removal and disposal of such waste materials, rubbish, and other debris
shall conform to Applicable Laws. The Contractor shall furnish trash bins for all
debris from construction. All debris shall be placed in trash bins daily. Forms and
false-work that are to be re-used shall be stacked neatly concurrently with their
removal. Forms and false-work that are not to be re-used shall be disposed of
concurrently with their removal.
C. Cleaning. Prior to Completion of the Work, Contractor shall clean the Site and make
it ready for utilization by the City. At the completion of the Work Contractor shall
remove from the Site all tools, appliances, construction equipment and machinery,
and surplus materials and shall restore to original condition all property not
designated for alteration by the Contract Documents.
Packet Page. 600
5.28 Utility Usage.
A. All temporary utilities, including but not limited to electricity, water, gas, and
telephone, used on the Work shall be furnished and paid for by Contractor.
Contractor shall provide necessary temporary distribution systems, including meters,
if necessary, from distribution points to points on the Work where the utility is
needed. Upon completion of the Work, Contractor shall remove all temporary
distribution systems. Contractor shall provide necessary and adequate utilities and
pay all costs for water, electricity, gas, oil, and sewer charges required for completion
of the Work, including but not limited to startup and testing required in the Contract
Documents. All permanent meters installed shall be listed in the Contractor’s name
until the Work is accepted. For Work to be performed in existing City facilities,
Contractor may use the City’s existing utilities, provided such use is reasonable
under the circumstances. If Contractor uses the City utilities, it will not need to
compensate the City for reasonably consumption of utilities, but Contractor will be
responsible for any excessive, unreasonable or wasteful utility usage. Amounts due
the City under this section may be deducted from progress payments.
5.29 Protection of Work and Property.
A. The Contractor shall digitally record video and take photographs of the Project site
and adjacent improvements in a manner and quality that clearly depicts the existing
condition of the Project Site and adjacent improvements immediately prior to the
start of Work (minimum 1080p video and 4MP photo). All videos and photographs
shall be date and time stamped. The Contractor shall submit the video and photos
in digital format on a memory stick before the commencement of Work, along with a
map outlining the route and locations of the videos and/or photographs. The
Contractor shall be responsible for all damages to persons or property that occur as
a result of the Work. Contractor shall be responsible for the proper care and
protection of all materials delivered and Work performed until completion and final
acceptance by the City. All Work shall be solely at the Contractor’s risk.
B. Contractor shall adequately protect adjacent property from settlement or loss of
lateral support as necessary. Contractor shall comply with all applicable safety laws
and building codes to prevent accidents or injury to persons on, about, or adjacent
to the Project site where Work is being performed. Contractor shall erect and
properly maintain at all times, as required by field conditions and progress of work,
all necessary safeguards, signs, barriers, lights, and watchmen for protection of
workers and the public, and shall post danger signs warning against hazards created
in the course of construction.
C. Contractor shall provide such heat, covering, and enclosures as are necessary to
protect all Work, materials, equipment, appliances, and tools against damage by
weather conditions.
D. Contractor shall take adequate precautions to protect existing sidewalks, curbs,
pavements, utilities, and other adjoining property and structures, and to avoid
damage thereto, and Contractor shall repair any damage thereto caused by the Work
operations. Contractor shall:
Packet Page. 601
1. Enclose the working area with a substantial barricade, and arrange work to cause
minimum amount of inconvenience and danger to the public.
2. Provide substantial barricades around any shrubs or trees indicated to be
preserved.
3. Deliver materials to the Site over a route designated by the City.
4. Provide any and all dust control required and follow the applicable air quality
regulations as appropriate. If the Contractor does not comply immediately with a
notice from the City or a public agency responsible for air quality, the City shall
have the authority to provide dust control and deduct the cost from payments to
the Contractor.
5. Confine Contractor’s apparatus, the storage of materials, and the operations of its
workers to limits required by law, ordinances, permits, or directions of the City.
Contractor shall not unreasonably encumber the Site with its materials.
6. Take care to prevent disturbing or covering any survey markers, monuments, or
other devices marking property boundaries or corners. If such markers are
disturbed by accident, they shall be replaced by a civil engineer or land surveyor
acceptable to the City, at no cost to the City.
7. Ensure that existing facilities, fences and other structures are all adequately
protected and that, upon completion of all Work, all facilities that may have been
damaged are restored to a condition acceptable to the City.
8. Preserve and protect from injury all buildings, pole lines and all directional, warning
and mileage signs that have been placed within the right-of-way.
9. At the completion of work each day, leave the Work and the Site in a clean, safe
condition.
10. Comply with any stage construction and/or traffic handling plans. Access to
residences and businesses shall be maintained at all times, except with the City’s
written approval. Any request for approval to reduce or restrict access to
residences and business must be submitted to the City at least seven (7) Days in
advance, and the City may issue or withhold approval in its sole discretion.
E. These precautionary measures will apply continuously and not be limited to normal
working hours. Full compensation for the work involved in the protection and
preservation of life, safety and property as above specified shall be considered as
included in the prices paid for the various contract items of Work, and no additional
allowance will be made therefor.
F. Should damage to persons or property occur as a result of the Work, Contractor shall
promptly notify the City, in writing. Contractor shall be responsible for proper
investigation, documentation, including video or photography, to adequately
memorialize and make a record of what transpired. The City shall be entitled to
inspect and copy any such documentation, video, or photographs.
Packet Page. 602
G. Contractor shall maintain all investigation documentation including video and/or
photographs for a minimum of four (4) years following completion of the Project.
5.30 Emergencies.
A. In emergencies affecting the safety or protection of persons or the Work or Property
at the Site or adjacent thereto, the Contractor, without special instruction or
authorization from the City or the Engineer, is obligated to act to prevent threatened
damage, injury or loss. The Contractor shall give the Engineer prompt written notice
if the Contractor believes that any significant changes in the Work or variations from
the Contract Documents have been caused thereby.
ARTICLE 6 -MATERIALS; INSPECTION
6.1 Access to Work.
A. The City, Engineer, their consultants and other representatives and personnel,
independent testing laboratories, and governmental agencies with jurisdictional
interests will have access to the Site and the Work at reasonable times for their
observation, inspection, and testing. Contractor shall provide them proper and safe
conditions for such access and advise them of Contractor’s safety procedures and
programs.
6.2 Materials.
A. Except as otherwise specifically stated in the Contract Documents, Contractor shall
provide and pay for all materials, labor, tools, equipment, water, lights, power,
transportation, superintendence, temporary constructions of every nature, and all
other services and facilities whatsoever necessary to execute and complete this
Contract within the Contract Time. Unless otherwise specified, all materials, parts,
and equipment furnished by the Contractor in the Work shall be new, the best of their
respective kinds and grades as noted and/or specified, and workmanship shall be of
good quality.
B. No materials, supplies, or equipment for Work under this Contract shall be
purchased subject to any chattel mortgage or under a conditional sale or other
agreement by which an interest therein or in any part thereof is retained by the seller
or supplier. Contractor warrants good title to all material, supplies, and equipment
installed or incorporated in the Work and agrees upon completion of all work to
deliver the Project, to the City free from any claims, liens, or charges.
C. Materials shall be furnished in ample quantities and at such times as to ensure
uninterrupted progress of the Work and shall be stored properly and protected as
required by the Contract Documents. Contractor shall be entirely responsible for
damage or loss by weather or other causes to materials or Work. Materials shall be
stored on the Project Site in such manner so as not to interfere with any operations
of the City or any independent contractor.
D. Contractor shall verify all measurements, dimensions, elevations, and quantities
before ordering any materials or performing any Work, and the City shall not be liable
for Contractor’s failure to so. Except for an adjustment to Unit Price Work for item
Packet Page. 603
overruns and underruns in accordance with the Contract Documents, no additional
compensation, over and above payment for the actual quantities at the prices set
out in the Bid Schedule, will be allowed because of differences between actual
measurements, dimension, elevations and quantities and those indicated on the
Plans and in the Specifications. Any difference therein shall be submitted to the
Engineer for consideration before proceeding with the Work.
6.3 Test and Inspections.
A. Inspection and Testing of Work and Materials
1. If the Contract Documents, the Engineer, or any instructions, laws, ordinances, or
public authority requires any part of the Work to be tested or approved, Contractor
shall provide the Engineer at least two (2) working days’ notice of its readiness for
observation or inspection. If inspection is by a public authority other than the City,
Contractor shall promptly inform the City of the date fixed for such inspection.
Required certificates of inspection (or similar) shall be secured by Contractor.
Costs for City testing and inspection shall be paid by the City. Costs of tests for
Work found not to be in compliance shall be paid by the Contractor.
2. The Contractor shall pay for the cost of any minimum “show up” costs of a materials
testing technician that was called for by the Contractor but ultimately the Contractor
work was not ready for the inspection. Any such costs shall be deducted from any
amounts due to the Contractor.
3. If any Work is done or covered up without the required testing or approval, the
Contractor shall uncover or deconstruct the Work, and the Work shall be redone
after completion of the testing at the Contractor’s cost in compliance with the
Contract Documents.
4. Where inspection and testing are to be conducted by an independent laboratory
or agency, materials or samples of materials to be inspected or tested shall be
selected by such laboratory or agency, or by the City, and not by Contractor.
Unless otherwise stated and as provided by the Contract Documents, the City shall
employ and pay for the services of an independent testing laboratory to perform
all inspections, tests, or approvals required by the Contract Documents. All tests
or inspections of materials shall be made in accordance with the commonly
recognized standards of national organizations.
5. Reexamination of Work may be ordered by the City. If so ordered, Work must be
uncovered or deconstructed by Contractor. If Work is found to be in accordance
with the Contract Documents, the City shall pay the costs of reexamination and
reconstruction. If such work is found not to be in accordance with the Contract
Documents, Contractor shall pay all costs.
B. Testing of Materials
1. In advance of manufacture of materials to be supplied by Contractor which must
be tested or inspected, Contractor shall notify the City so that the City may arrange
for testing at the source of supply. Any materials which have not satisfactorily
passed such testing and inspection shall not be incorporated into the Work.
Packet Page. 604
2. If the manufacture of materials to be inspected or tested will occur in a plant or
location greater than sixty (60) miles from the City, the Contractor shall pay for any
excessive or unusual costs associated with such testing or inspection, including
but not limited to excessive travel time, standby time and required lodging.
3. Unless otherwise specified in the Special Provisions, all initial testing and a
reasonable amount of retesting will be performed under the direction of the
Engineer, and at no expense to the Contractor. The Contractor shall notify the
Engineer in writing, at least 15 days in advance, of its intention to use materials for
which tests are specified, to allow sufficient time to perform the tests. The notice
shall name the proposed supplier and source of material. If the notice of intent to
use is sent before the materials are available for testing or inspection, or is sent so
far in advance that the materials on hand at the time will not last but will be replaced
by a new lot prior to use on the Work, it will be the Contractor's responsibility to re-
notify the Engineer when samples which are representative may be obtained.
4. A Certificate of Compliance shall be furnished to the Engineer prior to the use of
any material or assembled material for which these Specifications so require or if
so required by the Engineer. The Engineer may waive the materials testing
requirements and accept a Certificate of Compliance. Material test data may be
required by the Engineer to be included with the submittal. Materials used on the
basis of a Certificate of Compliance may be sampled and tested at any time. The
submission of a Certificate of Compliance shall not relieve the Contractor of
responsibility for incorporating material into the Work which conforms to the
requirements of the Contract Documents, and any material not conforming to the
requirements will be subject to rejection by the Engineer whether in place or not.
5. Copies of mill certificates of composition and quality of all component materials
(reinforcing steel, structural steel, lumber, etc.) incorporated in the construction of
the Work shall be provided to the City at the time of delivery. City shall retain the
right to reject any raw material not provided with a mill certificate at the time of
delivery.
6. If, after incorporating such materials into the Work, it is found that sources of supply
that have been approved do not furnish a uniform product, or if the product from
any source proves unacceptable at any time, the Contractor shall furnish approved
material from other approved sources. If any product proves unacceptable after
improper storage, handling or for any other reason it shall be rejected, not
incorporated into the Work, and shall be removed from the Project Site all at the
Contractor’s expense.
6.4 Requests for Substitutions.
A. For the purposes of this provision, the term “substitution” shall mean the substitution
of any material, method or service substantially equal to or better in every respect to
that indicated in the Standard Specifications or otherwise referenced herein.
B. Pursuant to Public Contract Code section 3400(b), the City may make a finding that
is described in the Notice Inviting Bids that designates certain products, things, or
services by specific brand or trade name.
Packet Page. 605
C. Unless specifically designated in the Special Conditions, whenever any material,
process, or article is indicated or specified by grade, patent, or proprietary name or
by name of manufacturer, such specifications shall be deemed to be used for the
purpose of facilitating the description of the material, process, or article desired and
shall be deemed to be followed by the words “or equal.” Contractor may, unless
otherwise stated, offer for substitution any material, process, or article which may be
substantially equal to or better in every respect to that so indicated or specified in
the Contract Documents. However, the City has adopted uniform standards for
certain materials, processes, and articles.
D. The Contractor shall submit substitution requests, together with substantiating data,
for substitution of any “or equal” material, process, or article no later than thirty-five
(35) calendar days after award of Contract. Provisions regarding submission of
substitution requests shall not in any way authorize an extension of time for the
performance of this Contract. If a substitution request is rejected by the City, the
Contractor shall provide the material, method or service specified herein. The City
shall not be responsible for any costs incurred by the Contractor associated with
substitution requests. The burden of proof as to the equality of any material,
process, or article shall rest with the Contractor. The Engineer has the complete
and sole discretion to determine if a material, process, or article is substantially equal
to or better than that specified and to approve or reject all substitution requests.
E. Substantiating data as described above shall include, at a minimum, the following
information:
1. A signed affidavit from the Contractor stating that the material, process, or article
proposed as a substitution is substantially equal to or better than that specified in
every way except as may be listed on the affidavit.
2. Illustrations, specifications, catalog cut sheets, and any other relevant data
required to prove that the material, process, or article is substantially equal to or
better than that specified.
3. A statement of the cost implications of the substitution being requested, indicating
whether and why the proposed substitution will reduce or increase the amount of
the contract.
4. Information detailing the durability and lifecycle costs of the proposed substitution.
F. Failure to submit all the required substantiating data detailed above in a timely
manner so that the substitution request can be adequately reviewed may result in
rejection of the substitution request. The Engineer is not obligated to review multiple
submittals related the same substitution request resulting from the Contractor’s
failure to initially submit a complete package.
G. Time limitations within this Article shall be strictly complied with and in no case will
an extension of time for completion of the contract be granted because of
Contractor’s failure to provide substitution requests at the time and in the manner
described herein.
Packet Page. 606
H. The Contractor shall bear the costs of all the City work associated with the review of
substitution requests.
I. If substitution requests approved by the Engineer require that Contractor furnish
materials, methods or services more expensive than that specified, the increased
costs shall be borne by Contractor.
ARTICLE 7 -SUBSURFACE AND PHYSICAL CONDITIONS; UTILITIES
7.1 Soils Investigations.
A. When a soils investigation report for the Site is available, such report is provided for
informational purposes only. Any information obtained from such report as to
subsurface soil condition, or to elevations of existing grades or elevations of
underlying rock, is approximate only and is not guaranteed. Contractor
acknowledges that any soils investigation report (including any borings) was
prepared for purposes of design only and Contractor is required to examine the Site
before submitting its Bid and must make whatever tests it deems appropriate to
determine the condition of the soil.
7.2 Ownership of Site Materials Found.
A. The title to water, soil, rock, gravel, sand, minerals, timber and any other materials
developed or obtained in the excavation or other operations of Contractor or any of
its Subcontractors in the performance of the Contract, and the right to use said items
in carrying out the Contract, or to dispose of same, is hereby expressly reserved by
the City. Neither Contractor nor any of its Subcontractors nor any of their
representatives or employees shall have any right, title, or interest in said materials,
nor shall they assert or make any claim thereto. Contractor will, as determined by
the City’s Representative, be permitted to use in the Work without charge, any such
materials which meet the requirements of the Contract Documents, provided the City
shall have the right to use or consume these materials without payment to a third
party.
7.3 Existence of Utilities at the Work Site.
A. Existing Utilities
1. The location of known existing utilities and pipelines are shown on the Plans in
their approximate locations. However, nothing herein shall be deemed to require
the City to indicate the presence of existing service laterals or appurtenances
whenever the presence of such utilities on the site of the project can be inferred
from the presence of other visible facilities, such as buildings, cleanouts, meter
and junction boxes, on or adjacent to the Site of the Project.
2. The City will assume the responsibility for the timely removal, relocation, or
protection of existing main or trunk line utility facilities located on the Project site if
such utilities are not identified by the City in the Contract Documents or which
cannot reasonably be inferred from the presence of other visible facilities.
B. Utility Location
Packet Page. 607
1. It shall be the Contractor’s responsibility to determine the exact location and depth
of all utilities, including service connections, which have been marked by the
respective utility owners and which the Contractor believes may affect or be
affected by the Contractor’s operations. The Contractor shall not be entitled to
additional compensation nor time extensions for work necessary to avoid
interferences nor for repair to damaged utilities if the Contractor does not expose
all such existing utilities as required by this Article.
2. The locating of utilities shall be in conformance with Government Code Section
4216 et seq. except for the City’s utilities located on the City’s property and not on
public right-of-way.
3. A “High Priority Subsurface Installation” is defined in Government Code Section
4216 (j) as “high-pressure natural gas pipelines with normal operating pressures
greater than 415kPA gauge (60psig) or greater than six inches nominal pipe
diameter, petroleum pipelines, pressurized sewage pipelines, high-voltage electric
supply lines, conductors, or cables that have a potential to ground of greater than
or equal to 60kv, or hazardous materials pipelines that are potentially hazardous
to workers or the public if damaged.”
4. A “Subsurface Installation” is defined in Government Code Section 4216 (s) as
“any underground pipeline, conduit, duct, wire, or other structure, except
nonpressurized sewer lines, nonpressurized storm drains, or other nonpressurized
drain lines.”
5. Pursuant to Government Code Section 4216.2 the Contractor shall contact the
appropriate regional notification center at least two (2) working days but not more
than 14 Days before performing any excavation. The date of the notification shall
not count as part of the two-working-day notice. Before notifying the appropriate
regional notification center, the Contractor shall delineate the area to be
excavated. The Contractor shall request that the utility owners conduct a utility
survey and mark or otherwise indicate the location of their service. The Contractor
shall furnish to the Engineer written documentation of its contact(s) with the
regional notification center prior to commencing excavation at such locations.
6. After the utility survey is completed, the Contractor shall commence “potholing” or
hand digging to determine the actual location of the pipe, duct, or conduit and in
accordance with Government Code Section 4216.4 if the excavation within the
“tolerance zone” of a subsurface installation. The Engineer shall be given notice
prior to commencing potholing operations. The Contractor shall uncover all piping
and conduits, to a point one (1) foot below the pipe, where crossings, interferences,
or connections are shown on the Drawings, prior to trenching or excavating for any
pipe or structures, to determine actual elevations. New pipelines shall be laid to
such grade as to clear all existing facilities, which are to remain in service for any
period subsequent to the construction of the run of pipe involved.
7. The Contractor's attention is directed to the requirements of Government Code
Section 4216.2 (c) which provides: “When the excavation is proposed within 10
feet of a high priority subsurface installation, the operator of the high priority
subsurface installation shall notify the excavator of the existence of the high priority
subsurface installation to set up an onsite meeting prior to the legal excavation
Packet Page. 608
start date and time or at a mutually agreed upon time to determine actions or
activities required to verify the location and prevent damage to the high priority
subsurface installation. As part of the meeting, the excavator shall discuss with the
operator the method and tools that will be used during the excavation and the
information the operator will provide to assist in verifying the location of the
subsurface installation. The excavator shall not begin excavating until after the
completion of the onsite meeting.” The Contractor shall notify the Engineer in
advance of this meeting.
C. Utility Relocation and Repair
1. If interferences occur at locations other than those indicated in the Contract
Documents with reasonable accuracy, the Contractor shall notify the Engineer in
writing. The Engineer will supply a method for correcting said interferences in
accordance with the responsibilities of this section and Government Code Section
4215. To the extent any delay is caused thereby, Contractor shall submit a notice
of delay within five (5) Days of discovery of the circumstances giving rise to the
delay in accordance with Article 9.1 Change Orders and Time Extensions.
2. Care shall be exercised by the Contractor to prevent damage to adjacent existing
facilities and public or private works; where equipment will pass over these
obstructions, suitable planking shall be placed. If high priority subsurface
installations are damaged and the operator cannot be contacted, the Contractor
shall call 911 emergency services.
3. The City will compensate the Contractor for the costs of locating and repairing
damage not due to the failure of the Contractor to exercise reasonable care, and
for removing or relocating such main or trunk line utility facilities not indicated in
the Contract Documents with reasonable accuracy, and for the cost of equipment
on the Project necessarily idled during such work. The payment for such costs will
be made as provided in Article 9.1 Change Orders and Time Extensions. The
Contractor shall not be assessed liquidated damages for delay in completion of the
Project, when such delay is caused by the failure of the City or utility company to
provide for removal or relocation of such utility facilities. Requests for extensions
of time arising out of utility relocation or repair delays shall be filed in accordance
with Article 9.1 Change Orders and Time Extensions and Article 9.3 Time for
Completion and Liquidated Damages.
4. The public utility, where it is the owner of the affected utility, shall have the sole
discretion to perform repairs or relocation work or permit the Contractor to do such
repairs or relocation work at a reasonable price. The right is reserved to the City
and the owners of utilities or their authorized agents to enter upon the Work area
for the purpose of making such changes as are necessary for the rearrangement
of their facilities or for making necessary connections or repairs to their properties.
The Contractor shall cooperate with forces engaged in such work and shall
conduct its operations in such a manner as to avoid any unnecessary delay or
hindrance to the work being performed by such forces and shall allow the
respective utilities time to relocate their facility.
5. When the Contract Documents indicate that a utility is to be relocated, altered or
constructed by others, the City will conduct all negotiations with the utility company
Packet Page. 609
and the work will be done at no cost to the Contractor, unless otherwise stipulated
in the Contract Documents.
6. Temporary or permanent relocation or alteration of utilities desired by the
Contractor for its own convenience shall be the Contractor’s responsibility and it
shall make arrangements and bear all costs for such work.
D. Construction at Existing Utilities
1. Where the Work to be performed crosses or otherwise interferes with water, sewer,
gas, or oil pipelines; buried cable; or other public or private utilities, the Contractor
shall perform construction in such a manner so that no damage will result to either
public or private utilities. It shall be the responsibility of the Contractor to determine
the actual locations of, and make accommodates to maintain, all utilities.
2. Before any utility is taken out of service, permission shall be obtained by the
Contractor from the owner. The owner, any impacted resident or business owner
and the City Representative will be advised of the nature and duration of the utility
outage as well as the Contractor’s plan for providing temporary utilities if required
by the owner. The Contractor shall be liable for all damage which may result from
its failure to maintain utilities during the progress of the Work, and the Contractor
shall indemnify City as required by the Contract Documents from all claims arising
out of or connected with damage to utilities encountered during construction;
damages resulting from disruption of service; and injury to persons or damage to
property resulting from the negligent, accidental, or intentional breaching of
utilities.
3. Unless otherwise called for by the Contract Documents, the cost of all material,
equipment, and labor required to complete this work, shall be included in
Contractor’s bid and distributed in the schedule of pay Items. No additional
compensation shall be made to the Contractor for this work.
7.4 Trenches
A. Trenches Five Feet or More in Depth.
1. Contractor shall submit to the Engineer at the preconstruction meeting, a detailed
plan showing the design of shoring, bracing, sloping or other provisions to be made
for worker protection from hazards of caving ground during the excavation of any
trench or trenches five feet or more in depth. If such plan varies from shoring
system standards established by the Construction Safety Orders of the California
Code of Regulations, Department of Industrial Relations, the plan shall be
prepared by a California registered civil or structural engineer. The plan shall not
be less effective than the shoring, bracing, sloping, or other provisions of the
Construction Safety Orders, as defined in the California Code of Regulations. The
Contractor shall designate in writing the “competent person” as defined in Title 8,
California Code of Regulations, who shall be present at the Work Site each day
that trenching/excavation is in progress. The “competent person” shall prepare
and provide daily trenching/excavation inspection reports to the Engineer.
Contractor shall also submit a copy of its annual California Occupational Safety
and Health Administration (Cal/OSHA) trench/excavation permit.
Packet Page. 610
B. Excavations Deeper than Four Feet.
1. If the Work involves excavating trenches or other excavations that extend deeper
than four (4) feet below the surface, Contractor shall promptly within three (3)
Days, and before the excavation is further disturbed, notify the City in writing of
any of the following conditions:
a. Material that the Contractor believes may be material that is hazardous waste,
as defined in section 25117 of the Health and Safety Code, that is required to
be removed to a Class I, Class II, or Class III disposal site in accordance with
provisions of existing law.
b. Subsurface or latent physical conditions at the site differing from those
indicated.
c. Unknown physical conditions at the site of any unusual nature, different
materially from those ordinarily encountered and generally recognized as
inherent in work of the character provided for in the Contract.
2. The City shall promptly investigate the conditions, and if it finds that the conditions
do so materially differ, or do involve hazardous waste, and cause a decrease or
increase in Contractor’s cost of, or the time required for, performance of any part
of the Work, shall issue a Change Order under the procedures described in Article
9.1 Change Orders and Time Extensions.
3. In the event that a dispute arises between the City and the Contractor as to whether
the conditions materially differ, or involve hazardous waste, or cause a decrease
or increase in the Contractor’s cost of, or time required for, performance of any
part of the Work, the Contractor shall not be excused from any scheduled
completion date provided for by the Contract, but shall proceed with all Work to be
performed under the Contract. Contractor shall retain any and all rights provided
either by contract or by law which pertain to the resolution of disputes and protests
between the parties.
ARTICLE 8 -PROSECUTION OF THE WORK
8.1 Contractor’s Means and Methods.
A. Contractor is solely responsible for the means and methods utilized to perform the
Work. In no case shall the Contractor’s means and methods deviate from commonly
used industry standards. The Contractor shall also ensure that businesses adjacent
to the Work remain operational and that access to them is maintained throughout
construction.
8.2 Construction Schedule.
A. General Requirements. The schedule shall be prepared in a Critical Path Method
(“CPM”) format and in an electronic scheduling program acceptable to the City and
as specified in the Contract Documents. Contractor shall deliver the schedule and
all updates to the City in both paper and electronic form. The electronic versions
Packet Page. 611
shall be in the format and include all data used to prepare the schedule. Copies are
not acceptable.
B. Schedule. The receipt or approval of any schedules by the City shall not in any way
relieve the Contractor of its obligations under the Contract Documents. The
Contractor is fully responsible to determine and provide for any and all staffing and
resources at levels which allow for good quality and timely completion of the Project.
Contractor’s failure to incorporate all elements of Work required for the performance
of the Contract or any inaccuracy in the schedule shall not excuse the Contractor
from performing all Work required for a completed Project within the specified
Contract Time. If the required schedule is not received by the time the first payment
under the Contract is due, Contractor shall not be paid until the schedule is received,
reviewed and accepted by the City.
C. Schedule Contents. The schedule shall allow enough time for inclement weather.
The schedule shall indicate the beginning and completion dates of all phases of
construction; critical path for all critical, sequential time related activities; and “float
time” for all “slack” or “gaps” in the non-critical activities. The schedule shall include
appropriate time allowances and constraints for submittals, items of interface with
Work performed by others, and specified construction, start-up and performance
tests. All float shall be owned by the Project. Schedules indicating early or late
completion shall not modify or have any effect on the Contract Time, regardless of
whether the schedules are reviewed and/or accepted by the City. For purposes of
determining Liquidated Damages, the Contract Time shall control and may only be
altered by a duly authorized Change Order.
D. Schedule Updates. Contractor shall continuously update its construction schedule.
Contractor shall submit an updated and accurate construction schedule to the City:
(1) prior to the start of construction, if there are any changes to the initial schedule;
(2) with each progress payment request; and (3) whenever requested to do so by
the City. The City may withhold progress payments or other amounts due under the
Contract Documents if Contractor fails to submit an updated and accurate
construction schedule. Upon the City’s request, Contractor shall submit any
schedules or updates to the City in the native electronic format of the software used
to create the schedule. Contractor shall also submit schedules showing a two-week
detailed look-ahead at weekly meetings conducted with the City. The two-week look-
ahead schedule shall clearly identify all staffing and other resources which in the
Contractor’s judgment are needed to complete the Work within the Contract Time,
and it shall clearly state the number of staff to be used on each daily segment of the
Work.
E. Acceptance. Acceptance of the schedules by the City will not impose on
responsibility for accuracy, for sequencing, scheduling, or progress of the Work, or
compliance with the Contract Documents. Acceptance will not interfere with or
relieve Contractor from Contractor’s full responsibility therefor.
F. Recovery Schedule.
1. Should any of the following conditions exist, City may require Contractor to
prepare, at no extra cost to City, a plan of action and a recovery schedule for
Packet Page. 612
completing the Work and achieving all contractual milestones within the allotted
Contract Time:
a. The Contractor's monthly progress report indicates delays that are, in the
opinion of City, of sufficient magnitude that City questions the Contractor's
ability to complete the Work;
b. The schedule shows the Contractor to be thirty (30) or more days behind the
critical path at any time during construction;
c. The Contractor desires to make changes in the logic or the planned duration
of future activities of the schedule which, in the opinion of City, are major in
nature.
2. The recovery schedule shall include proposed revisions to the Construction
Schedule, demonstrating how Contractor intends to achieve all contractual
milestones including Contract completion within the allotted Contract Time. The
submittal shall include a narrative describing the actions planned by the Contractor
to recover the schedule.
3. Contractor shall submit the Recovery Schedule within seven (7) Days of City’s
request. If Contractor asserts that City is responsible for the delay, failure to submit
the recovery schedule within seven (7) Days of City’s request, will be considered
a concurrent delay event attributable to Contractor, and Contractor shall only be
entitled to non-compensable adjustments to Contract Times. If Contractor is
responsible for the delay, this provision will not limit or affect Contractor's liability
and failure to submit the recovery schedule with seven (7) Days of City’s request
may result in City withholding progress payments or other amounts due under the
Contract Documents.
4. Contractor is responsible for all costs associated with the preparation and
execution of the recovery schedule, including any necessary recovery actions,
which may include, but are not limited to, assignment of additional labor, and/or
equipment, shift or overtime work, expediting of submittals or deliveries,
overlapping of activities or sequencing changes to increase activity concurrence.
Regardless of whether City directs Contractor to prepare a recovery schedule
pursuant to this Section, Contractor shall promptly undertake appropriate action at
no additional cost to City to recover the schedule whenever the current
construction schedule shows that the Contractor will not achieve a milestone
and/or complete the Work within the allotted Contract Time.
8.3 Time for Completion and Liquidated Damages
A. Time for Completion. The time for completion set forth in Article 2 of the Contract
for Construction shall commence: (1) on the date stated in the Notice to Proceed, or
(2) if the Notice to Proceed does not specify a commencement date, then on the
date of the Notice to Proceed and shall be completed by Contractor in the time
specified in the Contract Documents. The City is under no obligation to consider
early completion of the Project; and the Contract completion date shall not be
amended by the City’s receipt or acceptance of the Contractor’s proposed earlier
completion date. Any difference in time between the Contractor’s early completion
Packet Page. 613
and the Contract Time shall be considered a part of the Project float. Contractor
shall not be entitled to compensation, and the City will not compensate Contractor,
for delays which impact early completion. Contractor shall not, under any
circumstances, receive additional compensation from the City (including but not
limited to indirect, general, administrative or other forms of overhead costs) for the
period between the time of earlier completion proposed by the Contractor and the
Contract completion date.
B. Liquidated Damages. If the Work is not completed within the Contract Time(s), it is
understood that the City will suffer damage. In accordance with Government Code
section 53069.85 and Public Contract Code section 7102, being impractical and
infeasible to determine the amount of actual damage, it is agreed that Contractor
shall pay to the City as fixed and liquidated damages, and not as a penalty, the sum
stipulated in the Contract for each calendar day of delay until the Work is fully
completed. Contractor and its surety shall be liable for any liquidated damages. Any
money due or to become due the Contractor may be retained to cover liquidated
damages.
C. Inclement Weather. Contractor shall abide by the Engineer’s determination of what
constitutes inclement weather. Time extensions for inclement weather shall only be
granted when the Work stopped during inclement weather is on the critical path of
the Project schedule. Contractor shall not be entitled to reverse liquidated damages
for time extensions resulting from inclement weather.
D. Extension of Time. Contractor’s entitlement to an extension of the Contract Time is
limited to a City-caused extension of the critical path, reduced by the Contractor’s
concurrent delays, and established by a proper time impact analysis. Contractor
shall not be charged liquidated damages because of any delays in completion of the
Work due to unforeseeable causes beyond the control and without the fault or
negligence of Contractor (or its Subcontractors or Suppliers). The City shall
ascertain the facts and extent of delay and grant extension of time for completing
the Work when, in its judgment, the facts justify such an extension. Contractor shall
not be entitled to an adjustment in the Contract Times for delays within the control
of Contractor. Delays attributable to and within the control of a Subcontractor or
Supplier shall be deemed to be delays within the control of Contractor.
E. Reverse Liquidated Damages. Consistent with Public Contract Code Section 7102,
Contractor will be compensated for damages incurred due to unreasonable delays
to the critical path for which the City is responsible. The parties agree that
determining Contractor’s exact delay damages are and will continue to be
impracticable and extremely difficult. As such, for each calendar day in excess of
the time for completion set forth in Article 2 of the Contract for Construction, the City
shall pay to the Contractor the sum stipulated in the Contract per day. Such amount
shall constitute the only payment allowed for any City-caused delays and shall
necessarily include all overhead, all profits, all administrative costs, all bond costs,
all labor, materials, equipment and rental costs and any other costs, expenses and
fees incurred or sustained as a result of such delays. Contractor shall not be entitled
to reverse liquidated damages for any change in the Work in which Contractor is
compensated for overhead and profit through a change in Unit Price Work or a
Change Order resulting in a lump sum or allowed mark-up for the additional Work.
Packet Page. 614
The amount of reverse liquidated damages shall be reduced by Contractor’s
concurrent delays.
F. Force Majeure. In accordance with subparagraphs “D” and “E” above, the
Contractor shall not be charged liquidated damages, and the City shall not be
responsible, for any delays resulting from a Force Majeure Event. If a delay to the
critical path results from a Force Majeure Event, the Contractor will be entitled to a
time extension but will not receive an adjustment to the Contract Price or any other
compensation. Such a non-compensable adjustment shall be Contractor’s sole and
exclusive remedy for such delays.
G. No Damages for Reasonable Delay. The City’s liability to Contractor for delays for
which the City is responsible shall be limited to only an extension of time unless such
delays were unreasonable under the circumstances. In no case shall the City be
liable for any costs which are borne by the Contractor in the regular course of
business, including, but not limited to, home office overhead and other ongoing
costs. Damages caused by unreasonable City delay shall be based on actual costs
only, no proportions or formulas shall be used to calculate any delay damages.
H. Procedure for Time Extensions and Delay Damages. Contractor shall not be entitled
to any extension of time or any reverse liquidated damages unless Contractor
properly notices the delay and adjustment to compensation and requests a Change
Order in accordance with Article 9.1 Change Orders and Time Extensions.
Contractor’s failure to timely and fully comply with the Change Order procedures in
the Contract Documents shall constitute a waiver of Contractor’s right to a time
extension or reverse liquidated damages.
8.4 Contractor’s Responsibility for Work.
A. Until the acceptance of the Work by the Engineer as evidenced in writing, it shall be
under the charge and care of the Contractor. The Contractor shall take every
necessary precaution against injury or damage to any part thereof by the action of
the elements or from any cause whether arising from the execution or non-execution
of the Work. The Contractor shall rebuild, repair, restore and make good at its own
expense all injuries or damages to any portion of the Work before its completion and
acceptance. In the event of damage proximately caused by an Act of God, as
defined by Section 7105 of the Public Contract Code, the City will pay for repair or
restoration to damaged Work in excess of 5% of the total Bid.
8.5 Occupancy.
A. The City reserves the right to occupy or utilize any portion of the Work at any time
before completion, and such occupancy or use shall not constitute acceptance of
any part of Work covered by this Contract. This use shall not relieve the Contractor
of its responsibilities under the Contract.
8.6 Securities for Money Withheld
A. Pursuant to section 22300 of the Public Contract Code of the State of California,
Contractor may request the City to make retention payments directly to an escrow
agent or may substitute securities for any money withheld by the City to ensure
Packet Page. 615
performance under the contract. At the request and expense of Contractor,
securities equivalent to the amount withheld shall be deposited with the City or with
a state or federally chartered bank as the escrow agent who shall return such
securities to Contractor upon satisfactory completion of the contract. Deposit of
securities with an escrow agent shall be subject to a written agreement substantially
in the form provided in section 22300 of the Public Contract Code.
8.7 The City’s Right to Suspend/Terminate the Contract
A. Suspension of Work by the City
1. The City may, at its sole option, decide to suspend at any time the performance of
all or any portion of the Work by notice in writing to Contractor. Such notice of
suspension of Work will designate the amount and type of plant, labor, and
equipment to be committed to the Project during the period of suspension.
Contractor shall use its best efforts to utilize its plant, labor, and equipment in such
a manner as to minimize costs associated with suspension.
2. Upon receipt of any such notice, Contractor shall, unless the notice requires
otherwise:
a. Immediately discontinue Work on the date and to the extent
specified in the notice;
b. Place no further orders or subcontracts for material, services, or
facilities with respect to suspended Work other than to the extent required
in the notice;
c. Promptly make every reasonable effort to obtain suspension upon
terms satisfactory to the City’s Representative of all orders, subcontracts,
and rental agreements to the extent they relate to performance of Work
suspended; and
d. Continue to protect and maintain the Work including those portions
on which Work has been suspended.
3. Except as provided by this Article, as full and complete compensation for such
suspension, Contractor shall be granted an adjustment in the Contract Price based
on a negotiated daily rate that reflects the Contractor’s actual costs associated with
the demobilized condition of the Site and an extension of the Contract Times equal
to the number of days performance of Work is suspended; provided, however, that
no adjustment of Contract Price or extension of Contract Times shall be granted if
the suspension results from Contractor's non-compliance with the requirements of
the Contract.
B. Termination for Cause by the City:
1. In the sole estimation of the City, if the Contractor refuses or fails to prosecute the
Work or any separable part thereof with such diligence as will insure its completion
within the time specified by the Contract Documents, or any extension thereof, or
fails to complete such Work within such time, or if the Contractor should be
Packet Page. 616
adjudged a bankrupt, or if it should make a general assignment for the benefit of
its creditors, or if a receiver should be appointed on account of its insolvency, or
the Contractor or any of its subcontractors should violate any of the provisions of
this Contract, the City may serve written notice upon the Contractor and its surety
of the City's intention to terminate this Contract. This notice of intent to terminate
shall contain the reasons for such intention to terminate this Contract, and a
statement to the effect that the Contractor's right to perform this Contract shall
cease and terminate upon the expiration of ten (10) Days unless such violations
have ceased and arrangements satisfactory to the City have been made for
correction of said violations.
2. After expiration of the ten (10) Day period, the City may terminate the Contract by
providing a Notice of Termination to the Contractor. The City may take over and
complete the Work by any method it may deem appropriate, including enforcement
of the Project performance bond. Contractor and its surety shall be liable to the
City for any excess costs or other damages incurred by the City to complete the
Work. If the City takes over the Work, the City may, without liability for so doing,
take possession of and utilize in completing the Work such materials, appliances,
plant, and other property belonging to the Contractor as may be on the Site.
3. Upon termination, Contractor shall not be entitled to receive any further payment
from the City, except for Work which was duly performed prior to the effective date
of the Notice of Termination. Contractor shall submit an invoice for final payment
within thirty (30) Days of the effective date of the Notice of Termination. The City
may withhold from final payment up to 150% of any disputed amounts, including
any amounts which may be necessary to repair defective Work, complete
unfinished Work, or are otherwise occasioned by Contractor’s failure to perform its
duties under the Contract.
C. Termination for Convenience by the City:
1. The City may terminate performance of the Work called for by the Contract
Documents in whole or, from time to time, in part, upon ten (10) Days written notice
if the City determines that a termination is in the City's interest.
2. The Contractor shall terminate all or any part of the Work upon delivery to the
Contractor of a Notice of Termination specifying that the termination is for the
convenience of the City, the extent of termination, and the effective date of such
termination.
3. After receipt of Notice of Termination, and except as directed by the City's
Representative, the Contractor shall, regardless of any delay in determining or
adjusting any amounts due under this termination for convenience clause,
immediately proceed with the following obligations:
a. Stop Work as specified in the Notice.
b. Complete any Work specified in the Notice of Termination in a least
cost/shortest time manner while still maintaining the quality called for under
the Contract Documents.
Packet Page. 617
c. Leave the property upon which the Contractor was working and
upon which the facility (or facilities) forming the basis of the Contract
Document is situated in a safe and sanitary manner such that it does not
pose any threat to the public health or safety.
d. Terminate all subcontracts to the extent that they relate to the
portions of the Work terminated.
e. Place no further subcontracts or orders, except as necessary to
complete the continued portion of the Contract.
f. Submit to the City's Representative, within ten (10) Days from the
effective date of the Notice of Termination, all of the usual documentation
called for by the Contract Documents to substantiate all costs incurred by
the Contractor for labor, materials and equipment through the effective date
of the Notice of Termination. Any documentation substantiating costs
incurred by the Contractor solely as a result of the City's exercise of its right
to terminate this Contract pursuant to this clause, which costs the
contractor is authorized under the Contract documents to incur, shall: (1)
be submitted to and received by the Engineer no later than 30 Days after
the effective date of the Notice of Termination; (2) describe the costs
incurred with particularity; and (3) be conspicuously identified as
“Termination Costs occasioned by the City's Termination for Convenience.”
If the City rejects any costs, Contractor shall be deemed to waive the
rejected costs unless Contractor files a Claim within thirty (30) Days of the
rejection pursuant to Article 9.2.
g. Contractor shall be entitled to receive only the amounts payable
under this Article, and Contractor specifically waives any claim for any other
amounts or damages, including, but not limited to, any claim for
consequential damages or lost profits. The provisions in this Article are in
addition to and not in limitation of any other rights or remedies available to
the City.
4. Termination of the Contract shall not relieve surety of its obligation for any just
claims arising out of or relating to the Work performed.
5. Notwithstanding any other provision of this Article, when immediate action is
necessary to protect life and safety or to reduce significant exposure or liability, the
City may immediately order Contractor to cease Work on the Project until such
safety or liability issues are addressed to the satisfaction of the City or the Contract
is terminated.
6. If the City terminates Contractor for cause, and if it is later determined that the
termination was wrongful, such default termination shall automatically be
converted to and treated as a termination for convenience. In such event,
Contractor shall be entitled to receive only the amounts payable under this section,
and Contractor specifically waives any claim for any other amounts or damages,
including, but not limited to, any claim for consequential damages or lost profits.
Packet Page. 618
8.8 Completion and Acceptance of Work
A. Final Inspection. Upon written notice from Contractor that the entire Work is
complete, the Engineer will promptly make a final inspection with the City and
Contractor and will notify Contractor in writing of all particulars in which this
inspection reveals that the Work is incomplete or defective. Contractor shall
immediately take such measures as are necessary to complete such Work or
remedy such deficiencies.
B. Final Acceptance. The acceptance of the Work on behalf of the City will be made
by the Engineer. Such acceptance by the City shall not constitute a waiver of
defects. After Contractor has, in the opinion of the Engineer, satisfactorily completed
all corrections identified during the final inspection and has delivered, in accordance
with the Contract Documents, all maintenance and operating instructions,
schedules, guarantees, bonds, certificates or other evidence of insurance,
certificates of inspection, Record Documents, and other documents required by the
Contract Documents, the City shall execute a Notice of Completion, constituting final
acceptance and completion of the Project, except as may be expressly noted.
8.9 Warranty and Guaranty of Work.
A. Contractor hereby warrants that materials and Work shall be completed in
conformance with the Contract Documents and that the materials and Work provided
will fulfill the requirements of this Warranty. Contractor hereby agrees to repair or
replace, at the discretion of the City, any or all Work that may prove to be defective
in its workmanship, materials furnished, methods of installation or fail to conform to
the Contract Document requirements together with any other Work which may be
damaged or displaced by such defect(s) within a period of one (1) year (or as
otherwise indicated in the Contract Documents or in any guarantee or warranty
provided by any manufacturer or supplier of equipment or materials incorporated into
the Work, whichever is later) from the date of the Notice of Completion of the Project
without any expense whatever to the City, ordinary wear and tear and unusual abuse
and neglect excepted. Contractor shall be required to promptly repair or replace
defective equipment or materials, at Contractor’s option. All costs associated with
such corrective actions and testing, including the removal, replacement, and
reinstitution of equipment and materials necessary to gain access, shall be the sole
responsibility of the Contractor.
B. For any Work so corrected, Contractor’s obligation hereunder to correct defective
Work shall be reinstated for an additional one (1) year period, commencing with the
date of acceptance of such corrected Work. The reinstatement of the one (1) year
warranty shall apply only to that portion of work that was corrected. Contractor shall
perform such tests as the City may require to verify that any corrective actions,
including, without limitation, redesign, repairs, and replacements comply with the
requirements of the Contract. In the event of Contractor’s failure to comply with the
above-mentioned conditions within ten (10) Days after being notified in writing of
required repairs, to the reasonable satisfaction of the City, the City shall have the
right to correct and replace any defective or non-conforming Work and any work
damaged by such work or the replacement or correction thereof at Contractor’s sole
expense. Contractor shall be obligated to fully reimburse the City for any expenses
incurred hereunder immediately upon demand.
Packet Page. 619
C. In addition to the warranty set forth in this Article, Contractor shall obtain for the City
all warranties that would be given in normal commercial practice and assign to the
City any and all manufacturer’s or installer’s warranties for equipment or materials
not manufactured by Contractor and provided as part of the Work, to the extent that
such third-party warranties are assignable and extend beyond the warranty period
set forth in this Article. Contractor shall furnish the City with all warranty and
guarantee documents prior to final acceptance of the Project by the City as required.
D. When specifically indicated in the Contract Documents or when directed by the
Engineer, the City may furnish materials or products to the Contractor for installation.
In the event any act or failure to act by Contractor shall cause a warranty applicable
to any materials or products purchased by the City for installation by the Contractor
to be voided or reduced, Contractor shall indemnify the City from and against any
cost, expense, or other liability arising therefrom, and shall be responsible to the City
for the cost of any repairs, replacement or other costs that would have been covered
by the warranty but for such act or failure to act by Contractor.
E. The Contractor shall remedy at its expense any damage to City-owned or controlled
real or personal property.
F. The City shall notify the Contractor, in writing, within a reasonable time after the
discovery of any failure, defect, or damage. The Contractor shall within ten (10)
Days after being notified commence and perform with due diligence all necessary
Work. If the Contractor fails to promptly remedy any defect or damage, the City shall
have the right to replace, repair or otherwise remedy the defect, or damage at the
Contractor’s expense.
G. In the event of any emergency constituting an immediate hazard to health, safety,
property, or licensees, when caused by Work of the Contractor not in accordance
with the Contract requirements, the City may undertake at Contractor’s expense,
and without prior notice, all Work necessary to correct such condition.
H. Acceptance of Defective Work.
1. If, instead of requiring correction or removal and replacement of defective Work,
the City prefers to accept it, the City may do so. Contractor shall pay all claims,
costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or arbitration
or other dispute resolution costs) attributable to the City’s evaluation of and
determination to accept such defective Work and for the diminished value of the
Work. If any acceptance of Defective Work occurs prior to release of the Project
retention, a Change Order will be issued incorporating the necessary revisions in
the Contract Documents with respect to the Work, and the City shall be entitled to
an appropriate decrease in the Contract Price, reflecting the diminished value of
Work and all costs incurred by the City. If the acceptance of defective occurs after
release of the Project retention, an appropriate amount will be paid by Contractor
to the City.
I. The City May Correct Defective Work
Packet Page. 620
1. If Contractor fails within a reasonable time after written notice from the City to
correct Defective Work, or to remove and replace rejected Work as required by the
City, or if Contractor fails to perform the Work in accordance with the Contract
Documents, or if Contractor fails to comply with any other provision of the Contract
Documents, the City may, after seven (7) Days written notice to Contractor,
correct, or remedy any such deficiency.
2. In connection with such corrective or remedial action, the City may exclude
Contractor from all or part of the Site, take possession of all or part of the Work
and suspend Contractor’s services related thereto, take possession of Contractor’s
tools, appliances, construction equipment and machinery at the Site, and
incorporate in the Work all materials and equipment stored at the Site or for which
the City has paid Contractor but which are stored elsewhere. Contractor shall allow
the City, and the agents, employees, other contractors, and consultants of each of
them, access to the Site to enable the City to exercise the rights and remedies to
correct the Defective Work.
3. All claims, costs, losses, and damages (including but not limited to all fees and
charges of engineers, architects, attorneys, and other professionals and all court
or arbitration or other dispute resolution costs) incurred or sustained by the City
correcting the Defective Work will be charged against Contractor, and a Change
Order will be issued incorporating the necessary revisions in the Contract
Documents with respect to the Work; and the City shall be entitled to an
appropriate decrease in the Contract Price. Such claims, costs, losses and
damages will include but not be limited to all costs of repair, or replacement of work
of others destroyed or damaged by correction, removal, or replacement of
defective Work.
4. If the Change Order is executed after all payments under the Contract have been
paid by the City and the Project Retention is held in an escrow account as
permitted by the Contract Documents, Contractor will promptly alert the escrow
holder, in writing, of the amount of Retention to be paid to the City. If the Change
Order is executed after release of the Project retention, an appropriate amount will
be paid by Contractor to the City. Contractor shall not be allowed an extension of
the Contract Times because of any delay in the performance of the Work
attributable to the City correcting Defective Work.
J. Nothing in the warranty or in the Contract Documents shall be construed to limit the
rights and remedies available to the City at law or in equity, including, but not limited
to, Code of Civil Procedure section 337.15.
ARTICLE 9 -CHANGE ORDERS; DISPUTE RESOLUTION
9.1 Change Orders and Time Extensions
All changes to the Contract, including compensation increases and time extensions, shall be
through a written Change Order in accordance with this Article. The City, without invalidating the
Contract, may order changes in the Work consisting of additions, deletions or other revisions, and
Contractor’s compensation and the time for completion shall be adjusted accordingly. Whenever
any change is made as provided for herein, such change shall be considered and treated as
though originally included in the Contract, and shall be subject to all terms, conditions, and
Packet Page. 621
provisions of the original Contract. Contractor shall not be entitled to claim or bring suit for
damages, whether for loss of profits or otherwise, on account of any decrease or omission of any
item or portion of Work to be done. No dispute, disagreement, or failure of the parties to reach
agreement on the terms of the Change Order shall relieve the Contractor from the obligation to
proceed with performance of the Work, including Additional Work, promptly and expeditiously.
Any alterations, extensions of time, Additional Work, or any other changes may be made without
securing consent of the Contractor’s surety or sureties.
A. Change in Contract Procedures
1. City Directive. The City may direct changes in the Work by delivering a written
directive. To the extent the work directive results in a change to compensation or
time, Contractor must timely request a Change Order and comply with all Change
Order procedures in accordance with this Article. Notwithstanding issuance of a
work directive, Contractor’s failure to timely request a Change Order shall
constitute a waiver by Contractor of any adjustment to compensation or time
extension for Work performed under the directive. The City shall not be liable to
Contractor for Work performed or omitted by Contractor in reliance on verbal
orders.
2. Contractor’s Notice of Change/Delay. If Contractor intends to initiate a Change
Order Request, then Contractor shall provide the City with written notice of the
underlying facts and circumstances that gave rise to the proposed change within
the following times:
a. If due to unknown subsurface or latent physical conditions, within three (3) days
from the discovery date or prior to the alterations of the conditions, whichever
is earlier.
b. If due to a Force Majeure Event, as soon as reasonably practicable under the
conditions, which shall be no longer than three (3) days from the date the
Contractor discovers that the Force Majeure Event gives rise to a change,
unless that the conditions are such that notice within three (3) days is not
possible or practicable.
c. If due to any other matter that may involve an adjustment to the Contract Time
or the Contract Price, within seven (7) days from the discovery date.
To be considered valid and complete, the notice of change/delay shall include
a general statement of the circumstances giving rise to the notice of
change/delay and a reasonable order of magnitude estimate of the additional
costs and/or time. If the circumstances give rise to both a cost adjustment and
time extension, Contractor shall submit the notice of change and notice of delay
concurrently.
3. Request for Change in Compensation and/or Extension of Time. Contractor shall
submit a Change Order Request for any adjustment to Contractor’s compensation
and/or any extension of time. The Change Order Request shall be made prior to
incurring any expense and within fourteen (14) Days from either Contractor’s
notice of change/delay or the City’s directive ordering the change. The Change
Packet Page. 622
Order Request shall include all of the following information (unless inapplicable to
the change):
a. A detailed description of the circumstances giving rise to the
request;
b. A complete itemized cost proposal, including itemized pricing for
first tier Subcontractors;
c. Supporting documentation for all costs;
d. A time impact analysis showing the impact of the delay to the critical
path to completion;
e. If any added costs or information cannot be determined at the time
of the Change Order Request, the reason the costs or information cannot
be determined at the time; and
f. Certification to the accuracy of the Change Order Request under
penalty of perjury.
The time impact analysis shall be in the critical path method format
and shall show the sequencing of all critical and non-critical new
activities and/or activity revisions affected by the delay, with logic
ties to all affected existing activities noted on the schedule.
The City may demand, and Contractor shall provide, any additional
information supporting the Change Order Request, including but
not limited to native electronic format version of schedules and time
impact analyses. Contractor shall provide the requested additional
information within five (5) Days of the request.
For any costs or information that cannot be determined at the time
Contractor submits the Change Order Request, Contractor shall
submit to the City notice of the costs or information and all
supporting documentation within five (5) Days of when the costs or
other information become subject to determination.
4. City’s Final Decision on Change Order; Ordered Changes. If the City denies the
Change Order Request or disagrees with the proposal submitted by Contractor, it
will notify the Contractor, and the City will provide its opinion of the appropriate
price and/or time extension. If no agreement can be reached, the City shall have
the right to order the Work performed on a time and materials basis or to issue a
unilateral Change Order setting forth the City’s determination of the reasonable
additions or savings in costs and time attributable to the extra or deleted work. The
City shall also have the right to order changes in the Work to be performed
promptly by the Contractor on a time and materials basis or to issue a unilateral
Change Order setting forth the City’s determination of the reasonable additions or
savings in costs and time attributable to the extra or deleted work. The City’s
determination shall become final and binding if the Contractor fails to submit a
Claim in writing to the City within fourteen (14) Days of the issuance of the
Packet Page. 623
unilateral Change Order, disputing the terms of the unilateral Change Order and
providing such supporting documentation for its position as the City may
reasonably require.
5. Contractor’s Waiver of Further Relief. CONTRACTOR’S FAILURE TO PROVIDE
A COMPLETE AND TIMELY NOTICE OF CHANGE/DELAY AND/OR CHANGE
ORDER REQUEST, OR TO COMPLY WITH ANY OTHER REQUIREMENT OF
THIS ARTICLE, SHALL CONSTITUTE A WAIVER BY CONTRACTOR OF THE
RIGHT TO A CONTRACT ADJUSTMENT ON ACCOUNT OF SUCH
CIRCUMSTANCES AND A WAIVER OF ANY RIGHT TO FURTHER RECOURSE
OR RECOVERY BY REASON OF OR RELATED TO SUCH CHANGE BY
MEANS OF THE CLAIMS DISPUTE RESOLUTION PROCESS OR BY ANY
OTHER LEGAL PROCESS OTHERWISE PROVIDED FOR UNDER
APPLICABLE LAWS.
Contractor recognizes and acknowledges that timely submission of a formal written
notice of change/delay and Change Order Request, whether or not the
circumstances of the change may be known to the City or available to the City
through other means, is not a mere formality but is of crucial importance to the
ability of the City to promptly identify, prioritize, evaluate and mitigate the potential
effects of changes. Any form of informal notice, whether verbal or written
(including, without limitation, statements in requests for information, statements in
Submittals, statements at any job meeting or entries on monthly reports, daily logs
or job meeting minutes), that does not strictly comply with the formal requirements
of this Article, shall accordingly be insufficient.
6. Change Order Format
a. A Change Order signed by the Contractor indicates the Contractor's agreement
therewith, including any adjustment in compensation or extension of time, and
the full and final settlement of all costs (direct, indirect and overhead) related
to the Work authorized by the Change Order.
b. The City may designate the forms to be used for notices, requests, and Change
Orders. If so designated, Contractor may only use such forms. Contractor
shall not reserve a right to assert impact costs, extended job site costs,
extended overhead, constructive acceleration and/or actual acceleration
beyond what is stated in the Change Order. No Claims shall be allowed for
impact, extended overhead costs, constructive acceleration and/or actual
acceleration due to a multiplicity of changes and/or clarifications. The
Contractor may not change or modify the City’s Change Order form in an
attempt to reserve additional rights.
B. Determining Adjustments to Compensation.
1. Limitation on Costs. Contractor shall not be entitled to any compensation for Work
subject to a Change Order except as expressly set forth in this Article. The mark-
up added in instances of Additional Work shall constitute the entire amount of
profit, any mark-ups, any field or home office overhead costs, including personnel,
equipment or office space, any materials, or any costs of equipment idle time for
such Work.
Packet Page. 624
2. Unit Price Change Orders. When the actual quantity of a Unit Price Work item
varies from the Bid Schedule, compensation for the change in quantity will be
calculated by multiplying the actual quantity by the unit price. This calculation may
result in either an additive or deductive Change Order. Bid items included on the
Bid Schedule may be deducted from the Work in their entirety without any
negotiated extra costs. Because Unit Price Work includes overhead and profit as
determined by Contractor at the time of its Bid submission, no mark up or deduction
for overhead and profit will be allowed.
3. Lump Sum Change Orders. Whenever possible, any changes affecting
compensation shall be in a lump sum mutually agreed by the Contractor and the
City.
4. Time and Materials Change Orders. The City may direct the Contractor to proceed
with the Additional Work with payment to be made on the basis of actual cost of
the labor and materials required to complete the Additional Work. If the Project is
federally funded, a time and materials Change Order shall only be issued after a
determination that no other Change Order is suitable and the Change Order shall
include a ceiling price that the Contractor exceeds at its own risk.
5. Federally Funded Projects. For any change in price to the Contract, general and
administrative expenses shall be negotiated and must conform to the cost
principles set forth under at 2 C.F.R. Part 200, subpart E, and profit shall be
negotiated as a separate element of the cost. To establish a fair and reasonable
profit, consideration must be given to the complexity of the Additional Work to be
performed, the risk borne by the Contractor, the Contractor's investment, the
amount of subcontracting, the quality of its record of past performance, and
industry profit rates in the surrounding geographical area for similar work.
6. Allowed Costs. Estimates for lump sum quotations and accounting for time-and-
material work shall be limited to direct expenditures necessitated specifically by
the change and shall be segregated as follows:
a. Labor. The costs of labor will be the actual cost for wages prevailing locally for
each craft or type of worker at the time the Additional Work is done, plus
employer payments of payroll taxes and insurance, health and welfare,
pension, vacation, apprenticeship funds, and other direct costs resulting from
federal, state or local laws, as well as assessment or benefits required by lawful
collective bargaining agreements. The use of a labor classification which
would increase the Additional Work cost will not be permitted unless the
Contractor establishes the necessity for such additional costs. Labor costs for
equipment operators and helpers shall be reported only when such costs are
not included in the invoice for equipment rental.
b. Materials. The cost of materials reported shall be at the lowest current price at
which such materials are locally available in the quantities involved, plus sales
tax, freight and delivery. Materials costs shall be based upon supplier or
manufacturer’s invoice.
c. Tool and Equipment Use. Regardless of ownership, the rates to be used in
determining equipment use shall not exceed listed rates prevailing locally at
Packet Page. 625
equipment rental agencies, or distributors, at the time the work is performed.
The Contractor shall furnish cost data supporting the establishment of the
rental rate. The rental rate to be applied for use of each items of equipment
shall be the rate resulting in the least total cost to the City for the total period
of use. The City shall the make the final determination as to an equitable rental
rate for the equipment. No payment will be made for the use of small tools,
which have a replacement value of $1,000 or less.
(i) The rental time to be paid for equipment shall be the time the equipment
is in productive operation on the Additional Work being performed.
Rental time will not be allowed while equipment is inoperative due to
breakdowns.
(ii) All equipment shall, in the opinion of the City, be in good working
condition and suitable for the purpose for which the equipment is to be
used. Equipment with no direct power unit shall be powered by a unit
of at least the minimum rating recommended by the manufacturer.
(iii) Before construction equipment is used on any Additional Work, the
Contractor shall plainly stencil or stamp an identifying number thereon
at a conspicuous location, and shall furnish to the City, in duplicate, a
description of the equipment and its identifying number.
(iv) When hourly rates are listed, any part of an hour less than 30 minutes
of operation shall be considered to be 1/2-hour of operation, and any
part of an hour greater than 30 minutes will be considered one hour of
operation. When daily rates are listed, any part of a day less than 4
hours operation shall be considered to be 1/2-day of operation.
d. Allowed Mark-up. The allowed mark-up for any and all overhead (including
supervision and home and field office costs) and profit on work added to the
Contract shall be determined in accordance with the following provisions:
(i) “Net Cost” is defined as the actual costs of labor, materials and tools
and equipment only, excluding overhead and profit. The costs of
applicable insurance and bond premium will be reimbursed to the
Contractor and Subcontractors at cost only, without mark-up.
Contractor shall provide the City with documentation of the costs,
including but not limited to payroll records, invoices, and such other
information as the City may reasonably request.
(ii) For Work performed by the Contractor’s forces the allowed mark-up
shall not exceed fifteen (15%) percent of labor costs, ten percent (10%)
of material costs, and ten percent (10%) of the cost of tools and
equipment use.
(iii) For Work performed by a Subcontractor, the added cost for overhead
and profit shall not exceed fifteen percent (15%) of the Subcontractor’s
Net Cost of the Work to which the Contractor may add up to five percent
(5%) of the Subcontractor’s Net Cost.
Packet Page. 626
(iv) For Work performed by a sub-subcontractor, the added cost for
overhead and profit shall not exceed fifteen percent (15%) of the sub-
subcontractor’s Net Cost for Work to which the Subcontractor and
Contractor may each add up to an additional five percent (5%) of the
Net Cost of the lower tier subcontractor.
(v) No additional mark-up will be allowed for lower tier subcontractors, and
in no case shall the added cost for overhead and profit payable by the
City exceed twenty-five percent (25%) of the Net Cost as defined
herein, of the party that performs the Work.
(vi) Calculation of the mark-up will be subject to the limitations above and
to calculation as further detailed in (b)(B)(5) above.
e. Documentation of Time-and-Material Costs.
(i) T&M Daily Sheets. Contractor must submit timesheets, materials
invoices, records of equipment hours, and records of rental equipment
hours to the City’s for an approval signature each day that Work is
performed on a time-and-material basis. The Engineer’s signature on
time sheets only serves as verification that the Work was performed
and is not indicative of the City’s agreement to Contractor’s entitlement
to the cost.
(ii) T&M Summary Sheet. Contractor shall submit a T&M Summary Sheet,
which shall include total actual costs, within five (5) Days following
completion of Additional Work on a time-and-material basis.
Contractor’s total actual cost shall be presented in a summary table in
an electronic spreadsheet file by labor, material, equipment, and any
other costs, along with documentation supporting the costs.
Contractor’s failure to submit the T&M Summary Sheet within five (5)
Days of completion of the Additional Work will result in Contractor’s
waiver for any reimbursement of any costs associated with the
Additional Work.
f. Excluded Costs. The following costs or any other home or field office overhead
costs, all of which are to be considered administrative costs covered by the
Contractor’s mark-up, shall not be allowed costs and shall not be included in
any lump sum proposals or time-and-materials invoices:
(i) Overhead Cost. Payroll costs and other compensation of Contractor’s
officers, executives, principals, general managers, engineers,
architects, estimators, attorneys, auditors, accountants, purchasing
and contracting agents, timekeepers, clerks, and other personnel
employed by Contractor whether at the Site or in Contractor’s principal
office or any branch office, material yard, or shop for general
administration of the Work;
(ii) Office Expenses. Expenses of Contractor’s principal and branch
offices;
Packet Page. 627
(iii) Capital Expenses. Any part of Contractor’s capital expenses, including
interest on Contractor’s capital employed for the Additional Work and
charges against Contractor for delinquent payments;
(iv) Negligence. Costs due to the negligence of Contractor or any
Subcontractor or Supplier, or anyone directly or indirectly employed by
any of them or for whose acts any of them may be liable, including
without limitation the correction of Defective Work, disposal of materials
or equipment wrongly supplied, and making good any damage to
property;
(v) Small Tools. Cost of small tools valued at less than $1,000 and that
remain the property of Contractor;
(vi) Administrative Costs. Costs associated with the preparation of Change
Orders (whether or not ultimately authorized), cost estimates, or the
preparation or filing of Claims;
(vii) Anticipated Lost Profits. Expenses of Contractor associated with
anticipated lost profits or lost revenues, lost income or earnings, lost
interest on earnings, or unpaid retention;
(viii) Home Office Overhead. Costs derived from the computation of a
“home office overhead” rate by application of the Eichleay, Allegheny,
burden fluctuation, or other similar methods;
(ix) Special Consultants and Attorneys. Costs of special consultants or
attorneys, whether or not in the direct employ of Contractor, employed
for services specifically related to the resolution of a Claim, dispute, or
other matter arising out of or relating to the performance of the
Additional Work.
(x) Other. Other overhead or general expense costs of any kind and the
cost of any item not specifically and expressly included in the Contract
Documents; including but not limited to: submittals, drawings, field
drawings, shop drawings, including submissions of drawings; field
inspection; general superintendence; computer services; reproduction
services; salaries of project engineer, superintendent, timekeeper,
storekeeper, and secretaries; janitorial services; small tools, incidentals
and consumables; temporary on-site facilities (offices, telephones, high
speed internet access, plumbing, electrical power, lighting; platforms,
fencing, water); surveying; estimating; protection of work; handling and
disposal fees; final cleanup; other incidental work; related warranties;
insurance and bond premiums.
(xi) Compliance with Federal Cost Principles. If the Project is federally
funded, any costs that are not allowable, reasonable and allocable to
the Project, under generally accepted accounting principles and the
applicable federal requirements.
Packet Page. 628
9.2 Procedure for Resolving Claims.
Contractor shall timely comply with any and all requirement of the Contract Documents pertaining
to notices and requests for changes to the Contract Time or Contract Price, including but not
limited to all requirements of Article 9.1, as a prerequisite to filing any claim governed by this
Article. The failure to timely submit a notice of delay or notice of change, or to timely request a
change to the time for completion or Contractor’s compensation, or to timely provide any other
notice or request required herein shall constitute a waiver of the right to further pursue the claim
under the Contract or at law.
A. Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public
Contract Code prescribes a process utilizing informal conferences, non-binding
judicial supervised mediation, and judicial arbitration to resolve disputes on
construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of
the Public Contract Code prescribes a process for negotiation and mediation to
resolve disputes on construction claims. The intent of this Article is to implement
Sections 20104 et seq. and Section 9204 of the California Public Contract Code.
This Article shall be construed to be consistent with all applicable law, including but
not limited to these statutes.
B. Claims. For purposes of this Article, “Claim” means a separate demand by the
Contractor for:
1. An adjustment to the time for completion including, without limitation, for relief from
damages or penalties for delay assessed by the City;
2. Payment by the City of money or damages arising from Work done by or on behalf
of the Contractor pursuant to the Contract, payment for which is not otherwise
expressly provided or to which the Contractor is not otherwise entitled; or
3. An amount the payment of which is disputed by the City.
A “Claim” does not include any demand for payment for which the Contractor has
failed to provide notice, request a Change Order, or otherwise failed to follow any
procedures contained in the Contract Documents.
C. Filing Claims. Claims governed by this Article may not be filed unless and until the
Contractor completes any and all requirements of the Contract Documents
pertaining to notices and requests for changes to the Contract Time or Contract
Price, and Contractor’s request for a change has been denied in whole or in part.
Claims governed by this Article must be filed no later than thirty (30) Days after a
request for change has been denied in whole or in part or after any other event giving
rise to the Claim. The Claim shall be submitted in writing to the City and shall include
on its first page the following words in 16 point capital font: “THIS IS A CLAIM.” The
Claim shall include the all information and documents necessary to substantiate the
Claim, including but not limited to those identified below. Nothing in this Article is
intended to extend the time limit or supersede notice requirements otherwise
provided by Contract Documents. Failure to follow such contractual requirements
shall bar any Claims or subsequent proceedings for compensation or payment
thereon.
Packet Page. 629
D. Documentation. The Contractor shall submit all Claims in the following format:
1. Summary description of Claim including basis of entitlement, merit and amount of
time or money requested, with specific reference to the Contract Document
provisions pursuant to which the Claim is made
2. List of documents relating to Claim:
a. Specifications
b. Drawings
c. Clarifications (Requests for Information)
d. Schedules
e. Other
3. Chronology of events and correspondence
4. Narrative analysis of Claim merit
5. Analysis of Claim cost, including calculations and supporting documents
6. Time impact analysis in the form required by the Contract Documents or, if the
Contract Documents do not require a particular format, CPM format, if an
adjustment of the Contract Time is requested
E. City’s Response. Upon receipt of a Claim pursuant to this Article, the City shall
conduct a reasonable review of the Claim and, within a period not to exceed 45 Days,
shall provide the Contractor a written statement identifying what portion of the Claim
is disputed and what portion is undisputed. Any payment due on an undisputed
portion of the Claim will be processed and made within 60 Days after the City issues
its written statement.
1. If the City needs approval from its governing body to provide the Contractor a
written statement identifying the disputed portion and the undisputed portion of the
Claim, and the City’s governing body does not meet within the 45 Days or within
the mutually agreed to extension of time following receipt of a Claim sent by
registered mail or certified mail, return receipt requested, the City shall have up to
three (3) Days following the next duly publicly noticed meeting of the City’s
governing body after the 45-Day period, or extension, expires to provide the
Contractor a written statement identifying the disputed portion and the undisputed
portion.
2. Within 30 Days of receipt of a Claim, the City may request in writing additional
documentation supporting the Claim or relating to defenses or Claims the City may
have against the Contractor. If additional information is thereafter required, it shall
be requested and provided pursuant to this subdivision, upon mutual agreement
of the City and the Contractor. The City’s written response to the Claim, as further
documented, shall be submitted to the Contractor within 30 Days (if the Claim is
Packet Page. 630
less than $50,000, within 15 Days) after receipt of the further documentation, or
within a period of time no greater than that taken by the Contractor in producing
the additional information or requested documentation, whichever is greater.
F. Meet and Confer. If the Contractor disputes the City’s written response, or the City
fails to respond within the time prescribed, the Contractor may so notify the City, in
writing, either within 15 Days of receipt of the City’s response or within 15 Days of
the City’s failure to respond within the time prescribed, respectively, and demand in
writing an informal conference to meet and confer for settlement of the issues in
dispute. Upon receipt of a demand, the City shall schedule a meet and confer
conference within 30 Days for settlement of the dispute.
G. Mediation. Within 10 business days following the conclusion of the meet and confer
conference, if the Claim or any portion of the Claim remains in dispute, the City shall
provide the Contractor a written statement identifying the portion of the Claim that
remains in dispute and the portion that is undisputed. Any payment due on an
undisputed portion of the Claim shall be processed and made within 60 Days after
the City issues its written statement. Any disputed portion of the Claim, as identified
by the Contractor in writing, shall be submitted to nonbinding mediation, with the City
and the Contractor sharing the associated costs equally. The public entity and
Contractor shall mutually agree to a mediator within 10 business days after the
disputed portion of the Claim has been identified in writing, unless the parties agree
to select a mediator at a later time.
1. If the parties cannot agree upon a mediator, each party shall select a mediator and
those mediators shall select a qualified neutral third party to mediate with regard
to the disputed portion of the Claim. Each party shall bear the fees and costs
charged by its respective mediator in connection with the selection of the neutral
mediator.
2. For purposes of this Article, mediation includes any nonbinding process, including,
but not limited to, neutral evaluation or a dispute review board, in which an
independent third party or board assists the parties in dispute resolution through
negotiation or by issuance of an evaluation. Any mediation utilized shall conform
to the timeframes in this Article.
3. Unless otherwise agreed to by the City and the Contractor in writing, the mediation
conducted pursuant to this section shall excuse any further obligation under
Section 20104.4 to mediate after litigation has been commenced.
4. The mediation shall be held no earlier than the date the Contractor completes the
Work or the date that the Contractor last performs Work, whichever is earlier. All
unresolved Claims shall be considered jointly in a single mediation, unless a new
unrelated Claim arises after mediation is completed.
H. Procedures After Mediation. If following the mediation, the Claim or any portion
remains in dispute, the Contractor must file a Claim pursuant to Chapter 1
(commencing with Section 900) and Chapter 2 (commencing with Section 910) of
Part 3 of Division 3.6 of Title 1 of the Government Code prior to initiating litigation.
For purposes of those provisions, the running of the period of time within which a
Claim must be filed shall be tolled from the time the Contractor submits his or her
Packet Page. 631
written Claim pursuant to subdivision (a) until the time the Claim is denied, including
any period of time utilized by the meet and confer conference.
I. Civil Actions. The following procedures are established for all civil actions filed to
resolve Claims of $375,000 or less:
1. Within 60 Days, but no earlier than 30 Days, following the filing or responsive
pleadings, the court shall submit the matter to non-binding mediation unless
waived by mutual stipulation of both parties or unless mediation was held prior to
commencement of the action in accordance with Public Contract Code section
9204 and the terms of this Contract. The mediation process shall provide for the
selection within 15 Days by both parties of a disinterested third person as mediator,
shall be commenced within 30 Days of the submittal, and shall be concluded within
15 Days from the commencement of the mediation unless a time requirement is
extended upon a good cause showing to the court.
2. If the matter remains in dispute, the case shall be submitted to judicial arbitration
pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of
the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The
Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter
3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding
brought under this subdivision consistent with the rules pertaining to judicial
arbitration. In addition to Chapter 2.5 (commencing with Section 1141.10) of Title
3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be
experienced in construction law, and (B) any party appealing an arbitration award
who does not obtain a more favorable judgment shall, in addition to payment of
costs and fees under that chapter, also pay the attorney’s fees on appeal of the
other party.
J. Government Code Claim Procedures.
1. This Article does not apply to tort claims and nothing in this Article is intended nor
shall be construed to change the time periods for filing tort claims or actions
specified by Chapter 1 (commending with Section 900) and Chapter 2
(commencing with Section 910) of Part 3 of Division 3.5 of Title 1 of the
Government Code.
2. In addition to any and all requirements of the Contract Documents pertaining to
notices of and requests for adjustment to the Contract Time, Contract Price, or
compensation or payment for Additional Work, disputed Work, construction claims
and/or changed conditions, the Contractor must comply with the claim procedures
set forth in Government Code Section 900, et seq. prior to filing any lawsuit against
the City.
3. Such Government Code claims and any subsequent lawsuit based upon the
Government Code claims shall be limited to those matters that remain unresolved
after all procedures pertaining to adjustment of the Contract Time or Contract Price
for Additional Work, disputed Work, construction claims, and/or changed
conditions have been followed by Contractor. If Contractor does not comply with
the Government Code claim procedure or the prerequisite contractual
requirements, Contractor may not file any action against the City.
Packet Page. 632
4. A Government Code claim must be filed no earlier than the date the Work is
completed or the date the Contractor last performs Work on the Project,
whichever occurs first. A Government Code claim shall be inclusive of all
unresolved Claims known to Contractor or that should reasonably by known
to Contractor excepting only new unrelated Claims that arise after the
Government Code claim is submitted.
K. Non-Waiver. The City’s failure to respond to a Claim from the Contractor within the
time periods described in this Article or to otherwise meet the time requirements of
this Article shall result in the Claim being deemed rejected in its entirety, and shall
not constitute a waiver of any rights under this Article.
ARTICLE 10 - MEASUREMENT; PAYMENT
10.1 Cost Breakdown.
A. Lump Sum Work.
1. Contractor shall furnish on forms approved by the City within ten (10) Days of the
Notice to Proceed, a schedule of values allocating the entire Contract Price to the
various portions of the Work and prepared in such a form and supported by such
data to substantiate its accuracy as the Engineer may require. This schedule of
values, unless objected to by the Engineer, shall be used as a basis for reviewing
the Contractor’s applications for payment. Contractor shall submit the schedule of
values prior to submitting its first application for payment, and the City will not issue
any payment until it receives and approves the schedule of values.
B. Unit Price Work.
1. Where the Contract Documents provide that all or part of the Work is to be Unit
Price Work, initially the Contract Price will be deemed to include for all Unit Price
Work an amount equal to the sum of the unit price for each separately identified
item of Unit Price Work multiplied by the estimated quantity of each item as
indicated in the Contract. The estimated quantities of items of Unit Price Work are
not guaranteed and are solely for the purpose of comparison of Bids and
determining an initial Contract Price. Each unit price will be deemed to include an
amount considered by Contractor to be adequate to cover Contractor’s overhead
and or profit for each separately identified item.
2. Unless otherwise specified, payment will be based on the actual quantities of Work
as verified and approved by the Engineer, based on the price per unit as set forth
in the Bid.
3. The City or Contractor may initiate a Change Order or Change Order Request to
adjust the Contract Price in accordance with Contractor Documents based on
actual quantities of Unit Price Work. The City or Contractor may make a claim for
an adjustment in the Unit Price in accordance with the Contract Documents if:
a. the quantity of any item of Unit Price Work performed by Contractor
differs by twenty-five percent (25%) or more from the estimated quantity of
such item indicated in the Contract; and
Packet Page. 633
b. there is no corresponding adjustment with respect to any other item
of Work; and
c. Contractor believes that Contractor is entitled to an increase in unit
price as a result of having incurred additional expense or the City believes
that the City is entitled to a decrease in unit price and the parties are unable
to agree as to the amount of any such increase or decrease.
10.2 Progress Estimates and Payment.
A. By the tenth (10th) Day of the following calendar month, Contractor shall submit to
Engineer a payment request which shall set forth in detail the value of the Work done
for the period beginning with the date Work was first commenced and ending on the
end of the calendar month for which the payment request is prepared. Contractor
shall include an adjusted list of actual quantities, verified by the Engineer, for unit
price items listed, if any, in the Bid. Contractor shall include any amount earned for
authorized Additional Work. Contractor shall certify under penalty of perjury, that all
cost breakdowns and periodic estimates accurately reflect the Work on the Project.
B. From the total thus computed, a deduction shall be made in the amount of five
percent (5%) for retention, except where the City has adopted a finding that the Work
done under the Contract is substantially complex, and then the amount withheld as
retention shall be the percentage specified in the Notice Inviting Bids. From the
remainder a further deduction may be made in accordance with Section C below.
The amount computed, less the amount withheld for retention and any amounts
withheld as set forth below, shall be the amount of the Contractor’s payment request.
C. The City may withhold a sufficient amount or amounts of any payment or payments
otherwise due to Contractor, as in its judgment may be necessary to cover:
1. Payments which may be past due and payable for just claims against Contractor
or any Subcontractors for labor or materials furnished in and about the
performance of work on the Project under this Contract.
2. Defective work not remedied.
3. Failure of Contractor to make proper payments to his Subcontractor or for material
or labor.
4. Completion of the Contract if there is a reasonable doubt that the Work can be
completed for balance then unpaid.
5. Damage to another contractor or a third party.
6. Amounts which may be due the Count for claims against Contractor.
7. Failure of Contractor to keep the Record Drawings up to date.
8. Failure to provide update on construction schedule as required herein.
9. Site cleanup.
Packet Page. 634
10. Failure to comply with Contract Documents.
11. Liquidated damages.
12. Legally permitted penalties.
D. The City may apply such withheld amount or amounts to payment of such claims or
obligations at its discretion with the exception of subsections (C)(1), (3), and (5) of
this Article, which must be retained or applied in accordance with applicable law. In
so doing, the City shall be deemed the agent of Contractor and any payment so
made by the City shall be considered as a payment made under contract by the City
to Contractor and the City shall not be liable to Contractor for such payments made
in good faith. Such payments may be made without prior judicial determination of
claim or obligations. The City will render Contractor a proper accounting of such
funds disbursed on behalf of Contractor.
E. Upon receipt, the Engineer shall review the payment request to determine whether
it is undisputed and suitable for payment. If the payment request is determined to
be unsuitable for payment, it shall be returned to Contractor as soon as practicable
but not later than seven (7) Days after receipt, accompanied by a document setting
forth in writing the reasons why the payment request is not proper. The City shall
make the progress payment within 30 Days after the receipt of an undisputed and
properly submitted payment request from Contractor, provided that a release of liens
and claims has been received from the Contractor pursuant to Civil Code section
8132. The number of days available to the City to make a payment without incurring
interest pursuant to this paragraph shall be reduced by the number of Days by which
the Engineer exceeds the seven (7) Day requirement.
F. A payment request shall be considered properly executed if funds are available for
payment of the payment request and payment is not delayed due to an audit inquiry
by the financial officer of the City.
G. The City shall have the right to adjust any estimate of quantity and to subsequently
correct any error made in any estimate for payment.
10.3 Final Acceptance and Payment
A. Following the City’s acceptance of the Work, the Contractor shall submit to the City
a written statement of the final quantities of unit price items for inclusion in the final
payment request. The City shall have the right to adjust any estimate of quantity
and to correct any error made in any estimate for payment.
B. When the Work has been accepted there shall be paid to Contractor a sum equal to
the Contract Price less any amounts previously paid Contractor and less any
amounts withheld by the City from Contractor under the terms of the Contract. The
final five percent (5%), or the percentage specified in the Notice Inviting Bids where
the City has adopted a finding of substantially complete, shall not become due and
payable until as required by Public Contract Code section 7107. If the Contractor
has placed securities with the City as described herein, the Contractor shall be paid
a sum equal to one hundred percent (100%) of the Contract Price less any amounts
due the City under the terms of the Contract.
Packet Page. 635
C. Unless Contractor advises the City in writing prior to acceptance of the final five
percent (5%) or the percentage specified in the Notice Inviting Bids where the City
has adopted a finding of completion, or the return of securities held as described
herein, said acceptance shall operate as a release to the City of all claims and all
liability to Contractor for all things done or furnished in connection with this Work and
for every act of negligence of the City and for all other claims relating to or arising
out of this Work. If Contractor advises the City in writing prior to acceptance of final
payment or return of the securities that there is a dispute regarding the amount due
the Contractor, the City may pay the undisputed amount contingent upon the
Contractor furnishing a release of all undisputed claims against the City with the
disputed claims in stated amounts being specifically excluded by Contractor from the
operation of the release. No payments, however, final or otherwise, shall operate to
release Contractor or its sureties from the Faithful Performance Bond, Labor and
Material Payment Bond, or from any other obligation under this Contract.
D. In case of suspension of the Contract any unpaid balance shall be and become the
sole and absolute property of the City to the extent necessary to repay the City any
excess in the cost of the Work above the Contract Price.
E. Final payment shall be made no later than 60 Days after the date of acceptance of
the Work by the City or the date of occupation, beneficial use and enjoyment of the
Work by the City including any operation only for testing, start-up or commissioning
accompanied by cessation of labor on the Work, provided that a release of liens and
claims has been received from the Contractor pursuant to Civil Code section 8136.
In the event of a dispute between the City and the Contractor, the City may withhold
from the final payment an amount not to exceed 150% of the disputed amount.
F. Within ten (10) Days from the time that all or any portion of the retention proceeds
are received by Contractor, Contractor shall pay each of its Subcontractors from
whom retention has been withheld each Subcontractor’s share of the retention
received. However, if a retention payment received by Contractor is specifically
designated for a particular Subcontractor, payment of the retention shall be made to
the designated Subcontractor if the payment is consistent with the terms of the
subcontract.
ARTICLE 11 - MISCELLANEOUS
11.1 Patents.
A. Contractor shall hold and save the City, officials, officers, employees, and authorized
volunteers harmless from liability of any nature or kind of claim therefrom including
costs and expenses for or on account of any patented or unpatented invention,
article or appliance manufactured, furnished or used by Contractor in the
performance of this Contract.
11.2 Document Retention & Examination
A. In accordance with Government Code section 8546.7, records of both the City and
the Contractor shall be subject to examination and audit by the State Auditor General
for a period of three (3) years after final payment.
Packet Page. 636
B. Contractor shall make available to the City any of the Contractor’s other documents
related to the Project immediately upon request of the City.
C. In addition to the State Auditor rights above, the City shall have the right to examine
and audit all books, estimates, records, contracts, documents, bid documents,
subcontracts, and other data of the Contractor (including computations and
projections) related to negotiating, pricing, or performing the modification in order to
evaluate the accuracy and completeness of the cost or pricing data at no additional
cost to the City, for a period of four (4) years after final payment.
11.3 Notice.
A. All notices shall be in writing and either served by personal delivery or mailed to the
other party. Written notice to the Contractor shall be addressed to Contractor’s
principal place of business unless Contractor designates another address in writing
for service of notice. Notice to the City shall be addressed to the City as designated
in the Notice Inviting Bids unless the City designates another address in writing for
service of notice. Notice shall be effective upon receipt or five (5) Days after being
sent by first class mail, whichever is earlier. Notice given by facsimile shall not be
effective unless acknowledged in writing by the receiving party.
11.4 Notice of Third Party Claims
A. Pursuant to Public Contract Code section 9201, the City shall provide the Contractor
with timely notification of the receipt of any third-party claims relating to the Contract.
The City is entitled to recover reasonable costs incurred in providing such
notification.
11.5 State License Board Notice
A. Contractors are required by law to be licensed and regulated by the Contractors’
State License Board which has jurisdiction to investigate complaints against
contractors if a complaint regarding a patent act or omission is filed within four (4)
years of the date of the alleged violation. A complaint regarding a latent act or
omission pertaining to structural defects must be filed within ten (10) years of the
date of the alleged violation. Any questions concerning a contractor may be referred
to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento,
California 95826.
11.6 Assignment of Contract
A. Contractor shall not assign, transfer, convey, sublet or otherwise dispose of the
rights or title of interest of any or all of this contract without the prior written consent
of the City. Any assignment or change of Contractor’s name of legal entity without
the written consent of the City shall be void. Any assignment of money due or to
become due under this Contract shall be subject to a prior lien for services rendered
or material supplied for performance of Work called for under the Contract
Documents in favor of all persons, firms, or corporations rendering such services or
supplying such materials to the extent that claims are filed pursuant to the Civil Code,
the Code of Civil Procedure or the Government Code.
Packet Page. 637
11.7 Change In Name And Nature Of Contractor’s Legal Entity.
A. Should a change be contemplated in the name or nature of the Contractor’s legal
entity, the Contractor shall first notify the City in order that proper steps may be taken
to have the change reflected on the Contract and all related documents. No change
of Contractor’s name or nature will affect the City’s rights under the Contract,
including but not limited to the bonds.
11.8 Prohibited Interests
A. No City official or representative who is authorized in such capacity and on behalf of
City to negotiate, supervise, make, accept, or approve, or to take part in negotiating,
supervising, making, accepting or approving any engineering, inspection,
construction or material supply contract or any subcontract in connection with
construction of the project, shall be or become directly or indirectly interested
financially in the Contract.
11.9 Controlling Law
A. Notwithstanding any subcontract or other contract with any subcontractor, supplier,
or other person or organization performing any part of the Work, this Contract shall
be governed by the law of the State of California excluding any choice of law
provisions.
11.10 Jurisdiction; Venue
A. Contractor and any subcontractor, supplier, or other person or organization
performing any part of the Work agrees that any action or suits at law or in equity
arising out of or related to the bidding, award, or performance of the Work shall be
maintained in the Superior Court of San Bernardino County, California, and
expressly consent to the jurisdiction of said court, regardless of residence or
domicile, and agree that said court shall be a proper venue for any such action.
11.11 Cumulative Remedies.
A. The duties and obligations imposed by these General Conditions and the rights and
remedies available hereunder to the parties hereto are in addition to, and are not to
be construed in any way as a limitation of, any rights and remedies available to any
or all of them which are otherwise imposed or available by Applicable Laws, by
special warranty or guarantee, or by other provisions of the Contract Documents.
The provisions of this Article will be as effective as if repeated specifically in the
Contract Documents in connection with each particular duty, obligation, right, and
remedy to which they apply.
11.12 Survival of Obligations.
A. All representations, indemnifications, warranties, and guarantees made in, required
by, or given in accordance with the Contract Documents, as well as all continuing
obligations indicated in the Contract Documents, will survive final payment,
completion, and acceptance of the Work or termination or completion of the Contract
or termination of the services of Contractor.
Packet Page. 638
11.13 Headings.
A. Article and paragraph headings are inserted for convenience only and do not
constitute parts of these General Conditions.
11.14 Assignment of Antitrust Actions
A. In accordance with §7103.5(b) of the California Public Contract Code, Contractor
and Subcontractors must conform to the following requirements:
1. In entering into a public works contract or a subcontract to supply goods, services,
or materials pursuant to a public works contract, Contractor or Subcontractor offer
and agree to assign to the awarding body all rights, title, and interest in and to all
causes of action it may have under §4 of the Clayton Act (15 U.S.C. Sec. 15) or
under the Cartwright Act (Chapter 2 (commencing with §16700) of Part 2 of
Division 7 of the Business and Professions Code) arising from purchases of goods,
services, or materials pursuant to the public works contract or the subcontract.
2. This assignment must be made and become effective at the time the awarding
body tenders to Contractor, without further acknowledgment by the parties.
11.15 All Legal Provisions Included
A. Contractor shall give all notices and comply with all federal, state and local laws,
ordinances, rules and regulations bearing on conduct of work as indicated and
specified by their terms. References to specific laws, rules or regulations in this
Contract are for reference purposes only, and shall not limit or affect the applicability
of provisions not specifically mentioned. If Contractor observes that drawings and
specifications are at variance therewith, he shall promptly notify City in writing and
any necessary changes shall be adjusted as provided for in this Contract for changes
in Work. If Contractor performs any Work knowing it to be contrary to such laws,
ordinances, rules and regulations, and without such notice to City, he shall bear all
costs arising therefrom.
B. Contractor shall be responsible for familiarity with the Americans with Disabilities Act
(“ADA”) (42 U.S.C. § 12101 et seq.). The Work will be performed in compliance with
ADA laws, rules and regulations. Contractor shall comply with the Historic Building
Code, including, but not limited to, as it relates to the ADA, whenever applicable.
C. Contractor acknowledges and understands that, pursuant to Public Contract Code
section 20676, sellers of "mined material" must be on an approved list of sellers
published pursuant to Public Resources Code section 2717(b) in order to supply
mined material for this Contract.
D. No City official or representative who is authorized in such capacity and on behalf of
City to negotiate, supervise, make, accept, or approve, or to take part in negotiating,
supervising, making, accepting or approving any engineering, inspection,
construction or material supply contract or any subcontract in connection with
construction of the Work, shall be or become directly or indirectly interested
financially in the Contract.
Packet Page. 639
E. All provisions of law required to be inserted in the Contract or Contract Documents
pursuant to any Applicable Laws shall be and are inserted herein. If through mistake,
neglect, oversight, or otherwise, any such provision is not herein inserted or inserted
in improper form, upon the application of either party, the Contract or Contract
Documents shall be changed by City, at no increase in Contract Price or extension
in Contract Times, so as to strictly comply with the Applicable Laws and without
prejudice to the rights of either party hereunder
11.16 Electronic Signature. Each Party acknowledges and agrees that this Agreement may be
executed by electronic or digital signature, which shall be considered as an original
signature for all purposes and shall have the same force and effect as an original signature
ARTICLE 12 -– FLEET COMPLIANCE
12.1 To the extent applicable, Contractor, shall comply, and shall ensure all subcontractors
comply, with all requirements of the most current version of the California Air Resources
Board (“CARB”) including, without limitation, all applicable terms of Title 13, California
Code of Regulations Division 3, Chapter 9 and all pending amendments (“Regulation”).
12.2 Throughout Project, and for three (3) years thereafter, Contractor shall make available for
inspection and copying any and all documents or information associated with Contractor’s
and subcontractors’ fleet including, without limitation, the CRCs, fuel/refueling records,
maintenance records, emissions records, and any other information the Contractor is
required to produce, keep or maintain pursuant to the Regulation upon two (2) calendar
days’ notice from the City.
12.3 Contractor shall be solely liable for any and all costs associated with complying with the
Regulation as well as for any and all penalties, fines, damages, or costs associated with
any and all violations, or failures to comply with the Regulation. Contractor shall defend,
indemnify and hold harmless the City, its officials, officers, employees and authorized
volunteers free and harmless from any claims, liabilities, costs, penalties or interest arising
out of any failure or alleged failure to comply with the Regulation.
Packet Page. 640
00 73 13 – SPECIAL CONDITIONS
ARTICLE 1 -SCOPE OF WORK
1.1 Location of the Project.
A. N Mt Vernon Ave and 5th Street, San Bernardino, CA 92411
Packet Page. 641
1.2 Scope of Work.
The scope of work includes asphalt paving and re-striping of the library parking lot.
Work also consists of removing and replacing the existing driveway approaches,
installing ADA-compliant striping, signage, and markings for designated handicap
stalls, and providing a walking path from the loading area of the stalls to the ADA
ramps. In addition, the work includes water jetting two (2) drop inlets and replacing the
lighting bulbs and globes.
ARTICLE 2 -MODIFICATIONS TO THE GENERAL CONDITIONS
2.1 Section 2.12 Mobilization
Paragraph B.8 add the following:
No storage of equipment or materials will be allowed on private property, unless
written permission has been provided to City, or in street right-of-way.
2.2 Section 5.5 Safety
Section 5.5.A states, “Contractor to notify owners of adjacent property and of Underground
Facilities and other utility owners when prosecution of the work may affect them.” The following
requirements will be added to Section 5.5.A. The following list of individuals or entities, which
are known to have facilities in the area to be improved is merely for the Contractor's information
and may or may not be complete or inclusive:
City of San Bernardino (Engineering)------------------------------------(909) 998-2420
Southern California Edison, Ben Murguia-------------------------------(909) 307-6788
Southern California Gas Company, Devry Jennings-------------------(909) 335-7772
San Bernardino Municipal Water Department, Mike Nevarez------(909) 384-5092
Verizon Communications, Control Desk--------------------------------(909) 784-6655
AT&T, Rosemary Hamill--------------------------------------------------(916) 799-4642
Underground Service Alert------------------------------------------------(800) 227-2600
California Department of Transportation-------------------------------(909) 383-6920
Packet Page. 642
2.3 Section 5.27 Work Site
Section 5.27 Work Site, shall add the following requirements:
The contractor shall notify all residents and business owners, in writing (both in English and in
Spanish), of his proposed operations and schedule. Notice shall be delivered at least ten (10)
working days prior to start of construction. The contractor shall prepare a letter for this purpose
and submit the letter to the Engineer for approval at least five (5) working days prior to the date
needed for its circulation. The Contractor shall be responsible for reproduction and distribution
of the letters. The time to notify in advance shall be coordinated with the City inspector.
Project sign board shall be in-placed in advance (30 days after Notice to Proceed, NTP) prior
to any start of construction. Check with the City as to how far in advance to have the project
signage to be in-placed. See Attachment.
The Contractor shall follow: Greenbook 2024, Section 302-3.8, pages 317; Greenbook 2024,
Section 302-4.7, page 323, and Greenbook 2024, PART 6 TEMPORARY TRAFFIC CONTROL
SECTION 600-ACCESS, All of Sections 600 and 601, that apply to this project, pages 553 to
560. Businesses and residences adjacent to the Work shall be notified forty-eight (48) hours in
advance of closing of driveways.
Re-notification will be required if the Contractor’s schedule is altered or other delays occur,
which significantly affects the scheduled work. Then, it shall be at Contractor’s expense.
2.4 Section 5.29 Protection of Work and Property
Add Paragraph H and add the following:
The Contractor shall provide sufficient barricades, delineators and ribbon at each location to
adequately protect the new and fresh concrete surfaces from vandalism and unauthorized
markings. Newly poured and finished concrete areas shall be delineated or cordoned off with
tape to inhibit and discourage pedestrians, bikers and skateboards from tracking across the
fresh sidewalk surfaces. Unauthorized markings (i.e. graffiti, footprints, bike tire marks, scuff
marks) in the new sidewalk surfaces are not acceptable, and may be cause for rejection. All
such areas rejected due to such cause shall be removed and replaced at the Contractor’s
expense. All costs for protecting the new concrete surfaces and any graffiti removal shall be
considered as incidental to the cost of the work and no additional compensation will be allowed
therefore.
END OF SPECIAL CONDITIONS
Packet Page. 643
SPECIFICATIONS:
Each respective bid item and bid schedule as shown on the proposal form shall comply with all
respective sections of the most current edition of Standard Specifications for Public Works
Construction (Greenbook), its supplements, and any other publications as specified. If there is a
conflict between these inclusions and the Standard Specifications, these inclusions shall have
precedence.
Contractor shall provide all construction surveying, staking and monument/centerline ties
at no extra cost. Compensation for construction surveying and staking shall be considered
as included in various bid items. No additional compensations will be allowed.
BID ITEM 1: MOBILIZATION:
This bid item shall comply with the requirements of Section 7-3.4, "Mobilization", of the Standard
Specifications.
Mobilization may include, but not be limited to, the following principal items:
1. Submittal and modification, as required, of the Construction Schedule.
2. Providing a Project Office (if needed).
3. Review of the Site.
4. Obtaining all required Transportation Permits.
5. Submittal of all required insurance certificates and bonds as required by these Specifications.
6. Moving onto the site, including, but not limited to:
A. Equipment
B. Arranging for and erection of Contractor's work and storage areas.
7. Installing construction fencing and temporary construction power and wiring.
8. Providing a minimum of one restroom facility for each twenty-five (25) workers occupying the
site. Facilities may include existing functioning restrooms, or portable chemical facilities, or any
combination thereof, and shall count as one for each urinal or one for each water closet (as
required).
9. Installing all temporary utilities (as required).
10. Establishing required fire protection provisions.
11. Posting all OSHA required notices and establishment of safety programs.
12. Posting of all Department of Labor notices.
13. Having the Contractor's superintendent at the job site full-time and responding 24 hours per
day.
14. Air and water quality protective measures, as necessary, and without limitation.
15. Potholing and other research and review as necessary to verify site conditions and utility
locations.
16. Demobilization of the Site.
17. Water needed for project
18. Any other item as specified.
Storm Water Pollution Prevention shall include preparation of Storm Water Pollution Prevention
and erosion control plans, control of all waters entering the project sites, erosion control, and any
dewatering in accordance with California Regional Water Quality Control Board, Santa Ana River
Region requirements. Storm, surface and/or nuisance water may be encountered at various times
and locations during performance of the Work. Such waters may interfere with Contractor's
operation and may cause damage to adjacent or downstream private and/or public property by
flooding, lateral erosion, sedimentation or pollution if not properly controlled by Contractor.
Packet Page. 644
Contractor, by entering into the Contract, assumes all risk and responsibility for water control.
Contractor's responsibility includes, at a minimum, handling any nuisance and/or storm waters
that may result during the term of the Contract in a manner which will protect construction
throughout the various stages of work up to the point of final acceptance by Owner.
The contractor shall conduct its work in accordance with all rules and regulations set forth by the
Governing Jurisdiction(s). The contractor shall conduct and schedule operations so as to avoid
effects of erosion on adjacent work and property.
The cost of bonds, insurance, move in and move out costs, preparation and submission of
submittals, obtaining encroachment permits, provide project sign, prepare erosion control plan
and miscellaneous incidental costs, shall be included in the Bid Item provided for mobilization and
demobilization and incidental project costs as a lump sum item, for which 75 percent (75%) will
be eligible for inclusion in the first progress payment, with the remaining 25 percent (25%) not
eligible for inclusion until 100 percent (100%) of the work has been completed and if progress of
the work is satisfactory. No work shall be started without prior approval of the submittals. Failure
to comply with the preceding requirement will be sufficient ground for the Engineer to stop all work
on the project until the requirements are met.
Payment for this bid item shall be paid per Lump Sum (LS) and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing all
work involved in Mobilization per project specifications; no additional compensation will be
allowed.
BID ITEM 2: CLEARING AND GRUBBING:
This bid item shall comply with Section 300-1, "Clearing and Grubbing", Section 300-2,
"Unclassified Excavation", and Section 300-4, "Unclassified Fill", respectively, of the Standard
Specifications and these Special Provisions.
Clearing and grubbing shall consist of removing all vegetation and specified materials from the
demolition limits of the project and other such areas as may be shown in the documents. This
work shall be performed in accordance with the requirements herein specified, subject to erosion
control requirements. The area shall be cleared of all vegetation, such as palms; trees; logs;
stumps; bushes; hedges; roots, up to 12" below the existing ground surface; brush; grass; weeds;
concrete blocks, parkway concrete, mulch and all other objectionable materials within the
construction limits shown on the plans.
Clearing and grubbing shall include removal of any and all items not specifically covered under a
separate bid item including, but not limited to, the following:
1. Removal of interfering water, sewer, storm drain and abandoned gas pipe, as required,
facilitating new construction.
2. Moving of interfering items such as Bleachers, trash dumpsters, trash bins, storage bins,
concrete barrier to hold sand and other constrains. The work includes bringing those items back
after the construction.
3. All saw-cutting required to facilitate removal of existing AC and PCC improvements.
4. All unclassified excavation and saw cutting, removal and exporting of subgrade, concrete and
asphalt.
5. Minor existing fencing removal/ relocation/ restoration, if required.
6. Disposal of material removed from the site including concrete, asphalt and native soil.
7. All pull boxes, signs, fencing and other improvements, including foundations and bus pads, that
are not covered by individual bid items.
Packet Page. 645
8. Delivery of all salvaged material, as designated on the plans, to the City yard.
9. Providing, installing, maintaining and removing (at completion of construction) the construction
area signs required.
10. All trees and plants, debris, interfering portions of curb, gutters, asphalt and PCC concrete
pavements and sidewalks (including base, where applicable), and miscellaneous items they are
not shown on the Plans or not covered by individual bid items.
Unless otherwise stated on the Plans or Specifications, all material removed from the Work shall
become the property of the Contractor and shall be disposed of in a lawful manner. The Contractor
shall conform to the following requirements:
a. The Contractor shall not start any removal work unless it is prepared to perform reconstruction
work within 24 hours of the time removals were begun, unless otherwise approved by the
Engineer.
b. All concrete removed shall be hauled off the Work site no later than the calendar day following
the day that the removal is performed.
c. The Contractor shall complete forming and pouring of PCC construction within five (5) working
days following the removal of existing material at any location.
d. The Contractor shall not remove on-site improvements until it is prepared to construct the
adjacent street section and shall promptly restore all such improvements as applicable, upon
completion of the adjacent street work.
The limits for sidewalk, curb and gutter and driveway shown on the plans are approximate. The
actual removal and/or construction limits shall be as marked and/or directed by the Engineer in
the field.
In order to protect the public streets from deterioration due to hauling of materials, the Contractor
shall submit, prior to the Pre-Construction Meeting, for approval a proposed route for hauling of
materials for disposal. Upon approval, the Contractor shall strictly adhere to that route, unless
written permission from the Engineer is obtained to change the route.
Payment for this bid item shall be paid per Lump Sum (LS) and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing all
work involved in Clearing and Grubbing per project plans and specifications; no additional
compensation will be allowed.
BID ITEM 3: EROSION CONTROL PLAN & BMPs:
Erosion control plans, control of all waters entering the project sites erosion control in accordance
with California Regional Water Quality Control Board, Santa Ana River Region requirements.
Storm, surface and/or nuisance water may be encountered at various times and locations during
performance of the Work. Such waters may interfere with Contractor’s operation and may cause
damage to adjacent or downstream private and/or public property by flooding, lateral erosion,
sedimentation or pollution if not properly controlled by Contractor. Contractor, by entering into
the Contract, assumes all risk and responsibility for water control. Contractor’s responsibility
includes, at a minimum, handling any nuisance and/or storm waters that may result during the
term of the Contract in a manner which will protect construction throughout the various stages of
work up to the point of final acceptance by Owner.
Packet Page. 646
Contractor shall conduct its work in accordance with all rules and regulations set forth by the
Governing Jurisdiction(s). Contractor shall conduct and schedule operations so as to avoid
effects of erosion on adjacent work and property.
Contractor is responsible for, and the Contract Price includes the erosion control related to the
Work, including but not limited to devices such as additional dikes, basins, ditches, gravel bags,
sandbags and silt fences which might become necessary as a result of operations. Contractor
shall be responsible for pumping water and desilting water after each storm event. Contractor is
also aware that storm water from adjacent sites may be transported to the Project site, and it is
Contractor’s responsibility to maintain any previously installed erosion control facilities. The cost
of all such work plus that required to repair damage resulting from any erosion is part of the
Contract Price and no additional compensation shall be paid to Contractor for same.
The Contractor shall install and maintain all required or necessary erosion control measures to
cover the entire duration of the term of the Contract.
The Contractor is responsible to protect the Project site from erosion damage at all times by
utilizing Interim Erosion Control measures which, due to the site’s ever-changing condition during
construction, is achieved by implementing Best Management Practices (BMPs). Part of these
responsibilities shall include that the Contractor have available for Owner’s review on-site at all
times, a copy of the Project erosion control plans. This Erosion Control Plan shall be updated on
a continuous basis as required to assure its accuracy.
All construction shall be conducted with provisions for the control of sand, silt and debris
originating at the construction site. Appropriate areas shall be contained with berms, desilting
basins or similar structures to prevent runoff during construction operation. During construction,
the Contractor shall check and maintain berms and desilting basins prior to, during, and after all
rainfall events.
If construction of the project improvements necessitates removal of any erosion control device(s)
this device shall be replaced at the end of each working day when the five-day rain probability
forecast exceeds 40% or prior to the start of a weekend or holiday. Contractor shall prepare an
emergency flood plan that includes monitoring of weather forecasts.
The Contractor shall provide to the Owner a plan depicting interim erosion control desilting basin
locations and sizes prior to the start of construction. The Contractor shall provide to the Owner
supporting calculations for the desilting basin sizes.
All contractor-dewatering activities shall comply with most current permit, Waste Discharge
Requirements, “California Regional Water Quality Control Board, Santa Ana Region (CRWQCB)
and these specifications. Contractor shall notify the City and CRWQCB a minimum of thirty (30)
calendar days in advance of any dewatering activity and shall complete all permit application
documentation, supply all testing services and make all reporting required by the permit. In the
event that Contractor fails to comply with said permit’s requirements, Contractor shall be
responsible for all costs, fines and/or penalties assessed against Contractor, the City or any
affiliate of the City by CRWQCB and any other applicable agencies.
It is agreed among the parties that added construction costs incurred by the Contractor, due to
weather related damage or delay, shall be the Contractor’s responsibility.
The Contractor is notified that the approved Erosion Control Plan must be amended from time to
time during construction to reflect actual construction practices, and that each amendment must
Packet Page. 647
be made by, or under the direction of the Professional Engineer who prepared the Erosion Control
Plan.
The price paid for erosion control shall include full compensation for preparation and implementing
the Erosion Control Plan, and for amending the Erosion Control Plan to conform to Contractor’s
actual construction practices during construction. The total price bid for completing and submitting
the Erosion Control Plan, and for amending and administering the Erosion Control Plan shall
include the cost of all documentation and administration for the entire contract period and shall
be included in the lump sum contract price paid for the contract item of work, and no additional
compensation will be allowed therefore, Payment for this bid item shall be paid per Lump Sum
(LS) and shall be considered as full compensation for furnishing all labor, materials, tools,
equipment, and incidentals for doing all work involved in Erosion Control Plan & BMPs per project
plans and specifications; no additional compensation will be allowed.
BID ITEM 4: CONSTRUCT 4’ X 8’ PROJECT SIGN. SEE INFO IN APPENDIX:
Work specified in this section includes providing all materials and performing all operations to
fabricate, install, modify and/or relocate Project Information Sign, and as specified in these
Special Provisions. Submit a shop drawing for all sign panels, and the Manufacturer's data for the
Sign Panels.
MATERIALS:
A. Project Information Signs shall be constructed per Caltrans specifications for Plywood
single sheet and laminated panel signs.
B. Color of signs, panels and lettering shall be as indicated on the drawing in these
specifications.
C. Sign Posts shall be constructed of wood and shall conform to the provisions of section 56-
2.02B, Caltrans.
D. Mounting Hardware shall be furnished by the Contractor and shall conform to the
provisions of section 56-2.02D, Caltrans.
INSTALLATION:
For this contract, one (1) Project Information Sign shall be installed, relocated or modified for each
location as directed by the City Engineer and shall conform to the provisions of sections 56-2.03,
and 56-2.04, Caltrans.
Measurement and Payment:
The contract bid price paid to fabricate and install the signs including all ancillary work be paid by
the contract unit price paid per Each sign (EA) and shall include full compensation for providing
all materials including post, digging the foundations for the post, and restoring the area around
the post during the duration of the project. And restoring of the surrounding area after removal of
the sign. This will also include the removal of the signs and posts.
BID ITEM 5: REMOVE AND REPLACE 4" OF ASPHALT PAVEMENT PER PLANS AND
SPECIFICATIONS. 95% SUBGRADE COMPACTION:
This bid item shall consist of removing existing pavement and constructing 4” thick Asphalt
Pavement. Subgrade to be compacted to 95%. Nothing in these Special Provisions shall relieve
Packet Page. 648
the Contractor from his responsibilities as provided in Section 5-7 “Safety”, of the Standard
Specifications.
Measurement and Payment for this bid item shall be paid per Square Foot (SF) and shall be
considered as full compensation for furnishing all labor, materials, tools, equipment, and
incidentals for doing all work involved in this bid item per project plans and specifications; no
additional compensation will be allowed.
BID ITEM 6: COLD MILL 2" UNIFORM DEPTH IN ACCORDANCE WITH THE PLANS AND
SPECIFICATIONS, INCLUDING REMOVAL AND DISPOSAL OF ALL EXISTING WHEEL
STOPPERS. RETAIN ONLY THE TWO WHEEL STOPPERS IN THE BEST CONDITION FOR
REINSTALLATION AS SPECIFIED IN BID ITEM #12:
This bid item operations shall be performed in accordance with Section 404, "Cold Milling" of the
Greenbook Edition 2024, project plans, specifications and special provisions. Existing asphalt
concrete shall be milled at the locations and to the dimensions shown on the Plans and
specifications including removal and disposal of all exiting wheel stoppers whether rubberized or
concrete stoppers. The cold milling machine shall have a cutter head at least 60 inches wide and
shall be operated so as not to produce fumes or smoke. The rotor teeth shall cut in an upward
direction as to the direction of travel reducing the size of material until the desired gradation has
been achieved. The depth, width, and shape of the cut shall be as indicated on the typical cross
sections or as directed by the Engineer.
The final cut shall result in a uniform surface conforming to the typical cross sections. The outside
lines of the milled area shall be neat and uniform. The pavement surfacing to remain in place shall
not be damaged in any way. The material milled from the parking lot surface, including material
deposited in existing gutters or on the adjacent traveled way, shall be immediately removed. The
removal crew shall follow within 50 feet of the planer, unless otherwise directed by the Engineer.
Milling of asphalt concrete pavement will be measured by Square Foot (SF). The quantity to be
paid for the surface milled irrespective of the number of passes required. After the cold
milling/Micro milling operation, the Contractor shall pave/overlay the parking lot with new
pavement within 72 hours and/or as directed by the Engineer. Where transverse joints are milled
in the pavement at conform lines, no drop-off shall remain between the existing pavement and
the milled area when the pavement is opened to public traffic. If asphalt concrete has not been
placed to the level of public traffic, a temporary asphalt concrete taper shall be constructed.
Payment for this bid item shall be paid per Square Foot (SF) for "COLD MILL 2" UNIFORM
DEPTH PER PLANS AND SPECIFICATIONS" shall include full compensation for conforming to
the requirements of this section, for furnishing all materials, tools, equipment and incidentals, and
for doing all work involved in cold milling of asphalt concrete pavement, including disposal of
material milled from the site, furnishing asphalt concrete for temporary tapers and for constructing,
per the Plans, Specifications, Special Provisions and as directed by the Engineer, and no
additional compensation will be allowed therefor.
Packet Page. 649
BID ITEM 7: CONSTRUCT 2” AC OVERLAY PER PLANS AND SPECIFICATIONS:
These bid items shall comply with the requirements of Section 203-6, "Asphalt Concrete", and
Section 302-5, "Asphalt Concrete Pavement", of the Standard Specifications and these Special
Provisions. This bid item shall include, but not be limited to the following items as shown on the
Plans, as specified in specifications and Special Provisions, or as directed by the Engineer:
Use C2-PG 70-10 for 2" overlay. Coat surfaces with trackless tack coat. The Performance Grade
of the asphalt concrete shall be PG 70-10 ½". Where dense graded asphalt is being constructed
in two layers or more, the asphalt concrete pavement for the base course shall be B-PG 70-10".
Where dense graded asphalt is being constructed in a single layer or for a finishing course or
asphalt concrete overlay, the asphalt concrete pavement shall be C2-PG 70-10". A tack coat shall
be applied, as directed by the Engineer.
TACK COAT - Tack coat shall be applied in compliance with Sub-Section 302-5.4, "Trackless
Tack Coat" of the Standard Specifications, and as directed by the Engineer.
Contractor shall adjust all utility valves covers, cans, pull boxes to the finish grade. Adjusting
manhole frames and covers to grade and water valves enclosures after completion of paving shall
be in accordance with Sub-Section 301-1.6 "Adjustment of Manhole Frame and Cover Sets to
Grade", of the "Greenbook" Standard Specifications, Special Provisions and as directed by the
Engineer.
Payment for this bid item shall be paid per Ton (TN) and shall include full compensation for
furnishing and installation of all materials, tools, equipment and incidentals, Asphalt concrete, and
for doing all the work involved in furnishing, placing and compacting pavement material,
sweeping, adjusting manhole frames and covers, utility enclosures per the Plans, the Standard
Specifications, Special Provisions and as directed by the Engineer, and no additional
compensation will be allowed therefore.
BID ITEM 8: REMOVE EXISTING GLOBES & LIGHTING FIXTURES AND REPLACE THEM
WITH NEW LED FIXTURES AND GLOBES ON FIVE (5) LIGHT POLES SHOWN ON THE
PLANS, INCLUDING FULL REWIRING, CONDUITING, PHOTOCELL DEVICES, ALIGNMENT,
AND INSTALLATION OF ALL NECESSARY BRACKETS/ ADAPTERS TO PROVIDE A
COMPLETE SYSTEM:
This bid item consists of the removal and proper disposal of the existing globes and fixtures from
five (5) light poles as shown on the plans. The contractor shall furnish and install new Holophane
AWED3 Washington Gen3 LED fixtures, including the suggested housing per to the attached
submittal or approved equal, and mount them using suitable brackets or adapters as required by
the plans and specifications. Work includes full rewiring, removal of damaged conductors, proper
terminations, and testing to verify functionality and compliance with the CEC. Each pole shall be
fitted with a new 1-inch galvanized rigid metal conduit extending 5 feet vertically inside the pole,
with NEW wiring pulled through and routed to the fixture. At the base, the conduit shall be securely
connected to the new PVC conduit leading to the adjacent ground pull box. In the event the
contractor damages any pull box during the installation of new conduits or cables, the contractor
shall furnish and install a replacement pull box of the same brand as the original and restore the
area to its original condition. The bid item is also including furnishing and installing new photocell
devices compatible with the new fixtures per to the attached submittal or approved equal. The
completed system shall achieve the minimum foot-candle levels specified in the attached lighting
design; note that the photometric analysis has been prepared based on four (4) poles to reflect
Packet Page. 650
conditions that impact the parking lot. Poles shall be realigned as needed, with all mounting
hardware to be stainless steel or galvanized. Contractor shall provide manufacturer submittals
and photometric verification. Nothing in these Special Provisions shall relieve the Contractor from
his responsibilities as provided in Section 5-7, “Safety”, of the Standard Specifications.
Payment for this item will be made per Each pole (EA) and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing all
work involved in this bid item per project plans and specifications; no additional compensation will
be allowed.
BID ITEM 9: REMOVE AND DISPOSE OF THREE (3) EXISTING DRIVEWAY APPROACHES.
CONSTRUCT NEW PCC DRIVEWAY APPROACHES PER CITY STANDARD PLAN NO. 204,
PROJECT PLANS, AND SPECIFICATIONS, USING CONCRETE CLASS 560-C-3250,
INCLUDING REPAIR DAMAGED SD PIPE AT DWA #1:
This bid item consists of removing and disposing of three (3) existing driveway approaches and
constructing new PCC driveway approaches in accordance with City Standard Plan No. 204 (Type
I plan), the project plans and specifications, using concrete Class 560-C-3250. Work shall include
matching the newly constructed driveway approaches with the adjacent sidewalks and curbs, as
well as tying the new asphalt concrete overlay within the parking lot to the back of the newly
constructed handicap by-pass. At Driveway Approach No. 1, the work shall also include repairing
the existing storm drain pipe by properly extending it to the PCC gutter on E. Marshall Blvd. using
the same material as the existing pipe. The extended pipe shall be tested for leakage potential
prior to completing the new driveway construction.
In addition, the work shall also include furnishing and installing any necessary irrigation re-routing
or modifications required due to conflicts with the new construction. The Contractor shall also be
fully responsible for any damages caused to the existing irrigation system during the course of
work. Any re-routed irrigation shall be restored in a manner that continues to adequately serve
the areas where irrigation currently exists. Nothing in these Special Provisions shall relieve the
Contractor from his responsibilities as provided in Section 5-7, “Safety”, of the Standard
Specifications.
Measurement and Payment for this bid item shall be paid per Lump Sum (LS) and shall be
considered as full compensation for furnishing all labor, materials, tools, equipment, and
incidentals for doing all work involved in this bid item per project plans and specifications; no
additional compensation will be allowed.
BID ITEM 10: WATER JET AND CLEAN TWO (2) EXISTING DROP INLETS OF ALL DEBRIS
AND VERIFY PROPER FUNCTIONALITY:
This bid item shall consist of clean and flush two (2) existing drop inlets using high-pressure water
jetting to remove all accumulated debris, sediment, and obstructions. Contractor shall collect and
properly dispose of all waste material off-site in accordance with applicable regulations. After
cleaning, verify that each drop inlet and its connecting pipes function properly by testing for flow
and confirming unobstructed drainage to the storm drain system. Nothing in these Special
Provisions shall relieve the Contractor from his responsibilities as provided in Section 5-7,
“Safety”, of the Standard Specifications.
Packet Page. 651
Measurement and Payment for this bid item shall be paid per Each (EA) and shall be considered
as full compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing
all work involved in this bid item per project plans and specifications; no additional compensation
will be allowed.
BID ITEM 11: REMOVE AND DISPOSE THE EXISTING DISABLED PARKING STALL SIGN.
FURNISH AND INSTALL TWO (2) NEW SIGNS PER CALTRANS STANDARD PLAN
R99C(CA), THIS PLAN AND SPECIFICATIONS:
This bid item shall consist of Removal and disposal of the existing disabled parking stall sign.
Furnish and install new ones per Caltrans Standard Plan R99C(CA), plans and specifications.
Nothing in these Special Provisions shall relieve the Contractor from his responsibilities as
provided in Section 5-7, “Safety”, of the Standard Specifications.
Measurement and Payment for this bid item shall be paid per Each (EA) and shall be considered
as full compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing
all work involved in this bid item per project plans and specifications; no additional compensation
will be allowed.
BID ITEM 12: FURNISH AND APPLY 4" WIDE THERMOPLASTIC REFLECTIVE BLUE
STRIPING, AND BLUE BORDERS FOR HANDICAP PARKING STALLS, LOADING AREA
AND PATH INCLUDING HANDICAP AND NO PARKING SYMBOLS PER 2024 CALTRANS
STANDARD PLAN A24C & A24E, THIS PLAN AND SPECIFICATIONS. ALSO INCLUDING
PAINT IN BLUE AND INSTALL TWO WHEEL STOPPERS FOR THE TWO HANDICAP
PARKING STALLS:
This bid item shall consist of Furnish and apply 4-inch-wide thermoplastic reflective blue striping,
including blue borders for handicap parking stalls, loading areas, and accessible paths, in
accordance with the 2024 Caltrans Standard Plans A24C and A24E, project plans and
specifications. Work shall also include furnishing and applying handicap and “No Parking”
pavement symbols, and installing two (2) wheel stoppers for the designated handicap parking
stalls after repairing and painting them in blue. Nothing in these Special Provisions shall relieve
the Contractor from his responsibilities as provided in Section 5-7 “Safety”, of the Standard
Specifications.
Measurement and Payment for this bid item shall be paid per Lump Sum (LS) and shall be
considered as full compensation for furnishing all labor, materials, tools, equipment, and
incidentals for doing all work involved in this bid item per project plans and specifications; no
additional compensation will be allowed.
Packet Page. 652
BID ITEM 13: FURNISH AND APPLY 4" WIDE THERMOPLASTIC REFLECTIVE WHITE
STRIPING FOR PARKING STALLS AND ARROW PAVEMENT MARKINGS PER 2024
CALTRANS STANDARD PLAN A24A (TYPE I 10'-0" ARROW) IN THE PARKING LOT PER
PLANS AND SPECIFICATIONS:
This bid item shall consist Furnish and apply 4-inch-wide thermoplastic reflective white striping
for parking stalls, along with arrow pavement markings in accordance with the 2024 Caltrans
Standard Plan A24A (Type I, 10'-0" arrow), to be installed throughout the parking lot as shown on
the project plans and in compliance with the specifications. Nothing in these Special Provisions
shall relieve the Contractor from his responsibilities as provided in Section 5-7 “Safety”, of the
Standard Specifications.
Measurement and Payment for this bid item shall be paid per Lump Sum (LS) and shall be
considered as full compensation for furnishing all labor, materials, tools, equipment, and
incidentals for doing all work involved in this bid item per project plans and specifications; no
additional compensation will be allowed.
BID ITEM 14: REMOVE AND DISPOSE OF THE EXISTING CURB. CONSTRUCT A NEW TYPE
"A" PCC CURB (STANDARD PLAN NO. 200) TO MATCH THE EXISTING CURB. RESTORE
ALL DISTURBED AREAS AROUND TO THE ORIGINAL CONDITION. THE NEW AC
OVERLAY CLOSING OUT TO THE NEW CONSTRUCTED CURB IS INCLUDED:
The work under this item consists of remove and dispose of the existing curb and construct a new
Type “A” PCC curb in accordance with City Standard Plan No. 200, matching the alignment and
profile of the existing adjacent curb. Restore all adjacent disturbed areas to their original condition.
The new asphalt concrete overlay tying into the newly constructed curb shall be included in this
item. Nothing in these Special Provisions shall relieve the Contractor from his responsibilities as
provided in Section 5-7 “Safety”, of the Standard Specifications.
Measurement and Payment for this bid item shall be paid per Lump Sum (LS) and shall be
considered as full compensation for furnishing all labor, materials, tools, equipment, and
incidentals for doing all work involved in this bid item per project plans and specifications; no
additional compensation will be allowed.
Packet Page. 653
APPENDIX
CONSTRUCT 4’ X 8’ PROJECT SIGN
CITY OF SAN
BERNARDINO
Building a Better San
Bernardino
ROWE LIBRARY – PARKING LOT
SURFACING
PROJECT No. PR26-003 Estimated Completion:
------------------------
Funding Provided By:
Measure S
Eric Levitt, City Manager
Council Members: Theodore Sanchez, Sandra
Ibarra, Juan Figueroa, Fred Shorett, Kim Knaus,
Mario Flores, Treasure Ortiz
For more information, please call the Engineering
Department (909) 998-2420
Size of project sign: 4’ Vertical by 8’ horizontal. Material: ½” Plywood with graffiti laminate.
Colors: White background, blue and black graphics, full color logo.
Packet Page. 654
Packet Page. 655
PLANS AND DRAWINGS
THE FOLLOWING PLANS AND DRAWINGS ARE INCORPORATED HEREIN BY
REFERENCE AS IF SET FORTH IN THEIR ENTIRETY:
1. STANDARD PLANS FOR PUBLIC WORK CONSTRUCTION (2021 EDITION)
2. ROWE LIBRARY – PARKING LOT SURFACING, DRAWING NO. 13668
3. APPENDICES.
Packet Page. 656
1. BID TABULATION
PROJECT NAME: ROWE LIBRARY - PARKING LOT SURFACING
PROJECT NO: PR26-003
BID TABULATION
Apparent Low Bidder 1 Apparent Low Bidder 2 Apparent Low Bidder 3 Apparent Low Bidder 4 Apparent Low Bidder 5 Apparent Low Bidder 6 Apparent Low Bidder 7 Apparent Low Bidder 8 Apparent Low Bidder 9 Apparent Low Bidder 10 Apparent Low Bidder 11 Apparent Low Bidder 12 Apparent Low Bidder 13 Apparent Low Bidder 14 Apparent Low Bidder 15 Apparent Low Bidder 16
Leonida Builders, Inc.Cali State Paving, Inc.Horizons Construction Co. Int'l,
Inc.
Venture Construction &
Management
Roadway Engineering &
Construction Corp.Copp Contracting, Inc.NoLimit Construction Global Builders, Inc.Onyx Paving Company, Inc.Paveco Construction Inc JB Bostick LLC Guilherme Engineering PowerTech Inc.Prestige Paving Company
Inc.
RBH Construction &
Engineering Inc PaveWest, LLC
Bid Item and Description Quant
ity Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1 Mobilization 1 LS $8,000.00 $8,000.00 $10,000.00 $10,000.00 $6,500.00 $6,500.00 $8,000.00 $8,000.00 $20,000.00 $20,000.00 $12,000.00 $12,000.00 $13,363.6
4 $13,363.64 $7,496.00 $7,496.00 $12,147.7
0 $12,147.70 $1,500.00 $1,500.00 $2,500.00 $2,500.00 $7,430.05 $7,430.05 $0.00 $0.00 $2,286.00 $2,286.00 $13,850.0
0 $13,850.00 $16,500.0
0 $16,500.00
2 Clearing and Grubbing 1 LS $6,000.00 $6,000.00 $8,000.00 $8,000.00 $4,025.00 $4,025.00 $2,500.00 $2,500.00 $5,000.00 $5,000.00 $2,000.00 $2,000.00 $15,272.7
3 $15,272.73 $600.00 $600.00 $3,000.00 $3,000.00 $1,500.00 $1,500.00 $2,500.00 $2,500.00 $1,500.00 $1,500.00 $2,000.00 $2,000.00 $1,143.00 $1,143.00 $5,600.00 $5,600.00 $2,500.00 $2,500.00
3 Erosion Control Plan & BMPs 1 LS $6,000.00 $6,000.00 $8,000.00 $8,000.00 $1,725.00 $1,725.00 $2,500.00 $2,500.00 $3,500.00 $3,500.00 $1,000.00 $1,000.00 $28,636.3
6 $28,636.36 $800.00 $800.00 $3,000.00 $3,000.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,857.00 $2,857.00 $7,500.00 $7,500.00 $4,000.00 $4,000.00
4 Construct 4’ x 8’ Project Sign. See info in Appendix 1 EA $2,000.00 $2,000.00 $5,000.00 $5,000.00 $2,300.00 $2,300.00 $4,000.00 $4,000.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $89,727.2
7 $89,727.27 $3,200.00 $3,200.00 $3,000.00 $3,000.00 $1,500.00 $1,500.00 $500.00 $500.00 $800.00 $800.00 $1,000.00 $1,000.00 $686.00 $686.00 $2,750.00 $2,750.00 $1,950.00 $1,950.00
5 Remove and replace 4" of asphalt pavement per plans and
specifications. 95% subgrade compaction 300 SF $5.00 $1,500.00 $10.00 $3,000.00 $6.50 $1,950.00 $23.50 $7,050.00 $6.60 $1,980.00 $27.00 $8,100.00 $10.18 $3,054.00 $4,300.00 $4,300.00 $11.00 $3,300.00 $14.50 $4,350.00 $10.00 $3,000.00 $9.16 $2,748.00 $16.67 $5,001.00 $16.87 $5,061.00 $32.67 $9,801.00 $10.00 $3,000.00
6
Cold mill 2" uniform depth in accordance with the plans and
specifications, including removal and disposal of all existing wheel
stoppers. Retain only the two wheel stoppers in the best condition for
reinstallation as specified in bid item #12.
17,970 SF $1.00 $17,970.00 $0.70 $12,579.00 $1.50 $26,955.00 $1.10 $19,767.00 $0.90 $16,173.00 $1.05 $18,868.50 $0.38 $6,828.60 $32,300.0
0 $32,300.00 $0.69 $12,399.30 $0.75 $13,477.50 $1.20 $21,564.00 $1.00 $17,970.00 $0.84 $15,094.80 $1.03 $18,509.10 $7.52 $135,134.40 $1.23 $22,103.10
7 Construct 2" ac overlay per plans and specifications 224 TN $220.00 $49,280.00 $150.00 $33,600.00 $250.00 $56,000.00 $255.00 $57,120.00 $180.00 $40,320.00 $161.89 $36,263.36 $23.86 $5,344.64 $263.00 $58,912.00 $122.00 $27,328.00 $210.00 $47,040.00 $140.00 $31,360.00 $331.47 $74,249.95 $171.97 $38,521.28 $164.09 $36,756.16 $8.34 $1,868.16 $182.77 $40,940.48
8
Remove existing globes & lighting fixtures and replace them with new
LED fixtures and globes on five (5) light poles shown on the plans,
including full rewiring, conduiting, photocell devices, alignment, and
installation of all necessary brackets/ adapters to provide a complete
system
5 EA $3,000.00 $15,000.00 $6,000.00 $30,000.00 $4,200.00 $21,000.00 $5,200.00 $26,000.00 $6,000.00 $30,000.00 $5,500.00 $27,500.00 $1,527.27 $7,636.35 $4,640.00 $23,200.00 $5,425.00 $27,125.00 $5,700.00 $28,500.00 $7,500.00 $37,500.00 $7,000.00 $35,000.00 $3,000.00 $15,000.00 $6,580.20 $32,901.00 $1,370.00 $6,850.00 $6,795.00 $33,975.00
9
Remove and dispose of three (3) existing driveway approaches.
Construct new PCC driveway approaches per city standard plan no. 204,
project plans, and specifications, using concrete class 560-c-3250,
including repair damaged SD pipe at DWA #1
1 LS $10,000.00 $10,000.00 $25,000.00 $25,000.00 $16,900.00 $16,900.00 $38,610.00 $38,610.00 $17,200.00 $17,200.00 $34,444.00 $34,444.00 $2,863.64 $2,863.64 $16,000.0
0 $16,000.00 $17,000.0
0 $17,000.00 $31,000.0
0 $31,000.00 $43,860.0
0 $43,860.00 $45,000.0
0 $45,000.00 $23,000.0
0 $23,000.00 $27,257.0
0 $27,257.00 $24,000.0
0 $24,000.00 $28,212.0
0 $28,212.00
10 Water jet and clean two (2) existing drop inlets of all debris and verify
proper functionality 2 EA $1,000.00 $2,000.00 $500.00 $1,000.00 $1,150.00 $2,300.00 $2,000.00 $4,000.00 $1,000.00 $2,000.00 $1,000.00 $2,000.00 $1,145.45 $2,290.90 $1,250.00 $2,500.00 $1,000.00 $2,000.00 $3,150.00 $6,300.00 $500.00 $1,000.00 $1,500.00 $3,000.00 $500.00 $1,000.00 $1,828.50 $3,657.00 $1,000.00 $2,000.00 $950.00 $1,900.00
11
Remove and dispose the existing disabled parking stall signs. Furnish
and install (2) signs per Caltrans standard plan R99C(CA), this plan and
specifications
1 LS $2,200.00 $2,200.00 $1,000.00 $1,000.00 $870.00 $870.00 $600.00 $600.00 $345.00 $345.00 $850.00 $850.00 $2,672.73 $2,672.73 $2,500.00 $2,500.00 $350.00 $350.00 $350.00 $350.00 $500.00 $500.00 $1,075.00 $1,075.00 $750.00 $750.00 $1,086.00 $1,086.00 $5,600.00 $5,600.00 $325.00 $325.00
12
Furnish and apply 4" wide thermoplastic reflective blue striping, and blue
borders for handicap parking stalls, loading area and path including
handicap and no parking symbols per 2024 Caltrans standard plan A24C
& A24E, this plan and specifications. Also including paint in blue and
install two wheel stoppers for the two handicap parking stalls
1 LS $5,000.00 $5,000.00 $4,000.00 $4,000.00 $2,875.00 $2,875.00 $2,100.00 $2,100.00 $4,200.00 $4,200.00 $3,900.00 $3,900.00 $2,863.64 $2,863.64 $5,655.00 $5,655.00 $3,850.00 $3,850.00 $4,150.00 $4,150.00 $4,500.00 $4,500.00 $4,800.00 $4,800.00 $1,000.00 $1,000.00 $5,301.00 $5,301.00 $9,800.00 $9,800.00 $1,595.00 $1,595.00
13
Furnish and apply 4" wide thermoplastic reflective white striping for
parking stalls and arrow pavement markings in the parking lot, per plans
and specifications
1 LS $4,500.00 $4,500.00 $6,000.00 $6,000.00 $5,750.00 $5,750.00 $5,900.00 $5,900.00 $5,900.00 $5,900.00 $3,850.00 $3,850.00 $3,818.18 $3,818.18 $8,125.00 $8,125.00 $5,500.00 $5,500.00 $5,750.00 $5,750.00 $10,000.0
0 $10,000.00 $4,500.00 $4,500.00 $2,000.00 $2,000.00 $4,274.00 $4,274.00 $9,800.00 $9,800.00 $8,125.00 $8,125.00
14
Remove and dispose of the existing curb. Construct a new type "A" PCC
curb (standard plan no. 200) to match the existing curb. Restore all
disturbed areas around to the original condition. The new AC overlay
closing out to the new constructed curb is included.
1 LS $6,000.00 $6,000.00 $5,000.00 $5,000.00 $1,270.00 $1,270.00 $4,600.00 $4,600.00 $1,000.00 $1,000.00 $3,300.00 $3,300.00 $4,581.82 $4,581.82 $4,200.00 $4,200.00 $2,000.00 $2,000.00 $2,500.00 $2,500.00 $2,500.00 $2,500.00 $1,000.00 $1,000.00 $4,000.00 $4,000.00 $2,229.00 $2,229.00 $1,650.00 $1,650.00 $2,900.00 $2,900.00
BID RANKING Apparent Low
Bidder 1
Apparent Low
Bidder 2
Apparent Low
Bidder 3
Apparent Low
Bidder 4
Apparent Low
Bidder 5
Apparent Low
Bidder 6
Apparent Low
Bidder 7
Apparent Low
Bidder 8
Apparent Low
Bidder 9
Apparent Low
Bidder 10
Apparent Low
Bidder 11
Apparent Low
Bidder 12
Apparent Low
Bidder 13
Apparent Low
Bidder 14
Apparent Low
Bidder 15
Apparent Low
Bidder 16
TOTAL BID AMOUNT CALCULATED BASED ON UNIT PRICES $135,450.00 $152,179.00 $150,420.00 $182,747.00 $148,618.00 $155,075.86 $188,954.50 $169,788.00 $122,000.00 $149,417.50 $162,784.00 $201,073.00 $110,367.08 $144,003.26 $236,203.56 $168,025.58
TOTAL BID AMOUNT INDICATED BY BIDDER $135,450.00 $152,179.00 $150,420.00 $182,747.00 $148,618.00 $155,075.86 $189,000.00 $169,888.00 $122,000.00 $149,417.50 $162,784.00 $200,000.00 $110,367.08 $144,003.26 $236,050.00 $168,025.98
CALCULATION CORRECTIONS TO BID AMOUNT SUBMITTED BY CONTRACTOR BASED
ON CALCULATED BID AMOUNT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 -$45.50 -$100.00 $0.00 $0.00 $0.00 $1,073.00 $0.00 $0.00 $153.56 -$0.40
BID TABULATION 1 of 8
Packet Page. 657
ADDITIVE ALTERNATE #1
ADDITIVE ALTERNATE # TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
BASE BID + ADDITIVE ALTERNATVE TOTAL $135,450.00 $152,179.00 $150,420.00 $182,747.00 $148,618.00 $155,075.86 $188,954.50 $169,788.00 $122,000.00 $149,417.50 $162,784.00 $201,073.00 $110,367.08 $144,003.26 $236,203.56 $168,025.58
1. BID TABULATION
PROJECT NAME: ROWE LIBRARY - PARKING LOT SURFACING
PROJECT NO: PR26-003
BID TABULATION
Apparent Low Bidder 1 Apparent Low Bidder 2 Apparent Low Bidder 3 Apparent Low Bidder 4 Apparent Low Bidder 5 Apparent Low Bidder 6 Apparent Low Bidder 7 Apparent Low Bidder 8 Apparent Low Bidder 9 Apparent Low Bidder 10 Apparent Low Bidder 11 Apparent Low Bidder 12 Apparent Low Bidder 13 Apparent Low Bidder 14 Apparent Low Bidder 15 Apparent Low Bidder 16
Leonida Builders, Inc.Cali State Paving, Inc.Horizons Construction Co. Int'l,
Inc.
Venture Construction &
Management
Roadway Engineering &
Construction Corp.Copp Contracting, Inc.NoLimit Construction Global Builders, Inc.Onyx Paving Company, Inc.Paveco Construction Inc JB Bostick LLC Guilherme Engineering PowerTech Inc.Prestige Paving Company
Inc.
RBH Construction &
Engineering Inc PaveWest, LLC
Bid Item and Description Quant
ity Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
BID TABULATION 2 of 8
Packet Page. 658
2. REVIEW OF APPARENT LOW BID
APPARENT LOW BID SUBMITTED BY:PowerTech Inc.APPARENT LOW BID AMOUNT:
ITEM REVIEWED/CHECKED REVIEW RESULT BY DATE REMARKS
BID STAMPED AS RECEIVED PRIOR BID TIME:Yes Mohammad Alkhateeb 11/7/202
5BID BOND IN PROPER AMOUNT:Yes Mohammad Alkhateeb 11/7/202
5ADDENDA ACKNOWLEDGEMENT:Yes Mohammad Alkhateeb 11/7/202
5TOTAL BID PRICES CALCULATED CORRECTLY:Yes Mohammad Alkhateeb 11/7/202
5SUBCONTRACTOR AMOUNT:
MIN PRIME CONTRACTOR % REQUIREMENT FOR WORK PER SPECIFICATIONS:
PRIME CONTRACTOR % CALCULATED PER BID SUBMITTAL (THIS % MUST BE EQUAL OR
MORE THAN ABOVE %):
BIDDER COMPLIES WITH MIN PRIME CONTRACTOR % REQUIREMENT:
MAX ALLOWABLE SUBCONTRACTOR PERCENT PER SPECIFICATIONS:
SUB CONTRACTOR % CALCULATED PER BID SUBMITTAL (THIS % MUST BE EQUAL OR LESS
THAN ABOVE %):
BIDDER COMPLIES WITH MAX. SUB CONTRACTOR % REQUIREMENT:
PRIME CONTRACTOR LICENSE STATUS:PowerTech Inc.
Current and active till
08/31/2027 Mohammad Alkhateeb 11/7/202
5 Print-out from CLSB Web Page attached (http://www.cslb.ca.gov/)
PRIME CONTRACTOR DIR REGISTRATION STATUS:Active till 2026-06-30 Mohammad Alkhateeb 11/7/202
5 Print-out from DIR Web Page attached (https://services.dir.ca.gov/gsp)
SUB CONTRACTOR LICENSE STATUS:4D Milling Inc.
Current and active till
06/30/2027 Mohammad Alkhateeb #######
#Print-out from CLSB Web Page attached (http://www.cslb.ca.gov/)
SUB CONTRACTOR DIR REGISTRATION STATUS:Active till 06/30/2026 Mohammad Alkhateeb #######
#Print-out from DIR Web Page attached (https://services.dir.ca.gov/gsp)
SUB CONTRACTOR LICENSE STATUS:B-81 Paving Inc
Current and active till
09/30/2027 Mohammad Alkhateeb #######
#SUB CONTRACTOR DIR REGISTRATION STATUS:Active till 06/30/2026 Mohammad Alkhateeb #######
#SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
REVIEW OF APPARENT LOW BID 3 of 8
Packet Page. 659
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
PRIME CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:PRIME CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:
REFERENCE CHECK ACCEPTABLE:
REVIEW OF APPARENT LOW BID 4 of 8
Packet Page. 660
2. REVIEW OF APPARENT LOW BID
REMARKS
Print-out from CLSB Web Page attached (http://www.cslb.ca.gov/)
Print-out from DIR Web Page attached (https://services.dir.ca.gov/gsp)
Print-out from CLSB Web Page attached (http://www.cslb.ca.gov/)
Print-out from DIR Web Page attached (https://services.dir.ca.gov/gsp)
$110,367.08
REVIEW OF APPARENT LOW BID 5 of 8
Packet Page. 661
REVIEW OF APPARENT LOW BID 6 of 8
Packet Page. 662
3. REFERENCE CHECK OF APPARENT LOW BIDDER
REFERENCE DATA FOR APPARENT LOW BIDDER
REFERENCE CHECK FOR APPARENT LOW BIDDER
CH
E
C
K
E
D
BY
DA
T
E
Answer "YES" if satisfied or "NO" if not satisfied
REFERENCE PROJECT OWNER AND REFERENCE
NAME
TE
L
AM
O
U
N
T
DA
T
E
CO
M
P
L
E
T
E
D
DI
D
TH
E
CO
N
T
R
A
C
T
O
R
DO
QU
A
L
I
T
Y
WO
R
K
DI
D
TH
E
CO
N
T
R
A
C
T
O
R
ST
A
Y
ON
SC
H
E
D
U
L
E
DI
D
TH
E
CO
N
T
R
A
C
T
O
R
AS
K
FO
R
UN
N
E
C
E
S
S
A
R
Y
CH
A
N
G
E
OR
D
E
R
S
DI
D
TH
E
CO
N
T
R
A
C
T
O
R
FI
L
E
CL
A
I
M
S
AG
A
I
N
S
T
YO
U
WI
L
L
YO
U
HI
R
E
TH
E
CO
N
T
R
A
C
T
O
R
AG
A
I
N
REMARKS
Ontarion Basin Cleanup County of San Bernardino -
Juan
(909) 501-
5425 $50,000.00 ------Didn't respond to the
phone call
Mo
h
a
m
m
ad
Al
k
h
a
t
e
e
b
11
/
1
0
/
2
0
2
5
Concrete Work 4D Surface Management -
Mike
(951) 234-
4566 < $50,000 Ongoing Yes Yes No No Yes Very satisfied with his work
Mo
h
a
m
m
ad
Al
k
h
a
t
e
e
b
11
/
1
0
/
2
0
2
5
Asphalt Pavement Recycling - Jeff
Elder
(951) 232-
7197 < $500,000 Ongoing Yes Yes No No Yes Very satisfied with his work
Mo
h
a
m
m
ad
Al
k
h
a
t
e
e
b
11
/
1
0
/
2
0
2
5
Concrete, Asphalt, Electrical Vance Corp - Robert (909) 260-
5368 < $100,000 Ongoing Yes Yes No No Yes Very satisfied with his work
Mo
h
a
m
m
ad
Al
k
h
a
t
e
e
b
#######
#
REF CHECK 7 of 8
Packet Page. 663
4. LOWEST RESPONSIBLE BID
LOWEST RESPONSIBLE BID SUBMITTED BY:PowerTech Inc.
IN THE AMOUNT OF:$110,367.08
LOWEST RESPONSIBLE BID 8 of 8
Packet Page. 664
Packet Page. 665
Packet Page. 666
Packet Page. 667
Packet Page. 668
Packet Page. 669
Packet Page. 670
Packet Page. 671
Packet Page. 672
Packet Page. 673
Packet Page. 674
Packet Page. 675
Packet Page. 676
Packet Page. 677
Packet Page. 678
Packet Page. 679
Packet Page. 680
Packet Page. 681
Packet Page. 682
Packet Page. 683
Packet Page. 684
Packet Page. 685
Packet Page. 686
Packet Page. 687
Packet Page. 688
Packet Page. 689
Packet Page. 690
Packet Page. 691
Packet Page. 692
Packet Page. 693
Packet Page. 694
Packet Page. 695
Packet Page. 696
Packet Page. 697
Packet Page. 698
Packet Page. 699
Packet Page. 700
Packet Page. 701
CONSENT CALENDAR
January 21, 2026
Honorable Mayor and City Council Members
Lynn Merrill, Director of Public Works;
Vanessa Carder, Director of Parks, Recreation, and Community
Services
Public Works
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Approve Amendment No. 1 to the Professional Services Agreement with Next
Practice Partners, LLC to renew and extend the contract term for preparation
of the City of San Bernardino Parks Master Plan through June 30, 2026; and,
2. Authorize the City Manager, or designee, to execute Amendment No. 1; and
3. Authorize the Interim Director of Management Services to establish a purchase
order for the remaining contract balance in an amount not to exceed
$98,139.00.
No Comment
The City entered into a Professional Services Agreement with Next Practice Partners,
LLC on January 18, 2023, to prepare the Parks Master Plan in the amount of $997,400,
with a contract term ending December 31, 2024. Amendment No. 1 provides a time
only extension to the agreement through June 30, 2026. No changes to the scope or
cost are proposed, and the project continues to use the same funding allocations
previously approved, $350,000 from the Cultural Development Fund and $750,000
from the Measure S Fund, with no additional fiscal impact.
Packet Page. 702
Background
The City of San Bernardino is a diverse community with a broad range of recreational
needs supported by more than 30 parks, trails, greenways, community centers, athletic
facilities, and senior service locations.
Parks Master Plans are typically updated on a ten-year cycle to ensure that park
facilities, programming, and long-term investments align with community needs and
operational priorities. The City’s previous Parks Master Plan was last updated in 2008.
To address current and future needs, the City Council approved a Professional
Services Agreement with Next Practice Partners, LLC on January 18, 2023, to prepare
a comprehensive update to the Parks Master Plan.
The project was funded with $350,000 in Cultural Development funding and an
additional $750,000 in Measure S funding, for a total project budget of $1,100,000.00.
Work on the Parks Master Plan began in early 2023.
Discussion
Next Practice Partners, LLC has been actively engaged in development of the Parks
Master Plan and has demonstrated a strong understanding of the City’s park system,
operational needs, and long-term goals. The consultant has facilitated coordination
with City staff, conducted community outreach, and completed technical analysis
necessary to support a comprehensive and data-driven planning effort.
During the development of the Parks Master Plan, the City has also been advancing
numerous park improvement and capital projects. As a result, completion of the final
plan has extended beyond the original contract term.
The proposed amendment addresses an administrative oversight in aligning the
original contract expiration date with the actual duration of the planning process.
Throughout this period, the consultant has remained responsive and has continued to
work collaboratively with City staff to advance the project.
Amendment No. 1 extends the contract term from December 31, 2024, through June
30, 2026. The amendment does not increase the total contract amount and does not
modify the approved scope of services. The remaining balance owed to the consultant
is $98,139.00, which will allow completion of final coordination, workshops,
documentation, and delivery of the Parks Master Plan.
Maintaining continuity with the existing consultant preserves institutional knowledge,
avoids unnecessary delays, and supports completion of a high-quality Parks Master
Plan that will guide future park investments and policy decisions.
2021-2025 Strategic Targets and Goals
Approval of this action supports Key Target No. 3: Improved Quality of Life. Completion
of the Parks Master Plan will provide a strategic framework for enhancing park
facilities, improving recreational opportunities, and guiding future capital investments
Packet Page. 703
throughout the City.
Fiscal Impact
There is no General Fund impact associated with this action. Funding for the Parks
Master Plan was previously adopted in the amount of $1,100,000.00, consisting of
$350,000 from the Cultural Development Fund and $750,000 from Measure S.
Measure S funds in the amount of approximately $200,739 remain available within the
project budget. Of this amount, $98,139.00 is required to complete the consultant’s
remaining work under the existing agreement. No additional appropriations are
required.
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Approve Amendment No. 1 to the Professional Services Agreement with Next
Practice Partners, LLC to renew and extend the contract term for preparation
of the City of San Bernardino Parks Master Plan through June 30, 2026; and,
2. Authorize the City Manager, or designee, to execute Amendment No. 1; and
3. Authorize the Interim Director of Management Services to establish a purchase
order for the remaining contract balance in an amount not to exceed
$98,139.00.
Attachments
Attachment 1 Amendment No. 1 – Next Practice Partners, LLC.
Attachment 2 Original Profession Service Agreement Next
Practice Partners, LLC.
Ward:
All Wards
Synopsis of Previous Council Actions:
January 18, 2023 - The Mayor and City Council of the City of San Bernardino, CA
adopted Resolution 2023-016 Award a Professional Services
Agreement for a Parks Master Plan in the amount of $997,400.
CC: Eric Levitt, City Manager
Packet Page. 704
-1-
AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT
This Amendment No. 1 to the Professional Services Agreement is made and
entered into as of January 21, 2026 (“Effective Date”) by and between the City of San
Bernardino, a charter city and municipal corporation (“City”) and Next Practice Partner,
LLC (“Consultant”). City and Consultant are sometimes referred to herein individually as
a “Party” and collectively as “Parties.”
A. WHEREAS, the City and the Consultant have entered into an agreement,
dated January 18, 2023 , for the purpose of developing the City of San Bernardino Park
Master Plan (the “Original Agreement”).
B. WHEREAS, the Agreement established a contract term ending December
31, 2024; and
C. WHEREAS, the Parties desire to amend the Agreement to extend the term
in order to allow completion of the Parks Master Plan; and
D. WHEREAS, the Parties desire that this Amendment be a time-only
extension and that no changes be made to the scope of services or the total not-to-exceed
compensation authorized under the Agreement.
NOW, THEREFORE, in consideration of the above recitals and the mutual
covenants, conditions, and promises contained in this Amendment No. 1 and the Original
Agreement, the Parties mutually agree as follows:
1. Incorporation of Recitals. The recitals listed above are true and correct and
are hereby incorporated herein by this reference.
2. Term. The term of the Original Agreement shall be extended for an
additional term of eighteen months through June 30, 2026, unless earlier terminated.
3. Full Force. Except as amended by this Amendment No. 1, all provisions of
the Original Agreement, including without limitation the indemnity and insurance
provisions, shall remain in full force and effect and shall govern the actions of the Parties
under this Amendment No. 1.
4. Electronic Transmission. A manually signed copy of this Amendment No.
1 which is transmitted by facsimile, email or other means of electronic transmission shall
be deemed to have the same legal effect as delivery of an original executed copy of this
Amendment No. 1 for all purposes. This Amendment No. 1 may be signed using an
electronic signature.
Packet Page. 705
-2-
5. Counterparts. This Amendment No. 1 may be signed in counterparts, each
of which shall constitute an original.
[SIGNATURES ON FOLLOWING PAGE]
Packet Page. 706
-2-
Packet Page. 707
-3-
SIGNATURE PAGE FOR
IN WITNESS WHEREOF, the Parties hereto have executed this Amendment No.
1 on the Effective Date first herein above written.
APPROVED BY:
Eric Levitt
City Manager
APPROVED AS TO FORM:
Best Best & Krieger LLP
City Attorney
Neelay Bhatt
Founder & CEO
Packet Page. 708
1
PROFESSIONAL SERVICES AGREEMENT
BETWEEN THE CITY OF SAN BERNARDINO
AND NEXT PRACTICE PARTNERS, LLC.
This Agreement is made and entered into as of January 18, 2023, by and between
the City of San Bernardino, a charter city and municipal corporation organized and
operating under the laws of the State of California with its principal place of business at
Vanir Tower, 290 North D Street, San Bernardino, CA 92401 (“City”), and Next Practice
Partners, LLC. with its principal place of business at 1950 East Greyhound Pass, Suite
121, Carmel, IN 46033 (hereinafter referred to as “Consultant”). City and Consultant are
hereinafter sometimes referred to individually as “Party” and collectively as the “Parties.”
RECITALS
A. City is a public agency of the State of California and is in need of
professional services for the following project:
City of San Bernardino Park Master Plan (hereinafter referred to as “the Project”).
B. Consultant is duly licensed and has the necessary qualifications to provide
such services.
C. The Parties desire by this Agreement to establish the terms for City to retain
Consultant to provide the services described herein.
NOW, THEREFORE, IT IS AGREED AS FOLLOWS:
AGREEMENT
1. Incorporation of Recitals. The recitals above are true and correct and are
hereby incorporated herein by this reference.
2. Services. Consultant shall provide the City with the services described in
the Scope of Services attached hereto as Exhibit “A”.
3. Professional Practices. All professional services to be provided by
Consultant pursuant to this Agreement shall be provided by personnel identified in their
proposal. Consultant warrants that Consultant is familiar with all laws that may affect its
performance of this Agreement and shall advise City of any changes in any laws that may
affect Consultant’s performance of this Agreement. Consultant further represents that no
City employee will provide any services under this Agreement.
4. Compensation.
a. Subject to paragraph 4(b) below, the City shall pay for such services
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 709
2
in accordance with the Schedule of Charges set forth in Exhibit “A”..
b. In no event shall the total amount paid for services rendered by
Consultant under this Agreement exceed the sum of $997,400.00. This amount is to
cover all related costs, and the City will not pay any additional fees for printing expenses.
Consultant may submit invoices to City for approval. Said invoice shall be based on the
total of all Consultant’s services which have been completed to City’s sole satisfaction.
City shall pay Consultant’s invoice within forty-five (45) days from the date City receives
said invoice. The invoice shall describe in detail the services performed and the
associated time for completion. Any additional services approved and performed
pursuant to this Agreement shall be designated as “Additional Services” and shall identify
the number of the authorized change order, where applicable, on all invoices.
5. Additional Work. If changes in the work seem merited by Consultant or the
City, and informal consultations with the other party indicate that a change is warranted,
it shall be processed in the following manner: a letter outlining the changes shall be
forwarded to the City by Consultant with a statement of estimated changes in fee or time
schedule. An amendment to this Agreement shall be prepared by the City and executed
by both Parties before performance of such services, or the City will not be required to
pay for the changes in the scope of work. Such amendment shall not render ineffective
or invalidate unaffected portions of this Agreement.
a. Adjustments. No retroactive price adjustments will be considered.
Additionally, no price increases will be permitted during the first year of this Agreement,
unless agreed to by City and Consultant in writing.
6. Term. The term of this Agreement shall be from January 18, 2023 to
December 30, 2024, unless earlier terminated as provided herein. Consultant shall
complete the services within the term of this Agreement and shall meet any other
established schedules and deadlines set forth in each individual Task Order issued by
the City. All applicable indemnification provisions of this Agreement shall remain in effect
following the termination of this Agreement.
7. Maintenance of Records; Audits.
a. Records of Consultant’s services relating to this Agreement shall be
maintained in accordance with generally recognized accounting principles and shall be
made available to City for inspection and/or audit at mutually convenient times for a period
of four (4) years from the Effective Date.
b. Books, documents, papers, accounting records, and other evidence
pertaining to costs incurred shall be maintained by Consultant and made available at all
reasonable times during the contract period and for four (4) years from the date of final
payment under the contract for inspection by City.
8. Time of Performance. Consultant shall perform its services in a prompt and
timely manner and shall commence performance upon receipt of written notice from the
City to proceed. Consultant shall complete the services required hereunder within Term.
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 710
3
9. Delays in Performance.
a. Neither City nor Consultant shall be considered in default of this
Agreement for delays in performance caused by circumstances beyond the reasonable
control of the non-performing Party. For purposes of this Agreement, such circumstances
include a Force Majeure Event. A Force Majeure Event shall mean an event that
materially affects the Consultant’s performance and is one or more of the following: (1)
Acts of God or other natural disasters occurring at the project site; (2) terrorism or other
acts of a public enemy; (3) orders of governmental authorities (including, without
limitation, unreasonable and unforeseeable delay in the issuance of permits or approvals
by governmental authorities that are required for the services); and (4) pandemics,
epidemics or quarantine restrictions. For purposes of this section, “orders of
governmental authorities,” includes ordinances, emergency proclamations and orders,
rules to protect the public health, welfare and safety.
b. Should a Force Majeure Event occur, the non-performing Party shall,
within a reasonable time of being prevented from performing, give written notice to the
other Party describing the circumstances preventing continued performance and the
efforts being made to resume performance of this Agreement. Delays shall not entitle
Consultant to any additional compensation regardless of the Party responsible for the
delay.
c. Notwithstanding the foregoing, the City may still terminate this
Agreement in accordance with the termination provisions of this Agreement.
10. Compliance with Law.
a. Consultant shall comply with all applicable laws, ordinances, codes
and regulations of the federal, state and local government, including Cal/OSHA
requirements.
b. If required, Consultant shall assist the City, as requested, in obtaining
and maintaining all permits required of Consultant by federal, state and local regulatory
agencies.
c. If applicable, Consultant is responsible for all costs of clean up and/
or removal of hazardous and toxic substances spilled as a result of his or her services or
operations performed under this Agreement.
11. Standard of Care. Consultant’s services will be performed in accordance
with generally accepted professional practices and principles and in a manner consistent
with the level of care and skill ordinarily exercised by members of the profession currently
practicing under similar conditions. Consultant’s performance shall conform in all material
respects to the requirements of the Scope of Work.
12. Conflicts of Interest. During the term of this Agreement, Consultant shall at
all times maintain a duty of loyalty and a fiduciary duty to the City and shall not accept
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 711
4
payment from or employment with any person or entity which will constitute a conflict of
interest with the City.
13. City Business Certificate. Consultant shall, prior to execution of this
Agreement, obtain and maintain during the term of this Agreement a valid business
registration certificate from the City pursuant to Title 5 of the City’s Municipal Code and
any and all other licenses, permits, qualifications, insurance, and approvals of whatever
nature that are legally required of Consultant to practice his/her profession, skill, or
business.
14. Assignment and Subconsultant. Consultant shall not assign, sublet, or
transfer this Agreement or any rights under or interest in this Agreement without the
written consent of the City, which may be withheld for any reason. Any attempt to so
assign or so transfer without such consent shall be void and without legal effect and shall
constitute grounds for termination. Subcontracts, if any, shall contain a provision making
them subject to all provisions stipulated in this Agreement. Nothing contained herein shall
prevent Consultant from employing independent associates and subconsultants as
Consultant may deem appropriate to assist in the performance of services hereunder.
15. Independent Consultant. Consultant is retained as an independent
contractor and is not an employee of City. No employee or agent of Consultant shall
become an employee of City. The work to be performed shall be in accordance with the
work described in this Agreement, subject to such directions and amendments from City
as herein provided. Any personnel performing the work governed by this Agreement on
behalf of Consultant shall at all times be under Consultant’s exclusive direction and
control. Consultant shall pay all wages, salaries, and other amounts due such personnel
in connection with their performance under this Agreement and as required by law.
Consultant shall be responsible for all reports and obligations respecting such personnel,
including, but not limited to: social security taxes, income tax withholding, unemployment
insurance, and workers’ compensation insurance.
16. Insurance. Consultant shall not commence work for the City until it has
provided evidence satisfactory to the City it has secured all insurance required under this
section. In addition, Consultant shall not allow any subcontractor to commence work on
any subcontract until it has secured all insurance required under this section.
a. Additional Insured
The City of San Bernardino, its officials, officers, employees, agents, and
volunteers shall be named as additional insureds on Consultant’s and its subconsultants’
policies of commercial general liability and automobile liability insurance using the
endorsements and forms specified herein or exact equivalents.
b. Commercial General Liability
(i) The Consultant shall take out and maintain, during the
performance of all work under this Agreement, in amounts not less than specified herein,
Commercial General Liability Insurance, in a form and with insurance companies
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 712
5
acceptable to the City.
(ii) Coverage for Commercial General Liability insurance shall be
at least as broad as the following:
Insurance Services Office Commercial General Liability
coverage (Occurrence Form CG 00 01) or exact equivalent.
(iii) Commercial General Liability Insurance must include
coverage for the following:
(1) Bodily Injury and Property Damage
(2) Personal Injury/Advertising Injury
(3) Premises/Operations Liability
(4) Products/Completed Operations Liability
(5) Aggregate Limits that Apply per Project
(6) Explosion, Collapse and Underground (UCX)
exclusion deleted
(7) Contractual Liability with respect to this Contract
(8) Broad Form Property Damage
(9) Independent Consultants Coverage
(iv) The policy shall contain no endorsements or provisions
limiting coverage for (1) contractual liability; (2) cross liability exclusion for claims or suits
by one insured against another; (3) products/completed operations liability; or (4) contain
any other exclusion contrary to the Agreement.
(v) The policy shall give City, its elected and appointed officials,
officers, employees, agents, and City-designated volunteers additional insured status
using ISO endorsement forms CG 20 10 10 01 and 20 37 10 01, or endorsements
providing the exact same coverage.
(vi) The general liability program may utilize either deductibles
or provide coverage excess of a self-insured retention, subject to written approval by the
City, and provided that such deductibles shall not apply to the City as an additional
insured.
c. Automobile Liability
(i) At all times during the performance of the work under this
Agreement, the Consultant shall maintain Automobile Liability Insurance for bodily injury
and property damage including coverage for owned, non-owned and hired vehicles, in a
form and with insurance companies acceptable to the City.
(ii) Coverage for automobile liability insurance shall be at least
as broad as Insurance Services Office Form Number CA 00 01 covering automobile
liability (Coverage Symbol 1, any auto).
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 713
6
(iii) The policy shall give City, its elected and appointed officials,
officers, employees, agents and City designated volunteers additional insured status.
(iv) Subject to written approval by the City, the automobile liability
program may utilize deductibles, provided that such deductibles shall not apply to the City
as an additional insured, but not a self-insured retention.
d. Workers’ Compensation/Employer’s Liability
(i) Consultant certifies that he/she is aware of the provisions of
Section 3700 of the California Labor Code which requires every employer to be insured
against liability for workers’ compensation or to undertake self-insurance in accordance
with the provisions of that code, and he/she will comply with such provisions before
commencing work under this Agreement.
(ii) To the extent Consultant has employees at any time during
the term of this Agreement, at all times during the performance of the work under this
Agreement, the Consultant shall maintain full compensation insurance for all persons
employed directly by him/her to carry out the work contemplated under this Agreement,
all in accordance with the “Workers’ Compensation and Insurance Act,” Division IV of the
Labor Code of the State of California and any acts amendatory thereof, and Employer’s
Liability Coverage in amounts indicated herein. Consultant shall require all
subconsultants to obtain and maintain, for the period required by this Agreement, workers’
compensation coverage of the same type and limits as specified in this section.
e. Professional Liability (Errors and Omissions)
At all times during the performance of the work under this Agreement the
Consultant shall maintain professional liability or Errors and Omissions insurance
appropriate to its profession, in a form and with insurance companies acceptable to the
City and in an amount indicated herein. This insurance shall be endorsed to include
contractual liability applicable to this Agreement and shall be written on a policy form
coverage specifically designed to protect against acts, errors or omissions of the
Consultant. “Covered Professional Services” as designated in the policy must specifically
include work performed under this Agreement. The policy must “pay on behalf of” the
insured and must include a provision establishing the insurer's duty to defend.
f. Privacy/Network Security (Cyber)
At all times during the performance of the work under this Agreement, the
Consultant shall maintain privacy/network security insurance for: (1) privacy breaches,
(2) system breaches, (3) denial or loss of service, and the (4) introduction, implantation
or spread of malicious software code, in a form and with insurance companies acceptable
to the City.
g. Minimum Policy Limits Required
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 714
7
(i) The following insurance limits are required for the
Agreement:
Combined Single Limit
Commercial General Liability $2,000,000 per occurrence/$4,000,000
aggregate for bodily injury, personal
injury, and property damage
Automobile Liability $1,000,000 per occurrence for bodily
injury and property damage
Employer’s Liability $1,000,000 per occurrence
Professional Liability $1,000,000 per claim and aggregate
(errors and omissions)
Cyber Liability $1,000,000 per occurrence and
aggregate
(ii) Defense costs shall be payable in addition to the limits.
(iii) Requirements of specific coverage or limits contained in this
section are not intended as a limitation on coverage, limits, or other requirement, or a
waiver of any coverage normally provided by any insurance. Any available coverage shall
be provided to the parties required to be named as Additional Insured pursuant to this
Agreement.
h. Evidence Required
Prior to execution of the Agreement, the Consultant shall file with the City
evidence of insurance from an insurer or insurers certifying to the coverage of all
insurance required herein. Such evidence shall include original copies of the ISO CG
00 01 (or insurer’s equivalent) signed by the insurer’s representative and Certificate of
Insurance (Acord Form 25-S or equivalent), together with required endorsements. All
evidence of insurance shall be signed by a properly authorized officer, agent, or qualified
representative of the insurer and shall certify the names of the insured, any additional
insureds, where appropriate, the type and amount of the insurance, the location and
operations to which the insurance applies, and the expiration date of such insurance.
i. Policy Provisions Required
(i) Consultant shall provide the City at least thirty (30) days prior
written notice of cancellation of any policy required by this Agreement, except that the
Consultant shall provide at least ten (10) days prior written notice of cancellation of any
such policy due to non-payment of the premium. If any of the required coverage is
cancelled or expires during the term of this Agreement, the Consultant shall deliver
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 715
8
renewal certificate(s) including the General Liability Additional Insured Endorsement to
the City at least ten (10) days prior to the effective date of cancellation or expiration.
(ii) The Commercial General Liability Policy and Automobile
Policy shall each contain a provision stating that Consultant’s policy is primary insurance
and that any insurance, self-insurance or other coverage maintained by the City or any
named insureds shall not be called upon to contribute to any loss.
(iii) The retroactive date (if any) of each policy is to be no later
than the effective date of this Agreement. Consultant shall maintain such coverage
continuously for a period of at least three years after the completion of the work under
this Agreement. Consultant shall purchase a one (1) year extended reporting period A)
if the retroactive date is advanced past the effective date of this Agreement; B) if the
policy is cancelled or not renewed; or C) if the policy is replaced by another claims-made
policy with a retroactive date subsequent to the effective date of this Agreement.
(iv) All required insurance coverages, except for the professional
liability coverage, shall contain or be endorsed to provide waiver of subrogation in favor
of the City, its officials, officers, employees, agents, and volunteers or shall specifically
allow Consultant or others providing insurance evidence in compliance with these
specifications to waive their right of recovery prior to a loss. Consultant hereby waives
its own right of recovery against City, and shall require similar written express waivers
and insurance clauses from each of its subconsultants.
(v) The limits set forth herein shall apply separately to each
insured against whom claims are made or suits are brought, except with respect to the
limits of liability. Further the limits set forth herein shall not be construed to relieve the
Consultant from liability in excess of such coverage, nor shall it limit the Consultant’s
indemnification obligations to the City and shall not preclude the City from taking such
other actions available to the City under other provisions of the Agreement or law.
j. Qualifying Insurers
(i) All policies required shall be issued by acceptable insurance
companies, as determined by the City, which satisfy the following minimum
requirements:
(1) Each such policy shall be from a company or
companies with a current A.M. Best's rating of no less than A:VII and admitted to
transact in the business of insurance in the State of California, or otherwise allowed
to place insurance through surplus line brokers under applicable provisions of the
California Insurance Code or any federal law.
k. Additional Insurance Provisions
(i) The foregoing requirements as to the types and limits of
insurance coverage to be maintained by Consultant, and any approval of said insurance
by the City, is not intended to and shall not in any manner limit or qualify the liabilities
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 716
9
and obligations otherwise assumed by the Consultant pursuant to this Agreement,
including, but not limited to, the provisions concerning indemnification.
(ii) If at any time during the life of the Agreement, any policy of
insurance required under this Agreement does not comply with these specifications or is
canceled and not replaced, City has the right but not the duty to obtain the insurance it
deems necessary and any premium paid by City will be promptly reimbursed by
Consultant or City will withhold amounts sufficient to pay premium from Consultant
payments. In the alternative, City may cancel this Agreement.
(iii) The City may require the Consultant to provide complete
copies of all insurance policies in effect for the duration of the Project.
(iv) Neither the City nor the City Council, nor any member of the
City Council, nor any of the officials, officers, employees, agents or volunteers shall be
personally responsible for any liability arising under or by virtue of this Agreement.
l. Subconsultant Insurance Requirements. Consultant shall not allow
any subcontractors or subconsultants to commence work on any subcontract until they
have provided evidence satisfactory to the City that they have secured all insurance
required under this section. Policies of commercial general liability insurance provided
by such subcontractors or subconsultants shall be endorsed to name the City as an
additional insured using ISO form CG 20 38 04 13 or an endorsement providing the exact
same coverage. If requested by Consultant, City may approve different scopes or
minimum limits of insurance for particular subcontractors or subconsultants.
17. Indemnification.
a. To the fullest extent permitted by law, Consultant shall defend (with
counsel reasonably approved by the City), indemnify and hold the City, its elected and
appointed officials, officers, employees, agents, and authorized volunteers free and
harmless from any and all claims, demands, causes of action, suits, actions, proceedings,
costs, expenses, liability, judgments, awards, decrees, settlements, loss, damage or
injury of any kind, in law or equity, to property or persons, including wrongful death,
(collectively, “Claims”) in any manner arising out of, pertaining to, or incident to any
alleged acts, errors or omissions, or willful misconduct of Consultant, its officials, officers,
employees, subcontractors, consultants or agents in connection with the performance of
the Consultant’s services, the Project, or this Agreement, including without limitation the
payment of all damages, expert witness fees, attorneys’ fees and other related costs and
expenses. This indemnification clause excludes Claims arising from the sole negligence
or willful misconduct of the City. Consultant's obligation to indemnify shall not be
restricted to insurance proceeds, if any, received by the City, the City Council, members
of the City Council, its employees, or authorized volunteers. Consultant’s indemnification
obligation shall survive the expiration or earlier termination of this Agreement.
b. If Consultant’s obligation to defend, indemnify, and/or hold harmless
arises out of Consultant’s performance as a “design professional” (as that term is defined
under Civil Code section 2782.8), then, and only to the extent required by Civil Code
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 717
10
section 2782.8, which is fully incorporated herein, Consultant’s indemnification obligation
shall be limited to the extent which the Claims arise out of, pertain to, or relate to the
negligence, recklessness, or willful misconduct of the Consultant in the performance of
the services or this Agreement, and, upon Consultant obtaining a final adjudication by a
court of competent jurisdiction, Consultant’s liability for such claim, including the cost to
defend, shall not exceed the Consultant’s proportionate percentage of fault.
18. California Labor Code Requirements. Consultant is aware of the
requirements of California Labor Code Sections 1720 et seq. and 1770 et seq., as well
as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage
Laws"), which require the payment of prevailing wage rates and the performance of other
requirements on certain “public works” and “maintenance” projects. If the Services are
being performed as part of an applicable “public works” or “maintenance” project, as
defined by the Prevailing Wage Laws, Consultant agrees to fully comply with such
Prevailing Wage Laws, if applicable. Consultant shall defend, indemnify and hold the
City, its elected officials, officers, employees and agents free and harmless from any
claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to
comply with the Prevailing Wage Laws. It shall be mandatory upon the Consultant and
all subcontractors to comply with all California Labor Code provisions, which include but
are not limited to prevailing wages (Labor Code Sections 1771, 1774 and 1775),
employment of apprentices (Labor Code Section 1777.5), certified payroll records (Labor
Code Sections 1771.4 and 1776), hours of labor (Labor Code Sections 1813 and 1815)
and debarment of contractors and subcontractors (Labor Code Section 1777.1).
If the Services are being performed as part of an applicable “public works” or
“maintenance” project, then pursuant to Labor Code Sections 1725.5 and 1771.1, the
Consultant and all subconsultants performing such Services must be registered with the
Department of Industrial Relations. Consultant shall maintain registration for the duration
of the Project and require the same of any subconsultants, as applicable. This Project
may also be subject to compliance monitoring and enforcement by the Department of
Industrial Relations. It shall be Consultant’s sole responsibility to comply with all
applicable registration and labor compliance requirements.
19. Verification of Employment Eligibility. By executing this Agreement,
Consultant verifies that it fully complies with all requirements and restrictions of state and
federal law respecting the employment of undocumented aliens, including, but not limited
to, the Immigration Reform and Control Act of 1986, as may be amended from time to
time, and shall require all subconsultants and sub-subconsultants to comply with the
same.
20. Laws and Venue. This Agreement shall be interpreted in accordance with
the laws of the State of California. If any action is brought to interpret or enforce any term
of this Agreement, the action shall be brought in a state or federal court situated in the
County of San Bernardino, State of California.
21. Termination or Abandonment
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 718
11
a. City has the right to terminate or abandon any portion or all of the
work under this Agreement by giving ten (10) calendar days’ written notice to Consultant.
In such event, City shall be immediately given title and possession to all original field
notes, drawings and specifications, written reports and other documents produced or
developed for that portion of the work completed and/or being abandoned. City shall pay
Consultant the reasonable value of services rendered for any portion of the work
completed prior to termination. If said termination occurs prior to completion of any task
for the Project for which a payment request has not been received, the charge for services
performed during such task shall be the reasonable value of such services, based on an
amount mutually agreed to by City and Consultant of the portion of such task completed
but not paid prior to said termination. City shall not be liable for any costs other than the
charges or portions thereof which are specified herein. Consultant shall not be entitled
to payment for unperformed services, and shall not be entitled to damages or
compensation for termination of work.
b. Consultant may terminate its obligation to provide further services
under this Agreement upon thirty (30) calendar days’ written notice to City only in the
event of substantial failure by City to perform in accordance with the terms of this
Agreement through no fault of Consultant.
22. Attorneys’ Fees. In the event that litigation is brought by any Party in
connection with this Agreement, the prevailing Party shall be entitled to recover from the
opposing Party all costs and expenses, including reasonable attorneys’ fees, incurred by
the prevailing Party in the exercise of any of its rights or remedies hereunder or the
enforcement of any of the terms, conditions, or provisions hereof. The costs, salary, and
expenses of the City Attorney’s Office in enforcing this Agreement on behalf of the City
shall be considered as “attorneys’ fees” for the purposes of this Agreement.
23. Responsibility for Errors. Consultant shall be responsible for its work and
results under this Agreement. Consultant, when requested, shall furnish clarification
and/or explanation as may be required by the City’s representative, regarding any
services rendered under this Agreement at no additional cost to City. In the event that an
error or omission attributable to Consultant’s professional services occurs, Consultant
shall, at no cost to City, provide all other services necessary to rectify and correct the
matter to the sole satisfaction of the City and to participate in any meeting required with
regard to the correction.
24. Prohibited Employment. Consultant shall not employ any current employee
of City to perform the work under this Agreement while this Agreement is in effect.
25. Costs. Each Party shall bear its own costs and fees incurred in the
preparation and negotiation of this Agreement and in the performance of its obligations
hereunder except as expressly provided herein.
26. Documents. Except as otherwise provided in “Termination or
Abandonment,” above, all original field notes, written reports, Drawings and
Specifications and other documents, produced or developed for the Project shall, upon
payment in full for the services described in this Agreement, be furnished to and become
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 719
12
the property of the City.
27. Organization. Consultant shall assign Neelay Bhatt as Project Manager.
The Project Manager shall not be removed from the Project or reassigned without the
prior written consent of the City.
28. Limitation of Agreement. This Agreement is limited to and includes only the
work included in the Project described above.
29. Notice. Any notice or instrument required to be given or delivered by this
Agreement may be given or delivered by depositing the same in any United States Post
Office, certified mail, return receipt requested, postage prepaid, addressed to the
following addresses and shall be effective upon receipt thereof:
CITY:
City of San Bernardino
Vanir Tower, 290 North D Street
San Bernardino, CA 92401
Attn: City Manager
With Copy To:
City of San Bernardino
Vanir Tower, 290 North D Street
San Bernardino, CA 92401
CONSULTANT:
Next Practice Partners, LLC.
1950 East Greyhound Pass, Suite 121
Carmel, IN 46033
30. Third Party Rights. Nothing in this Agreement shall be construed to give
any rights or benefits to anyone other than the City and the Consultant.
31. Equal Opportunity Employment. Consultant represents that it is an equal
opportunity employer and that it shall not discriminate against any employee or applicant
for employment because of race, religion, color, national origin, ancestry, sex, age or
other interests protected by the State or Federal Constitutions. Such non-discrimination
shall include, but not be limited to, all activities related to initial employment, upgrading,
demotion, transfer, recruitment or recruitment advertising, layoff or termination.
32. Entire Agreement. This Agreement, including Exhibit “A,” represents the
entire understanding of City and Consultant as to those matters contained herein, and
supersedes and cancels any prior or contemporaneous oral or written understanding,
promises or representations with respect to those matters covered hereunder. Each
Party acknowledges that no representations, inducements, promises, or agreements
have been made by any person which are not incorporated herein, and that any other
agreements shall be void. This is an integrated Agreement.
33. Severability. If any provision of this Agreement is determined by a court of
competent jurisdiction to be invalid, illegal, or unenforceable for any reason, such
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 720
13
determination shall not affect the validity or enforceability of the remaining terms and
provisions hereof or of the offending provision in any other circumstance, and the
remaining provisions of this Agreement shall remain in full force and effect.
34. Successors and Assigns. This Agreement shall be binding upon and shall
inure to the benefit of the successors in interest, executors, administrators and assigns
of each Party to this Agreement. However, Consultant shall not assign or transfer by
operation of law or otherwise any or all of its rights, burdens, duties or obligations without
the prior written consent of City. Any attempted assignment without such consent shall
be invalid and void.
35. Non-Waiver. The delay or failure of either Party at any time to require
performance or compliance by the other Party of any of its obligations or agreements shall
in no way be deemed a waiver of those rights to require such performance or compliance.
No waiver of any provision of this Agreement shall be effective unless in writing and
signed by a duly authorized representative of the Party against whom enforcement of a
waiver is sought. The waiver of any right or remedy with respect to any occurrence or
event shall not be deemed a waiver of any right or remedy with respect to any other
occurrence or event, nor shall any waiver constitute a continuing waiver.
36. Time of Essence. Time is of the essence for each and every provision of
this Agreement.
37. Headings. Paragraphs and subparagraph headings contained in this
Agreement are included solely for convenience and are not intended to modify, explain,
or to be a full or accurate description of the content thereof and shall not in any way affect
the meaning or interpretation of this Agreement.
38. Amendments. Only a writing executed by all of the Parties hereto or their
respective successors and assigns may amend this Agreement.
39. City’s Right to Employ Other Consultants. City reserves its right to employ
other consultants, including engineers, in connection with this Project or other projects.
40. Prohibited Interests. Consultant maintains and warrants that it has neither
employed nor retained any company or person, other than a bona fide employee working
solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants
that it has not paid nor has it agreed to pay any company or person, other than a bona
fide employee working solely for Consultant, any fee, commission, percentage, brokerage
fee, gift or other consideration contingent upon or resulting from the award or making of
this Agreement. For breach or violation of this warranty, City shall have the right to
rescind this Agreement without liability. For the term of this Agreement, no official, officer
or employee of City, during the term of his or her service with City, shall have any direct
interest in this Agreement, or obtain any present or anticipated material benefit arising
therefrom.
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 721
14
41. Counterparts. This Agreement may be executed in one or more
counterparts, each of which shall be deemed an original. All counterparts shall be
construed together and shall constitute one single Agreement.
42. Authority. The persons executing this Agreement on behalf of the Parties
hereto warrant that they are duly authorized to execute this Agreement on behalf of said
Parties and that by doing so, the Parties hereto are formally bound to the provisions of
this Agreement.
43. Electronic Signature. Each Party acknowledges and agrees that this
Agreement may be executed by electronic or digital signature, which shall be considered
as an original signature for all purposes and shall have the same force and effect as an
original signature.
[SIGNATURES ON FOLLOWING PAGE]
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 722
15
SIGNATURE PAGE FOR PROFESSIONAL SERVICES AGREEMENT
BETWEEN THE CITY OF SAN BERNARDINO
AND NEXT PRACTICE PARTNERS, LLC.
IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date
first written above.
CITY OF SAN BERNARDINO
APPROVED BY:
Charles E. McNeely
Interim City Manager
ATTESTED BY:
Genoveva Rocha, CMC
City Clerk
APPROVED AS TO FORM:
Best Best & Krieger LLP
City Attorney
CONSULTANT
Signature
Name
Title
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Founder & CEO
Neelay Bhatt
Packet Page. 723
16
EXHIBIT A
Scope of Services
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 724
October 2022 City of San
Bernardino Parks
Master Plan Proposal
Next Practice Partners, LLC.
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 725
1
Table of Contents
CHAPTER ONE – COVER LETTER ............................................................................................... 2
CHAPTER TWO – DESCRIPTION OF COMPANY AND QUALIFICATIONS ..................... 4
WHO WE ARE ............................................................................................................................................................................................................ 4
WHAT WE DO ............................................................................................................................................................................................................ 4
OUR HISTORY ............................................................................................................................................................................................................ 5
OUR TEAM ................................................................................................................................................................................................................... 5
AVAILABILITY OF STAFF ......................................................................................................................................................................................12
CHAPTER THREE - SUB-CONSULTANTS USED .................................................................... 13
RHA LANDSCAPE ARCHITECTS-PLANNERS INC. ....................................................................................................................................13
BOA ARCHITECTURE ............................................................................................................................................................................................ 14
AQUATIC DESIGN GROUP ...................................................................................................................................................................................15
ETC INSTITUTE ......................................................................................................................................................................................................... 16
MERGE DIVERSE ABILITIES INCLUSION CONSULTING ........................................................................................................................ 17
HISPANIC / LATINO COMMUNITY OUTREACH ......................................................................................................................................... 17
NATIVE AMERICAN RESOURCE CENTER .................................................................................................................................................... 17
CHAPTER FOUR - STATEMENT OF LOCAL PREFERENCE ELIGIBILITY ......................... 18
CHAPTER FIVE – EXPERIENCE ON SIMILAR PROJECTS .................................................... 19
CITY OF CARLSBAD, CALIFORNIA .................................................................................................................................................................. 19
CITY OF FREMONT, CALIFORNIA ................................................................................................................................................................... 20
BROWARD COUNTY, FLORIDA ........................................................................................................................................................................21
CITY OF ROCKVILLE, MARYLAND ................................................................................................................................................................... 22
CITY OF CHINO, CALIFORNIA ........................................................................................................................................................................... 23
CITY OF TEMPLE CITY, CALIFORNIA............................................................................................................................................................. 24
CHAPTER SIX – DESCRIPTION OF PROPOSED METHODS AND REPORT ................... 25
WHAT YOU WANT ................................................................................................................................................................................................. 25
HOW WILL WE DELIVER ................................................................................................................................................................................... 26
PHASE 1: DISCOVER (WHAT-IS) ...................................................................................................................................................................... 26
PHASE 2: ENVISION (WHAT’S NEXT) ............................................................................................................................................................ 30
PHASE 3: DEVELOP (FUTURE ROADMAP) ................................................................................................................................................... 36
CHAPTER SEVEN TIMELINE ....................................................................................................... 39
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 726
2
CHAPTER ONE – COVER LETTER
To,
City of San Bernardino,
Public Works Department,
Engineering Division.
Attn: Alex Qishta, DDPW / City Engineer
Ref: Parks Master Plan RFP Response
San Bernardino’s History and Culture
The City of San
Bernardino is an
incredibly diverse
community in its people
and its offerings. With
your range of offerings
including 30+ parks,
greenways and trails,
recreation centers,
soccer complexes,
senior services, and
cemeteries, you truly
have a richness of
culture and heritage.
The presence of a
higher than national
average Hispanic /
Latino and Native
American population,
numerous veterans and
thousands of students
through Cal State San
Bernardino can created
a melting pot of
backgrounds and cultures and one that parks, recreation and community services can truly unite
and bring together.
In addition, the ongoing SanBernardino2050 Plan and your emergence out of decade long
bankruptcy are momentous steps in moving the city forward. This Parks Master Plan will further
rejuvenate the City and its people so they can all have access to the quality of life they truly
deserve.
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 727
Proposal
Parks Masterplan
3
Our Experience
We are excited to submit our proposal to partner with the City on this transformational project.
At Next Practice Partners, we have a vision to build a more inclusive and innovative world for all
and we have assembled a team that shares our values and our mission.
Our team, led by yours truly, has experience with 150+ Park System Master, Strategic and Business
Plans from Anchorage, AK to Allentown, PA and extensive experience in California, specifically
Southern California. Our team members have lived and grown up in California and are multicultural
and multilingual, including Spanish, Hindi and American Sign Language. Our experiences range
from companies such as Disney and Target to national gold medal and award-winning park
agencies such as Broward County, FL, Carmel-Clay, IN, Carlsbad, CA, Durango, CO, Gurnee Park
District, IL among others.
Our Team
We have assembled a team of experts who are local and national. RHA Landscape Architects-
Planners in Riverside, CA, Aquatics Design Group in Carlsbad and BOA Architects in Long Beach,
are our local partners while national statistically valid survey experts, ETC Institute are in Kansas
and national inclusion experts MERGE Diverse Abilities Inclusion Consulting are in Massachusetts.
This helps us provide the best of local, regional and national expertise to this critical project.
Our Approach
Our entire team is committed to ensuring our approach is the most inclusive planning process for
a Parks Master Plan so that everyone in San Bernardino who wishes to participate has a chance to
share their vision for the future.
With a combination of existing team members, your staff, and the community leaders, we will craft
an approach that meets people where they are and incorporates cutting edge technology and
innovative practices in this process.
We look forward to hearing from you and welcome an opportunity to further share our approach
to build this critical piece of the City’s future and provide the diverse community hope and a sense
of optimism to look forward to.
Gratefully,
Neelay Bhatt
Founder and CEO
Next Practice Partners, LLC.
Email: Neelay.Bhatt@BeNextPractice.com / Web: www.BeNextPractice.com
Cell: 740 591 0225
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 728
4
CHAPTER TWO – DESCRIPTION OF
COMPANY AND QUALIFICATIONS
WHO WE ARE
Next Practice Partners, LLC. is a team
committed to building a more inclusive and
innovative future for all through planning,
training, and technology services.
WHAT WE DO
Master Planning + Strategic Planning+
Business Planning
We believe innovation is not a by-product, but
the very essence of a planning process.
We also ensure that inclusion is not optional
but an integral part of our approach.
This combination of innovation and inclusion
fuels our approach to Master Planning,
Strategic Planning, and Business Planning.
We are committed to helping users see their
values and unmet needs reflected in the plans and developing plans that aren’t just pretty pictures
(that are unrealistic) but rather living documents that are financially and environmentally
sustainable.
Our team’s background with CAPRA visitors, fluency in 6 languages, and our proprietary digital
technologies help us provide the most inclusive community engagement possible. In addition, we
center empathy and equity at the core of our process through our focus on listening, storytelling,
and the user experience.
Your plans will benefit from our experience on 150+ plans from Anchorage, Alaska to Allentown,
Pennsylvania so that your roadmap for the future balances strategic goals and human capital along
with infrastructure priorities and political realities.
OUR VISION
A more inclusive and innovative
future for all
OUR MISSION
To help communities prepare for
what's next
OUR VALUES
INCLUSION + INNOVATION +
INFORMATION = INSPIRATION
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 729
Proposal
Parks Masterplan
5
OUR HISTORY
The Company is newly founded in July 2022 and is headquartered in Carmel, Indiana. Our project
team members have close to 100 years of experience in the parks, recreation, and sports industries
in addition to working with national Gold Medal agencies. The staff profiled on the following pages
will be directly involved in this Master Plan. The Founder & CEO has been a national leader in the
parks and recreation industry space having served on the Board of the National Recreation and
Park Association, spoken at multiple national conferences and even keynoted the California
Recreation and Park Society conference and consulted with parks and recreation / community
services agencies all over California and nationwide.
OUR TEAM
NEELAY BHATT
Founder & CEO
Education
Exec. Education / 2018 / Sr. Executives in State and Local Government / Harvard University
MSA 2005 / Masters in Sports Administration / Ohio University
MBA / 2004 / Masters in Business Administration / Ohio University
PG / 2003 / Post Graduate Diploma in Advertising & Public Relations / University of Mumbai
BA/2002/Psychology and Economics / University of Mumbai
Mr. Bhatt’s career on five continents includes Disney, The Super
Bowl, The Olympics, and years of consulting, public speaking, and
training. He champions “Ideas Worth Spreading” as the curator for
TEDxCollegePark, TEDxIndianapolis, and TEDxIndianapolisWomen,
and his service as a trustee for the National Recreation and Park
Association sought to ensure “no child was left indoors.”
As the Founder & CEO of Next Practice Partners, he combines
inclusion and innovation to help agencies prepare for “what’s next”
through planning, training, and technology solutions. Over his 25-year
journey, he has developed business and operations plans for Los
Angeles County serving 12 million people, trained Olympic Governing
bodies, and co-created the world’s largest municipal customer service
and leadership training initiative for Chicago Park District’s 3000
employees.
His Master and Strategic planning work with Atlanta, Broward County, Charlotte-Mecklenburg
County, Indianapolis, Las Vegas, and San Diego, among others have recommended facility
development and infrastructure improvements totaling over $2.5 billion, shaping a more equitable
and accessible future for all. In addition, he has extensively worked all over California including
City of San Diego, City of Carlsbad, City of San Clemente, Los Angeles County, Riverside County,
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 730
6
City of Chino, City of Pasadena, Temple City, City of San José, City of Fremont, City of Gilroy and
many others.
As a first-generation immigrant raised by three women and a father who always showed up, he
hopes to model the same for his two kids. These life experiences are woven into his keynotes on
next practices and trends, the art of storytelling, and magical customer service, and have inspired
executives, professionals, startups, and students from Charlotte to China and from Switzerland to
New Zealand.
JASON ELISSALDE
Senior Project Manager
Education
BA/2001/Communication and Media Studies/ Cal State University, Sacramento
Mr. Elissalde has 25 years of experience in training, development, and
management both in the private and public sectors. Within his work
in the public sector with organizations such as Enterprise Rent-A-Car,
and Target; Jason would lead multiple teams and processes; receiving
awards and commendations for his work in customer service,
operational excellence, data analytics, and fiscal growth.
He would finally find his “Why” in his seven-plus years at Willamalane
Park and Recreation District, where he was a key part of their
National Gold Medal-winning team and take the lead in their, now,
successful CAPRA accreditation process. He championed the
District’s workplace culture, with a focus on staff development and a
“mission” focused approach to problem-solving, goal setting, and
personal accountability.
A consultant, a CAPRA accreditation visitor, and a passionate Disney fan (ask him about his Tinker
Bell story someday) committed to being an ally for those not in the room, he routinely speaks
nationally on workplace culture, change management, purpose-driven leadership, and the
importance of developing an emotional connection to the work we do and the communities we
serve.
ESTRELLA SAINBURG
Project Associate – Hispanic / Latino Outreach Lead
Education
MS 2023 (May)/ City / Urban, Community and Regional Planning, UT Austin
BA/2016/Development Studies, minor Global Poverty and Practice, UC Berkeley
Ms. Sainburg focuses on bringing about stronger communities and relationships with our natural
environment through park and recreation planning. She is expected to graduate with her Masters
in Community and Regional Planning at the University of Texas at Austin in 2023 and has earned
her Bachelor of Arts in Development Studies with a minor in Global Poverty and Practice at UC
Berkeley while also spending time in Chile at Pontificia Universidad Católica de Chile.
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 731
Proposal
Parks Masterplan
7
Ms. Sainburg has experience in public service, organizational
leadership, project management, community engagement, and
strategic planning and is a native Spanish speaker from her
Mexican American heritage.
Originally from Los Angeles, California, Estrella grew up at the
foothills of the Angels Crest National Forest and is passionate
about bridging the gap in access to nature and recreation for
underserved communities.
When she’s not studying or researching, she is enjoying the
beautiful outdoors, visiting family, or exploring parks in different
cities. She enjoys biking, dancing, reading, and hanging out with
her nieces and nephews.
RYAN MALISZEWSKI,
Project Consultant – ASL Meeting Facilitator / Deaf Community Outreach Lead
Education
BS/2001/Business Administration and Management/ University of Arizona
Mr. Maliszewski partners with passionate leaders and visionaries
to apply universal design and strategy to solve complex
organizational challenges and promote inclusive & accessible
workspaces.
Previously, he was the Chief Executive Officer of a Deaf-led
Neapolitan pizzeria responsible for scaling the business across
multiple locations and Director of Innovation & Entrepreneurship
at Gallaudet University which is the only liberal arts university for
the Deaf in the world. He also served as an Executive Strategy
and Technology Advisor for the Federal Bureau of Investigation
(FBI). Mr. Maliszewski has long been a serial entrepreneur within
the accessibility and inclusion space and is involved with the local
community where he provides strategic planning support to
several disability-focused organizations and currently sits on the Washington DC Mayor’s
Innovation & Technology Inclusion Council.
He recently spoke at TEDxCollegePark at the University of Maryland about tapping into the power
of “DeafGain” highlighting how Deaf people navigate through life not built for them, yet they
constantly adapt, problem solve, and innovate, often reinventing technology and discovering new
resources with universal appeal.
View his TEDx talk here: Gaining New Perspectives: Leadership Lessons from a Deaf CEO
https://www.youtube.com/watch?v=J-oiEapn7og
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 732
8
DOUG GROVE, RLA, ASLA LEED AP
RHA Landscape Architects-Planners President
Education
BS/1985/Landscape Architecture/ Cal State Polytechnic University,
Pomona
Active Registration
1987/Landscape Architect/2799/State of California
LEED Accredited Professional – United States Green Building
Council (USGBC)
Mr. Grove is a Principal Landscape Architect and LEED Accredited
Professional with RHA LANDSCAPE ARCHITECTS-PLANNERS, INC.
He graduated from California State Polytechnic University, Pomona
in 1985 and holds a Bachelor of Science degree in Landscape
Architecture. He has more than twenty-eight years of experience as a professional Landscape
Architect. He brings to the firm a wide range of experience in the public works sector having been
personally involved in the design and project management of hundreds of park projects as well as
housing development, streetscape, institutional and commercial projects.
Mr. Grove serves on the California Park and Recreation Society (CPRS) State Board of Directors
as Vice President and on the CPRS District 11 Board of Directors as the Administrators Section
Representative. He is a past President of the CPRS State Development and Operations Section.
He is on the Board of Directors for the Building Industry Association (BIA) Riverside County and
is on the Board of Directors for the California Turf and Landscape Foundation at the University of
California, Riverside. He is a past Board Member for the United States Green Building Council
Inland Empire (USGBC-IE).
LAUREN MCHUGH, RLA
RHA Landscape Architects-Planners Inc. Project Architect
Education
BS/2006/Landscape Architecture/ Cal State Polytechnic University,
Pomona
Active Registration
2009/Landscape Architect/5578/State of California
Ms. McHugh is a Project Architect with RHA Landscape Architects-
Planners, Inc. She graduated from California State Polytechnic
University, Pomona, and holds a Bachelor of Science degree in
Landscape Architecture. She has more than 15 years of landscape
design and computer-aided graphic design experience. Her
experience has included the design of projects from preliminary
phases to construction documents. She has been responsible for design development, project
coordination, and project approval. She possesses computer design skills that allow for multi-
media presentations and computer rendering. Ms. McHugh’s experience includes developing plans
for parks, streetscapes, schools, housing and commercial properties.
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 733
Proposal
Parks Masterplan
9
EDWARD LOC NG
BOA Architects, Principal / Director of Design
Education
Bachelor of Architecture, University of Hawaii, 1981
Professional Registration
Licensed Architect, C-16840, State of California, 1986
LEED Accredited Professional, 2009
Disabled Access Appeals Board, City of Long Beach, since 1989
Certified Access Review Board and Design Review Board
City of Downey, since 1992
Completed Accessibility Surveyor Training for State Leased
Buildings and Facilities State of California, since 2003
Mr. Ng has been a member of BOA since 1982 and is currently their Principal and Director of
Design, Mr. Ng has over 38 years of experience in all phases of the design process. He has
personally designed and managed over 500 municipal facility projects, 400 ADA compliance
projects, and completed design work for over 50 park facilities for local cities. He has been the
Project Manager and Designer for numerous projects within civic/public buildings, the Parks and
Recreation facilities, city hall, Fire Station facilities, Police facilities, and ADA retrofit/transition
plan projects.
This experience coupled with Mr. Ng’s dedication and commitment to sustainability and design
excellence has led to numerous honors and repeat clients for BOA. Finally, Mr. Ng has personally
designed numerous parks and recreation facilities and public parks, including the Cities of: Carson,
Bellflower, Cypress, Hawthorne, Irvine, Huntington Beach, Torrance, Tustin, State of California,
and many others.
Mr. Ng and BOA are currently working in San Bernardino on the community center renovation at
Nicholson Park and they have performed work on several other projects in the city as well.
A certified plan review consultant to California’s Division of the State Architect, Mr. Lok Ng has
completed DSA-sponsored training as an Access Compliance Plan Reviewer and Accessibility
Surveyor. As a member of the City of Long Beach Disabled Access Appeals Board since 1994 and
the Design Review Board for the City of Downey since 1989, he has reviewed applications and
appeals for a broad range of commercial and municipal design projects. He is also LEED, AP
Certified and has designed several LEED Certified projects, which will be a great asset for the
sustainability design.
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 734
10
JUSTIN CARON
Aquatic Design Group, Principal / CEO
Education
MBA/2009/ Capella University
BA/2003/Bachelor of Arts/Auburn University
Professional Affiliations
California Parks & Recreation Society
Certified Aquatic Facility Operator (AFO)
National Recreation & Park Association / USA Swimming
World Waterpark Association Innovation & Technology Committee
Mr. Caron has spent much of his life in and around pools. He was a
six- time All American and two-time captain for Auburn University’s
swim team, which won four SEC titles and one national championship title while he was there. He
has also coached at elite camps around the country and spends most of his free time now in the
pool with his two young children.
His unique combination of passion for swimming and technical knowledge enables him to relate
to all members during the design process. Mr. Caron is responsible for project management,
programming, planning, business development, and communication between the Client, other
design professionals, and Aquatic Design Group.
Similar Project Experience (partial list)
Adventure Park Wet Play Addition, Visalia, CA
Alga Norte Community Park, Carlsbad, CA
Apple Campus Spas, Cupertino, CA
Brooks Street Pool Assessment, Oceanside, CA
City Heights Pool Renovation, San Diego, CA
DryTown Waterpark Renovation, Palmdale, CA
East Oakland Sports Center, Oakland, CA
El Cariso Pool Renovation, Los Angeles, CA
El Corazon Aquatic Center, Oceanside, CA
Grape Day Park Master Plan Study, Escondido, CA
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 735
Proposal
Parks Masterplan
11
LISA DRENNAN, FOUNDER
MERGE Diverse Abilities Inclusion Consulting
Education
BS/1988/Psychology/Early Childhood Education/Saint Michael’s
College, Vermont
Ms. Drennan has a 38-year career advocating for individuals with
disabilities to be active and meaningfully engaged members of society
through supporting community entities to enhance their disability
inclusion initiatives, resulting in greater accessibility, purpose and
belonging.
At New England Village in Pembroke, MA, a residential community for
adults with developmental disabilities, she gained experience as a
direct support worker, then climbed the ranks and expanded her
journey to be named the Director of the Sollar Wellness Center,
helping to design and open a first-of-its-kind building offering aquatics, fitness, music, art, and
education specifically designed to meet the needs of persons with disabilities.
In 2014, she joined the South Shore YMCA as the first-ever Association Director of Inclusion.
Through innovative program development, creation and execution of comprehensive staff training
and building community partnerships, she was recognized as a leader in the field of social and
recreational inclusion for persons with diverse abilities. Lisa was appointed as the National
Chairperson of the Y-USA’s Diverse Abilities Working Group providing a platform of learning and
sharing of best practices for Y’s across the country. In 2018 Lisa started MERGE, where she
provides comprehensive consultation, staff training and systems implementation to community
entities committed to disability inclusion, access and belonging.
Ms. Drennan lives with her family in Pembroke, Massachusetts and is an avid fitness enthusiast
who enjoys outdoor adventure activities (especially when she brings her grand-puppy Lucy along).
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 736
12
AVAILABILITY OF STAFF
The following table represents staff availability based on our current understanding of the project.
This will be finalized based on the City’s needs should we be chosen to work on this project.
Staff Role % of Time Available
on this project
Neelay Bhatt Principal Consultant and Project Manager 65%
Jason Elissalde Asst. Project Manager 60%
Estrella Sainburg Project Consultant – Hispanic Outreach Lead 50%
Doug Grove Local Support and Site Assessment Lead 35%
Lauren McHugh Planning and Site Assessment Consultant 35%
Lisa Drennan Inclusion Assessment Lead 15%
Ryan Maliszewski ASL Meeting Lead + Deaf Community Outreach 10%
Edward Loc Ng Architect - Facility Assessment Lead 10%
Justin Caron Aquatics – Pool Assessment Lead 5%
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 737
Proposal
Parks Masterplan
13
CHAPTER THREE - SUB-CONSULTANTS
USED
RHA LANDSCAPE ARCHITECTS-PLANNERS INC.
RHA is headed by two principals: Doug Grove, RLA, ASLA, LEED AP, the firm's
president, and Greg Meek, RLA, CPSC. We use a "team" approach under the
direction of the firm's principals and its associates. The staff of eight people includes
four licensed landscape architects as well as support designers.
Established in 1979, RHA Landscape Architects-Planners, Inc. offers a wide range of landscape
architectural and planning services to assist public agencies and private developers in the design
of variety of public spaces and facilities including but not limited to:
• Parks and Recreation Master Plans
• Regional, Community, and Neighborhood Parks
• Government Centers
• Public Office Buildings and Administration Facilities
• Preservation of Natural and Historic sites
RHA has completed hundreds of parks and recreation planning projects in California over the last
42 years.
System-wide Master Plans include:
• Parks, Trails, & Open Space Master Plan City of Benicia
• Parks & Facilities Master Plan City of Chino
• Park & Recreation Master Plan City of Carlsbad
• Park, Facilities & Recreation MP Pleasant Hill Rec. & Park District
• Park & Recreation Master Plan City of San Clemente
• Parks & Recreation Master Plan City of Cathedral City
• Park and Open Space Master Plan City of Temple City
• Needs Assessment and Action Plan City of Carlsbad
• Needs Assessment/Park and Recreation Master Plan Town of Ladera Ranch
• Pico Rivera Golf Course Master Plan City of Pico Rivera
• Park & Recreation Master Plan City of San Jacinto
• California Citrus State Historic Park General Plan City of Riverside/State of California
• Ten Year Master Plan of Parks & Recreation Rim of the World RPD
Partnership: The Next Practice Partners team members and RHA have teamed on more than 10
similar parks and recreation projects, as has RHA with BOA and Aquatic Design Group. .
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 738
14
BOA ARCHITECTURE
Located in West Long Beach, BOA has been in continuous
business for 60 years, with a competitive advantage in
Public Works architectural modernization projects
including: building additions, renovation/retrofit, tenant improvements (TI); façade improvement
projects, and building systems modernization. Although they have completed new construction
projects, this is their industry niche and competitive advantage. They have completed over 2,000
Public Works architectural projects for over 80 local public entities. They have unique expertise in
Parks/Recreation Facilities, Fire Stations, Security-Workplace Safety Improvements, Community
Centers, ADA Compliance, and Civic Center Facilities.
Their staff expertise and production systems are geared for these types of architectural
modernization and often “messy” renovation projects. They have completed the design of over
500 Parks/Recreation projects, over 60 Community Centers, over 70 fire stations, 20 libraries,
over 400 ADA Compliance renovation projects, and 20 civic center renovation projects. BOA is
currently working on the community center renovation at Nicholson Park in San Bernardino and
currently has an on-call contract with the City.
Relevant projects include:
Nicholson Park Community Center, San Bernardino, CA
Wilmington Senior/Multi-Purpose Center at Banning Park, Los Angeles, Wilmington, CA
Bartlett Senior Center, Torrance, CA
Bellflower Indoor Pool & Locker Room Renovation, Bellflower, CA
Jesse Owens Indoor Swimming Pool Facility, Los Angeles, CA
LA COUNTY ISD, Deferred Maintenance Program, Los Angeles County, CA
As-Needed Citywide ADA Facilities Compliance, Long Beach, CA
Pasadena Villa Parke Community Pool Deck & Equipment Replacement, Pasadena, CA
ADA Transition Plan, Santa Maria, CA
Warner Grand Theater Facilities Historic Assessment & ADA Compliance, Los Angeles, CA
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 739
Proposal
Parks Masterplan
15
AQUATIC DESIGN GROUP
For more than 37 years, Aquatic Design Group has set the standard
for quality design and consulting services within the aquatics
industry. They have been responsible for the design and processing
of over 3,000 projects in 43 states and 25 countries around the world.
The firm is focused on swimming pool and water feature architectural, structural, mechanical, and
electrical design services within the following market segments: parks and recreation, high schools,
higher education, hospitality, health care, and anything else that might call for an aquatics
specialist. They specialize in all types of water including competition, recreation, leisure, therapy,
and ornamental and natural water features.
Relevant projects include:
Alga Norte Community Park, Carlsbad, CA
Antelope Aquatics Complex, Antelope, CA
Arcadia Park Pool, Arcadia, CA
Balboa Park Pool Renovation, San Francisco, CA
Belmont Plaza Pool Facility Assessment, Long
Beach, CA
Belvedere Community Park Pool, Los Angeles,
CA
Charter Swim Complex Olympic Time Trail Pool,
Long Beach, CA
East Oakland Sports Center, Oakland, CA
Fontana Park Aquatic Center, Fontana, CA
Garvey Park Splash Zone Replacement,
Rosemead, CA
Hamilton Pool Renovation, Novato, CA
Hart Park Pool Renovation, Orange, CA
Hartnell College Competition Pool Renovation,
Salinas, CA
Jurupa Valley Aquatic Center “The Cove”, Riverside, CA
Lincoln Village Pool Replaster, Rancho Cordova, CA
Memorial Park Pool, San Diego, CA
Mike Shellito Indoor Pool Splashpad, Roseville, CA
Perris Valley Aquatic Center “DropZone”, Perris, CA
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 740
16
ETC INSTITUTE
ETC Institute is a 102-person market research firm that
specializes in the design and administration of market
research for governmental organizations. Our major areas of
emphasis include citizen satisfaction surveys, park and
recreation surveys, community planning surveys, business
surveys, transportation surveys, employee
surveys, voter opinion surveys, focus groups, and
stakeholder interviews. Since 1982, ETC Institute
has completed research projects for
organizations in 49 states. ETC Institute has
designed and administered more than 3,500
statistically valid surveys and our team of
professional researchers has moderated more
than 1,000 focus groups and 2,000 stakeholder
meetings.
During the past five years alone, ETC Institute has
administered surveys in more than 700 cities and
counties across the United States. ETC Institute
has conducted research for more major U.S. cities
and counties than any other firm.
Core services of the firm involve conducting
statistically valid surveys and related market
research. ETC Institute has conducted more than
600 surveys for parks and recreation systems in
46 states across the country for a wide variety of projects including parks and recreation master
plans, strategic plans and feasibility studies.
Established in 1992, the principals and associates of ETC Institute helped secure funding for more
than $2 billion of parks and recreation projects.
Partnership: The Next Practice Partners team members and ETC Institute have teamed on more
than 100 similar parks and recreation projects.
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 741
Proposal
Parks Masterplan
17
MERGE DIVERSE ABILITIES INCLUSION CONSULTING
MERGE understands and celebrates that people interact, learn, and
experience the world around them differently. We build stronger
communities together, with you, providing expert guidance on inclusion
of persons with diverse abilities. Our consultative services are backed by
decades of hands-on experience, to build organizational commitment and
culture change.
Our services give community organizations the tools and confidence to
ensure community members with diverse abilities are welcomed, engaged
and supported to be successful in all aspects of your community, programs and offerings, while
meaningfully participating alongside their peers without disabilities.
MERGE has recently worked with the Old Colony YMCA Association based in Southeast
Massachusetts. Their Senior Executive team recognized the need for organizational change and
commitment to disability inclusion to better serve their community and align with their mission to
be “For ALL”. We worked together to bring forth a needs assessment and inclusion audit,
identifying goals and implementation strategies to help them on their pathway toward inclusion.
Resources/Articles
www.mergeconsulting.org
Building Friendships Between Persons With and Without Disabilities Toolkit
NRPA Article - Inclusive Recreation: A Pathway Toward Friendship
Inclusion: It's Not Just The Right Thing To Do
Inclusive Sport Design Australia Blog
Partnership: The Next Practice Partners team members and Merge have been in contact since
2019.
HISPANIC / LATINO COMMUNITY OUTREACH
We recognize the critical importance of maximizing engagement with the Hispanic / Latino
community. In addition, to our team members, we will collaborate with the City to identify
appropriate stakeholders and groups such as the Inland Empire Hispanic Leadership Council,
Latino Health Collaborative, Coalition of Inland Empire Latino Organizations (CIELO) and other
neighborhood, faith-based groups to maximize outreach, education, and input collection for the
Hispanic / Latino community.
NATIVE AMERICAN RESOURCE CENTER
The Next Practice Partners team has also had conversations with the Native American Resource
Center. This center seeks to build a transformative society through deepening structured
partnerships between Native American cultural lifeways and colonial societal models that are
committed to reimagining their infrastructures by building relationships with Indigenous Peoples
through political & cultural inclusivity.
If we are chosen to partner with the City on this project, we will identify ways to engage them and
their connections to maximize outreach and ensure indigenous voices in San Bernardino are heard.
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 742
18
CHAPTER FOUR - STATEMENT OF LOCAL
PREFERENCE ELIGIBILITY
We do not have an office or any employees in the City of San Bernardino.
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 743
Proposal
Parks Masterplan
19
CHAPTER FIVE – EXPERIENCE ON SIMILAR
PROJECTS
Note: The Next Practice Partners team worked on these projects during their prior employment experience.
CITY OF CARLSBAD, CALIFORNIA
What: Parks and Recreation Master Plan, Park Master Plans and Feasibility Studies and Parks and
Recreation Master Plan Update
Who: The Next Practice Partners team along with RHA and ETC Institute
Scope:
Community Input (Focus Groups, Key Leadership
Meetings, Public Forums, Statistically reliable survey)
Customized crowdsourcing project website
(www.carlsbadparksplan.com)
Demographic and Recreation Trends Analysis
Park and Facility Assessment / Recreation Program
Assessment
Internal Operational Assessment
Funding and Revenue Strategies
Level of Service Standards / GIS Mapping
Capital Improvement Plan and Priority Rankings
Detailed Strategic Action Plan
Duration: Multiple Plans from 2013 – Ongoing
Outcomes: Short term, midterm, and ongoing recommendations for day-to-day operational tactics
and two signature “ideas”.
1. Development of dedicated pickleball courts, expansion of 3 Community Parks and a Senior
Center; increase program participation and greater equity of access.
2. The Department became one of 5 agencies in California to obtain national accreditation
through CAPRA (Council for Accreditation of Parks and Recreation Agencies).
3. Currently, the Next Practice Team is updating the 2021 Parks and Recreation Master Plan.
Website: http://carlsbadparksplan.com/pdf/carlsbad-parks-and-recreation-department-master-
plan.pdf
References: Mr. Kyle Lancaster, Parks & Recreation Director, 799 Pine Avenue, Carlsbad, CA
92008; (760) 434-2941; Kyle.Lancaster@carlsbadca.gov
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 744
20
CITY OF FREMONT, CALIFORNIA
What: Comprehensive Parks and Recreation Master Plan
Who: The Next Practice Partners team with WRT and ETC Institute
Scope:
Community Input (Focus Groups, Key
Leadership Meetings, Virtual Public Forums)
Focus Group meeting in American Sign Language
Multilingual Statistically Valid Survey
o 5 languages
Online Surveys (English and Spanish)
Customized crowdsourcing project website
Community Input App
Demographic and Recreation Trends Analysis
Park and Facility Assessment
Recreation Program Assessment
Maintenance Management Plan
Funding and Revenue Strategies
Level of Service Standards
Equity Mapping
Capital Improvement Plan and Priority Rankings
CAPRA Submittal Review
Visioning and Strategic Action Plan
Duration: Dec 2019 – Mar 2022
Outcomes: First Master Plan in the 21st Century: unanimously adopted 7-0 by Council
First ever stakeholder meeting held entirely in American Sign Language
Statistically Valid Surveys in 5 languages; Built multi-lingual website and ADA accessible website
4. (Recommended) 10 min walk access to a park for all.
5. (Recommended) Build Multi-generational, multi-use recreation center(s).
6. (Recommended) Update existing park amenities and diversify funding sources.
7. (Recommended) Increased staffing / contract support for future levels of service
Website: https://www.fremont.gov/government/departments/parks-planning-design/park-
planning/parks-master-plan
References: Ms. Suzanne Wolf, Community Services Director; 3300 Capitol Avenue, Bldg B,
Fremont, CA 94538; (408) 203 9203; swolf@fremont.gov;
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 745
Proposal
Parks Masterplan
21
BROWARD COUNTY, FLORIDA
What: Parks and Recreation System Master Plan
Who: The Next Practice Partners team with Chen Moore, Barth & Associates and ETC Institute
Scope:
Pop. 2 million / Home to Everglades National Park /
Large Hispanic and Caribbean population
Community Input (Focus Groups, Key Leadership
Meetings, Public Forums, Statistically valid and Online
Survey)
Customized crowdsourcing project website
Demographic and Recreation Trends Analysis
Park and Facility Assessment
Recreation Program Assessment
Signature Park Series Development
Funding and Revenue Strategies
Level of Service Standards / Equity Mapping
Capital Improvement Plan and Priority Rankings
Visioning Workshop
Strategic Action Plan
Duration: November 2019 – May 2022
Outcomes: First ever system-wide Master Plan for the
gold-medal winning agency
1. (Recommended) Create a world class and truly
inclusive guest experience
2. (Recommended) Develop specialty parks and
signature elements unique to Broward County
(initial designs provided)
3. (Recommended) Ensure long-term financial sustainability with dedicated funding
4. (Recommended) Incorporate green initiatives, resilience, and environmental sustainability
in all aspects of operations, especially return on investments
5. (Recommended) Pursue National (re)Accreditation and second Gold Medal Award.
Website: https://www.betterparksbetterbroward.com
References: Mr. Dan West, Parks & Recreation Director, 950 NW 38th Street, Oakland Park, FL
333009; (954) 826-2483; Dwest@broward.org
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 746
22
CITY OF ROCKVILLE, MARYLAND
What: Recreation and Parks Strategic Plan
Who: The Next Practice Partners team with LPDA and ETC Institute
Scope:
Community Input (Focus Groups, Key Leadership Meetings,
Public Forums)
Statistically valid Survey
Online Survey
Customized ADA accessible crowdsourcing project website
Demographic and Recreation Trends Analysis
Parks, Trails and Facility Assessment
Recreation Program and Senior Program Assessment
Marketing Plan
Internal Operations and Maintenance Assessment
Funding and Revenue Strategies
Level of Service Standards / GIS Mapping
Vision, Mission and Core Values
Capital Improvement Plan and Priority Rankings
Strategic Action Plan
Duration: – January 2019 – October 2020
Outcomes: Completed Strategic Plan through the pandemic; unanimous 5-0 adoption
Established Department’s core values starting with Diversity, Equity and Inclusion
Connected the Strategic Plan to the Arts and Culture Study and Senior Citizen Needs Assessment
1. (Recommended) Build a standalone branding identity for the Department
2. (Recommended) Design, develop and maximize use of RedGate Park (old golf course) as a
regional destination
3. (Recommended) Redevelop King Farm Farmstead to add cultural offerings to historic
amenities
4. (Recommended) Ensure equity of access for all offerings and evaluate adding multi-
generational community facilities
Website: http://rockourfuture.com/technical-reports.html
References: Mr. Tim Chesnutt, Recreation and Parks Director, 111 Maryland Avenue #3, Rockville,
MD 20850; (240) 314-8620; tchesnutt@rockvillemd.gov
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 747
Proposal
Parks Masterplan
23
CITY OF CHINO, CALIFORNIA
What: Parks and Facilities Master Plan
Who: The Next Practice Partners team with RHA, ETC Institute, and WLC Architects
Scope:
Community Input (Focus Groups, Key Leadership Meetings, Public Forums, Statistically
valid Survey)
Crowdsourcing Project Website
Demographic and Recreation Trends Analysis
Park and Facility Assessment
Recreation Program Assessment
Funding and Revenue Strategies
Level of Service Standards / GIS Mapping
Capital Improvement Plan and Priority Rankings
Visioning and Action Plan
Duration: 2019 – 2021
Outcomes:
Unanimous Council approval
Short term, midterm, and ongoing recommendations for improvements to existing parks and
programs with full park assessments documented in GIS files
1. (Recommended) Dedicated marketing/branding support (including staff position)
2. (Recommended) Focus on long-term sustainability
3. (Recommended) Partner with the City to reenergize the Downtown area
4. (Recommended) Prioritize trail connectivity and increase equity of access
5. (Recommended) Upgrade existing facilities / amenities to enhance the user experience
Website: https://chinocreatescommunity.com/technical-reports.html
References: Ms. Linda Reich, City Manager; (909) 334-3491; lreich@cityofchino.org
Ms. Silvia Avalos, Community Services Director; (909) 334-3434; savalos@cityofchino.org
13220 Central Avenue, Chino, C 91701
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 748
24
CITY OF TEMPLE CITY, CALIFORNIA
What: Parks and Open Space Master Plan
Who: RHA with Next Practice Partners team member and ETC Institute
Scope:
Community Input (Focus Groups / Key Leadership Meetings / Public Meetings)
Intercept Surveys (in Mandarin Chinese)
Statistically valid Survey
Demographic and Recreation Trends Analysis
Park and Facility Assessment
Recreation Program Assessment
Funding and Revenue Strategies
Level of Service Standards / GIS Mapping
Capital Improvement Plan and Priority Rankings
Detailed Strategic Action Plan
Google Earth Interactive Map
Duration: 2013 - 2014
Outcomes:
First public engagement in Mandarin Chinese for the Master Plan
Short term, midterm, and ongoing recommendations for improvements to existing parks and
potential parcels to be acquired for to create additional park space
References: Agency contact is no longer with the city (retired)
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 749
Proposal
Parks Masterplan
25
CHAPTER SIX – DESCRIPTION OF
PROPOSED METHODS AND REPORT
WHAT YOU WANT
Outcomes
Trends
Staffing and
Funding Needs
Community
Priorities
Recommendations
Short, Mid, Long
Range Plan
Mission, Vision,
Values
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 750
26
HOW WILL WE DELIVER
PHASE 1: DISCOVER (WHAT-IS)
6.1.1 FACILITATE THE MASTER PLAN PROCESS
Our team is committed to lead and partner with you on the entire plan process. We operate in a
collaborative manner with ongoing communication and a transparent process. This will include:
1. Initial Kickoff Meeting
2. Bi-monthly project status meetings
3. Shared folders for collaborative work
4. Regular milestone presentations for key findings
5. Communication with Advisory Committee and Council / Commissions, as appropriate
6.1.2 COLLABORATE WITH ADVISORY COMMITTEE
Our team would be delighted to work with an Advisory Committee throughout the project. We
will plan at least four (4) advisory committee meetings starting from the initial kick-off, interim
findings, visioning and recommendations stages. We will collaborate with the city to ensure
maximum participation in each stage of this process to ensure their input and buy-in for the plan.
6.1.3 REVIEW EXISTING DOCUMENTATION
We will review and familiarize ourselves with all background information and context provided by
staff. This may include, but is not limited to the following:
• 2016 Parks, Recreation & Forestry Plan
• 2022-23 City of San Bernardino Capital Improvement Plan
• 2020-25 City Council Goals
• Other relevant background information
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 751
Proposal
Parks Masterplan
27
6.1.4 DEVELOP COMMUNITY OUTREACH / EDUCATION STRATEGY
The Consulting Team will work with the City to develop a comprehensive approach that is inclusive
and innovative to promote the Plan, increase awareness, obtain input and, thus, create community
buy-in. We will assist the City with creative ideas for marketing strategies that staff can implement
to maximize greater community awareness and engagement.
A. Public Engagement/Advocacy Strategy – The Consulting Team with our internal and partner
outreach experts will collaborate with staff to develop a comprehensive, multilingual, in-person
and digital outreach and advocacy plan. The goal will be to ensure a fully transparent process
and one where we engage the community where they are to ensure anyone who wants to
participate in the planning process has an opportunity to do so.
B. Project Storytelling – We believe in the power of storytelling and will help craft a brand
identity and story for the Master Plan that the staff and community can advocate and support.
C. Develop Stakeholder List - Ensuring a representative stakeholder mix is critical to the plan
process. We will work with the City to identify key stakeholders and user groups that should
be involved in the process.
6.1.5 DEVELOP COMMUNITY DEMOGRAPHICS AND TRENDS
To develop a plan, it is essential to understand what the population and the trends for the future
are. The Consulting Team will utilize the City of San Bernardino’s projections and supplement using
US Census information and census tract data from Environmental Systems Research Institute, Inc.
(ESRI), the largest research and development organization dedicated to Geographical Information
Systems (GIS) and specializing in population projections and market trends.
This will help identify the demographic makeup of the population being served, their recreation
preferences, future changes in the demographics and participation trends. Ultimately, these are
foundational data sets to help the city plan for a future based on population shifts, and what
recreation trends are occurring.
The analysis uses US 2020 Census information, 2023 (estimates) and future projections for
characteristics including age, income, race / ethnicity, gender, health metrics etc.
The ESRI Information will be supplemented by Sports & Fitness Industry Association’s (SFIA) 2022
Study of Sports, Fitness and Leisure Participation, ESRI local market potential, and outdoor
recreation trends from the Outdoor Foundation and Tree Equity analysis from American Forests.
6.1.6 CONDUCT INCLUSION AUDIT
Our team will conduct an inclusion audit that will help identify goals and implementation strategies
to help the Department on your pathway toward inclusion. This will be performed from varied
perspectives including, but not limited to, age, gender, language, culture, neurodivergence and
sensory ability, physical ability. Some tasks will include:
Onsite evaluations of programming spaces
Evaluation of user journey for internal and external customers in San Bernardino
Evaluation of website and marketing pieces
Evaluation of policies and procedures to ensure inclusive practices for internal staff
Focus group meetings with for staff offering specialized programs to identify barriers to
inclusion
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 752
28
In addition, our team will also conduct a Leadership Roadmap to Inclusion workshop for senior
team members to ensure the Department leadership understands the principles and elements of
inclusion and for each team member to identify their specific action steps as the plan is developed.
6.1.7 INVENTORY AND ASSESS EXISTING PARKS AND FACILITIES
The Consulting Team will compile a comprehensive inventory of all City parks, amenities, and open
space including year built and acreage. This will include confirmation of the location and size of
existing parks and amenities, and functionality, accessibility, condition, comfort, and convenience.
The analysis will list each location’s amenities, its current condition, and estimated age. The
Consulting Team will provide qualitative evaluation of amenities per park report (e.g., equal
balance of amenities in each park) and develop a set of prioritized recommendations for
improvements needed within existing parks.
To begin, a park tour will be
performed with City staff to assess
and confirm the inventory and
existing conditions. We will also
review and ensure alignment with
other City of San Bernardino plans
to ensure synergies and
interconnectivity between the
various planning documents. The
Consulting Team will provide a
graphic and written site assessment
of existing parks, open space, and
trails in the City.
An aerial photo of each site will be
obtained from Google Maps and a list of the existing park and amenities will be listed. All park
amenities will be documented in GIS for use by city staff in future planning.
1. Locations - Update City Plan
2. Size and boundary
3. Use - Neighborhood or Regional
4. History - Provided by City (history and past renovations)
5. Current condition
6. Facilities - Inventory of all park and recreational facilities (playgrounds, playfields, ball courts,
pools, gyms, restrooms, parking capacity).
7. Compliance with ADA requirements
8. Constraints - Identify the constraint that minimizes the parks’/facilities’ ability to be
maximized.
9. Opportunities - Identify opportunities to expand or enhance recreational opportunities.
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 753
Proposal
Parks Masterplan
29
10. Operations and Maintenance –
Review with the City and
contracted maintenance staff
overall maintenance practices, as
well as provide
recommendations for
required/enhanced maintenance
requirements, including a review
of trash collection at the parks.
11. Potential revenue sources -
Identify areas of potential
revenue from parks and
recreation facilities, including any
City easements.
12. School Facilities - Review of school playfield facilities and potential uses.
13. Evaluate opportunities to increase sustainability practices such as reducing turf, energy, and
water consumption, etc.
6.1.8 ASSESS EXISTING PROGRAMS AND EVENTS
Recreation programs and
events are the key tools to
bringing the community
together, activating
facilities and determining
future spaces, be it parks or
recreation facilities /
complexes.
As the Department seeks
to serve the San
Bernardino community in
the best way possible, this
assessment reviews how
well the offerings are
aligned with community
values, user demographics,
program trends,
underserved needs and envisions what future service delivery would look like.
Using staff input, existing data, and nationwide program trends, this process will provide strategies
and recommendations for program offerings that are innovative and inclusive.
The eventual goal of this process is to help identify the unmet programmatic needs of the diverse
community that the Department serves and the gaps in services currently offered that may be best
fulfilled by other service providers.
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 754
30
6.1.9 ASSESS ORGANIZATIONAL CULTURE
The Consulting Team will evaluate the staff culture to determine
organizational readiness and willingness to move forward on key
recommendations that could come from the Plan.
The Consultant Team will organize and develop a staff and workforce
engagement survey modeled after the Malcolm Baldridge Quality
Assessment Survey titled “Are We Making Progress?” which rates the
perceptions of individuals regarding leading issues in the workplace.
This survey
assessment will be
developed based on
the survey instrument
of the Baldridge
National Quality
Program, a program
of the National
Institute of Standards
and Technology,
which is a component
of the U.S.
Department of
Commerce. The
questions of the
survey are designed to assess the nature and degree of engagement in performing the functions
and meeting the vision of the organization.
PHASE 2: ENVISION (WHAT’S NEXT)
6.1.10 CONDUCT PUBLIC OUTREACH
The community’s input and their values shape our approach towards envisioning the future. We
believe that the individuals impacted by the plan need to help shape what the plan includes. To
that end, we will ensure the most robust public outreach approach shaped by the Public
Engagement / Advocacy Outreach plan developed in the initial phase of the plan.
Specific tasks include but are not limited to:
A. Key Leadership/Focus Group/Stakeholder Interviews – The Consulting Team will engage
stakeholders, key leaders and staff interviews and discussions through a combination of
individual / small group discussions in person and online. We propose to conduct at least 24
interviews over a 2-day period to help identify priorities, unmet needs, and their vision for the
future. The list of potential interviewees will be determined based on discussion with City staff
and should include, but is not limited to:
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 755
Proposal
Parks Masterplan
31
City Elected Officials
City Staff
Commissions
Diverse Community Groups
Key Business Leaders
Key Partners
Local school officials
Faith based groups
Users and non-users of the system
Senior Groups
Veterans
Youth Groups
Youth Sports organizations
B. Multi-lingual Outreach – Our team includes native speakers of multiple languages including
Spanish, Hindi, Greek, American Sign Language etc. and will work with other local experts to
ensure a truly inclusive environment where language access is not a barrier to participation.
We will conduct dedicated focus groups in Spanish and American Sign Language for the
Hispanic / Latino community members and the Deaf / Hard of Hearing Community. In addition,
we will partner with the Native American Resource Center or other groups to engage and seek
input from the Indigenous community. This is not an exhaustive list, and we will conduct
additional outreach based on conversations with City staff.
C. Public Workshops – These
meetings are open to all and
will be held in spaces to
maximize community
participation. These meetings
will seek community feedback
on parks, trails, programs,
events, and other needs in
multiple ways and provide
education on the Master Plan
process and its importance to
the community.
We propose to conduct at least eight (8) public workshops:
Seek Input:
Two (2) initial in-person workshops – with Spanish Language Interpreters
Two (2) virtual workshops – with Spanish Language Interpretation / Closed Captioning
to share the Master Plan’s story and obtain initial feedback and ideas for the future.
Share Findings and Draft Recommendations:
Two (2) in-person workshops – with Spanish Language Interpreters
Two (2) virtual workshops – with Spanish Language Interpretation / Closed Captioning
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 756
32
Each workshop will have options for live polling through the meeting platform or our digital
tools to share input and see results in real time.
D. Youth / Teen Engagement – The Consulting Team will specifically engage youth through an
online survey or meeting with Youth / Teen Advisory groups. These surveys and meetings will
ensure the future generations in San Bernardino are involved in shaping their future.
E. Special Event / Cultural Event Outreach – We will partner with City staff to identify the key
special events/ cultural events such as the recently held Festival – Where Our Cultures Collide
to share plan info and obtain feedback. This can be done through intercept surveys at the event
or a specific booth. If possible, we could also do a pop-up outreach event at a school / park.
F. Bi-Lingual Electronic Survey – The Consulting Team will also create a bilingual online survey
administered in English and Spanish through www.surveymonkey.com. This survey will be
promoted through the Project website and the City’s website and promotional mediums to
maximize outreach and response rates. These surveys would provide complementary insights
to the input obtained from the other public engagement sources and help compare findings
from the Statistically valid survey.
G. Multi-lingual Statistically-Valid Survey –
The Consulting Team will work with ETC
Institute to perform a random, scientifically
valid community-wide household survey to
quantify knowledge, need, unmet need,
priorities and support for system
improvements that include facility,
programming, and the park needs of the
City. The survey will be administered by a
combination of a mail/phone, will have
options for respondents to answer in
multiple languages besides English (as
determined by the City staff) and will have a
minimum sample size of 500 completed surveys at a 95% level of confidence and a confidence
interval of +/- 4.9%.
It will be developed in collaboration with the City staff and is anticipated that 3-4 drafts of the
survey will be prepared before the final draft.
ETC Institute will ensure that the survey results will be statistically represent San Bernardino
residents and that the results are statistically significant based on the City’s population.
The mailed survey will include a cover letter (on City letterhead) that explains the importance
of the survey, encourages participation, and includes an online link to complete the survey. All
mailed surveys, including the cover letter, will be printed by ETC Institute. All attempts to
contact respondents will be tracked to accurately calculate the number and rates for refusals,
ineligible contact information, eligible contact information, and completed interviews.
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 757
Proposal
Parks Masterplan
33
H. Multilingual ADA Accessible
Digital Platform – The
Consulting Team will develop
a customized multilingual,
ADA Accessible digital
platform that includes a
project website, live
streaming of meetings, social
media engagement and
location-based feedback.
This will also share all project
updates and milestones to ensure a transparent and collaborative process to engage the entire
community, especially ones that may not participate in meetings. Examples can be viewed at
www.BetterParksBetterBroward.com or www.carlsbadparksplan.com.
This multi-lingual website is key to reaching out to a younger millennial and Gen Z audience
that may not traditionally show up at public meetings or respond to surveys.
I. HAPPiFEETtm Community Input App
HAPPiFEET is our proprietary GPS location-
based feedback app for the community to
participate in the Master Planning process. As
technology evolves and more millennials use
apps and mobile devices to engage, this San
Bernardino branded App will allow users to
share feedback from any park, trail, event in
the City.
Instant Notification: Predetermined staff (by
location) will get instant email notifications of
any user feedback to address the issue and this
feedback would be helpful with determining
site-specific needs that can be woven into the
plan’s recommendations and CIP as well.
Ad-Supported Functionality: The functionality will also include a provision to incorporate banner
ads to highlight upcoming meetings / special events and other opportunities for the community to
share input in the planning process.
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 758
34
Data Dashboards: The information obtained from the app will be accessible to staff through a
personalized web portal (www.keephappifeet.com). It will provide the ability to sort and view by
specific location thus allowing the city and City leadership to address specific issues or concerns
in the planning process.
6.1.11 ASSESS NEEDS AND LEVELS OF SERVICE
The in-depth assessment and input collection during the Phase 1 – Discovery phase will help
determine true community priorities and demand / unmet needs. Using information from the
community input and the statistically valid survey, the Consulting team will determine the existing
Levels of Service for
Access – Assesses an overall 10 min walk access to a park and travel distances to parks
and individual facilities such as playgrounds, athletic fields, recreation centers, etc.
Acreage – Measures acreage in a ratio to the community’s population (acres per 1,000).
Amenities – Measures facility capacity in a ratio to the community’s population and
comparing against a standard or guideline.
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 759
Proposal
Parks Masterplan
35
Quality – Measures the
quality of facilities and
amenities across the
community.
Based on community input, trends,
NRPA and CPRS guidelines, staff input
and our professional experience, we
will develop a recommended Levels of
Service standards that will influence
strategies for parkland acquisition,
park and trail development and
enhancement and recreation facilities
and programming.
6.1.12 DEVELOP EQUITY
MAPPING AND GAP
ANALYSIS
The Consulting Team will utilize
geographic information systems to
develop maps that show the service
area covered by each park type or
amenity types.
This presents an objective tool to
determine equity of access and determine true gaps and overlaps.
This will help the City staff take appropriate steps to build, acquire, expand, or divest offerings and
ultimately maximize access to parks, trails, recreation amenities and facilities in an equitable
manner.
6.1.13 CREATE MISSION, VISION, VALUES, GOALS, & OBJECTIVES
The Consulting Team will conduct a Visioning Workshop with staff and participants to co-create
the core values and vision for the future. This will include
Review top priorities needs
View levels of service and equity of access
Compare benchmark findings
Determine Core Values and Guiding Principles
Establish / update Department’s Vision and Mission
Share vision and strategies for
o Culture and historic preservation
o Equity and Inclusion
o Environmental Stewardship and Fire Safety
o Financial Sustainability
o Parks and Trails
o Programs and Events
o Marketing and Storytelling
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 760
36
The outcome of this process will be a vision, key goals and strategies for the Department to plan
for implementation. The Consulting team will facilitate the process with support from City staff to
ensure maximum buy-in and co-creation of the vision.
PHASE 3: DEVELOP (FUTURE ROADMAP)
6.1.14 DEVELOP PRIORITIES
We will utilize priority
investment ratings from the
community survey to provide
priority recommendations and
phasing for additions,
renovation, redevelopments,
replacements, decommissioning,
maintenance, and
improvements of existing and
proposed parks, playgrounds,
shelters, sport courts, parking
lots, etc. based on research and
needs.
A list of all implementation
projects including proposed
improvements and renovations
will be provided along with identifying amenities that should and should not be replaced.
Information from this assessment will be used to develop the Levels of Service standards and
influence the Capital Improvement Plan for the master plan.
6.1.15 BUILD ASSET MANAGEMENT PLAN AND TIMELINE
The Consulting Team will work with staff to define parameters and elements to be included with
the asset mapping and management in collaboration with the City staff. The parameters will
include list of typical assets and their useful lifecycle, sample spreadsheet to include the detailed
inventory and assessment of amenities conducted (including fields, buildings, pavilions, benches,
lights, playground equipment, drinking fountains, bike racks, etc.) and schedules and guidelines to
help staff preserve and protect existing and future assets.
6.1.16 DEVELOP PLAN FOR ACQUISITION / DISPOSAL
Our analysis will include a Trust for Public Land-focused analysis of existing and future park land
and make recommendations for parkland allocation to help achieve the maximum 10-minute walk
to a park guideline.
Our Property Acquisition Report and Action Plan will include phasing for all proposed
improvements and address recommendations for type, size and general location of future
park/land acquisition and disposal of surplus property with suggestions for the use of proceeds.
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 761
Proposal
Parks Masterplan
37
6.1.17 PREPARE CIP AND BUDGET ESTIMATES
We will prepare a detailed Capital Improvement Plan (CIP) that will identify all proposed
improvement recommendations with associated costs.
The CIP will be a multi-page Excel document that will address improvement costs, funding needs,
funding sources, priorities, and phasing.
6.1.18 TRAIN STAFF ON INCLUSIVE IMPLEMENTATION
To ensure successful implementation, we will provide staff training over a half day workshop
Topics covered could include: “Words Matter”, disability etiquette/suggested interactions,
implementing inclusive strategies, working with families and community members, communication
practices, and understanding hidden disabilities.
The goal will be to help staff understand the need to move from “inclusion programs to inclusive
organization” thus decreasing the default toward specialized (segregated) offerings. Creation of
“Sensory Kits” and “Inclusion Binders” to assist front line staff by providing them with tools to help
members with disabilities or experiencing behavioral challenges to be more successful in their
group settings.
6.1.19 DEVELOP DRAFT MASTER PLAN
Upon completion and review of the implementation priorities, funding and timelines, the Consulting Team
will compile all information into a draft Master Plan document for the staff’s review. Based on staff
feedback, the Consulting Team will update the draft plan and then submit for City-wide review and
presentations.
6.1.20 PRESENT DRAFT MASTER PLAN
The Consulting Team will present the draft Master Plan to the following and others, as determined by
staff to ensure buy-in for the Plan’s vision and recommendations, and final acceptance by the City Council.
a) Community
b) Staff
c) Project Steering committee
d) Park and Recreation Advisory Board
Benicia PTOSMP Capital Improvement Plan October 15, 2022
Action Plan 10:50 AM
PARKS Acres Acres Acres Acres New Parks Acres
9SP 9th Street Park 6 DGP Duncan Graham Park 1.41 LHRP Lake Herman Regional Park 577 STPS St. Paul's Square 0.14 BVW Benicia Views II ?
ARP Arneson Park (14th Street) 0.1 ESP Ethelree Saraiva Park 0.5 MRFP Maria & Ribiero Fields 4 TBP Turnbull Park 0.2 BTHP Bottle Hill Park (East I - 6th & 7th) ?
BCP Benicia Community Park 50 FZP Fitzgerald Field 4 MTP Matthew Turner Park (12th St) 2.5 WFP Waterfront Park CTWR Clocktower Park ?
BRP Bridgeview Park 4.59 FTP Francesca Terrace Park 5 OLP Overlook Park 2.7 WEP Water's End Park 2.58 HSRP Hastings Road Park 10
CCP Channing Circle Park 2.5 FSP Frank Skillman Park 2.66 SLP Solano Park 1 SAP Steve Armenta Park 1.65 PWNP Perth Way Neighborhood Park 8
CTP City Park 3.5 GTP Gateway Park 0.36 SOHP Southampton Park 6 BDPA Bordoni Public Access 0.78
CVP Civic Center Park 3.5 JLP Jack London Park 7.7 STCW St. Catherine's Wood 1.32
STREET END PARKS
SE14 14th Street SE8 8th Street SEF F Street
SE13 13th Street SE6 6th Street (Raymond Bordoni) SEE E Street
SE11 11th Street SEH H Street SEC C Street
PHASE RATIONALS
Phase 1 Years 1-5 General Fund GF PIR Priority Investment Rating
Phase 2 Years 6-10 Parks, Landscape, & Lighting Assessment District PLLAD MR Maintenance Repair
Phase 3 Years 11-15 Prop 68 Per Capita P68 PA Park Assessment
MP Master Plan Miscellaneous Grants GRANT WS Water Savings
TBD TBD
Measure C +GF MEC
Phase Quantity Site Location Category Estimate/Cost Funding Rational - PIRRational - MRRational - PARational - WS
P1 2 ea 9th Street Park 9SP Renovation 10,000$ TBD PA
P1 4 ea 9th Street Park 9SP Renovation 6,000$ TBD
P1 1 ea 9th Street Park 9SP Renovation 10,000$ TBD
P1 3 ea 9th Street Park 9SP New 9,000$ TBD PIR PA
P1 18,000 sf 9th Street Park 9SP Renovation 270,000$ TBD PIR PA WS
P1 2,400 lf 9th Street Park 9SP Renovation 14,400$ TBD PA
P2 97,000 sf 9th Street Park 9SP Renovation 485,000$ TBD PA WS
P2 1 ls 9th Street Park 9SP Renovation 250,000$ TBD PA
P2 1 ea 9th Street Park 9SP Renovation 25,000$ TBD
P3 1 ls 9th Street Park 9SP New 1,700,000$ TBD PIR PA
P3 11 ea 9th Street Park 9SP Renovation 16,500$ TBD PA
P3 1 ls 9th Street Park 9SP Renovation 1,500,000$ TBD
MP 1 ls 9th Street Park 9SP New 100,000$ TBD
P1 1 ea Arneson Park ARP Renovation 5,000$ TBD PA
P1 1 ea Arneson Park ARP Renovation 1,500$ TBD
P2 100 lf Arneson Park ARP Renovation 1,100$ TBD PA
Status
FUNDING SOURCES
Comments
2018 assessment
2021 assessment
2021 assessment
2018 assessment
2018 assessment
2018 assessment
2021 assessment
2018 assessment
2018 assessment
2018 assessment
Project Description
Replace picnic tables
Concrete Trash Receptacles
Drinking fountain
Wayfinding signage
Remove turf/install low water use plants
Replace all asphalt walkways
Replace irrigation
Replace parking
Add to ET System
Waterfront access
Replace benches
Replace pier and dock
Parks Master Plan
Replace picnic tables
Concrete Trash Receptacle
Replace pathway
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 762
38
e) City Manager and City Council
It is envisioned that these presentations will be completed in a hybrid in-person, and virtual format.
6.1.21 DEVELOP AND PRESENT FINAL MASTER PLAN
The Consulting Team will develop and present the final Master Plan based on feedback from the various
groups and present to the City Council for final approval. The Consulting team will also develop a separate
executive summary of the Master Plan report and all documents will be made available in digital format
through the project website as well as shared with the staff in pdf copies and print, as required.
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 763
Proposal
Parks Masterplan
39
CHAPTER SEVEN TIMELINE
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 764
HOURS FEES
Phase 1
D A.On-Going Project Management 160 $27,000
I B.Kick-off Meeting and Site Tour 152 $21,840
S C.Bi-Monthly Project Meetings 204 $38,520
C D.Data Collection 40 $8,000
O
V
E
R A. On-going Advisory Committee updates + presentations (4)88 $14,880
A. Review Previous / Ongoing Reports and Planning Documents 40 $6,320
B. Review Existing Policies, Procedures and Internal Data 16 $3,200
A. Public Engagement/Advocacy Strategy 84 $12,040
B. Project Storytelling 48 $7,800
C. Develop Stakeholder List 20 $2,500
A. Demographics Projections 56 $10,400
B. Recreation Participation Trends 40 $7,800
C. Local Market Potential 56 $8,600
D. Tree Equity Analysis 24 $3,300
A. Onsite evaluation of programming spaces 128 $20,800
B. User journey evaluation 60 $10,800
C. Website and marketing collateral audits 32 $6,200
D. Policy and procedure reviews 32 $5,000
E. Staff - barrier identification focus groups 24 $4,000
A. Inventory all park assets and amenities 89 $9,770
B. Assess all parks, amenities and open spaces 118 $13,240
C. Inventory and assess aquatics spaces 158 $18,190
D. Inventory and assess recreation facilities and structures 328 $38,040
E. Inventory and assessment report 53 $8,870
F.Operations and Maintenance Review 112 $18,600
A.Program Assessment Review 104 $19,600
B.Recreation Program and Events Plan 148 $26,800
A.Develop and administer Org. Culture Survey 84 $12,300
B.Org. Culture Assessment discovery meetings 40 $7,800
C.Findings Presentation 32 $6,400
D.Develop org. culture report and recommendations 120 $22,000
Phase 2
E A.Key Leadership/Focus Group/Stakeholder Interviews 116 $20,580
N B.Multi-lingual Outreach 152 $25,700
V C. Public Workshops 148 $24,440
I D. Youth / Teen Engagement 48 $9,600
S E. Special Event / Cultural Event Outreach 92 $15,840
I F.Bi-Lingual Electronic Survey 72 $13,200
O G. Multi-lingual Statistically-Valid Survey 202 $27,400
N H. Multilingual ADA Accessible Digital Platform 224 $25,400
I. HAPPiFEET Community Input App 220 $24,500
A.Develop current Levels of Service 124 $23,500
B. Determine future Levels of Service recommendations 90 $17,800
A.Develop Equity Maps for all parks, amenities, facility types 40 $9,000
B. Develop drive time maps for 10 min walk access 40 $9,000
C.Conduct Gap Analysis 76 $15,300
A.Plan and conduct Visioning Workshop 124 $21,640
B. Finalize guiding principles, core values and vision / mission 56 $8,800
C.Develop Visioning framework, goals and strategies 168 $28,800
Phase 3
D A. Develop Priority Investment Rankings for Parks and Amenities 68 $13,100
E B. Develop Priority Investment Rankings for Programs and Events 68 $13,100
V C. Implementation Project Priorities and Timelines 72 $15,000
E
L
O
P A. Asset Mapping and Lifecycle Assessment 74 $11,560
B. Develop Asset Manaagement Plan and Timeline 32 $6,400
A.Develop Property Acquisition / Disposal Plan 86 $13,420
A.Develop detailed CIP and Budget Estimates 110 $17,910
A.Inclusive Implementation Workshop 97 $16,900
B. Creating Inclusion Binders and shared language around implementation 71 $10,000
A.Develop Draft Master Plan 264 $40,800
B. Incorporate Staff Review and Feedback 88 $12,100
C.Provide updated Draft of the Master Plan 32 $6,400
A.Community wide presentations 56 $11,040
B. Steering Committee and Advisory Board Presentations 48 $9,440
C.Council Presentations 48 $9,440
A.Present Final Master Plan 134 $24,480
B. Develop and deliver Final Master Plan document 136 $25,200
TOTAL HOURS 6166
TOTAL FEES (including expenses)$997,400
City of San Bernardino MP
TASK 1 - FACILITATE THE MASTER PLAN PROCESS
TASK 2 - COLLABORATE WITH ADVISORY COMMITTEE
TASK 3 - REVIEW EXISTING DOCUMENTATION
TASK 15 - BUILD ASSET MANAGEMENT PLAN AND TIMELINE
TASK 16 - DEVELOP PLAN FOR ACQUISITION / DISPOSAL
TASK 5 - DEVELOP COMMUNITY DEMOGRAPHICS AND TRENDS
TASK 6 - CONDUCT INCLUSION AUDIT
TASK 7 - INVENTORY AND ASSESS EXISTING PARKS AND FACILITIES
TASK 8 - ASSESS EXISTING PROGRAMS AND EVENTS
TASK 9 - ASSESS ORGANIZATIONAL CULTURE
TASK 10 - CONDUCT PUBLIC OUTREACH
TASK 11 - ASSESS NEEDS AND LEVELS OF SERVICE
TASK 12 - DEVELOP EQUITY MAPPING AND GAP ANALYSIS
TASK 13 - CREATE MISSION, VISION, VALUES, GOALS, & OBJECTIVES
TASK 14 - DEVELOP PRIORITIES
TASK 4 - DEVELOP COMMUNITY OUTREACH / EDUCATION STRATEGY
TASK 17 - PREPARE CIP AND BUDGET ESTIMATES
TASK 18 - TRAIN STAFF ON INCLUSIVE IMPLEMENTATION
TASK 19 - DEVELOP DRAFT MASTER PLAN
TASK 20 - PRESENT DRAFT MASTER PLAN
TASK 21 - DEVELOP AND PRESENT FINAL MASTER PLAN
DocuSign Envelope ID: F27C92BE-5283-4F60-B319-506CB022FDF0
Packet Page. 765
CONSENT CALENDAR
January 21, 2026
Honorable Mayor and City Council Members
Lynn Merrill, Director of Public Works
Public Works
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Approve Amendment No. 1 to the Maintenance Services Agreement with Cal
Stripe, Inc. to increase the not-to-exceed amount from $420,000.00 to
$2,100,000.00, clarifying that the total contract value reflects the cumulative
amount for the full five-year term, which includes the initial term and all four option
years, as authorized under the Original Agreement; and
2. Authorize the City Manager to execute all related documents necessary to
effectuate this amendment.
No comments
Public Works is seeking approval of an administrative correction to the existing
Maintenance Services Agreement with Cal Stripe, Inc. for street striping and pavement
marking services. The contract was originally approved on February 21, 2024, with a
not-to-exceed (NTE) amount of $420,000.00 for the initial annual term through June
30, 2025, with four one-year option renewals available under the agreement.
The requested amendment does not increase the annual cost of services and does not
require additional funding per year. This action simply corrects the contract’s
cumulative NTE to reflect the full five-year term. All services under this agreement are
Packet Page. 766
fully funded through the adopted CIP project, Signing & Striping which includes an
annual allocation for striping services.
Background
The City of San Bernardino maintains an extensive roadway network that includes
approximately 569 miles of roadway segments, more than 1,300 lane miles, over 1,200
crosswalks, and numerous parking lots and public facilities. These locations require
ongoing pavement striping and marking to ensure visibility, guide vehicle and
pedestrian movements, support traffic safety, and meet state and federal standards for
roadway operations. Regular maintenance of pavement markings is essential, as
traffic volumes, weather conditions, and wear over time cause striping to fade and lose
reflectivity.
On February 21, 2024, the City Council approved a Maintenance Services Agreement
with Cal Stripe, Inc., which provides the City with the professional services, equipment,
and materials necessary to perform thermoplastic striping, painted markings, curb
painting, pavement legend installation, and related traffic control markings throughout
the City. These services are critical for maintaining safe transportation conditions,
reducing collision risks, enhancing mobility, and responding promptly to maintenance
needs across the City’s large roadway system.
Discussion
The Maintenance Services Agreement with Cal Stripe, Inc., for the provision of street
striping and pavement marking services authorized a purchase order in the amount of
$420,000.00 for the initial contract period. The agreement includes four one-year
option years, allowing for continued service at the City’s discretion. Under the terms
of the agreement, the not-to-exceed amount should have represented the maximum
amount to be paid over the course of the entire contract, including all option years.
However, the amount listed in the executed agreement reflected the annual allocation
only. As a result, a correction is necessary to increase the not-to-exceed value to
$2,100,000.00, based on the annual allocation of $420,000.00 multiplied by the five-
year maximum contract duration.
The Amendment No 1 requested is administrative and does not modify the scope of
work, the term of the agreement, or the annual not-to-exceed funding level. The
amendment simply clarifies the total contract value and ensures that the cumulative
not-to-exceed amount accurately reflects the full five-year term authorized by the
original agreement. No additional budget appropriation is required, as striping work
performed under this agreement is funded through the Signing and Striping Capital
Improvement Project, which includes recurring annual allocations designated for these
services. Approval of this amendment also allows the City to exercise the option years
without the need for further administrative correction.
2021-2025 Strategic Targets and Goals
Packet Page. 767
The project supports Strategic Target 3c, Improve Quality of Life, which emphasizes
enhancing the quality of public safety services. Clear and well-maintained pavement
markings improve traffic operations, enhance pedestrian safety, and support a safer
transportation network.
Fiscal Impact
There is no fiscal impact associated with this amendment because annual allocation
remains the same. The annual allocation was previously approved by the City
Council. Funding for all services performed under the Maintenance Services
Agreement is included in the Signing and Striping Capital Improvement Project for
fiscal year 2025–26, and funding will continue to be programmed annually for future
years as required. No additional General Fund or Gas Tax funds are required for this
amendment.
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Approve Amendment No. 1 to the Maintenance Services Agreement with Cal
Stripe, Inc. to increase the not-to-exceed amount from $420,000.00 to
$2,100,000.00, clarifying that the total contract value reflects the cumulative
amount for the full five-year term, including the initial term and all four option years,
as authorized under the Original Agreement; and
2. Authorize the City Manager to execute all related documents necessary to
effectuate this amendment.
Attachments
Attachment 1 Amendment No. 1 to Cal Stripe Inc. Maintenance
Services Agreement
Attachment 2 Original Maintenance Services Agreement
Ward:
All Wards
Synopsis of Previous Council Actions:
On February 21, 2024, the Mayor and City Council approving an agreement with Cal
Stripe, Inc.
CC: Eric Levitt, City Manager
Packet Page. 768
-1-
AMENDMENT NO. 1 TO
MAINTENANCE SERVICES AGREEMENT
WITH CAL STRIPE, INC.
This Amendment No. 1 to the Maintenance Services Agreement is made and
entered into as of January 21, 2026 (“Effective Date”) by and between the City of San
Bernardino, a charter city and municipal corporation (“City”) and Cal Stripe, Inc., a
California Corporation (“Contractor”). City and Contractor are sometimes referred to
herein individually as a “Party” and collectively as “Parties.”
RECITALS
A. WHEREAS, the City and the Contractor have entered into an agreement,
dated February 21, 2024, for the purpose of providing Street Striping and Pavement
Marking Services (the “Original Agreement”).
B. WHEREAS, the Parties now desire to amend the Original Agreement in
order to increase the not-to-exceed amount from Four Hundred Twenty Thousand Dollars
($420,000.00) to Two Million One Hundred Thousand Dollars ($2,100,000.00) and to
clarify that the total contract value reflects the cumulative amount for the full five-year
term, including the initial term and all option years, in accordance with the compensation
provisions of the Original Agreement.
NOW, THEREFORE, in consideration of the above recitals and the mutual covenants,
conditions, and promises contained in this Amendment No. 1 and the Original Agreement,
the Parties mutually agree as follows:
AGREEMENT
1. Incorporation of Recitals. The recitals listed above are true and correct and
are hereby incorporated herein by this reference.
2. Compensation. The compensation for services performed pursuant to this
Amendment No. 1 shall not exceed One Million Six Hundred Eighty Thousand Dollars
($1,680,000.00), thereby increasing the total not-to-exceed compensation of the Original
Agreement from Four Hundred and Twenty Thousand Dollars ($420,000.00) to Two
Million One Hundred Thousand Dollars ($2,100,000.00). Work shall continue to be
performed at the rates set forth in the Original Agreement.
3. Full Force. Except as amended by this Amendment No. 1, all provisions of
the Original Agreement, including without limitation the indemnity and insurance
provisions, shall remain in full force and effect and shall govern the actions of the Parties
under this Amendment No. 1.
4. Electronic Transmission. A manually signed copy of this Amendment No. 1
which is transmitted by facsimile, email or other means of electronic transmission shall
be deemed to have the same legal effect as delivery of an original executed copy of this
Packet Page. 769
-2-
Amendment No. 1 for all purposes. This Amendment No. 1 may be signed using an
electronic signature.
5. Counterparts. This Amendment No. 1 may be signed in counterparts, each
of which shall constitute an original.
[SIGNATURES ON FOLLOWING PAGE]
Packet Page. 770
-3-
SIGNATURE PAGE FOR
AMENDMENT NO. 1 TO THE MAINTENANCE SERVICES AGREEMENT
WITH CAL STRIPE INC.
IN WITNESS WHEREOF, the Parties hereto have executed this Amendment No.
1 on the Effective Date first herein above written.
CITY OF SAN BERNARDINO
APPROVED BY:
Eric Levitt
City Manager
APPROVED AS TO FORM:
Best Best & Krieger LLP
City Attorney
CONTRACTOR
CAL STRIPE INC.
President
Packet Page. 771
- 1 -
CITY OF SAN BERNARDINO
MAINTENANCE SERVICES AGREEMENT
1. PARTIES AND DATE.
This Agreement is made and entered into this 21st day of February, 2024 by and between
the City of San Bernardino, a municipal corporation organized under the laws of the State of
California with its principal place of business at Vanir Tower, 290 North D Street, San Bernardino,
California 92401, County of San Bernardino, State of California (“City”) and CAL STRIPE, INC.,
a CALIFORNIA CORPORATION, with its principal place of business at 2040 E. Steel Road,
Colton, CA 92324 (“Contractor”). City and Contractor are sometimes individually referred to as
“Party” and collectively as “Parties” in this Agreement.
2. RECITALS.
2.1 Contractor.
Contractor desires to perform and assume responsibility for the provision of certain
maintenance services required by the City on the terms and conditions set forth in this Agreement.
Contractor represents that it is experienced in providing street striping and pavement marking
services to public clients, that it and its employees or subcontractors have all necessary licenses
and permits to perform the Services in the State of California, and that is familiar with the plans
of City. Contractor shall not subcontract any portion of the work required by this Agreement,
except as expressly stated herein, without prior written approval of City. Subcontracts, if any,
shall contain a provision making them subject to all provisions stipulated in this Agreement.
2.2 Project.
City desires to engage Contractor to render such services for the street striping and
pavement marking services project (“Project”) as set forth in this Agreement.
3. TERMS.
3.1 Scope of Services and Term.
3.1.1 General Scope of Services. Contractor promises and agrees to furnish to
the City all labor, materials, tools, equipment, services, and incidental and customary work
necessary to fully and adequately supply the professional street striping and pavement
marking services necessary for the Project (“Services”). The Services are more particularly
described in Exhibit “A” attached hereto and incorporated herein by reference. All Services shall
be subject to, and performed in accordance with, this Agreement, the exhibits attached hereto
and incorporated herein by reference, and all applicable local, state and federal laws, rules and
regulations.
3.1.2 Term. The term of this Agreement shall be from February 21, 2024 to
June 30, 2025 with four additional option years, unless earlier terminated as provided herein.
Contractor shall complete the Services within the term of this Agreement and shall meet any other
established schedules and deadlines. The Parties may, by mutual, written consent, extend the
term of this Agreement if necessary to complete the Services.
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 772
- 2 -
3.2 Responsibilities of Contractor.
3.2.1 Control and Payment of Subordinates; Independent Contractor. The
Services shall be performed by Contractor or under its supervision. Contractor will determine the
means, methods and details of performing the Services subject to the requirements of this
Agreement. City retains Contractor on an independent contractor basis and not as an employee.
Contractor retains the right to perform similar or different services for others during the term of
this Agreement. Any additional personnel performing the Services under this Agreement on
behalf of Contractor shall also not be employees of City and shall at all times be under
Contractor’s exclusive direction and control. Contractor shall pay all wages, salaries, and other
amounts due such personnel in connection with their performance of Services under this
Agreement and as required by law. Contractor shall be responsible for all reports and obligations
respecting such additional personnel, including, but not limited to: social security taxes, income
tax withholding, unemployment insurance, disability insurance, and workers’ compensation
insurance.
3.2.2 Schedule of Services. Contractor shall perform the Services expeditiously,
within the term of this Agreement, and in accordance with the Schedule of Services set forth in
Exhibit “B” attached hereto and incorporated herein by reference. Contractor represents that it
has the professional and technical personnel required to perform the Services in conformance
with such conditions. In order to facilitate Contractor’s conformance with the Schedule, City shall
respond to Contractor’s submittals in a timely manner. Upon request of City, Contractor shall
provide a more detailed schedule of anticipated performance to meet the Schedule of Services.
3.2.3 Conformance to Applicable Requirements. All work prepared by
Contractor shall be subject to the approval of City.
3.2.4 City’s Representative. The City hereby designates Azzam Jabsheh PE,
or his or her designee, to act as its representative for the performance of this Agreement (“City’s
Representative”). City’s Representative shall have the power to act on behalf of the City for all
purposes under this Agreement. Contractor shall not accept direction or orders from any person
other than the City’s Representative or his or her designee.
3.2.5 Contractor’s Representative. Contractor hereby designates Adam Lippa,
or his or her designee, to act as its representative for the performance of this Agreement
(“Contractor’s Representative”). Contractor’s Representative shall have full authority to represent
and act on behalf of the Contractor for all purposes under this Agreement. The Contractor ’s
Representative shall supervise and direct the Services, using his or her best skill and attention,
and shall be responsible for all means, methods, techniques, sequences and procedures and for
the satisfactory coordination of all portions of the Services under this Agreement.
3.2.6 Coordination of Services. Contractor agrees to work closely with City staff
in the performance of Services and shall be available to City’s staff, consultants and other staff at
all reasonable times.
3.2.7 Standard of Care; Performance of Employees. Contractor shall perform all
Services under this Agreement in a skillful and competent manner, consistent with the standards
generally recognized as being employed by professionals in the same discipline in the State of
California. Contractor represents and maintains that it is skilled in the professional calling
necessary to perform the Services. Contractor warrants that all employees and subcontractors
shall have sufficient skill and experience to perform the Services assigned to them. Finally,
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 773
- 3 -
Contractor represents that it, its employees and subcontractors have all licenses, permits,
qualifications and approvals of whatever nature that are legally required to perform the Services,
including a City Business License, and that such licenses and approvals shall be maintained
throughout the term of this Agreement. As provided for in the indemnification provisions of this
Agreement, Contractor shall perform, at its own cost and expense and without reimbursement
from the City, any services necessary to correct errors or omissions which are caused by the
Contractor’s failure to comply with the standard of care provided for herein. Any employee of the
Contractor or its sub-contractors who is determined by the City to be uncooperative, incompetent,
a threat to the adequate or timely completion of the Project, a threat to the safety of persons or
property, or any employee who fails or refuses to perform the Services in a manner acceptable to
the City, shall be promptly removed from the Project by the Contractor and shall not be
re-employed to perform any of the Services or to work on the Project.
3.2.8 Period of Performance. Contractor shall perform and complete all Services
under this Agreement within the term set forth in Section 3.1.2 above (“Performance Time”).
Contractor shall perform the Services in strict accordance with any completion schedule or Project
milestones described in Exhibits “A” or “B” attached hereto, or which may be provided separately
in writing to the Contractor. Contractor agrees that if the Services are not completed within the
aforementioned Performance Time and/or pursuant to any such completion schedule or Project
milestones developed pursuant to provisions of this Agreement, it is understood, acknowledged
and agreed that the City will suffer damage.
3.2.9 Disputes. Should any dispute arise respecting the true value of any work
done, of any work omitted, or of any extra work which Contractor may be required to do, or
respecting the size of any payment to Contractor during the performance of this Contract,
Contractor shall continue to perform the Work while said dispute is decided by the City. If
Contractor disputes the City’s decision, Contractor shall have such remedies as may be provided
by law.
3.2.10 Laws and Regulations; Employee/Labor Certifications. Contractor shall
keep itself fully informed of and in compliance with all local, state and federal laws, rules and
regulations in any manner affecting the performance of the Project or the Services, including all
Cal/OSHA requirements, and shall give all notices required by law. Contractor shall be liable for
all violations of such laws and regulations in connection with Services. If the Contractor performs
any work knowing it to be contrary to such laws, rules and regulations and without giving written
notice to the City, Contractor shall be solely responsible for all costs arising therefrom. City is a
public entity of the State of California subject to certain provisions of the Health & Safety Code,
Government Code, Public Contract Code, and Labor Code of the State. It is stipulated and agreed
that all provisions of the law applicable to the public contracts of a municipality are a part of this
Agreement to the same extent as though set forth herein and will be complied with. These include
but are not limited to the payment of prevailing wages, the stipulation that eight (8) hours’ labor
shall constitute a legal day’s work and that no worker shall be permitted to work in excess of eight
(8) hours during any one calendar day except as permitted by law. Contractor shall defend,
indemnify and hold City, its officials, directors, officers, employees and agents free and harmless,
pursuant to the indemnification provisions of this Agreement, from any claim or liability arising out
of any failure or alleged failure to comply with such laws, rules or regulations.
3.2.10.1 Employment Eligibility; Contractor. By executing this
Agreement, Contractor verifies that it fully complies with all requirements and restrictions of state
and federal law respecting the employment of undocumented aliens, including, but not limited to,
the Immigration Reform and Control Act of 1986, as may be amended from time to time. Such
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 774
- 4 -
requirements and restrictions include, but are not limited to, examination and retention of
documentation confirming the identity and immigration status of each employee of the Contractor.
Contractor also verifies that it has not committed a violation of any such law within the five (5)
years immediately preceding the date of execution of this Agreement and shall not violate any
such law at any time during the term of the Agreement. Contractor shall avoid any violation of
any such law during the term of this Agreement by participating in an electronic verification of
work authorization program operated by the United States Department of Homeland Security, by
participating in an equivalent federal work authorization program operated by the United States
Department of Homeland Security to verify information of newly hired employees, or by some
other legally acceptable method. Contractor shall maintain records of each such verification and
shall make them available to the City or its representatives for inspection and copy at any time
during normal business hours. The City shall not be responsible for any costs or expenses related
to Contractor’s compliance with the requirements provided for in Section 3.2.10 or any of its sub-
sections.
3.2.10.2 Employment Eligibility; Subcontractors, Sub-subcontractors and
Consultants. To the same extent and under the same conditions as Contractor, Contractor shall
require all of its subcontractors, sub-subcontractors and consultants performing any work relating
to the Project or this Agreement to make the same verifications and comply with all requirements
and restrictions provided for in Section 3.2.10.1.
3.2.10.3 Employment Eligibility: Failure to Comply. Each person
executing this Agreement on behalf of Contractor verifies that they are a duly authorized officer
of Contractor, and understands that any of the following shall be grounds for the City to terminate
the Agreement for cause: (1) failure of Contractor or its subcontractors, sub-subcontractors or
consultants to meet any of the requirements provided for in Sections 3.2.10.1 or 3.2.10.2; (2) any
misrepresentation or material omission concerning compliance with such requirements (including
in those verifications provided to the Contractor under Section 3.2.10.2); or (3) failure to
immediately remove from the Project any person found not to be in compliance with such
requirements.
3.2.10.4 Labor Certification. By its signature hereunder, Contractor
certifies that it is aware of the provisions of Section 3700 of the California Labor Code which
require every employer to be insured against liability for Workers’ Compensation or to undertake
self-insurance in accordance with the provisions of that Code and agrees to comply with such
provisions before commencing the performance of the Services.
3.2.10.5 Equal Opportunity Employment. Contractor represents that it is
an equal opportunity employer, and it shall not discriminate against any subcontractor, employee
or applicant for employment because of race, religion, color, national origin, handicap, ancestry,
sex or age. Such non-discrimination shall include, but not be limited to, all activities related to
initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or
termination.
3.2.10.6 Air Quality. Contractor must fully comply with all applicable laws,
rules and regulations in furnishing or using equipment and/or providing services, including, but
not limited to, emissions limits and permitting requirements imposed by the California Air
Resources Board (CARB). Contractor shall specifically be aware of the CARB limits and
requirements’ application to “portable equipment”, which definition is considered by CARB to
include any item of equipment with a fuel-powered engine. Contractor shall indemnify City against
any fines or penalties imposed by CARB or any other governmental or regulatory agency for
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 775
- 5 -
violations of applicable laws, rules and/or regulations by Contractor, its subcontractors, or others
for whom Contractor is responsible under its indemnity obligations provided for in this Agreement.
3.2.10.7 Water Quality.
(A) Management and Compliance. To the extent applicable,
Contractor’s Services must account for, and fully comply with, all local, state and federal laws,
rules and regulations that may impact water quality compliance, including, without limitation, all
applicable provisions of the Federal Water Pollution Control Act (33 U.S.C. §§ 1300); the
California Porter-Cologne Water Quality Control Act (Cal Water Code §§ 13000-14950); laws,
rules and regulations of the Environmental Protection Agency and the State Water Resources
Control Board; the City’s ordinances regulating discharges of storm water; and any and all
regulations, policies, or permits issued pursuant to any such authority regulating the discharge of
pollutants, as that term is used in the Porter-Cologne Water Quality Control Act, to any ground or
surface water in the State.
(B) Liability for Non-Compliance. Failure to comply with the
laws, regulations and policies described in this Section is a violation of law that may subject
Contractor or City to penalties, fines, or additional regulatory requirements. Contractor shall
defend, indemnify and hold the City, its directors, officials, officers, employees, volunteers and
agents free and harmless, pursuant to the indemnification provisions of this Agreement, from and
against any and all fines, penalties, claims or other regulatory requirements imposed as a result
of Contractor’s non-compliance with the laws, regulations and policies described in this Section,
unless such non-compliance is the result of the sole established negligence, willful misconduct or
active negligence of the City, its officials, officers, agents, employees or authorized volunteers.
(C) Training. In addition to any other standard of care
requirements set forth in this Agreement, Contractor warrants that all employees and
subcontractors shall have sufficient skill and experience to perform the Services assigned to them
without impacting water quality in violation of the laws, regulations and policies described in this
Section. Contractor further warrants that it, its employees and subcontractors will receive
adequate training, as determined by City, regarding the requirements of the laws, regulations and
policies described in this Section as they may relate to the Services provided under this
Agreement. Upon request, City will provide Contractor with a list of training programs that meet
the requirements of this paragraph.
3.2.11 Insurance.
3.2.11.1 Time for Compliance. Contractor shall not commence Work
under this Agreement until it has provided evidence satisfactory to the City that it has secured all
insurance required under this Section. In addition, Contractor shall not allow any subcontractor
to commence work on any subcontract until it has provided evidence satisfactory to the City that
the subcontractor has secured all insurance required under this Section.
3.2.11.2 Minimum Requirements. Contractor shall, at its expense,
procure and maintain for the duration of the Agreement insurance against claims for injuries to
persons or damages to property which may arise from or in connection with the performance of
the Agreement by the Contractor, its agents, representatives, employees, or subcontractors.
Contractor shall also require all of its subcontractors to procure and maintain the same insurance
for the duration of the Agreement. Such insurance shall meet at least the following minimum levels
of coverage:
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 776
- 6 -
(A) Minimum Scope of Insurance. Coverage shall be at least
as broad as the latest version of the following: (1) General Liability: Insurance Services Office
Commercial General Liability coverage (occurrence form CG 0001); (2) Automobile Liability:
Insurance Services Office Business Auto Coverage form number CA 0001, code 1 (any auto); (3)
Workers’ Compensation and Employer’s Liability: Workers’ Compensation insurance as required
by the State of California and Employer’s Liability Insurance; (4) Privacy/Network Security
(Cyber), in a form and with insurance companies acceptable to City; and the policy shall not
contain any exclusion contrary to the Agreement, including but not limited to endorsements or
provisions limiting coverage for (1) contractual liability (including but not limited to ISO CG 24 26
or 21 29); or (2) cross liability for claims or suits by one insured against another.
(B) Minimum Limits of Insurance. Contractor shall maintain
limits no less than: (1) General Liability $2,000,000 MINIMUM; and $4,000,000 aggregate per
occurrence for bodily injury, personal injury, and property damage. If Commercial General
Liability Insurance or other form with general aggregate limit is used including, but not limited to,
form CG 2503, either the general aggregate limit shall apply separately to this Agreement/location
or the general aggregate limit shall be twice the required occurrence limit; (2) Automobile Liability
$1,000,000 MINIMUM; per accident for bodily injury and property damage; (3) Workers’
Compensation and Employer’s Liability: Workers’ Compensation limits as required by the Labor
Code of the State of California. Employer’s Liability limits of $1,000,000 MINIMUM per accident
for bodily injury or disease; (4) Cyber Liability: $1,000,000 PER OCCURRENCE/AGGREGATE
for privacy breaches, system breaches, denial/loss of service, and introduction, implantation or
spread of malicious software code; Defense costs shall be paid in addition to the limits.
(C) Notices; Cancellation or Reduction of Coverage. At least
fifteen (15) days prior to the expiration of any such policy, evidence showing that such insurance
coverage has been renewed or extended shall be filed with the City. If such coverage is cancelled
or materially reduced, Contractor shall, within ten (10) days after receipt of written notice of such
cancellation or reduction of coverage, file with the City evidence of insurance showing that the
required insurance has been reinstated or has been provided through another insurance company
or companies. In the event any policy of insurance required under this Agreement does not
comply with these specifications or is canceled and not replaced, the City has the right but not
the duty to obtain the insurance it deems necessary, and any premium paid by the City will be
promptly reimbursed by Contractor or the City may withhold amounts sufficient to pay premium
from Contractor payments. In the alternative, the City may suspend or terminate this Agreement.
(D) Additional Insured. The City of San Bernardino, its
directors, officials, officers, employees, agents, and volunteers shall be named as additional
insureds on Contractor’s and its subcontractors’ policies of commercial general liability and
automobile liability insurance using the endorsements and forms specified herein or exact
equivalents.
3.2.11.3 Insurance Endorsements. The insurance policies shall contain
the following provisions, or Contractor shall provide endorsements on forms supplied or approved
by the City to add the following provisions to the insurance policies:
(A) General Liability. The general liability policy shall include or
be endorsed (amended) to state that: (1) using ISO CG forms 20 10 and 20 37, or endorsements
providing the exact same coverage, the City of San Bernardino, its directors, officials, officers,
employees, agents, and volunteers shall be covered as additional insured with respect to the
Services or ongoing and complete operations performed by or on behalf of the Contractor,
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 777
- 7 -
including materials, parts or equipment furnished in connection with such work; and (2) using ISO
form 20 01, or endorsements providing the exact same coverage, the insurance coverage shall
be primary insurance as respects the City, its directors, officials, officers, employees, agents, and
volunteers, or if excess, shall stand in an unbroken chain of coverage excess of the Contractor’s
scheduled underlying coverage. Any excess insurance shall contain a provision that such
coverage shall also apply on a primary and noncontributory basis for the benefit of the City, before
the City’s own primary insurance or self-insurance shall be called upon to protect it as a named
insured. Any insurance or self-insurance maintained by the City, its directors, officials, officers,
employees, agents, and volunteers shall be excess of the Contractor’s insurance and shall not be
called upon to contribute with it in any way. Notwithstanding the minimum limits set forth in
Section 3.2.11.2(B), any available insurance proceeds in excess of the specified minimum limits
of coverage shall be available to the parties required to be named as additional insureds pursuant
to this Section 3.2.11.3(A).
(B) Automobile Liability. The automobile liability policy shall
include or be endorsed (amended) to state that: (1) the City, its directors, officials, officers,
employees, agents, and volunteers shall be covered as additional insureds with respect to the
ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired
or borrowed by the Contractor or for which the Contractor is responsible; and (2) the insurance
coverage shall be primary insurance as respects the City, its directors, officials, officers,
employees, agents, and volunteers, or if excess, shall stand in an unbroken chain of coverage
excess of the Contractor’s scheduled underlying coverage. Any insurance or self-insurance
maintained by the City, its directors, officials, officers, employees, agents, and volunteers shall be
excess of the Contractor’s insurance and shall not be called upon to contribute with it in any way.
Notwithstanding the minimum limits set forth in Section 3.2.11.2(B), any available insurance
proceeds in excess of the specified minimum limits of coverage shall be available to the parties
required to be named as additional insureds pursuant to this Section 3.2.11.3(B).
(C) Workers’ Compensation and Employer’s Liability Coverage.
The insurer shall agree to waive all rights of subrogation against the City, its directors, officials,
officers, employees, agents, and volunteers for losses paid under the terms of the insurance
policy which arise from work performed by the Contractor.
(D) All Coverages. Each insurance policy required by this
Agreement shall be endorsed to state that: (A) coverage shall not be suspended, voided, reduced
or canceled except after thirty (30) days (10 days for nonpayment of premium) prior written notice
by certified mail, return receipt requested, has been given to the City; and (B) any failure to comply
with reporting or other provisions of the policies, including breaches of warranties, shall not affect
coverage provided to the City, its directors, officials, officers, employees, agents, and volunteers.
Any failure to comply with reporting or other provisions of the policies including breaches of
warranties shall not affect coverage provided to the City, its officials, officers, employees, agents
and volunteers, or any other additional insureds.
3.2.11.4 Separation of Insureds; No Special Limitations; Waiver of
Subrogation. All insurance required by this Section shall contain standard separation of insureds
provisions. In addition, such insurance shall not contain any special limitations on the scope of
protection afforded to the City, its directors, officials, officers, employees, agents, and volunteers.
All policies shall waive any right of subrogation of the insurer against the City, its officials, officers,
employees, agents, and volunteers, or any other additional insureds, or shall specifically allow
Contractor or others providing insurance evidence in compliance with these specifications to
waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 778
- 8 -
against City, its officials, officers, employees, agents, and volunteers, or any other additional
insureds, and shall require similar written express waivers and insurance clauses from each of its
subcontractors.
3.2.11.5 Deductibles and Self-Insurance Retentions. Any deductibles or
self-insured retentions must be declared to and approved by the City. Contractor shall guarantee
that, at the option of the City, either: (1) the insurer shall reduce or eliminate such deductibles or
self-insured retentions as respects the City, its directors, officials, officers, employees, agents,
and volunteers; or (2) the Contractor shall procure a bond guaranteeing payment of losses and
related investigation costs, claims and administrative and defense expenses.
3.2.11.6 Subcontractor Insurance Requirements. Contractor shall not
allow any subcontractors to commence work on any subcontract relating to the work under the
Agreement until they have provided evidence satisfactory to the City that they have secured all
insurance required under this Section. If requested by Contractor, the City may approve different
scopes or minimum limits of insurance for particular subcontractors. The Contractor and the City
shall be named as additional insureds on all subcontractors’ policies of Commercial General
Liability using ISO form 20 38, or coverage at least as broad.
3.2.11.7 Acceptability of Insurers. Insurance is to be placed with insurers
with a current A.M. Best’s rating no less than A: VIII, licensed to do business in California, and
satisfactory to the City.
3.2.11.8 Verification of Coverage. Contractor shall furnish City with
original certificates of insurance and endorsements effecting coverage required by this Agreement
on forms satisfactory to the City. The certificates and endorsements for each insurance policy
shall be signed by a person authorized by that insurer to bind coverage on its behalf and shall be
on forms provided by the City if requested. All certificates and endorsements must be received
and approved by the City before work commences. The City reserves the right to require
complete, certified copies of all required insurance policies, at any time.
3.2.11.9 Reporting of Claims. Contractor shall report to the City, in
addition to Contractor’s insurer, any and all insurance claims submitted by Contractor in
connection with the Services under this Agreement.
3.2.12 Safety. Contractor shall execute and maintain its work so as to avoid injury
or damage to any person or property. In carrying out its Services, the Contractor shall at all times
be in compliance with all applicable local, state and federal laws, rules and regulations, and shall
exercise all necessary precautions for the safety of employees appropriate to the nature of the
work and the conditions under which the work is to be performed. Safety precautions as
applicable shall include, but shall not be limited to: (A) adequate life protection and lifesaving
equipment and procedures; (B) instructions in accident prevention for all employees and
subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks,
confined space procedures, trenching and shoring, equipment and other safety devices,
equipment and wearing apparel as are necessary or lawfully required to prevent accidents or
injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety
measures.
3.2.13 Bonds.
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 779
- 9 -
3.2.13.1 Performance Bond. If required by law or otherwise specifically
requested by City in Exhibit “C” attached hereto and incorporated herein by reference, Contractor
shall execute and provide to City concurrently with this Agreement a Performance Bond in the
amount of the total, not-to-exceed compensation indicated in this Agreement, and in a form
provided or approved by the City. If such bond is required, no payment will be made to Contractor
until it has been received and approved by the City.
3.2.13.2 Payment Bond. If required by law or otherwise specifically
requested by City in Exhibit “C” attached hereto and incorporated herein by reference, Contractor
shall execute and provide to City concurrently with this Agreement a Payment Bond in the amount
of the total, not-to-exceed compensation indicated in this Agreement, and in a form provided or
approved by the City. If such bond is required, no payment will be made to Contractor until it has
been received and approved by the City.
3.2.13.3 Bond Provisions. Should, in City’s sole opinion, any bond
become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace
the affected bond within 10 days of receiving notice from City. In the event the surety or
Contractor intends to reduce or cancel any required bond, at least thirty (30) days prior written
notice shall be given to the City, and Contractor shall post acceptable replacement bonds at least
ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due
or will be made under this Agreement until any replacement bonds required by this Section are
accepted by the City. To the extent, if any, that the total compensation is increased in accordance
with the Agreement, the Contractor shall, upon request of the City, cause the amount of the bonds
to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to
the City. To the extent available, the bonds shall further provide that no change or alteration of
the Agreement (including, without limitation, an increase in the total compensation, as referred to
above), extensions of time, or modifications of the time, terms, or conditions of payment to the
Contractor, will release the surety. If the Contractor fails to furnish any required bond, the City
may terminate this Agreement for cause.
3.2.13.4 Surety Qualifications. Only bonds executed by an admitted
surety insurer, as defined in Code of Civil Procedure Section 995.120, shall be accepted. The
surety must be a California-admitted surety with a current A.M. Best’s rating no less than A: VIII
and satisfactory to the City. If a California-admitted surety insurer issuing bonds does not meet
these requirements, the insurer will be considered qualified if it is in conformance with
Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the
City.
3.2.14 Accounting Records. Contractor shall maintain complete and accurate
records with respect to all costs and expenses incurred under this Agreement. All such records
shall be clearly identifiable. Contractor shall allow a representative of City during normal business
hours to examine, audit, and make transcripts or copies of such records and any other documents
created pursuant to this Agreement. Contractor shall allow inspection of all work, data,
documents, proceedings, and activities related to the Agreement for a period of three (3) years
from the date of final payment under this Agreement.
3.2.15 Work Site.
3.2.15.1 Inspection Of Site. Contractor shall visit sites where Services
are to be performed and shall become acquainted with all conditions affecting the Services prior
to commencing the Services. Contractor shall make such examinations as it deems necessary to
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 780
- 10 -
determine the condition of the work sites, its accessibility to materials, workmen and equipment,
and to determine Contractor’s ability to protect existing surface and subsurface
improvements. No claim for allowances–time or money–will be allowed as to such matters after
commencement of the Services.
3.2.15.2 Field Measurements. Contractor shall make field
measurements, verify field conditions and shall carefully compare such field measurements and
conditions and other information known to Contractor with the Contract Documents, including any
plans, specifications, or scope of work before commencing Services. Errors, inconsistencies or
omissions discovered shall be reported to the City immediately and prior to performing any
Services or altering the condition.
3.2.16 Loss and Damage. Contractor shall be responsible for all loss and damage
which may arise out of the nature of the Services agreed to herein, or from the action of the
elements, or from any unforeseen difficulties which may arise or be encountered in the
prosecution of the Services until the same is fully completed and accepted by City.
3.2.17 Warranty. Contractor warrants all Services under the Contract (which for
purposes of this Section shall be deemed to include unauthorized work which has not been
removed and any non-conforming materials incorporated into the work) to be of good quality and
free from any defective or faulty material and workmanship. Contractor agrees that for a period
of one year (or the period of time specified elsewhere in the Contract or in any guarantee or
warranty provided by any manufacturer or supplier of equipment or materials incorporated into
the work, whichever is later) after the date of final acceptance, Contractor shall within ten (10)
days after being notified in writing by the City of any defect in the Services or non-conformance
of the Services to the Contract, commence and prosecute with due diligence all Services
necessary to fulfill the terms of the warranty at its sole cost and expense. Contractor shall act
sooner as requested by the City in response to an emergency. In addition, Contractor shall, at its
sole cost and expense, repair and replace any portions of the work (or work of other contractors)
damaged by its defective Services or which becomes damaged in the course of repairing or
replacing defective work. For any work so corrected, Contractor’s obligation hereunder to correct
defective work shall be reinstated for an additional one year period, commencing with the date of
acceptance of such corrected work. Contractor shall perform such tests as the City may require
to verify that any corrective actions, including, without limitation, redesign, repairs, and
replacements comply with the requirements of the Contract. All costs associated with such
corrective actions and testing, including the removal, replacement, and reinstitution of equipment
and materials necessary to gain access, shall be the sole responsibility of the Contractor. All
warranties and guarantees of subcontractors, suppliers and manufacturers with respect to any
portion of the work, whether express or implied, are deemed to be obtained by Contractor for the
benefit of the City, regardless of whether or not such warranties and guarantees have been
transferred or assigned to the City by separate agreement and Contractor agrees to enforce such
warranties and guarantees, if necessary, on behalf of the City. In the event that Contractor fails
to perform its obligations under this Section, or under any other warranty or guaranty under this
Contract, to the reasonable satisfaction of the City, the City shall have the right to correct and
replace any defective or non-conforming work and any work damaged by such work or the
replacement or correction thereof at Contractor's sole expense. Contractor shall be obligated to
fully reimburse the City for any expenses incurred hereunder upon demand.
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 781
- 11 -
3.3 Fees and Payments.
3.3.1 Compensation. Contractor shall receive compensation, including
authorized reimbursements, for all Services rendered under this Agreement at the rates set forth
in Exhibit “C” attached hereto and incorporated herein by reference. The total compensation shall
not exceed Four Hundred Twenty Thousand Dollars ($420,000) without the written approval of
City’s City Engineer. Extra Work may be authorized, as described below, and if authorized, will
be compensated at the rates and manner set forth in this Agreement.
3.3.2 Payment of Compensation. Contractor shall submit to City a monthly
itemized statement which indicates work completed and hours of Services rendered by
Contractor. The statement shall describe the amount of Services and supplies provided since the
initial commencement date, or since the start of the subsequent billing periods, as appropriate,
through the date of the statement. City shall, within 45 days of receiving such statement, review
the statement and pay all approved charges thereon.
3.3.3 Deductions. City may deduct or withhold, as applicable, from each
progress payment an amount necessary to protect City from loss because of: (1) stop payment
notices as allowed by state law; (2) unsatisfactory prosecution of the Services by Contractor; (3)
sums representing expenses, losses, or damages as determined by the City, incurred by the City
for which Contractor is liable under the Agreement; and (4) any other sums which the City is
entitled to recover from Contractor under the terms of the Agreement or pursuant to state law,
including Section 1727 of the California Labor Code. The failure by the City to deduct any of
these sums from a progress payment shall not constitute a waiver of the City's right to such sums.
3.3.4 Reimbursement for Expenses. Contractor shall not be reimbursed for any
expenses unless authorized in writing by City.
3.3.5 Extra Work. At any time during the term of this Agreement, City may
request that Contractor perform Extra Work. As used herein, “Extra Work” means any work which
is determined by City to be necessary for the proper completion of the Project, but which the
parties did not reasonably anticipate would be necessary at the execution of this Agreement.
Contractor shall not perform, nor be compensated for, Extra Work without written authorization
from City’s Representative.
3.3.6 Prevailing Wages. Contractor is aware of the requirements of California
Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations,
Title 8, Section 16000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing
wage rates and the performance of other requirements on certain “public works” and
“maintenance” projects. If the Services are being performed as part of an applicable “public
works” or “maintenance” project, as defined by the Prevailing Wage Laws, and if the total
compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage
Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect
at the commencement of this Contract. Contractor shall make copies of the prevailing rates of
per diem wages for each craft, classification or type of worker needed to execute the Services
available to interested parties upon request, and shall post copies at Contractor’s principal place
of business and at the project site. Contractor shall defend, indemnify and hold the City, its
officials, officers, employees and agents free and harmless from any claims, liabilities, costs,
penalties or interest arising out of any failure or alleged failure to comply with the Prevailing Wage
Laws. It shall be mandatory upon the Contractor and all subcontractors to comply with all
California Labor Code provisions, which include but are not limited to prevailing wages (Labor
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 782
- 12 -
Code Sections 1771, 1774 and 1775), employment of apprentices (Labor Code Section 1777.5),
certified payroll records (Labor Code Sections 1771.4 and 1776), hours of labor (Labor Code
Sections 1813 and 1815) and debarment of contractors and subcontractors (Labor Code Section
1777.1). The requirement to submit certified payroll records directly to the Labor Commissioner
under Labor Code section 1771.4 shall not apply to work performed on a public works project that
is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.
3.3.7 Registration/DIR Compliance. If the Services are being performed as part
of an applicable “public works” or “maintenance” project, and if the total compensation is $15,000
or more, then pursuant to Labor Code Sections 1725.5 and 1771.1, the Contractor and all
subcontractors performing such Services must be registered with the Department of Industrial
Relations. Contractor shall maintain registration for the duration of the Project and require the
same of any subcontractors, as applicable. This Project may also be subject to compliance
monitoring and enforcement by the Department of Industrial Relations. It shall be Contractor’s
sole responsibility to comply with all applicable registration and labor compliance requirements.
Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code
Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is
exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and
1771.1. Any stop orders issued by the Department of Industrial Relations against Contractor or
any subcontractor that affect Contractor’s performance of Services, including any delay, shall be
Contractor’s sole responsibility. Any delay arising out of or resulting from such stop orders shall
be considered Contractor caused delay and shall not be compensable by the City. Contractor
shall defend, indemnify and hold the City, its officials, officers, employees and agents free and
harmless from any claim or liability arising out of stop orders issued by the Department of
Industrial Relations against Contractor or any subcontractor.
3.4 Termination of Agreement.
3.4.1 Grounds for Termination. City may, by written notice to Contractor,
terminate the whole or any part of this Agreement at any time and without cause by giving written
notice to Contractor of such termination, and specifying the effective date thereof, at least seven
(7) days before the effective date of such termination. Upon termination, Contractor shall be
compensated only for those services which have been adequately rendered to City, and
Contractor shall be entitled to no further compensation. Contractor may not term inate this
Agreement except for cause.
3.4.2 Effect of Termination. If this Agreement is terminated as provided herein,
City may require Contractor to provide all finished or unfinished Documents and Data and other
information of any kind prepared by Contractor in connection with the performance of Services
under this Agreement. Contractor shall be required to provide such document and other
information within fifteen (15) days of the request.
3.4.3 Additional Services. In the event this Agreement is terminated in whole or
in part as provided herein, City may procure, upon such terms and in such manner as it may
determine appropriate, services similar to those terminated.
3.5 General Provisions.
3.5.1 Delivery of Notices. All notices permitted or required under this Agreement
shall be given to the respective parties at the following address, or at such other address as the
respective parties may provide in writing for this purpose:
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 783
- 13 -
Contractor:
Cal Stripe, Inc.
2040 E Steel Road
Colton, CA 92324
Contact: Adam Lippa
City:
City of San Bernardino
Vanir Tower, 290 North D Street
San Bernardino, CA 92401
Attn: Azzam Jabsheh, PE
With Copy To:
City of San Bernardino
Vanir Tower, 290 North D Street
San Bernardino, CA 92401
Attn: City Attorney
Such notice shall be deemed made when personally delivered or when mailed,
forty-eight (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to
the party at its applicable address. Actual notice shall be deemed adequate notice on the date
actual notice occurred, regardless of the method of service.
3.5.2 Indemnification.
3.5.2.1 Scope of Indemnity. To the fullest extent permitted by law,
Contractor shall defend, indemnify and hold the City, its officials, employees, agents and
volunteers free and harmless from any and all claims, demands, causes of action, suits, actions,
proceedings, costs, expenses, liability, judgments, awards, decrees, settlements, loss, damage
or injury of any kind, in law or equity, regardless of whether the allegations are false, fraudulent,
or groundless, to property or persons, including wrongful death, (collectively, “Claims”) in any
manner arising out of, pertaining to, or incident to any alleged acts, errors or omissions, or willful
misconduct of Contractor, its officials, officers, employees, subcontractors, consultants or agents
in connection with the performance of the Contractor’s Services, the Project or this Agreement,
including without limitation the payment of all expert witness fees, attorneys’ fees and other
related costs and expenses. Notwithstanding the foregoing, to the extent required by Civil Code
section 2782, Contractor’s indemnity obligation shall not apply to liability for damages for death
or bodily injury to persons, injury to property, or any other loss, damage or expense which is
caused by the the sole or active negligence or willful misconduct of the City or the City’s agents,
servants, or independent contractors who are directly responsible to the City.
3.5.2.2 Additional Indemnity Obligations. Contractor shall defend, with
counsel of City’s choosing and at Contractor’s own cost, expense and risk, any and all Claims
covered by this indemnification section that may be brought or instituted against City or its officials,
employees, agents and volunteers. In addition, Contractor shall pay and satisfy any judgment,
award or decree that may be rendered against City or its officials, employees, agents and
volunteers as part of any such claim, suit, action or other proceeding. Contractor shall also
reimburse City for the cost of any settlement paid by City or its officials, employees, agents and
volunteers as part of any such claim, suit, action or other proceeding. Such reimbursement shall
include payment for City’s attorney’s fees and costs, including expert witness fees. Contractor
shall reimburse City and its officials, employees, agents and volunteers, for any and all legal
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 784
- 14 -
expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity
herein provided. Contractor’s obligation to indemnify shall survive expiration or termination of this
Agreement, and shall not be restricted to insurance proceeds, if any, received by the City, its
officials, employees, agents and volunteers.
3.5.3 Governing Law; Government Code Claim Compliance. This Agreement
shall be governed by the laws of the State of California. Venue shall be in San Bernardino County,
California. In addition to any and all contract requirements pertaining to notices of and requests
for compensation or payment for extra work, disputed work, claims and/or changed conditions,
Contractor must comply with the claim procedures set forth in Government Code sections 900 et
seq. prior to filing any lawsuit against the City. Such Government Code claims and any
subsequent lawsuit based upon the Government Code claims shall be limited to those matters
that remain unresolved after all procedures pertaining to extra work, disputed work, claims, and/or
changed conditions have been followed by Contractor. If no such Government Code claim is
submitted, or if any prerequisite contractual requirements are not otherwise satisfied as specified
herein, Contractor shall be barred from bringing and maintaining a valid lawsuit against the City.
3.5.4 Time of Essence. Time is of the essence for each and every provision of
this Agreement.
3.5.5 City’s Right to Employ Other Contractors. City reserves right to employ
other contractors in connection with this Project.
3.5.6 Successors and Assigns. This Agreement shall be binding on the
successors and assigns of the parties.
3.5.7 Assignment or Transfer. Contractor shall not assign, hypothecate or
transfer, either directly or by operation of law, this Agreement or any interest herein without the
prior written consent of the City. Any attempt to do so shall be null and void, and any assignees,
hypothecates or transferees shall acquire no right or interest by reason of such attempted
assignment, hypothecation or transfer.
3.5.8 Construction; References; Captions. Since the Parties or their agents have
participated fully in the preparation of this Agreement, the language of this Agreement shall be
construed simply, according to its fair meaning, and not strictly for or against any Party. Any term
referencing time, days or period for performance shall be deemed calendar days and not work
days. All references to Contractor include all personnel, employees, agents, and subcontractors
of Contractor, except as otherwise specified in this Agreement. All references to City include its
officials, officers, employees, agents, and volunteers except as otherwise specified in this
Agreement. The captions of the various articles and paragraphs are for convenience and ease
of reference only, and do not define, limit, augment, or describe the scope, content or intent of
this Agreement.
3.5.9 Amendment; Modification. No supplement, modification or amendment of
this Agreement shall be binding unless executed in writing and signed by both Parties.
3.5.10 Waiver. No waiver of any default shall constitute a waiver of any other
default or breach, whether of the same or other covenant or condition. No waiver, benefit,
privilege, or service voluntarily given or performed by a Party shall give the other Party any
contractual rights by custom, estoppel or otherwise.
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 785
- 15 -
3.5.11 No Third Party Beneficiaries. Except to the extent expressly provided for
in Section 3.5.7, there are no intended third party beneficiaries of any right or obligation assumed
by the Parties.
3.5.12 Invalidity; Severability. If any portion of this Agreement is declared invalid,
illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions
shall continue in full force and effect.
3.5.13 Prohibited Interests. Contractor maintains and warrants that it has not
employed nor retained any company or person, other than a bona fide employee working solely
for Contractor, to solicit or secure this Agreement. Further, Contractor warrants that it has not
paid nor has it agreed to pay any company or person, other than a bona fide employee working
solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration
contingent upon or resulting from the award or making of this Agreement. Contractor further
agrees to file, or shall cause its employees or subcontractors to file, a Statement of Economic
Interest with the City’s Filing Officer as required under state law in the performance of the
Services. For breach or violation of this warranty, City shall have the right to rescind this
Agreement without liability. For the term of this Agreement, no member, officer or employee of
City, during the term of his or her service with City, shall have any direct interest in this Agreement,
or obtain any present or anticipated material benefit arising therefrom.
3.5.14 Cooperation; Further Acts. The Parties shall fully cooperate with one
another and shall take any additional acts or sign any additional documents as may be necessary,
appropriate or convenient to attain the purposes of this Agreement.
3.5.15 Authority to Enter Agreement. Contractor has all requisite power and
authority to conduct its business and to execute, deliver, and perform the Agreement. Each Party
warrants that the individuals who have signed this Agreement have the legal power, right, and
authority to make this Agreement and bind each respective Party.
3.5.16 Counterparts. This Agreement may be signed in counterparts, each of
which shall constitute an original.
3.5.17 Entire Agreement. This Agreement contains the entire Agreement of the
parties with respect to the subject matter hereof, and supersedes all prior negotiations,
understandings or agreements. This Agreement may only be modified by a writing signed by both
parties.
3.5.18 Electronic Signature. Each Party acknowledges and agrees that this
Agreement may be executed by electronic or digital signature, which shall be considered as an
original signature for all purposes and shall have the same force and effect as an original
signature.
3.5.19 Federal Provisions. When funding for the Services is provided, in whole or
in part, by an agency of the federal government, Contractor shall also fully and adequately comply
with the provisions included in Exhibit “D” (Federal Requirements) attached hereto and
incorporated herein by reference (“Federal Requirements”). With respect to any conflict between
such Federal Requirements and the terms of this Agreement and/or the provisions of state law,
the more stringent requirement shall control.
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 786
- 16 -
[SIGNATURES ON FOLLOWING PAGE]
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 787
- 17 -
SIGNATURE PAGE FOR MAINTENANCE SERVICES AGREEMENT
BETWEEN THE CITY OF SAN BERNARDINO
AND CAL STRIPE, INC.
IN WITNESS WHEREOF, the Parties hereto have executed this Agreement as of the date
first written above.
CITY OF SAN BERNARDINO
APPROVED BY:
CHARLES A MONTOYA
City Manager
ATTESTED BY:
Genoveva Rocha, CMC
City Clerk
APPROVED AS TO FORM:
Best Best & Krieger LLP
City Attorney
CAL STRIPE, INC.
2040 E. Steel Road
Colton, CA 92324
By:
Its:
Printed
Name:
By:
Its:
Printed
Name:
____________________________________
Contractor’s License Number
____________________________________
DIR Registration Number
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Steve Fleener
General Manager
Packet Page. 788
EXHIBIT A
PRICE PROPOSAL FORM
VENDOR NAME: CAL STRIPE INC.
ADDRESS: 2040 E. STEET RD COLTON, CA 92324
PHONE: (909) 884-7170
The undersigned, hereby declare that they have carefully examined the location of the proposed
work, familiarized themselves with the local conditions affecting the cost of the work, and have
read and examined the terms and conditions for the following Project:
Street Striping and Pavement Marking Services
The undersigned, hereby propose to furnish all labor, materials, equipment, tools, transportation,
and services, and to discharge all duties and obligations necessary and required to perform and
complete the Project in strict accordance with the Vendor Price Quote for the
ELECTRONICALLY SUBMITTED TOTAL VENDOR QUOTE PRICE. Please submit the
“Total” amount on Planetbids “Line Items” price form.
All quantities below are estimates for the purposes of bid comparison. Estimated quantities are no
guarantee of actual usage.
Unit costs shall include all materials, supplies, labor, equipment and ancillary costs required to
complete the work.
Provide prices on the following items using the most recent Caltrans Standard Plans for Pavement
Markers and Traffic Lines Pages A20A through A20D and A24A through A24E, appendix A.
Ite
m
No.
Estimated
Amount
Description Cost per Linear
Ft Total
1 60,000 4” Broken Lines $0.10 $6,000.00
2 35,000 4” Solid Lines $0.12 $4,200.00
3 50,000 Two - 4” Solid Lines with 3” Black separation $0.25 $12,500.00
4 35,000 8” Solid Line $0.20 $7,000.00
5 60,000 Two way left turn lanes, two lines, One solid
one dashed with 3” Black Separation
$0.20 $12,000.00
6 15,000 6” Solid Line $0.20 $3,000.00
7 500 Broken 4” Lane lines and Centerlines through
intersection(Details 40 & 41)
$1.50 $750.00
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 789
Ite
m
No.
Estimated
Amount
Description Cost per Linear
Ft Total
TOTAL VENDOR QUOTE $ $45,450.00
Painted Reflective Pavement Markings Including Stencils, Crosswalks, Limit Lines etc. :
Ite
m
No.
Estimated
Amount
Description Cost per Square
Ft Total
8 75,000 Pavement Markings $1.00 $75,000.00
TOTAL VENDOR QUOTE $ $75,000.00
Thermoplastic Reflective Centerlines and lane Lines:
Ite
m
No.
Estimated
Amount
Description Cost per Linear
Ft Total
9 150,000 4”Broken Lines (Yellow/White) $0.30 $45,000.00
10 75,000 4” Solid ( yellow or white) Lines $0.35 $26,250.00
11 75,000 Two - 4” Solid yellow Lines with 3” Black
separation
$0.80 $60,000.00
12 5,000 8” Solid Line $0.80 $4,000.00
13 150,000 Two way left turn lanes, two yellow lines, One
solid & one dashed with 3” Black Separation
$0.70 $105,000.00
14 4,000 6” Solid Line (bike Lane) $0.70 $2,800.00
15 1,000 12” diagonals (yellow /White) $2.25 $2,250.00
16 2,000 Lane Drop at intersection (Detail 37B) $1.00 $2,000.00
17 2,000 Broken 4” Lane lines and Centerlines extension
through intersection (Details 40 & 41)
$3.00 $6,000.00
TOTAL VENDOR QUOTE $ $253,300.00
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 790
Curb Painting Red, White, Green, Yellow & Blue:
Ite
m
No.
Estimated
Amount Description Cost per Linear Ft Total
18 40,000 Painting of curbs $0.65 $26,000.00
TOTAL VENDOR QUOTE $ $26,000.00
Painting of Small Stencils:
Ite
m
No.
Estimated
Amount
Description Cost per Letter Total
19 400 Painting of 3"- 4” Non-reflective letters for top
of curbs
$10.00 $4,000.00
TOTAL VENDOR QUOTE $ $4,000.00
Thermoplastic Pavement Markings Including Stencils, Regular crosswalks, Continental
crosswalks , ladder crosswalks , Pavement Arrows, Limit Lines etc. :
Ite
m
No.
Estimated
Amount
Description Cost per
Square Ft Total
20 *200,000 Pavement Markings
$2.35 $470,000.00
TOTAL VENDOR QUOTE $ $470,000.00
*NOTE: Not all estimated amounts will be
utilized.
Removals (includes legal disposal of debris):
Ite
m
No.
Estimated
Amount
Description Cost per Square Ft Total
21 20,000 Wet Sandblasting
$0.70 $14,000.00
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 791
Ite
m
No.
Estimated
Amount
Description Cost per Square Ft Total
22 5,000 Grinding $1.10 $5,500.00
TOTAL VENDOR QUOTE $ $19,500.00
Pre-lining (Cat-track):
Ite
m
No.
Estimated
Amount
Description Cost per Linear Ft Total
23 80,000
Pre-lining
$0.12 $9,600.00
TOTAL VENDOR QUOTE $ $9,600.00
Raised Pavement Markers:
Ite
m
No.
Estimated
Amount
Description Cost per Marker Total
24 20,000 Retroreflective raised Pavement Markers $1.60 $32,000.00
25 300 White Rumble Strips $46.00 $13,800.00
26 5000 Ceramic Pavement Markers $1.25 $6,250.00
TOTAL VENDOR QUOTE $ $52,050.00
Total Number of Additional Pages:
Submitted By: ____ Title: _________________
(Authorized Representative Signature)
Print Name:
Contractor’s License Number and Classification:
DIR REGISTRATION NUMBER (IF APPLICABLE): ____________________________
DocuSign Envelope ID: 18BA9EAF-D126-4F48-A3F2-AB27E6C71E6F
Packet Page. 792
3
1
2
2
CONSENT CALENDAR
January 21, 2026
Honorable Mayor and City Council Members
Lynn Merrill, Director of Public Works
Public Works
(Wards 1, 2, 4, 5)
It is recommended that the Mayor and City Council of the City of San Bernardino
California, adopt Resolution No. 2026-003 authorizing the City Manager and/or
designee to amend the City’s Master List of certain streets or portions thereof
designated as Through Highways and authorizing the establishment of stop control at
the following locations:
a. Pine Ave & Irvington Ave (Ward 5)
b.11th St & J St (Ward 1)
c.11th St & Wall Ave (Ward 1)
d.11th St & Perris St (Ward 1)
e.49th St & E St (Ward 4)
f. Mountain Ave & Marshall Blvd (Ward 4)
g. 28th St & Turill Ave (Ward 2)
h. Bobbet Dr & Olive St (Ward 1)
No Comment
The Public Works Department recommends the approval of the installation of stop
signs at various locations to enhance safety and improve vehicular and pedestrian
flow. The proposed stop signs align with the City’s broader commitment to improve
safety and accessibility on the roadway segments in the City.
Staff received a citizens request to evaluate the potential installation of stop signs at
Packet Page. 793
3
1
2
2
the following intersections:
a. Pine Ave & Irvington Ave (Ward 5)
b.11th St & J St (Ward 1)
c.11th St & Wall Ave (Ward 1)
d.11th St & Perris St (Ward 1)
e.49th St & E St (Ward 4)
f. Mountain Ave & Marshall Blvd (Ward 4)
g. 28th St & Turill Ave (Ward 2)
h. Bobbett Dr & Olive St (Ward 1)
The City has adopted the Guidelines published in the California Manual of Uniform
Traffic Control Devices (CA MUTCD) on the use of stop signs that have been
implemented by the City. The guidelines recommend the use of a stop sign facing the
minor street of a 4-legged intersection and the terminating leg of a T-intersection, given
certain conditions exist to better clarify and regulate right-of-way at an intersection.
Additionally, common factors and warrants considered for the installation of stop signs
is as follows:
Traffic Volumes
Pedestrian Volume
Visibility
Accident History
Discussion
The Traffic Engineering Section of the Public Works Department has been focused on
installing stop signs at uncontrolled intersections by implementing two-way and four-
way stops at intersections with limited visibility and a history of collisions. These
uncontrolled intersections without clear stop signs have led to confusion among drivers
and a challenge for vehicles, bicyclists, and pedestrians to safely navigate crossings .
This lack of signage can result in drivers having insufficient time to notice pedestrians,
cyclists, and cross traffic. Such situations may lead to difficulties in deciding when
and/or whether to come to a full stop at these intersecting streets.
Staff investigated traffic conditions at the intersections referenced above and found
that stop signs should be installed to better clarify the rules of the road at each
intersection. Stop signs are also recommended to mitigate sight distance issues such
as corner landscaping, corner perimeter or structure walls, and/or horizontal or vertical
road curvature which may exist at these locations.
The table below identifies the types of sight distance issues and other causes found at
each intersection.
Packet Page. 794
3
1
2
2
Intersection Justification for stop
sign
Pine Ave and Irvington
Ave
Warrant A-1
11th St and J St Warrant A-2
11th St and Wall Ave Warrant A-1
11th St and Perris St Warrant A-2
49th St and E St Warrant A-2
Mountain Ave and
Marshall Blvd
Warrant A-1
28th St and Turrill Ave Warrant A-2
Bobbett Dr & Olive St Warrant A-1
The City must designate roadways as Through Highways in order to implement traffic
control measures. Staff presented the proposed stop sign locations to the City’s Public
Safety and Human Relations Commission (PS&HR) at its November 10, 2025,
meeting, except for Bobbett and Olive it was presented to the PS&HR at the May 12,
2025, meeting. The Commission recommended approval for installation at all the
locations indicated in the staff report
2021-2025 Strategic Targets and Goals
This project is consistent with Key Target No. 3d: Improved Quality of Life. The
project will evaluate and enhance the quality of public safety services.
Fiscal Impact
There is no impact to the General Fund, the total cost will range from $2,000-$3,000
per location. Public Works has an existing contract with Cal Stripe, Inc., a Paving and
Markings contractor to implement the proposed stop sign installations.
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino
California, adopt Resolution No. 2026-003 authorizing the City Manager and/or
designee to amend the City’s Master List of certain streets or portions thereof
designated as Through Highways and authorizing the establishment of stop control at
the following locations:
a. Pine Ave & Irvington Ave (Ward 5)
b.11th St & J St (Ward 1)
c.11th St & Wall Ave (Ward 1)
d.11th St & Perris St (Ward 1)
e.49th St & E St (Ward 4)
f. Mountain Ave & Marshall Blvd (Ward 4)
g. 28th St & Turill Ave (Ward 2)
h. Bobbet Dr & Olive St (Ward 1)
Packet Page. 795
3
1
2
2
Attachments
Attachment 1 Resolution No. 2026-003
Attachment 2 Exhibit “A” Master List
Attachment 3 Pine Ave & Irvington Ave stop sign warrant & Site plan
Attachment 4 11th St & J St stop sign warrant & Site plan
Attachment 5 11th St & Wall Ave stop sign warrant & Site plan
Attachment 6 11th St & Perris St stop sign warrant & Site plan
Attachment 7 49th St & E St stop sign warrant & Site plan
Attachment 8 Mountain Ave & Marshall Blvd stop sign warrant & Site plan
Attachment 9 28th St & Turill Ave stop sign warrant & Site plan
Attachment 10 Bobbett Dr & Olive St stop sign warrant
Attachment 11 Bobbett Dr & Olive St stop sign warrant Site plan
Ward:
1,2,4,7
Synopsis of Previous Council Actions:
None
CC: Eric Levitt, City Manager
Packet Page. 796
Resolution No. 2026-003
Resolution 2026-003
January 21, 2026
Page 1 of 4
RESOLUTION NO. 2026-003
RESOLUTION OF THE MAYOR AND CITY COUNCIL
OF THE CITY OF SAN BERNARDINO AMENDING
THE CITY’S MASTER LIST OF CERTAIN STREETS
OR PORTIONS AS THROUGH HIGHWAYS AND
AUTHORIZING THE ESTABLISHMENT OF STOP
CONTROL AT THE INTERSECTIONS OF PINE AVE &
IRVINGTON AVE, 11TH ST & J ST, 11TH ST & WALL
AVE, 11TH ST & PERRIS ST, 49TH ST & E ST,
MOUNTAIN AVE & MARSHALL BLVD, 28TH ST &
TURILL AVE, BOBBETT DR & OLIVE ST.
WHEREAS, the Traffic Engineering Section of the Public Works Department is focused
on installing stop signs at uncontrolled intersections and implementing two-way and four-way
stops at intersections with limited visibility and a history of collisions; and
WHEREAS, guidelines published in the California Manual of Uniform Traffic Control
Devices (CA MUTCD) on the use of stop signs have been adopted by the City; and
WHEREAS, in order to meet eligibility for the installation of traffic control measures,
roadways within the City must be designated as Through Highways in accordance with the Vehicle
Code of the State of California; and
WHEREAS, the City previously adopted Resolution No. 655 and subsequent
amendments designating various roadways as Through Highways and Boulevards throughout the
City; and
WHEREAS, Vehicle Code Section 600 describes a Through Highway as a highway or
portion thereof at the entrance to which vehicular traffic from intersecting highways is regulated
by stop signs or traffic control signals or is controlled when entering on a separated right-turn
roadway by a yield-right-of-way sign; and
WHEREAS, stop signs will better clarify the rules of the road by creating safer crossings
for pedestrians, vehicles, cyclists, and cross traffic, and promote order when approaching, driving,
and/or crossing through the two-way or four-way street; and
WHEREAS, the City rescinded Resolution No. 655 of the City of San Bernardino to
designate certain streets or portions thereof as Through Highways; and
WHEREAS, the City adopted Master List to designate certain streets or portions thereof
as Through Highways and Boulevards throughout the City (Exhibit A) ; and
WHEREAS, the Traffic Engineering Division of the Public Works Department received
a request to evaluate traffic control needs at the intersections of Pine Ave & Irvington Ave, 11th
Packet Page. 797
Resolution No. 2026-003
Resolution 2026-003
January 21, 2026
Page 2 of 4
St & J St, 11th St & Wall Ave. 11th St & Perris St, 49th St & E St, Mountain Ave & Marshall
Blvd, 28th St & Turill Ave, Lincoln Ave & Macy St, Bobbett St and Olive St.; and
WHEREAS, staff have determined the intersections of Pine Ave & Irvington Ave, 11th
St & J St, 11th St & Wall Ave. 11th St & Perris St, 49th St & E St, Mountain Ave & Marshall
Blvd, 28th St & Turill Ave, Bobbett St and Olive St meets the warrants for an All -Way/Two way
stop sign installation at the locations; and
WHEREAS, staff presented the proposed stop sign locations to the City’s Public Safety
and Human Relations Commission (PS&HR) at its November 10, 2025, meeting and for Bobbett
Dr & Olive St at its May 12, 2025, meeting. PS&HR recommended the establishment of the stops
at the intersections outlined in this Resolution; and
WHEREAS, the City intends to install traffic control in the form of a stop control on
these roadway segments to enhance traffic safety at Pine Ave.
BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF
SAN BERNARDINO AS FOLLOWS:
SECTION 1. The above recitals are true and correct and are incorporated herein by this
reference.
SECTION 2. The Mayor and City Council hereby add to the Master List - Exhibit “A”,
the following intersections: the intersections of Pine Ave & Irvington Ave, 11th St & J St, 11th
St & Wall Ave. 11th St & Perris St, 49th St & E St, Mountain Ave & Marshall Blvd, 28th St &
Turill Ave, Bobbett Dr and Olive St.
SECTION 3. The City Council finds this Resolution is not subject to the California
Environmental Quality Act (CEQA) in that the activity is covered by the general rule that CEQA
applies only to projects which have the potential for causing a significant effect on the
environment. Where it can be seen with certainty, as in this case, that there is no possibility that
the activity in question may have a significant effect on the environment, the activity is not subject
to CEQA.
SECTION 4. Severability. If any provision of this Resolution or the application thereof
to any person or circumstance is held invalid, such invalidity shall not affect other provisions or
applications, and to this end the provisions of this Resolution are declared to be severable.
SECTION 5. Effective Date. This Resolution shall become effective immediately.
Packet Page. 798
Resolution No. 2026-003
Resolution 2026-003
January 21, 2026
Page 3 of 4
APPROVED and ADOPTED by the City Council and signed by the Mayor and attested
by the City Clerk this 21st day of January 2026.
Helen Tran, Mayor
City of San Bernardino
Attest:
Telicia Lopez, CMC, City Clerk
Approved as to form:
Sonia Carvalho, City Attorney
Packet Page. 799
Resolution No. 2026-003
Resolution 2026-003
January 21, 2026
Page 4 of 4
CERTIFICATION
STATE OF CALIFORNIA )
COUNTY OF SAN BERNARDINO) ss
CITY OF SAN BERNARDINO )
I, Telicia Lopez, CMC, City Clerk, hereby certify that the attached is a true copy of
Resolution No. 2026-003, adopted at a regular meeting held on the 21st day of January 2026 by
the following vote:
Council Members: AYES NAYS ABSTAIN ABSENT
SANCHEZ _____ _____ _______ _______
IBARRA _____ _____ _______ _______
FIGUEROA _____ _____ _______ _______
SHORETT _____ _____ _______ _______
KNAUS _____ _____ _______ _______
FLORES _____ _____ _______ _______
ORTIZ _____ _____ _______ _______
WITNESS my hand and official seal of the City of San Bernardino this ___ day of ____________
2026.
Telicia Lopez, CMC, City Clerk
Packet Page. 800
Exhibit A
EXHIBIT A
Reso 655 Index Street Intersecting Street Stop Control
1 Baseline St All Various
1 E St All Various
1 Eucalyptus Ave All Various
1 F Street All Various
1 Highland Ave All Various
1 I Street All Various
1 Mt Vernon Ave All Various
1 Pepper Ave All Various
1 Sierra Way All Various
1 Victoria Ave All Various
1 State College Pkwy All Various
1.2 Acacia Ave 31st St EB, WB
1.2 Acacia Ave 46th St WB
1.4 Arden Ave Piedmont Dr to Pacific St.Various
1.4 Arden Ave Lynwood Dr All Way
1.4 Arden Ave Marshall Blvd All Way
1.5 Arrowhead Ave Orangeshow Rd to Marshall Blvd Various
1.56 Aster St Jasmine St to Sheridan Rd Various
1.57 Atlantic Ave Bangor Ave NB
1.57 Atlantic Ave Colwyn Ave NB
1.6 Beechwood Ave Azalea Ave SB
1.7 Belmont Ave Little League Drive to Pine Avenue Various
1.7 Belmont Ave Little League Dr All Way
1.7 Belmont Ave Magnolia Ave All Way
1.8 Benedict Rd Sunnyside Ave NB, SB
1.9 Birch St Rexford St NB, SB
1.94 Bronson St Cristy Ave 3-Way
2 Cajon Blvd Highland Ave to the North City Limits Various
3 California St Baseline St to Cajon Blvd Various
Packet Page. 801
Exhibit A
3 California St Magnolia Ave 3-Way
3 California St 16th St All Way
3.02 Cambridge Ave Universal Ave 3-Way
3.1 Caroline St Club Center Dr All Way
3.2 Club Center Dr Hunts Ln to Redlands Blvd Various
3.23 College Ave Iris St SB
3.3 Colorado St California St to Evans St Various
3.35 Colwyn Ave 17th St
3.4 Coulston Curtis St
3.4 Coulston Tippecanoe Avenue to Mt. View Avenue Various
3.4 Coulston Richerdson St All Way
3.5 Crestview Ave Baseline St to 21st St Various
3.5 Crestview Ave 18th St 3-Way
3.6 Cristy Ave Rosarita Dr / Bronson St 3-Way
3.8 Curtis St Gould St
4 Darby St Cajon Blvd to California St Various
4.05 David Way Mariposa Dr 3-Way
4.1 Davidson Ave Highland Ave to Miramonte Dr (Exepting 27th St)Various
4.3 18th St Crestview Ave 3-Way
4.5 8th St Western Ave to K St Various
4.7 11th St Wilson St All Way
5 5th St Sierra Way to Mt Vernon Ave Various
5.4 46th St Mt View Ave
5.4 46th St Acacia Ave to Electric Ave Various
6 14th St I St to Mt Vernon Ave Various
7 4th St Foothill Blvd to Waterman Ave (Exepting Mt Vernon Ave)Various
7.05 G St 33rd St All Way
7.1 Genevieve St 33rd St
7.1 Genevieve St 35th St
7.1 Genevieve St Parkdale Ave to 40th St
7.3 Golden Ave Highland Ave to 40th St (Exepting 39th St and 35th St)Various
7.4 Grand Ave Varsity Ave 3-Way
7.45 Guthrie St Pacific to Highland Ave Various
Packet Page. 802
Exhibit A
7.45 Guthrie St Sunrise Ln All Way
7.5 H St College Dr to Mill St Various
7.5 H St 4th St to Marshall Blvd Various
7.5 H St 13th St All Way
7.5 H St 16th St All Way
7.5 H St 27th St All Way
7.5 H St Marshall Blvd All Way
7.5 H St 48th St to Dover Dr Various
7.5 H St 48th St All Way
8 Harrison St 25th St to Hampshire Rd (Exepting 7th St and Lynwood Dr)Various
8.3 Hospitality Ln E St to Tippecanoe Ave Various
8.4 Hunts Ln Harwick Dr to Hospitality Ln (Exepting EBRT veh on E St)Various
8.5 Institution Rd Cajon Blvd
8.6 Irvington Ave Magnolia Ave to Pine Ave Various
8.6 Irvington Ave Palm Ave All Way
8.6 Irvington Ave Olive Ave All Way
8.6 Irvington Ave Walnut Ave All Way
8.63 J St Congrss St to Rialto Ave Various
8.65 Jasmine St Aster St to Sheridan Rd Various
8.65 Jasmine St Hyacinth St 3-Way
8.65 Jasmine St Sheridan Rd 3-Way
8.7 Kenwood Ave Evans St
8.7 Kenwood Ave Niles St
8.8 Kingmand St Cabrera Ave
9 L St 5th St to Baseline St (Excepting 27th St)Various
9.1 La Praix St Buckeye St
9.1 Lakewood Dr Windsor St
9.1 Lakewood Dr Sheridan Rd All Way
9.2 Little League Dr Kendall Dr to Meyers Rd Various
9.3 Magnolia Ave Pico Ave
9.4 Macy St Ellen St All Way
9.4 Macy St Mill St to Rialto Ave Various
9.4 Macy St Mill St All Way
Packet Page. 803
Exhibit A
9.57 Lugo Ave Baseline St to 16th St Various
9.6 Lynwood Dr Valencia Ave to Victoria Ave (Excepting 30th Connector St)Various
9.67 Magnolia Ave Belmont Ave to Garfield St
9.68 Magnolia Ave Arizona Ave
9.68 Magnolia Ave California St 3-Way
9.68 Magnolia Ave Medical Center Dr All Way
9.68 Magnolia Ave Pico Ave
9.7 Meridian Ave Randall Ave to Birch St Various
9.7 Meridian Ave Randall Ave All Way
9.7 Meridian Ave Poplar St 3-Way
9.7 Meridian Ave Birch St 3-Way
9.7 Meridian Ave Rialto to 9th St Various
9.7 Meridian Ave 6th St All Way
9.7 Meridian Ave Etiwanda Ave All Way
9.8 Mariposa Dr David Way 3-Way
9.9 Marshall Blvd Little Mountain Dr to Parkside Dr (Excepting Miramonte Dr & EB @ Ladera Rd)Various
Packet Page. 804
Exhibit A
10.5 Mt View Ave 34th St All Way
10.5 Mt View Ave Thompson Pl / Parkdale Dr All Way
10.5 Mt View Ave 46th St All Way
10.5 Mt View Ave only)Various
Packet Page. 805
Exhibit A
13.75 Pennsylvania Ave Magnolia Ave
13.81 Pershing Ave 20th St
13.82 Pico Ave King St
13.9 Piedmont Dr Piedmont Ave EB
14 Pine Ave Kendall Dr to Pennsylvania Ave Various
14.1 Pleasant Hll Dr Baldrige Canyon Dr to Palm Ave Various
14.2 Poplar St Meridian Ave 3-Way
14.23 Pumalo St Del Rosa Ave to Date Pl Various
14.3 Rancho ave Mill St to Foothill Blvd Various
14.4 Randall Ave Pepper Ave All Way
14.4 Randall Ave Meridian Ave All Way
14.6 Richardson St Coulston St to Riverside Dr Various
14.6 Richardson St Coulston St All Way
14.64 Rosarita St Cristy Ave 3-Way
14.8 San Carlo Ave Mesa St
15 2nd St Waterman Ave to Mt Vernon Ave Various
15.2 Sepulveda Ave 40th St to 53rd St (Excepting Sierra Way)Various
15.25 7th St Gardena St
15.25 7th St Medical Center Dr All Way
15.25 7th St Medical Center Dr to Mt Vernon Ave Various
15.25 7th St Garner Ave
15.27 Sheridan Rd Aster St to Jasmine St Various
15.27 Sheridan Rd Jamine St 3-Way
15.27 Sheridan Rd Lakewood Dr All Way
15.3 Sierra Way Mill St to Waterman Ave (Excepting 2nd St and 16th St)Various
15.5 16th St State St to H St (Excepting J St, Harris St, and Trnton St)Various
15.5 16th St California St All Way
15.5 16th St Western Ave All Way
15.5 16th St Massachusetts Ave All Way
15.5 16th St H St All Way
15.5 16th St Stoddard Ave
15.5 16th St D St All Way
15.5 16th St Arrowhead Ave to Crestview Ave except Mt View Ave Various
Packet Page. 806
Exhibit A
15.5 16th St Sierra Way All Way
16 6th St Meridian Ave
16 6th St Ramona Ave
16 6th St Western Ave
16 6th St Pico Ave
16 6th St Garner Ave
16 6th St J St to H St
16 6th St Mt View Ave
16 6th St Del Rosa Dr
16.5 State St University Pkwy to Sheridan Rd Various
16.7 Sunrise Ln Guthrie St All Way
17 10th St G St to I St Various
17.5 3rd St Viaduct Blvd to East City Limits Various
17.57 13th St H St to Waterman Ave except Sierra Way Various
17.57 13th St G St (Listed twice)All Way
17.57 13th St F St All Way
17.57 13th St D St All Way
17.57 13th St Mt View Ave All Way
17.6 30th St Miramonte Dr to San Gabriel St Various
17.7 39th St Severance Ave
17.7 39th St Golden Ave to Del Rosa Ave Various
17.75 36th St
Packet Page. 807
Exhibit A
21.2 Universal Ave Cambridge Ave 3-Way
21.25 Valencia Ave Highland Ave to 40th St Various
21.25 Valencia Ave Parkdale Ave All Way
21.25 Valencia Ave 40th St 3-Way
21.3 Varsity Ave College Ave to Universal Ave Various
21.4 Verdemont Dr Palm Ave to Olive Ave Various
21.5 Victoria Ave Richerdson St
21.7 Victoria Ave Lynwood Dr 3-Way
21.8 Wall Ave Temple St
21.8 Wall Ave Olive St
21.8 Wall Ave 15th St
21.9 Walnut Ave Belmont Ave All Way
21.9 Walnut Ave Irvington Ave All Way
21.25 Valencia Ave Highland to 40th St Various
21.25 Valencia Ave Parkdale Dr All Way
21.25 Valencia Ave 40th St 3-Way
22 Western Ave 16th St to Highland Ave Various
22.2 Wier Rd Harwick Dr
22.5 Wilson Street 9th St All Way
22.5 Wilson Street 11th St All Way
Harwick Dr Wier Rd All Way
13th St Sierra Way All Way
Hill Dr Mountain Dr All Way
Holly Vista Blvd Garrilee Dr One Way SB
Holly Vista Blvd Conejo Dr One Way SB
Holly Vista Blvd Garden Dr One Way SB
Esperanza St k St North IS-NB
Mountain View Ave 33rd St NB-SB
Mountain View Ave 36th St NB-SB
40th St Golden Ave East IS -EB-WB
46th St Genevieve St All Way
Valencia Ave Marshall Blvd All Way
Pine Ave Irvington Ave All Way
Packet Page. 808
Exhibit A
11th St J St One-Way NB
11th St Wall Ave All-Way
11th St Perris St One-Way SB
49th St E St ON-Way WB
Mountain Ave Marshall Blvd All_Way
28th St Turrill Ave One-Way SB
Macy St Lincoln Ave Two-Way EB-WB
Bobbett Dr Olive St One-Way WB
Packet Page. 809
Aj 10/26/2023
Packet Page. 810
Packet Page. 811
Packet Page. 812
Packet Page. 813
Packet Page. 814
Packet Page. 815
Packet Page. 816
Packet Page. 817
Packet Page. 818
Packet Page. 819
Packet Page. 820
Packet Page. 821
Packet Page. 822
Packet Page. 823
Packet Page. 824
Packet Page. 825
Packet Page. 826
Packet Page. 827
Packet Page. 828
Packet Page. 829
Packet Page. 830
Packet Page. 831
Packet Page. 832
Packet Page. 833
Packet Page. 834
Packet Page. 835
Packet Page. 836
Packet Page. 837
Packet Page. 838
Packet Page. 839
Packet Page. 840
Packet Page. 841
City of San Bernardino
POLICY
Stop sign may be warranted at an intersection where any of the following warrants A-1, A-2, B or C
are met
A-1 STATE WARRANTS FOR MULTI-WAY STOP CONTROL
Warrant is satisfied if any of the following criteria are met
A-1.1 Traffic signals are warranted and urgently needed, multi-way stop
need to be installed as interim measure until signal is installed
A-1.2 Five or more right angle and/or turning movement accidents in recent
12 months
A Combined vehicle volume on major street during any 8 hours
averages 300+ veh/hr
B
Combined vehicle and pedestrian volume on minor street during the
same 8 hours averages 200+ unit/hr, And Delay to minor street
vehicles during the maximum hour of the same 8 hours averages 30
sec/hr
A1.3:
All 3
conditions
listed to
the right
must be
met to
satisfy
warrant
A-1.3
C 85th percentile approach speed exceeds 40 mph (64 km/h), min.
vehicular volume warrant is 70% of the above requirements
A-1.4 Where no single criterion is satisfied, but where Criteria A-1.2, A-1.3A,
and A-1.3B are all satisfied to 80% of the minimum values
A-1.5
If visibility cannot otherwise be addressed, there is a need to control
vehicle-pedestrian conflicts (or bicycle) near high pedestrian/bicycle
generators, left-turn or right-angle conflicts, or the traffic operation of
an intersection of two residential streets of similar design and
operational characteristics would be improved with an All-way stop.
Intersection is
currently Stop
Controlled EB
,no stop
control
existing WB
at the N IS.
x
A-1: IS STATE WARRANT FOR MULTI-WAY STOP CONTROL SATISFIED?
A-2 STATE WARRANTS FOR TWO/ONE-WAY STOP CONTROL
Warrant is satisfied if any of the following criteria are met
A-2.1 On the less important road at its intersection with a main road where
accident history justifies the placement of Stop signs.
A-2.2 On a county road or city street with its intersection with a State
Highway.
A-2.3
At the intersection with two main highways. The highway traffic to
be stopped depends on the approach speeds, volumes and turning
movements.
A-2.4 On a street entering a legally established through highway or street.
A-2.5 On a minor street where the safe speed is less than 10 mph (16
km/h).
A-2.6 At an un-signalized intersection in a signalized area.
Packet Page. 842
A-2.7 At intersections where a combination of high speed, restricted view
and accident records indicates a need for control by the Stop sign.
A-2: IS STATE WARRANT FOR TWO/ONE-WAY STOP CONTROL SATISFIED?
Packet Page. 843
Packet Page. 844
B.PETITION WARRANTS FOR LOCAL RESIDENTIAL STREETS
BY CITY ADMINISTRATIVE POLICY
Use only at residential street intersections excluding arterials, collectors, local collectors,
where ADT do not exceed 2,500 Vehicles on each Intersecting Street
Warrant B is satisfied if B and any two of the criteria B-1 through B-12 are met
CRITERIA REQUIREMENTS
REMARK
S Y N
B.
Is there a petition signed by more than 60% of property
owners/residents located within 600 feet of proposed stop sign; AND
TWO OF THE FOLLOWING CRITERIA ARE MET.
B-1.School located within 600 feet of intersection and intersection is
on “suggested route to school”.
B-2.Streets leading to intersection do not intersect at right angles.
B-3.One or more streets leading to intersection is at a grade of more than
5%.
B-4.
Where one or more of the approaches, requiring the stop sign(s),
does not meet the required minimum sight distance, due to permanent
view obstruction or roadway geometry.
B-5.Intersection is abutting a park, major shopping center or other
high pedestrian use facility.
B-6.Pedestrian volume greater than 480 units/hr in any 8 hour period.
B-7.
The combined vehicular and pedestrian volume crossing the major
street exceeds 125 units during at least two hours where at least 200
vehicles enter the intersection each hour from all approaches during
any 8-hour period.
B-8.One approach of the intersection is a driveway serving a
commercial area.
B-9.One approach of the intersection is a driveway servicing a
residential property.
B-10.
Pass through (non-local traffic) on the subject residential street
exceeds 50 vehicles per hour and exceeds 40% of the vehicle traffic
during the hours from 7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:00
p.m. on a non-holiday Tuesday, Wednesday, or Thursday, with local
traffic defined as vehicles traversing/commuting through the
neighborhood.
B-11.The vehicle volume entering the intersection from all approaches
exceeds 600 units during any hour at an intersection.
B-12.
Less than desirable pedestrian or vehicular conditions not listed
above or contained in the criteria of the State of California for the
installation of Stop signs exist at the intersection (as
determined/verified by the City’s licensed Traffic Engineer).
B: IS B PLUS ANY TWO OF THE CRITERIA B-1 THROUGH B-12 SATISFIED?
Packet Page. 845
Packet Page. 846
C. ACCIDENTS AND SAFETY WARRANTS FOR LOCAL RESIDENTIAL STREETS
BY CITY ADMINISTRATIVE POLICY
Use Only at Residential Street Intersections Where ADT do not exceed 2,500 Vehicles on
each Intersecting Street
Warrant C is satisfied if C and any two conditions C-1 through C-10 are met
CRITERIA REQUIREMENTS REMARKS Y N
C.
Three or more accidents in a 12 month period susceptible to
correction by stop signs; or at least 200 vehicles enter the
intersection each hour from all approaches during any consecutive 8
hour period; AND TWO OF THE FOLLOWING CRITERIA ARE MET.
C-1.School located within 600 feet of intersection and intersection is
on “suggested route to school”.
C-2.Streets leading to intersection do not intersect at right angles.
C-3.One or more streets leading to intersection is at a grade of more than
5%.
C-4.
Where one or more of the approaches, requiring the stop sign(s),
does not meet the required minimum sight distance, due to permanent
view obstruction or roadway geometry.
C-5.Intersection is abutting a park, major shopping center or other
high pedestrian use facility.
C-6.Pedestrian volume is greater than 480 units/hr in the 8-hour period.
C-7.
The combined vehicular and pedestrian volume crossing the major
street exceeds 125 units during at least two hours where at least 200
vehicles enter the intersection each hour from all approaches during
any 8-hour period.
C-8.One approach of the intersection is a driveway serving a
commercial area.
C-9.One approach of the intersection is a driveway servicing a
residential property.
C-10.
Pass through (non-local traffic) on the subject residential street
exceeds 50 vehicles per hour and 40% of the vehicle traffic during the
hours from 7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:00 p.m. on a
non-holiday Tuesday, Wednesday, or Thursday, with local traffic
defined as vehicles traversing/commuting through the neighborhood.
C-11.The vehicle volume entering the intersection from all approaches
exceeds 600 units during any hour at an intersection.
C-12.
Less than desirable pedestrian or vehicular conditions not listed
above or contained in the criteria of the State of California for the
installation of stop signs exist at the intersection (as
determined/verified by the City’s licensed Traffic Engineer).
C: IS C PLUS ANY TWO CRITERIA C-1 THROUGH C-10 SATISFIED?
Packet Page. 847
DID THIS LOCATION MEET ANY OF THE WARRANTS A-1, A-2, B OR C ABOVE?
IF YES, CHECK WARRANTS MET
A-1 A-2 B C
IF ANY OF THE WARRANTS ARE MET, A STOP SIGN SHOULD BE INSTALLED AFTER APPROVAL BY MAYOR
AND COMMON COUNCIL AND THE INTERSETION IS DESIGNATED A “STOP INTERSECTION” BY THE MAYOR
AND COMMON COUNCIL.
Good traffic engineering judgment must be exercised before installing stop signs at certain intersections
(whether it meets the warrants or not)
X
Packet Page. 848
Packet Page. 849
2
4
7
0
CONSENT CALENDAR
January 21, 2026
Honorable Mayor and City Council Members
Lynn Merrill, Director of Public Works
Azzam Jabsheh, Deputy Director of Public Works/City Engineer
Public Works
It is recommended that the Mayor and City Council of the City of San Bernardino,
California;
1. Approve the award of a Construction Agreement with Toro Enterprises
Inc., in the amount of $2,489,475.40 for the Construction of a Raised
Median Island Along Kendall Drive Between H Street and E Street
Project; and
2. Authorize the construction contingencies, construction management, and
administrative costs in the total amount of $560,524.60 for the Project,
bringing the total Project budget to $3,050,000; and
3. Authorize the Interim Director of Finance and Management Services to
approve the reallocation of Measure I funds in the amount of
$1,135,945.42 from the Street Improvements (Rehabilitation) City Wide
at 50 Locations To Be Constructed in Phases Project (SS25-001) to fully
fund the Construction of a Raised Median Island Along Kendall Drive
Between H Street and E Street Project; and
4. Adopt Resolution No. 2026-004 amending the FY 2025-26 Capital
Improvement Program Budget to reallocate Measure I funds in the
amount of $1,135,945.42 from the Street Improvements (Rehabilitation)
City Wide at 50 Locations To Be Constructed in Phases Project (SS25-
Packet Page. 850
2
4
7
0
001) to fully fund the Construction of a Raised Median Island Along
Kendall Drive Between H Street and E Street Project.
5. Authorize the City Manager or designee to execute all documents with
Toro Enterprises Inc.; and
6. Authorize the City Manager or designee to expend the contingency fund,
if necessary, to complete the Project.
City Manager's Comments
No comments
Executive Summary
Awarding the construction contract for the Construction of a Raised Median Island
Along Kendall Drive between “H” Street and “E” Street will improve roadway
operations, accessibility and overall beautification of the corridor. The Project generally
consists of constructing a raised median island, upgrading street lighting to solar
fixtures and completing associated roadway improvements necessary to bring the
facility up to current standards.
Approval of this agreement will allow the City to issue a Notice to Proceed and begin
construction in accordance with the approved plans and specifications. The Project is
funded through Measure S and Gas Tax funds, including (1) $914,054.58 in Measure
S and $1,000,000.00 in Gas Tax previously approved as part of the adopted FY 2025-
26 Capital Improvement Program, and (2) $1,135,945.42 in Measure I funds proposed
for reallocation from the Street Improvements (Rehabilitation) City Wide at 50
Locations To Be Constructed in Phases Project (SS25-001), for a total Project budget
of $3,050,000.
Background
Kendall Drive is a major east–west arterial serving residential, commercial, and
institutional uses within Wards 4, 5, and 7. The segment of Kendall Drive between H
Street and E Street experiences high daily traffic volumes and functions as an
important corridor connecting surrounding neighborhoods and destinations.
The existing roadway configuration within the project limits does not include a
continuous raised median. The Project provides an opportunity to implement access
management improvements and corridor enhancements, including pavement
rehabilitation, storm drainage improvements, signing and striping, raised median
construction, and lighting upgrades along the project limits.
City staff developed the Construction of a Raised Median Island Along Kendall Drive
between H Street and E Street Project to implement access management and corridor
improvements along the project limits. The Project includes construction of a raised
median island, pavement rehabilitation, storm drainage improvements, signing and
striping and street lighting upgrades, including conversion to solar-powered fixtures to
Packet Page. 851
2
4
7
0
reduce vandalism-related impacts. Associated roadway improvements will be
Packet Page. 852
2
4
7
0
completed as necessary to support the median and lighting improvements.
Funding for the Project is provided through Measure S and Gas Tax funds as part of
the City’s adopted FY 2025-26 Capital Improvement Program. On June 4, 2025, the
Mayor and City Council approved Measure S and Gas Tax funding totaling
$1,914,054.58.
The Street Improvements (Rehabilitation) City Wide at 50 Locations To Be Constructed
in Phases Project (SS25-001) was also adopted as part of the FY 2025-26 Capital
Improvement Program, with a total approved budget of $20,034,080, consisting of
$10,000,000 in Measure S funds, $5,150,000 in Gas Tax funds, $3,800,000 in
Measure I funds and $1,084,080 in Road Maintenance and Rehabilitation Account
(RMRA) funds.
Staff recommends reallocating $1,135,945.42 of the approved $3,800,000 Measure I
funds from SS25-001 to fully fund the Kendall Drive Raised Median and Corridor
Improvements Project.
Discussion
The proposed Construction of a Raised Median Island Along Kendall Drive between H
Street and E Street Project was advertised for construction in accordance with City
purchasing requirements. The Project scope includes construction of a raised median
island, pavement rehabilitation, storm drainage improvements, signing and striping,
street lighting upgrades, and related incidental work necessary to complete the Project
in accordance with the approved plans and specifications.
The Project was publicly advertised for competitive bidding through PlanetBids on
November 17, 2025, and bids were opened on December 15, 2025. A total of nine (9)
sealed bids were received. The total base bid plus additive alternate prices are as
follows:
SN NAME OF BIDDER CITY TOTAL BID
1 Toro Enterprises, Inc.Oxnard $2,489,475.40
2 LCR Earthwork & Engineering, Corp.Jurupa Valley $2,567,212.55
3 Aneen Construction, Inc Riverside $2,655,629.32
4 Tryco General Engineering Rimforest $2,667,891.85
5 Vance Corporation Beaumont $3,032,485.32
6 KASA Construction, Inc.Chino $3,154,203.26
7 Hardy & Harper, Inc.Lake Forest $3,628,000.00
8 Roadway Engineering & Construction Corp.Perris $3,769,524.79
9 All American Asphalt Corona $3,998,205.55
After review, staff determined that Toro Enterprises, Inc., of Oxnard, California,
Packet Page. 853
2
4
7
0
submitted the lowest responsive and responsible bid in the amount of $2,489,475.40.
Staff have reviewed Toro Enterprises, Inc.’s bid documents, CSLB license, and DIR
registration, and confirmed that all requirements were met. Staff recommends
awarding the construction agreement to Toro Enterprises, Inc.
The total Project cost, including contingencies, construction management, quantity
variations, field adjustments, unforeseen work and administrative expenses, is
estimated at $3,050,000.
Project Cost
Lowest Bid $2,489,475.40
Contingency & Administrative Cost $560,524.60
Total Construction Cost $3,050,000.00
The improvements will enhance roadway operations, accessibility, and overall corridor
appearance along Kendall Drive, supporting the City’s ongoing efforts to maintain and
improve public infrastructure within the project area.
The Street Improvements (Rehabilitation) City Wide at 50 Locations To Be Constructed
in Phases Project (SS25-001) was established as a flexible, citywide pavement
rehabilitation program intended to address roadway segments based on pavement
condition and operational need. At the time of program adoption, specific street
locations were not pre-identified, as locations are selected and prioritized through the
City’s Pavement Management Program (PMP) using Pavement Condition Index (PCI)
data and available funding.
Pavement condition data from the City’s Pavement Management Program indicate that
the Kendall Drive corridor consists of multiple roadway segments with PCI values
ranging from approximately 18 to 47, which fall within the very poor to fair condition
categories. The Kendall Dr corridor exhibit PCI values below acceptable service
thresholds for a major arterial roadway, indicating that preventive maintenance alone
is no longer sufficient and that rehabilitation is warranted. Based on these PCI
conditions, the Kendall Drive roadway segments would have been prioritized for
inclusion in future pavement rehabilitation projects. The approximately $20 million
allocation approved by the Mayor and City Council on June 4, 2025 as part of the FY
2025-26 Capital Improvement Program (SS25-001) would have included this segment
of the roadway regardless, due to its documented condition and need for rehabilitation.
Staff is recommending the reallocating $1,135,945.42 in Measure I funds from the
$3,800,000.00 adopted for SS25-001 to fully fund this Project. Final location selection
and construction phasing under SS25-001 will continue to be guided by PCI conditions
identified through the PMP, available funding, and operational priorities.
Staff further recommends prioritizing the Kendall Drive Raised Median and Corridor
Improvements Project due to its direct corridor-level operational benefits on a major
arterial serving Wards 4, 5, and 7. A significant portion of the project scope consists of
Packet Page. 854
2
4
7
0
pavement rehabilitation, and the observed PCI conditions along Kendall Drive support
near-term rehabilitation. Treating Kendall Drive as a corridor-level improvement allows
the City to efficiently address multiple deteriorated pavement segments and is
consistent with the objectives of SS25-001 and the City’s overall pavement
management and rehabilitation strategy. Reallocating funds at this time allows the City
to deliver a complete, buildable corridor improvement package within the current fiscal
year.
Budget
Measure S $914,054.58
Gas Tax $1,000,000.00
Measure I (Reallocated from SS25-001)$1,135,945.42
Project Total Cost $3,050,000.00
Environmental Impact
The Project is categorically exempt from the California Environmental Quality Act
(“CEQA”) pursuant to State CEQA Guidelines Section 15302, Replacement or
Reconstruction (“Class 2”). The Class 2 exemptions allow for the replacement or
reconstruction of existing structures or facilities where the new structure will be
located on the same site as the structure replaced and will have substantially the
same purpose and capacity as the structure replaced. Here, the Project involves
minor improvements and reconstructing of the median located on the same site.
The City has also considered whether the proposed Project is subject to any
exception to the Class 2 exemption, as set forth in State CEQA Guidelines section
15300.2. No exception applies for the following reasons:
a) The location exception only applies to Class 3, 4, 5, 6, and 11
exemptions, none of which are being utilized here.
b) The proposed Project would not result in any significant
cumulative impacts on the environment. The cumulative impacts
exception does not apply because the Project has no
incrementally significant impacts on the environment.
c) A categorical exemption may be subject to an exception where
there is a reasonable possibility that the activity will have a
significant effect on the environment due to unusual
circumstances. The proposed Project does not involve any
unusual circumstances and has no potential to result in a
significant impact on the environment.
d) Under the “scenic highways” exception, a categorical exemption
may be subject to an exception where the Project may result in
damage to scenic resources within a highway officially
designated as a state scenic highway. The exception does not
apply here as the Project would not damage any scenic
resources within a state scenic highway.
e) The Project is not located on a site which is included on any list
Packet Page. 855
2
4
7
0
compiled pursuant to Section 65962.5 of the Government Code.
f) The Project site does not contain a historical resource.
2021-2025 Strategic Targets and Goals
Authorizing this agreement aligns with Key Target No. 3: Improved Quality of Life.
Completion of the Construction of a Raised Median Island Along Kendall Drive
between H Street and E Street Project will enhance roadway operations, accessibility,
and overall corridor appearance. The Project supports the City’s goal of maintaining
and improving public infrastructure that contributes to efficient transportation corridors
and well-maintained community environments.
Fiscal Impact
The total Project cost is $3,050,000. Funding for the Project consists of the following
sources:
Measure S funds in the amount of $914,054.58, previously approved as part of
the adopted FY 2025-26 Capital Improvement Program;
Gas Tax funds in the amount of $1,000,000.00.
Measure I funds in the amount of $1,135,945.42, proposed for reallocation from
the Street Improvements (Rehabilitation) City Wide at 50 Locations To Be
Constructed in Phases Project (SS25-001), which was adopted by the Mayor
and City Council as part of the FY 2025-26 Capital Improvement Program on
June 4, 2025; and
Sufficient funds are available within the adopted FY 2025-26 Capital Improvement
Program budget. The proposed Measure I reallocation represents a transfer between
adopted CIP projects within the same fiscal year, and will allow the City to utilize
available Measure I funding within the current fiscal year, and will not require additional
budget appropriations.
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino,
California;
1. Approve the award of a Construction Agreement with Toro Enterprises
Inc., in the amount of $2,489,475.40 for the Construction of a Raised
Median Island Along Kendall Drive Between H Street and E Street
Project; and
2. Authorize the construction contingencies, construction management, and
administrative costs in the total amount of $560,524.60 for the Project,
bringing the total Project budget to $3,050,000; and
3. Authorize the Interim Director of Finance and Management Services to
approve the reallocation of Measure I funds in the amount of
$1,135,945.42 from the Street Improvements (Rehabilitation) City Wide
Packet Page. 856
2
4
7
0
at 50 Locations To Be Constructed in Phases Project (SS25-001) to fully
fund the Construction of a Raised Median Island Along Kendall Drive
Between H Street and E Street Project; and
4. Adopt Resolution No. 2026-004 amending the FY 2025-26 Capital
Improvement Program Budget to reallocate Measure I funds in the
amount of $1,135,945.42 from the Street Improvements (Rehabilitation)
City Wide at 50 Locations To Be Constructed in Phases Project (SS25-
001) to fully fund the Construction of a Raised Median Island Along
Kendall Drive Between H Street and E Street Project.
5. Authorize the City Manager or designee to execute all documents with
Toro Enterprises Inc.; and
6. Authorize the City Manager or designee to expend the contingency fund,
if necessary, to complete the Project.
Attachments
Attachment 1 Agreement with Toro Enterprises, Inc.
Attachment 2 Bid Tabulation
Attachment 3 Bid Proposal
Attachment 4 Location Map
Attachment 5 Resolution No. 2026-004
Ward:
Ward 4,5 & 7
Synopsis of Previous Council Actions:
June 04, 2025, FY 2025/2026 Budget Presentation (All Wards)
CC: Eric Levitt, City Manager
Packet Page. 857
00 52 13 – CONTRACT FOR CONSTRUCTION
This Contract for Construction (“Contract”), Construction Of A Raised Median Island Along
Kendall Drive, Between “H” Street And “E” Street, Cip No. SS22-004, Contract -
Specification No. 13575 is made and entered into this 21st day of January, 2026 by and
between the CITY OF SAN BERNARDINO , with its principal place of business at Vanir Tower,
290 North D Street, San Bernardino, California 92401, sometimes hereinafter called the “City”
and Toro Enterprises, Inc., sometimes hereinafter called “Contractor.”
WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these
presents do covenant and agree with each other as follows:
ARTICLE 1. SCOPE OF WORK.
The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide
all labor, materials, equipment, tools, utility services, and transportation to complete all of the
Work required in strict compliance with the Contract Documents as specified in Article 5, below,
for the following Project:
Construction Of A Raised Median Island Along Kendall Drive, Between “H” Street And
“E” Street, Cip No. SS22-004, Contract - Specification No. 13575
Contractor is an independent contractor and not an agent of the City. The Contractor and its
surety shall be liable to the City for any damages arising as a result of the Contractor’s failure to
comply with this obligation.
ARTICLE 2. TIME FOR COMPLETION.
Time is of the essence in the performance of the Work. The Work shall be commenced on the
date stated in the City’s Notice to Proceed. The Contractor shall complete all Work required by
the Contract Documents within 180 calendar days from the commencement date stated in the
Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set forth
above is adequate and reasonable to complete the Work.
ARTICLE 3. CONTRACT PRICE.
The City shall pay to the Contractor as full compensation for the performance of the Contract,
subject to any additions or deductions as provided in the Contract Documents, and including all
applicable taxes and costs, the sum of Two Million Four Hundred Eighty-Nine Thousand Four
Hundred Seventy-Five Dollars And Forty Cents. Dollars ($2,489,475.40). Payment shall be
made as set forth in the General Conditions. The City will pay to Contractor compensation based
upon the prices set forth in the Bid Schedule.
ARTICLE 4. LIQUIDATED DAMAGES.
Contractor acknowledges that the City will sustain actual damages for each and every Day
completion of the Project is delayed beyond the Contract Time. Because of the nature of the
Project, it would be impracticable or extremely difficult to determine the City’s actual damages.
Accordingly, in accordance with Government Code section 53069.85, it is agreed that the
Contractor will pay the City the sum of $1,500 for each and every calendar day of delay beyond
Packet Page. 858
the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages
and not as a penalty or forfeiture. In the event this is not paid, the Contractor agrees the City may
deduct that amount from any money due or that may become due the Contractor under the
Contract. This Section does not exclude recovery of other damages specified in the Contract
Documents. Liquidated damages may be deducted from progress payments due Contractor,
Project retention or may be collected directly from Contractor, or from Contractor's surety. These
provisions for liquidated damages shall not prevent the City, in case of Contractor's default, from
terminating the Contractor.
ARTICLE 5. COMPONENT PARTS OF THE CONTRACT.
The “Contract Documents” include the following:
Notice Inviting Bids
Instructions to Bidders
Bid Forms
Bid Acknowledgement
Bid Schedule
Bid Guarantee
Designation of Subcontractors
Information Required of Bidders
Non-Collusion Declaration Form
Iran Contracting Act Certification
Public Works Contractor DIR Registration Certification
Performance Bond
Payment (Labor and Materials) Bond
Contract for Construction
General Conditions
Special Conditions
Specifications
Addenda
Appendices
Construction Plans and Drawings
Standard Specifications for Public Works Construction “Greenbook”, latest edition,
Except sections 1-9
Applicable Local Agency Standards and Specifications, as last revised
Reference Specifications
Approved and fully executed Change Orders
Permits
Any other documents contained in or incorporated into the Contract
The Contractor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the
Contract Documents and not by others shall be done as if required by all. In the event of conflict,
the various Contract Documents will be given effect in the order set forth in the General
Conditions. This Contract shall supersede any prior agreement of the parties.
Packet Page. 859
ARTICLE 6. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE.
Each and every provision of law required to be included in these Contract Documents shall be
deemed to be included in these Contract Documents. The Contractor shall comply with all
requirements of applicable federal, state and local laws, rules and regulations, including, but not
limited to, the provisions of the California Labor Code and California Public Contract Code which
are applicable to this Work.
ARTICLE 7. INDEMNIFICATION.
Contractor shall provide indemnification and defense as set forth in the General Conditions.
ARTICLE 8. PREVAILING WAGES.
Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor
Code which such rates shall be made available at the City’s Office or may be obtained online at
http://www.dir.ca.gov and which must be posted at the job site.
ARTICLE 9. FALSE CLAIMS.
Contractor acknowledges that if a false claim is submitted to the City, it may be considered fraud
and Contractor may be subject to criminal prosecution. Contractor acknowledges that the False
Claims Act, California Government Code sections 12650, et seq., provides for civil penalties
where a person knowingly submits a false claim to a public entity. These provisions include within
their scope false claims made with deliberate ignorance of the false information or in reckless
disregard of the truth or falsity of the information. In the event the City seeks to recover penalties
pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorneys’
fees. Contractor hereby acknowledges that the filing of a false claim may the Contractor to an
administrative debarment proceeding wherein Contractor may be prevented from further bidding
on public contracts for a period of up to five (5) years.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
Packet Page. 860
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on
the day and year above written.
By:
Eric Levitt
City Manager
ATTEST:
By:
Telicia Lopez, City Clerk
APPROVED AS TO FORM:
By:
Best Best & Krieger LLP
City Attorney
Toro Enterprises, Inc.
By:
Its:
Printed Name:
By:
Its:
Printed Name:
____________________________________
Contractor’s License Number and
Classification
____________________________________
DIR Registration Number
(CONTRACTOR’S SIGNATURE MUST BE
NOTARIZED AND CORPORATE
SEAL AFFIXED, IF APPLICABLE)
END OF CONTRACT
Packet Page. 861
Notary Acknowledgment
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Name Of Person(s) Or Entity(ies)
Packet Page. 862
REQUIREMENTS
ACKNOWLEDGEMENT OF INSURANCE REQUIREMENTS
VENDOR NAME: PHONE:
ADDRESS:
The Proposer shall demonstrate the willingness and ability to provide the required insurance
coverage as set forth in the City requirements within ten (10) calendar days of notification of
selection for contract award. The insurance requirements are detailed below:
MINIMUM INSURANCE REQUIREMENTS
RFQ F-25-4056 CONSTRUCTION OF A RAISED MEDIAN ISLAND ALONG KENDALL
DRIVE BETWEEN H STREET AND E STREET, PROJECT NO. 8825, CIP NO. SS22-004,
CONTRACT/SPECIFICATION NO. 13575
Commercial General Liability $2,000,000 per occurrence/$4,000,000
aggregate
and property damage
aggregate
By signing below, the Proposer acknowledges that they have reviewed the City’s insurance
requirements and confirm their ability to meet these requirements within the specified timeframe.
SUBMITTED BY: DATE: ___________________
(Authorized Representative Signature)
PRINT NAME: TITLE: ___________________
Packet Page. 863
00 61 13 – BOND FORMS
Performance Bond
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, the CITY OF SAN BERNARDINO , with its principal place of business at Vanir
Tower, 290 North D Street, San Bernardino, California 92401, (hereinafter referred to as the
“City”) has awarded to _________________________, (hereinafter referred to as the
“Contractor”) an agreement for Contract No._________, (hereinafter referred to as the “Project”).
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the
Contract Documents for the Project dated ________________, (hereinafter referred to as
“Contract Documents”), the terms and conditions of which are expressly incorporated herein by
reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof
and to furnish a bond for the faithful performance of said Contract Documents.
NOW, THEREFORE, we, ______________________, the undersigned Contractor and
________________________________________________ as Surety, a corporation organized
and duly authorized to transact business under the laws of the State of California, are held and
firmly bound unto the City in the sum of ___________________________ DOLLARS,
($____________), said sum being not less than one hundred percent (100%) of the total amount
of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs,
executors and administrators, successors and assigns, jointly and severally, firmly by these
presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs,
executors, administrators, successors or assigns, shall in all things stand to and abide by, and
well and truly keep and perform the covenants, conditions and agreements in the Contract
Documents and any alteration thereof made as therein provided, on its part, to be kept and
performed at the time and in the manner therein specified, and in all respects according to their
intent and meaning; and shall faithfully fulfill all obligations including the one (1) year guarantee
of all materials and workmanship; and shall indemnify and save harmless the City, its officials,
officers, employees, and authorized volunteers, as stipulated in said Contract Documents, then
this obligation shall become null and void; otherwise it shall be and remain in full force and effect.
As a part of the obligation secured hereby and in addition to the face amount specified therefore,
there shall be included costs and reasonable expenses and fees including reasonable attorney’s
fees, incurred by the City in enforcing such obligation.
As a condition precedent to the satisfactory completion of the Contract Documents, unless
otherwise provided for in the Contract Documents, the above obligation shall hold good for a
period of one (1) year after the acceptance of the work by the City, during which time if Contractor
shall fail to make full, complete, and satisfactory repair and replacements and totally protect the
City from loss or damage resulting from or caused by defective materials or faulty workmanship.
The obligations of Surety hereunder shall continue so long as any obligation of Contractor
remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations under
Packet Page. 864
the Contract, law or equity, including, but not limited to, California Code of Civil Procedure Section
337.15.
Whenever Contractor shall be, and is declared by the City to be, in default under the Contract
Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall
promptly, at the City’s option:
i. Take over and complete the Project in accordance with all terms and conditions in
the Contract Documents; or
ii. Obtain a bid or bids for completing the Project in accordance with all terms and
conditions in the Contract Documents and upon determination by Surety of the
lowest responsive and responsible bidder, arrange for a Contract between such
bidder, the Surety and the City, and make available as work progresses sufficient
funds to pay the cost of completion of the Project, less the balance of the contract
price, including other costs and damages for which Surety may be liable. The term
“balance of the contract price” as used in this paragraph shall mean the total
amount payable to Contractor by the City under the Contract and any modification
thereto, less any amount previously paid by the City to the Contractor and any
other set offs pursuant to the Contract Documents.
iii. Permit the City to complete the Project in any manner consistent with California
law and make available as work progresses sufficient funds to pay the cost of
completion of the Project, less the balance of the contract price, including other
costs and damages for which Surety may be liable. The term “balance of the
contract price” as used in this paragraph shall mean the total amount payable to
Contractor by the City under the Contract and any modification thereto, less any
amount previously paid by the City to the Contractor and any other set offs
pursuant to the Contract Documents.
Surety expressly agrees that the City may reject any contractor or subcontractor which may be
proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.
Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from
Contractor for completion of the Project if the City, when declaring the Contractor in default,
notifies Surety of the City’s objection to Contractor’s further participation in the completion of the
Project.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract Documents or to the Project to be performed
thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice
of any such change, extension of time, alteration or addition to the terms of the Contract
Documents or to the Project.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
Packet Page. 865
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of
______________, 20___.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
The rate of premium on this bond is ____________ per thousand. The total amount of premium
charges is $_______________________________.
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________
___________________________________________
___________________________________________
(Name and Address of Agent or ___________________________________________
Representative for service of ___________________________________________
process in California, if different ___________________________________________
from above)
(Telephone number of Surety ___________________________________________
and Agent or Representative for
service of process in California)
Packet Page. 866
Notary Acknowledgment
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Name Of Person(s) Or Entity(ies)
NOTE: This acknowledgment is to be completed for Contractor/Principal.
Packet Page. 867
Notary Acknowledgment
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Name Of Person(s) Or Entity(ies)
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of Attorney to
local representatives of the bonding company must also be attached.
END OF PERFORMANCE BOND
Packet Page. 868
Payment Bond (Labor and Materials).
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the CITY OF SAN BERNARDINO , with its principal place of business at Vanir
Tower, 290 North D Street, San Bernardino, California 92401 (hereinafter designated as the
“City”), by action taken or a resolution passed ___________________ , 20_____, has awarded
to ________________________ hereinafter designated as the “Principal,” a contract for the
work described as follows: Contract No.____________ (the “Project”); and
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the
Contract Documents for the Project dated ________________, (hereinafter referred to as
“Contract Documents”), the terms and conditions of which are expressly incorporated herein by
reference; and
WHEREAS, said Principal is required to furnish a bond in connection with said contract;
providing that if said Principal or any of its Subcontractors shall fail to pay for any materials,
provisions, provender, equipment, or other supplies used in, upon, for or about the performance
of the work contracted to be done, or for any work or labor done thereon of any kind, or for
amounts due under the Unemployment Insurance Code or for any amounts required to be
deducted, withheld, and paid over to the Employment Development Department from the wages
of employees of said Principal and its Subcontractors with respect to such work or labor the
Surety on this bond will pay for the same to the extent hereinafter set forth.
NOW THEREFORE, we, the Principal and __________________________ as Surety, are held
and firmly bound unto the City in the penal sum of ______________ Dollars ($___________)
lawful money of the United States of America, for the payment of which sum well and truly to be
made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its
subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of
the persons named in Civil Code Section 9100, fail to pay for any materials, provisions or other
supplies, used in, upon, for or about the performance of the work contracted to be done, or for
any work or labor thereon of any kind, or amounts due under the Unemployment Insurance
Code with respect to work or labor performed under the contract, or for any amounts required to
be deducted, withheld, and paid over to the Employment Development Department or Franchise
Tax Board from the wages of employees of the contractor and his subcontractors pursuant to
Revenue and Taxation Code Section 18663, with respect to such work and labor the Surety or
Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and
also, in case suit is brought upon this bond, all litigation expenses incurred by the City in such
suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation
expenses.
This bond shall inure to the benefit of any of the persons named in Civil Code Section 9100 so
as to give a right of action to such persons or their assigns in any suit brought upon this bond.
It is further stipulated and agreed that the Surety on this bond shall not be exonerated or
released from the obligation of this bond by any change, extension of time for performance,
addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement
Packet Page. 869
pertaining or relating to any scheme or work of improvement herein above described, or
pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any
change or modification of any terms of payment or extension of the time for any payment
pertaining or relating to any scheme or work of improvement herein above described, nor by any
rescission or attempted rescission or attempted rescission of the contract, agreement or bond,
nor by any conditions precedent or subsequent in the bond attempting to limit the right of
recovery of claimants otherwise entitled to recover under any such contract or agreement or
under the bond, nor by any fraud practiced by any person other than the claimant seeking to
recover on the bond and that this bond be construed most strongly against the Surety and in
favor of all persons for whose benefit such bond is given, and under no circumstances shall
Surety be released from liability to those for whose benefit such bond has been given, by
reason of any breach of contract between the owner or the City and original contractor or on the
part of any obligee named in such bond, but the sole conditions of recovery shall be that
claimant is a person described in Civil Code Section 9100, and has not been paid the full
amount of his claim.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract to be performed thereunder, shall in any way
affect its obligations on this bond, and it does hereby waive notice of any such change,
extension of time, alteration or addition to the terms of Contract, including but not limited to, the
provisions of Sections 2819 and 2845 of the California Civil Code.
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of
______________, 20__.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
Packet Page. 870
Notary Acknowledgment
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Name Of Person(s) Or Entity(ies)
NOTE: This acknowledgment is to be completed for Contractor/Principal.
Packet Page. 871
Notary Acknowledgment
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Name Of Person(s) Or Entity(ies)
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to local
representatives of the bonding company must also be attached.
END OF PAYMENT BOND
Packet Page. 872
00 72 00 – GENERAL CONDITIONS
ARTICLE 1 -TERMS; DEFINITIONS
1.1 Defined Terms
A. Whenever used in the Contract Documents and printed with initial capital letters, the
terms listed below will have the meanings indicated which are applicable to both the
singular and plural thereof. In addition to terms specifically defined below, terms with
initial capital letters in the Contract Documents include references to identified
articles and paragraphs, and the titles of other documents or forms.
1. Act of God – An earthquake of magnitude of 3.5 or higher on the Richter scale or
a tidal wave.
2. Addenda -- Written or graphic instruments issued prior to the submission of Bids
which clarify, correct, or change the Contract Documents.
3. Additional Work -- New or unforeseen work will be classified as “Additional Work”
when the Engineer determines that it is not covered by the Contract.
4. Applicable Laws -- The laws, statutes, ordinances, rules, codes, regulations,
permits, and licenses of any kind, issued by local, state or federal governmental
authorities or private authorities with jurisdiction (including utilities), to the extent
they apply to the Work.
5. Bid -- The offer or proposal of a Bidder submitted on the prescribed form setting
forth the prices and other terms for the Work to be performed.
6. Bid Guarantee -- The Bid Bond, cashier’s check, or certified check to be made by
the Bidder, which is to accompany the Bid as a guaranty of good faith to enter into
a written contract.
7. Bidder -- The individual or entity who submits a Bid directly to the City.
8. Change Order (“CO”) -- A document that authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Times,
issued on or after the Effective Date of the Contract, in accordance with the
Contract Documents and in the form contained in the Contract Documents.
9. Change Order Request (“COR”) -- A request made by the Contractor for an
adjustment in the Contract Price and/or Contract Times as the result of a
Contractor-claimed change to the Work. This term may also be referred to as a
Change Order Proposal (“COP”), or Request for Change (“RFC”).
10. City’s Representative – The City Engineer, and acting through properly authorized
agents, such as the Engineer or such other agents acting within the scope of the
particular duties entrusted to them. Also sometimes referred to as the “City’s
Representative” or “Representative” in the Contract Documents. The terms the
City and Owner may be used interchangeably
Packet Page. 873
11. Claim -- A demand or assertion by the City or Contractor seeking an adjustment of
Contract Price or Contract Times, or both, or other relief with respect to the terms
of the Contract. A demand for money or services by a third party is not a Claim.
12. Contract -- The entire integrated written agreement between the City and
Contractor concerning the Work. “Contract” may be used interchangeably with
“Agreement” in the Contract Documents. The Contract supersedes prior
negotiations, representations, or agreements, whether written or oral, and includes
all Contract Documents.
13. Contract Documents -- The documents listed in Section 00 52 13, Article 5 of the
Contract for Construction. Some documents provided by the City to the Bidders
and Contractor, including but not limited to reports and drawings of subsurface and
physical conditions are not Contract Documents.
14. Contract Price -- Amount to be paid by the City to the Contractor as full
compensation for the performance of the Contract and completion of the Work,
subject to any additions or deductions as provided in the Contract Documents, and
including all applicable taxes and costs.
15. Contract Time -- The number of days or the dates stated in the Contract
Documents to: achieve defined milestones, if any; and to complete the Work so
that it is ready for final payment.
16. Contractor -- The individual or entity with which the City has contracted for
performance of the Work.
17. Contractor’s Designated On-Site Representative -- The Contractor’s Designated
On-Site Representative will be identified by the Contractor and shall not be
changed without prior written consent of the City.
18. Critical Supply Shortage -- An unusual shortage in materials that is (a) supported
by documented proof that Contractor made every effort to obtain such materials
from all available sources; (b) such shortage is due to the fact that such materials
are not physically available from single or multiple sources or could have been
obtained only at exorbitant prices entirely inconsistent with current and standard
rates taking into account the quantities involved and the usual industry practices
in obtaining such quantities; and (c) such shortages and the difficulties in obtaining
alternate sources of materials could not have been known or anticipated by
Contractor at the time it submitted its bid or entered the Contract. Market
fluctuations in prices of materials, whether or not resulting from a Force Majeure
Event, does not constitute a Critical Supply Shortage.
19. Daily Rate -- The Daily Rate stipulated in the Contract Documents as full
compensation to the Contractor due to the City’s unreasonable delay to the Project
that was not contemplated by the parties.
20. Day -- A calendar day of 24 hours measured from midnight to the next midnight.
21. Defective Work -- Work that is unsatisfactory, faulty, or deficient; or that does not
conform to the Contract Documents; or that does not meet the requirements of any
Packet Page. 874
inspection, reference standard, test, or approval referenced in the Contract
Documents.
22. Demobilization -- The complete dismantling and removal by the Contractor of all
of the Contractor’s temporary facilities, equipment, and personnel at the Site.
23. Drawings -- That part of the Contract Documents prepared by of the Engineer of
Record which graphically shows the scope, extent, and character of the Work to
be performed by Contractor. Shop Drawings and other Contractor Submittals are
not Drawings as so defined.
24. Effective Date of the Contract -- The date indicated in the Contract on which it
becomes effective, but if no such date is indicated, it means the date on which the
Contract is signed and delivered by the last of the two parties to sign and deliver.
25. Engineer -- Whenever not qualified, shall mean the City Engineer or the Engineer
authorized to act for and in behalf of the City, acting either directly or through
properly authorized agents, such agents acting severally within the scope of the
particular duties entrusted to them.
26. Force Majeure Event -- An event that materially affects a party’s performance and
is one or more of the following: (1) Acts of God or other natural disasters occurring
at the Site; (2) terrorism or other acts of a public enemy; (3) orders of governmental
authorities (including, without limitation, unreasonable and unforeseeable delay in
the issuance of permits or approvals by governmental authorities that are required
for the Work); (4) pandemics, epidemics or quarantine restrictions; (5) strikes and
other organized labor action occurring at the Site and the effects thereof on the
Work, only to the extent such strikes and other organized labor action are beyond
the control of Contractor and its Subcontractors, of every Tier, and to the extent
the effects thereof cannot be avoided by use of replacement workers; and (6) a
Critical Supply Shortage. For purposes of this section, “orders of governmental
authorities,” includes ordinances, emergency proclamations and orders, rules to
protect the public health, welfare and safety, and other actions of the City in its
capacity as a municipal authority.
27. Hazardous Waste -- The term “Hazardous Waste” shall have the meaning provided
in Section 104 of the Solid Waste Disposal Act (42 U.S.C. § 6903) as amended
from time to time, or any substance or material identified as hazardous under any
state or federal statute governing handling, disposal and/or cleanup of any such
substance or material, whichever is more restrictive.
28. Holiday – Holidays occur on:
New Year’s Day - January 1
Martin Luther King Jr Day – January 20
President’s Day – Third Monday in February
Memorial Day - Last Monday in May
Juneteenth – June 19
Independence Day - July 4
Labor Day - First Monday in September
Packet Page. 875
Veteran’s Day - November 11
Thanksgiving Day - Fourth Thursday in November
Friday after Thanksgiving
Christmas Eve – December 24
Christmas Day - December 25
Day After Christmas – December 26
New Year’s Eve – December 31
If any Holiday listed above falls on a Saturday, Saturday and the preceding Friday are
both Holidays. If the Holiday should fall on a Sunday, Sunday and the following Monday
are both Holidays.
29. Notice of Award -- The written notice by the City to the Successful Bidder stating
that upon timely compliance by the Successful Bidder with the conditions
precedent listed therein, the City will sign and deliver the Contract.
30. Notice of Completion -- The form which may be executed by the City constituting
final acceptance of the Project.
31. Notice to Proceed -- A written notice given by the City to Contractor fixing the date
on which the Contractor may proceed with the Work and when Contract Times will
commence to run.
32. Project -- The total construction of which the Work to be performed under the
Contract Documents may be the whole, or a part.
33. Record Drawings – The record set of as-builts prepared by the Contractor during
the Work in accordance with the requirements of the General Conditions.
34. Recyclable Waste Materials -- Materials removed from the Site which are required
to be diverted to a recycling center rather than an area landfill. Recyclable Waste
Materials include, but are not limited to, asphalt, concrete, brick, concrete block,
and rock.
35. Sample -- A physical example furnished by the Contractor to illustrate materials,
equipment or workmanship; to establish standards by which the Work will be
judged.
36. Schedule of Submittals -- A schedule, prepared and maintained by Contractor, of
required submittals and the time requirements to facilitate scheduled performance
of related construction activities.
37. Shop Drawings -- All drawings, diagrams, illustrations, schedules, and other data
or information which are specifically prepared or assembled by or for Contractor
and submitted by Contractor to illustrate some portion of the Work.
38. Site -- Lands or areas indicated in the Contract Documents as being furnished by
the City upon which the Work is to be performed, including rights-of-way and
easements for access thereto, and such other lands furnished by the City which
are designated for the use of Contractor.
Packet Page. 876
39. Specifications -- That part of the Contract Documents consisting of written
requirements for materials, equipment, systems, standards and workmanship as
applied to the Work, and certain administrative requirements and procedural
matters applicable thereto.
40. Stop Payment Notice -- A written notice as defined in Civil Code section 8044.
41. Subcontractor -- An individual or entity other than a Contractor having a contract
with any other entity than the City for performance of any portion of the Work at
the Site.
42. Submittal -- Written and graphic information and physical samples prepared and
supplied by the Contractor demonstrating various portions of the Work.
43. Successful Bidder -- The responsible Bidder submitting a responsive Bid to whom
the City makes an award.
44. Supplier -- A manufacturer, fabricator, supplier, distributor, material man, or vendor
having a direct contract with Contractor or with any Subcontractor to furnish
materials or equipment used in the performance of the Work or to be incorporated
in the Work.
45. Underground Facilities -- All underground pipelines, conduits, ducts, cables, wires,
manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any
encasements containing such facilities, including those that convey electricity,
gases, steam, liquid petroleum products, telephone or other communications,
cable television, water, wastewater, storm water, other liquids or chemicals, or
traffic or other control systems.
46. Unit Price Work -- Work to be paid for on the basis of unit prices as provided by
the Contractor in its Bid or as adjusted in accordance with the Contract Documents.
47. Warranty -- A guarantee provided to the City by the Contractor that the Work will
remain free of defects and suitable for its intended use for the period required by
the Contract Documents or the longest period permitted by the law of this state,
whichever is longer.
48. Work -- The entire construction or the various separately identifiable parts thereof
required to be provided under the Contract Documents. Work includes and is the
result of performing or providing all labor, services, and documentation necessary
to produce such construction, and furnishing, installing, and incorporating all
materials and equipment into such construction, all as required by the Contract
Documents.
1.2 Terminology.
A. The words and terms below are not defined but, when used in the Contract
Documents, have the indicated meaning.
1. The word “furnish,” when used in connection with services, materials, or
equipment, shall mean to supply and deliver said services, materials, or equipment
Packet Page. 877
to the Site (or some other specified location) ready for use or installation and in
usable or operable condition.
2. The word “install,” when used in connection with services, materials, or equipment,
shall mean to put into use or place in final position said services, materials, or
equipment complete and ready for intended use.
3. The words “perform” or “provide,” when used in connection with services,
materials, or equipment, shall mean to furnish and install said services, materials,
or equipment complete and ready for intended use.
4. Regardless of whether “furnish,” “install,” “perform,” or “provide” is used in
connection with services, materials, or equipment, an obligation of Contractor is
implied.
5. The word “work” that which is proposed to be constructed or done under the
Contract or permit, including the furnishing of all labor, materials, equipment, and
services.
B. Unless stated otherwise in the Contract Documents, words or phrases that have a
well-known technical or construction industry or trade meaning are used in the
Contract Documents in accordance with such recognized meaning.
ARTICLE 2 -PRELIMINARY MATTERS
2.1 Delivery of Contract Documents
A. Within ten (10) Days after receipt of the Notice of Award and before the City will
execute the Contract, the Contractor shall furnish and file with the City a signed
Contract and the necessary Performance Bond, Payment Bond, and Certificates of
Insurance and Endorsements, as well as any other documents specified in the
Contract Documents.
2.2 Bonds
A. Contractor shall submit the bonds on the forms provided with the Contract
Documents, duly executed by a responsible corporate surety admitted to transact
surety business in the State of California, as defined in Code of Civil Procedure
section 995.120, and listed in the United States Department of the Treasury circular
entitled "Companies Holding Certificates of Authority as Acceptable Sureties on
Federal Bonds and as Acceptable Reinsuring Companies," authorized to do
business in the State of California and acceptable to the City conditioned upon the
faithful performance by the Contractor of all requirements of the Contract
Documents. Each of the bonds shall be in a sum no less than one hundred percent
(100%) of the Contract Price. Bonds shall be delivered to the City within ten (10)
Days after receipt of the Notice of Award and before execution of the Contract by
the City.
Packet Page. 878
2.3 Evidence of Insurance
A. Prior to commencing any Work but no later than ten (10) Days after receipt of the
Notice of Award, the Contractor shall submit or cause to be submitted any and all
Certificates of Insurance and Endorsements, showing that the Contractor has the
required insurance, to the attention of the City. Such insurance is to be provided at
the sole cost and expense of the Contractor. No Work shall be performed until all of
the required insurance has been received and approved.
2.4 Execution of the Contract
A. Upon receipt of the required Contract Documents, the City will execute the Contract,
establishing the Effective Date of the Contract.
2.5 Contractor’s Failure to Perform
A. Should Contractor fail to comply with timelines provided above, the City shall retain
the right to enforce and collect on the Contractor’s Bid Guarantee, rescind award to
the Contractor and award the Contract to the next lowest responsive, responsible
bidder as determined by the City. If the City elects to accept bonds and insurance
submitted late, the Contract Times will begin to run as of the date stated in the Notice
to Proceed. However, the number of days beyond the original ten (10) Days it took
to receive the properly executed Contract and related items may be deducted from
the Contract Times.
2.6 Commencement of Contract Times; Notice to Proceed
A. The City will not issue a Notice to Proceed until after the Effective Date of the Contract.
Work shall commence within ten (10) Days of the date stated in the Notice to Proceed.
The Contract Times begin to run on the date specified in the Notice to Proceed. No
Work shall be done at the Site prior to the issuance of the Notice to Proceed.
2.7 Copies of Documents
A. Contractor will be furnished, free of charge, five (5) copies of the Contract
Documents. Additional copies may be obtained at cost of reproduction. Contractor
shall maintain a clean, undamaged set of Contract Documents, including Submittals,
at the Project site.
2.8 Substitution Requests, Schedule of Submittals, and Schedule
A. Substitution Requests. Within fifteen (15) Days after Notice of Award (unless
otherwise specified in the Contract Documents), Contractor shall provide all
substitution requests as further described in Section 00 72 00, Article 6.5.
B. Schedule of Submittals. Within five (5) Days after the issuance of the Notice of
Proceed (unless otherwise specified in the Contract Documents), Contractor shall
submit to the City a Schedule of Submittals that conforms with the requirements of
Section 00 72 00, Article 5.21.
Packet Page. 879
C. Schedule. Within ten (10) days after the issuance of the Notice of Proceed (unless
otherwise specified in the Contract Documents), the Contractor shall submit a
construction schedule that conforms with the requirements of Section 00 72 00,
Article 8.2.
2.9 Preconstruction Conference; Designation of Authorized Representatives.
A. Before any Work at the Site is started, a conference attended by the City, Contractor,
Engineer, and others as appropriate will be held to establish a working
understanding among the parties as to the Work and to discuss the schedules
referred to herein, procedures for handling Submittals and Shop Drawings,
processing applications for payment, and maintaining required records.
B. At this conference the City and Contractor each shall designate, in writing, a specific
individual to act as its authorized representative with respect to the services and
responsibilities under the Contract. Such individuals shall have the authority to
transmit instructions, receive information, render decisions relative to the Contract,
and otherwise act on behalf of each respective party.
2.10 Subcontractor Mobilization Meeting.
A. Prior to the start of each major Subcontractor’s Site Work, the Contractor, the
involved Subcontractor, and Engineer shall attend a pre-start meeting to discuss the
schedule, coordination, procedures, and other administrative issues.
2.11 Authority of Board; Engineer
A. The Board has the final authority in all matters affecting the Work. Within the scope
of the Contract, the Engineer has the authority to enforce compliance with the
Contract Documents. The Contractor shall promptly comply with instructions from
the Engineer.
B. The decision of the Engineer is final and binding on all questions relating to:
1. quantities;
2. acceptability of material, equipment, or work;
3. execution, progress or sequence of work;
4. interpretation of the Plans, Specifications, or other Contract Documents; and
5. Any other areas specifically identified in the Contract Documents or under the law.
C. Compliance with instructions from the Engineer shall be a condition precedent to any
payment under the Contract, unless otherwise ordered by the Board.
2.12 Mobilization
A. When a Bid item is included in the Bid Schedule for mobilization, the costs of Work
in advance of construction operations and not directly attributable to any specific bid
Packet Page. 880
item will be included in the progress estimate. When no bid item is provided for
mobilization payment for such costs will be deemed to be included in the other items
of the Work.
B. Payment for mobilization based on the lump sum provided in the Bid Schedule, shall
constitute full compensation for all such Work. No payment for mobilization will be
made until all of the listed items have been completed to the satisfaction of the
Engineer. The scope of the Work included under mobilization shall include, but shall
not be limited to, the following principal items:
1. Obtaining and paying for all bonds, insurance, and permits.
2. Moving on to the Project Site of all Contractor’s plant and equipment required for
the first month’s operations.
3. Installing temporary construction power, wiring, and lighting facilities, as
applicable.
4. Establishing fire protection system, as applicable.
5. Developing and installing a construction water supply, as applicable.
6. Providing and maintaining the field office trailers for the Contractor, if necessary,
and the Engineer (if specified), complete, with all specified furnishings and utility
services.
7. Providing on-site sanitary facilities and potable water facilities as specified per Cal-
OSHA and these Contract Documents.
8. Furnishing, installing, and maintaining all storage buildings or sheds required for
temporary storage of products, equipment, or materials that have not yet been
installed in the Work. All such storage shall meet manufacturer’s specified storage
requirements, and the specific provisions of the specifications, including
temperature and humidity control, if recommended by the manufacturer, and for
all security.
9. Arranging for and erection of Contractor’s work and storage yard.
10. Posting all OSHA required notices and establishment of safety programs per Cal-
OSHA.
11. Full-time presence of Contractor’s superintendent at the job Site as required
herein.
12. Submittal of construction schedule as required by the Contract Documents.
Packet Page. 881
ARTICLE 3 -CONTRACT DOCUMENTS; INTENT
3.1 Examination of Drawings, Specifications, and Site of Work
A. Examination of Contract Documents; Site. Before commencing any portion of the
Work, Contractor shall again carefully examine all applicable Contract Documents,
the Project Site, and other information given to Contractor as to materials and
methods of construction and other Project requirements. Contractor shall
immediately notify the Engineer of any potential error, inconsistency, ambiguity,
conflict, or lack of detail or explanation. If Contractor performs, permits, or causes
the performance of any Work which is in error, inconsistent or ambiguous, or not
sufficiently detailed or explained, Contractor shall bear any and all resulting costs,
including, without limitation, the cost of correction. In no case shall the Contractor
or any Subcontractor proceed with Work if uncertain as to the applicable
requirements.
B. Additional Instructions. After notification of any error, inconsistency, ambiguity,
conflict, or lack of detail or explanation, the Engineer will provide any required
additional instructions, by means of drawings or other written direction, necessary
for proper execution of Work.
C. Quality of Parts, Construction and Finish. All parts of the Work shall be of the best
quality of their respective kinds and the Contractor must use all diligence to inform
itself fully as to the required construction and finish.
D. Contractor’s Variation from Contract Document Requirements. If it is found that the
Contractor has varied from the requirements of the Contract Documents including
the requirement to comply with all Applicable Laws, the Engineer may at any time,
before or after completion of the Work, order the improper Work removed, remade
or replaced by the Contractor at the Contractor’s expense.
3.2 Intent of Contract Documents
A. The Contract Documents are complementary; what is required by any one will be
binding as if required by all. It is the intent of the Contract Documents to describe a
functionally complete Project (or part thereof) to be constructed in accordance with
the Contract Documents. Any labor, documentation, services, materials, or
equipment that reasonably may be inferred from the Contract Documents or from
prevailing custom or trade usage as being required to produce the indicated result
will be provided whether or not specifically called for, at no additional cost to the City.
B. The Contractor shall furnish, unless otherwise provided in the Contract Documents,
all materials, implements, machinery, equipment, tools, supplies and labor
necessary to the prosecution and completion of the Project.
C. Clarifications and interpretations of the Contract Documents shall be issued by the
Engineer as provided in these General Conditions.
D. If utilities to equipment/fixtures are not shown but are necessary to operate the
equipment/fixtures, the utilities service installation is considered to be part of the
Packet Page. 882
Work. The implied Work will conform to the appropriate sections of the Contract
Documents.
E. Organization of the Contract Documents into divisions, sections, and articles, and
arrangement of drawings shall not control the Contractor in dividing Work among
Subcontractors or in establishing the extent of Work to be performed by any trade.
3.3 Reference Standards.
A. Standards, Specifications, Codes, Laws, and Regulations.
1. Reference to federal specifications, federal standards, other standards,
specifications, manuals, or codes of any technical society, organization, or
association, or to Applicable Laws, whether such reference be specific or by
implication, shall mean the standard, specification, manual, code, or Applicable
Laws in effect at the time of opening of Bids (or on the Effective Date of the
Contract if there were no Bids), except as may be otherwise specifically stated in
the Contract Documents.
2. No provision of any such standard, specification, manual, or code, or any
instruction of a Supplier, shall be effective to change the duties or responsibilities
of the City, Contractor, or any of their Subcontractors, consultants, agents, or
employees, from those set forth in the Contract Documents. No such provision or
instruction shall be effective to assign to the City, or any of their officers, directors,
members, partners, employees, agents, consultants, or subcontractors, any duty
or authority to supervise or direct the performance of the Work or any duty or
authority to undertake responsibility inconsistent with the provisions of the Contract
Documents.
3.4 Reporting and Resolving Discrepancies; Order of Precedence.
A. Reporting Discrepancies.
1. The Contract Documents are intended to be fully cooperative and complementary.
Before undertaking each part of the Work, Contractor shall carefully study and
compare the Contract Documents and check and verify pertinent figures therein
and all applicable field measurements. Contractor shall promptly report in writing
to the City any conflict, error, ambiguity, or discrepancy which Contractor
discovers, should have discovered, or has actual knowledge of, and shall obtain a
written interpretation or clarification from the City before proceeding with any Work
affected thereby. If, during the performance of the Work, Contractor discovers any
conflict, error, ambiguity, or discrepancy within the Contract Documents, or
between the Contract Documents and (i) any Applicable Law, (ii) any standard,
specification, manual, or code, or (iii) any instruction of any Supplier, then
Contractor shall promptly submit a written Request for Information (RFI) to the City.
Contractor shall not proceed with the Work affected thereby (except in an
emergency) until an amendment or supplement to the Contract Documents has
been issued by one of the methods indicated in the Contract Documents, and any
Work performed by Contractor before receipt of an amendment or supplement
shall be at Contractor’s own risk.
Packet Page. 883
B. Order of Precedence.
1. In case of conflicts between the Contract Documents, the order of precedence
shall be as follows:
a. Permits from other agencies as may be required by law
b. Change Orders, most recent first
c. Contract
d. Addenda, most recent first
e. Special Conditions
f. Specifications
g. Construction Plans and Drawings(Contract Drawings)
h. General Conditions
i. Instructions to Bidders
j. Notice Inviting Bids
k. Contractor’s Bid (Bid Forms)
l. Standard Specifications for Public Works Construction “Greenbook” latest
edition (Sections 1-9 Excluded)
m. Applicable Local Agency Standards and Specifications
n. Standard Drawings
o. Reference Documents
2. With reference to the Drawings the order of precedence shall be as follows:
a. Figures govern over scaled dimensions
b. Detail drawings govern over general drawings
c. Addenda/Change Order drawings govern over Drawings
d. Contract Drawings govern over Standard Drawings
e. Contract Drawings govern over Shop Drawings
3. Notwithstanding the orders of precedence established above, in the event of
conflicts, the higher standard, higher quality and most expensive shall always
apply.
Packet Page. 884
3.5 Amending and Supplementing Contract Documents.
A. The Contract Documents may be amended to provide for additions, deletions, and
revisions in the Work or to modify the terms and conditions thereof only by Change
Order or written amendment to the Contract duly executed by the parties.
B. The requirements of the Contract Documents may be supplemented, and minor
variations and deviations in the Work may be authorized at no cost to the City, by
one or more of the following ways:
1. The City’s review of a Submittal, Shop Drawing, Sample or substitution request
without exception (subject to the provisions of the Contract Documents); or
2. The City’s issuance of a response to an RFI.
C. However, no review or RFI response will reduce or modify the Contractor’s obligation
to fully satisfy and comply with the requirements of the Contract Documents.
3.6 Reuse of Documents.
A. Contractor and any Subcontractor or Supplier shall not:
1. have or acquire any title to or ownership rights in any of the Drawings,
Specifications, or other documents (or copies of any thereof) prepared by or
bearing the seal of Engineer of Record or its consultants, including electronic
media editions; or
2. reuse any such Drawings, Specifications, other documents, or copies thereof on
extensions of the Project or any other project without written consent of the City
and Engineer of Record and specific written verification or adaptation by Engineer
of Record.
B. The prohibitions of this Article will survive final payment, or termination of the
Contract. Nothing herein shall preclude Contractor from retaining copies of the
Contract Documents for record purposes.
ARTICLE 4 -INDEMNIFICATION; INSURANCE
4.1 Indemnification
A. To the fullest extent permitted by law, Contractor shall immediately defend (with
counsel of the City’s choosing), indemnify and hold harmless the City, its officials,
officers, agents, employees, and representatives, and each of them from and
against:
1. Any and all claims, demands, causes of action, costs, expenses, injuries, losses
or liabilities, in law or in equity, of every kind or nature whatsoever, but not limited
to, injury to or death, including wrongful death, of any person, and damages to or
destruction of property of any person, arising out of, related to, or in any manner
directly or indirectly connected with the Work or this Contract, including claims
made by subcontractors for nonpayment, including without limitation the payment
Packet Page. 885
of all consequential damages and attorney’s fees and other related costs and
expenses, however caused, regardless of whether the allegations are false,
fraudulent, or groundless, and regardless of any negligence of the City or its
officers, employees, or authorized volunteers (including passive negligence),
except the sole negligence or willful misconduct or active negligence of the City or
its officials, officers, employees, or authorized volunteers.
2. Contractor’s defense and indemnity obligation herein includes, but is not limited to
damages, fines, penalties, attorney’s fees and costs arising from claims under the
Americans with Disabilities Act (ADA) or other federal or state disability access or
discrimination laws arising from Contractor’s Work during the course of
construction of the improvements or after the Work is complete, as the result of
defects or negligence in Contractor’s construction of the improvements.
3. Any and all actions, proceedings, damages, costs, expenses, fines, penalties or
liabilities, in law or equity, of every kind or nature whatsoever, arising out of,
resulting from, or on account of the violation of any governmental law or regulation,
compliance with which is the responsibility of Contractor;
4. Any and all losses, expenses, damages (including damages to the Work itself),
attorney’s fees, and other costs, including all costs of defense which any of them
may incur with respect to the failure, neglect, or refusal of Contractor to faithfully
perform the Work and all of Contractor’s obligations under Contract. Such costs,
expenses, and damages shall include all costs, including attorney’s fees, incurred
by the indemnified parties in any lawsuit to which they are a party.
B. Contractor shall immediately defend, at Contractor’s own cost, expense and risk,
with the counsel of the City choosing, any and all such aforesaid suits, actions or
other legal proceedings of every kind that may be brought or instituted against the
City, its officials, officers, agents, employees and representatives. Contractor shall
pay and satisfy any judgment, award or decree that may be rendered against the
City, its officials, officers, employees, agents, employees and representatives, in any
such suit, action or other legal proceeding. Contractor shall reimburse the City, its
officials, officers, agents, employees and representatives for any and all legal
expenses and costs incurred by each of them in connection therewith or in enforcing
the indemnity herein provided. The only limitations on this provision shall be those
imposed by Civil Code section 2782.
C. The provisions of this Article shall survive the termination of this Contract howsoever
caused, and no payment, partial payment, or acceptance of occupancy in whole or
part of the Work shall waive or release any of the provisions of this Article.
4.2 Insurance
The Contractor shall obtain, and at all times during performance of the Work of Contract, maintain
all of the insurance described in this Article. Contractor shall not commence Work under this
Contract until it has provided evidence satisfactory to the City that it has secured all insurance
required hereunder. Contractor shall not allow any Subcontractor to commence work on any
subcontract until it has provided evidence satisfactory to the City that the subcontractor has
secured all insurance required under this Article. Failure to provide and maintain all required
Packet Page. 886
insurance shall be grounds for the City to terminate this Contract for cause. Contractor shall
furnish the City with original certificates of insurance and endorsements effective coverage
required by this Contract on forms satisfactory to the City. The certificates and endorsements for
each insurance policy shall be signed by a person authorized by that insurer to bind coverage on
its behalf, and shall be on forms acceptable to the City. All certificates and endorsements must
be received and approved by the City before Work commences.
A. Additional Insureds; Waiver of Subrogation. The City, its officials, officers,
employees, agents and authorized volunteers shall be named as Additional Insureds
on Contractor’s All Risk policy and on Contractor’s and its subcontractors’ policies
of Commercial General Liability and Automobile Liability insurance using, for
Contractor’s policy/ies of Commercial General Liability insurance, ISO CG forms 20
10 and 20 37 (or endorsements providing the exact same coverage, including
completed operations), and, for subcontractors’ policies of Commercial General
Liability insurance, ISO CG form 20 38 (or endorsements providing the exact same
coverage). Notwithstanding the minimum limits set forth in this Contract for any type
of insurance coverage, all available insurance proceeds in excess of the specified
minimum limits of coverage shall be available to the parties required to be named as
Additional Insureds hereunder. All insurance coverage maintained or procured
pursuant to this Contract shall be endorsed to waive subrogation against the City, its
officers, officials, agents, employees or volunteers or shall specifically allow
Contractor - or others providing insurance evidence in compliance with these
specifications - to waive their right of recovery prior to a loss. Contractor hereby
waives its own right of recovery against the City, and shall require similar written
express waivers and insurance clauses from each of its subcontractors. Copies of
these waivers shall be submitted to the City prior to commencement of work.
B. Workers’ Compensation Insurance. The Contractor shall provide workers’
compensation insurance for all of the employees engaged in Work under this
Contract, on or at the Site, and, in case of any sublet Work, the Contractor shall
require the subcontractor similarly to provide workers’ compensation insurance for
all the latter’s employees as prescribed by State law. Any class of employee or
employees not covered by a subcontractor’s insurance shall be covered by the
Contractor’s insurance. In case any class of employees engaged in work under this
Contract, on or at the Site, is not protected under the Workers’ Compensation
Statutes, the Contractor shall provide or shall cause a subcontractor to provide,
adequate insurance coverage for the protection of such employees not otherwise
protected. The Contractor is required to secure payment of compensation to his
employees in accordance with the provisions of section 3700 of the Labor Code.
The Contractor shall file with the City certificates of his insurance protecting workers.
Company or companies providing insurance coverage shall be acceptable to the
City, if in the form and coverage as set forth in the Contract Documents.
C. Employer’s Liability Insurance. Contractor shall provide Employer’s Liability
Insurance, including Occupational Disease, in the amount of at least one million
dollars ($1,000,000.00) per person per accident. Contractor shall provide the City
with a certificate of Employer’s Liability Insurance. Such insurance shall comply with
the provisions of the Contract Documents. The policy shall be endorsed, if
applicable, to provide a Borrowed Servant/Alternate Employer Endorsement and
contain a Waiver of Subrogation in favor of the City.
Packet Page. 887
D. Commercial General Liability Insurance. Contractor shall provide “occurrence”
form Commercial General Liability insurance coverage at least as broad as the most
current ISO CGL Form 00 01, including but not limited to, premises liability,
contractual liability, products/completed operations, personal and advertising injury
which may arise from or out of Contractor’s operations, use, and management of the
Site, or the performance of its obligations hereunder. The policy shall not contain
any exclusion contrary to this Contract including but not limited to endorsements or
provisions limiting coverage for (1) contractual liability (including but not limited to
ISO CG 24 26 or 21 39); or (2) cross-liability for claims or suits against one insured
against another. Policy limits shall not be less than $2,000,000 per occurrence for
bodily injury, personal injury and property damage. If Commercial General Liability
Insurance or other form with a general aggregate limit is used, either the general
aggregate limit shall apply separately to this project/location or the general
aggregate limit shall be twice the required occurrence limit. Defense costs shall be
paid in addition to the limits.
1. Such policy shall comply with all the requirements of this Article. The limits set forth
herein shall apply separately to each insured against whom claims are made or
suits are brought, except with respect to the limits of liability. Further the limits set
forth herein shall not be construed to relieve the Contractor from liability in excess
of such coverage, nor shall it limit Contractor’s indemnification obligations to the
City, and shall not preclude the City from taking such other actions available to the
City under other provisions of the Contract Documents or law.
2. All general liability policies provided pursuant to the provisions of this Article shall
comply with the provisions of the Contract Documents.
3. All general liability policies shall be written to apply to all bodily injury, including
death, property damage, personal injury, owned and non-owned equipment,
blanket contractual liability, completed operations liability, explosion, collapse,
under-ground excavation, removal of lateral support, and other covered loss,
however occasioned, occurring during the policy term, and shall specifically insure
the performance by Contractor of that part of the indemnification contained in these
General Conditions relating to liability for injury to or death of persons and damage
to property.
4. If the coverage contains one or more aggregate limits, a minimum of 50% of any
such aggregate limit must remain available at all times; if over 50% of any
aggregate limit has been paid or reserved, the City may require additional
coverage to be purchased by Contractor to restore the required limits. Contractor
may combine primary, umbrella, and as broad as possible excess liability coverage
to achieve the total limits indicated above. Any umbrella or excess liability policy
shall include the additional insured endorsement described in the Contract
Documents.
5. All policies of general liability insurance shall permit and Contractor does hereby
waive any right of subrogation which any insurer of Contractor may acquire from
Contractor by virtue of the payment of any loss.
Packet Page. 888
E. Automobile Liability Insurance. Contractor shall provide Automobile Liability
Insurance at least as broad as ISO CA 00 01 (Any Auto) in the amount of, at least,
one million dollars ($1,000,000) per accident for bodily injury and property damage.
Such insurance shall provide coverage with respect to the ownership, operation,
maintenance, use, loading or unloading of any auto owned, leased, hired or
borrowed by Contractor or for which Contractor is responsible, in a form and with
insurance companies acceptable to the City. All policies of automobile insurance
shall permit and Contractor does hereby waive any right of subrogation which any
insurer of Contractor may acquire from Contractor by virtue of the payment of any
loss.
F. Privacy/Network Security (Cyber). Contractor shall provide Cyber Liability
Insurance, in a form and with insurance companies acceptable to City, in the amount
of, at least, one million dollars ($1,000,000) per occurrence and aggregate. Such
insurance shall provide coverage for: (1) privacy breaches, (2) system breaches, (3)
denial or loss of service, and (4) the introduction, implantation or spread of malicious
software code.
G. Aviation and/or Drone Liability. If Contractor shall utilize drones as part of the Work,
Contractor shall provide Aviation and/or Drone Liability Insurance, in a form and with
insurance companies acceptable to City, in the amount of, at least, one million dollars
($1,000,000) per occurrence limit. Such insurance shall provide coverage for bodily
injury and property damage.
H. Builder’s Risk [“All Risk”]
1. It is the Contractor’s responsibility to maintain or cause to be maintained Builder’s
Risk [“All Risk”] extended coverage insurance on all work, material, equipment,
appliances, tools, and structures that are or will become part of the Work and
subject to loss or damage by fire, and vandalism and malicious mischief, in an
amount to cover 100% of the replacement cost. The City accepts no responsibility
for the Work until the Work is formally accepted by the City. The Contractor shall
provide a certificate evidencing this coverage before commencing performance of
the Work.
2. The named insureds shall be Contractor, all Subcontractors of any tier (excluding
those solely responsible for design work), suppliers, and the City, its elected
officials, officers, employees, agents and authorized volunteers, as their interests
may appear. Contractor shall not be required to maintain property insurance for
any portion of the Work following acceptance by the City.
3. Policy shall be provided for replacement value on an “all risk” basis. There shall
be no coinsurance penalty provision in any such policy. Policy must include: (1)
coverage for any ensuing loss from faulty workmanship, nonconforming work,
omission or deficiency in design or specifications; (2) coverage against machinery
accidents and operational testing; (3) coverage for removal of debris, and insuring
the buildings, structures, machinery, equipment, materials, facilities, fixtures and
all other properties constituting a part of the Project; (4) transit coverage, including
ocean marine coverage (unless insured by the supplier), with sub-limits sufficient
to insure the full replacement value of any key equipment item; and (5) coverage
Packet Page. 889
with sub-limits sufficient to insure the full replacement value of any property or
equipment stored either on or off the Site. Such insurance shall be on a form
acceptable to the City to ensure adequacy and sublimit.
4. In addition, the policy shall meet the following requirements:
a. Insurance policies shall be so conditioned as to cover the performance of any
extra work performed under the Contract.
b. Coverage shall include all materials stored on site and in transit.
c. Coverage shall include Contractor’s tools and equipment.
d. Insurance shall include boiler, machinery and material hoist coverage.
I. NOT USED.
J. Contractor shall require all tiers of Subcontractors working under this Contract to
provide the insurance required under this Article unless otherwise agreed to in
writing by the City. Contractor shall make certain that any and all Subcontractors
hired by Contractor are insured in accordance with this Contract. If any
Subcontractor’s coverage does not comply with the foregoing provisions, Contractor
shall indemnify and hold the City harmless from any damage, loss, cost, or expense,
including attorneys’ fees, incurred by the City as a result thereof.
K. Notwithstanding the minimum limits set forth in this Contract for any type of
insurance coverage, if Contractor maintains higher limits than the minimums shown
above, the City requires and shall be entitled to coverage for the higher limits
maintained by the Contractor. Any available insurance proceeds in excess of the
specified minimum limits of insurance and coverage shall be available to the City.
L. Form and Proof of Carriage of Insurance
1. Any insurance carrier providing insurance coverage required by the Contract
Documents shall be admitted to and authorized to do business in the State of
California unless waived, in writing, by the City’s Risk Manager. Carrier(s) shall
have an A.M. Best rating of not less than an A:VII. Insurance deductibles or self-
insured retentions must be declared by the Contractor. At the election of the City
the Contractor shall either 1) reduce or eliminate such deductibles or self-insured
retentions, or 2) procure a bond which guarantees payment of losses and related
investigations, claims administration, and defense costs and expenses. If umbrella
or excess liability coverage is used to meet any required limit(s) specified herein,
the Contractor shall provide a “follow form” endorsement satisfactory to the City
indicating that such coverage is subject to the same terms and conditions as the
underlying liability policy.
2. Each insurance policy required by this Contract shall be endorsed to state that: (1)
coverage shall not be suspended, voided, reduced or cancelled except after thirty
(30) days prior written notice by certified mail, return receipt requested, has been
given to the City; and (2) any failure to comply with reporting or other provisions of
Packet Page. 890
the policies, including breaches of warranties, shall not affect coverage provided
to the City, its officials, officers, agents, employees, and volunteers.
3. The Certificates(s) and policies of insurance shall contain or shall be endorsed to
contain the covenant of the insurance carrier(s) that it shall provide no less than
thirty (30) days written notice be given to the City prior to any material modification
or cancellation of such insurance. In the event of a material modification or
cancellation of coverage, the City may terminate the Contract or stop the Work in
accordance with the Contract Documents, unless the City receives, prior to such
effective date, another properly executed original Certificate of Insurance and
original copies of endorsements or certified original policies, including all
endorsements and attachments thereto evidencing coverage’s set forth herein and
the insurance required herein is in full force and effect. Contractor shall not take
possession, or use the Site, or commence operations under this Contract until the
City has been furnished original Certificate(s) of Insurance and certified original
copies of endorsements or policies of insurance including all endorsements and
any and all other attachments as required in this Article. The original
endorsements for each policy and the Certificate of Insurance shall be signed by
an individual authorized by the insurance carrier to do so on its behalf.
4. The Certificate(s) of Insurance, policies and endorsements shall so covenant and
shall be construed as primary, and the City’s insurance and/or deductibles and/or
self-insured retentions or self-insured programs shall not be construed as
contributory.
5. The City reserves the right to adjust the monetary limits and types of insurance
coverages during the term of this Contract including any extension thereof if, in the
City’s reasonable judgment, the amount or type of insurance carried by the
Contractor becomes inadequate.
6. Contractor shall report to the City, in addition to the Contractor’s insurer, any and
all insurance claims submitted by the Contractor in connection with the Work under
this Contract.
7. Products/completed operations coverage shall extend a minimum of three years
after the project completion. Coverage shall be included on behalf of the insured
for covered claims arising out of the actions of independent contractors. If the
insured is using subcontractors, the policy must include work performed “by or on
behalf” of the insured. Policy shall contain no language that would invalidate or
remove the insurer’s duty to defend or indemnify for claims or suits expressly
excluded from coverage. Policy shall specifically provide for a duty to defend on
the part of the insurer. The City, its officers, officials, agents employees, and
volunteers shall be included as insureds under the policy.
ARTICLE 5 -CONTRACTOR RESPONSIBILITIES; REGULATORY REQUIREMENTS
5.1 Applicable Laws
A. Contractor shall give all notices required by and shall comply with all Applicable Laws
applicable to the performance of the Work. Except where otherwise expressly
Packet Page. 891
required by Applicable Laws, neither the City nor the City’s Representative shall be
responsible for monitoring Contractor’s compliance with any Applicable Laws. If
Contractor performs any Work knowing or having reason to know that it is contrary
to Applicable Laws, Contractor shall bear all claims, costs, losses, and damages
(including but not limited to all fees and charges of engineers, architects, attorneys,
and other professionals and all court or arbitration or other dispute resolution costs)
arising out of or relating to such Work.
5.2 Permits and Licenses
A. Permits and licenses necessary for prosecution of the Work shall be secured and
paid for by Contractor, including, but not limited to, excavation permit, for plumbing,
mechanical and electrical work and for operations in or over public streets or right of
way under jurisdiction of public agencies other than the City, unless otherwise
specified in the Contract Documents.
B. The Contractor shall arrange and pay for all off-site inspection of the Work related to
permits and licenses, including certification, required by the specifications, drawings,
or by governing authorities, except for such off-site inspections delineated as the
City’s responsibility pursuant to the Contract Documents.
C. Before acceptance of the Work, the Contractor shall submit all licenses, permits,
certificates of inspection and required approvals to the City.
5.3 Taxes
A. Contractor shall pay all sales, consumer, use, and other similar taxes required to be
paid in accordance with the Applicable Laws of the place of the Project which are
applicable during the performance of the Work. In accordance with Revenue and
Taxation Code section 107.6, the Contract Documents may create a possessory
interest subject to personal property taxation for which Contractor will be
responsible.
5.4 Traffic Control
A. Traffic control plans, if required, shall be prepared at Contractor’s expense. Traffic
control shall be performed at Contractor’s expense in accordance with the
requirements of the City and/or the local agency with jurisdiction. Costs for traffic
control plans, implementation of traffic control, or traffic signal services required by
the City shall be included in the Contractor’s Bid.
B. All warning signs and safety devices used by the Contractor to perform the Work
shall conform to the requirements contained in the State of California, Department
of Transportation’s current edition of “Manual of Traffic Controls for Construction and
Maintenance Work Zones” or to the requirements of the local agency. The Contractor
shall also be responsible for all traffic control required by the agency having
jurisdiction over the Project on the intersecting streets. Contractor must submit a
traffic control plan to the agency having jurisdiction over the Project for approval prior
to starting Work.
Packet Page. 892
C. The Contractor’s representative on the site responsible for traffic control shall
produce evidence that he/she has completed training acceptable to the California
Department of Transportation for safety through construction zones. All of the streets
in which the Work will occur shall remain open to traffic and one lane of traffic
maintained at all times unless otherwise directed by the agency of jurisdiction.
Businesses and residences adjacent to the Work shall be notified forty-eight (48)
hours in advance of closing of driveways. The Contractor shall make every effort to
minimize the amount of public parking temporarily eliminated due to construction in
areas fronting businesses. No stockpiles of pipe or other material will be allowed in
traveled right-of-ways after working hours unless otherwise approved by the
Engineer.
5.5 Safety
A. Contractor shall be solely responsible for all safety precautions and programs in
connection with the Work. Such responsibility does not relieve Subcontractors of
their responsibility for the safety of persons or property in the performance of their
work, nor for compliance with applicable safety laws. Contractor shall comply with
all Applicable Laws relating to the safety of persons or property, or to the protection
of persons or property from damage, injury, or loss; and shall erect and maintain all
necessary safeguards for such safety and protection. Contractor shall notify owners
of adjacent property and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them in the
protection, removal, relocation, and replacement of their property.
B. The Contractor shall maintain emergency first aid treatment for his employees which
complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C. §
651 et seq.), and California Code of Regulations, Title 8, Industrial Relations Division
1, Department of Industrial Relations, Chapter 4. The Contractor shall ensure the
availability of emergency medical services for its employees in accordance with
California Code of Regulations, Title 8, Section 1512. The Contractor shall submit
an Illness and Injury Prevention Program and a Project Site specific safety program
to the City prior to beginning Work. Contractor shall maintain a confined space
program that meets or exceeds the City’s standards. Contractor needs to make
themselves aware of the City’s safety policies and procedures, and shall meet or
exceed all City standards in areas where the City must enter to perform inspections.
C. Hazard Communication Programs. Contractor shall be responsible for coordinating
any exchange of material safety data sheets or other hazard communication
information required to be made available to or exchanged between or among
employers at the Site in accordance with Applicable Laws.
5.6 Hazardous Materials
A. The City shall not be responsible for any Hazardous Waste brought to the site by the
Contractor. If the Contractor: (i) introduces and/or discharges a Hazardous Waste
onto the site in a manner not specified by the Contract Documents; and/or (ii)
disturbs a Hazardous Material identified in the Contract Documents, the Contractor
shall hire a qualified remediation contractor at Contractor’s sole cost to eliminate the
condition as soon as possible. Under no circumstance shall the Contractor perform
Packet Page. 893
Work for which it is not qualified. The City, in its sole discretion, may require the
Contractor to retain at Contractor’s cost an independent testing laboratory.
B. If the Contractor encounters a Hazardous Waste which may cause foreseeable injury
or damage, Contractor shall immediately: (i) secure or otherwise isolate such
condition; (ii) stop all Work in connection with such material or substance (except in
an emergency situation); and (iii) notify the City (and promptly thereafter confirm
such notice in writing).
C. Subject to Contractor’s compliance with this Article 5.6(B), the City shall verify the
presence or absence of the Hazardous Waste reported by the Contractor, except as
qualified under Article 5.6(A) and Article 5.6(B) in the event such material or
substance is found to be present, verify that the levels of the hazardous material are
below OSHA Permissible Exposure Levels and below levels which would classify
the material as a state of California or federal hazardous waste. When the material
falls below such levels, Work in the affected area shall resume upon direction by the
City.
D. Contractor shall indemnify and hold harmless the City from and against claims,
damages, losses and expenses, arising from a Hazardous Waste on the Project Site,
if such Hazardous Waste exceeded OSHA Permissible Exposure Levels or levels
which would classify the material as a state of California or federal hazardous waste,
and was either i) shown on the Contract Documents or information available to
bidders; or (ii) brought to the site by Contractor. Nothing in this paragraph shall
obligate the Contractor to indemnify the City in the event of the sole or active
negligence or willful misconduct of the City, its officers, agents, or employees.
5.7 Sanitary Facilities.
A. Contractor shall provide sanitary temporary toilet buildings and hand washing
facilities for the use of all workers. All toilets and hand washing facilities shall comply
with local codes and ordinances. Toilets shall be placed inside sealed secondary
containment devices installed on a flat, level surface. Accumulated liquids in the
secondary containment devices shall be properly removed and legally disposed
without spillage onto the ground. Toilets shall be kept supplied with toilet paper and
shall have workable door fasteners. Toilets and hand washing facilities shall be
serviced no less than once weekly and shall be present in a quantity of not less than
1 per 20 workers as required by Cal/OSHA regulations. The toilets and hand
washing facilities shall be maintained in a sanitary condition at all times. Use of toilet
and hand washing facilities in the Work under construction shall not be permitted.
Any other sanitary facilities required by Cal/OSHA shall be the responsibility of the
Contractor.
5.8 Dust Control
A. Contractor, at its expense, shall maintain all excavations, embankments, haul roads,
permanent access roads, plant sites, waste disposal areas, borrow areas, and all
other work areas free from dust. Industry accepted methods of dust control suitable
for the area involved, such as sprinkling, chemical treatment, light bituminous
treatment or similar methods, will be permitted.
Packet Page. 894
5.9 Air Pollution Control
A. Contractor shall comply with all air pollution control rules, regulations, ordinances
and statutes. All containers of paint, thinner, curing compound, solvent or liquid
asphalt shall be labeled to indicate that the contents fully comply with the applicable
material requirements.
B. Without limiting the foregoing, Contractor must fully comply with all applicable laws,
rules and regulations in furnishing or using equipment and/or providing services,
including, but not limited to, emissions limits and permitting requirements imposed
by the Air Quality Management District with jurisdiction over the Project and/or
California Air Resources Board (CARB). Contractor shall specifically be aware of
the application of these limits and requirements to "portable equipment", which
definition includes any item of equipment with a fuel-powered engine. Contractor
shall indemnify the City against any fines or penalties imposed by the air quality
management district, CARB, or any other governmental or regulatory agency for its
violations of Applicable Laws as well as those of its subcontractors or others for
whom Contractor is responsible under its indemnity obligations provided for in the
Contract Documents.
5.10 Water Quality Management and Compliance
A. Storm, surface, ground, nuisance, or other waters may be encountered at various
times during construction of the Work. The Contractor hereby acknowledges that it
has investigated the risk arising from such waters, has prepared its Bid accordingly,
and assumes any and all risks and liabilities arising therefrom.
B. Contractor shall keep itself and all subcontractors, staff, and employees fully
informed of and in compliance with all local, state and federal laws, rules and
regulations that may impact, or be implicated by the performance of the Work
including, without limitation, all applicable provisions regulating discharges of storm
water; the Federal Water Pollution Control Act (33 U.S.C. § 13000 et seq.); the
California Porter-Cologne Water Quality Control Act (Cal Water Code §§ 13000-
14950); and any and all regulations, policies, or permits issued pursuant to any such
authority. These include, but are not limited to California State Water Resources
Control Board Order Number 2009-0009-DWQ (NPDES Permit No. CAS000002),
as amended by Order Numbers 2010-0014-DWQ, 2012-0006-DWQ, and any
subsequent amendment to or renewal thereof, State Water Resources Control
Board Order No. 2013-0001-DWQ (NPDES Order No. CAS000004), Santa Ana
Regional Water Quality Control Board No. R8-2010-0036 (NPDES No. CAS618036),
and any amendment or renewal thereof.
C. Contractor shall comply with all conditions of the State Water Resources Control
Board (“State Water Board”) National Pollutant Discharge Elimination System
General Permit for Waste Discharge Requirements for Discharges of Storm Water
Runoff Associated with Construction Activity (“Construction General Permit”) for all
construction activity which results in the disturbance of in excess of one acre of total
land area or which is part of a larger common area of development or sale.
Contractor shall comply with the lawful requirements of the City, and any other
applicable municipality, drainage district, or other local agency with jurisdiction over
Packet Page. 895
the location where the Work is to be conducted, regarding discharges of storm water
to separate storm drain systems or other watercourses under their jurisdiction,
including applicable requirements in municipal storm water management programs.
D. Unless otherwise specified in the Special Conditions or other portion of the Contract
Documents, the City has not prepared a Storm Water Pollution Prevention Plan
(“SWPPP”) or other storm water compliance plan for the Project Site. Contractor
shall be responsible for filing the Notice of Intent (“NOI”) and for obtaining coverage
under the Construction General Permit. This includes filing all necessary
documentation including the Permit Registration Documents (“PRDs”) through the
Stormwater Multiple Applications and Report Tracking System (“SMARTS”);
preparing and implementing a SWPPP for the Work site; implementing all other
provisions, and monitoring and reporting requirements required by the Construction
General Permit; and providing a Qualified SWPPP Developer (“QSD”) and Qualified
SWPPP Practitioner (“QSP”), as necessary for all Work site activities, including but
not limited to preparation and submittal of all reports, plans, inspections, and
monitoring information in compliance with the Construction General Permit. All
submittals shall be coordinated with the City’s Legally Responsible Person and
Authorized Signatory as those terms are defined in the Construction General Permit.
Before any NOI, PRD, SWPPP, or other Construction General Permit-related
document may be submitted to the State Water Board or implemented on the Project
site, it must first be reviewed and approved by the City and/or City’s designee.
Contractor shall include all costs of compliance with specified requirements in the
Contract Price.
E. The City retains the right to develop its own documentation for the Project site,
including but not limited to the SWPPP, and in the alternative may require Contractor
to adopt and implement portions of the City developed SWPPP. The City expressly
reserves the right to procure coverage under the Construction General Permit for
the Work site if Contractor fails to draft satisfactory PRDs or SWPPP or otherwise
fails to proceed in a manner that complies with the requirements of the Construction
General Permit. The City additionally reserves the right to hire additional contractors
to maintain compliance at the Work site. Whether Contractor has adequately
maintained compliance with the Construction General Permit shall be the City’s sole
determination. Any costs incurred by the City in procuring coverage under the
Construction General Permit, or drafting and/or implementing a SWPPP for the Work
site shall be paid by Contractor.
F. Notwithstanding the above, for those Work sites where construction activity results
in the disturbance of less than one acre of total land area and/or do not need
coverage under the Construction General Permit, the Contractor shall be
responsible for preparing and implementing an Erosion and Sediment Control Plan
in accordance with State Water Resources Control Board Order No. 2013-0001-
DWQ (NPDES Order No. CAS000004) and any amendment to or renewal thereof.
G. Failure to comply with the Construction General Permit, laws, regulations, and
ordinances listed in this Article is a violation of federal and state law.
Notwithstanding any other indemnity contained in these Contract Documents,
Contractor agrees to indemnify and hold harmless the City, its officials, officers,
agents, employees and authorized volunteers from and against any and all claims,
Packet Page. 896
demands, fees, costs, expenses, or losses or liabilities of any kind or nature which
the City, its officials, officers, agents, employees and authorized volunteers may
sustain or incur for noncompliance with the Permit, laws, regulations, and ordinances
listed above, arising out of or in connection with the Work, except for liability resulting
from the sole established negligence, willful misconduct or active negligence of the
City, its officials, officers, agents, employees or authorized volunteers.
H. The City reserves the right to defend any enforcement action or civil action brought
against the City for Contractor’s failure to comply with any applicable water quality
law, regulation, or policy. Contractor hereby agrees to be bound by, and to
reimburse the City for the costs associated with, any settlement reached between
the City and any relevant enforcement entity.
5.11 Environmental Quality Protection
A. The Contractor shall comply with all requirements of applicable federal, state, and
local environmental rules and regulations. Any infractions of said rules and
regulations by the Contractor during the term of the Contract, which result in
penalties, will be the responsibility of the Contractor. The City operates under a
number of environmental permits issued by various agencies. If due to an action,
inaction, or negligence by the Contractor, the City becomes subject to non-
compliance penalties, the cost of such penalties shall be borne by the Contractor.
B. The Contractor shall exercise care to preserve the natural landscape and
vegetation, and shall conduct operations so as to prevent unnecessary destruction,
scarring, or defacing of the natural surroundings in the vicinity of the Work.
Movement of crews and equipment within the rights-of-way and over routes provided
for access to the Work shall be performed in a manner to prevent damage to
property. When no longer required, construction roads shall be restored to original
contours. Upon completion of the Work, and following removal of construction
facilities and required cleanup, land used for construction purposes and not required
for the completed installation shall be scarified and regraded, as required, so that all
surfaces are left in a condition that will facilitate natural revegetation, provide for
proper drainage, and prevent erosion.
C. If, in the performance of the Work, evidence of the possible occurrence of any
Federally listed threatened or endangered plant or animal is discovered, the
Contractor shall notify the City Representative immediately, giving the location and
nature of the findings. Written confirmation of the evidence, location and nature of
the findings shall be forwarded to City within two (2) Days. The Contractor shall
immediately cease all construction activities in the immediate area of the discovery
to the extent necessary to protect the endangered plant or animal. If directed by the
City Representative, Contractor will refrain from working in the immediate area,
suspend the Work in its entirety, or alter its performance to ensure full compliance
with all applicable permits, laws and regulations. Any City directed changes to the
Work as a result of a siting will be pursuant to the Contract Documents. Any costs
or delays incurred by City or the Contractor due to unreasonable or false notification
of an endangered plant or animal will be borne by the Contractor.
Packet Page. 897
D. If, in the performance of the Work, Contractor should unearth cultural resources (for
example, human remains, animal bones, stone tools, artifacts and/or midden
deposits) through excavation, grading, watering or other means, the Contractor shall
notify the construction/archeological monitor and/or the City Representative
immediately, giving the location and nature of the findings. Written confirmation of
the evidence, location and nature of the findings shall be forwarded to the
construction/archeological monitor and/or City within two (2) Days. The Contractor
shall immediately cease all construction activities in the immediate area of the
discovery to the extent necessary to protect the cultural resource. If directed by the
City Representative, Contractor will refrain from working in the immediate area,
suspend the Work in its entirety, or re-sequence and/or alter its performance to
ensure full compliance with all applicable permits, laws and regulations. Should the
presence of cultural resources be confirmed, the Contractor will assist the City
Representative and the construction/archeological monitor in the preparation and
implementation of a data recovery plan. The Contractor shall provide such
cooperation and assistance as may be necessary to preserve the cultural resources
for removal or other disposition. Any City directed changes to the Work as a result
of the cultural resource will be pursuant to the Contract Documents. Should
Contractor, without permission, injure, destroy, excavate, appropriate, or remove
any cultural resource on or adjacent to the Site, it will be subject to disciplinary action,
arrest and penalty under applicable law. The Contractor shall be principally
responsible for all costs of mitigation and/or restoration of cultural resources related
to the unauthorized actions identified above. Contractor shall be required to pay for
unauthorized damage and mitigation costs to cultural resources (historical and
archeological resources) as a result of unauthorized activities that damage cultural
resources and shall indemnify City pursuant to the Contract Documents.
5.12 Excessive Noise
A. Contractor shall use only such equipment on the Work and in such state of repair so
that the emission of sound therefrom is within the noise tolerance level of that
equipment as established by Cal/OSHA. Contractor shall comply with the most
restrictive of the following: (1) local sound control and noise level rules, regulations
and ordinances and (2) the requirements contained in these Contract Documents,
including hours of operation requirements.
B. No internal combustion engine shall be operated on the Project without a muffler of
the type recommended by the manufacturer. Should any muffler or other control
device sustain damage or be determined to be ineffective or defective, the
Contractor shall promptly remove the equipment and shall not return said equipment
to the job until the device is repaired or replaced. Said noise and vibration level
requirements shall apply to all equipment on the job or related to the job, including
but not limited to, trucks, transit mixers or transit equipment that may or may not be
owned by the Contractor.
5.13 Diversion of Recyclable Waste Material
A. In compliance with the applicable City’s waste reduction and recycling efforts,
Contractor shall divert all Recyclable Waste Materials to appropriate recycling
centers as required for compliance with the local jurisdiction’s waste diversion
Packet Page. 898
ordinances. Contractor will be required to submit weight tickets and written proof of
diversion with its monthly progress payment requests. Contractor shall complete
and execute any certification forms required by the City or other applicable agencies
to document Contractor’s compliance with these diversion requirements. All costs
incurred for these waste diversion efforts shall be the responsibility of the Contractor.
5.14 Inspector’s Field Office.
A. If required by the City, the Contractor shall be responsible for providing the
inspector’s field office. The office shall be a substantial waterproof construction with
adequate natural light and ventilation by means of stock design windows. Door shall
have a key type lock or padlock clasp. The office shall have heating and air
conditioning and shall be equipped with a telephone, a telephone answering
machine, an ability to connect to the internet, and a fax machine at Contractor’s
expense. The field office shall be provided within 20 Days of the Notice to Proceed.
B. A table satisfactory for the study of plans and two chairs shall be provided by
Contractor. Contractor shall provide and pay for adequate electric lights, local
telephone service, and adequate heat and air conditioning for the field office until
authorized removal.
5.15 Contractor’s Supervision.
A. Contractor shall continuously keep at the Project site, a competent and experienced
full-time Project superintendent acceptable to the City. Superintendent must be able
to proficiently speak, read and write in English and shall have the authority to make
decisions on behalf of the Contractor. Contractor shall continuously provide efficient
supervision of the Project.
5.16 Workers.
A. Contractor shall at all times enforce strict discipline and good order among its
employees. Contractor shall not employ on the Project any unfit person or any one
not skilled in the Work assigned to him or her.
B. Any person in the employ of the Contractor whom the City may deem incompetent
or unfit shall be dismissed from the Work and shall not be employed on this Project.
5.17 Independent Contractors.
A. Contractor shall be an independent contractor for the City and not an employee.
Contractor understands and agrees that it and all of its employees shall not be
considered officers, employees, or agents of the City and are not entitled to benefits
of any kind normally provided employees of the City, including but not limited to,
state unemployment compensation or workers’ compensation. Contractor assumes
full responsibility for the acts and omissions of its employees or agents related to the
Work.
Packet Page. 899
5.18 Verification of Employment Eligibility.
A. By executing the Contract, Contractor verifies that it fully complies with all
requirements and restrictions of state and federal law respecting the employment of
undocumented aliens, including, but not limited to, the Immigration Reform and
Control Act of 1986, as may be amended from time to time, and shall require all
subcontractors, sub-subcontractors and consultants to comply with the same. Each
person executing this Contract on behalf of Contractor verifies that he or she is a
duly authorized officer of Contractor and that any of the following shall be grounds
for the City to terminate the Contract for cause: (1) failure of the Contractor or its
Subcontractors, sub-subcontractors or consultants to meet any of the requirements
provided for in this Article; (2) any misrepresentation or material omission concerning
compliance with such requirements; or (3) failure to immediately remove from the
Work any person found not to be in compliance with such requirements.
5.19 Labor.
A. Hours of Work
1. As provided in Article 3 (commencing at section 1810), Chapter 1, Part 7, Division
2 of the Labor Code, Contractor stipulates that eight (8) hours of labor shall
constitute a legal day’s work. The time of service of any worker employed at any
time by the Contractor or by any subcontractor on any subcontract under this
Contract upon the Work or upon any part of the Work contemplated by this
Contract is limited and restricted to eight (8) hours during any one calendar day
and 40 hours during any one calendar week, except as hereinafter provided.
Notwithstanding the provisions herein above set forth, work performed by
employees of Contractor in excess of eight (8) hours per day, and 40 hours during
any one week, shall be permitted upon this public work upon compensation for all
hours worked in excess of eight (8) hours per day at not less than one and one-
half times the basic rate of pay.
2. The Contractor and every Subcontractor shall keep an accurate record showing
the name of and actual hours worked each calendar day and each calendar week
by each worker employed in connection with the Work or any part of the Work
contemplated by this Contract. The record shall be kept open at all reasonable
hours to the inspection of the City and to the Division of Labor Law Enforcement,
Department of Industrial Relations of the State of California.
3. The Contractor shall pay to the City a penalty of twenty-five dollars ($25.00) for
each worker employed in the execution of this Contract by the Contractor or by
any subcontractor for each calendar day during which such worker is required or
permitted to work more than eight (8) hours in any calendar day and 40 hours in
any one calendar week in violation of the provisions of Article 3 (commencing at
section 1810), Chapter 1, Part 7, Division 2 of the Labor Code.
4. Any work necessary to be performed after regular working hours, or on Saturdays
and Sundays or other holidays, shall be performed without additional expense to
the City.
Packet Page. 900
5. If Contractor gives notice of an inspection pursuant to the Contract Documents,
the City will provide inspection during normal working hours from 7:00 a.m. to 3:30
p.m. Monday through Friday. Requested inspections before or after this time will
be charged to the Contractor as reimbursable inspection time. Inspections on
weekends requires two (2) Days’ notice for review and approval. Upon written
request and approval the 8.5 hour working day may be changed to other limits
subject to city/county ordinance.
6. It shall be unlawful for any person to operate, permit, use, or cause to operate any
of the following at the Project Site, other than between the hours of 7:00 a.m. to
5:00 p.m., Monday through Friday, with no Work allowed on City-observed
Holidays, unless otherwise approved by the City:
a. Powered Vehicles
b. Construction Equipment
c. Loading and Unloading Vehicles
d. Domestic Power Tools
B. Payroll Records; Labor Compliance
1. Pursuant to Labor Code section 1776, Contractor and all subcontractors shall
maintain weekly certified payroll records, showing the names, addresses, Social
Security numbers, work classifications, straight time and overtime hours worked
each day and week, and the actual per diem wages paid to each journeyman,
apprentice, worker, or other employee employed by them in connection with the
Work under this Contract. Contractor shall certify under penalty of perjury that
records maintained and submitted by Contractor are true and accurate. Contractor
shall also require Subcontractor(s) to certify weekly payroll records under penalty
of perjury.
2. In accordance with Labor Code section 1771.4, the Contractor and each
Subcontractor shall furnish the certified payroll records directly to the Department
of Industrial Relations (“DIR”) on the specified interval and format prescribed by
the DIR, which may include electronic submission. Contractor shall comply with
all requirements and regulations from the DIR relating to labor compliance
monitoring and enforcement. The requirement to submit certified payroll records
directly to the Labor Commissioner under Labor Code section 1771.4 shall not
apply to work performed on a public works project that is exempt pursuant to the
small project exemption specified in Labor Code Section 1771.4.
3. Any stop orders issued by the DIR against Contractor or any Subcontractor that
affect Contractor’s performance of Work, including any delay, shall be Contractor’s
sole responsibility. Any delay arising out of or resulting from such stop orders shall
be considered Contractor caused delay subject to any applicable liquidated
damages and shall not be compensable by the City. Contractor shall defend,
indemnify and hold the City, its officials, officers, employees and agents free and
Packet Page. 901
harmless from any claim or liability arising out of stop orders issued by the DIR
against Contractor or any Subcontractor.
4. The payroll records described herein shall be certified and submitted by the
Contractor at a time designated by the City. The Contractor shall also provide the
following:
a. A certified copy of the employee’s payroll records shall be made available for
inspection or furnished to such employee or his or her authorized representative
on request.
b. A certified copy of all payroll records described herein shall be made available
for inspection or furnished upon request of the DIR.
5. Unless submitted electronically, the certified payroll records shall be on forms
provided by the Division of Labor Standards Enforcement (“DLSE”) of the DIR or
shall contain the same information as the forms provided by the DLSE.
6. Any copy of records made available for inspection as copies and furnished upon
request to the public or any public agency, the City, the Division of Apprenticeship
Standards or the Division of Labor Standards Enforcement shall be marked or
obliterated in such a manner as to prevent disclosure of an individual's name,
address and social security number. The name and address of the Contractor
awarded the Contract or performing the Contract shall not be marked or
obliterated.
7. In the event of noncompliance with the requirements of this Article, the Contractor
shall have ten (10) Days in which to comply subsequent to receipt of written notice
specifying in what respects the Contractor must comply with this Article. Should
noncompliance still be evident after such 10-day period, the Contractor shall pay
a penalty of one hundred dollars ($100.00) to the City for each calendar day, or
portion thereof, for each worker, until strict compliance is effectuated. Upon the
request of the Division of Apprenticeship Standards or the Division of Labor
Standards Enforcement, such penalties shall be withheld from progress payment
then due.
8. The responsibility for compliance with this Article shall rest upon the Contractor.
C. Prevailing Rates of Wages
1. The Contractor is aware of the requirements of Labor Code sections 1720 et seq.
and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000
et seq. (“Prevailing Wage Laws”), which require the payment of prevailing wage
rates and the performance of other requirements on certain “public works” and
“maintenance” projects. Since this Project involves an applicable “public works” or
“maintenance” project, as defined by the Prevailing Wage Laws, and since the total
compensation is $1,000 or more, Contractor agrees to fully comply with such
Prevailing Wage Laws. The Contractor shall obtain a copy of the prevailing rates
of per diem wages at the commencement of this Contract from the website of the
Division of Labor Statistics and Research of the Department of Industrial Relations
Packet Page. 902
located at www.dir.ca.gov. In the alternative, the Contractor may view a copy of
the prevailing rate of per diem wages which are on file at the City’s Administration
Office and shall be made available to interested parties upon request. Contractor
shall make copies of the prevailing rates of per diem wages for each craft,
classification, or type of worker needed to perform work on the Project available to
interested parties upon request, and shall post copies at the Contractor’s principal
place of business and at the Project site. Contractor shall defend, indemnify and
hold the City, its officials, officers, employees and authorized volunteers free and
harmless from any claims, liabilities, costs, penalties or interest arising out of any
failure or allege failure to comply with the Prevailing Wage Laws.
2. The Contractor shall forfeit as a penalty to the City not more than Two Hundred
Dollars ($200.00), pursuant to Labor Code section 1775, for each calendar day, or
portion thereof, for each worker paid less than the prevailing wage rate as
determined by the Director of the DIR for such work or craft in which such worker
is employed for any public work done under the Contract by it or by any
Subcontractor under it. The difference between such prevailing wage rate and the
amount paid to each worker for each calendar day or portion thereof, for which
each worker was paid less than the prevailing wage rate, shall be paid to each
worker by the Contractor.
3. Contractor shall post, at appropriate conspicuous points on the Project Site, a
schedule showing all determined general prevailing wage rates and all authorized
deductions, if any, from unpaid wages actually earned.
D. Public Works Contractor Registration
1. Pursuant to Labor Code sections 1725.5 and 1771.1, the Contractor and its
Subcontractors must be registered with the DIR prior to the execution of a contract
to perform public works. By entering into this Contract, Contractor represents that
it is aware of the registration requirement and is currently registered with the DIR.
Contractor shall maintain a current registration for the duration of the Project.
Contractor shall further include the requirements of Labor Code sections 1725.5
and 1771.1 in any subcontract and ensure that all Subcontractors are registered
at the time this Contract is entered into and maintain registration for the duration
of the Project. Notwithstanding the foregoing, the contractor registration
requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not
apply to work performed on a public works project that is exempt pursuant to the
small project exemption specified in Labor Code Sections 1725.5 and 1771.1.
E. Employment of Apprentices
1. Contractor and all Subcontractors shall comply with the requirements of Labor
Code sections 1777.5 and 1777.6 in the employment of apprentices.
2. Information relative to apprenticeship standards, wage schedules, and other
requirements may be obtained from the Director of Industrial Relations, ex officio
the Administrator of Apprenticeship, San Francisco, California, or from the Division
of Apprenticeship Standards and its branch offices.
Packet Page. 903
3. Knowing violations of Labor Code section 1777.5 will result in forfeiture not to
exceed one hundred dollars ($100.00) for each calendar day of non-compliance
pursuant to Labor Code section 1777.7.
F. Nondiscrimination/Equal Employment Opportunity
1. Pursuant to Labor Code section 1735 and other applicable provisions of law, the
Contractor and its Subcontractors shall not discriminate against any employee or
applicant for employment because of race, religious creed, color, national origin,
ancestry, physical disability, mental disability, medical condition, marital status,
sex, age, sexual orientation, or any other classifications protected by law on this
Project. The Contractor will take affirmative action to insure that employees are
treated during employment or training without regard to their race, religious creed,
color, national origin, ancestry, physical disability, mental disability, medical
condition, marital status, sex, age, sexual orientation, or any other classifications
protected by law.
G. Debarment of Contractors and Subcontractors
1. Contractors or Subcontractors may not perform work on a public works project with
a subcontractor who is ineligible to perform work on a public project pursuant to
Labor Code section 1777.1 or 1777.7. Any contract on a public works project
entered into between a contractor and a debarred subcontractor is void as a matter
of law. A debarred subcontractor may not receive any public money for performing
work as a subcontractor on a public works contract. Any public money that is paid,
or may have been paid to a debarred subcontractor by a contractor on the project
shall be returned to the City. The Contractor shall be responsible for the payment
of wages to workers of a debarred subcontractor who has been allowed to work
on the Project.
5.20 Subcontracts.
A. Contractor agrees to bind every Subcontractor to the terms of the Contract
Documents as far as such terms are applicable to Subcontractor’s portion of the
Work. Contractor shall be as fully responsible to the City for the acts and omissions
of its subcontractors and of persons either directly or indirectly employed by its
subcontractors, as Contractor is for acts and omissions of persons directly employed
by Contractor. Nothing contained in these Contract Documents shall create any
contractual relationship between any subcontractor and the City.
B. The City reserves the right to accept all subcontractors. The City’s acceptance of
any Subcontractor under this Contract shall not in any way relieve Contractor of its
obligations in the Contract Documents.
C. Prior to substituting any Subcontractor listed in the Bid Forms, Contractor must
comply with the requirements of the Subletting and Subcontracting Fair Practices
Act pursuant to California Public Contract Code section 4100 et seq.
Packet Page. 904
5.21 Progress Meetings
A. The Contractor shall schedule and hold regular progress meetings at least weekly
and at other times as requested by Engineer or as required by progress of the Work.
The Contractor, City, and all Subcontractors active on the Site shall attend each
meeting. Contractor may at its discretion request attendance by representatives of
its Suppliers, manufacturers, and other Subcontractors. The City will preside at the
progress meetings and will arrange for keeping and distributing the minutes. The
purpose of the meetings is to review the progress of the Work, maintain coordination
of efforts, discuss changes in scheduling, and resolve other problems which may
develop. During each meeting, the Contractor shall present any issues which may
impact its progress with a view to resolve these issues expeditiously.
5.22 Submittals
A. Schedule of Submittals. Within five (5) Days after the Notice to Proceed (unless
otherwise specified in the Contract Documents), Contractor will prepare and deliver
a Schedule of Submittals to the City that has been fully integrated with the progress
schedule and identifies each Submittal required by the Contract Documents as well
as the date on which Contractor will deliver each Submittal to the City. Each
Submittal must be delivered to the City at least thirty (30) Days prior to the date the
material or equipment is scheduled to be incorporated into the Work. The Contractor
is responsible for any schedule delays resulting from the Submittal process.
B. Submittal Procedures.
1. Contractor will follow the following procedures for each Submittal, Shop Drawing
and Sample required by the Contract Documents:
a. Submittals must be transmitted electronically.
b. Transmittals will be sequentially numbered. Contractor to mark revised
Submittals with original number and sequential alphabetic suffix.
c. Each Submittal will identify the Project, Contractor, Subcontractor and
Supplier, pertinent Drawing and detail number, and Specification Section
number appropriate to Submittal.
d. By transmitting a Submittal, Contractor certifies it has reviewed and approved
each Submittal, verified products required, field dimensions, adjacent
construction Work, and that coordination of information is according to
requirements of the Work and Contract Documents.
e. Identify variations in Contract Documents and product or system limitations
that may differ and/or be detrimental to successful performance of completed
Work.
f. When Submittal is revised for resubmission, Contractor shall promptly address
the City’s comments and resubmit. Contractor shall identify changes made
since previous submission.
Packet Page. 905
g. The City’s review of Shop Drawings shall not relieve Contractor from
responsibility for deviations from the Contract Documents unless Contractor
has, in writing, called the City’s attention to such deviations at time of
submission and the City has taken no exception to the deviation. The City’s
review of Shop Drawings shall not relieve Contractor from responsibility for
errors in Shop Drawings.
h. Submittals not required by the Contract Documents or requested by the City
will not be acknowledged or processed.
i. Incomplete Submittals will not be reviewed by the City. Delays resulting from
incomplete Submittals are not the responsibility of the City.
j. Contractor shall not be entitled to any extension of the Contract Times as a
result of the Submittal process.
k. Contractor shall allow a minimum of 20 working days for review of Submittals
unless otherwise specified in the Contract Documents.
2. Where a Submittal, Shop Drawing or Sample is required by the Contract
Documents or the Schedule of Submittals, any related Work performed prior to the
City review and approval of the pertinent submittal will be performed at the sole
risk and expense and responsibility of Contractor.
C. Schedule Milestone for Submittals. Contractor must submit all Submittals required
by the Contract Documents in accordance with the Schedule of Submittals. If
Contractor fails to submit the Submittals in accordance with the Schedule of
Submittals, Contractor will be solely liable for any delays or impacts caused by the
delayed Submittal, whether direct or indirect. Contractor will be liable for the time
calculated from the date the Submittal is due until the date a compliant Submittal is
made. A compliant Submittal will be one that is complete and satisfies the
requirements of the Contract Documents.
5.23 Shop Drawings and Sample Submittal Procedures.
A. Before submitting each Shop Drawing or Sample, Contractor shall have:
1. Reviewed and coordinated each Shop Drawing or Sample with other Shop
Drawings and Samples and with the requirements of the Work and the Contract
Documents;
2. Determined and verified all field measurements, quantities, dimensions, specified
performance and design criteria, installation requirements, materials, catalog
numbers, and similar information with respect thereto;
3. Determined and verified the suitability of all materials offered with respect to the
indicated application, fabrication, shipping, handling, storage, assembly, and
installation pertaining to the performance of the Work; and
Packet Page. 906
4. Determined and verified all information relative to Contractor’s responsibilities for
means, methods, techniques, sequences, and procedures of construction, and
safety precautions and programs incident thereto.
B. With each Submittal, Contractor shall give the City specific written notice of any
variations that the Shop Drawing or Sample may have from the requirements of the
Contract Documents. This notice shall be both a written communication separate
from the Shop Drawings or Sample Submittal and, in addition, a specific notation
made on each Shop Drawing or Sample submitted to the City for review and
approval of each such variation.
C. Shop Drawings.
1. Data shown on the Shop Drawings will be complete with respect to quantities,
dimensions, specified performance and design criteria, materials, and similar data
to show the City the services, materials, and equipment Contractor proposes to
provide and to enable the City to review the information for assessing conformance
with information given and design concept expressed in Contract Documents.
2. When required by individual Specification sections, provide Shop Drawings signed
and sealed by a professional engineer responsible for designing components
shown on Shop Drawings. Shop Drawings must include signed and sealed
calculations to support design in a form suitable for submission to and approval by
authorities having jurisdiction.
3. Shop Drawings for steel structures shall consist of shop details, erection and other
working Drawings showing details, dimensions, sizes of members and other
information necessary for the complete fabrication and erection of the metal work.
4. Shop Drawings of concrete structures shall consist of such detailed drawings as
may reasonably be required for the successful prosecution of the Work and which
are not included in the Drawings furnished by the Engineer. These may include
drawings for false work, bracing, centering and form work, masonry layout
diagrams, and diagrams for bent reinforcement.
5. Contractor shall make revisions and provide additional information when required
by authorities having jurisdiction.
D. Samples. Clearly identify each Sample as to material, Supplier, pertinent data such
as catalog numbers, the use for which intended and other data as required to enable
the City to review the submittal for assessing conformance with information given
and design concept expressed in Contract Documents. Samples should be of
appropriate size and detail to assess functional, aesthetic, color, texture, patterns
and finish selection.
E. City’s Review.
1. The City will review Shop Drawings and Samples in accordance with the Schedule
of Submittals. The City’s review and acceptance will be only to determine if the
items covered by the Submittals will, after installation or incorporation in the Work,
conform to the information given in the Contract Documents and be compatible
Packet Page. 907
with the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents.
2. The City review and approval will not extend to means, methods, techniques,
sequences, or procedures of construction (except where a particular means,
method, technique, sequence, or procedure of construction is specifically and
expressly called for by the Contract Documents) or to safety precautions or
programs incident thereto. The review and approval of a separate item as such
will not indicate approval of the assembly in which the item functions.
3. The City’s review and acceptance shall not relieve Contractor from responsibility
for any variation from the requirements of the Contract Documents unless the City
has given written approval of each such variation by specific written notation
thereof incorporated in or accompanying the Shop Drawing or Sample.
F. Resubmittal Procedures. Contractor shall make corrections required by the City and
shall return corrected Shop Drawings and submit, as required, new Samples for
review and approval. Contractor shall direct specific attention in writing to revisions
other than the corrections called for by the City on previous Submittals.
5.24 Record (“As-Built”) Drawings.
A. The Contractor shall maintain one record set of Contract Documents at the Site or
digitally in an acceptable format. On these, it shall mark all Project conditions,
locations, configurations, and any other changes or deviations which may vary from
the information represented in the original Contract Documents, including buried or
concealed construction and utility features which are revealed during the course of
construction. Special attention shall be given to recording the horizontal and vertical
location of all buried utilities that differ from the locations indicated, or which were
not indicated on the Drawings. For all Projects involving the installation of any
pipeline, Contractor shall survey and record the top of the pipe at a minimum of every
100 linear feet, and at each bend, recording both the horizontal and vertical
locations. Said Drawings shall be supplemented by any detailed sketches as
necessary or directed to fully indicate the Work as actually constructed. Any required
as-built drawings of civil engineering elements of the Work shall be prepared by a
registered civil engineer.
B. These master Record Drawings of the as-built conditions, including all revisions
made necessary by Addenda and Change Orders, shall be maintained up-to-date
during the progress of the Project. Red ink shall be used for alterations and notes.
Notes shall identify relevant Change Orders by number and date. Record Drawings
shall be accessible to the Engineer at all times during the construction period.
Failure on the Contractor’s part to keep Record Drawings current could result in
withholding partial payment.
C. Upon completion of the Project and as a condition of final acceptance, the Contractor
shall finalize and deliver a complete set of Record Drawings to the Engineers. The
information submitted by the Contractor will be assumed to be correct, and the
Contractor shall be responsible for, and liable to the City, for the accuracy of such
information, and for any errors or omissions which may or may not appear on the
Record Drawings.
Packet Page. 908
D. Unless otherwise called for by the Contract Documents, the cost of all material,
equipment, and labor required to complete the Record Drawings shall be included in
Contractor’s bid and distributed in the Bid Schedule. No additional compensation
shall be made to the Contractor for this Work.
5.25 Layout and Field Engineering.
A. The Contractor shall utilize a properly licensed surveyor to perform all layout surveys
required for the control and completion of the Work, and all necessary surveys to
compute quantities of Work performed.
5.26 Separate Contracts and Cooperation.
A. Separate Contracts. The City reserves the right to let other contracts in connection
with this Work or on the Project site. Contractor shall permit other contractors
reasonable access and storage of their materials and execution of their work and
shall properly connect and coordinate its Work with theirs. To ensure proper
execution of its subsequent Work, Contractor shall immediately inspect work already
in place and shall at once report to the Engineer any problems with the Work in place
or discrepancies with the Contract Documents.
B. Cooperation. Contractor shall ascertain to its own satisfaction the scope of the
Project and nature of any other contracts that have been or may be awarded by the
City in prosecution of the Project to the end that Contractor may perform this
Contract in the light of such other contracts, if any. Nothing herein contained shall
be interpreted as granting to Contractor exclusive occupancy at site of the Project.
Contractor shall not cause any unnecessary hindrance or delay to any other
contractor working on the Project. If simultaneous execution of any contract for the
Project is likely to cause interference with performance of some other contract or
contracts, the Engineer shall decide which Contractor shall cease Work temporarily
and which contractor shall continue or whether work can be coordinated so that
contractors may proceed simultaneously. The City shall not be responsible for any
damages suffered or for extra costs incurred by Contractor resulting directly or
indirectly from award, performance, or attempted performance of any other contract
or contracts on the Project Site.
5.27 Work Site.
A. Limitation of Use of Site and Other Areas. Rights-of-way, easements, or rights-of-
entry for the Work will be provided by the City. Unless otherwise specified in the
Special Provisions, the Contractor shall make arrangements, pay for, and assume
all responsibility for acquiring, using, and disposing of additional work areas and
facilities temporarily required. The Contractor shall indemnify and hold the City
harmless from all claims for damages caused by such actions. Contractor shall
confine construction equipment, the storage of materials and equipment, and the
operations of workers to the Site and other areas permitted by Applicable Laws, and
shall not unreasonably encumber the Site and other areas with construction
equipment or other materials or equipment. Contractor shall assume full
responsibility for any damage to any such land or area, or to City or occupant thereof,
or of any adjacent land or areas resulting from the performance of the Work.
Packet Page. 909
B. Site Maintenance. During the progress of the Work, Contractor shall keep the Site
and other areas free from accumulations of waste materials, rubbish, and other
debris. Removal and disposal of such waste materials, rubbish, and other debris
shall conform to Applicable Laws. The Contractor shall furnish trash bins for all
debris from construction. All debris shall be placed in trash bins daily. Forms and
false-work that are to be re-used shall be stacked neatly concurrently with their
removal. Forms and false-work that are not to be re-used shall be disposed of
concurrently with their removal.
C. Cleaning. Prior to Completion of the Work, Contractor shall clean the Site and make
it ready for utilization by the City. At the completion of the Work Contractor shall
remove from the Site all tools, appliances, construction equipment and machinery,
and surplus materials and shall restore to original condition all property not
designated for alteration by the Contract Documents.
5.28 Utility Usage.
A. All temporary utilities, including but not limited to electricity, water, gas, and
telephone, used on the Work shall be furnished and paid for by Contractor.
Contractor shall provide necessary temporary distribution systems, including meters,
if necessary, from distribution points to points on the Work where the utility is
needed. Upon completion of the Work, Contractor shall remove all temporary
distribution systems. Contractor shall provide necessary and adequate utilities and
pay all costs for water, electricity, gas, oil, and sewer charges required for completion
of the Work, including but not limited to startup and testing required in the Contract
Documents. All permanent meters installed shall be listed in the Contractor’s name
until the Work is accepted. For Work to be performed in existing City facilities,
Contractor may use the City’s existing utilities, provided such use is reasonable
under the circumstances. If Contractor uses the City utilities, it will not need to
compensate the City for reasonably consumption of utilities, but Contractor will be
responsible for any excessive, unreasonable or wasteful utility usage. Amounts due
the City under this section may be deducted from progress payments.
5.29 Protection of Work and Property.
A. The Contractor shall digitally record video and take photographs of the Project site
and adjacent improvements in a manner and quality that clearly depicts the existing
condition of the Project Site and adjacent improvements immediately prior to the
start of Work (minimum 1080p video and 4MP photo). All videos and photographs
shall be date and time stamped. The Contractor shall submit the video and photos
in digital format on a memory stick before the commencement of Work, along with a
map outlining the route and locations of the videos and/or photographs. The
Contractor shall be responsible for all damages to persons or property that occur as
a result of the Work. Contractor shall be responsible for the proper care and
protection of all materials delivered and Work performed until completion and final
acceptance by the City. All Work shall be solely at the Contractor’s risk.
B. Contractor shall adequately protect adjacent property from settlement or loss of
lateral support as necessary. Contractor shall comply with all applicable safety laws
and building codes to prevent accidents or injury to persons on, about, or adjacent
Packet Page. 910
to the Project site where Work is being performed. Contractor shall erect and
properly maintain at all times, as required by field conditions and progress of work,
all necessary safeguards, signs, barriers, lights, and watchmen for protection of
workers and the public, and shall post danger signs warning against hazards created
in the course of construction.
C. Contractor shall provide such heat, covering, and enclosures as are necessary to
protect all Work, materials, equipment, appliances, and tools against damage by
weather conditions.
D. Contractor shall take adequate precautions to protect existing sidewalks, curbs,
pavements, utilities, and other adjoining property and structures, and to avoid
damage thereto, and Contractor shall repair any damage thereto caused by the Work
operations. Contractor shall:
1. Enclose the working area with a substantial barricade, and arrange work to cause
minimum amount of inconvenience and danger to the public.
2. Provide substantial barricades around any shrubs or trees indicated to be
preserved.
3. Deliver materials to the Site over a route designated by the City.
4. Provide any and all dust control required and follow the applicable air quality
regulations as appropriate. If the Contractor does not comply immediately with a
notice from the City or a public agency responsible for air quality, the City shall
have the authority to provide dust control and deduct the cost from payments to
the Contractor.
5. Confine Contractor’s apparatus, the storage of materials, and the operations of its
workers to limits required by law, ordinances, permits, or directions of the City.
Contractor shall not unreasonably encumber the Site with its materials.
6. Take care to prevent disturbing or covering any survey markers, monuments, or
other devices marking property boundaries or corners. If such markers are
disturbed by accident, they shall be replaced by a civil engineer or land surveyor
acceptable to the City, at no cost to the City.
7. Ensure that existing facilities, fences and other structures are all adequately
protected and that, upon completion of all Work, all facilities that may have been
damaged are restored to a condition acceptable to the City.
8. Preserve and protect from injury all buildings, pole lines and all directional, warning
and mileage signs that have been placed within the right-of-way.
9. At the completion of work each day, leave the Work and the Site in a clean, safe
condition.
10. Comply with any stage construction and/or traffic handling plans. Access to
residences and businesses shall be maintained at all times, except with the City’s
written approval. Any request for approval to reduce or restrict access to
Packet Page. 911
residences and business must be submitted to the City at least seven (7) Days in
advance, and the City may issue or withhold approval in its sole discretion.
E. These precautionary measures will apply continuously and not be limited to normal
working hours. Full compensation for the work involved in the protection and
preservation of life, safety and property as above specified shall be considered as
included in the prices paid for the various contract items of Work, and no additional
allowance will be made therefor.
F. Should damage to persons or property occur as a result of the Work, Contractor shall
promptly notify the City, in writing. Contractor shall be responsible for proper
investigation, documentation, including video or photography, to adequately
memorialize and make a record of what transpired. The City shall be entitled to
inspect and copy any such documentation, video, or photographs.
G. Contractor shall maintain all investigation documentation including video and/or
photographs for a minimum of four (4) years following completion of the Project.
5.30 Emergencies.
A. In emergencies affecting the safety or protection of persons or the Work or Property
at the Site or adjacent thereto, the Contractor, without special instruction or
authorization from the City or the Engineer, is obligated to act to prevent threatened
damage, injury or loss. The Contractor shall give the Engineer prompt written notice
if the Contractor believes that any significant changes in the Work or variations from
the Contract Documents have been caused thereby.
ARTICLE 6 -MATERIALS; INSPECTION
6.1 Access to Work.
A. The City, Engineer, their consultants and other representatives and personnel,
independent testing laboratories, and governmental agencies with jurisdictional
interests will have access to the Site and the Work at reasonable times for their
observation, inspection, and testing. Contractor shall provide them proper and safe
conditions for such access and advise them of Contractor’s safety procedures and
programs.
6.2 Materials.
A. Except as otherwise specifically stated in the Contract Documents, Contractor shall
provide and pay for all materials, labor, tools, equipment, water, lights, power,
transportation, superintendence, temporary constructions of every nature, and all
other services and facilities whatsoever necessary to execute and complete this
Contract within the Contract Time. Unless otherwise specified, all materials, parts,
and equipment furnished by the Contractor in the Work shall be new, the best of their
respective kinds and grades as noted and/or specified, and workmanship shall be of
good quality.
B. No materials, supplies, or equipment for Work under this Contract shall be
purchased subject to any chattel mortgage or under a conditional sale or other
Packet Page. 912
agreement by which an interest therein or in any part thereof is retained by the seller
or supplier. Contractor warrants good title to all material, supplies, and equipment
installed or incorporated in the Work and agrees upon completion of all work to
deliver the Project, to the City free from any claims, liens, or charges.
C. Materials shall be furnished in ample quantities and at such times as to ensure
uninterrupted progress of the Work and shall be stored properly and protected as
required by the Contract Documents. Contractor shall be entirely responsible for
damage or loss by weather or other causes to materials or Work. Materials shall be
stored on the Project Site in such manner so as not to interfere with any operations
of the City or any independent contractor.
D. Contractor shall verify all measurements, dimensions, elevations, and quantities
before ordering any materials or performing any Work, and the City shall not be liable
for Contractor’s failure to so. Except for an adjustment to Unit Price Work for item
overruns and underruns in accordance with the Contract Documents, no additional
compensation, over and above payment for the actual quantities at the prices set
out in the Bid Schedule, will be allowed because of differences between actual
measurements, dimension, elevations and quantities and those indicated on the
Plans and in the Specifications. Any difference therein shall be submitted to the
Engineer for consideration before proceeding with the Work.
6.3 Test and Inspections.
A. Inspection and Testing of Work and Materials
1. If the Contract Documents, the Engineer, or any instructions, laws, ordinances, or
public authority requires any part of the Work to be tested or approved, Contractor
shall provide the Engineer at least two (2) working days’ notice of its readiness for
observation or inspection. If inspection is by a public authority other than the City,
Contractor shall promptly inform the City of the date fixed for such inspection.
Required certificates of inspection (or similar) shall be secured by Contractor.
Costs for City testing and inspection shall be paid by the City. Costs of tests for
Work found not to be in compliance shall be paid by the Contractor.
2. The Contractor shall pay for the cost of any minimum “show up” costs of a materials
testing technician that was called for by the Contractor but ultimately the Contractor
work was not ready for the inspection. Any such costs shall be deducted from any
amounts due to the Contractor.
3. If any Work is done or covered up without the required testing or approval, the
Contractor shall uncover or deconstruct the Work, and the Work shall be redone
after completion of the testing at the Contractor’s cost in compliance with the
Contract Documents.
4. Where inspection and testing are to be conducted by an independent laboratory
or agency, materials or samples of materials to be inspected or tested shall be
selected by such laboratory or agency, or by the City, and not by Contractor.
Unless otherwise stated and as provided by the Contract Documents, the City shall
employ and pay for the services of an independent testing laboratory to perform
Packet Page. 913
all inspections, tests, or approvals required by the Contract Documents. All tests
or inspections of materials shall be made in accordance with the commonly
recognized standards of national organizations.
5. Reexamination of Work may be ordered by the City. If so ordered, Work must be
uncovered or deconstructed by Contractor. If Work is found to be in accordance
with the Contract Documents, the City shall pay the costs of reexamination and
reconstruction. If such work is found not to be in accordance with the Contract
Documents, Contractor shall pay all costs.
B. Testing of Materials
1. In advance of manufacture of materials to be supplied by Contractor which must
be tested or inspected, Contractor shall notify the City so that the City may arrange
for testing at the source of supply. Any materials which have not satisfactorily
passed such testing and inspection shall not be incorporated into the Work.
2. If the manufacture of materials to be inspected or tested will occur in a plant or
location greater than sixty (60) miles from the City, the Contractor shall pay for any
excessive or unusual costs associated with such testing or inspection, including
but not limited to excessive travel time, standby time and required lodging.
3. Unless otherwise specified in the Special Provisions, all initial testing and a
reasonable amount of retesting will be performed under the direction of the
Engineer, and at no expense to the Contractor. The Contractor shall notify the
Engineer in writing, at least 15 days in advance, of its intention to use materials for
which tests are specified, to allow sufficient time to perform the tests. The notice
shall name the proposed supplier and source of material. If the notice of intent to
use is sent before the materials are available for testing or inspection, or is sent so
far in advance that the materials on hand at the time will not last but will be replaced
by a new lot prior to use on the Work, it will be the Contractor's responsibility to re-
notify the Engineer when samples which are representative may be obtained.
4. A Certificate of Compliance shall be furnished to the Engineer prior to the use of
any material or assembled material for which these Specifications so require or if
so required by the Engineer. The Engineer may waive the materials testing
requirements and accept a Certificate of Compliance. Material test data may be
required by the Engineer to be included with the submittal. Materials used on the
basis of a Certificate of Compliance may be sampled and tested at any time. The
submission of a Certificate of Compliance shall not relieve the Contractor of
responsibility for incorporating material into the Work which conforms to the
requirements of the Contract Documents, and any material not conforming to the
requirements will be subject to rejection by the Engineer whether in place or not.
5. Copies of mill certificates of composition and quality of all component materials
(reinforcing steel, structural steel, lumber, etc.) incorporated in the construction of
the Work shall be provided to the City at the time of delivery. City shall retain the
right to reject any raw material not provided with a mill certificate at the time of
delivery.
Packet Page. 914
6. If, after incorporating such materials into the Work, it is found that sources of supply
that have been approved do not furnish a uniform product, or if the product from
any source proves unacceptable at any time, the Contractor shall furnish approved
material from other approved sources. If any product proves unacceptable after
improper storage, handling or for any other reason it shall be rejected, not
incorporated into the Work, and shall be removed from the Project Site all at the
Contractor’s expense.
6.4 Requests for Substitutions.
A. For the purposes of this provision, the term “substitution” shall mean the substitution
of any material, method or service substantially equal to or better in every respect to
that indicated in the Standard Specifications or otherwise referenced herein.
B. Pursuant to Public Contract Code section 3400(b), the City may make a finding that
is described in the Notice Inviting Bids that designates certain products, things, or
services by specific brand or trade name.
C. Unless specifically designated in the Special Conditions, whenever any material,
process, or article is indicated or specified by grade, patent, or proprietary name or
by name of manufacturer, such specifications shall be deemed to be used for the
purpose of facilitating the description of the material, process, or article desired and
shall be deemed to be followed by the words “or equal.” Contractor may, unless
otherwise stated, offer for substitution any material, process, or article which may be
substantially equal to or better in every respect to that so indicated or specified in
the Contract Documents. However, the City has adopted uniform standards for
certain materials, processes, and articles.
D. The Contractor shall submit substitution requests, together with substantiating data,
for substitution of any “or equal” material, process, or article no later than thirty-five
(35) calendar days after award of Contract. Provisions regarding submission of
substitution requests shall not in any way authorize an extension of time for the
performance of this Contract. If a substitution request is rejected by the City, the
Contractor shall provide the material, method or service specified herein. The City
shall not be responsible for any costs incurred by the Contractor associated with
substitution requests. The burden of proof as to the equality of any material,
process, or article shall rest with the Contractor. The Engineer has the complete
and sole discretion to determine if a material, process, or article is substantially equal
to or better than that specified and to approve or reject all substitution requests.
E. Substantiating data as described above shall include, at a minimum, the following
information:
1. A signed affidavit from the Contractor stating that the material, process, or article
proposed as a substitution is substantially equal to or better than that specified in
every way except as may be listed on the affidavit.
2. Illustrations, specifications, catalog cut sheets, and any other relevant data
required to prove that the material, process, or article is substantially equal to or
better than that specified.
Packet Page. 915
3. A statement of the cost implications of the substitution being requested, indicating
whether and why the proposed substitution will reduce or increase the amount of
the contract.
4. Information detailing the durability and lifecycle costs of the proposed substitution.
F. Failure to submit all the required substantiating data detailed above in a timely
manner so that the substitution request can be adequately reviewed may result in
rejection of the substitution request. The Engineer is not obligated to review multiple
submittals related the same substitution request resulting from the Contractor’s
failure to initially submit a complete package.
G. Time limitations within this Article shall be strictly complied with and in no case will
an extension of time for completion of the contract be granted because of
Contractor’s failure to provide substitution requests at the time and in the manner
described herein.
H. The Contractor shall bear the costs of all the City work associated with the review of
substitution requests.
I. If substitution requests approved by the Engineer require that Contractor furnish
materials, methods or services more expensive than that specified, the increased
costs shall be borne by Contractor.
ARTICLE 7 -SUBSURFACE AND PHYSICAL CONDITIONS; UTILITIES
7.1 Soils Investigations.
A. When a soils investigation report for the Site is available, such report is provided for
informational purposes only. Any information obtained from such report as to
subsurface soil condition, or to elevations of existing grades or elevations of
underlying rock, is approximate only and is not guaranteed. Contractor
acknowledges that any soils investigation report (including any borings) was
prepared for purposes of design only and Contractor is required to examine the Site
before submitting its Bid and must make whatever tests it deems appropriate to
determine the condition of the soil.
7.2 Ownership of Site Materials Found.
A. The title to water, soil, rock, gravel, sand, minerals, timber and any other materials
developed or obtained in the excavation or other operations of Contractor or any of
its Subcontractors in the performance of the Contract, and the right to use said items
in carrying out the Contract, or to dispose of same, is hereby expressly reserved by
the City. Neither Contractor nor any of its Subcontractors nor any of their
representatives or employees shall have any right, title, or interest in said materials,
nor shall they assert or make any claim thereto. Contractor will, as determined by
the City’s Representative, be permitted to use in the Work without charge, any such
materials which meet the requirements of the Contract Documents, provided the City
shall have the right to use or consume these materials without payment to a third
party.
Packet Page. 916
7.3 Existence of Utilities at the Work Site.
A. Existing Utilities
1. The location of known existing utilities and pipelines are shown on the Plans in
their approximate locations. However, nothing herein shall be deemed to require
the City to indicate the presence of existing service laterals or appurtenances
whenever the presence of such utilities on the site of the project can be inferred
from the presence of other visible facilities, such as buildings, cleanouts, meter
and junction boxes, on or adjacent to the Site of the Project.
2. The City will assume the responsibility for the timely removal, relocation, or
protection of existing main or trunk line utility facilities located on the Project site if
such utilities are not identified by the City in the Contract Documents or which
cannot reasonably be inferred from the presence of other visible facilities.
B. Utility Location
1. It shall be the Contractor’s responsibility to determine the exact location and depth
of all utilities, including service connections, which have been marked by the
respective utility owners and which the Contractor believes may affect or be
affected by the Contractor’s operations. The Contractor shall not be entitled to
additional compensation nor time extensions for work necessary to avoid
interferences nor for repair to damaged utilities if the Contractor does not expose
all such existing utilities as required by this Article.
2. The locating of utilities shall be in conformance with Government Code Section
4216 et seq. except for the City’s utilities located on the City’s property and not on
public right-of-way.
3. A “High Priority Subsurface Installation” is defined in Government Code Section
4216 (j) as “high-pressure natural gas pipelines with normal operating pressures
greater than 415kPA gauge (60psig) or greater than six inches nominal pipe
diameter, petroleum pipelines, pressurized sewage pipelines, high-voltage electric
supply lines, conductors, or cables that have a potential to ground of greater than
or equal to 60kv, or hazardous materials pipelines that are potentially hazardous
to workers or the public if damaged.”
4. A “Subsurface Installation” is defined in Government Code Section 4216 (s) as
“any underground pipeline, conduit, duct, wire, or other structure, except
nonpressurized sewer lines, nonpressurized storm drains, or other nonpressurized
drain lines.”
5. Pursuant to Government Code Section 4216.2 the Contractor shall contact the
appropriate regional notification center at least two (2) working days but not more
than 14 Days before performing any excavation. The date of the notification shall
not count as part of the two-working-day notice. Before notifying the appropriate
regional notification center, the Contractor shall delineate the area to be
excavated. The Contractor shall request that the utility owners conduct a utility
survey and mark or otherwise indicate the location of their service. The Contractor
Packet Page. 917
shall furnish to the Engineer written documentation of its contact(s) with the
regional notification center prior to commencing excavation at such locations.
6. After the utility survey is completed, the Contractor shall commence “potholing” or
hand digging to determine the actual location of the pipe, duct, or conduit and in
accordance with Government Code Section 4216.4 if the excavation within the
“tolerance zone” of a subsurface installation. The Engineer shall be given notice
prior to commencing potholing operations. The Contractor shall uncover all piping
and conduits, to a point one (1) foot below the pipe, where crossings, interferences,
or connections are shown on the Drawings, prior to trenching or excavating for any
pipe or structures, to determine actual elevations. New pipelines shall be laid to
such grade as to clear all existing facilities, which are to remain in service for any
period subsequent to the construction of the run of pipe involved.
7. The Contractor's attention is directed to the requirements of Government Code
Section 4216.2 (c) which provides: “When the excavation is proposed within 10
feet of a high priority subsurface installation, the operator of the high priority
subsurface installation shall notify the excavator of the existence of the high priority
subsurface installation to set up an onsite meeting prior to the legal excavation
start date and time or at a mutually agreed upon time to determine actions or
activities required to verify the location and prevent damage to the high priority
subsurface installation. As part of the meeting, the excavator shall discuss with the
operator the method and tools that will be used during the excavation and the
information the operator will provide to assist in verifying the location of the
subsurface installation. The excavator shall not begin excavating until after the
completion of the onsite meeting.” The Contractor shall notify the Engineer in
advance of this meeting.
C. Utility Relocation and Repair
1. If interferences occur at locations other than those indicated in the Contract
Documents with reasonable accuracy, the Contractor shall notify the Engineer in
writing. The Engineer will supply a method for correcting said interferences in
accordance with the responsibilities of this section and Government Code Section
4215. To the extent any delay is caused thereby, Contractor shall submit a notice
of delay within five (5) Days of discovery of the circumstances giving rise to the
delay in accordance with Article 9.1 Change Orders and Time Extensions.
2. Care shall be exercised by the Contractor to prevent damage to adjacent existing
facilities and public or private works; where equipment will pass over these
obstructions, suitable planking shall be placed. If high priority subsurface
installations are damaged and the operator cannot be contacted, the Contractor
shall call 911 emergency services.
3. The City will compensate the Contractor for the costs of locating and repairing
damage not due to the failure of the Contractor to exercise reasonable care, and
for removing or relocating such main or trunk line utility facilities not indicated in
the Contract Documents with reasonable accuracy, and for the cost of equipment
on the Project necessarily idled during such work. The payment for such costs will
be made as provided in Article 9.1 Change Orders and Time Extensions. The
Packet Page. 918
Contractor shall not be assessed liquidated damages for delay in completion of the
Project, when such delay is caused by the failure of the City or utility company to
provide for removal or relocation of such utility facilities. Requests for extensions
of time arising out of utility relocation or repair delays shall be filed in accordance
with Article 9.1 Change Orders and Time Extensions and Article 9.3 Time for
Completion and Liquidated Damages.
4. The public utility, where it is the owner of the affected utility, shall have the sole
discretion to perform repairs or relocation work or permit the Contractor to do such
repairs or relocation work at a reasonable price. The right is reserved to the City
and the owners of utilities or their authorized agents to enter upon the Work area
for the purpose of making such changes as are necessary for the rearrangement
of their facilities or for making necessary connections or repairs to their properties.
The Contractor shall cooperate with forces engaged in such work and shall
conduct its operations in such a manner as to avoid any unnecessary delay or
hindrance to the work being performed by such forces and shall allow the
respective utilities time to relocate their facility.
5. When the Contract Documents indicate that a utility is to be relocated, altered or
constructed by others, the City will conduct all negotiations with the utility company
and the work will be done at no cost to the Contractor, unless otherwise stipulated
in the Contract Documents.
6. Temporary or permanent relocation or alteration of utilities desired by the
Contractor for its own convenience shall be the Contractor’s responsibility and it
shall make arrangements and bear all costs for such work.
D. Construction at Existing Utilities
1. Where the Work to be performed crosses or otherwise interferes with water, sewer,
gas, or oil pipelines; buried cable; or other public or private utilities, the Contractor
shall perform construction in such a manner so that no damage will result to either
public or private utilities. It shall be the responsibility of the Contractor to determine
the actual locations of, and make accommodates to maintain, all utilities.
2. Before any utility is taken out of service, permission shall be obtained by the
Contractor from the owner. The owner, any impacted resident or business owner
and the City Representative will be advised of the nature and duration of the utility
outage as well as the Contractor’s plan for providing temporary utilities if required
by the owner. The Contractor shall be liable for all damage which may result from
its failure to maintain utilities during the progress of the Work, and the Contractor
shall indemnify City as required by the Contract Documents from all claims arising
out of or connected with damage to utilities encountered during construction;
damages resulting from disruption of service; and injury to persons or damage to
property resulting from the negligent, accidental, or intentional breaching of
utilities.
3. Unless otherwise called for by the Contract Documents, the cost of all material,
equipment, and labor required to complete this work, shall be included in
Packet Page. 919
Contractor’s bid and distributed in the schedule of pay Items. No additional
compensation shall be made to the Contractor for this work.
7.4 Trenches
A. Trenches Five Feet or More in Depth.
1. Contractor shall submit to the Engineer at the preconstruction meeting, a detailed
plan showing the design of shoring, bracing, sloping or other provisions to be made
for worker protection from hazards of caving ground during the excavation of any
trench or trenches five feet or more in depth. If such plan varies from shoring
system standards established by the Construction Safety Orders of the California
Code of Regulations, Department of Industrial Relations, the plan shall be
prepared by a California registered civil or structural engineer. The plan shall not
be less effective than the shoring, bracing, sloping, or other provisions of the
Construction Safety Orders, as defined in the California Code of Regulations. The
Contractor shall designate in writing the “competent person” as defined in Title 8,
California Code of Regulations, who shall be present at the Work Site each day
that trenching/excavation is in progress. The “competent person” shall prepare
and provide daily trenching/excavation inspection reports to the Engineer.
Contractor shall also submit a copy of its annual California Occupational Safety
and Health Administration (Cal/OSHA) trench/excavation permit.
B. Excavations Deeper than Four Feet.
1. If the Work involves excavating trenches or other excavations that extend deeper
than four (4) feet below the surface, Contractor shall promptly within three (3)
Days, and before the excavation is further disturbed, notify the City in writing of
any of the following conditions:
a. Material that the Contractor believes may be material that is hazardous waste,
as defined in section 25117 of the Health and Safety Code, that is required to
be removed to a Class I, Class II, or Class III disposal site in accordance with
provisions of existing law.
b. Subsurface or latent physical conditions at the site differing from those
indicated.
c. Unknown physical conditions at the site of any unusual nature, different
materially from those ordinarily encountered and generally recognized as
inherent in work of the character provided for in the Contract.
2. The City shall promptly investigate the conditions, and if it finds that the conditions
do so materially differ, or do involve hazardous waste, and cause a decrease or
increase in Contractor’s cost of, or the time required for, performance of any part
of the Work, shall issue a Change Order under the procedures described in Article
9.1 Change Orders and Time Extensions.
3. In the event that a dispute arises between the City and the Contractor as to whether
the conditions materially differ, or involve hazardous waste, or cause a decrease
or increase in the Contractor’s cost of, or time required for, performance of any
Packet Page. 920
part of the Work, the Contractor shall not be excused from any scheduled
completion date provided for by the Contract, but shall proceed with all Work to be
performed under the Contract. Contractor shall retain any and all rights provided
either by contract or by law which pertain to the resolution of disputes and protests
between the parties.
ARTICLE 8 -PROSECUTION OF THE WORK
8.1 Contractor’s Means and Methods.
A. Contractor is solely responsible for the means and methods utilized to perform the
Work. In no case shall the Contractor’s means and methods deviate from commonly
used industry standards. The Contractor shall also ensure that businesses adjacent
to the Work remain operational and that access to them is maintained throughout
construction.
8.2 Construction Schedule.
A. General Requirements. The schedule shall be prepared in a Critical Path Method
(“CPM”) format and in an electronic scheduling program acceptable to the City and
as specified in the Contract Documents. Contractor shall deliver the schedule and
all updates to the City in both paper and electronic form. The electronic versions
shall be in the format and include all data used to prepare the schedule. Copies are
not acceptable.
B. Schedule. The receipt or approval of any schedules by the City shall not in any way
relieve the Contractor of its obligations under the Contract Documents. The
Contractor is fully responsible to determine and provide for any and all staffing and
resources at levels which allow for good quality and timely completion of the Project.
Contractor’s failure to incorporate all elements of Work required for the performance
of the Contract or any inaccuracy in the schedule shall not excuse the Contractor
from performing all Work required for a completed Project within the specified
Contract Time. If the required schedule is not received by the time the first payment
under the Contract is due, Contractor shall not be paid until the schedule is received,
reviewed and accepted by the City.
C. Schedule Contents. The schedule shall allow enough time for inclement weather.
The schedule shall indicate the beginning and completion dates of all phases of
construction; critical path for all critical, sequential time related activities; and “float
time” for all “slack” or “gaps” in the non-critical activities. The schedule shall include
appropriate time allowances and constraints for submittals, items of interface with
Work performed by others, and specified construction, start-up and performance
tests. All float shall be owned by the Project. Schedules indicating early or late
completion shall not modify or have any effect on the Contract Time, regardless of
whether the schedules are reviewed and/or accepted by the City. For purposes of
determining Liquidated Damages, the Contract Time shall control and may only be
altered by a duly authorized Change Order.
D. Schedule Updates. Contractor shall continuously update its construction schedule.
Contractor shall submit an updated and accurate construction schedule to the City:
Packet Page. 921
(1) prior to the start of construction, if there are any changes to the initial schedule;
(2) with each progress payment request; and (3) whenever requested to do so by
the City. The City may withhold progress payments or other amounts due under the
Contract Documents if Contractor fails to submit an updated and accurate
construction schedule. Upon the City’s request, Contractor shall submit any
schedules or updates to the City in the native electronic format of the software used
to create the schedule. Contractor shall also submit schedules showing a two-week
detailed look-ahead at weekly meetings conducted with the City. The two-week look-
ahead schedule shall clearly identify all staffing and other resources which in the
Contractor’s judgment are needed to complete the Work within the Contract Time,
and it shall clearly state the number of staff to be used on each daily segment of the
Work.
E. Acceptance. Acceptance of the schedules by the City will not impose on
responsibility for accuracy, for sequencing, scheduling, or progress of the Work, or
compliance with the Contract Documents. Acceptance will not interfere with or
relieve Contractor from Contractor’s full responsibility therefor.
F. Recovery Schedule.
1. Should any of the following conditions exist, City may require Contractor to
prepare, at no extra cost to City, a plan of action and a recovery schedule for
completing the Work and achieving all contractual milestones within the allotted
Contract Time:
a. The Contractor's monthly progress report indicates delays that are, in the
opinion of City, of sufficient magnitude that City questions the Contractor's
ability to complete the Work;
b. The schedule shows the Contractor to be thirty (30) or more days behind the
critical path at any time during construction;
c. The Contractor desires to make changes in the logic or the planned duration
of future activities of the schedule which, in the opinion of City, are major in
nature.
2. The recovery schedule shall include proposed revisions to the Construction
Schedule, demonstrating how Contractor intends to achieve all contractual
milestones including Contract completion within the allotted Contract Time. The
submittal shall include a narrative describing the actions planned by the Contractor
to recover the schedule.
3. Contractor shall submit the Recovery Schedule within seven (7) Days of City’s
request. If Contractor asserts that City is responsible for the delay, failure to submit
the recovery schedule within seven (7) Days of City’s request, will be considered
a concurrent delay event attributable to Contractor, and Contractor shall only be
entitled to non-compensable adjustments to Contract Times. If Contractor is
responsible for the delay, this provision will not limit or affect Contractor's liability
and failure to submit the recovery schedule with seven (7) Days of City’s request
Packet Page. 922
may result in City withholding progress payments or other amounts due under the
Contract Documents.
4. Contractor is responsible for all costs associated with the preparation and
execution of the recovery schedule, including any necessary recovery actions,
which may include, but are not limited to, assignment of additional labor, and/or
equipment, shift or overtime work, expediting of submittals or deliveries,
overlapping of activities or sequencing changes to increase activity concurrence.
Regardless of whether City directs Contractor to prepare a recovery schedule
pursuant to this Section, Contractor shall promptly undertake appropriate action at
no additional cost to City to recover the schedule whenever the current
construction schedule shows that the Contractor will not achieve a milestone
and/or complete the Work within the allotted Contract Time.
8.3 Time for Completion and Liquidated Damages
A. Time for Completion. The time for completion set forth in Article 2 of the Contract
for Construction shall commence: (1) on the date stated in the Notice to Proceed, or
(2) if the Notice to Proceed does not specify a commencement date, then on the
date of the Notice to Proceed and shall be completed by Contractor in the time
specified in the Contract Documents. The City is under no obligation to consider
early completion of the Project; and the Contract completion date shall not be
amended by the City’s receipt or acceptance of the Contractor’s proposed earlier
completion date. Any difference in time between the Contractor’s early completion
and the Contract Time shall be considered a part of the Project float. Contractor
shall not be entitled to compensation, and the City will not compensate Contractor,
for delays which impact early completion. Contractor shall not, under any
circumstances, receive additional compensation from the City (including but not
limited to indirect, general, administrative or other forms of overhead costs) for the
period between the time of earlier completion proposed by the Contractor and the
Contract completion date.
B. Liquidated Damages. If the Work is not completed within the Contract Time(s), it is
understood that the City will suffer damage. In accordance with Government Code
section 53069.85 and Public Contract Code section 7102, being impractical and
infeasible to determine the amount of actual damage, it is agreed that Contractor
shall pay to the City as fixed and liquidated damages, and not as a penalty, the sum
stipulated in the Contract for each calendar day of delay until the Work is fully
completed. Contractor and its surety shall be liable for any liquidated damages. Any
money due or to become due the Contractor may be retained to cover liquidated
damages.
C. Inclement Weather. Contractor shall abide by the Engineer’s determination of what
constitutes inclement weather. Time extensions for inclement weather shall only be
granted when the Work stopped during inclement weather is on the critical path of
the Project schedule. Contractor shall not be entitled to reverse liquidated damages
for time extensions resulting from inclement weather.
D. Extension of Time. Contractor’s entitlement to an extension of the Contract Time is
limited to a City-caused extension of the critical path, reduced by the Contractor’s
Packet Page. 923
concurrent delays, and established by a proper time impact analysis. Contractor
shall not be charged liquidated damages because of any delays in completion of the
Work due to unforeseeable causes beyond the control and without the fault or
negligence of Contractor (or its Subcontractors or Suppliers). The City shall
ascertain the facts and extent of delay and grant extension of time for completing
the Work when, in its judgment, the facts justify such an extension. Contractor shall
not be entitled to an adjustment in the Contract Times for delays within the control
of Contractor. Delays attributable to and within the control of a Subcontractor or
Supplier shall be deemed to be delays within the control of Contractor.
E. Reverse Liquidated Damages. Consistent with Public Contract Code Section 7102,
Contractor will be compensated for damages incurred due to unreasonable delays
to the critical path for which the City is responsible. The parties agree that
determining Contractor’s exact delay damages are and will continue to be
impracticable and extremely difficult. As such, for each calendar day in excess of
the time for completion set forth in Article 2 of the Contract for Construction, the City
shall pay to the Contractor the sum stipulated in the Contract per day. Such amount
shall constitute the only payment allowed for any City-caused delays and shall
necessarily include all overhead, all profits, all administrative costs, all bond costs,
all labor, materials, equipment and rental costs and any other costs, expenses and
fees incurred or sustained as a result of such delays. Contractor shall not be entitled
to reverse liquidated damages for any change in the Work in which Contractor is
compensated for overhead and profit through a change in Unit Price Work or a
Change Order resulting in a lump sum or allowed mark-up for the additional Work.
The amount of reverse liquidated damages shall be reduced by Contractor’s
concurrent delays.
F. Force Majeure. In accordance with subparagraphs “D” and “E” above, the
Contractor shall not be charged liquidated damages, and the City shall not be
responsible, for any delays resulting from a Force Majeure Event. If a delay to the
critical path results from a Force Majeure Event, the Contractor will be entitled to a
time extension but will not receive an adjustment to the Contract Price or any other
compensation. Such a non-compensable adjustment shall be Contractor’s sole and
exclusive remedy for such delays.
G. No Damages for Reasonable Delay. The City’s liability to Contractor for delays for
which the City is responsible shall be limited to only an extension of time unless such
delays were unreasonable under the circumstances. In no case shall the City be
liable for any costs which are borne by the Contractor in the regular course of
business, including, but not limited to, home office overhead and other ongoing
costs. Damages caused by unreasonable City delay shall be based on actual costs
only, no proportions or formulas shall be used to calculate any delay damages.
H. Procedure for Time Extensions and Delay Damages. Contractor shall not be entitled
to any extension of time or any reverse liquidated damages unless Contractor
properly notices the delay and adjustment to compensation and requests a Change
Order in accordance with Article 9.1 Change Orders and Time Extensions.
Contractor’s failure to timely and fully comply with the Change Order procedures in
the Contract Documents shall constitute a waiver of Contractor’s right to a time
extension or reverse liquidated damages.
Packet Page. 924
8.4 Contractor’s Responsibility for Work.
A. Until the acceptance of the Work by the Engineer as evidenced in writing, it shall be
under the charge and care of the Contractor. The Contractor shall take every
necessary precaution against injury or damage to any part thereof by the action of
the elements or from any cause whether arising from the execution or non-execution
of the Work. The Contractor shall rebuild, repair, restore and make good at its own
expense all injuries or damages to any portion of the Work before its completion and
acceptance. In the event of damage proximately caused by an Act of God, as
defined by Section 7105 of the Public Contract Code, the City will pay for repair or
restoration to damaged Work in excess of 5% of the total Bid.
8.5 Occupancy.
A. The City reserves the right to occupy or utilize any portion of the Work at any time
before completion, and such occupancy or use shall not constitute acceptance of
any part of Work covered by this Contract. This use shall not relieve the Contractor
of its responsibilities under the Contract.
8.6 Securities for Money Withheld
A. Pursuant to section 22300 of the Public Contract Code of the State of California,
Contractor may request the City to make retention payments directly to an escrow
agent or may substitute securities for any money withheld by the City to ensure
performance under the contract. At the request and expense of Contractor,
securities equivalent to the amount withheld shall be deposited with the City or with
a state or federally chartered bank as the escrow agent who shall return such
securities to Contractor upon satisfactory completion of the contract. Deposit of
securities with an escrow agent shall be subject to a written agreement substantially
in the form provided in section 22300 of the Public Contract Code.
8.7 The City’s Right to Suspend/Terminate the Contract
A. Suspension of Work by the City
1. The City may, at its sole option, decide to suspend at any time the performance of
all or any portion of the Work by notice in writing to Contractor. Such notice of
suspension of Work will designate the amount and type of plant, labor, and
equipment to be committed to the Project during the period of suspension.
Contractor shall use its best efforts to utilize its plant, labor, and equipment in such
a manner as to minimize costs associated with suspension.
2. Upon receipt of any such notice, Contractor shall, unless the notice requires
otherwise:
a. Immediately discontinue Work on the date and to the extent
specified in the notice;
b. Place no further orders or subcontracts for material, services, or
facilities with respect to suspended Work other than to the extent required
in the notice;
Packet Page. 925
c. Promptly make every reasonable effort to obtain suspension upon
terms satisfactory to the City’s Representative of all orders, subcontracts,
and rental agreements to the extent they relate to performance of Work
suspended; and
d. Continue to protect and maintain the Work including those portions
on which Work has been suspended.
3. Except as provided by this Article, as full and complete compensation for such
suspension, Contractor shall be granted an adjustment in the Contract Price based
on a negotiated daily rate that reflects the Contractor’s actual costs associated with
the demobilized condition of the Site and an extension of the Contract Times equal
to the number of days performance of Work is suspended; provided, however, that
no adjustment of Contract Price or extension of Contract Times shall be granted if
the suspension results from Contractor's non-compliance with the requirements of
the Contract.
B. Termination for Cause by the City:
1. In the sole estimation of the City, if the Contractor refuses or fails to prosecute the
Work or any separable part thereof with such diligence as will insure its completion
within the time specified by the Contract Documents, or any extension thereof, or
fails to complete such Work within such time, or if the Contractor should be
adjudged a bankrupt, or if it should make a general assignment for the benefit of
its creditors, or if a receiver should be appointed on account of its insolvency, or
the Contractor or any of its subcontractors should violate any of the provisions of
this Contract, the City may serve written notice upon the Contractor and its surety
of the City's intention to terminate this Contract. This notice of intent to terminate
shall contain the reasons for such intention to terminate this Contract, and a
statement to the effect that the Contractor's right to perform this Contract shall
cease and terminate upon the expiration of ten (10) Days unless such violations
have ceased and arrangements satisfactory to the City have been made for
correction of said violations.
2. After expiration of the ten (10) Day period, the City may terminate the Contract by
providing a Notice of Termination to the Contractor. The City may take over and
complete the Work by any method it may deem appropriate, including enforcement
of the Project performance bond. Contractor and its surety shall be liable to the
City for any excess costs or other damages incurred by the City to complete the
Work. If the City takes over the Work, the City may, without liability for so doing,
take possession of and utilize in completing the Work such materials, appliances,
plant, and other property belonging to the Contractor as may be on the Site.
3. Upon termination, Contractor shall not be entitled to receive any further payment
from the City, except for Work which was duly performed prior to the effective date
of the Notice of Termination. Contractor shall submit an invoice for final payment
within thirty (30) Days of the effective date of the Notice of Termination. The City
may withhold from final payment up to 150% of any disputed amounts, including
any amounts which may be necessary to repair defective Work, complete
Packet Page. 926
unfinished Work, or are otherwise occasioned by Contractor’s failure to perform its
duties under the Contract.
C. Termination for Convenience by the City:
1. The City may terminate performance of the Work called for by the Contract
Documents in whole or, from time to time, in part, upon ten (10) Days written notice
if the City determines that a termination is in the City's interest.
2. The Contractor shall terminate all or any part of the Work upon delivery to the
Contractor of a Notice of Termination specifying that the termination is for the
convenience of the City, the extent of termination, and the effective date of such
termination.
3. After receipt of Notice of Termination, and except as directed by the City's
Representative, the Contractor shall, regardless of any delay in determining or
adjusting any amounts due under this termination for convenience clause,
immediately proceed with the following obligations:
a. Stop Work as specified in the Notice.
b. Complete any Work specified in the Notice of Termination in a least
cost/shortest time manner while still maintaining the quality called for under
the Contract Documents.
c. Leave the property upon which the Contractor was working and
upon which the facility (or facilities) forming the basis of the Contract
Document is situated in a safe and sanitary manner such that it does not
pose any threat to the public health or safety.
d. Terminate all subcontracts to the extent that they relate to the
portions of the Work terminated.
e. Place no further subcontracts or orders, except as necessary to
complete the continued portion of the Contract.
f. Submit to the City's Representative, within ten (10) Days from the
effective date of the Notice of Termination, all of the usual documentation
called for by the Contract Documents to substantiate all costs incurred by
the Contractor for labor, materials and equipment through the effective date
of the Notice of Termination. Any documentation substantiating costs
incurred by the Contractor solely as a result of the City's exercise of its right
to terminate this Contract pursuant to this clause, which costs the
contractor is authorized under the Contract documents to incur, shall: (1)
be submitted to and received by the Engineer no later than 30 Days after
the effective date of the Notice of Termination; (2) describe the costs
incurred with particularity; and (3) be conspicuously identified as
“Termination Costs occasioned by the City's Termination for Convenience.”
If the City rejects any costs, Contractor shall be deemed to waive the
rejected costs unless Contractor files a Claim within thirty (30) Days of the
rejection pursuant to Article 9.2.
Packet Page. 927
g. Contractor shall be entitled to receive only the amounts payable
under this Article, and Contractor specifically waives any claim for any other
amounts or damages, including, but not limited to, any claim for
consequential damages or lost profits. The provisions in this Article are in
addition to and not in limitation of any other rights or remedies available to
the City.
4. Termination of the Contract shall not relieve surety of its obligation for any just
claims arising out of or relating to the Work performed.
5. Notwithstanding any other provision of this Article, when immediate action is
necessary to protect life and safety or to reduce significant exposure or liability, the
City may immediately order Contractor to cease Work on the Project until such
safety or liability issues are addressed to the satisfaction of the City or the Contract
is terminated.
6. If the City terminates Contractor for cause, and if it is later determined that the
termination was wrongful, such default termination shall automatically be
converted to and treated as a termination for convenience. In such event,
Contractor shall be entitled to receive only the amounts payable under this section,
and Contractor specifically waives any claim for any other amounts or damages,
including, but not limited to, any claim for consequential damages or lost profits.
8.8 Completion and Acceptance of Work
A. Final Inspection. Upon written notice from Contractor that the entire Work is
complete, the Engineer will promptly make a final inspection with the City and
Contractor and will notify Contractor in writing of all particulars in which this
inspection reveals that the Work is incomplete or defective. Contractor shall
immediately take such measures as are necessary to complete such Work or
remedy such deficiencies.
B. Final Acceptance. The acceptance of the Work on behalf of the City will be made
by the Engineer. Such acceptance by the City shall not constitute a waiver of
defects. After Contractor has, in the opinion of the Engineer, satisfactorily completed
all corrections identified during the final inspection and has delivered, in accordance
with the Contract Documents, all maintenance and operating instructions,
schedules, guarantees, bonds, certificates or other evidence of insurance,
certificates of inspection, Record Documents, and other documents required by the
Contract Documents, the City shall execute a Notice of Completion, constituting final
acceptance and completion of the Project, except as may be expressly noted.
8.9 Warranty and Guaranty of Work.
A. Contractor hereby warrants that materials and Work shall be completed in
conformance with the Contract Documents and that the materials and Work provided
will fulfill the requirements of this Warranty. Contractor hereby agrees to repair or
replace, at the discretion of the City, any or all Work that may prove to be defective
in its workmanship, materials furnished, methods of installation or fail to conform to
the Contract Document requirements together with any other Work which may be
Packet Page. 928
damaged or displaced by such defect(s) within a period of one (1) year (or as
otherwise indicated in the Contract Documents or in any guarantee or warranty
provided by any manufacturer or supplier of equipment or materials incorporated into
the Work, whichever is later) from the date of the Notice of Completion of the Project
without any expense whatever to the City, ordinary wear and tear and unusual abuse
and neglect excepted. Contractor shall be required to promptly repair or replace
defective equipment or materials, at Contractor’s option. All costs associated with
such corrective actions and testing, including the removal, replacement, and
reinstitution of equipment and materials necessary to gain access, shall be the sole
responsibility of the Contractor.
B. For any Work so corrected, Contractor’s obligation hereunder to correct defective
Work shall be reinstated for an additional one (1) year period, commencing with the
date of acceptance of such corrected Work. The reinstatement of the one (1) year
warranty shall apply only to that portion of work that was corrected. Contractor shall
perform such tests as the City may require to verify that any corrective actions,
including, without limitation, redesign, repairs, and replacements comply with the
requirements of the Contract. In the event of Contractor’s failure to comply with the
above-mentioned conditions within ten (10) Days after being notified in writing of
required repairs, to the reasonable satisfaction of the City, the City shall have the
right to correct and replace any defective or non-conforming Work and any work
damaged by such work or the replacement or correction thereof at Contractor’s sole
expense. Contractor shall be obligated to fully reimburse the City for any expenses
incurred hereunder immediately upon demand.
C. In addition to the warranty set forth in this Article, Contractor shall obtain for the City
all warranties that would be given in normal commercial practice and assign to the
City any and all manufacturer’s or installer’s warranties for equipment or materials
not manufactured by Contractor and provided as part of the Work, to the extent that
such third-party warranties are assignable and extend beyond the warranty period
set forth in this Article. Contractor shall furnish the City with all warranty and
guarantee documents prior to final acceptance of the Project by the City as required.
D. When specifically indicated in the Contract Documents or when directed by the
Engineer, the City may furnish materials or products to the Contractor for installation.
In the event any act or failure to act by Contractor shall cause a warranty applicable
to any materials or products purchased by the City for installation by the Contractor
to be voided or reduced, Contractor shall indemnify the City from and against any
cost, expense, or other liability arising therefrom, and shall be responsible to the City
for the cost of any repairs, replacement or other costs that would have been covered
by the warranty but for such act or failure to act by Contractor.
E. The Contractor shall remedy at its expense any damage to City-owned or controlled
real or personal property.
F. The City shall notify the Contractor, in writing, within a reasonable time after the
discovery of any failure, defect, or damage. The Contractor shall within ten (10)
Days after being notified commence and perform with due diligence all necessary
Work. If the Contractor fails to promptly remedy any defect or damage, the City shall
Packet Page. 929
have the right to replace, repair or otherwise remedy the defect, or damage at the
Contractor’s expense.
G. In the event of any emergency constituting an immediate hazard to health, safety,
property, or licensees, when caused by Work of the Contractor not in accordance
with the Contract requirements, the City may undertake at Contractor’s expense,
and without prior notice, all Work necessary to correct such condition.
H. Acceptance of Defective Work.
1. If, instead of requiring correction or removal and replacement of defective Work,
the City prefers to accept it, the City may do so. Contractor shall pay all claims,
costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or arbitration
or other dispute resolution costs) attributable to the City’s evaluation of and
determination to accept such defective Work and for the diminished value of the
Work. If any acceptance of Defective Work occurs prior to release of the Project
retention, a Change Order will be issued incorporating the necessary revisions in
the Contract Documents with respect to the Work, and the City shall be entitled to
an appropriate decrease in the Contract Price, reflecting the diminished value of
Work and all costs incurred by the City. If the acceptance of defective occurs after
release of the Project retention, an appropriate amount will be paid by Contractor
to the City.
I. The City May Correct Defective Work
1. If Contractor fails within a reasonable time after written notice from the City to
correct Defective Work, or to remove and replace rejected Work as required by the
City, or if Contractor fails to perform the Work in accordance with the Contract
Documents, or if Contractor fails to comply with any other provision of the Contract
Documents, the City may, after seven (7) Days written notice to Contractor,
correct, or remedy any such deficiency.
2. In connection with such corrective or remedial action, the City may exclude
Contractor from all or part of the Site, take possession of all or part of the Work
and suspend Contractor’s services related thereto, take possession of Contractor’s
tools, appliances, construction equipment and machinery at the Site, and
incorporate in the Work all materials and equipment stored at the Site or for which
the City has paid Contractor but which are stored elsewhere. Contractor shall allow
the City, and the agents, employees, other contractors, and consultants of each of
them, access to the Site to enable the City to exercise the rights and remedies to
correct the Defective Work.
3. All claims, costs, losses, and damages (including but not limited to all fees and
charges of engineers, architects, attorneys, and other professionals and all court
or arbitration or other dispute resolution costs) incurred or sustained by the City
correcting the Defective Work will be charged against Contractor, and a Change
Order will be issued incorporating the necessary revisions in the Contract
Documents with respect to the Work; and the City shall be entitled to an
appropriate decrease in the Contract Price. Such claims, costs, losses and
Packet Page. 930
damages will include but not be limited to all costs of repair, or replacement of work
of others destroyed or damaged by correction, removal, or replacement of
defective Work.
4. If the Change Order is executed after all payments under the Contract have been
paid by the City and the Project Retention is held in an escrow account as
permitted by the Contract Documents, Contractor will promptly alert the escrow
holder, in writing, of the amount of Retention to be paid to the City. If the Change
Order is executed after release of the Project retention, an appropriate amount will
be paid by Contractor to the City. Contractor shall not be allowed an extension of
the Contract Times because of any delay in the performance of the Work
attributable to the City correcting Defective Work.
J. Nothing in the warranty or in the Contract Documents shall be construed to limit the
rights and remedies available to the City at law or in equity, including, but not limited
to, Code of Civil Procedure section 337.15.
ARTICLE 9 -CHANGE ORDERS; DISPUTE RESOLUTION
9.1 Change Orders and Time Extensions
All changes to the Contract, including compensation increases and time extensions, shall be
through a written Change Order in accordance with this Article. The City, without invalidating the
Contract, may order changes in the Work consisting of additions, deletions or other revisions, and
Contractor’s compensation and the time for completion shall be adjusted accordingly. Whenever
any change is made as provided for herein, such change shall be considered and treated as
though originally included in the Contract, and shall be subject to all terms, conditions, and
provisions of the original Contract. Contractor shall not be entitled to claim or bring suit for
damages, whether for loss of profits or otherwise, on account of any decrease or omission of any
item or portion of Work to be done. No dispute, disagreement, or failure of the parties to reach
agreement on the terms of the Change Order shall relieve the Contractor from the obligation to
proceed with performance of the Work, including Additional Work, promptly and expeditiously.
Any alterations, extensions of time, Additional Work, or any other changes may be made without
securing consent of the Contractor’s surety or sureties.
A. Change in Contract Procedures
1. City Directive. The City may direct changes in the Work by delivering a written
directive. To the extent the work directive results in a change to compensation or
time, Contractor must timely request a Change Order and comply with all Change
Order procedures in accordance with this Article. Notwithstanding issuance of a
work directive, Contractor’s failure to timely request a Change Order shall
constitute a waiver by Contractor of any adjustment to compensation or time
extension for Work performed under the directive. The City shall not be liable to
Contractor for Work performed or omitted by Contractor in reliance on verbal
orders.
2. Contractor’s Notice of Change/Delay. If Contractor intends to initiate a Change
Order Request, then Contractor shall provide the City with written notice of the
Packet Page. 931
underlying facts and circumstances that gave rise to the proposed change within
the following times:
a. If due to unknown subsurface or latent physical conditions, within three (3) days
from the discovery date or prior to the alterations of the conditions, whichever
is earlier.
b. If due to a Force Majeure Event, as soon as reasonably practicable under the
conditions, which shall be no longer than three (3) days from the date the
Contractor discovers that the Force Majeure Event gives rise to a change,
unless that the conditions are such that notice within three (3) days is not
possible or practicable.
c. If due to any other matter that may involve an adjustment to the Contract Time
or the Contract Price, within seven (7) days from the discovery date.
To be considered valid and complete, the notice of change/delay shall include
a general statement of the circumstances giving rise to the notice of
change/delay and a reasonable order of magnitude estimate of the additional
costs and/or time. If the circumstances give rise to both a cost adjustment and
time extension, Contractor shall submit the notice of change and notice of delay
concurrently.
3. Request for Change in Compensation and/or Extension of Time. Contractor shall
submit a Change Order Request for any adjustment to Contractor’s compensation
and/or any extension of time. The Change Order Request shall be made prior to
incurring any expense and within fourteen (14) Days from either Contractor’s
notice of change/delay or the City’s directive ordering the change. The Change
Order Request shall include all of the following information (unless inapplicable to
the change):
a. A detailed description of the circumstances giving rise to the
request;
b. A complete itemized cost proposal, including itemized pricing for
first tier Subcontractors;
c. Supporting documentation for all costs;
d. A time impact analysis showing the impact of the delay to the critical
path to completion;
e. If any added costs or information cannot be determined at the time
of the Change Order Request, the reason the costs or information cannot
be determined at the time; and
f. Certification to the accuracy of the Change Order Request under
penalty of perjury.
The time impact analysis shall be in the critical path method format
and shall show the sequencing of all critical and non-critical new
Packet Page. 932
activities and/or activity revisions affected by the delay, with logic
ties to all affected existing activities noted on the schedule.
The City may demand, and Contractor shall provide, any additional
information supporting the Change Order Request, including but
not limited to native electronic format version of schedules and time
impact analyses. Contractor shall provide the requested additional
information within five (5) Days of the request.
For any costs or information that cannot be determined at the time
Contractor submits the Change Order Request, Contractor shall
submit to the City notice of the costs or information and all
supporting documentation within five (5) Days of when the costs or
other information become subject to determination.
4. City’s Final Decision on Change Order; Ordered Changes. If the City denies the
Change Order Request or disagrees with the proposal submitted by Contractor, it
will notify the Contractor, and the City will provide its opinion of the appropriate
price and/or time extension. If no agreement can be reached, the City shall have
the right to order the Work performed on a time and materials basis or to issue a
unilateral Change Order setting forth the City’s determination of the reasonable
additions or savings in costs and time attributable to the extra or deleted work. The
City shall also have the right to order changes in the Work to be performed
promptly by the Contractor on a time and materials basis or to issue a unilateral
Change Order setting forth the City’s determination of the reasonable additions or
savings in costs and time attributable to the extra or deleted work. The City’s
determination shall become final and binding if the Contractor fails to submit a
Claim in writing to the City within fourteen (14) Days of the issuance of the
unilateral Change Order, disputing the terms of the unilateral Change Order and
providing such supporting documentation for its position as the City may
reasonably require.
5. Contractor’s Waiver of Further Relief. CONTRACTOR’S FAILURE TO PROVIDE
A COMPLETE AND TIMELY NOTICE OF CHANGE/DELAY AND/OR CHANGE
ORDER REQUEST, OR TO COMPLY WITH ANY OTHER REQUIREMENT OF
THIS ARTICLE, SHALL CONSTITUTE A WAIVER BY CONTRACTOR OF THE
RIGHT TO A CONTRACT ADJUSTMENT ON ACCOUNT OF SUCH
CIRCUMSTANCES AND A WAIVER OF ANY RIGHT TO FURTHER RECOURSE
OR RECOVERY BY REASON OF OR RELATED TO SUCH CHANGE BY
MEANS OF THE CLAIMS DISPUTE RESOLUTION PROCESS OR BY ANY
OTHER LEGAL PROCESS OTHERWISE PROVIDED FOR UNDER
APPLICABLE LAWS.
Contractor recognizes and acknowledges that timely submission of a formal written
notice of change/delay and Change Order Request, whether or not the
circumstances of the change may be known to the City or available to the City
through other means, is not a mere formality but is of crucial importance to the
ability of the City to promptly identify, prioritize, evaluate and mitigate the potential
effects of changes. Any form of informal notice, whether verbal or written
(including, without limitation, statements in requests for information, statements in
Packet Page. 933
Submittals, statements at any job meeting or entries on monthly reports, daily logs
or job meeting minutes), that does not strictly comply with the formal requirements
of this Article, shall accordingly be insufficient.
6. Change Order Format
a. A Change Order signed by the Contractor indicates the Contractor's agreement
therewith, including any adjustment in compensation or extension of time, and
the full and final settlement of all costs (direct, indirect and overhead) related
to the Work authorized by the Change Order.
b. The City may designate the forms to be used for notices, requests, and Change
Orders. If so designated, Contractor may only use such forms. Contractor
shall not reserve a right to assert impact costs, extended job site costs,
extended overhead, constructive acceleration and/or actual acceleration
beyond what is stated in the Change Order. No Claims shall be allowed for
impact, extended overhead costs, constructive acceleration and/or actual
acceleration due to a multiplicity of changes and/or clarifications. The
Contractor may not change or modify the City’s Change Order form in an
attempt to reserve additional rights.
B. Determining Adjustments to Compensation.
1. Limitation on Costs. Contractor shall not be entitled to any compensation for Work
subject to a Change Order except as expressly set forth in this Article. The mark-
up added in instances of Additional Work shall constitute the entire amount of
profit, any mark-ups, any field or home office overhead costs, including personnel,
equipment or office space, any materials, or any costs of equipment idle time for
such Work.
2. Unit Price Change Orders. When the actual quantity of a Unit Price Work item
varies from the Bid Schedule, compensation for the change in quantity will be
calculated by multiplying the actual quantity by the unit price. This calculation may
result in either an additive or deductive Change Order. Bid items included on the
Bid Schedule may be deducted from the Work in their entirety without any
negotiated extra costs. Because Unit Price Work includes overhead and profit as
determined by Contractor at the time of its Bid submission, no mark up or deduction
for overhead and profit will be allowed.
3. Lump Sum Change Orders. Whenever possible, any changes affecting
compensation shall be in a lump sum mutually agreed by the Contractor and the
City.
4. Time and Materials Change Orders. The City may direct the Contractor to proceed
with the Additional Work with payment to be made on the basis of actual cost of
the labor and materials required to complete the Additional Work. If the Project is
federally funded, a time and materials Change Order shall only be issued after a
determination that no other Change Order is suitable and the Change Order shall
include a ceiling price that the Contractor exceeds at its own risk.
Packet Page. 934
5. Federally Funded Projects. For any change in price to the Contract, general and
administrative expenses shall be negotiated and must conform to the cost
principles set forth under at 2 C.F.R. Part 200, subpart E, and profit shall be
negotiated as a separate element of the cost. To establish a fair and reasonable
profit, consideration must be given to the complexity of the Additional Work to be
performed, the risk borne by the Contractor, the Contractor's investment, the
amount of subcontracting, the quality of its record of past performance, and
industry profit rates in the surrounding geographical area for similar work.
6. Allowed Costs. Estimates for lump sum quotations and accounting for time-and-
material work shall be limited to direct expenditures necessitated specifically by
the change and shall be segregated as follows:
a. Labor. The costs of labor will be the actual cost for wages prevailing locally for
each craft or type of worker at the time the Additional Work is done, plus
employer payments of payroll taxes and insurance, health and welfare,
pension, vacation, apprenticeship funds, and other direct costs resulting from
federal, state or local laws, as well as assessment or benefits required by lawful
collective bargaining agreements. The use of a labor classification which
would increase the Additional Work cost will not be permitted unless the
Contractor establishes the necessity for such additional costs. Labor costs for
equipment operators and helpers shall be reported only when such costs are
not included in the invoice for equipment rental.
b. Materials. The cost of materials reported shall be at the lowest current price at
which such materials are locally available in the quantities involved, plus sales
tax, freight and delivery. Materials costs shall be based upon supplier or
manufacturer’s invoice.
c. Tool and Equipment Use. Regardless of ownership, the rates to be used in
determining equipment use shall not exceed listed rates prevailing locally at
equipment rental agencies, or distributors, at the time the work is performed.
The Contractor shall furnish cost data supporting the establishment of the
rental rate. The rental rate to be applied for use of each items of equipment
shall be the rate resulting in the least total cost to the City for the total period
of use. The City shall the make the final determination as to an equitable rental
rate for the equipment. No payment will be made for the use of small tools,
which have a replacement value of $1,000 or less.
(i) The rental time to be paid for equipment shall be the time the equipment
is in productive operation on the Additional Work being performed.
Rental time will not be allowed while equipment is inoperative due to
breakdowns.
(ii) All equipment shall, in the opinion of the City, be in good working
condition and suitable for the purpose for which the equipment is to be
used. Equipment with no direct power unit shall be powered by a unit
of at least the minimum rating recommended by the manufacturer.
Packet Page. 935
(iii) Before construction equipment is used on any Additional Work, the
Contractor shall plainly stencil or stamp an identifying number thereon
at a conspicuous location, and shall furnish to the City, in duplicate, a
description of the equipment and its identifying number.
(iv) When hourly rates are listed, any part of an hour less than 30 minutes
of operation shall be considered to be 1/2-hour of operation, and any
part of an hour greater than 30 minutes will be considered one hour of
operation. When daily rates are listed, any part of a day less than 4
hours operation shall be considered to be 1/2-day of operation.
d. Allowed Mark-up. The allowed mark-up for any and all overhead (including
supervision and home and field office costs) and profit on work added to the
Contract shall be determined in accordance with the following provisions:
(i) “Net Cost” is defined as the actual costs of labor, materials and tools
and equipment only, excluding overhead and profit. The costs of
applicable insurance and bond premium will be reimbursed to the
Contractor and Subcontractors at cost only, without mark-up.
Contractor shall provide the City with documentation of the costs,
including but not limited to payroll records, invoices, and such other
information as the City may reasonably request.
(ii) For Work performed by the Contractor’s forces the allowed mark-up
shall not exceed fifteen (15%) percent of labor costs, ten percent (10%)
of material costs, and ten percent (10%) of the cost of tools and
equipment use.
(iii) For Work performed by a Subcontractor, the added cost for overhead
and profit shall not exceed fifteen percent (15%) of the Subcontractor’s
Net Cost of the Work to which the Contractor may add up to five percent
(5%) of the Subcontractor’s Net Cost.
(iv) For Work performed by a sub-subcontractor, the added cost for
overhead and profit shall not exceed fifteen percent (15%) of the sub-
subcontractor’s Net Cost for Work to which the Subcontractor and
Contractor may each add up to an additional five percent (5%) of the
Net Cost of the lower tier subcontractor.
(v) No additional mark-up will be allowed for lower tier subcontractors, and
in no case shall the added cost for overhead and profit payable by the
City exceed twenty-five percent (25%) of the Net Cost as defined
herein, of the party that performs the Work.
(vi) Calculation of the mark-up will be subject to the limitations above and
to calculation as further detailed in (b)(B)(5) above.
e. Documentation of Time-and-Material Costs.
(i) T&M Daily Sheets. Contractor must submit timesheets, materials
invoices, records of equipment hours, and records of rental equipment
Packet Page. 936
hours to the City’s for an approval signature each day that Work is
performed on a time-and-material basis. The Engineer’s signature on
time sheets only serves as verification that the Work was performed
and is not indicative of the City’s agreement to Contractor’s entitlement
to the cost.
(ii) T&M Summary Sheet. Contractor shall submit a T&M Summary Sheet,
which shall include total actual costs, within five (5) Days following
completion of Additional Work on a time-and-material basis.
Contractor’s total actual cost shall be presented in a summary table in
an electronic spreadsheet file by labor, material, equipment, and any
other costs, along with documentation supporting the costs.
Contractor’s failure to submit the T&M Summary Sheet within five (5)
Days of completion of the Additional Work will result in Contractor’s
waiver for any reimbursement of any costs associated with the
Additional Work.
f. Excluded Costs. The following costs or any other home or field office overhead
costs, all of which are to be considered administrative costs covered by the
Contractor’s mark-up, shall not be allowed costs and shall not be included in
any lump sum proposals or time-and-materials invoices:
(i) Overhead Cost. Payroll costs and other compensation of Contractor’s
officers, executives, principals, general managers, engineers,
architects, estimators, attorneys, auditors, accountants, purchasing
and contracting agents, timekeepers, clerks, and other personnel
employed by Contractor whether at the Site or in Contractor’s principal
office or any branch office, material yard, or shop for general
administration of the Work;
(ii) Office Expenses. Expenses of Contractor’s principal and branch
offices;
(iii) Capital Expenses. Any part of Contractor’s capital expenses, including
interest on Contractor’s capital employed for the Additional Work and
charges against Contractor for delinquent payments;
(iv) Negligence. Costs due to the negligence of Contractor or any
Subcontractor or Supplier, or anyone directly or indirectly employed by
any of them or for whose acts any of them may be liable, including
without limitation the correction of Defective Work, disposal of materials
or equipment wrongly supplied, and making good any damage to
property;
(v) Small Tools. Cost of small tools valued at less than $1,000 and that
remain the property of Contractor;
(vi) Administrative Costs. Costs associated with the preparation of Change
Orders (whether or not ultimately authorized), cost estimates, or the
preparation or filing of Claims;
Packet Page. 937
(vii) Anticipated Lost Profits. Expenses of Contractor associated with
anticipated lost profits or lost revenues, lost income or earnings, lost
interest on earnings, or unpaid retention;
(viii) Home Office Overhead. Costs derived from the computation of a
“home office overhead” rate by application of the Eichleay, Allegheny,
burden fluctuation, or other similar methods;
(ix) Special Consultants and Attorneys. Costs of special consultants or
attorneys, whether or not in the direct employ of Contractor, employed
for services specifically related to the resolution of a Claim, dispute, or
other matter arising out of or relating to the performance of the
Additional Work.
(x) Other. Other overhead or general expense costs of any kind and the
cost of any item not specifically and expressly included in the Contract
Documents; including but not limited to: submittals, drawings, field
drawings, shop drawings, including submissions of drawings; field
inspection; general superintendence; computer services; reproduction
services; salaries of project engineer, superintendent, timekeeper,
storekeeper, and secretaries; janitorial services; small tools, incidentals
and consumables; temporary on-site facilities (offices, telephones, high
speed internet access, plumbing, electrical power, lighting; platforms,
fencing, water); surveying; estimating; protection of work; handling and
disposal fees; final cleanup; other incidental work; related warranties;
insurance and bond premiums.
(xi) Compliance with Federal Cost Principles. If the Project is federally
funded, any costs that are not allowable, reasonable and allocable to
the Project, under generally accepted accounting principles and the
applicable federal requirements.
9.2 Procedure for Resolving Claims.
Contractor shall timely comply with any and all requirement of the Contract Documents pertaining
to notices and requests for changes to the Contract Time or Contract Price, including but not
limited to all requirements of Article 9.1, as a prerequisite to filing any claim governed by this
Article. The failure to timely submit a notice of delay or notice of change, or to timely request a
change to the time for completion or Contractor’s compensation, or to timely provide any other
notice or request required herein shall constitute a waiver of the right to further pursue the claim
under the Contract or at law.
A. Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public
Contract Code prescribes a process utilizing informal conferences, non-binding
judicial supervised mediation, and judicial arbitration to resolve disputes on
construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of
the Public Contract Code prescribes a process for negotiation and mediation to
resolve disputes on construction claims. The intent of this Article is to implement
Sections 20104 et seq. and Section 9204 of the California Public Contract Code.
Packet Page. 938
This Article shall be construed to be consistent with all applicable law, including but
not limited to these statutes.
B. Claims. For purposes of this Article, “Claim” means a separate demand by the
Contractor for:
1. An adjustment to the time for completion including, without limitation, for relief from
damages or penalties for delay assessed by the City;
2. Payment by the City of money or damages arising from Work done by or on behalf
of the Contractor pursuant to the Contract, payment for which is not otherwise
expressly provided or to which the Contractor is not otherwise entitled; or
3. An amount the payment of which is disputed by the City.
A “Claim” does not include any demand for payment for which the Contractor has
failed to provide notice, request a Change Order, or otherwise failed to follow any
procedures contained in the Contract Documents.
C. Filing Claims. Claims governed by this Article may not be filed unless and until the
Contractor completes any and all requirements of the Contract Documents
pertaining to notices and requests for changes to the Contract Time or Contract
Price, and Contractor’s request for a change has been denied in whole or in part.
Claims governed by this Article must be filed no later than thirty (30) Days after a
request for change has been denied in whole or in part or after any other event giving
rise to the Claim. The Claim shall be submitted in writing to the City and shall include
on its first page the following words in 16 point capital font: “THIS IS A CLAIM.” The
Claim shall include the all information and documents necessary to substantiate the
Claim, including but not limited to those identified below. Nothing in this Article is
intended to extend the time limit or supersede notice requirements otherwise
provided by Contract Documents. Failure to follow such contractual requirements
shall bar any Claims or subsequent proceedings for compensation or payment
thereon.
D. Documentation. The Contractor shall submit all Claims in the following format:
1. Summary description of Claim including basis of entitlement, merit and amount of
time or money requested, with specific reference to the Contract Document
provisions pursuant to which the Claim is made
2. List of documents relating to Claim:
a. Specifications
b. Drawings
c. Clarifications (Requests for Information)
d. Schedules
e. Other
Packet Page. 939
3. Chronology of events and correspondence
4. Narrative analysis of Claim merit
5. Analysis of Claim cost, including calculations and supporting documents
6. Time impact analysis in the form required by the Contract Documents or, if the
Contract Documents do not require a particular format, CPM format, if an
adjustment of the Contract Time is requested
E. City’s Response. Upon receipt of a Claim pursuant to this Article, the City shall
conduct a reasonable review of the Claim and, within a period not to exceed 45 Days,
shall provide the Contractor a written statement identifying what portion of the Claim
is disputed and what portion is undisputed. Any payment due on an undisputed
portion of the Claim will be processed and made within 60 Days after the City issues
its written statement.
1. If the City needs approval from its governing body to provide the Contractor a
written statement identifying the disputed portion and the undisputed portion of the
Claim, and the City’s governing body does not meet within the 45 Days or within
the mutually agreed to extension of time following receipt of a Claim sent by
registered mail or certified mail, return receipt requested, the City shall have up to
three (3) Days following the next duly publicly noticed meeting of the City’s
governing body after the 45-Day period, or extension, expires to provide the
Contractor a written statement identifying the disputed portion and the undisputed
portion.
2. Within 30 Days of receipt of a Claim, the City may request in writing additional
documentation supporting the Claim or relating to defenses or Claims the City may
have against the Contractor. If additional information is thereafter required, it shall
be requested and provided pursuant to this subdivision, upon mutual agreement
of the City and the Contractor. The City’s written response to the Claim, as further
documented, shall be submitted to the Contractor within 30 Days (if the Claim is
less than $50,000, within 15 Days) after receipt of the further documentation, or
within a period of time no greater than that taken by the Contractor in producing
the additional information or requested documentation, whichever is greater.
F. Meet and Confer. If the Contractor disputes the City’s written response, or the City
fails to respond within the time prescribed, the Contractor may so notify the City, in
writing, either within 15 Days of receipt of the City’s response or within 15 Days of
the City’s failure to respond within the time prescribed, respectively, and demand in
writing an informal conference to meet and confer for settlement of the issues in
dispute. Upon receipt of a demand, the City shall schedule a meet and confer
conference within 30 Days for settlement of the dispute.
G. Mediation. Within 10 business days following the conclusion of the meet and confer
conference, if the Claim or any portion of the Claim remains in dispute, the City shall
provide the Contractor a written statement identifying the portion of the Claim that
remains in dispute and the portion that is undisputed. Any payment due on an
undisputed portion of the Claim shall be processed and made within 60 Days after
Packet Page. 940
the City issues its written statement. Any disputed portion of the Claim, as identified
by the Contractor in writing, shall be submitted to nonbinding mediation, with the City
and the Contractor sharing the associated costs equally. The public entity and
Contractor shall mutually agree to a mediator within 10 business days after the
disputed portion of the Claim has been identified in writing, unless the parties agree
to select a mediator at a later time.
1. If the parties cannot agree upon a mediator, each party shall select a mediator and
those mediators shall select a qualified neutral third party to mediate with regard
to the disputed portion of the Claim. Each party shall bear the fees and costs
charged by its respective mediator in connection with the selection of the neutral
mediator.
2. For purposes of this Article, mediation includes any nonbinding process, including,
but not limited to, neutral evaluation or a dispute review board, in which an
independent third party or board assists the parties in dispute resolution through
negotiation or by issuance of an evaluation. Any mediation utilized shall conform
to the timeframes in this Article.
3. Unless otherwise agreed to by the City and the Contractor in writing, the mediation
conducted pursuant to this section shall excuse any further obligation under
Section 20104.4 to mediate after litigation has been commenced.
4. The mediation shall be held no earlier than the date the Contractor completes the
Work or the date that the Contractor last performs Work, whichever is earlier. All
unresolved Claims shall be considered jointly in a single mediation, unless a new
unrelated Claim arises after mediation is completed.
H. Procedures After Mediation. If following the mediation, the Claim or any portion
remains in dispute, the Contractor must file a Claim pursuant to Chapter 1
(commencing with Section 900) and Chapter 2 (commencing with Section 910) of
Part 3 of Division 3.6 of Title 1 of the Government Code prior to initiating litigation.
For purposes of those provisions, the running of the period of time within which a
Claim must be filed shall be tolled from the time the Contractor submits his or her
written Claim pursuant to subdivision (a) until the time the Claim is denied, including
any period of time utilized by the meet and confer conference.
I. Civil Actions. The following procedures are established for all civil actions filed to
resolve Claims of $375,000 or less:
1. Within 60 Days, but no earlier than 30 Days, following the filing or responsive
pleadings, the court shall submit the matter to non-binding mediation unless
waived by mutual stipulation of both parties or unless mediation was held prior to
commencement of the action in accordance with Public Contract Code section
9204 and the terms of this Contract. The mediation process shall provide for the
selection within 15 Days by both parties of a disinterested third person as mediator,
shall be commenced within 30 Days of the submittal, and shall be concluded within
15 Days from the commencement of the mediation unless a time requirement is
extended upon a good cause showing to the court.
Packet Page. 941
2. If the matter remains in dispute, the case shall be submitted to judicial arbitration
pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of
the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The
Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter
3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding
brought under this subdivision consistent with the rules pertaining to judicial
arbitration. In addition to Chapter 2.5 (commencing with Section 1141.10) of Title
3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be
experienced in construction law, and (B) any party appealing an arbitration award
who does not obtain a more favorable judgment shall, in addition to payment of
costs and fees under that chapter, also pay the attorney’s fees on appeal of the
other party.
J. Government Code Claim Procedures.
1. This Article does not apply to tort claims and nothing in this Article is intended nor
shall be construed to change the time periods for filing tort claims or actions
specified by Chapter 1 (commending with Section 900) and Chapter 2
(commencing with Section 910) of Part 3 of Division 3.5 of Title 1 of the
Government Code.
2. In addition to any and all requirements of the Contract Documents pertaining to
notices of and requests for adjustment to the Contract Time, Contract Price, or
compensation or payment for Additional Work, disputed Work, construction claims
and/or changed conditions, the Contractor must comply with the claim procedures
set forth in Government Code Section 900, et seq. prior to filing any lawsuit against
the City.
3. Such Government Code claims and any subsequent lawsuit based upon the
Government Code claims shall be limited to those matters that remain unresolved
after all procedures pertaining to adjustment of the Contract Time or Contract Price
for Additional Work, disputed Work, construction claims, and/or changed
conditions have been followed by Contractor. If Contractor does not comply with
the Government Code claim procedure or the prerequisite contractual
requirements, Contractor may not file any action against the City.
4. A Government Code claim must be filed no earlier than the date the Work is
completed or the date the Contractor last performs Work on the Project,
whichever occurs first. A Government Code claim shall be inclusive of all
unresolved Claims known to Contractor or that should reasonably by known
to Contractor excepting only new unrelated Claims that arise after the
Government Code claim is submitted.
K. Non-Waiver. The City’s failure to respond to a Claim from the Contractor within the
time periods described in this Article or to otherwise meet the time requirements of
this Article shall result in the Claim being deemed rejected in its entirety, and shall
not constitute a waiver of any rights under this Article.
Packet Page. 942
ARTICLE 10 - MEASUREMENT; PAYMENT
10.1 Cost Breakdown.
A. Lump Sum Work.
1. Contractor shall furnish on forms approved by the City within ten (10) Days of the
Notice to Proceed, a schedule of values allocating the entire Contract Price to the
various portions of the Work and prepared in such a form and supported by such
data to substantiate its accuracy as the Engineer may require. This schedule of
values, unless objected to by the Engineer, shall be used as a basis for reviewing
the Contractor’s applications for payment. Contractor shall submit the schedule of
values prior to submitting its first application for payment, and the City will not issue
any payment until it receives and approves the schedule of values.
B. Unit Price Work.
1. Where the Contract Documents provide that all or part of the Work is to be Unit
Price Work, initially the Contract Price will be deemed to include for all Unit Price
Work an amount equal to the sum of the unit price for each separately identified
item of Unit Price Work multiplied by the estimated quantity of each item as
indicated in the Contract. The estimated quantities of items of Unit Price Work are
not guaranteed and are solely for the purpose of comparison of Bids and
determining an initial Contract Price. Each unit price will be deemed to include an
amount considered by Contractor to be adequate to cover Contractor’s overhead
and or profit for each separately identified item.
2. Unless otherwise specified, payment will be based on the actual quantities of Work
as verified and approved by the Engineer, based on the price per unit as set forth
in the Bid.
3. The City or Contractor may initiate a Change Order or Change Order Request to
adjust the Contract Price in accordance with Contractor Documents based on
actual quantities of Unit Price Work. The City or Contractor may make a claim for
an adjustment in the Unit Price in accordance with the Contract Documents if:
a. the quantity of any item of Unit Price Work performed by Contractor
differs by twenty-five percent (25%) or more from the estimated quantity of
such item indicated in the Contract; and
b. there is no corresponding adjustment with respect to any other item
of Work; and
c. Contractor believes that Contractor is entitled to an increase in unit
price as a result of having incurred additional expense or the City believes
that the City is entitled to a decrease in unit price and the parties are unable
to agree as to the amount of any such increase or decrease.
Packet Page. 943
10.2 Progress Estimates and Payment.
A. By the tenth (10th) Day of the following calendar month, Contractor shall submit to
Engineer a payment request which shall set forth in detail the value of the Work done
for the period beginning with the date Work was first commenced and ending on the
end of the calendar month for which the payment request is prepared. Contractor
shall include an adjusted list of actual quantities, verified by the Engineer, for unit
price items listed, if any, in the Bid. Contractor shall include any amount earned for
authorized Additional Work. Contractor shall certify under penalty of perjury, that all
cost breakdowns and periodic estimates accurately reflect the Work on the Project.
B. From the total thus computed, a deduction shall be made in the amount of five
percent (5%) for retention, except where the City has adopted a finding that the Work
done under the Contract is substantially complex, and then the amount withheld as
retention shall be the percentage specified in the Notice Inviting Bids. From the
remainder a further deduction may be made in accordance with Section C below.
The amount computed, less the amount withheld for retention and any amounts
withheld as set forth below, shall be the amount of the Contractor’s payment request.
C. The City may withhold a sufficient amount or amounts of any payment or payments
otherwise due to Contractor, as in its judgment may be necessary to cover:
1. Payments which may be past due and payable for just claims against Contractor
or any Subcontractors for labor or materials furnished in and about the
performance of work on the Project under this Contract.
2. Defective work not remedied.
3. Failure of Contractor to make proper payments to his Subcontractor or for material
or labor.
4. Completion of the Contract if there is a reasonable doubt that the Work can be
completed for balance then unpaid.
5. Damage to another contractor or a third party.
6. Amounts which may be due the Count for claims against Contractor.
7. Failure of Contractor to keep the Record Drawings up to date.
8. Failure to provide update on construction schedule as required herein.
9. Site cleanup.
10. Failure to comply with Contract Documents.
11. Liquidated damages.
12. Legally permitted penalties.
Packet Page. 944
D. The City may apply such withheld amount or amounts to payment of such claims or
obligations at its discretion with the exception of subsections (C)(1), (3), and (5) of
this Article, which must be retained or applied in accordance with applicable law. In
so doing, the City shall be deemed the agent of Contractor and any payment so
made by the City shall be considered as a payment made under contract by the City
to Contractor and the City shall not be liable to Contractor for such payments made
in good faith. Such payments may be made without prior judicial determination of
claim or obligations. The City will render Contractor a proper accounting of such
funds disbursed on behalf of Contractor.
E. Upon receipt, the Engineer shall review the payment request to determine whether
it is undisputed and suitable for payment. If the payment request is determined to
be unsuitable for payment, it shall be returned to Contractor as soon as practicable
but not later than seven (7) Days after receipt, accompanied by a document setting
forth in writing the reasons why the payment request is not proper. The City shall
make the progress payment within 30 Days after the receipt of an undisputed and
properly submitted payment request from Contractor, provided that a release of liens
and claims has been received from the Contractor pursuant to Civil Code section
8132. The number of days available to the City to make a payment without incurring
interest pursuant to this paragraph shall be reduced by the number of Days by which
the Engineer exceeds the seven (7) Day requirement.
F. A payment request shall be considered properly executed if funds are available for
payment of the payment request and payment is not delayed due to an audit inquiry
by the financial officer of the City.
G. The City shall have the right to adjust any estimate of quantity and to subsequently
correct any error made in any estimate for payment.
10.3 Final Acceptance and Payment
A. Following the City’s acceptance of the Work, the Contractor shall submit to the City
a written statement of the final quantities of unit price items for inclusion in the final
payment request. The City shall have the right to adjust any estimate of quantity
and to correct any error made in any estimate for payment.
B. When the Work has been accepted there shall be paid to Contractor a sum equal to
the Contract Price less any amounts previously paid Contractor and less any
amounts withheld by the City from Contractor under the terms of the Contract. The
final five percent (5%), or the percentage specified in the Notice Inviting Bids where
the City has adopted a finding of substantially complete, shall not become due and
payable until as required by Public Contract Code section 7107. If the Contractor
has placed securities with the City as described herein, the Contractor shall be paid
a sum equal to one hundred percent (100%) of the Contract Price less any amounts
due the City under the terms of the Contract.
C. Unless Contractor advises the City in writing prior to acceptance of the final five
percent (5%) or the percentage specified in the Notice Inviting Bids where the City
has adopted a finding of completion, or the return of securities held as described
herein, said acceptance shall operate as a release to the City of all claims and all
Packet Page. 945
liability to Contractor for all things done or furnished in connection with this Work and
for every act of negligence of the City and for all other claims relating to or arising
out of this Work. If Contractor advises the City in writing prior to acceptance of final
payment or return of the securities that there is a dispute regarding the amount due
the Contractor, the City may pay the undisputed amount contingent upon the
Contractor furnishing a release of all undisputed claims against the City with the
disputed claims in stated amounts being specifically excluded by Contractor from the
operation of the release. No payments, however, final or otherwise, shall operate to
release Contractor or its sureties from the Faithful Performance Bond, Labor and
Material Payment Bond, or from any other obligation under this Contract.
D. In case of suspension of the Contract any unpaid balance shall be and become the
sole and absolute property of the City to the extent necessary to repay the City any
excess in the cost of the Work above the Contract Price.
E. Final payment shall be made no later than 60 Days after the date of acceptance of
the Work by the City or the date of occupation, beneficial use and enjoyment of the
Work by the City including any operation only for testing, start-up or commissioning
accompanied by cessation of labor on the Work, provided that a release of liens and
claims has been received from the Contractor pursuant to Civil Code section 8136.
In the event of a dispute between the City and the Contractor, the City may withhold
from the final payment an amount not to exceed 150% of the disputed amount.
F. Within ten (10) Days from the time that all or any portion of the retention proceeds
are received by Contractor, Contractor shall pay each of its Subcontractors from
whom retention has been withheld each Subcontractor’s share of the retention
received. However, if a retention payment received by Contractor is specifically
designated for a particular Subcontractor, payment of the retention shall be made to
the designated Subcontractor if the payment is consistent with the terms of the
subcontract.
ARTICLE 11 - MISCELLANEOUS
11.1 Patents.
A. Contractor shall hold and save the City, officials, officers, employees, and authorized
volunteers harmless from liability of any nature or kind of claim therefrom including
costs and expenses for or on account of any patented or unpatented invention,
article or appliance manufactured, furnished or used by Contractor in the
performance of this Contract.
11.2 Document Retention & Examination
A. In accordance with Government Code section 8546.7, records of both the City and
the Contractor shall be subject to examination and audit by the State Auditor General
for a period of three (3) years after final payment.
B. Contractor shall make available to the City any of the Contractor’s other documents
related to the Project immediately upon request of the City.
Packet Page. 946
C. In addition to the State Auditor rights above, the City shall have the right to examine
and audit all books, estimates, records, contracts, documents, bid documents,
subcontracts, and other data of the Contractor (including computations and
projections) related to negotiating, pricing, or performing the modification in order to
evaluate the accuracy and completeness of the cost or pricing data at no additional
cost to the City, for a period of four (4) years after final payment.
11.3 Notice.
A. All notices shall be in writing and either served by personal delivery or mailed to the
other party. Written notice to the Contractor shall be addressed to Contractor’s
principal place of business unless Contractor designates another address in writing
for service of notice. Notice to the City shall be addressed to the City as designated
in the Notice Inviting Bids unless the City designates another address in writing for
service of notice. Notice shall be effective upon receipt or five (5) Days after being
sent by first class mail, whichever is earlier. Notice given by facsimile shall not be
effective unless acknowledged in writing by the receiving party.
11.4 Notice of Third Party Claims
A. Pursuant to Public Contract Code section 9201, the City shall provide the Contractor
with timely notification of the receipt of any third-party claims relating to the Contract.
The City is entitled to recover reasonable costs incurred in providing such
notification.
11.5 State License Board Notice
A. Contractors are required by law to be licensed and regulated by the Contractors’
State License Board which has jurisdiction to investigate complaints against
contractors if a complaint regarding a patent act or omission is filed within four (4)
years of the date of the alleged violation. A complaint regarding a latent act or
omission pertaining to structural defects must be filed within ten (10) years of the
date of the alleged violation. Any questions concerning a contractor may be referred
to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento,
California 95826.
11.6 Assignment of Contract
A. Contractor shall not assign, transfer, convey, sublet or otherwise dispose of the
rights or title of interest of any or all of this contract without the prior written consent
of the City. Any assignment or change of Contractor’s name of legal entity without
the written consent of the City shall be void. Any assignment of money due or to
become due under this Contract shall be subject to a prior lien for services rendered
or material supplied for performance of Work called for under the Contract
Documents in favor of all persons, firms, or corporations rendering such services or
supplying such materials to the extent that claims are filed pursuant to the Civil Code,
the Code of Civil Procedure or the Government Code.
Packet Page. 947
11.7 Change In Name And Nature Of Contractor’s Legal Entity.
A. Should a change be contemplated in the name or nature of the Contractor’s legal
entity, the Contractor shall first notify the City in order that proper steps may be taken
to have the change reflected on the Contract and all related documents. No change
of Contractor’s name or nature will affect the City’s rights under the Contract,
including but not limited to the bonds.
11.8 Prohibited Interests
A. No City official or representative who is authorized in such capacity and on behalf of
City to negotiate, supervise, make, accept, or approve, or to take part in negotiating,
supervising, making, accepting or approving any engineering, inspection,
construction or material supply contract or any subcontract in connection with
construction of the project, shall be or become directly or indirectly interested
financially in the Contract.
11.9 Controlling Law
A. Notwithstanding any subcontract or other contract with any subcontractor, supplier,
or other person or organization performing any part of the Work, this Contract shall
be governed by the law of the State of California excluding any choice of law
provisions.
11.10 Jurisdiction; Venue
A. Contractor and any subcontractor, supplier, or other person or organization
performing any part of the Work agrees that any action or suits at law or in equity
arising out of or related to the bidding, award, or performance of the Work shall be
maintained in the Superior Court of San Bernardino County, California, and
expressly consent to the jurisdiction of said court, regardless of residence or
domicile, and agree that said court shall be a proper venue for any such action.
11.11 Cumulative Remedies.
A. The duties and obligations imposed by these General Conditions and the rights and
remedies available hereunder to the parties hereto are in addition to, and are not to
be construed in any way as a limitation of, any rights and remedies available to any
or all of them which are otherwise imposed or available by Applicable Laws, by
special warranty or guarantee, or by other provisions of the Contract Documents.
The provisions of this Article will be as effective as if repeated specifically in the
Contract Documents in connection with each particular duty, obligation, right, and
remedy to which they apply.
11.12 Survival of Obligations.
A. All representations, indemnifications, warranties, and guarantees made in, required
by, or given in accordance with the Contract Documents, as well as all continuing
obligations indicated in the Contract Documents, will survive final payment,
completion, and acceptance of the Work or termination or completion of the Contract
or termination of the services of Contractor.
Packet Page. 948
11.13 Headings.
A. Article and paragraph headings are inserted for convenience only and do not
constitute parts of these General Conditions.
11.14 Assignment of Antitrust Actions
A. In accordance with §7103.5(b) of the California Public Contract Code, Contractor
and Subcontractors must conform to the following requirements:
1. In entering into a public works contract or a subcontract to supply goods, services,
or materials pursuant to a public works contract, Contractor or Subcontractor offer
and agree to assign to the awarding body all rights, title, and interest in and to all
causes of action it may have under §4 of the Clayton Act (15 U.S.C. Sec. 15) or
under the Cartwright Act (Chapter 2 (commencing with §16700) of Part 2 of
Division 7 of the Business and Professions Code) arising from purchases of goods,
services, or materials pursuant to the public works contract or the subcontract.
2. This assignment must be made and become effective at the time the awarding
body tenders to Contractor, without further acknowledgment by the parties.
11.15 All Legal Provisions Included
A. Contractor shall give all notices and comply with all federal, state and local laws,
ordinances, rules and regulations bearing on conduct of work as indicated and
specified by their terms. References to specific laws, rules or regulations in this
Contract are for reference purposes only, and shall not limit or affect the applicability
of provisions not specifically mentioned. If Contractor observes that drawings and
specifications are at variance therewith, he shall promptly notify City in writing and
any necessary changes shall be adjusted as provided for in this Contract for changes
in Work. If Contractor performs any Work knowing it to be contrary to such laws,
ordinances, rules and regulations, and without such notice to City, he shall bear all
costs arising therefrom.
B. Contractor shall be responsible for familiarity with the Americans with Disabilities Act
(“ADA”) (42 U.S.C. § 12101 et seq.). The Work will be performed in compliance with
ADA laws, rules and regulations. Contractor shall comply with the Historic Building
Code, including, but not limited to, as it relates to the ADA, whenever applicable.
C. Contractor acknowledges and understands that, pursuant to Public Contract Code
section 20676, sellers of "mined material" must be on an approved list of sellers
published pursuant to Public Resources Code section 2717(b) in order to supply
mined material for this Contract.
D. No City official or representative who is authorized in such capacity and on behalf of
City to negotiate, supervise, make, accept, or approve, or to take part in negotiating,
supervising, making, accepting or approving any engineering, inspection,
construction or material supply contract or any subcontract in connection with
construction of the Work, shall be or become directly or indirectly interested
financially in the Contract.
Packet Page. 949
E. All provisions of law required to be inserted in the Contract or Contract Documents
pursuant to any Applicable Laws shall be and are inserted herein. If through mistake,
neglect, oversight, or otherwise, any such provision is not herein inserted or inserted
in improper form, upon the application of either party, the Contract or Contract
Documents shall be changed by City, at no increase in Contract Price or extension
in Contract Times, so as to strictly comply with the Applicable Laws and without
prejudice to the rights of either party hereunder
11.16 Electronic Signature. Each Party acknowledges and agrees that this Agreement may be
executed by electronic or digital signature, which shall be considered as an original
signature for all purposes and shall have the same force and effect as an original signature
ARTICLE 12 - FLEET COMPLIANCE
12.1 To the extent applicable, Contractor, shall comply, and shall ensure all subcontractors
comply, with all requirements of the most current version of the California Air Resources
Board (“CARB”) including, without limitation, all applicable terms of Title 13, California
Code of Regulations Division 3, Chapter 9 and all pending amendments (“Regulation”).
12.2 Throughout Project, and for three (3) years thereafter, Contractor shall make available for
inspection and copying any and all documents or information associated with Contractor’s
and subcontractors’ fleet including, without limitation, the CRCs, fuel/refueling records,
maintenance records, emissions records, and any other information the Contractor is
required to produce, keep or maintain pursuant to the Regulation upon two (2) calendar
days’ notice from the City.
12.3 Contractor shall be solely liable for any and all costs associated with complying with the
Regulation as well as for any and all penalties, fines, damages, or costs associated with
any and all violations, or failures to comply with the Regulation. Contractor shall defend,
indemnify and hold harmless the City, its officials, officers, employees and authorized
volunteers free and harmless from any claims, liabilities, costs, penalties or interest arising
out of any failure or alleged failure to comply with the Regulation.
Packet Page. 950
00 73 13 – SPECIAL CONDITIONS
ARTICLE 1 - SCOPE OF WORK
1.1 Location of the Project.
A. FROM “Kendall Dr & N H St, San Bernardino, CA 92407” TO “Kendall Dr & N E
St, San Bernardino, CA 92405”
Packet Page. 951
1.2 Scope of Work.
The work consists of constructing a raised median island along Kendall Drive between
“H” Street and “E” Street, including survey, clearing and grubbing, removals,
excavation, grading, construction of PCC curbs, gutters, sidewalks and concrete
structures; installation of storm drain pipes, catch basins, and drainage
appurtenances; cold milling, pavement reconstruction, asphalt overlays with
reinforcing fibers, and pavement restoration; signing, striping, and replacement of
traffic signal loop detectors; implementation of Erosion Control Plan & BMPs and traffic
control measures; installation of removable bollards and grouted river rock median
surfacing; and all other incidental work necessary to complete the project as shown
on the plans and specifications.
The Contractor will furnish all transportation, materials, equipment, labor and supplies
to complete the improvements, together with the appurtenant work necessary or
incidental to complete, in a workmanlike manner, the improvements as contemplated
and as intended by the Plans and Specifications.
1.3 Approved Materials
Whenever the expression “or approved equal” is used, it shall be taken to mean the
approval by the City Engineer of any substitution of material or material specified
herein. All substitution requests shall state the reason for the request and the
difference in price between the item specified and the requested substitution. All
substitution requests shall be submitted to the City Engineer in writing five (5) working
days prior to the bid opening. No requests for substitutions will be considered by
telephone. The Contractor shall submit to the Engineer for review and approval six (6)
copies of all shop drawings. The Contractor shall make any corrections to shop
drawings required by the Engineer.
1.4 Asphalt Concrete
a. GENERAL -- Asphalt concrete shall comply with the requirements of Section 203-
6, "Asphalt Concrete," and Section 302-5, "Asphalt Concrete Pavement," of the
Standard Specifications and these Special Provisions.
The Performance Grade of the asphalt concrete shall be PG 64-10. Where dense graded
asphalt is being constructed in two or more layers, the asphalt concrete pavement for the
base course shall be B-PG 64-10. Where dense graded asphalt is being constructed in a
single layer or for a finishing course or asphalt concrete overlay, the asphalt concrete
pavement shall be C2-PG 70-10.
A tack coat shall be applied, as directed by the Engineer.
b. PAVEMENT REPAIR -- shall comply with the requirements for “ASPHALT
CONCRETE”, as specified herein, and as shown on the Plans and where directed
Packet Page. 952
by the Engineer. The existing localized portions of failed pavement structural
section, as shown on the Plans and when directed by the Engineer, shall be
completely removed (remove Asphalt concrete pavement to reach underlying
aggregate base material/ structural section material). Per the Plans, where
removals are in an area that is to be milled, the removals are to be done after
milling operations once underlying sub base or subgrade is compacted to 95%
relative compaction. Asphalt pavement may be removed by saw cutting and
removal of the existing pavement section, or by milling, as per Plan and as
approved and directed by the Engineer.
c. TACK COAT -- A Tack Coat shall be applied between base and finish courses
when the finish course is not placed immediately after the base course, and to
existing paved surfaces where new asphalt concrete overlaps or abuts existing
pavement. Tack Coat shall be as specified in the “Greenbook” Section 302-5.4.
There shall be no separate payment for Tack Coat.
d. DISTRIBUTION -- Asphalt concrete shall not be placed until the atmospheric
temperature is a minimum of 10ºC (50ºF) and rising, and the surface temperature
of the underlying material is a minimum of 4ºC (40ºF). Asphalt concrete shall also
not be placed during unsuitable weather.
e. CRACK SEALING (ASPHALT CONCRETE PAVEMENT) -- within each roadway’s
Project limits, all longitudinal and transverse cracks wider than 1/4” shall be
cleaned and sealed with a hot-applied rubberized asphalt sealant, prior to
placement of Asphalt concrete pavement overlay, or slurry seal, as appropriate.
The Engineer shall have the final determination as to which cracks shall be sealed.
Crack sealing shall not take place until after all milling/ planing operations for the roadway
have been completed.
With each delivery of crack treatment material to the job site, submit:
1. Manufacturer's name
2. Production location
3. Product brand or trade name
4. Product designation
5. Crack treatment trade name
6. Batch or lot number
7. Maximum heating temperature
Crack treatment material must be delivered to the job site premixed in cardboard
containers with meltable inclusion liners or in a fully meltable package. Heat hot-applied
crack treatment material in compliance with the manufacturer's instructions. Comply with
the manufacturer's application instructions.
The crack sealing material shall be rubberized crack seal by “Crafco,” or Engineer-
approved equal.
The entire limits of the roadway shall be machine swept within 24 hours prior to crack
treatment. Vegetation removal prior to crack cleaning shall be as specified in “CLEARING
AND GRUBBING,” of these Special Provisions. Cracks must be cleaned out and dry
Packet Page. 953
before treating. Before treating, blast cracks with oil-free compressed air at a pressure of
at least 90 psi.
If the pavement temperature is below 40 °F or if there is evidence of moisture in the crack,
use a hot air lance immediately before applying crack treatment. The hot air lance must
not apply flame directly on the pavement.
Cracks greater than 1/4” inch wide to 1-1/2” wide, shall be cleaned full depth by blowing
operations prior to applying sealant. The sealant shall be applied in accordance with the
manufacturer’s instructions. If after 2 days the crack treatment is more than 1/4 inch below
the specified level, the sealant fails, or the crack re-opens, re-treat the crack.
Cracks greater than 1-1/2” wide shall be cleaned full depth by routing and blowing
operations. A tack coat must be applied to the edges and then the crack is filled with a
fine asphalt concrete hot mix approved for skin patch and compacted level with the top of
the adjacent pavement.
Immediately remove crack treatment material spilled or deposited on the pavement
surface.
Before opening to traffic, apply sand or the manufacturer's recommended de-tack agent
to tacky crack treatment material within the traveled way. Sweep excess sand before
opening to traffic.
Sand applied to tacky crack treatment material must be clean, free of clay, and comply
with:
Sand Gradation
Sieve Size Percent Passing
f. ADJUST UTILITY FRAME AND COVER, AND WATER VALVE COVER, TO
GRADE -- Adjusting utility frames and covers to grade after completion of paving
shall be in accordance with Sub-Section 301-1.6 “Adjustment of Manhole Frame
and Cover Sets to Grade,” of the Standard Specifications, SECTION 46, “ADJUST
UTILITY FRAME AND COVER TO GRADE,” of these Special Provisions, and as
directed by the Engineer.
Adjusting water valve covers to grade after completion of paving shall be in accordance
with SECTION 25, “Adjustment of Water Facilities,” of these Special Provisions, and as
directed by the Engineer.
All debris and foreign material shall be removed from the cover in accordance with Sub-
Section 403, “Adjustment of Manhole Frame and Cover Sets to Grade,”
of the Standard Specifications.
g. ADJUST NON-CITY UTILITY FRAME AND COVER/VAULT -- Adjusting non-city
utility frame and cover/ vault frames and covers to grade after completion of paving
shall be performed by others.
Packet Page. 954
h. SOIL STERILANT -- The Contractor shall submit a proposal for a pre-emergent
herbicide soil sterilant, with dye, and approved for use in California, to the Engineer
for review and approval. The Contractor shall provide proof of registration for use
in California which can be verified by accessing the California Department of
Pesticide Regulation website at:
http://www.cdpr.ca.gov/docs/label/labelque.htm#regprods
Review and approval by the Engineer of the soil sterilant to be used on this Contract is for
administration purposes only and does not relieve the Contractor from responsibility for
providing and applying a suitable State registered soil sterilant in quantities and rates
sufficient for its intended purpose.
Contractor shall apply soil sterilant using spray equipment that provides good mechanical
agitation and even coverage of the area to be treated. Spray equipment shall be calibrated
before material is applied. The Engineer shall be the sole evaluator of the effectiveness
of the spray equipment before and during sterilant application, and the Engineer’s decision
concerning the use of the equipment on this Contract shall be final. If in the opinion of the
Engineer, the sterilant applicator and application is not sufficient for the job, the Contractor
shall immediately adjust, repair, or replace the spray equipment (and/or rate of application)
to the satisfaction of the Engineer and at the Contractor’s expense.
Contractor shall apply soil sterilant to the area(s) to be covered by asphalt concrete
pavement, as shown on the plans, or as directed by the Engineer. Soil sterilant shall be
applied at the rate specified by the manufacturer for the intended purpose, and repeated,
as necessary, as recommended by the manufacturer. Great care shall be taken to apply
soil sterilant to the designated areas only.
Asphalt concrete may only be placed after proper application and placement of soil
sterilant and only as recommended by the manufacturer. It should be noted that some
manufacturers require more than one soil sterilant application separated by a specific time
period to be effective.
The dye shall not stain concrete or masonry where visible.
Full compensation for conforming to the requirements of Soil Sterilant shall be considered
as included in Contract bid price paid for the various items of work involved and no
additional compensation will be allowed therefor.
i. PAYMENT -- The Contract unit bid price paid per TON (TN) and Square Foot
(SF) for the various AC Pavement related items as provided in the Bid Schedule,
shall include full compensation for furnishing all materials, tools, equipment and
incidentals, Asphalt concrete, and for doing all the work involved in furnishing,
placing and compacting pavement material, sweeping roadway prior to crack
treatment, cleaning out all cracks, applying soil sterilant, furnishing and installing
crack sealing for all cracks greater than ¼” width, furnishing, placement and
compaction of asphalt concrete for filling cracks greater than 1 ½” width, sand for
tack operations, sweeping excess sand, tack coat, per the Plans, the Standard
Specifications, these Special Provisions and as directed by the Engineer, and no
additional compensation will be allowed therefor.
Packet Page. 955
Cost of compaction testing ordered by the Engineer shall be paid for in the following
manner:
1. Tests which do not meet the required relative compaction shall be paid for by the
Contractor, as a deduction from this Contract. The Contractor shall pay the price at the
same rate that the CITY is charged by the testing soils lab.
2. Tests which do meet the required relative compaction shall be paid for by the CITY.
Adjusting water valve enclosures to grade following the Contractor’s paving operations
shall be considered as included in the various bid items and no additional compensation
will be allowed therefor.
Adjusting utility frames and covers to grade following the Contractor’s paving operations
shall be considered as included in the Contract unit bid price for the various bid items and
no additional compensation will be allowed therefor.
ARTICLE 2 -MODIFICATIONS TO THE GENERAL CONDITIONS
2.1 Section 2.12 Mobilization
Paragraph B.8 add the following:
No storage of equipment or materials will be allowed on private property, unless
written permission has been provided to City, or in street right-of-way.
2.2 Section 5.5 Safety
Section 5.5.A states, “Contractor to notify owners of adjacent property and of Underground
Facilities and other utility owners when prosecution of the work may affect them.” The following
requirements will be added to Section 5.5.A. The following list of individuals or entities, which
are known to have facilities in the area to be improved is merely for the Contractor's information
and may or may not be complete or inclusive:
City of San Bernardino (Engineering)------------------------------------(909) 998-2420
Southern California Edison, Ben Murguia-------------------------------(909) 307-6788
Southern California Gas Company, Devry Jennings-------------------(909) 335-7772
San Bernardino Municipal Water Department, Mike Nevarez------(909) 384-5092
Verizon Communications, Control Desk--------------------------------(909) 784-6655
AT&T, Rosemary Hamill--------------------------------------------------(916) 799-4642
Underground Service Alert------------------------------------------------(800) 227-2600
California Department of Transportation-------------------------------(909) 383-6920
Packet Page. 956
2.3 Section 5.27 Work Site
Section 5.27 Work Site, shall add the following requirements:
The contractor shall notify all residents and business owners, in writing (both in English and in
Spanish), of his proposed operations and schedule. Notice shall be delivered at least ten (10)
working days prior to start of construction. The contractor shall prepare a letter for this purpose
and submit the letter to the Engineer for approval at least five (5) working days prior to the date
needed for its circulation. The Contractor shall be responsible for reproduction and distribution
of the letters. The time to notify in advance shall be coordinated with the City inspector.
Project sign board shall be in-placed in advance (30 days after Notice to Proceed, NTP) prior
to any start of construction. Check with the City as to how far in advance to have the project
signage to be in-placed. See Attachment.
The Contractor shall follow: Greenbook 2024, Section 302-3.8, pages 317; Greenbook 2024,
Section 302-4.7, page 323, and Greenbook 2024, PART 6 TEMPORARY TRAFFIC CONTROL
SECTION 600-ACCESS, All of Sections 600 and 601, that apply to this project, pages 553 to
560. Businesses and residences adjacent to the Work shall be notified forty-eight (48) hours in
advance of closing of driveways.
Re-notification will be required if the Contractor’s schedule is altered or other delays occur,
which significantly affects the scheduled work. Then, it shall be at Contractor’s expense.
2.4 Section 5.29 Protection of Work and Property
Add Paragraph H and add the following:
The Contractor shall provide sufficient barricades, delineators and ribbon at each location to
adequately protect the new and fresh concrete surfaces from vandalism and unauthorized
markings. Newly poured and finished concrete areas shall be delineated or cordoned off with
tape to inhibit and discourage pedestrians, bikers and skateboards from tracking across the
fresh sidewalk surfaces. Unauthorized markings (i.e. graffiti, footprints, bike tire marks, scuff
marks) in the new sidewalk surfaces are not acceptable, and may be cause for rejection. All
such areas rejected due to such cause shall be removed and replaced at the Contractor’s
expense. All costs for protecting the new concrete surfaces and any graffiti removal shall be
considered as incidental to the cost of the work and no additional compensation will be allowed
therefore.
ARTICLE 3 -REQUIRED DOCUMENTS FOR PAY APPLICATION
Each monthly or milestone invoice from the General Contractor must include:
1. Contractor’s Invoice and Schedule of Values (SOV)
o Must reflect cumulative progress to date.
o Each line item should correspond to measurable work completed and/or
materials supplied.
Packet Page. 957
2. Subcontractor Invoices
o Each subcontractor listed in the SOV must submit a corresponding invoice.
o Invoices should specify labor, materials, and equipment consistent with progress
reports.
3. Subcontractor Conditional/Unconditional Releases
o Conditional Waiver and Release on Progress Payment (Civil Code §8132)
for partial payments.
o Unconditional Waiver and Release on Progress Payment (Civil Code §8134)
once payment is made.
o Final Waivers (Civil Code §§8136–8138) upon project completion.
4. Material Supplier Documentation
o Invoices for materials incorporated into the project.
o Corresponding lien releases from suppliers to subcontractors or the GC.
o Delivery tickets or packing slips verifying material delivery to site.
5. Certified Payroll Records (CPRs)
o Weekly payroll reports for all contractors and subcontractors (Labor Code
§1776).
o Must match reported progress and labor hours billed.
o Electronic submission via the Department of Industrial Relations (DIR) is
required.
6. Apprenticeship Compliance Documentation
o Evidence of registered apprentices (Labor Code §1777.5).
o Proof of training contributions.
7. Inspection Reports / Field Verification
o Inspection logs confirming percent completion of each SOV line item.
o Field engineer sign-off on progress estimates.
8. Retention and Withholding Summary
o Confirmation of 5% retention per Public Contract Code §9203.
o Identification of withheld funds for non-compliant documentation.
END OF SPECIAL CONDITIONS
Packet Page. 958
SPECIFICATIONS
Each respective bid item and bid schedule as shown on the proposal form shall comply with all
respective sections of the most current edition of Standard Specifications for Public Works
Construction (Greenbook), its supplements, and any other publications as specified. If there is a
conflict between these inclusions and the Standard Specifications, these inclusions shall have
precedence.
Contractor shall provide all construction surveying, staking and monument/centerline ties
at no extra cost. Compensation for construction surveying and staking shall be considered
as included in various bid items. No additional compensations will be allowed.
BID ITEM 1: MOBILIZATION
This bid item shall comply with the requirements of Section 7-3.4, "Mobilization", of the Standard
Specifications.
Mobilization may include, but not be limited to, the following principal items:
1. Submittal and modification, as required, of the Construction Schedule.
2. Providing a Project Office (if needed)
3. Review of the Site.
4. Obtaining all required Transportation Permits.
5. Submittal of all required insurance certificates and bonds as required by these
Specifications.
6. Moving onto the site, including, but not limited to:
A. Equipment
B. Arranging for and erection of Contractor’s work and storage areas.
7. Installing construction fencing and temporary construction power and wiring.
8. Providing a minimum of one restroom facility for each twenty-five (25) workers occupying
the site. Facilities may include existing functioning restrooms, or portable chemical
facilities, or any combination thereof, and shall count as one for each urinal or one for
each water closet (as required).
9. Installing all temporary utilities (as required).
10. Establishing required fire protection provisions.
11. Posting all OSHA required notices and establishment of safety programs.
12. Posting of all Department of Labor notices.
13. Having the Contractor’s superintendent at the job site full-time and responding 24 hours
per day.
14. Air and water quality protective measures, as necessary, and without limitation.
15. Potholing and other research and review as necessary to verify site conditions and utility
locations.
16. Demobilization of the Site.
17. Any other item as specified.
The cost of bonds, insurance, move in and move out costs, preparation and submission of
submittals, obtaining encroachment permits, and miscellaneous incidental costs, shall be
included in the Bid Item provided for mobilization and demobilization and incidental project costs
as a lump sum item, for which 75 percent (75%) will be eligible for inclusion in the first progress
Packet Page. 959
payment, with the remaining 25 percent (25%) not eligible for inclusion until 100 percent (100%)
of the work has been completed and if progress of the work is satisfactory. No work shall be
started without prior approval of the submittals. Failure to comply with the preceding requirement
will be sufficient ground for the Engineer to stop all work on the project until the requirements are
met.
Payment for this bid item shall be paid per Lump Sum (LS) and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing all
work involved in Mobilization per project plans and specifications; no additional compensation will
be allowed.
BID ITEM 2: CLEARING & GRUBBING UNCLASSIFIED EXCAVATION & UNCLASSIFIED
FILL
This bid item shall comply with Section 300-1, "Clearing and Grubbing", Section 300-2,
"Unclassified Excavation", and Section 300-4, "Unclassified Fill", respectively, of the Standard
Specifications and these Special Provisions.
Clearing and grubbing shall include, but not be limited to the following items as shown on the
Plans, as specified in these Special Provisions, or as directed by the Engineer.
The following items shall be classified as clearing and grubbing and unclassified excavation:
1. Removal and replacement or removal, capping and disposal, of removed landscape
irrigation work where encountered and as directed by the Engineer.
2. Removal and disposal of interfering portions of trees, tree roots, shrubs, plants and
turf or other local features that interfere with the prosecution of the work, as directed
by the Engineer.
3. Removal in full or in part existing driveway approaches and/or driveways, cross
gutters, spandrels, access/curb ramps, sidewalk, curb, and curb and gutter, per the
Plans, including saw cutting, and as directed by the Engineer.
4. Removal in full or in part existing Asphalt Concrete (AC), base material, AC berms per
project plans and specifications, including saw cutting, and as directed by the
Engineer.
5. Removal and cleanup of project area trash during the course of the project including
street sweeping if necessary.
6. Grade existing roadway in preparation of placing new sub-base and asphalt concrete
pavement, where shown on the Plans or as directed by the Engineer.
7. Guard rail, CMP, storm drain concrete structures.
Nothing in these Special Provisions shall relieve the Contractor from his responsibilities as
provided in Section 5-7, “Safety”, of the Standard Specifications.
All removed concrete, AC and other materials, not specifically requested to be salvaged, shall
become the property of the Contractor and shall be legally disposed of outside of the right-of-way
Packet Page. 960
in accordance with Section 300-2.2, "Unsuitable Materials", and Section 300-2.6, "Surplus
Material", of the Standard Specifications.
The Contractor shall deliver salvaged material to the CITY YARD, at 234 South Mountain View
Avenue, San Bernardino, CA 92404. The Contractor shall contact the Engineer at (909) 384-
5166, 48 hours prior to hauling. The Contractor shall provide equipment, as required, to safely
load and unload the salvaged materials.
Where unclassified fill and grading is necessary in preparation for laying concrete, it shall be made
with clean material which shall be solidly compacted to avoid future settlement.
The Contractor shall grade the roadway as required, provide all unclassified excavation and
unclassified fill necessary for curbs, gutters, cross gutter and apron, sidewalk, driveways,
driveway approaches, handicap ramps and street paving, as indicated on the Plans and described
in these Special Provisions. Excess and/or unsuitable materials shall be removed from the site
by the Contractor.
Outside the traveled way, in areas to receive concrete, soil shall be compacted to a relative
density of not less than 90%.
Backfill under the traveled way shall be compacted to a relative compaction of a minimum of 95%.
When asphalt pavement is to be placed directly on subgrade material, subgrade material shall be
compacted to a relative compaction of 95%.
The contract bid price paid for "CLEARING & GRUBBING UNCLASSIFIED EXCAVATION &
UNCLASSIFIED FILL," shall be considered as full compensation for providing all the tools and
equipment and for doing all the work involved in clearing and grubbing, per the Plans, the
Standard Specifications, these Special Provisions, and as directed by the Engineer, and shall be
considered as included in the various items of work involved and no additional compensation will
be allowed therefor.
The costs for compaction testing ordered by the Engineer shall be paid for in the following manner:
1. Tests which do not meet the required relative compaction shall be paid for by the
Contractor, as a deduction from his contract. CONTRACTOR shall pay the price at
the same rate that the CITY is charged by the Soils Testing Lab.
2. Tests which do meet the required relative compaction will be paid for by the CITY.
Payment for this bid item shall be paid per Lump Sum (LS) and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing all
work per project plans and specifications; no additional compensation will be allowed.
BID ITEM 3: STORM WATER POLLUTION AND PREVENTION PLAN (SWPPP) AND NPDES
COMPLIANCE:
Storm Water Pollution Prevention shall include preparation of Storm Water Pollution Prevention
and erosion control plans, control of all waters entering the project sites, erosion control, and any
dewatering in accordance with California Regional Water Quality Control Board, Santa Ana River
Region requirements.
Packet Page. 961
Storm, surface and/or nuisance water may be encountered at various times and locations during
performance of the Work. Such waters may interfere with Contractor’s operation and may cause
damage to adjacent or downstream private and/or public property by flooding, lateral erosion,
sedimentation, or pollution if not properly controlled by Contractor. Contractor, by entering the
Contract, assumes all risk and responsibility for water control. Contractor’s responsibility
includes, at a minimum, handling any nuisance and/or storm waters that may result during the
term of the Contract in a manner which will protect construction throughout the various stages of
work up to the point of final acceptance by Owner.
The contractor shall conduct its work in accordance with all rules and regulations set forth by the
Governing Jurisdiction(s). The contractor shall conduct and schedule operations to avoid the
effects of erosion on adjacent work and property.
Contractor is responsible for, and the Contract Price includes the erosion control related to the
Work, including but not limited to devices shown on the drawings and additional dikes, basins,
ditches, gravel bags, sandbags and silt fences which might become necessary as a result of
operations. The contractor shall be responsible for pumping water and desilting waters after each
storm event. Contractor is also aware that storm water from adjacent sites may be transported
to the Project site and it is Contractor’s responsibility to maintain any previously installed erosion
control facilities. The cost of all such work plus that required to repair damage resulting from any
erosion is part of the Contract Price and no additional compensation shall be paid to Contractor
for same.
The Contractor shall install and maintain all required or necessary erosion control measures to
cover the entire duration of the term of the Contract.
The Contractor is responsible to always protect the Project site from erosion damage by utilizing
Interim Erosion Control measures which, due to the site’s ever-changing condition during
construction, is achieved by implementing Best Management Practices (BMPs). Part of these
responsibilities shall include that the Contractor always have available for Owner’s review on-site,
a copy of the Project SWPPP and the Project erosion control plans. This Erosion Control Plan
shall be updated on a continuous basis as required to assure its accuracy.
All construction shall be conducted with provisions for the control of sand, silt and debris
originating at the construction site. Appropriate areas shall be contained with berms, desilting
basins, or similar structures to prevent runoff during construction operation. During construction,
the Contractor shall check and maintain berms and desilting basins prior to, during, and after all
rainfall events.
If construction of the project improvements necessitates removal of any erosion control device(s)
this device shall be replaced at the end of each working day when the five-day rain probability
forecast exceeds 40% or prior to the start of a weekend or holiday. The Contractor shall prepare
an emergency flood plan that includes monitoring of weather forecasts.
The Contractor shall provide to the Owner a plan depicting interim erosion control desilting basin
locations and sizes prior to the start of construction. The Contractor shall provide to the Owner
supporting calculations for the desilting basin sizes.
All contractor-dewatering activities shall comply with most current permit, Waste Discharge
Requirements, “California Regional Water Quality Control Board, Santa Ana Region (CRWQCB)
and these specifications. Contractor shall notify the City and CRWQCB a minimum of thirty (30)
Packet Page. 962
calendar days in advance of any dewatering activity and shall complete all permit application
documentation, supply all testing services and make all reporting required by the permit. In the
event that Contractor fails to comply with said permit’s requirements, Contractor shall be
responsible for all costs, fines and/or penalties assessed against Contractor, the City or any
affiliate of the City by CRWQCB and any other applicable agencies.
It is agreed among the parties that added construction costs incurred by the Contractor, due to
weather related damage or delay, shall be the Contractor’s responsibility.
The Contractor is notified that the approved Erosion Control Plan must be amended from time to
time during construction to reflect actual construction practices, and that each amendment must
be made by, or under the direction of, the Professional Engineer who prepared the Erosion Control
Plan.
The price paid for erosion control shall include full compensation for preparation and implementing
the Erosion Control Plan, which shall become a part of the Stormwater Pollution Prevention Plan
(SWPPP), and for amending the Erosion Control Plan to conform to Contractor’s actual
construction practices during construction. The total price bid for completing and submitting the
Erosion Control Plan, and for amending and administering the Erosion Control Plan shall include
the cost of all documentation and administration for the entire contract period and shall be
included in the lump sum contract price paid for the contract item of work, “Storm Water Pollution
Prevention Plan (SWPPP)” and no additional compensation will be allowed, therefore.
Payment for this bid item shall be paid per Lump Sum (LS) and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing all
work involved in Stormwater Pollution and Prevention Plan and NPDES Compliance, including
clearing and grubbing, per project plans and specifications; no additional compensation will be
allowed therefor.
BID ITEM 4: TEMPORARY TRAFFIC CONTROL
This bid item shall include all traffic control operations and devises proposed for use on this project
shall conform to the latest MUTCD, and the Part 6 of the “2024 Greenbook”.
Work under this section shall include, but not be limited to, traffic control and additional control as
specified by the City of San Bernardino including temporary traffic light signals, barricades,
flaggers (flagmen), portable delineators, traffic cones, signs, portable flashing beacons,
channelizers, temporary railing (Type K), and crash barriers. The Contractor shall utilize solar
powered equipment as much as possible to maintain the control existing traffic. Battery operated
equipment shall be utilized for night-time operations.
Payment for this bid item shall be paid per Lump Sum (LS) and shall be considered as full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing all
work involved in Traffic Control per project plans and specifications; no additional compensation
will be allowed.
BID ITEM 5: SAWCUT, REMOVE AND DISPOSE OF EXISTING AC PAVEMENT
This bid item shall comply with Section 401-2, “Asphalt Concrete Pavement” of the Standard
Specifications and these Special Provisions.
Packet Page. 963
Contractor shall scan the work area using a metal detector of adequate strength prior to any saw
cutting of the existing pavement. Contractor shall be responsible for locating and protecting
manhole, water valve, utility access frames and covers or other metal appurtenances buried
below the existing pavement surface whether shown on the plans or not.
All existing asphalt concrete pavement that is to be joined by new construction shall be sawcut in
a straight line. The Contractor shall not disturb or damage existing improvements to be protected
in place. The Contractor shall call USA / Dig Alert prior to excavation and shall "pothole" existing
utilities that fall within the proposed pavement "dig-out" areas as necessary to determine their
depth to avoid damaging existing utilities.
AC pavement shall be sawcut to full depth around entire join perimeter. Removal of existing
pavement sections shall be to the depth required for construction of the replacement roadway
sections as shown on the plans and will include the removal of existing AC pavement, cement
treated base and/or aggregate base. All removed material shall become the property of the
Contractor and shall be hauled away and legally disposed of properly outside of the roadway right
of way.
The contract bid unit price paid per Square Foot (SF) for “SAWCUT, REMOVE AND DISPOSE
OF EXISTING AC PAVEMENT” shall include full compensation for furnishing all materials, tools,
equipment and incidentals, and for doing all the work involved in saw cutting, removals, disposal,
and locating and protecting utilities per the Plans, the “Greenbook” Standard Specifications, these
Special Provisions and as directed by the Engineer, and no additional compensation will be
allowed therefor.
BID ITEM 6, 7, 8, 11 AND 12: SAWCUT, REMOVE, AND DISPOSE OF EXISTING CONCRETE
CURB & GUTTER, MASONRY STONE CURB & GUTTER, CONCRETE SIDEWALK, CATCH
BASIN AND 18” RCP PIPE
This bid items shall comply with Section 401-3.2, “Concrete Curb, Walk, Gutters, Cross Gutters,
Curb Ramps, Driveways and Alley Intersections” and Section 401-3.3, “Reinforced Concrete and
Masonry Structures” of the Standard Specifications and these Special Provisions.
Contractor shall scan the work area prior to any saw cutting of the existing concrete and masonry
stone curb & gutter, and concrete sidewalk. Contractor shall be responsible for locating and
protecting manholes, utility access frames, pull boxes, covers or other metal appurtenances
buried below the existing surface whether shown on the plans or not. The Contractor shall not
disturb or damage existing improvements to be protected in place. All removed material shall
become the property of the Contractor and shall be hauled away and legally disposed of properly
outside of the roadway right of way.
The contract bid unit price paid for Bid Item 6 - “SAWCUT, REMOVE AND DISPOSE OF
EXISTING CONCRETE CURB & GUTTER”, Bid Item 7 - “SAWCUT, REMOVE AND DISPOSE
OF EXISTING MASONRY STONE CURB & GUTTER”, and Bid Item 12 – “SAWCUT, REMOVE
AND DISPOSE OF EXISTING 18” RCP PIPE” shall be per Linear Foot (LF).
The contract bid unit price paid for Bid Item 8 - “SAWCUT, REMOVE, AND DISPOSE OF
EXISTING CONCRETE SIDEWALK” shall be per Square Foot (SF).
The contract bid unit price paid for Bid Item 11 – “REMOVE AND DISPOSE OF EXISTING
CATCH BASIN” shall be per Each (EA).
Packet Page. 964
The contract bid unit price paid for the various bid items shall include full compensation for
furnishing all materials, tools, equipment and incidentals, and for doing all the work involved in
saw cutting, removals, disposal, locating and protecting utilities per the Plans, the “Greenbook”
Standard Specifications, these Special Provisions and as directed by the Engineer, and no
additional compensation will be allowed therefor.
BID ITEMS 9 AND 10: COLD MILL EXISTING AC PAVEMENT TO A DEPTH OF 2" AND 3”
This bid items shall comply with Section 404, “Cold Milling” of the Standard Specifications and
these Special Provisions.
Contractor shall scan the work area using a metal detector of adequate strength prior to any saw
cutting of the existing pavement. Contractor shall be responsible for locating and protecting
manhole, water valve, utility access frames and covers or other metal appurtenances buried
below the existing pavement surface whether shown on the plans or not.
Pavement throughout project limits may contain petromats. Cracks, joints, and holes to be filled
shall be cleaned after cold milling. AC for AC pavement repairs shall be placed the same day as
removals are performed.
The contract bid unit price paid per Square Foot (SF) for “COLD MILL EXISTING AC PAVEMENT
TO A DEPTH OF 2" AND 3” shall include full compensation for furnishing all materials, tools,
equipment and incidentals, and for doing all the work involved in cold milling, removals, disposal,
and locating and protecting utilities per the Plans, the “Greenbook” Standard Specifications, these
Special Provisions and as directed by the Engineer, and no additional compensation will be
allowed therefor. No additional payment shall also be made for pavement transition, repair of
cracks or potholes, header grind, or edge grind that is called out on plans or in specifications.
BID ITEMS 13, 14, 18, 19 AND 22: CONSTRUCT 8” TYPE "A" PCC CURB ONLY, 8” TYPE
“B” PCC CURB & GUTTER (STANDARD AND MODIFIED), 8” PCC MEDIAN CURB &
GUTTER, AND PCC MEDIAN CURB WITH REVERSED SLOPING GUTTER OVER 4” THICK
CLASS II CAB PER CITY STD. PLAN 200 AND/OR DETAIL ON SHEET 3
This bid items shall comply with the requirements of Section 200-1, “Rock Products”, Section 201,
"Concrete, Mortar and Related Materials”, and Section 303-5, "Concrete Curbs, Walks, Gutters,
Cross Gutters, Alley intersections, Access Ramps and Driveway" of the Standard Specifications
and these Special Provisions.
Portland cement concrete curb for the median curb, 8” high curb face, shall be constructed in
accordance with the CITY’S Standard Plan 200, the project plans, and as directed by the
Engineer.
The above-referenced CITY Standard Plan is included in the APPENDIX and made a part of these
Special Provisions. All work shall conform to the above standards to the extent feasible; however,
emphasis shall be given to matching dimensions of adjoining improvements, subject to
concurrence of the Engineer.
Packet Page. 965
The Contractor shall be responsible for modifying traffic signal and highway lighting conduit and
conductors when adjusting pull boxes in ramp areas. The Contractor shall be responsible for
replacement of any pull boxes and/or pull box covers damaged prior to and/or during construction.
The Contractor shall be responsible for modifying any portion of sprinkler irrigation system found
to be in conflict with the construction of median curb or pavement, as applicable. The Contractor
shall be responsible for replacement of any portion of sprinkler irrigation facilities damaged prior
to and/or during construction.
The Contractor shall protect all existing structures and facilities which are adjacent to the limits of
the work to be done under this contract, in accordance with Section 400, “Protection and
Restoration of Existing Improvements”, of the “Greenbook” Standard Specifications and these
Special Provisions.
The Contractor is responsible for protecting all new Portland cement concrete construction from
vandalism. All construction of Portland cement concrete shall be conducted under direct supervision
of the Contractor’s staff, and shall be monitored until the work has adequately cured and is not
susceptible to damage from vandalism. Any vandalism identified on new concrete construction shall
be removed and replaced by the Contractor, as required and directed by the Engineer, at no
additional cost to the City.
The contract bid unit price paid per Linear Foot (LF) for “CONSTRUCT 8” TYPE "A" PCC CURB
ONLY, 8” TYPE “B” PCC CURB & GUTTER (STANDARD AND MODIFIED), 8” PCC MEDIAN
CURB & GUTTER, AND PCC MEDIAN CURB WITH REVERSED SLOPING GUTTER OVER 4”
THICK CLASS II CAB PER CITY STD. PLAN 200 AND/OR DETAIL ON SHEET 3” shall include
full compensation for furnishing all materials, tools, equipment and incidentals, and for doing all
the work involved in constructing Portland cement concrete curb, including saw cutting,, removals,
adjusting water valves and traffic pull boxes to grade, restoring irrigation system, performing
unclassified excavation and unclassified fill, asphalt concrete repair, if required, per the Plans, the
“Greenbook” Standard Specifications, these Special Provisions and as directed by the Engineer,
and no additional compensation will be allowed therefor.
BID ITEM 15 AND 32: CONSTRUCT GROUTED RIVER ROCK BETWEEN MEDIAN CURBS
PER CITY STD. PLAN 206 AND DETAIL ON SHEET 4, AND CONSTRUCT GROUTED RIPRAP
WITH 6” MAX. ROUND ROCK, DIMENSIONS PER PLAN
This bid items shall comply with the requirements of Section 200-1, “Rock Products”, Section 200-
2, “Untreated Base Materials”, Section 201, "Concrete, Mortar and Related Materials”, and
Section 213, “Engineering Geosynthetics” of the Standard Specifications and these Special
Provisions.
Grouted river rock median and grouted riprap shall be constructed in accordance with the CITY’S
Standard Plan 206, the project plans and details, and as directed by the Engineer. Stone for the
grouted river rock median and grouted riprap shall be rounded cobblestone per 200-1.6. Filter
cloth on the compacted median subgrade shall be Mirafi 140N non-woven geotextile filter fabric
or approved equivalent. The above-referenced CITY Standard Plan is included in the APPENDIX
and made a part of these Special Provisions. All work shall conform to the above standards to the
extent feasible.
The Contractor is responsible for protecting all new grouted river rock median and grouted riprap
construction from vandalism. All grouted river rock and riprap construction shall be conducted under
Packet Page. 966
direct supervision of the Contractor’s staff, and shall be monitored until the work has adequately
cured and is not susceptible to damage from vandalism. Any vandalism and/or damage to the river
rock new concrete construction shall be removed and replaced by the Contractor, as required and
directed by the Engineer, at no additional cost to the City.
The contract bid unit price paid per Square Foot (SF) for “CONSTRUCT GROUTED RIVER
ROCK BETWEEN MEDIAN CURBS PER CITY STD. PLAN 206 AND DETAIL ON SHEET 4,
AND CONSTRUCT GROUTED RIP-RAP WITH 6” MAX. ROUND ROCK” shall include full
compensation for furnishing all materials, tools, equipment and incidentals, and for doing all the
work involved in constructing the grouted river rock median and grouted riprap stamped concrete
median, including saw cutting existing concrete or pavement, removing existing concrete or
pavement, adjusting water valves and traffic pull boxes to grade, restoring irrigation system,
performing unclassified excavation and unclassified fill, asphalt concrete repair, if required, per
the Plans, the “Greenbook” Standard Specifications, these Special Provisions and as directed by
the Engineer, and no additional compensation will be allowed therefor.
BID ITEMS 16, 17, 24, 25, 26, 27 AND 29: CONSTRUCT 12" WIDE STRIP OF FULL DEPTH
AC PAVEMENT AND AC PAVEMENT JOIN AT SAWCUT LINE PER DETAIL ON SHEET 3,
CONSTRUCT AC OVERLAY (2”, 3”, VARIABLE 2” TO 8” THICKNESS, AND 0.85’ DEEP LIFT)
WITH ASPHALT REINFORCING FIBERS, AND AC PAVEMENT RESTORATION FOR
TRENCHES PER CITY STD. PLAN 310
This bid items shall comply with the requirements of Section 203-6, "Asphalt Concrete", and
Section 302-5, "Asphalt Concrete Pavement" of the Standard Specifications, these Special
Provisions, the CITY’s Standard Plan No. 310, and project plans.
The above-referenced CITY Standard Plan is included in the APPENDIX and made a part of these
Special Provisions. All work shall conform to the above standards to the extent feasible; however,
emphasis shall be given to matching dimensions of adjoining improvements, subject to
concurrence of the Engineer.
The Performance Grade of the asphalt concrete shall be PG 64-10. Where dense graded asphalt
is being constructed in two layers or more, the asphalt concrete pavement for the base course
shall be B-PG 64-10. Where dense graded asphalt is being constructed in a single layer or for a
finishing course or asphalt concrete overlay, the asphalt concrete pavement shall be C2-PG 70-
10. A tack coat shall be applied, as directed by the Engineer.
CRACK SEALING - In project areas where an overlay of asphalt concrete is to be made on
existing paving, all cracks larger than 1/4” shall be cleaned and sealed with a hot-applied
rubberized asphalt sealant, prior to placing overlay. Within the project area, the Engineer shall
make the sole determination as to which cracks shall be sealed. The crack sealing material shall
be rubberized crack seal by “Crafco,” or Engineer-approved equal.
Cracks 1/2” inch wide, to 1-1/2” wide, shall be cleaned full depth by blowing operations prior to
applying sealant. The sealant shall be applied in accordance with the manufacturer’s instructions.
Cracks greater than 1-1/2” wide shall be cleaned full depth by routing and blowing operations
prior to applying the sealant. A tack coat must be applied to the edges and filled with a fine asphalt
concrete hot mix.
TACK COAT - Tack coat shall be applied in compliance with Sub-Section 302-5.4, “Tack Coat” of
the Standard Specifications, and as directed by the Engineer.
Packet Page. 967
UTILITY ADJUSTMENTS - Contractor shall adjust all utility valves covers, cans, pull boxes to the
finish grade as necessary.
ASPHALT REINFORCING FIBERS – FORTA-FI Asphalt reinforcing fibers or approved equal
shall be applied to the asphalt mix.
FORTA-FI Area Representative:
Alex Kotrotsios, P.E., Project Manager / Southern California
Pacific Geosource
34111 Amber Lantern
Dana Point, CA 92629
C: 949-610-2627 | O: 1-877-454-8096 | F: 541-391-4805 | PACIFICGEOSOURCE.COM
A. DEFINITIONS
1. Reinforcing Fibers: High tensile strength aramid fiber blend specially formulated to
reinforce hot mix asphalt.
2. Fiber Reinforced Asphalt Concrete (FRAC): A mixture of hot or warm mix asphalt and
reinforcing fibers that has greater resistance to rutting, thermal cracking, fatigue
cracking, and reflective cracking as compared to conventional non-fiber asphalt mixes.
3. Fiber Reinforced Asphalt Rubber Hot Mix (FR-ARHM): A mixture of rubberized asphalt
and reinforcing fibers that has greater resistance to rutting, thermal cracking, fatigue
cracking, and reflective cracking as compared to non-fiber rubberized asphalt mixes.
4. Aramid Dispersion State Ratio (ADSR): A measure of the dispersion efficiency of the
Reinforcing Fibers within asphalt mixes. ADSR is calculated by comparing the mass
of aramid in the individual state to the total mass of extracted aramid fibers, expressed
as a percentage.
B. REFERENCES
1. ASTM D2172, Standard Test Methods for Quantitative Extraction of Bitumen from
Bituminous Paving Mixtures
2. ASTM D6433, Standard Practice for Roads and Parking Lots Pavement Condition
Index Surveys.
3. AASHTO T322, Determining the Creep Compliance and Strength of Hot-Mix Asphalt
(HMA) Using the Indirect Tensile Test Device.
4. AASHTO TP79, Standard Method of Test for Determining the Dynamic Modulus and
Flow Number (FN) for Asphalt Mixtures Using the Asphalt Mixture Performance
Tester.
5. Zeiada, W., Underwood, S., Stempihar, J., “Extraction of Aramid Fibers from Fiber
Reinforced Asphalt Concrete – Special Test Method”, Arizona State University, May
11, 2016.
Packet Page. 968
C. SUBMITTALS
1. Submit the following as part of the submittal package:
a. Representative fiber product sample.
b. Fiber product data sheet and certification from the Manufacturer that the fiber
product supplied meets the requirements of this specification.
c. Manufacturer’s instructions and general recommendations.
d. Performance results of ADSR testing from a minimum of three separate laboratory
trials to validate Dispersion Efficiency.
e. Performance results of PCI testing from a minimum of three separate field trials to
validate Cracking Resistance.
f. Performance results of FN testing from a minimum of three separate laboratory
trials to validate Rutting Resistance.
**NOTE: Testing is NOT required on samples from the job mix, submit previously
completed lab testing only.
2. Submit a minimum of five unique project examples and references where the
reinforcing fiber product was used within 250 miles of the project location.
D. MATERIALS AND PERFORMANCE
1. Reinforcing Fiber Properties
a. Provide a reinforcing fiber blend of Virgin Polyolefins and Virgin Aramids that
meets the requirements in Table 1 and Table 2 below.
b. FORTA-FI®, provided by the Forta Corporation, is an acceptable product and
meets the performance and material properties outlined in this section.
c. If a different aramid-based fiber blend is proposed, performance test results
complying with Section D.2 below must be submitted at least two weeks prior to
bid date for approval by engineer.
d. Non-aramid fiber blends will not be considered as acceptable alternatives to this
specification.
Table 1 - Reinforcing Fiber Material Properties
Form Manufacturer
Certification Serrated Monofilament
ASTM D276 0.91 1.44
Tensile Strength (psi) ASTM D7269 NA1 400,000
Packet Page. 969
Length (in) Manufacturer
Certification 0.75 0.75
1. Polyolefin fibers will melt or become plastically deformed during production
Table 2 - Reinforcing Fiber Performance Properties
Test Method Standard Requirement
Dispersion Efficiency Dispersion State ASTM ≥ 85%
Field Performance
Cracking Resistance
Pavement
Condition Index
ASTM
D6433
≥ 10 PCI Points
Increase, Minimum 4
Resistance to
Permanent
Deformation (Rutting)
Flow Number
(FN)
AASTHO
TP79 ≥ 75% increase
2. Performance Testing Requirements
All historical test results submitted to validate the fiber’s performance in asphalt mixes
shall be from previously completed laboratory and field trials using plant-produced
FRAC from a documented source only. Results from lab-produced FRAC or FRAC
from an undocumented source will not be accepted. Testing is NOT required on
samples from the job mix.
Fiber dosage rate in all submitted test reports must be equal to the rate proposed for
this project. Only testing performed by an AASHTO accredited laboratory or nationally
recognized university testing lab will be considered.
a. Aramid Dispersion State Ratio (ADSR) Tests from a minimum of three (3) separate
laboratory trials.
1. Perform ADSR test based on modified ASTM D2172 procedures as
provided in the document entitled “Extraction of Aramid Fibers from Fiber
Reinforced Asphalt Concrete – Special Test Method”. A copy of the
modified extraction methodology can be obtained by making an inquiry to
the Pavement and Materials Laboratory at Arizona State University at
NCE@asu.edu.
2. To validate ADSR results, average extracted aramid fiber quantity must
equal 0.007 percent by total sample weight with no individual result less
than 0.005 percent of the total sample weight.
3. All tested fiber mixes must achieve a minimum ADSR of 85%.
b. Pavement Condition Index (PCI) side by side comparison from a minimum of three
(3) field trails with a minimum in-service pavement age of four years.
Packet Page. 970
1. Perform PCI surveys shall be performed according to ASTM D6433.
2. Tests results shall include a control and a fiber reinforced pavement
section. FRAC mix shall be identical to control mix except for the inclusion
of fibers added at the same dosage as proposed on the project.
3. In field performance sections shall be subject to the same environmental
and traffic conditions. A minimum surface area of 500 yd2 per FRAC and
control section is required.
4. PCI results from fiber sections shall show a minimum 10 PCI points greater
than the control section after a minimum of 4 years.
c. Flow Number (FN) Tests from a minimum of three (3) separate laboratory trials.
1. Perform FN tests using the protocol from AASHTO TP79.
2. Tests results shall include a control and a fiber reinforced mix. FRAC mix
shall be identical to control mix except for the inclusion of fibers added at
the same dosage as proposed on the project.
3. Results from fiber specimens shall each show an average FN increase of
at least 75% over control specimens.
E. DELIVERY, STORAGE, AND HANDLING
1. Deliver fiber-reinforcement in sealed, undamaged containers with labels intact and
legible, indicating material name and lot number.
2. Deliver fiber-reinforcement to location where it will be added to each batch or loaded
into the mixer.
3. Store materials covered and off the ground. Keep sand and dust out of boxes and do
not allow boxes to become wet.
F. MIXING AND PRODUCTION
1. Add aramid and polyolefin reinforcing fiber blends at a dosage rate of one (1) pound
fiber per one (1) ton of asphalt.
2. Add alternative aramid fiber blends at a rate proposed by the manufacturer that
achieves the ADSR, PCI, and FN results required by Section D.
3. Have a fiber manufacturer’s representative on site during mixing and production. This
requirement can be waived if fiber manufacturer and asphalt producer can supply
evidence of manufacturer’s brand of fiber being successfully produced a minimum of
three times at the asphalt plant to be used for the project.
4. Batch Plant. When a batch plant is used, add fiber to the aggregate in the weigh
hopper and increase both dry and wet mixing times. Ensure that the fiber is uniformly
distributed before the injection of asphalt cement into the mixture.
5. Drum Plant:
Packet Page. 971
a. Inject fibers through the RAP collar using an automatic, metered air blown system
to promote rapid and complete fiber dispersion. System must automatically record
fiber addition data so as to remove human error. Rate the feeding of fibers with
the rate the plant is producing asphalt mix. If there is any evidence of fiber bundles
at the discharge chute, increase the mixing time and/or temperature or change the
angle of the fiber feeder line to increase dry mixing time.
b. Manual feeding of the fibers is not allowed.
c. Add fibers continuously and in a steady uniform manner. Provide automated
proportioning devices and control delivery within ±10% of the mass of the fibers
required. Perform an equipment calibration to the satisfaction of the fiber
manufacturer’s representative to show that the fiber is being accurately metered
and uniformly distributed into the mix. Include the following with the air blown
system:
• Low level indicators
• No-flow indicators
• A printout of feed rate status in pounds/minute
• A section of transparent pipe in the fiber supply line for observing
consistency of flow or feed.
• Manufacturer’s representative’s approval of fiber addition system.
G. PLACEMENT
Follow manufacturer and engineer’s recommendations for placement of FRAC.
H. QUALITY CONTROL
1. At the discretion of the Engineer, FRAC mix from the project site may be randomly
sampled for an analysis of the dispersion state of aramid fibers using the ADSR test
procedure defined in Section D.2.a. If test results show ADSR < 85%, the Engineer
may require the Contractor to cease operations until a correction plan has been
submitted and approved.
2. Aramid Dispersion Visual Test: Collect a 10kg sample of mix from the discharge chute
during first 50 tons of production. Visually assess the state of aramid fibers in the
sample according to Reference 4 (Section B of this specification) and rate the sample
as “Pass” or “Fail”.
i. “Pass” = All fibers exist in an Individual State and no Undistributed Clips or
Agitated Bundles of fiber are detected.
ii. “Fail” = One or more Undistributed Clips or Agitated Bundles are detected.
3. If a sample is rated as “Fail”, adjust mixing operations to improve fiber dispersion and
repeat Step 1 above.
4. If Visual Test results in three consecutive “Fail” ratings, plant mix samples should be
sent to a third-party laboratory for complete ADSR testing before production is allowed
to commence.
5. In addition to Visual Test, use a shovel to inspect FRAC mix in the back of first three
trucks and every tenth truck thereafter to confirm adequate blending of the fiber.
Packet Page. 972
6. Remove any observed fiber bundles from placed mixture and adjust operations per
the manufacturer’s recommendation to eliminate future fiber bundle development, and
repeat Steps 2 through 4 above to confirm adequate aramid fiber dispersion.
The contract bid unit price paid for Bid Item 16 - “CONSTRUCT 12" WIDE STRIP OF FULL
DEPTH AC PAVEMENT”, and Bid Item 17 – “CONSTRUCT AC PAVEMENT JOIN AT SAWCUT
LINE PER DETAIL ON SHEET 3” shall be per Linear Foot (LF).
The contract bid unit price paid for Bid Item 24 through 27 – “CONSTRUCT AC OVERLAY (2”,
3”, VARIABLE 2” TO 8” THICKNESS, AND 0.85’ DEEP LIFT) WITH ASPHALT REINFORCING
FIBERS”, and Bid Item 29 – “CONSTRUCT AC PAVEMENT RESTORATION FOR TRENCHES
PER CITY STD. PLAN 310” shall be per Ton (TN).
The contract bid unit price paid for the various bid items shall include full compensation for saw-
cutting, removals, AC pavement repairs and restoration, furnishing all labor, materials, paint
binder (tack coat), tools, equipment and incidentals and for doing all of the work involved in
constructing asphalt concrete pavement complete in place as shown on the plans and specified
in these Special Provisions, and no additional compensation will be allowed. Weight certification
tickets are required for payment. No additional compensation will be allowed therefore.
BID ITEM 21: CONSTRUCT 6” REMOVABLE LOCKING BOLLARD WITH EMBEDMENT
SLEEVE AND CEMENT FOUNDATION PER DETAIL ON SHEET 3.
Removal bollards to allow and restrict access to the turnout areas shall be 6” diameter x 36” tall
Schedule 40 steel bollard with 12” depth flush mount embedment sleeve installed in a cement
foundation per the project plans. The exposed top post shall be power coated yellow and have a
smooth dome top. A self-closing and lockable hinged lid / closure plate for pedestrian safety after
post removal shall be provided. No. 4 rebar stirrups and horizontal reinforcement shall be provided
in the cement foundation.
The contract bid unit price paid per Each (EA) for “CONSTRUCT REMOVABLE LOCKING
BOLLARD PER DETAIL ON SHEET 3” shall include full compensation for furnishing all labor,
materials, tools, equipment and incidentals and for doing all of the work involved in constructing
the removable locking bollard, embedment sleeve and cement foundation complete in place as
shown on the project plans and specified in these Special Provisions, and no additional
compensation will be allowed.
BID ITEMS 20, 23, 28, 30 AND 31: CONSTRUCT 15’ CURB OPENING WITH 3’ WIDE PCC
RIBBON GUTTER OVER 4” CLASS II CAB PER DETAIL ON SHEET 3, CONSTRUCT TYPE 1
LOCAL DEPRESSION PER CITY STD. PLAN 407 OVER 4” CLASS II CAB, CONSTRUCT
CONCRETE SIDEWALK PER CITY STD. PLAN 202, CONSTRUCT 6” THICK PCC CURB
CHANNEL W/ 8” CF OVER 4” CLASS II CAB PER DETAIL 1 ON SHEET 3, AND CONSTRUCT
CASE E LOCAL DEPRESSION OVER 4” CLASS II CAB PER SPPWC STD. PLAN 313-4
This bid items shall comply with the requirements of Section 200-1, “Rock Products”, Section 201,
"Concrete, Mortar and Related Materials”, and Section 303-5, "Concrete Curbs, Walks, Gutters,
Cross Gutters, Alley intersections, Access Ramps and Driveway" of the Standard Specifications
and these Special Provisions.
Packet Page. 973
Portland cement concrete ribbon gutter and v-gutter shall be constructed in accordance with the
project plans and as directed by the Engineer. Portland cement concrete local depression at street
catch basin locations, and concrete sidewalk shall be constructed in accordance with the CITY
Standard Plan 407 and 202 respectively, and as directed by the Engineer.
The above-referenced CITY Standard Plan is included in the APPENDIX and made a part of these
Special Provisions. All work shall conform to the above standards to the extent feasible; however,
emphasis shall be given to matching dimensions of adjoining improvements, subject to
concurrence of the Engineer.
The Contractor shall be responsible for modifying traffic signal and highway lighting conduit and
conductors when adjusting pull boxes in sidewalk and ramp areas. The Contractor shall be
responsible for replacement of any pull boxes and/or pull box covers damaged prior to and/or
during construction.
The Contractor shall protect all existing structures and facilities which are adjacent to the limits of
the work to be done under this contract, in accordance with Section 400, “Protection and
Restoration of Existing Improvements” of the “Greenbook” Standard Specifications and these
Special Provisions.
The Contractor is responsible for protecting all new Portland cement concrete construction from
vandalism. All construction of Portland cement concrete shall be conducted under direct supervision
of the Contractor’s staff, and shall be monitored until the work has adequately cured and is not
susceptible to damage from vandalism. Any vandalism identified on new concrete construction shall
be removed and replaced by the Contractor, as required and directed by the Engineer, at no
additional cost to the City.
The contract bid unit price paid for Bid Item 20 – “CONSTRUCT 15’ CURB OPENING WITH 3’
WIDE PCC RIBBON GUTTER OVER 4” CLASS II CAB PER DETAIL ON SHEET 3”, Bid Item
28 – “CONSTRUCT CONCRETE SIDEWALK PER CITY STD. PLAN 202”, and Bid Item 30 –
“CONSTRUCT 6” THICK PCC CURB CHANNEL W/ 8” CF OVER 4” CLASS II CAB PER DETAIL
1 ON SHEET 3” shall be per Square Foot (SF).
The contract bid unit price paid for Bid Item 23 – “CONSTRUCT TYPE 1 LOCAL DEPRESSION
PER CITY STD. PLAN 407 OVER 4” CLASS II CAB” and Bid Item 31 – “CONSTRUCT CASE E
LOCAL DEPRESSION OVER 4” CLASS II CAB PER SPPWC STD. PLAN 313-4” shall be per
Each (EA).
The contract bid unit price paid for the various bid items shall include full compensation for
furnishing all materials, tools, equipment and incidentals, and for doing all the work involved in
constructing Portland cement ribbon gutter, v-gutter, curb channel, local depression and sidewalk,
including saw cutting, removals, unclassified excavation and unclassified fill, conduit and pull box
adjustments, asphalt concrete repair, if required, per the project plans, the “Greenbook” Standard
Specifications, these Special Provisions and as directed by the Engineer, and no additional
compensation will be allowed therefor.
BID ITEM 33 AND 37: INSTALL 4" PVC PIPE AND 18” RCP (1500 D-LOAD), TRENCH AND
PIPE BEDDING PER CITY STD. PLAN NO. 306
This bid items shall comply with the requirements of Section 306, "Open Trench Conduit
Construction", Section 207-2, "Reinforced Concrete Pipe (RCP)", and Section 207-17, “PVC
Gravity Pipe of the Standard Specifications and these Special Provisions.
Packet Page. 974
Reinforced concrete pipe and pipe bedding shall be constructed in accordance with the project
plans, the CITY’S Standard Plan 306, Section 306-6, “Bedding” of the Standard Specifications,
and as directed by the Engineer. All work necessary for any given length of pipe placed, including
excavation, bedding, pipe placement, backfill and temporary resurfacing, shall be accomplished
during the same working day, in accordance with Section 306-3.5, “Maximum Length of Open
Trench”. Placing backfill uniformly on all sides shall mean limiting the differential fill level to two
feet or less. Compaction equipment or methods which may cause excessive displacement or may
damage structures, such as sleeve tapers or other drop-weight type equipment, shall not be used.
The above-referenced CITY Standard Plan is included in the APPENDIX and made a part of these
Special Provisions. All work shall conform to the above standards to the extent feasible; however,
emphasis shall be given to matching dimensions of adjoining improvements, subject to
concurrence of the Engineer.
Payment for “INSTALL 4" PVC PIPE AND 18” RCP (1500 D-LOAD), TRENCH AND PIPE
BEDDING PER CITY STD. PLAN NO. 306” per Linear Foot (LF) shall include full compensation
for furnishing all labor, tools, equipment, and incidentals, including necessary excavation,
trenching, removal and disposal of material, trench shoring, bedding and backfill required for
installation of the prefabricated gravity pipe, and for doing all other work necessary to construct
the prefabricated gravity pipe complete and in place, as shown on the Plans, as specified in the
Greenbook Standard Specifications and these Special Provisions, and as directed by the
Engineer.
BID ITEMS 34, 35 AND 36: INSTALL 18", 24” AND 48” HDPE. TRENCH AND PIPE BEDDING
PER MANUFACTURER’S SPECIFICATIONS
This bid items shall comply with the requirements of Section 306, "Open Trench Conduit
Construction", and Section 207-18, "Annular High-Density Polyethylene Pipe with Smooth
Interior, Corrugated Exterior, with Bell and Spigot Joints (Type S)" of the Standard Specifications
and these Special Provisions.
High Density Polyethylene Pipe (HDPE) pipe shall be constructed in accordance with the project
plans with trenching and bedding per the Manufacturer’s Specifications, CITY’s Standard Plan
306, Section 217, “Bedding Material” and Section 306-6, “Bedding” of the Standard Specifications.
Payment for “INSTALL 18", 24” AND 48” HDPE. TRENCH AND PIPE BEDDING PER
MANUFACTURER’S SPECIFICATIONS” per Linear Foot (LF) shall include full compensation
for furnishing all labor, tools, equipment, and incidentals, including necessary excavation,
trenching, removal and disposal of material, trench shoring, bedding and backfill required for
installation of the prefabricated gravity pipe, and for doing all other work necessary to construct
the prefabricated gravity pipe complete and in place, as shown on the Plans, as specified in the
Greenbook Standard Specifications and these Special Provisions, and as directed by the
Engineer.
BID ITEMS 38, 39, 40, 43, 44, 45 AND 51: CONSTRUCT CATCH BASIN NO. 1 (W = 7’) PER
CITY STD. PLAN NO. 403, CONSTRUCT CATCH BASIN NO. 3 (W = 7’ & 14’ OR MODIFIED)
PER CITY STD. PLAN NO. 405 AND DETAIL ON SHEET 3, CONSTRUCT MANHOLE STD.
NO. 2 PER CITY STD. PLAN NO. 415, LID TYPE PER PROFILE AND ADDITIONAL DETAIL
ON SHEET 9, CONSTRUCT CONCRETE COLLAR PER CITY STD. PLAN NO. 412, AND
CONSTRUCT 4” DRAIN OUTLET PER DETAIL 57 ON SHEET 9
Packet Page. 975
This bid items shall comply with the requirements of Section 201, "Concrete, Mortar and Related
Materials”, Section 303-1, "Concrete Structures”, and Section 306-3, “Trench Excavation” of the
Standard Specifications and these Special Provisions.
Catch basins, manholes and concrete collars shall be constructed in accordance with the project
plans and per CITY Standard Plan 403 & 405, 415 and 412, respectively. Drain outlets shall be
constructed in accordance with the project plans.
The above-referenced CITY Standard Plan is included in the APPENDIX and made a part of these
Special Provisions. All work shall conform to the above standards to the extent feasible; however,
emphasis shall be given to matching dimensions of adjoining improvements, subject to
concurrence of the Engineer.
Payment for “CONSTRUCT CATCH BASIN NO. 1 (W = 7’) PER CITY STD. PLAN NO. 403,
CONSTRUCT CATCH BASIN NO. 3 (W = 7’ & 14’ OR MODIFIED) PER CITY STD. PLAN NO.
405 AND DETAIL ON SHEET 3, CONSTRUCT MANHOLE STD. NO. 2 PER CITY STD. PLAN
NO. 415, LID TYPE PER PROFILE AND ADDITIONAL DETAIL ON SHEET 9, CONSTRUCT
CONCRETE COLLAR PER CITY STD. PLAN NO. 412, AND CONSTRUCT 4” DRAIN OUTLET
PER DETAIL 57 ON SHEET 9” per Each (EA) shall include full compensation for furnishing all
labor, tools, equipment, and incidentals, including necessary excavation, trenching, removal and
disposal of material, trench shoring, bedding and backfill required for installation of the catch
basins, manholes, concrete collars, and drain outlets, and for doing all other work necessary to
construct the improvements and in place, as shown on the project plans, as specified in the
Greenbook Standard Specifications and these Special Provisions, and as directed by the
Engineer.
BID ITEM 41, 42, 49 AND 50: INSTALL 18" AND 24” CORRUGATED METAL PIPE (C.M.P.)
16 GAGE METAL, AND INSTALL 24" AND 36” CORRUGATED METAL PIPE (C.M.P.) RISER
WITH CAGE INLET
This bid items shall comply with the requirements of Section 306, "Open Trench Conduit
Construction", Section 306-7.6, “Corrugated Metal Pipe (CMP), Section 207-11, "Corrugated
Steel Pipe and Pipe Arches", and Section 207-13, “Corrugated Aluminum Pipe and Pipe Arches)
of the Standard Specifications and these Special Provisions.
Corrugated Metal Pipe (CMP) is inclusive of corrugated steel and corrugated aluminum pipes.
Installation of CMP pipe and riser shall be as constructed in accordance with the project plans
with pipe bedding per the CITY’S Standard Plan 306, Section 306-6, “Bedding” of the Standard
Specifications, and as directed by the Engineer. The above-referenced CITY Standard Plan is
included in the APPENDIX and made a part of these Special Provisions. All work shall conform
to the above standards to the extent feasible.
The contract bid unit price paid for Bid Items 41 & 42 – “INSTALL 18" AND 24” CORRUGATED
METAL PIPE (C.M.P.) 16 GAGE METAL” shall be per Linear Foot (LF).
The contract bid unit price paid for Bid Items 49 & 50 – “INSTALL 24" AND 36” CORRUGATED
METAL PIPE (C.M.P.) RISER WITH CAGE INLET” shall be per Each (EA).
The contract bid unit price paid for the various bid items shall include full compensation for
furnishing all labor, tools, equipment, and incidentals, including necessary excavation, trenching,
removal and disposal of material, bedding and backfill required for installation of the corrugated
Packet Page. 976
metal pipe riser and pipes, and for doing all other work necessary to construct the corrugated
metal pipe riser and pipe complete and in place, as shown on the project plans, as specified in
the Greenbook Standard Specifications and these Special Provisions, and as directed by the
Engineer.
BID ITEM 46 AND 47: CONNECT HDPE PIPE TO CONCRETE STRUCTURE WITH WATER
TIGHT GASKET & NON-SHRINK GROUT PER MANUFACTURER SPECIFICATIONS, AND
CONNECT RCP PIPE TO CONCRETE CATCH BASIN / JUNCTION STRUCTURE. OUTLET
PIPE JOIN SHALL BE WATER TIGHT WITH NON-SHRINK GROUT
This bid items shall comply with the requirements of Section 306, "Open Trench Conduit
Construction", Section 207-18, "Annular High-Density Polyethylene Pipe with Smooth Interior,
Corrugated Exterior, with Bell and Spigot Joints (Type S)", and Section 207-2, "Reinforced
Concrete Pipe (RCP)" of the Standard Specifications and these Special Provisions.
Use non-shrink grout (or construction grout) at connections of RCP and HDPE pipes to catch
basins and manholes / junction structures shall conform to the manufacturer’s specifications. All
connections shall be made watertight.
Payment for “CONNECT HDPE PIPE TO CONCRETE STRUCTURE WITH WATER TIGHT
GASKET & NON-SHRINK GROUT PER MANUFACTURER SPECIFICATIONS, AND CONNECT
RCP PIPE TO CONCRETE CATCH BASIN / JUNCTION STRUCTURE. OUTLET PIPE JOIN
SHALL BE WATER TIGHT WITH NON-SHRINK GROUT per Each (EA) shall include full
compensation for furnishing all labor, tools, equipment, and incidentals, including necessary
excavation, trenching, removal and disposal of material, trench shoring, bedding and backfill
required for installation of the pipe connections, and for doing all other work necessary to construct
the improvements complete and in place, as shown on the Plans, as specified in the Greenbook
Standard Specifications and these Special Provisions, and as directed by the Engineer.
BID ITEM 48: INSTALL BROOKS 3636 CB DRAIN INLET (OR APPROVED EQUAL), WITH
3636 STEEL TRAFFIC GRATE (1-PC. BOLTED DOWN)
This bid item shall comply with the requirements of Section 303-1.2, “Subgrade for Concrete
Structures” and Section 306-3, “Trench Excavation” of the Standard Specifications and these
Special Provisions.
The Contractor shall furnish and install the Brooks 36” x 36” CB Precast Concrete Catch Basin
with bolted down galvanized 3636 Steel Grates in accordance with the project plans. The above-
reference Brooks 3636 CB catalog drawing is included in the APPENDIX and made a part of
these Special Provisions.
Payment for “INSTALL BROOKS 3636 CB DRAIN INLET (OR APPROVED EQUAL), WITH 3636
STEEL GRATE (1-PC. BOLTED DOWN)” per Each (EA) shall include full compensation for
furnishing all labor, tools, equipment, and incidentals, including necessary excavation, trenching,
removal and disposal of material, backfill, and subgrade preparation required for installation of
the precast catch basin box complete in place as shown on the project plans, as specified in the
Greenbook Standard Specifications and these Special Provisions, and as directed by the
Engineer.
Packet Page. 977
BID ITEM 52: INSTALL ¼” THICK GALVANIZED STEEL RESTRICTOR PLATE SET OVER
18” STORM DRAIN OUTLET OPENING MOUNTED WITH STAINLESS STEEL “L” BOLTS
AND ¼” DIA. STAINLESS STEEL HEX. HEAD NUTS PER DETAIL NO. 58 ON SHEET 9
The Contractor shall furnish and install the 2’(H) x 2’-6”(W) x ¼”(T) galvanized steel plate with 11”
diameter opening to the outlet wall of the storm drain manhole in accordance with the project
plans and details.
Payment for “INSTALL ¼” THICK GALVANIZED STEEL RESTRICTOR PLATE SET OVER 18”
STORM DRAIN OUTLET OPENING MOUNTED WITH STAINLESS STEEL “L” BOLTS AND ¼”
DIA. STAINLESS STEEL HEX HEAD NUTS PER DETAIL NO. 58 ON SHEET 9” per Each (EA)
shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals
required for fabrication and installation of the steel restrictor plate to the manhole outlet, complete
in place as shown on the project plans, as specified in the Greenbook Standard Specifications
and these Special Provisions, and as directed by the Engineer.
BID ITEM 53: CONSTRUCT 8” CONCRETE MASONRY RETAINING WALL PER CITY STD.
PLAN NO. 5.9 (SLOPING BACKFILL)
This bid item shall comply with the requirements of Section 201, “Concrete, Mortar, and Related
Materials”, Section 202, “Masonry Materials”, and Section 303, “Concrete and Masonry
Construction” of the Standard Specifications and these Special Provisions.
The Contractor shall construct an 8” concrete masonry block retaining wall as shown on the
project plans, including for corresponding wall height, length and elevation, per the CITY’s
Standard Plan 5.9 and in accordance with the requirements of 303-4, “Masonry Construction” of
the Standard Specifications, and as directed by the Engineer. The above-referenced CITY
Standard Plan is included in the APPENDIX and made a part of these Special Provisions. All
work shall conform to the above standards to the extent feasible.
Payment for “CONSTRUCT 8” CONCRETE MASONRY RETAINING WALL PER CITY STD.
PLAN NO. 5.9 (SLOPING BACKFILL)” per Square Foot (SF) shall include full compensation for
furnishing all labor, materials, tools, equipment, and incidentals required for fabrication and
installation of the steel restrictor plate to the manhole outlet, complete in place as shown on the
project plans, as specified in the Greenbook Standard Specifications and these Special
Provisions, and as directed by the Engineer.
BID ITEM 54: SIGNING AND STRIPING PER PLANS AND SPECIFICATIONS
SIGNING: Relocation and installation of new roadside signs on single posts shall be installed at
the locations shown on the Plan, or as directed by the Engineer. Roadside signs on single post,
shall be installed in accordance with the City Standard Drawing No. 504, and as directed by the
Engineer. The Contractor shall obtain approval from the Engineer regarding the type of sign
material and post type required for installation prior to actual placement. New installation shall not
encroach into required ADA access distance around obstacles. A minimum clearance of 48” shall
be maintained.
STRIPING: The application of traffic striping and pavement markings, raised pavement markers,
stop bars, crosswalks and pavement legends shall conform to the requirements of Section 314-
4, “Traffic Striping, Curb & Pavement Markings, and Pavement Markers”, of the Standard
Specifications and these Special Provisions.
Packet Page. 978
Thermoplastic material for traffic stripes shall be applied at a minimum thickness of 0.080-inch.
Thermoplastic traffic stripes and pavement markings shall be placed a minimum of 6 working days
after paving is completed. Raised pavement markers (RPMs), if required, shall be Stimsonite-Low
Profile No. 953A (yellow) and No. 953B (clear white) or approved equal.
The Contractor shall be responsible for maintaining traffic striping, signing, and markings as
necessary to control traffic throughout the duration of his work. As part of the contract, all existing
striping, markings, and pavement markers shall be documented by the Contractor. All striping
limit lines left illegible by slurry must be temporarily replaced on the same day of slurry sealing.
The method of temporary striping must have prior approval by the Engineer. Existing conflicting
striping and markings shall be removed by sandblasting or grinding.
The CALTRANS Standard Plans details referenced on the Plans and elsewhere within these
Special Provisions, and the related figures from the California Manual on Uniform Traffic Control
Devices (CA MUTCD) are included in the plans and made a part of these Special Provisions. All
work shall conform to the above standards to the extent feasible; however, emphasis shall be
given to matching dimensions of adjoining improvements, subject to concurrence of the Engineer.
The contract bid price per Lump Sum (LS) paid for “SIGNING AND STRIPING PER PLANS AND
SEPECIFICATIONS” shall include full compensation for furnishing all equipment and materials,
and for doing all work involved in installing new and/or relocating roadside signs on single post,
application of thermoplastic pavement traffic striping, raised markers, and pavement marking per
the Plans, the CALTRANS Standard Plans and the California Manual on Uniform Traffic Control
Devices (CA MUTCD) Figures, the Standard Specifications, these Special Provisions and as
directed by the Engineer, and no additional compensation will be allowed therefor.
BID ITEM 55: REPLACE TRAFFIC SIGNAL LOOP DETECTORS PER PLANS AND
SPECIFICATIONS
Inductive loop detectors shall conform to the provisions in Section 700-5.8, “Detectors,” of the
Standard Specifications for Public Works Construction (SPPWC) “Greenbook” and the California
Department of Transportation (Caltrans) Standard Specifications and Standard Plans, latest
editions in effect on the first day of the advertised “Notice Inviting Sealed Bids” for this project,
and these Special Provisions.
The traffic signal work includes installation of new inductive loop detectors and detector lead-in-
cables as shown on the Plan and/or as directed by the Engineer, and shall conform to Section
700-5.8, “Detectors”, of the “Greenbook” Standard Specifications, and these Special Provisions.
The Contractor shall test inductive detector loops in accordance with Section 701-18, “Testing”,
of the “Greenbook” Standard Specifications, and as directed by the Engineer.
An operating test consisting of five (5) days of trouble-free operation shall be satisfactorily
completed prior to acceptance by the Engineer.
The contract bid unit price paid per Lump Sum (LS) for “REPLACE TRAFFIC SIGNAL LOOP
DETECTORS PER PLANS AND SPECIFICATIONS” shall include full compensation for
furnishing all materials, tools and equipment and for doing all the work involved in the installation
of the inductive loop detector lead-in cable and inductive detector loops, including all the
appurtenant facilities, saw cutting, splicing, testing, removing sealant and cleaning existing
Packet Page. 979
conduit, removing dirt/debris from existing pull boxes, to replace existing complete in place, as
shown on the Plans, per the “Greenbook” Standard Specifications, the Caltrans Standard
Specifications and Plans, these Special Provisions and as directed by the Engineer, and no
additional compensation shall be allowed therefor.
BID ITEM 56: CONSTRUCTION 4’ X 8’ PROJECT SIGN AS PER PLANS, SPECIFICATIONS
AND SPECIAL CONDITIONS:
Work specified in this section includes providing all materials and performing all operations to
fabricate, install, modify and/or relocate Project Information Sign, and as specified in these
Special Provisions. Submit a shop drawing for all sign panels, and the Manufacturer's data for the
Sign Panels.
MATERIALS:
A. Project Information Signs shall be constructed per Caltrans specifications for Plywood
single sheet and laminated panel signs.
B. Color of signs, panels and lettering shall be as indicated on the drawing in these
specifications.
C. Sign Posts shall be constructed of wood and shall conform to the provisions of section 56-
2.02B, Caltrans.
D. Mounting Hardware shall be furnished by the Contractor and shall conform to the
provisions of section 56-2.02D, Caltrans.
INSTALLATION:
For this contract, one (1) Project Information Sign shall be installed, relocated or modified for each
location as directed by the City Engineer and shall conform to the provisions of sections 56-2.03,
and 56-2.04, Caltrans.
Measurement and Payment:
The contract bid price paid to fabricate and install the signs including all ancillary work be paid by
the contract unit price paid per Each sign (EA) and shall include full compensation for providing
all materials including post, digging the foundations for the post, and restoring the area around
the post during the duration of the project. And restoring of the surrounding area after removal of
the sign. This will also include the removal of the signs and posts.
Packet Page. 980
APPENDIX “A”
STANDARD DRAWINGS
Packet Page. 981
Packet Page. 982
Packet Page. 983
Packet Page. 984
Packet Page. 985
Packet Page. 986
Packet Page. 987
Packet Page. 988
Packet Page. 989
Packet Page. 990
Packet Page. 991
Packet Page. 992
Packet Page. 993
Packet Page. 994
Packet Page. 995
Packet Page. 996
Packet Page. 997
Packet Page. 998
Packet Page. 999
Packet Page. 1000
Packet Page. 1001
Packet Page. 1002
Packet Page. 1003
Packet Page. 1004
Packet Page. 1005
Packet Page. 1006
APPENDIX “B”
CITY OF SAN BERNARDINO
BUSINESS REGISTRATION CERTIFICATE APPLICATION FORM
Packet Page. 1007
Packet Page. 1008
APPENDIX “C”
CONSTRUCT 4’ X 8’ PROJECT SIGN
CITY OF SAN
BERNARDINO
Building a Better San
Bernardino
CONSTRUCTION OF A RAISED
MEDIAN ISLAND ALONG KENDALL
DRIVE BETWEEN H STREET AND E
STREET
PROJECT No: SS22-004 Estimated Completion:
------------------------
Funding Provided By:
Measure S, Gas Tax
Eric Levitt, City Manager
Council Members: Theodore Sanchez, Sandra
Ibarra, Juan Figueroa, Fred Shorett, Kim Knaus,
Mario Flores, Treasure Ortiz
For more information, please call the Engineering
Department (909) 998-2420
Packet Page. 1009
Size of project sign: 4’ Vertical by 8’ horizontal. Material: ½” Plywood with graffiti laminate.
Colors: White background, blue and black graphics, full color logo.
PLANS AND DRAWINGS
THE FOLLOWING PLANS AND DRAWINGS ARE INCORPORATED HEREIN BY
REFERENCE AS IF SET FORTH IN THEIR ENTIRETY:
1. STANDARD PLANS FOR PUBLIC WORK CONSTRUCTION (2021 EDITION)
2. STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION (2024 EDITION)
3. CONSTRUCTION OF A RAISED MEDIAN ISLAND ALONG KENDALL DRIVE, BETWEEN “H”
STREET AND “E” STREET, CIP NO. SS22-004, CONTRACT – SPECIFICATION DRAWING NO.
13575
3. APPENDICES.
Packet Page. 1010
1. BID TABULATION
PROJECT NAME: Construction of a Raised Median Island Along Kendall Drive Between H
Street and E Street, CIP No SS22-004 Contract Specification No. 13575
PROJECT NO: 8825
BID TABULATION
Apparent Low Bidder 1 Apparent Low Bidder 2 Apparent Low Bidder 3 Apparent Low Bidder 4 Apparent Low Bidder 5 Apparent Low Bidder 6 Apparent Low Bidder 7 Apparent Low Bidder 8 Apparent Low Bidder 9
Vance Corporation All American Asphalt Aneen Construction, Inc.KASA Construction, Inc.Hardy & Harper, Inc.Tryco General Engineering LCR Earthwork & Engineering,
Corp.Toro Enterprises, Inc.Roadway Engineering & Construction
Corp.
Bid Item and Description Quantit
y Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1 Mobilization 1 LS $305,000.00 $305,000.00 $365,000.00 $365,000.00 $94,882.00 $94,882.00 $425,000.00 $425,000.00 $100,000.00 $100,000.00 $180,000.00 $180,000.00 $150,000.00 $150,000.00 $395,000.0
0 $395,000.00 $100,000.00 $100,000.00
2 Clearing & grubbing unclassified excavation & unclassified fill 1 LS $73,781.00 $73,781.00 $25,000.00 $25,000.00 $70,000.00 $70,000.00 $290,000.00 $290,000.00 $106,973.45 $106,973.45 $48,000.00 $48,000.00 $75,000.00 $75,000.00 $100,500.0
0 $100,500.00 $75,000.00 $75,000.00
3 Storm Water Pollution and Prevention Plan (SWPPP) and NPDES
Compliance 1 LS $17,681.00 $17,681.00 $20,000.00 $20,000.00 $10,000.00 $10,000.00 $27,000.00 $27,000.00 $20,000.00 $20,000.00 $25,000.00 $25,000.00 $15,000.00 $15,000.00 $13,235.00 $13,235.00 $40,000.00 $40,000.00
4 Temporary traffic control 1 LS $153,136.00 $153,136.00 $355,000.00 $355,000.00 $130,000.00 $130,000.00 $150,000.00 $150,000.00 $300,000.00 $300,000.00 $60,000.00 $60,000.00 $200,000.00 $200,000.00 $147,000.0
0 $147,000.00 $50,000.00 $50,000.00
5 Sawcut, remove and dispose of existing AC pavement 30,958 SF $1.33 $41,174.14 $3.30 $102,161.40 $3.50 $108,353.00 $5.00 $154,790.00 $3.50 $108,353.00 $0.50 $15,479.00 $5.00 $154,790.00 $1.20 $37,149.60 $1.00 $30,958.00
6 Sawcut, remove, and dispose of existing concrete curb & gutter 90 LF $32.00 $2,880.00 $15.00 $1,350.00 $100.00 $9,000.00 $28.00 $2,520.00 $45.00 $4,050.00 $29.00 $2,610.00 $20.00 $1,800.00 $21.35 $1,921.50 $15.00 $1,350.00
7 Sawcut, remove, and dispose of existing masonry stone curb & gutter 7 LF $72.00 $504.00 $27.00 $189.00 $500.00 $3,500.00 $150.00 $1,050.00 $90.00 $630.00 $200.00 $1,400.00 $100.00 $700.00 $51.50 $360.50 $50.00 $350.00
8 Sawcut, remove, and dispose of existing concrete sidewalk 152 SF $8.40 $1,276.80 $3.00 $456.00 $20.00 $3,040.00 $18.00 $2,736.00 $10.00 $1,520.00 $28.00 $4,256.00 $5.00 $760.00 $4.50 $684.00 $4.00 $608.00
9 Cold mill existing AC pavement to a depth of 2"127,27
3 SF $0.32 $40,727.36 $0.53 $67,454.69 $0.40 $50,909.20 $0.52 $66,181.96 $0.45 $57,272.85 $0.45 $57,272.85 $0.35 $44,545.55 $0.30 $38,181.90 $0.47 $59,818.31
10 Cold mill existing AC pavement to a depth of 3"26,626 SF $0.37 $9,851.62 $0.63 $16,774.38 $0.70 $18,638.20 $0.55 $14,644.30 $0.45 $11,981.70 $0.50 $13,313.00 $0.50 $13,313.00 $0.50 $13,313.00 $0.48 $12,780.48
11 Remove and dispose of existing catch basin (depth to be verified in the
field).1 EA $8,904.00 $8,904.00 $2,700.00 $2,700.00 $10,000.00 $10,000.00 $1,000.00 $1,000.00 $2,500.00 $2,500.00 $5,800.00 $5,800.00 $5,000.00 $5,000.00 $1,600.00 $1,600.00 $7,500.00 $7,500.00
12 Sawcut, remove, and dispose of existing 18" RCP pipe 2 LF $2,234.00 $4,468.00 $590.00 $1,180.00 $1,000.00 $2,000.00 $500.00 $1,000.00 $600.00 $1,200.00 $900.00 $1,800.00 $200.00 $400.00 $1,010.00 $2,020.00 $1,500.00 $3,000.00
13 Construct type "A" PCC curb only with 8" CF per City Std. Plan 200.
Place 4” thick class II cab under curb 3,343 LF $30.00 $100,290.00 $35.00 $117,005.00 $50.00 $167,150.00 $28.00 $93,604.00 $30.00 $100,290.00 $79.00 $264,097.00 $65.00 $217,295.00 $24.55 $82,070.65 $80.00 $267,440.00
14 Construct type "B" PCC curb & gutter with 8" CF per City Std. Plan 200.
Place 4” thick class II cab under curb & gutter 366 LF $60.00 $21,960.00 $73.00 $26,718.00 $70.00 $25,620.00 $50.00 $18,300.00 $50.00 $18,300.00 $88.00 $32,208.00 $95.00 $34,770.00 $46.10 $16,872.60 $65.00 $23,790.00
15 Construct grouted river rock between median curbs per City Std. Plan
206 and detail on sheet 4 12,500 SF $26.00 $325,000.00 $25.00 $312,500.00 $30.00 $375,000.00 $15.00 $187,500.00 $25.00 $312,500.00 $15.00 $187,500.00 $10.00 $125,000.00 $14.70 $183,750.00 $27.00 $337,500.00
16 Construct 12” wide strip of full depth AC pavement per detail on sheet 3 8,300 LF $11.00 $91,300.00 $16.71 $138,693.00 $13.00 $107,900.00 $16.00 $132,800.00 $12.00 $99,600.00 $6.50 $53,950.00 $10.00 $83,000.00 $11.45 $95,035.00 $15.00 $124,500.00
17 Construct AC pavement join at sawcut line per detail on sheet 3 8,678 LF $1.20 $10,413.60 $2.40 $20,827.20 $13.00 $112,814.00 $4.00 $34,712.00 $3.00 $26,034.00 $7.50 $65,085.00 $3.00 $26,034.00 $2.30 $19,959.40 $4.00 $34,712.00
18 Construct PCC median curb & gutter with 8" CF per detail on sheet 3.
Gutter width=12". Place 4" thick class II cab under curb & gutter 3,115 LF $40.00 $124,600.00 $41.00 $127,715.00 $70.00 $218,050.00 $37.00 $115,255.00 $50.00 $155,750.00 $86.00 $267,890.00 $85.00 $264,775.00 $32.20 $100,303.00 $80.00 $249,200.00
19 Construct modified type "B" PCC curb & gutter with 8" CF per detail on
sheet 3. Gutter Width=18". Place 4" thick class II cab under curb & gutter 527 LF $60.00 $31,620.00 $71.00 $37,417.00 $65.00 $34,255.00 $50.00 $26,350.00 $50.00 $26,350.00 $89.00 $46,903.00 $85.00 $44,795.00 $46.10 $24,294.70 $65.00 $34,255.00
20 Construct 15' curb opening with 3' wide PCC ribbon gutter per detail on
sheet 3. Place 4" thick class II cab under ribbon gutter 90 SF $24.00 $2,160.00 $28.00 $2,520.00 $100.00 $9,000.00 $25.00 $2,250.00 $25.00 $2,250.00 $68.00 $6,120.00 $45.00 $4,050.00 $39.35 $3,541.50 $80.00 $7,200.00
21 Construct 6" removable locking bollard with embedment sleeve and
cement foundation per detail on shtee 3 6 EA $1,920.00 $11,520.00 $2,200.00 $13,200.00 $2,500.00 $15,000.00 $1,800.00 $10,800.00 $2,500.00 $15,000.00 $1,200.00 $7,200.00 $2,000.00 $12,000.00 $2,225.00 $13,350.00 $1,500.00 $9,000.00
22 Construct PCC median curb with reversed sloping gutter per detail on
sheet 3. Gutter width=12". Place 4" thick class II cab under curb & gutter 200 LF $60.00 $12,000.00 $63.00 $12,600.00 $90.00 $18,000.00 $50.00 $10,000.00 $50.00 $10,000.00 $82.00 $16,400.00 $95.00 $19,000.00 $32.95 $6,590.00 $65.00 $13,000.00
23 Construct type 1 local depression per City Std. Plan 407. Place 4" thick
class II cab under local depression 4 EA $900.00 $3,600.00 $4,800.00 $19,200.00 $6,000.00 $24,000.00 $875.00 $3,500.00 $4,500.00 $18,000.00 $5,680.00 $22,720.00 $15,000.00 $60,000.00 $2,425.00 $9,700.00 $5,200.00 $20,800.00
24 Construct 2" AC overlay with asphalt reinforcing fibers 1,435 TN $160.00 $229,600.00 $136.82 $196,336.70 $146.00 $209,510.00 $200.00 $287,000.00 $135.00 $193,725.00 $158.00 $226,730.00 $150.00 $215,250.00 $135.60 $194,586.00 $165.00 $236,775.00
25 Construct 3" AC overlay with asphalt reinforcing fibers 481 TN $214.00 $102,934.00 $136.82 $65,810.42 $146.00 $70,226.00 $200.00 $96,200.00 $135.00 $64,935.00 $159.00 $76,479.00 $150.00 $72,150.00 $135.85 $65,343.85 $170.00 $81,770.00
26 Construct variable thickness AC overlay (2” to 8”) with asphalt reinforcing
fibers 308 TN $256.00 $78,848.00 $136.82 $42,140.56 $146.00 $44,968.00 $300.00 $92,400.00 $135.00 $41,580.00 $159.00 $48,972.00 $165.00 $50,820.00 $135.50 $41,734.00 $170.00 $52,360.00
27 Construct 0.85’ deep lift AC with asphalt reinforcing fibers 65 TN $237.00 $15,405.00 $574.28 $37,328.20 $225.00 $14,625.00 $300.00 $19,500.00 $275.00 $17,875.00 $200.00 $13,000.00 $250.00 $16,250.00 $213.60 $13,884.00 $200.00 $13,000.00
28 Construct concrete sidewalk per City Std. Plan 202 152 SF $8.40 $1,276.80 $14.00 $2,128.00 $50.00 $7,600.00 $20.00 $3,040.00 $15.00 $2,280.00 $22.00 $3,344.00 $15.00 $2,280.00 $9.50 $1,444.00 $12.00 $1,824.00
29 Construct AC pavement restoration for trenches per City Std. Plan 310 20 TN $1,248.00 $24,960.00 $590.00 $11,800.00 $600.00 $12,000.00 $1,000.00 $20,000.00 $600.00 $12,000.00 $240.00 $4,800.00 $300.00 $6,000.00 $595.00 $11,900.00 $200.00 $4,000.00
30 Construct 6” thick PCC curb channel with 8” CF per detail 1 on sheet 3.
Place 4” thick class II cab under curb channel 103 SF $30.00 $3,090.00 $46.00 $4,738.00 $100.00 $10,300.00 $40.00 $4,120.00 $25.00 $2,575.00 $149.00 $15,347.00 $45.00 $4,635.00 $44.90 $4,624.70 $80.00 $8,240.00
31 Construct case E local depression per SPPWC Std. Plan 313-4. Place 4”
thick class II cab under local depression 2 EA $900.00 $1,800.00 $4,300.00 $8,600.00 $7,000.00 $14,000.00 $875.00 $1,750.00 $4,000.00 $8,000.00 $5,480.00 $10,960.00 $15,000.00 $30,000.00 $1,170.00 $2,340.00 $4,600.00 $9,200.00
32 Construct grouted Rip-Rap with 6" max. round rock, dimensions per plan.170 SF $24.00 $4,080.00 $227.00 $38,590.00 $20.00 $3,400.00 $35.00 $5,950.00 $225.00 $38,250.00 $158.00 $26,860.00 $20.00 $3,400.00 $39.65 $6,740.50 $240.00 $40,800.00
33 Install 4" schedule 80 PVC pipe, trench and pipe bedding per City Std.
Plan No. 306 61 LF $192.00 $11,712.00 $313.00 $19,093.00 $100.00 $6,100.00 $155.00 $9,455.00 $300.00 $18,300.00 $89.00 $5,429.00 $25.00 $1,525.00 $121.00 $7,381.00 $334.00 $20,374.00
34 Install 18" HDPE. Trench and pipe bedding per manufacturer’s
specifications 6 LF $628.00 $3,768.00 $1,880.00 $11,280.00 $1,000.00 $6,000.00 $585.00 $3,510.00 $1,800.00 $10,800.00 $800.00 $4,800.00 $300.00 $1,800.00 $734.00 $4,404.00 $2,000.00 $12,000.00
35 Install 24" HDPE. Trench and pipe bedding per manufacturer’s
specifications 114 LF $574.00 $65,436.00 $1,390.00 $158,460.00 $150.00 $17,100.00 $340.00 $38,760.00 $1,300.00 $148,200.00 $348.00 $39,672.00 $250.00 $28,500.00 $238.00 $27,132.00 $1,480.00 $168,720.00
36 Install 48" HDPE. Trench and pipe bedding per manufacturer’s
specifications 229 LF $687.00 $157,323.00 $1,400.00 $320,600.00 $150.00 $34,350.00 $525.00 $120,225.00 $1,325.00 $303,425.00 $365.00 $83,585.00 $325.00 $74,425.00 $342.00 $78,318.00 $1,500.00 $343,500.00
37 Install 18" RCP (1500 D-Load). Trench and pipe bedding per City Std.
Plan No. 306 560 LF $617.00 $345,520.00 $1,060.00 $593,600.00 $200.00 $112,000.00 $300.00 $168,000.00 $1,000.00 $560,000.00 $298.00 $166,880.00 $350.00 $196,000.00 $324.00 $181,440.00 $1,140.00 $638,400.00
38 Construct catch basin No. 1 per City Std. Plan No. 403 (Width=7’)1 EA $35,599.00 $35,599.00 $22,300.00 $22,300.00 $15,000.00 $15,000.00 $20,000.00 $20,000.00 $21,000.00 $21,000.00 $26,000.00 $26,000.00 $7,500.00 $7,500.00 $11,700.00 $11,700.00 $24,000.00 $24,000.00
39 Construct catch basin No. 3 per City Std. Plan No. 405 (Width=7’)1 EA $35,599.00 $35,599.00 $22,300.00 $22,300.00 $15,000.00 $15,000.00 $20,000.00 $20,000.00 $21,000.00 $21,000.00 $25,000.00 $25,000.00 $8,000.00 $8,000.00 $13,300.00 $13,300.00 $24,000.00 $24,000.00
40 Construct catch basin No. 3 per City Std. Plan No. 405 (Width=14’)3 EA $45,626.00 $136,878.00 $31,000.00 $93,000.00 $20,000.00 $60,000.00 $27,000.00 $81,000.00 $30,000.00 $90,000.00 $21,000.00 $63,000.00 $15,000.00 $45,000.00 $23,855.00 $71,565.00 $33,400.00 $100,200.00
41 Install 18" corrugated metal pipe (C.M.P.) 16 gage metal 3 LF $686.00 $2,058.00 $1,000.00 $3,000.00 $1,000.00 $3,000.00 $1,000.00 $3,000.00 $1,000.00 $3,000.00 $900.00 $2,700.00 $500.00 $1,500.00 $1,472.00 $4,416.00 $1,100.00 $3,300.00
42 Install 24" corrugated metal pipe (C.M.P.) 16 gage metal 4 LF $713.00 $2,852.00 $1,000.00 $4,000.00 $1,000.00 $4,000.00 $650.00 $2,600.00 $1,000.00 $4,000.00 $1,000.00 $4,000.00 $500.00 $2,000.00 $1,235.00 $4,940.00 $1,100.00 $4,400.00
43 Construct manhole No. 2 per City Std. Plan No. 415, see profile for lid
type - see additional detail on sheet 9 1 EA $26,948.00 $26,948.00 $26,800.00 $26,800.00 $10,000.00 $10,000.00 $35,000.00 $35,000.00 $25,000.00 $25,000.00 $39,880.00 $39,880.00 $9,000.00 $9,000.00 $20,045.00 $20,045.00 $28,600.00 $28,600.00
44 Construct modified catch basin No. 3 per detail on sheet 3 and City Std.
Plan No. 405 (Width=10’)2 EA $39,771.00 $79,542.00 $26,800.00 $53,600.00 $15,000.00 $30,000.00 $25,000.00 $50,000.00 $25,000.00 $50,000.00 $21,000.00 $42,000.00 $10,000.00 $20,000.00 $15,155.00 $30,310.00 $28,600.00 $57,200.00
45 Construct concrete collar per City Std. Plan No. 412 1 EA $5,560.00 $5,560.00 $4,400.00 $4,400.00 $5,000.00 $5,000.00 $1,900.00 $1,900.00 $4,500.00 $4,500.00 $4,800.00 $4,800.00 $2,000.00 $2,000.00 $3,850.00 $3,850.00 $4,800.00 $4,800.00
46 Connect HDPE pipe to concrete structure with water tight gasket & non-
shrink grout per manufacturer’s specifications 8 EA $3,485.00 $27,880.00 $5,200.00 $41,600.00 $5,000.00 $40,000.00 $1,400.00 $11,200.00 $5,000.00 $40,000.00 $1,980.00 $15,840.00 $750.00 $6,000.00 $995.00 $7,960.00 $5,600.00 $44,800.00
47 Connect RCP pipe to concrete catch basin/junction structure. Outlet pipe
join shall be water tight with non-shrink grout 14 EA $3,525.00 $49,350.00 $5,200.00 $72,800.00 $5,000.00 $70,000.00 $1,500.00 $21,000.00 $5,000.00 $70,000.00 $2,000.00 $28,000.00 $500.00 $7,000.00 $3,855.00 $53,970.00 $5,600.00 $78,400.00
48 Install Brooks 3636 CB drain inlet (or approved equal), with 3636 steel
traffic rated grate (1-PC. Bolted down)1 EA $21,510.00 $21,510.00 $13,200.00 $13,200.00 $15,000.00 $15,000.00 $6,400.00 $6,400.00 $13,000.00 $13,000.00 $7,280.00 $7,280.00 $4,000.00 $4,000.00 $7,600.00 $7,600.00 $14,100.00 $14,100.00
49 Install 24" corrugated metal pipe (C.M.P.) riser with cage inlet 1 EA $15,865.00 $15,865.00 $26,800.00 $26,800.00 $7,000.00 $7,000.00 $8,000.00 $8,000.00 $25,000.00 $25,000.00 $10,800.00 $10,800.00 $5,000.00 $5,000.00 $5,095.00 $5,095.00 $28,600.00 $28,600.00
50 Install 36" corrugated metal pipe (C.M.P.) riser with cage inlet 1 EA $17,366.00 $17,366.00 $28,300.00 $28,300.00 $7,000.00 $7,000.00 $14,000.00 $14,000.00 $27,000.00 $27,000.00 $12,800.00 $12,800.00 $5,000.00 $5,000.00 $4,415.00 $4,415.00 $30,000.00 $30,000.00
51 Construct 4” drain outlet per detail 57 on sheet 9 1 EA $4,266.00 $4,266.00 $22,600.00 $22,600.00 $1,500.00 $1,500.00 $500.00 $500.00 $21,000.00 $21,000.00 $4,800.00 $4,800.00 $500.00 $500.00 $9,925.00 $9,925.00 $2,400.00 $2,400.00
52
Install 1/4" thick galvanized steel restrictor plate set over 18" storm drain
outlet opening mounted with stainless steel L bolts and 1/4" dia.
Stainless steel hex. head nuts per detail No. 58 on sheet 9
1 EA $6,180.00 $6,180.00 $6,700.00 $6,700.00 $7,500.00 $7,500.00 $1,500.00 $1,500.00 $7,000.00 $7,000.00 $5,980.00 $5,980.00 $3,500.00 $3,500.00 $2,150.00 $2,150.00 $7,200.00 $7,200.00
53 Construct 8" concrete masonry retaining wall per City Std. Plan No. 5.9
(sloping backfill)40 SF $90.00 $3,600.00 $440.00 $17,600.00 $500.00 $20,000.00 $175.00 $7,000.00 $400.00 $16,000.00 $210.00 $8,400.00 $500.00 $20,000.00 $440.00 $17,600.00 $450.00 $18,000.00
54 Signing and striping per plans and specifications 1 LS $21,536.00 $21,536.00 $27,000.00 $27,000.00 $35,000.00 $35,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $29,000.00 $29,000.00 $27,000.00 $27,000.00 $57,000.00 $57,000.00 $29,000.00 $29,000.00
55 Replace traffic signal loop detectors per plans and specifications 1 LS $7,199.00 $7,199.00 $5,830.00 $5,830.00 $7,820.00 $7,820.00 $7,900.00 $7,900.00 $5,000.00 $5,000.00 $19,800.00 $19,800.00 $7,500.00 $7,500.00 $6,655.00 $6,655.00 $9,500.00 $9,500.00
56 Construct 4’ x 8’ Project Sign. See info in Appendix 2 EA $1,800.00 $3,600.00 $2,800.00 $5,600.00 $2,000.00 $4,000.00 $2,200.00 $4,400.00 $2,500.00 $5,000.00 $2,400.00 $4,800.00 $2,500.00 $5,000.00 $1,500.00 $3,000.00 $1,000.00 $2,000.00
57
Furnish and install new concrete light poles on the existing foundations,
including the mast arm and solar lighting fixture, in accordance with plans
and specifications
2 EA $4,799.00 $9,598.00 $16,000.00 $32,000.00 $13,519.00 $27,038.00 $8,700.00 $17,400.00 $16,000.00 $32,000.00 $16,800.00 $33,600.00 $13,000.00 $26,000.00 $16,400.00 $32,800.00 $15,000.00 $30,000.00
58 Remove the existing streetlights, furnish and install new solar lighting in
accordance with plans and specifications 9 EA $4,199.00 $37,791.00 $11,800.00 $106,200.00 $4,917.00 $44,253.00 $9,700.00 $87,300.00 $12,000.00 $108,000.00 $8,700.00 $78,300.00 $5,000.00 $45,000.00 $11,858.00 $106,722.00 $4,500.00 $40,500.00
59
Remove and dispose the existing lids on all electrical pull boxes and
construct new concrete covers in accordance with plans and
specifications
17 EA $360.00 $6,120.00 $730.00 $12,410.00 $415.76 $7,067.92 $600.00 $10,200.00 $1,000.00 $17,000.00 $450.00 $7,650.00 $450.00 $7,650.00 $729.00 $12,393.00 $400.00 $6,800.00
BID RANKING Apparent Low
Bidder 1
Apparent Low
Bidder 2
Apparent Low
Bidder 3
Apparent Low
Bidder 4
Apparent Low
Bidder 5
Apparent Low
Bidder 6
Apparent Low
Bidder 7
Apparent Low
Bidder 8 Apparent Low Bidder 9
TOTAL BID AMOUNT CALCULATED BASED ON UNIT PRICES $2,996,497.32 $3,944,205.55 $2,614,469.32 $3,076,203.26 $3,550,000.00 $2,586,291.85 $2,519,212.55 $2,435,115.40 $3,721,524.79
TOTAL BID AMOUNT INDICATED BY BIDDER $2,997,932.32 $3,944,205.55 $2,465,441.40 $3,076,203.26 $3,550,000.00 $2,586,292.58 $2,519,212.55 ##########$3,721,524.79
CALCULATION CORRECTIONS TO BID AMOUNT SUBMITTED BY CONTRACTOR BASED
ON CALCULATED BID AMOUNT -$1,435.00 $0.00 $149,027.92 $0.00 $0.00 -$0.73 $0.00 $0.00 $0.00
ADDITIVE ALTERNATE #1
A1 Furnish new solar lighting fixtures per specifications and deliver
them to the city yard location 12 EA $2,999.00 $35,988.00 $4,500.00 $54,000.00 $3,430.00 $41,160.00 $6,500.00 $78,000.00 $6,500.00 $78,000.00 $6,800.00 $81,600.00 $4,000.00 $48,000.00 $4,530.00 $54,360.00 $4,000.00 $48,000.00
ADDITIVE ALTERNATE # TOTAL
$35,988.00 $54,000.00 $41,160.00 $78,000.00 $78,000.00 $81,600.00 $48,000.00 $54,360.00 $48,000.00
BASE BID + ADDITIVE ALTERNATVE TOTAL
$3,032,485.32 $3,998,205.55 $2,655,629.32 $3,154,203.26 $3,628,000.00 $2,667,891.85 $2,567,212.55 $2,489,475.40 $3,769,524.79
IS THE BIDDER QUALIFIED BASED ON REFERENCE PROJECTS
SUBCONTRACTOR % AND AMOUNT SHOWN IN THE BID
BID TABULATION 1 of 9
Packet Page. 1011
2. REVIEW OF APPARENT LOW BID
APPARENT LOW BID SUBMITTED BY:Toro Enterprises, Inc.APPARENT LOW BID AMOUNT:
ITEM REVIEWED/CHECKED REVIEW RESULT BY DATE REMARKS
BID STAMPED AS RECEIVED PRIOR BID TIME:Yes Mohammad Alkhateeb #######
#BID BOND IN PROPER AMOUNT:Yes Mohammad Alkhateeb #######
#ADDENDA ACKNOWLEDGEMENT:Yes Mohammad Alkhateeb #######
#TOTAL BID PRICES CALCULATED CORRECTLY:Yes Mohammad Alkhateeb #######
#SUBCONTRACTOR AMOUNT:
MIN PRIME CONTRACTOR % REQUIREMENT FOR WORK PER SPECIFICATIONS:
PRIME CONTRACTOR % CALCULATED PER BID SUBMITTAL (THIS % MUST BE EQUAL OR
MORE THAN ABOVE %):
BIDDER COMPLIES WITH MIN PRIME CONTRACTOR % REQUIREMENT:
MAX ALLOWABLE SUBCONTRACTOR PERCENT PER SPECIFICATIONS:
SUB CONTRACTOR % CALCULATED PER BID SUBMITTAL (THIS % MUST BE EQUAL OR LESS
THAN ABOVE %):
BIDDER COMPLIES WITH MAX. SUB CONTRACTOR % REQUIREMENT:
PRIME CONTRACTOR LICENSE STATUS:Toro Enterprises, Inc.
Current and active till
08/31/2027 Mohammad Alkhateeb #######
#Print-out from CLSB Web Page attached (http://www.cslb.ca.gov/)
PRIME CONTRACTOR DIR REGISTRATION STATUS:Active till 6/30/2028 Mohammad Alkhateeb #######
#Print-out from DIR Web Page attached (https://services.dir.ca.gov/gsp)
SUB CONTRACTOR LICENSE STATUS:ELECNOR BELCO
ELECTRIC INC
Current and active till
07/31/2027 Mohammad Alkhateeb #######
#Print-out from CLSB Web Page attached (http://www.cslb.ca.gov/)
SUB CONTRACTOR DIR REGISTRATION STATUS:Active till 06/30/2028 Mohammad Alkhateeb #######
#Print-out from DIR Web Page attached (https://services.dir.ca.gov/gsp)
SUB CONTRACTOR LICENSE STATUS:RUBBERIZED
CRACKFILLER
SEALANT INC
Current and active till
11/30/2026 Mohammad Alkhateeb #######
#
SUB CONTRACTOR DIR REGISTRATION STATUS:Active till 06/30/2026 Mohammad Alkhateeb #######
#
SUB CONTRACTOR LICENSE STATUS:CINDY TRUMP INC
Current and active till
09/30/2026 Mohammad Alkhateeb #######
#
SUB CONTRACTOR DIR REGISTRATION STATUS:Active till 06/30/2026 Mohammad Alkhateeb #######
#
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
REVIEW OF APPARENT LOW BID 2 of 9
Packet Page. 1012
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
SUB CONTRACTOR LICENSE STATUS:
SUB CONTRACTOR DIR REGISTRATION STATUS:
PRIME CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:PRIME CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:
REVIEW OF APPARENT LOW BID 3 of 9
Packet Page. 1013
SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:
REFERENCE CHECK ACCEPTABLE:
REVIEW OF APPARENT LOW BID 4 of 9
Packet Page. 1014
2. REVIEW OF APPARENT LOW BID
REMARKS
Print-out from CLSB Web Page attached (http://www.cslb.ca.gov/)
Print-out from DIR Web Page attached (https://services.dir.ca.gov/gsp)
Print-out from CLSB Web Page attached (http://www.cslb.ca.gov/)
Print-out from DIR Web Page attached (https://services.dir.ca.gov/gsp)
$2,435,115.40
REVIEW OF APPARENT LOW BID 5 of 9
Packet Page. 1015
REVIEW OF APPARENT LOW BID 6 of 9
Packet Page. 1016
REVIEW OF APPARENT LOW BID 7 of 9
Packet Page. 1017
3. REFERENCE CHECK OF APPARENT LOW BIDDER
REFERENCE DATA FOR APPARENT LOW BIDDER REFERENCE CHECK FOR APPARENT LOW BIDDER
CH
E
C
K
E
D
BY
DA
T
E
Answer "YES" if satisfied or "NO" if not satisfied
REFERENCE PROJECT OWNER AND REFERENCE
NAME TEL
AM
O
U
N
T
DA
T
E
CO
M
P
L
E
T
E
D
DI
D
TH
E
CO
N
T
R
A
C
T
O
R
DO
QU
A
L
I
T
Y
WO
R
K
DI
D
TH
E
CO
N
T
R
A
C
T
O
R
ST
A
Y
ON
SC
H
E
D
U
L
E
DI
D
TH
E
CO
N
T
R
A
C
T
O
R
AS
K
FO
R
UN
N
E
C
E
S
S
A
R
Y
CH
A
N
G
E
OR
D
E
R
S
DI
D
TH
E
CO
N
T
R
A
C
T
O
R
FI
L
E
CL
A
I
M
S
AG
A
I
N
S
T
YO
U
WI
L
L
YO
U
HI
R
E
TH
E
CO
N
T
R
A
C
T
O
R
AG
A
I
N
REMARKS
Community Beautification City of Glendale
Sarkis Oganesyan 818-548-3945 $
8,356,287.95 Apr-24 Yes Yes No No Yes
Sarkis was unavailable, and
Victorya Pakhanyan took the call
and provided the feedback. They
are very satisfied with his work Mo
h
a
m
m
a
d
Al
k
h
a
t
e
e
b
12
/
1
7
/
2
0
2
5
Lawrence & Teller Improvements City of Thousand Oaks
Masoud Razavi 805-449-2454 $
1,865,987.00 Aug-22 -----
No feedback received. I called
the reference twice on separate
days and left voicemails;
however, I have not received a
return call.Mo
h
a
m
m
a
d
Al
k
h
a
t
e
e
b
12
/
1
9
/
2
0
2
5
Overlay D City of Santa Clarita
Ramiro Fuentes 661-286-4134 $9,099,917.80 Oct-22 Yes Yes No No Yes Very satisfied with his work.
Mo
h
a
m
m
ad
Al
k
h
a
t
e
e
b
12
/
1
9
/
2
0
2
5
Harvard Blvd Sewer Pipeline and
Water Mainline Replacement
Project
City of Santa Paula
Jon Turner 805-850-8562 ############Jan-24 Yes Yes No No Yes
Very satisfied with his work. The
City has two (2) ongoing
projects with the contractor.Mo
h
a
m
m
ad
Al
k
h
a
t
e
e
b
##
#
#
#
#
#
#
REF CHECK 8 of 9
Packet Page. 1018
4. LOWEST RESPONSIBLE BID
LOWEST RESPONSIBLE BID SUBMITTED BY:Toro Enterprises, Inc.
IN THE AMOUNT OF:$2,435,115.40
LOWEST RESPONSIBLE BID 9 of 9
Packet Page. 1019
Packet Page. 1020
Packet Page. 1021
Packet Page. 1022
Packet Page. 1023
Packet Page. 1024
Packet Page. 1025
Packet Page. 1026
Packet Page. 1027
Packet Page. 1028
Packet Page. 1029
Packet Page. 1030
Packet Page. 1031
Packet Page. 1032
Packet Page. 1033
Packet Page. 1034
Packet Page. 1035
Packet Page. 1036
Packet Page. 1037
Packet Page. 1038
Packet Page. 1039
Packet Page. 1040
Packet Page. 1041
Packet Page. 1042
Packet Page. 1043
Packet Page. 1044
Packet Page. 1045
Packet Page. 1046
Packet Page. 1047
Packet Page. 1048
Packet Page. 1049
Packet Page. 1050
Packet Page. 1051
Packet Page. 1052
Packet Page. 1053
Packet Page. 1054
Packet Page. 1055
Packet Page. 1056
Packet Page. 1057
Packet Page. 1058
Packet Page. 1059
Packet Page. 1060
Packet Page. 1061
Packet Page. 1062
Packet Page. 1063
Packet Page. 1064
Packet Page. 1065
Packet Page. 1066
Packet Page. 1067
Packet Page. 1068
Packet Page. 1069
Packet Page. 1070
Packet Page. 1071
Packet Page. 1072
Packet Page. 1073
Packet Page. 1074
Resolution No. 2026-004
Resolution No. 2026-004
January 21, 2026
Page 1 of 4
RESOLUTION NO. 2026-004
RESOLUTION OF THE MAYOR AND CITY COUNCIL OF
THE CITY OF SAN BERNARDINO, CALIFORNIA,
AUTHORIZING THE AMENDMENT OF THE FY 2025-2026
CAPITAL IMPROVEMENT PROGRAM TO REALLOCATE
MEASURE I FUNDS IN THE AMOUNT OF $1,135,945.42
FROM THE STREET IMPROVEMENTS
(REHABILITATION) CITY WIDE AT 50 LOCATIONS TO
BE CONSTRUCTED IN PHASES PROJECT (SS25-001) TO
THE CONSTRUCTION OF A RAISED MEDIAN ISLAND
ALONG KENDALL DRIVE BETWEEN H STREET AND E
STREET PROJECT.
WHEREAS, on June 4, 2025, the Mayor and City Council adopted the FY 2025-2026
Capital Improvement Program (CIP), which included the Street Improvements (Rehabilitation)
City Wide at 50 Locations To Be Constructed in Phases Project (SS25-001), funded in part by
Measure I; and
WHEREAS, the Construction of a Raised Median Island Along Kendall Drive Between
H Street and E Street Project (the “Project”) is a corridor improvement project intended to enhance
traffic safety, access management, and roadway operations along a major arterial roadway serving
multiple City wards; and
WHEREAS, bids for the Project were received and the lowest responsive and responsible
bid exceeded the originally programmed construction funding; and
WHEREAS, sufficient Measure I funds are available within SS25-001 to support a partial
reallocation without eliminating the ability to deliver street improvement locations through phased
implementation; and
WHEREAS, staff recommends reallocating a portion of the Measure I funds, in the
amount of $1,135,945.42 from SS25-001 to fully fund the Project and allow construction to
proceed within the current fiscal year; and
WHEREAS, the reallocation of Measure I funds requires an amendment to the FY 2025-
2026 Capital Improvement Program; and
WHEREAS, this action is a fiscal and administrative activity and does not constitute a
project under the California Environmental Quality Act (CEQA).
BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF
SAN BERNARDINO AS FOLLOWS:
Packet Page. 1075
Resolution No. 2026-004
Resolution No. 2026-004
January 21, 2026
Page 2 of 4
SECTION 1. The City Council hereby authorizes the reallocation of $1,135,945.42 in
Measure I funds from the Street Improvements (Rehabilitation) City Wide at 50 Locations To Be
Constructed in Phases Project (SS25-001) to the Construction of a Raised Median Island Along
Kendall Drive Between H Street and E Street Project.
SECTION 2. The Director of Finance & Management Services is hereby authorized to
amend the FY 2025-2026 Capital Improvement Program to reflect the Measure I fund reallocation
described in Section 1 of this Resolution.
SECTION 3. This action is not subject to the California Environmental Quality Act
(CEQA) because it can be seen with certainty that there is no possibility that the activity may have
a significant effect on the environment, pursuant to Section 15061(b)(3) of the CEQA Guidelines.
SECTION 4. Severability. If any provision of this Resolution or the application thereof to
any person or circumstance is held to be invalid, such invalidity shall not affect other provisions
or applications of the Resolution that can be given effect without the invalid provision or
application.
SECTION 5. Effective Date. This Resolution shall become effective immediately upon
adoption.
APPROVED and ADOPTED by the City Council and signed by the Mayor and attested
by the City Clerk this 21st day of January 2026.
Helen Tran, Mayor
City of San Bernardino
Attest:
Telicia Lopez, CMC, City Clerk
Approved as to form:
Sonia Carvalho, City Attorney
Packet Page. 1076
Resolution No. 2026-004
Resolution No. 2026-004
January 21, 2026
Page 3 of 4
CERTIFICATION
STATE OF CALIFORNIA )
COUNTY OF SAN BERNARDINO) ss
CITY OF SAN BERNARDINO )
I, Telicia Lopez, CMC, City Clerk, hereby certify that the attached is a true copy of
Resolution No. 2026-004, adopted at a regular meeting held on the 21st day of January 2026 by
the following vote:
Council Members: AYES NAYS ABSTAIN ABSENT
SANCHEZ _____ _____ _______ _______
IBARRA _____ _____ _______ _______
FIGUEROA _____ _____ _______ _______
SHORETT _____ _____ _______ _______
KNAUS _____ _____ _______ _______
FLORES _____ _____ _______ _______
ORTIZ _____ _____ _______ _______
WITNESS my hand and official seal of the City of San Bernardino this 21st day of January 2026.
Telicia Lopez, CMC, City Clerk
Packet Page. 1077
DISCUSSION
City of San Bernardino
Request for Council Action
January 21, 2026
To: Honorable Mayor and City Council Members
From: Lynn Merrill, Director of Public Works
Department:
Subject: Award of Construction Agreement to Spec Construction
Co Inc. for Construction of Homeless Navigation Center
SB Campus Project in the amount of $15,037,000 and
Contingency of $2,255,550 for a Total Amount of
Recommendation:
It is recommended that the Mayor and City Council of the City of San Bernardino,
California;
1. Approve the award of a Construction Agreement with Spec Construction
Co Inc., in the amount of $15,037,000 for the Construction of Homeless
Navigation Center SB Campus Project; and
2.Authorize the construction contingencies and administrative costs in the
total amount of $2,255,550 for the Project, bringing the total Project
budget for the Construction Agreement to $17,292,550; and
3.Approve Resolution No. 2026-005 authorizing the Interim Director of
Finance and Management Services to amend the FY 2025-2026
Operating Budget to loan $8,768,982 from the General Fund - Fund
Balance to fully fund the construction of the San Bernardino Homeless
Navigation Center SB Campus Project; and
4. Authorize the City Manager or designee to execute all documents with
Spec Construction Co Inc.; and
5.Authorize the City Manager or designee to expend the contingency fund,
if necessary, to complete the Project.
City Manager's Comments
Recommends approval with a 15% contingency.
Packet Page. 1078
Executive Summary
Awarding the construction agreement with Spec Construction Co Inc. will allow the City
to move forwards with the site preparation for the Navigation Center facility and the
installation of the modular units, which are currently being manufactured off-site. This
will include fully preparing the site such as performing site grading and utility
construction; performing the installation and finishing of the modular units; and
finalizing the site for the facility’s operation, which includes installing landscaping,
paving, and site lighting, among other components.
Spec Construction Co Inc was selected through a competitive procurement process,
where staff evaluated all responsive and responsible bids based on cost, experience,
and demonstrated capacity to deliver the project within the required schedule and
quality standards. The selected contractor was determined to be the lowest responsive
and responsible bidder and possesses the qualifications necessary to successfully
construct the facility in compliance with approved plans, specifications, and applicable
building and safety regulations.
Existing project funding in the amount of $8,523,568 is provided through ARPA, CDBG,
General Fund, HHAP-3, Home-ARP (construction), Hospital /HMO Donations and Low
Mod funds as part of the City’s adopted FY 2025-26 Capital Improvement Program. As
a result, a loan of $8,768,982 from the General Funds, fund balance is needed to
provide the necessary funding for the awarded contract and contingency.
Background
The City of San Bernardino Navigation Center is a comprehensive, 200-bed interim
housing campus designed to address the immediate and long-term needs of
individuals experiencing homelessness. The facility will provide a combination of
congregate and non-congregate housing options, allowing the City to accommodate a
diverse population, including individuals with medical, behavioral health, or
accessibility needs. In addition to safe and secure temporary shelter, the Navigation
Center will offer recuperative care for individuals transitioning from hospitals or other
care facilities, ensuring continuity of care in a supportive environment.
The Navigation Center is designed as a service-rich campus that combines temporary
housing with the supportive programs people need to stabilize and move toward
permanent housing. Core services will include case management, housing navigation
and diversion, employment readiness and workforce development, and coordination
with health and social service partners, all offered on-site to reduce barriers to care.
By centralizing shelter, services, and care coordination in one location, the Navigation
Center will improve service delivery, strengthen collaboration with healthcare,
behavioral health, nonprofit, and workforce partners, and reduce duplication of effort.
This facility will serve as a key hub in the City’s homelessness response, helping lower
unsheltered homelessness, support public health and safety, and create clear
pathways from crisis to stability and long-term housing.
Packet Page. 1079
Development of the San Bernardino Navigation Center is funded entirely through
restricted grant sources that are dedicated exclusively to this project. These funds are
specifically designated for the planning, design, and construction of the facility and
cannot be used for other City purposes. This grant-funded investment reflects a
strategic and fiscally responsible approach to addressing homelessness, while
ensuring compliance with funding requirements and advancing the City’s broader goals
of public health, safety, and community well-being.
The current total amount available across all funding sources is $9,720,931.73. After
allocating $1,272,363 for Amendment No. 1 to the CREDE contract, the City’s
remaining available funding across all sources will be $8,448,568. To this amount the
Kaiser Permanente Grant in the amount of $75,000 was added to the total funding
allocation, giving the project a remaining budget of $8,523,568.
Discussion
The construction agreement with Spec Construction Co Inc. is for the site preparation
and installation of the modular units for the Navigation Center facility. The scope of
work associated with this contract will consist of, in general, site grading, landscaping,
utility, parking lot paving, lighting, concrete foundation, fencing, ADA accessibility, and
modular building installation and finishing.
The Project was publicly advertised for competitive bidding through PlanetBids on
November 07, 2025, and bids were opened on January 13, 2026. A total of one sealed
bid was received. The total base bid is as follows:
SN NAME OF BIDDER CITY TOTAL BID
After review, staff determined that Spec Construction Co Inc., of Ontario, California,
submitted the lowest responsive and responsible bid in the amount of $15,037,000.
Staff have reviewed Spec’s bid documents, CSLB license, and DIR registration, and
confirmed that all requirements were met. Staff recommend awarding the construction
agreement to Spec Construction Co Inc.
The total Project cost, including contingencies, construction, quantity variations, field
adjustments, unforeseen work and administrative expenses, is estimated at
$17,292,550.
Project Cost
Construction Bid Amount $15,037,000
Contingency & Administrative Cost $2,255,550
Total Construction Cost $17,292,550
Current Project Budget and Proposed General Fund Loan
Packet Page. 1080
A total of $22,045,382 in funding has been committed to the Navigation Center from
federal, state, and private sources. Of this amount, $13,521,813.27 has been
obligated, leaving $8,523,568 available.
Source Spent or
Encumbered
ARPA $11,344,785.00 $11,344,785.00 $0.00
CDBG $3,397,541.00 $524,181.50 $2,873,359.50
Dignity Health $250,000.00 $0.00 $250,000.00
HHAP-3 $808,385.00 $689,839.13 $118,545.87
HOME-ARP $4,299,671.00 $524,181.50 $3,775,489.50
Kaiser Permanente $75,000.00 $0.00 $75,000.00
Inland Empire Health $1,500,000.00 $224,406.14 $1,275,593.86
Loma Linda University $70,000.00 $0.00 $70,000.00
Molina Healthcare $300,000.00 $214,420.00 $85,580.00
TOTAL $22,045,382.00 $13,521,813.27 $8,523,568.73
With the total construction and contingency cost totaling $17,292,550, a loan of
$8,768,982 from the General Fund is needed to close the financial gap and advance
construction. This amount will be repaid to the General Fund as the City explores and
secures additional funding commitments for the Navigation Center’s development.
Total Funding Gap ($8,768,981.27)
General Fund Loan $8,768,982.00
Environmental Impact
The Project is categorically exempt from the California Environmental Quality Act
(“CEQA”) pursuant to State CEQA Guidelines Section 15269 Emergency Shelter
and Supportive Housing) Projects involving the provision of emergency shelters,
transitional housing, supportive housing, or services for individuals experiencing
homelessness are commonly found exempt when they are developed to address an
urgent public health and safety need. Navigation Centers are generally recognized
as essential public facilities that address homelessness, which the State has
identified as an ongoing emergency. If the project meets the criteria under this
section, it may qualify as a statutory exemption.
2021-2025 Strategic Targets and Goals
Authorizing this construction contract aligns with Key Target No. 3: Improved Quality
of Life. Completion of the Navigation Center will expand access to shelter, care, and
supportive services for the City’s unhoused residents, directly supporting community
Packet Page. 1081
health, safety, and neighborhood stability.
Fiscal Impact
This project will be supported by the funds originally allocated and the $8,768,982 loan
from the General Fund – Fund Balance.
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino,
California;
1. Approve the award of a Construction Agreement with Spec Construction
Co Inc., in the amount of $15,037,000 for the Construction of Homeless
Navigation Center SB Campus Project; and
2.Authorize the construction contingencies and administrative costs in the
total amount of $2,255,550 for the Project, bringing the total Project
budget for the Construction Agreement to $17,292,550; and
3.Approve Resolution No. 2026-005 authorizing the Interim Director of
Finance and Management Services to amend the FY 2025-2026
Operating Budget to loan $8,768,982 from the General Fund - Fund
Balance to fully fund the construction of the San Bernardino Homeless
Navigation Center SB Campus Project:
4.Authorize the City Manager or designee to execute all documents with
Spec Construction Co Inc.; and
5.Authorize the City Manager or designee to expend the contingency fund,
if necessary, to complete the Project.
Attachments
Attachment 1 Resolution No. 2026-005
Attachment 2 Construction Agreement with Spec Construction Co, Inc.
Attachment 3 Bid Tabulation
Attachment 4 Bid Proposal
Attachment 5 Location Map
Ward:
Ward 1
Synopsis of Previous Council Actions:
June 04, 2025, FY 2025/2026 Budget Presentation (All Wards)
CC
Eric Levitt, City Manager
Packet Page. 1082
Resolution No. 2026-005
Resolution No. 2026-005
January 21, 2026
Page 1 of 4
RESOLUTION NO. 2026-005
RESOLUTION OF THE MAYOR AND CITY COUNCIL OF
THE CITY OF SAN BERNARDINO, CALIFORNIA,
AUTHORIZING THE AMENDMENT OF THE FY 2025-2026
OPERATING BUDGET TO LOAN $8,768,982 FROM THE
GENERAL FUND – FUND BALANCE TO FULLY FUND
THE CONSTRUCTION OF THE SAN BERNARDINO
HOMELESS NAVIGATION CENTER SB CAMPUS
PROJECT
WHEREAS, the City is proceeding with development of the Homeless Navigation Center
SB Campus Project (“Project”), a priority initiative intended to provide interim housing and
coordinated services to individuals experiencing homelessness within the City of San Bernardino;
and
WHEREAS, the total estimated cost of constructing the Navigation Center exceeds the
balance of available grant funding previously appropriated to the Project; and
WHEREAS, the City Council desires to ensure that construction of the Navigation Center
continues without interruption to maintain schedule, avoid cost escalation, and advance the City’s
commitments to addressing homelessness; and
WHEREAS, a loan of $8,768,982 from the General Fund will fully support the Navigation
Center construction award, contingencies, construction management, and associated
administrative needs; and
WHEREAS, this action is a fiscal and administrative activity and does not constitute a
project under the California Environmental Quality Act (CEQA).
BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF
SAN BERNARDINO AS FOLLOWS:
SECTION 1. The City Council hereby authorizes a loan of $8,768,982 from the General
Fund – Fund Balance.
SECTION 2. The Director of Finance & Management Services is hereby authorized to
amend the FY 2025-2026 Operating Budget to reflect the loan described in Section 1 of this
Resolution.
SECTION 3. This action is not subject to the California Environmental Quality Act
(CEQA) because it can be seen with certainty that there is no possibility that the activity may have
a significant effect on the environment, pursuant to Section 15061(b)(3) of the CEQA Guidelines.
Packet Page. 1083
Resolution No. 2026-005
Resolution No. 2026-005
January 21, 2026
Page 2 of 4
SECTION 4. Severability. If any provision of this Resolution or the application thereof to
any person or circumstance is held to be invalid, such invalidity shall not affect other provisions
or applications of the Resolution that can be given effect without the invalid provision or
application.
SECTION 5. Effective Date. This Resolution shall become effective immediately upon
adoption.
APPROVED and ADOPTED by the City Council and signed by the Mayor and attested
by the City Clerk this 21st day of January 2026.
Helen Tran, Mayor
City of San Bernardino
Attest:
Telicia Lopez, CMC, City Clerk
Approved as to form:
Sonia Carvalho, City Attorney
Packet Page. 1084
Resolution No. 2026-005
Resolution No. 2026-005
January 21, 2026
Page 3 of 4
CERTIFICATION
STATE OF CALIFORNIA )
COUNTY OF SAN BERNARDINO) ss
CITY OF SAN BERNARDINO )
I, Telicia Lopez, CMC, City Clerk, hereby certify that the attached is a true copy of
Resolution No. 2026-005, adopted at a regular meeting held on the 21st day of January 2026 by
the following vote:
Council Members: AYES NAYS ABSTAIN ABSENT
SANCHEZ _____ _____ _______ _______
IBARRA _____ _____ _______ _______
FIGUEROA _____ _____ _______ _______
SHORETT _____ _____ _______ _______
KNAUS _____ _____ _______ _______
FLORES _____ _____ _______ _______
ORTIZ _____ _____ _______ _______
WITNESS my hand and official seal of the City of San Bernardino this 21st day of January 2026.
Telicia Lopez, CMC, City Clerk
Packet Page. 1085
00 52 13 – CONTRACT FOR CONSTRUCTION
This Contract for Construction (“Contract”), No. GB24-010 is made and entered into this twenty-
first day of January, 2026 by and between the CITY OF SAN BERNARDINO , with its principal
place of business at Vanir Tower, 290 North D Street, San Bernardino, California 92401,
sometimes hereinafter called the “City” and Spec Construction Co Inc, sometimes hereinafter
called “Contractor.”
WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these
presents do covenant and agree with each other as follows:
ARTICLE 1. SCOPE OF WORK.
The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide
all labor, materials, equipment, tools, utility services, and transportation to complete all of the
Work required in strict compliance with the Contract Documents as specified in Article 5, below,
for the following Project:
Homeless Navigation Center Campus
Contractor is an independent contractor and not an agent of the City. The Contractor and its
surety shall be liable to the City for any damages arising as a result of the Contractor’s failure to
comply with this obligation.
ARTICLE 2. TIME FOR COMPLETION.
Time is of the essence in the performance of the Work. The Work shall be commenced on the
date stated in the City’s Notice to Proceed. The Contractor shall complete all Work required by
the Contract Documents within 256 working days from the commencement date stated in the
Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set forth
above is adequate and reasonable to complete the Work.
ARTICLE 3. CONTRACT PRICE.
The City shall pay to the Contractor as full compensation for the performance of the Contract,
subject to any additions or deductions as provided in the Contract Documents, and including all
applicable taxes and costs, the sum of Fifteen Million Thirty-Seven Thousand Dollars
($15,037,000). Payment shall be made as set forth in the General Conditions. The City will pay
to Contractor compensation based upon the prices set forth in the Bid Schedule.
ARTICLE 4. LIQUIDATED DAMAGES.
Contractor acknowledges that the City will sustain actual damages for each and every Day
completion of the Project is delayed beyond the Contract Time. Because of the nature of the
Project, it would be impracticable or extremely difficult to determine the City’s actual damages.
Accordingly, in accordance with Government Code section 53069.85, it is agreed that the
Contractor will pay the City the sum of $1,500 for each and every calendar day of delay beyond
the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages
and not as a penalty or forfeiture. In the event this is not paid, the Contractor agrees the City may
deduct that amount from any money due or that may become due the Contractor under the
Contract. This Section does not exclude recovery of other damages specified in the Contract
Packet Page. 1086
Documents. Liquidated damages may be deducted from progress payments due Contractor,
Project retention or may be collected directly from Contractor, or from Contractor's surety. These
provisions for liquidated damages shall not prevent the City, in case of Contractor's default, from
terminating the Contractor.
ARTICLE 5. COMPONENT PARTS OF THE CONTRACT.
The “Contract Documents” include the following:
o Notice Inviting Bids
o Instructions to Bidders
o Bid Forms
o Bid Acknowledgement
o Bid Schedule
o Bid Guarantee
o Designation of Subcontractors
o Information Required of Bidders
o Non-Collusion Declaration Form
o Iran Contracting Act Certification
o Public Works Contractor DIR Registration Certification
o Performance Bond
o Payment (Labor and Materials) Bond
o Contract for Construction
o General Conditions
o Special Conditions
o Specifications
o Addenda
o Construction Plans and Drawings
o Standard Specifications for Public Works Construction “Greenbook”, latest edition,
Except Sections 1-9
o Applicable Local Agency Standards and Specifications, as last revised
o Reference Specifications
o Approved and fully executed Change Orders
o Permits
o Compliance With American Rescue Plan Act (Arpa) Coronavirus Local Fiscal
Recovery Fund (CLFRF) Federal Guidelines Use of ARPA CLFRF And
Requirements
o General Decision Number CA20250026, Dated 10/03/2025
o HUD Packet Attachments – Federal Requirements
o 24 CFR Part 75, Dated 11/4/2024
Any other documents contained in or incorporated into the Contract
The Contractor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the
Contract Documents and not by others shall be done as if required by all. In the event of conflict,
the various Contract Documents will be given effect in the order set forth in the General
Conditions. This Contract shall supersede any prior agreement of the parties.
Packet Page. 1087
ARTICLE 6. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE.
Each and every provision of law required to be included in these Contract Documents shall be
deemed to be included in these Contract Documents. The Contractor shall comply with all
requirements of applicable federal, state and local laws, rules and regulations, including, but not
limited to, the provisions of the California Labor Code and California Public Contract Code which
are applicable to this Work.
ARTICLE 7. INDEMNIFICATION.
Contractor shall provide indemnification and defense as set forth in the General Conditions.
ARTICLE 8. PREVAILING WAGES.
Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor
Code which such rates shall be made available at the City’s Office or may be obtained online at
http://www.dir.ca.gov and which must be posted at the job site.
ARTICLE 9. FALSE CLAIMS.
Contractor acknowledges that if a false claim is submitted to the City, it may be considered fraud
and Contractor may be subject to criminal prosecution. Contractor acknowledges that the False
Claims Act, California Government Code sections 12650, et seq., provides for civil penalties
where a person knowingly submits a false claim to a public entity. These provisions include within
their scope false claims made with deliberate ignorance of the false information or in reckless
disregard of the truth or falsity of the information. In the event the City seeks to recover penalties
pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorneys’
fees. Contractor hereby acknowledges that the filing of a false claim may the Contractor to an
administrative debarment proceeding wherein Contractor may be prevented from further bidding
on public contracts for a period of up to five (5) years.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
Packet Page. 1088
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on
the day and year above written.
By:
Eric Levitt
City Manager
ATTEST:
By:
Telicia Lopez, City Clerk
APPROVED AS TO FORM:
By:
Best Best & Krieger LLP
City Attorney
[IF CORPORATION, TWO SIGNATURES,
PRESIDENT OR VICE PRESIDENT AND
SECRETARY OR TREASURER REQUIRED]
By:
Its:
Printed Name:
[DELETE THE FOLLOWING SIGNATURE
LINE IF NOT REQUIRED]
By:
Its:
Printed Name:
____________________________________
Contractor’s License Number and
Classification
____________________________________
(CONTRACTOR’S SIGNATURE MUST BE
NOTARIZED AND CORPORATE
SEAL AFFIXED, IF APPLICABLE)
END OF CONTRACT
Packet Page. 1089
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Name Of Person(s) Or Entity(ies)
Packet Page. 1090
00 61 13 – BOND FORMS
Performance Bond
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, the CITY OF SAN BERNARDINO , with its principal place of business at
Vanir Tower, 290 North D Street, San Bernardino, California 92401, (hereinafter referred to as
the “City”) has awarded to _________________________, (hereinafter referred to as the
“Contractor”) an agreement for Contract No._________, (hereinafter referred to as the
“Project”).
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the
Contract Documents for the Project dated ________________, (hereinafter referred to as
“Contract Documents”), the terms and conditions of which are expressly incorporated herein by
reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof
and to furnish a bond for the faithful performance of said Contract Documents.
NOW, THEREFORE, we, ______________________, the undersigned Contractor and
________________________________________________ as Surety, a corporation organized
and duly authorized to transact business under the laws of the State of California, are held and
firmly bound unto the City in the sum of ___________________________ DOLLARS,
($____________), said sum being not less than one hundred percent (100%) of the total
amount of the Contract, for which amount well and truly to be made, we bind ourselves, our
heirs, executors and administrators, successors and assigns, jointly and severally, firmly by
these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs,
executors, administrators, successors or assigns, shall in all things stand to and abide by, and
well and truly keep and perform the covenants, conditions and agreements in the Contract
Documents and any alteration thereof made as therein provided, on its part, to be kept and
performed at the time and in the manner therein specified, and in all respects according to their
intent and meaning; and shall faithfully fulfill all obligations including the one (1) year guarantee
of all materials and workmanship; and shall indemnify and save harmless the City, its officials,
officers, employees, and authorized volunteers, as stipulated in said Contract Documents, then
this obligation shall become null and void; otherwise it shall be and remain in full force and
effect.
As a part of the obligation secured hereby and in addition to the face amount specified
therefore, there shall be included costs and reasonable expenses and fees including reasonable
attorney’s fees, incurred by the City in enforcing such obligation.
As a condition precedent to the satisfactory completion of the Contract Documents, unless
otherwise provided for in the Contract Documents, the above obligation shall hold good for a
period of one (1) year after the acceptance of the work by the City, during which time if
Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally
protect the City from loss or damage resulting from or caused by defective materials or faulty
workmanship. The obligations of Surety hereunder shall continue so long as any obligation of
Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s
Packet Page. 1091
obligations under the Contract, law or equity, including, but not limited to, California Code of
Civil Procedure Section 337.15.
Whenever Contractor shall be, and is declared by the City to be, in default under the Contract
Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall
promptly, at the City’s option:
i. Take over and complete the Project in accordance with all terms and conditions in
the Contract Documents; or
ii. Obtain a bid or bids for completing the Project in accordance with all terms and
conditions in the Contract Documents and upon determination by Surety of the
lowest responsive and responsible bidder, arrange for a Contract between such
bidder, the Surety and the City, and make available as work progresses sufficient
funds to pay the cost of completion of the Project, less the balance of the contract
price, including other costs and damages for which Surety may be liable. The term
“balance of the contract price” as used in this paragraph shall mean the total
amount payable to Contractor by the City under the Contract and any modification
thereto, less any amount previously paid by the City to the Contractor and any
other set offs pursuant to the Contract Documents.
iii. Permit the City to complete the Project in any manner consistent with California
law and make available as work progresses sufficient funds to pay the cost of
completion of the Project, less the balance of the contract price, including other
costs and damages for which Surety may be liable. The term “balance of the
contract price” as used in this paragraph shall mean the total amount payable to
Contractor by the City under the Contract and any modification thereto, less any
amount previously paid by the City to the Contractor and any other set offs
pursuant to the Contract Documents.
Surety expressly agrees that the City may reject any contractor or subcontractor which may be
proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.
Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from
Contractor for completion of the Project if the City, when declaring the Contractor in default,
notifies Surety of the City’s objection to Contractor’s further participation in the completion of the
Project.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract Documents or to the Project to be performed
thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice
of any such change, extension of time, alteration or addition to the terms of the Contract
Documents or to the Project.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
Packet Page. 1092
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of
______________, 20___.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
The rate of premium on this bond is ____________ per thousand. The total amount of premium
charges is $_______________________________.
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________
___________________________________________
___________________________________________
(Name and Address of Agent or ___________________________________________
Representative for service of ___________________________________________
process in California, if different ___________________________________________
from above)
(Telephone number of Surety ___________________________________________
and Agent or Representative for
service of process in California)
Packet Page. 1093
Notary Acknowledgment
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Name Of Person(s) Or Entity(ies)
NOTE: This acknowledgment is to be completed for Contractor/Principal.
Packet Page. 1094
Notary Acknowledgment
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Name Of Person(s) Or Entity(ies)
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of Attorney to
local representatives of the bonding company must also be attached.
END OF PERFORMANCE BOND
Packet Page. 1095
Payment Bond (Labor and Materials).
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the CITY OF SAN BERNARDINO , with its principal place of business at Vanir
Tower, 290 North D Street, San Bernardino, California 92401 (hereinafter designated as the
“City”), by action taken or a resolution passed ___________________ , 20_____, has awarded
to ________________________ hereinafter designated as the “Principal,” a contract for the
work described as follows: Contract No.____________ (the “Project”); and
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the
Contract Documents for the Project dated ________________, (hereinafter referred to as
“Contract Documents”), the terms and conditions of which are expressly incorporated herein by
reference; and
WHEREAS, said Principal is required to furnish a bond in connection with said contract;
providing that if said Principal or any of its Subcontractors shall fail to pay for any materials,
provisions, provender, equipment, or other supplies used in, upon, for or about the performance
of the work contracted to be done, or for any work or labor done thereon of any kind, or for
amounts due under the Unemployment Insurance Code or for any amounts required to be
deducted, withheld, and paid over to the Employment Development Department from the wages
of employees of said Principal and its Subcontractors with respect to such work or labor the
Surety on this bond will pay for the same to the extent hereinafter set forth.
NOW THEREFORE, we, the Principal and __________________________ as Surety, are held
and firmly bound unto the City in the penal sum of ______________ Dollars ($___________)
lawful money of the United States of America, for the payment of which sum well and truly to be
made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its
subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of
the persons named in Civil Code Section 9100, fail to pay for any materials, provisions or other
supplies, used in, upon, for or about the performance of the work contracted to be done, or for
any work or labor thereon of any kind, or amounts due under the Unemployment Insurance
Code with respect to work or labor performed under the contract, or for any amounts required to
be deducted, withheld, and paid over to the Employment Development Department or Franchise
Tax Board from the wages of employees of the contractor and his subcontractors pursuant to
Revenue and Taxation Code Section 18663, with respect to such work and labor the Surety or
Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and
also, in case suit is brought upon this bond, all litigation expenses incurred by the City in such
suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation
expenses.
This bond shall inure to the benefit of any of the persons named in Civil Code Section 9100 so
as to give a right of action to such persons or their assigns in any suit brought upon this bond.
It is further stipulated and agreed that the Surety on this bond shall not be exonerated or
released from the obligation of this bond by any change, extension of time for performance,
addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement
pertaining or relating to any scheme or work of improvement herein above described, or
Packet Page. 1096
pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any
change or modification of any terms of payment or extension of the time for any payment
pertaining or relating to any scheme or work of improvement herein above described, nor by any
rescission or attempted rescission or attempted rescission of the contract, agreement or bond,
nor by any conditions precedent or subsequent in the bond attempting to limit the right of
recovery of claimants otherwise entitled to recover under any such contract or agreement or
under the bond, nor by any fraud practiced by any person other than the claimant seeking to
recover on the bond and that this bond be construed most strongly against the Surety and in
favor of all persons for whose benefit such bond is given, and under no circumstances shall
Surety be released from liability to those for whose benefit such bond has been given, by
reason of any breach of contract between the owner or the City and original contractor or on the
part of any obligee named in such bond, but the sole conditions of recovery shall be that
claimant is a person described in Civil Code Section 9100, and has not been paid the full
amount of his claim.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract to be performed thereunder, shall in any way
affect its obligations on this bond, and it does hereby waive notice of any such change,
extension of time, alteration or addition to the terms of Contract, including but not limited to, the
provisions of Sections 2819 and 2845 of the California Civil Code.
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of
______________, 20__.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
Packet Page. 1097
Notary Acknowledgment
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Name Of Person(s) Or Entity(ies)
NOTE: This acknowledgment is to be completed for Contractor/Principal.
Packet Page. 1098
Notary Acknowledgment
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Name Of Person(s) Or Entity(ies)
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to local
representatives of the bonding company must also be attached.
END OF PAYMENT BOND
Packet Page. 1099
00 72 00 – GENERAL CONDITIONS
ARTICLE 1 -TERMS; DEFINITIONS
1.1 Defined Terms
A. Whenever used in the Contract Documents and printed with initial capital letters, the
terms listed below will have the meanings indicated which are applicable to both the
singular and plural thereof. In addition to terms specifically defined below, terms with
initial capital letters in the Contract Documents include references to identified
articles and paragraphs, and the titles of other documents or forms.
1. Act of God – An earthquake of magnitude of 3.5 or higher on the Richter scale or
a tidal wave.
2. Addenda -- Written or graphic instruments issued prior to the submission of Bids
which clarify, correct, or change the Contract Documents.
3. Additional Work -- New or unforeseen work will be classified as “Additional Work”
when the Engineer determines that it is not covered by the Contract.
4. Applicable Laws -- The laws, statutes, ordinances, rules, codes, regulations,
permits, and licenses of any kind, issued by local, state or federal governmental
authorities or private authorities with jurisdiction (including utilities), to the extent
they apply to the Work.
5. Bid -- The offer or proposal of a Bidder submitted on the prescribed form setting
forth the prices and other terms for the Work to be performed.
6. Bid Guarantee -- The Bid Bond, cashier’s check, or certified check to be made by
the Bidder, which is to accompany the Bid as a guaranty of good faith to enter into
a written contract.
7. Bidder -- The individual or entity who submits a Bid directly to the City.
8. Change Order (“CO”) -- A document that authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Times,
issued on or after the Effective Date of the Contract, in accordance with the
Contract Documents and in the form contained in the Contract Documents.
9. Change Order Request (“COR”) -- A request made by the Contractor for an
adjustment in the Contract Price and/or Contract Times as the result of a
Contractor-claimed change to the Work. This term may also be referred to as a
Change Order Proposal (“COP”), or Request for Change (“RFC”).
10. City’s Representative – The Public Works Director, and acting through properly
authorized agents, such as the City Engineer or such other agents acting within
the scope of the particular duties entrusted to them. Also sometimes referred to
as the “City’s Representative” or “Representative” in the Contract Documents. The
terms the City and Owner may be used interchangeably
Packet Page. 1100
11. Claim -- A demand or assertion by the City or Contractor seeking an adjustment of
Contract Price or Contract Times, or both, or other relief with respect to the terms
of the Contract. A demand for money or services by a third party is not a Claim.
12. Contract -- The entire integrated written agreement between the City and
Contractor concerning the Work. “Contract” may be used interchangeably with
“Agreement” in the Contract Documents. The Contract supersedes prior
negotiations, representations, or agreements, whether written or oral, and includes
all Contract Documents.
13. Contract Documents -- The documents listed in Section 00 52 13, Article 5 of the
Contract for Construction. Some documents provided by the City to the Bidders
and Contractor, including but not limited to reports and drawings of subsurface and
physical conditions are not Contract Documents.
14. Contract Price -- Amount to be paid by the City to the Contractor as full
compensation for the performance of the Contract and completion of the Work,
subject to any additions or deductions as provided in the Contract Documents, and
including all applicable taxes and costs.
15. Contract Time -- The number of days or the dates stated in the Contract
Documents to: achieve defined milestones, if any; and to complete the Work so
that it is ready for final payment.
16. Contractor -- The individual or entity with which the City has contracted for
performance of the Work.
17. Contractor’s Designated On-Site Representative -- The Contractor’s Designated
On-Site Representative will be identified by the Contractor and shall not be
changed without prior written consent of the City.
18. Critical Supply Shortage -- An unusual shortage in materials that is (a) supported
by documented proof that Contractor made every effort to obtain such materials
from all available sources; (b) such shortage is due to the fact that such materials
are not physically available from single or multiple sources or could have been
obtained only at exorbitant prices entirely inconsistent with current and standard
rates taking into account the quantities involved and the usual industry practices
in obtaining such quantities; and (c) such shortages and the difficulties in obtaining
alternate sources of materials could not have been known or anticipated by
Contractor at the time it submitted its bid or entered the Contract. Market
fluctuations in prices of materials, whether or not resulting from a Force Majeure
Event, does not constitute a Critical Supply Shortage.
19. Daily Rate -- The Daily Rate stipulated in the Contract Documents as full
compensation to the Contractor due to the City’s unreasonable delay to the Project
that was not contemplated by the parties.
20. Day -- A calendar day of 24 hours measured from midnight to the next midnight.
21. Defective Work -- Work that is unsatisfactory, faulty, or deficient; or that does not
conform to the Contract Documents; or that does not meet the requirements of any
Packet Page. 1101
inspection, reference standard, test, or approval referenced in the Contract
Documents.
22. Demobilization -- The complete dismantling and removal by the Contractor of all
of the Contractor’s temporary facilities, equipment, and personnel at the Site.
23. Drawings -- That part of the Contract Documents prepared by of the Engineer of
Record which graphically shows the scope, extent, and character of the Work to
be performed by Contractor. Shop Drawings and other Contractor Submittals are
not Drawings as so defined.
24. Effective Date of the Contract -- The date indicated in the Contract on which it
becomes effective, but if no such date is indicated, it means the date on which the
Contract is signed and delivered by the last of the two parties to sign and deliver.
25. Engineer -- Whenever not qualified, shall mean the City Engineer or the Engineer
authorized to act for and on behalf of the City, acting either directly or through
properly authorized agents, such agents acting severally within the scope of the
particular duties entrusted to them.
26. Force Majeure Event -- An event that materially affects a party’s performance and
is one or more of the following: (1) Acts of God or other natural disasters occurring
at the Site; (2) terrorism or other acts of a public enemy; (3) orders of governmental
authorities (including, without limitation, unreasonable and unforeseeable delay in
the issuance of permits or approvals by governmental authorities that are required
for the Work); (4) pandemics, epidemics or quarantine restrictions; (5) strikes and
other organized labor action occurring at the Site and the effects thereof on the
Work, only to the extent such strikes and other organized labor action are beyond
the control of Contractor and its Subcontractors, of every Tier, and to the extent
the effects thereof cannot be avoided by use of replacement workers; and (6) a
Critical Supply Shortage. For purposes of this section, “orders of governmental
authorities,” includes ordinances, emergency proclamations and orders, rules to
protect the public health, welfare and safety, and other actions of the City in its
capacity as a municipal authority.
27. Hazardous Waste -- The term “Hazardous Waste” shall have the meaning provided
in Section 104 of the Solid Waste Disposal Act (42 U.S.C. § 6903) as amended
from time to time, or any substance or material identified as hazardous under any
state or federal statute governing handling, disposal and/or cleanup of any such
substance or material, whichever is more restrictive.
28. Holiday – Holidays occur on:
New Year’s Day - January 1
President’s Day – Third Monday in February
Memorial Day - Last Monday in May
Independence Day - July 4
Labor Day - First Monday in September
Veteran’s Day - November 11
Thanksgiving Day - Fourth Thursday in November
Friday after Thanksgiving
Packet Page. 1102
Christmas Eve – December 24
Christmas Day - December 25
Day After Christmas – December 26
New Year’s Eve – December 31
If any Holiday listed above falls on a Saturday, Saturday and the preceding Friday are
both Holidays. If the Holiday should fall on a Sunday, Sunday and the following Monday
are both Holidays.
29. Notice of Award -- The written notice by the City to the Successful Bidder stating
that upon timely compliance by the Successful Bidder with the conditions
precedent listed therein, the City will sign and deliver the Contract.
30. Notice of Completion -- The form which may be executed by the City constituting
final acceptance of the Project.
31. Notice to Proceed -- A written notice given by the City to Contractor fixing the date
on which the Contractor may proceed with the Work and when Contract Times will
commence to run.
32. Project -- The total construction of which the Work to be performed under the
Contract Documents may be the whole, or a part.
33. Record Drawings – The record set of as-builts prepared by the Contractor during
the Work in accordance with the requirements of the General Conditions.
34. Recyclable Waste Materials -- Materials removed from the Site which are required
to be diverted to a recycling center rather than an area landfill. Recyclable Waste
Materials include, but are not limited to, asphalt, concrete, brick, concrete block,
and rock.
35. Sample -- A physical example furnished by the Contractor to illustrate materials,
equipment or workmanship; to establish standards by which the Work will be
judged.
36. Schedule of Submittals -- A schedule, prepared and maintained by Contractor, of
required submittals and the time requirements to facilitate scheduled performance
of related construction activities.
37. Shop Drawings -- All drawings, diagrams, illustrations, schedules, and other data
or information which are specifically prepared or assembled by or for Contractor
and submitted by Contractor to illustrate some portion of the Work.
38. Site -- Lands or areas indicated in the Contract Documents as being furnished by
the City upon which the Work is to be performed, including rights-of-way and
easements for access thereto, and such other lands furnished by the City which
are designated for the use of Contractor.
39. Specifications -- That part of the Contract Documents consisting of written
requirements for materials, equipment, systems, standards and workmanship as
Packet Page. 1103
applied to the Work, and certain administrative requirements and procedural
matters applicable thereto.
40. Stop Payment Notice -- A written notice as defined in Civil Code section 8044.
41. Subcontractor -- An individual or entity other than a Contractor having a contract
with any other entity than the City for performance of any portion of the Work at
the Site.
42. Submittal -- Written and graphic information and physical samples prepared and
supplied by the Contractor demonstrating various portions of the Work.
43. Successful Bidder -- The responsible Bidder submitting a responsive Bid to whom
the City makes an award.
44. Supplier -- A manufacturer, fabricator, supplier, distributor, material man, or vendor
having a direct contract with Contractor or with any Subcontractor to furnish
materials or equipment used in the performance of the Work or to be incorporated
in the Work.
45. Underground Facilities -- All underground pipelines, conduits, ducts, cables, wires,
manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any
encasements containing such facilities, including those that convey electricity,
gases, steam, liquid petroleum products, telephone or other communications,
cable television, water, wastewater, storm water, other liquids or chemicals, or
traffic or other control systems.
46. Unit Price Work -- Work to be paid for on the basis of unit prices as provided by
the Contractor in its Bid or as adjusted in accordance with the Contract Documents.
47. Warranty -- A guarantee provided to the City by the Contractor that the Work will
remain free of defects and suitable for its intended use for the period required by
the Contract Documents or the longest period permitted by the law of this state,
whichever is longer.
48. Work -- The entire construction or the various separately identifiable parts thereof
required to be provided under the Contract Documents. Work includes and is the
result of performing or providing all labor, services, and documentation necessary
to produce such construction, and furnishing, installing, and incorporating all
materials and equipment into such construction, all as required by the Contract
Documents.
1.2 Terminology.
A. The words and terms below are not defined but, when used in the Contract
Documents, have the indicated meaning.
1. The word “furnish,” when used in connection with services, materials, or
equipment, shall mean to supply and deliver said services, materials, or equipment
to the Site (or some other specified location) ready for use or installation and in
usable or operable condition.
Packet Page. 1104
2. The word “install,” when used in connection with services, materials, or equipment,
shall mean to put into use or place in final position said services, materials, or
equipment complete and ready for intended use.
3. The words “perform” or “provide,” when used in connection with services,
materials, or equipment, shall mean to furnish and install said services, materials,
or equipment complete and ready for intended use.
4. Regardless of whether “furnish,” “install,” “perform,” or “provide” is used in
connection with services, materials, or equipment, an obligation of Contractor is
implied.
B. Unless stated otherwise in the Contract Documents, words or phrases that have a
well-known technical or construction industry or trade meaning are used in the
Contract Documents in accordance with such recognized meaning.
ARTICLE 2 -PRELIMINARY MATTERS
2.1 Delivery of Contract Documents
A. Within ten (10) Days after receipt of the Notice of Award and before the City will
execute the Contract, the Contractor shall furnish and file with the City a signed
Contract and the necessary Performance Bond, Payment Bond, and Certificates of
Insurance and Endorsements, as well as any other documents specified in the
Contract Documents.
2.2 Bonds
A. Contractor shall submit the bonds on the forms provided with the Contract
Documents, duly executed by a responsible corporate surety admitted to transact
surety business in the State of California, as defined in Code of Civil Procedure
section 995.120, and listed in the United States Department of the Treasury circular
entitled "Companies Holding Certificates of Authority as Acceptable Sureties on
Federal Bonds and as Acceptable Reinsuring Companies," authorized to do
business in the State of California and acceptable to the City conditioned upon the
faithful performance by the Contractor of all requirements of the Contract
Documents. Each of the bonds shall be in a sum no less than one hundred percent
(100%) of the Contract Price. Bonds shall be delivered to the City within ten (10)
Days after receipt of the Notice of Award and before execution of the Contract by
the City.
2.3 Evidence of Insurance
A. Prior to commencing any Work but no later than ten (10) Days after receipt of the
Notice of Award, the Contractor shall submit or cause to be submitted any and all
Certificates of Insurance and Endorsements, showing that the Contractor has the
required insurance, to the attention of the City. Such insurance is to be provided at
the sole cost and expense of the Contractor. No Work shall be performed until all of
the required insurance has been received and approved.
Packet Page. 1105
2.4 Execution of the Contract
A. Upon receipt of the required Contract Documents, the City will execute the Contract,
establishing the Effective Date of the Contract.
2.5 Contractor’s Failure to Perform
A. Should Contractor fail to comply with timelines provided above, the City shall retain
the right to enforce and collect on the Contractor’s Bid Guarantee, rescind award to
the Contractor and award the Contract to the next lowest responsive, responsible
bidder as determined by the City. If the City elects to accept bonds and insurance
submitted late, the Contract Times will begin to run as of the date stated in the Notice
to Proceed. However, the number of days beyond the original ten (10) Days it took
to receive the properly executed Contract and related items may be deducted from
the Contract Times.
2.6 Commencement of Contract Times; Notice to Proceed
A. The City will not issue a Notice to Proceed until after the Effective Date of the Contract.
Work shall commence within ten (10) Days of the date stated in the Notice to Proceed.
The Contract Times begin to run on the date specified in the Notice to Proceed. No
Work shall be done at the Site prior to the issuance of the Notice to Proceed.
2.7 Copies of Documents
A. Contractor will be furnished, free of charge, five (5) copies of the Contract
Documents. Additional copies may be obtained at cost of reproduction. Contractor
shall maintain a clean, undamaged set of Contract Documents, including Submittals,
at the Project site.
2.8 Substitution Requests, Schedule of Submittals, and Schedule
A. Substitution Requests. Within fifteen (15) Days after Notice of Award (unless
otherwise specified in the Contract Documents), Contractor shall provide all
substitution requests as further described in Section 00 72 00, Article 6.5.
B. Schedule of Submittals. Within five (5) Days after the issuance of the Notice of
Proceed (unless otherwise specified in the Contract Documents), Contractor shall
submit to the City a Schedule of Submittals that conforms with the requirements of
Section 00 72 00, Article 5.21.
C. Schedule. Within ten (10) days after the issuance of the Notice of Proceed (unless
otherwise specified in the Contract Documents), the Contractor shall submit a
construction schedule that conforms with the requirements of Section 00 72 00,
Article 8.2.
2.9 Preconstruction Conference; Designation of Authorized Representatives.
A. Before any Work at the Site is started, a conference attended by the City, Contractor,
Engineer, and others as appropriate will be held to establish a working
understanding among the parties as to the Work and to discuss the schedules
Packet Page. 1106
referred to herein, procedures for handling Submittals and Shop Drawings,
processing applications for payment, and maintaining required records.
B. At this conference the City and Contractor each shall designate, in writing, a specific
individual to act as its authorized representative with respect to the services and
responsibilities under the Contract. Such individuals shall have the authority to
transmit instructions, receive information, render decisions relative to the Contract,
and otherwise act on behalf of each respective party.
2.10 Subcontractor Mobilization Meeting.
A. Prior to the start of each major Subcontractor’s Site Work, the Contractor, the
involved Subcontractor, and Engineer shall attend a pre-start meeting to discuss the
schedule, coordination, procedures, and other administrative issues.
2.11 Authority of Board; Engineer
A. The Board has the final authority in all matters affecting the Work. Within the scope
of the Contract, the Engineer has the authority to enforce compliance with the
Contract Documents. The Contractor shall promptly comply with instructions from
the Engineer.
B. The decision of the Engineer is final and binding on all questions relating to:
1. quantities;
2. acceptability of material, equipment, or work;
3. execution, progress or sequence of work;
4. interpretation of the Plans, Specifications, or other Contract Documents; and
5. Any other areas specifically identified in the Contract Documents or under the law.
C. Compliance with instructions from the Engineer shall be a condition precedent to any
payment under the Contract, unless otherwise ordered by the Board.
2.12 Mobilization
A. When a Bid item is included in the Bid Schedule for mobilization, the costs of Work
in advance of construction operations and not directly attributable to any specific bid
item will be included in the progress estimate. When no bid item is provided for
mobilization payment for such costs will be deemed to be included in the other items
of the Work.
B. Payment for mobilization based on the lump sum provided in the Bid Schedule, shall
constitute full compensation for all such Work. No payment for mobilization will be
made until all of the listed items have been completed to the satisfaction of the
Engineer. The scope of the Work included under mobilization shall include, but shall
not be limited to, the following principal items:
Packet Page. 1107
1. Obtaining and paying for all bonds, insurance, and permits.
2. Moving on to the Project Site of all Contractor’s plant and equipment required for
the first month’s operations.
3. Installing temporary construction power, wiring, and lighting facilities, as
applicable.
4. Establishing fire protection system, as applicable.
5. Developing and installing a construction water supply, as applicable.
6. Providing and maintaining the field office trailers for the Contractor, if necessary,
and the Engineer (if specified), complete, with all specified furnishings and utility
services.
7. Providing on-site sanitary facilities and potable water facilities as specified per Cal-
OSHA and these Contract Documents.
8. Furnishing, installing, and maintaining all storage buildings or sheds required for
temporary storage of products, equipment, or materials that have not yet been
installed in the Work. All such storage shall meet manufacturer’s specified storage
requirements, and the specific provisions of the specifications, including
temperature and humidity control, if recommended by the manufacturer, and for
all security.
9. Arranging for and erection of Contractor’s work and storage yard.
10. Posting all OSHA required notices and establishment of safety programs per Cal-
OSHA.
11. Full-time presence of Contractor’s superintendent at the job Site as required
herein.
12. Submittal of construction schedule as required by the Contract Documents.
ARTICLE 3 -CONTRACT DOCUMENTS; INTENT
3.1 Examination of Drawings, Specifications, and Site of Work
A. Examination of Contract Documents; Site. Before commencing any portion of the
Work, Contractor shall again carefully examine all applicable Contract Documents,
the Project Site, and other information given to Contractor as to materials and
methods of construction and other Project requirements. Contractor shall
immediately notify the Engineer of any potential error, inconsistency, ambiguity,
conflict, or lack of detail or explanation. If Contractor performs, permits, or causes
the performance of any Work which is in error, inconsistent or ambiguous, or not
sufficiently detailed or explained, Contractor shall bear any and all resulting costs,
including, without limitation, the cost of correction. In no case shall the Contractor
or any Subcontractor proceed with Work if uncertain as to the applicable
requirements.
Packet Page. 1108
B. Additional Instructions. After notification of any error, inconsistency, ambiguity,
conflict, or lack of detail or explanation, the Engineer will provide any required
additional instructions, by means of drawings or other written direction, necessary
for proper execution of Work.
C. Quality of Parts, Construction and Finish. All parts of the Work shall be of the best
quality of their respective kinds and the Contractor must use all diligence to inform
itself fully as to the required construction and finish.
D. Contractor’s Variation from Contract Document Requirements. If it is found that the
Contractor has varied from the requirements of the Contract Documents including
the requirement to comply with all Applicable Laws, the Engineer may at any time,
before or after completion of the Work, order the improper Work removed, remade
or replaced by the Contractor at the Contractor’s expense.
3.2 Intent of Contract Documents
A. The Contract Documents are complementary; what is required by any one will be
binding as if required by all. It is the intent of the Contract Documents to describe a
functionally complete Project (or part thereof) to be constructed in accordance with
the Contract Documents. Any labor, documentation, services, materials, or
equipment that reasonably may be inferred from the Contract Documents or from
prevailing custom or trade usage as being required to produce the indicated result
will be provided whether or not specifically called for, at no additional cost to the City.
B. The Contractor shall furnish, unless otherwise provided in the Contract Documents,
all materials, implements, machinery, equipment, tools, supplies and labor
necessary to the prosecution and completion of the Project.
C. Clarifications and interpretations of the Contract Documents shall be issued by the
Engineer as provided in these General Conditions.
D. If utilities to equipment/fixtures are not shown but are necessary to operate the
equipment/fixtures, the utilities service installation is considered to be part of the
Work. The implied Work will conform to the appropriate sections of the Contract
Documents.
E. Organization of the Contract Documents into divisions, sections, and articles, and
arrangement of drawings shall not control the Contractor in dividing Work among
Subcontractors or in establishing the extent of Work to be performed by any trade.
3.3 Reference Standards.
A. Standards, Specifications, Codes, Laws, and Regulations.
1. Reference to federal specifications, federal standards, other standards,
specifications, manuals, or codes of any technical society, organization, or
association, or to Applicable Laws, whether such reference be specific or by
implication, shall mean the standard, specification, manual, code, or Applicable
Laws in effect at the time of opening of Bids (or on the Effective Date of the
Packet Page. 1109
Contract if there were no Bids), except as may be otherwise specifically stated in
the Contract Documents.
2. No provision of any such standard, specification, manual, or code, or any
instruction of a Supplier, shall be effective to change the duties or responsibilities
of the City, Contractor, or any of their Subcontractors, consultants, agents, or
employees, from those set forth in the Contract Documents. No such provision or
instruction shall be effective to assign to the City, or any of their officers, directors,
members, partners, employees, agents, consultants, or subcontractors, any duty
or authority to supervise or direct the performance of the Work or any duty or
authority to undertake responsibility inconsistent with the provisions of the Contract
Documents.
3.4 Reporting and Resolving Discrepancies; Order of Precedence.
A. Reporting Discrepancies.
1. The Contract Documents are intended to be fully cooperative and complementary.
Before undertaking each part of the Work, Contractor shall carefully study and
compare the Contract Documents and check and verify pertinent figures therein
and all applicable field measurements. Contractor shall promptly report in writing
to the City any conflict, error, ambiguity, or discrepancy which Contractor
discovers, should have discovered, or has actual knowledge of, and shall obtain a
written interpretation or clarification from the City before proceeding with any Work
affected thereby. If, during the performance of the Work, Contractor discovers any
conflict, error, ambiguity, or discrepancy within the Contract Documents, or
between the Contract Documents and (i) any Applicable Law, (ii) any standard,
specification, manual, or code, or (iii) any instruction of any Supplier, then
Contractor shall promptly submit a written Request for Information (RFI) to the City.
Contractor shall not proceed with the Work affected thereby (except in an
emergency) until an amendment or supplement to the Contract Documents has
been issued by one of the methods indicated in the Contract Documents, and any
Work performed by Contractor before receipt of an amendment or supplement
shall be at Contractor’s own risk.
B. Order of Precedence.
1. In case of conflicts between the Contract Documents, the order of precedence
shall be as follows:
a. Permits from other agencies as may be required by law
b. Change Orders, most recent first
c. Contract
d. Addenda, most recent first
e. Special Conditions
f. Specifications
Packet Page. 1110
g. Construction Plans and Drawings(Contract Drawings)
h. General Conditions
i. Instructions to Bidders
j. Notice Inviting Bids
k. Contractor’s Bid (Bid Forms)
l. Standard Specifications for Public Works Construction “Greenbook” latest
edition (Sections 1-9 Excluded)
m. Applicable Local Agency Standards and Specifications
n. Standard Drawings
o. Reference Documents
2. With reference to the Drawings the order of precedence shall be as follows:
a. Figures govern over scaled dimensions
b. Detail drawings govern over general drawings
c. Addenda/Change Order drawings govern over Drawings
d. Contract Drawings govern over Standard Drawings
e. Contract Drawings govern over Shop Drawings
3. Notwithstanding the orders of precedence established above, in the event of
conflicts, the higher standard, higher quality and most expensive shall always
apply.
3.5 Amending and Supplementing Contract Documents.
A. The Contract Documents may be amended to provide for additions, deletions, and
revisions in the Work or to modify the terms and conditions thereof only by Change
Order or written amendment to the Contract duly executed by the parties.
B. The requirements of the Contract Documents may be supplemented, and minor
variations and deviations in the Work may be authorized at no cost to the City, by
one or more of the following ways:
1. The City’s review of a Submittal, Shop Drawing, Sample or substitution request
without exception (subject to the provisions of the Contract Documents); or
2. The City’s issuance of a response to an RFI.
C. However, no review or RFI response will reduce or modify the Contractor’s obligation
to fully satisfy and comply with the requirements of the Contract Documents.
Packet Page. 1111
3.6 Reuse of Documents.
A. Contractor and any Subcontractor or Supplier shall not:
1. have or acquire any title to or ownership rights in any of the Drawings,
Specifications, or other documents (or copies of any thereof) prepared by or
bearing the seal of Engineer of Record or its consultants, including electronic
media editions; or
2. reuse any such Drawings, Specifications, other documents, or copies thereof on
extensions of the Project or any other project without written consent of the City
and Engineer of Record and specific written verification or adaptation by Engineer
of Record.
B. The prohibitions of this Article will survive final payment, or termination of the
Contract. Nothing herein shall preclude Contractor from retaining copies of the
Contract Documents for record purposes.
ARTICLE 4 -INDEMNIFICATION; INSURANCE
4.1 Indemnification
A. To the fullest extent permitted by law, Contractor shall immediately defend (with
counsel of the City’s choosing), indemnify and hold harmless the City, its officials,
officers, agents, employees, and representatives, and each of them from and
against:
1. Any and all claims, demands, causes of action, costs, expenses, injuries, losses
or liabilities, in law or in equity, of every kind or nature whatsoever, but not limited
to, injury to or death, including wrongful death, of any person, and damages to or
destruction of property of any person, arising out of, related to, or in any manner
directly or indirectly connected with the Work or this Contract, including claims
made by subcontractors for nonpayment, including without limitation the payment
of all consequential damages and attorney’s fees and other related costs and
expenses, however caused, regardless of whether the allegations are false,
fraudulent, or groundless, and regardless of any negligence of the City or its
officers, employees, or authorized volunteers (including passive negligence),
except the sole negligence or willful misconduct or active negligence of the City or
its officials, officers, employees, or authorized volunteers.
2. Contractor’s defense and indemnity obligation herein includes, but is not limited to
damages, fines, penalties, attorney’s fees and costs arising from claims under the
Americans with Disabilities Act (ADA) or other federal or state disability access or
discrimination laws arising from Contractor’s Work during the course of
construction of the improvements or after the Work is complete, as the result of
defects or negligence in Contractor’s construction of the improvements.
3. Any and all actions, proceedings, damages, costs, expenses, fines, penalties or
liabilities, in law or equity, of every kind or nature whatsoever, arising out of,
resulting from, or on account of the violation of any governmental law or regulation,
compliance with which is the responsibility of Contractor;
Packet Page. 1112
4. Any and all losses, expenses, damages (including damages to the Work itself),
attorney’s fees, and other costs, including all costs of defense which any of them
may incur with respect to the failure, neglect, or refusal of Contractor to faithfully
perform the Work and all of Contractor’s obligations under Contract. Such costs,
expenses, and damages shall include all costs, including attorney’s fees, incurred
by the indemnified parties in any lawsuit to which they are a party.
B. Contractor shall immediately defend, at Contractor’s own cost, expense and risk,
with the counsel of the City choosing, any and all such aforesaid suits, actions or
other legal proceedings of every kind that may be brought or instituted against the
City, its officials, officers, agents, employees and representatives. Contractor shall
pay and satisfy any judgment, award or decree that may be rendered against the
City, its officials, officers, employees, agents, employees and representatives, in any
such suit, action or other legal proceeding. Contractor shall reimburse the City, its
officials, officers, agents, employees and representatives for any and all legal
expenses and costs incurred by each of them in connection therewith or in enforcing
the indemnity herein provided. The only limitations on this provision shall be those
imposed by Civil Code section 2782.
C. The provisions of this Article shall survive the termination of this Contract howsoever
caused, and no payment, partial payment, or acceptance of occupancy in whole or
part of the Work shall waive or release any of the provisions of this Article.
4.2 Insurance
The Contractor shall obtain, and at all times during performance of the Work of Contract, maintain
all of the insurance described in this Article. Contractor shall not commence Work under this
Contract until it has provided evidence satisfactory to the City that it has secured all insurance
required hereunder. Contractor shall not allow any Subcontractor to commence work on any
subcontract until it has provided evidence satisfactory to the City that the subcontractor has
secured all insurance required under this Article. Failure to provide and maintain all required
insurance shall be grounds for the City to terminate this Contract for cause. Contractor shall
furnish the City with original certificates of insurance and endorsements effective coverage
required by this Contract on forms satisfactory to the City. The certificates and endorsements for
each insurance policy shall be signed by a person authorized by that insurer to bind coverage on
its behalf, and shall be on forms acceptable to the City. All certificates and endorsements must
be received and approved by the City before Work commences.
A. Additional Insureds; Waiver of Subrogation. The City, its officials, officers,
employees, agents and authorized volunteers shall be named as Additional Insureds
on Contractor’s All Risk policy and on Contractor’s and its subcontractors’ policies
of Commercial General Liability and Automobile Liability insurance using, for
Contractor’s policy/ies of Commercial General Liability insurance, ISO CG forms 20
10 and 20 37 (or endorsements providing the exact same coverage, including
completed operations), and, for subcontractors’ policies of Commercial General
Liability insurance, ISO CG form 20 38 (or endorsements providing the exact same
coverage). Notwithstanding the minimum limits set forth in this Contract for any type
of insurance coverage, all available insurance proceeds in excess of the specified
minimum limits of coverage shall be available to the parties required to be named as
Additional Insureds hereunder. All insurance coverage maintained or procured
pursuant to this Contract shall be endorsed to waive subrogation against the City, its
Packet Page. 1113
officers, officials, agents, employees or volunteers or shall specifically allow
Contractor - or others providing insurance evidence in compliance with these
specifications - to waive their right of recovery prior to a loss. Contractor hereby
waives its own right of recovery against the City, and shall require similar written
express waivers and insurance clauses from each of its subcontractors. Copies of
these waivers shall be submitted to the City prior to commencement of work.
B. Workers’ Compensation Insurance. The Contractor shall provide workers’
compensation insurance for all of the employees engaged in Work under this
Contract, on or at the Site, and, in case of any sublet Work, the Contractor shall
require the subcontractor similarly to provide workers’ compensation insurance for
all the latter’s employees as prescribed by State law. Any class of employee or
employees not covered by a subcontractor’s insurance shall be covered by the
Contractor’s insurance. In case any class of employees engaged in work under this
Contract, on or at the Site, is not protected under the Workers’ Compensation
Statutes, the Contractor shall provide or shall cause a subcontractor to provide,
adequate insurance coverage for the protection of such employees not otherwise
protected. The Contractor is required to secure payment of compensation to his
employees in accordance with the provisions of section 3700 of the Labor Code.
The Contractor shall file with the City certificates of his insurance protecting workers.
Company or companies providing insurance coverage shall be acceptable to the
City, if in the form and coverage as set forth in the Contract Documents.
C. Employer’s Liability Insurance. Contractor shall provide Employer’s Liability
Insurance, including Occupational Disease, in the amount of at least one million
dollars ($1,000,000.00) per person per accident. Contractor shall provide the City
with a certificate of Employer’s Liability Insurance. Such insurance shall comply with
the provisions of the Contract Documents. The policy shall be endorsed, if
applicable, to provide a Borrowed Servant/Alternate Employer Endorsement and
contain a Waiver of Subrogation in favor of the City.
D. Commercial General Liability Insurance. Contractor shall provide “occurrence”
form Commercial General Liability insurance coverage at least as broad as the most
current ISO CGL Form 00 01, including but not limited to, premises liability,
contractual liability, products/completed operations, personal and advertising injury
which may arise from or out of Contractor’s operations, use, and management of the
Site, or the performance of its obligations hereunder. The policy shall not contain
any exclusion contrary to this Contract including but not limited to endorsements or
provisions limiting coverage for (1) contractual liability (including but not limited to
ISO CG 24 26 or 21 39); or (2) cross-liability for claims or suits against one insured
against another. Policy limits shall not be less than $2,000,000 per occurrence for
bodily injury, personal injury and property damage. If Commercial General Liability
Insurance or other form with a general aggregate limit is used, either the general
aggregate limit shall apply separately to this project/location or the general
aggregate limit shall be twice the required occurrence limit. Defense costs shall be
paid in addition to the limits.
1. Such policy shall comply with all the requirements of this Article. The limits set forth
herein shall apply separately to each insured against whom claims are made or
suits are brought, except with respect to the limits of liability. Further the limits set
forth herein shall not be construed to relieve the Contractor from liability in excess
Packet Page. 1114
of such coverage, nor shall it limit Contractor’s indemnification obligations to the
City, and shall not preclude the City from taking such other actions available to the
City under other provisions of the Contract Documents or law.
2. All general liability policies provided pursuant to the provisions of this Article shall
comply with the provisions of the Contract Documents.
3. All general liability policies shall be written to apply to all bodily injury, including
death, property damage, personal injury, owned and non-owned equipment,
blanket contractual liability, completed operations liability, explosion, collapse,
under-ground excavation, removal of lateral support, and other covered loss,
however occasioned, occurring during the policy term, and shall specifically insure
the performance by Contractor of that part of the indemnification contained in these
General Conditions relating to liability for injury to or death of persons and damage
to property.
4. If the coverage contains one or more aggregate limits, a minimum of 50% of any
such aggregate limit must remain available at all times; if over 50% of any
aggregate limit has been paid or reserved, the City may require additional
coverage to be purchased by Contractor to restore the required limits. Contractor
may combine primary, umbrella, and as broad as possible excess liability coverage
to achieve the total limits indicated above. Any umbrella or excess liability policy
shall include the additional insured endorsement described in the Contract
Documents.
5. All policies of general liability insurance shall permit and Contractor does hereby
waive any right of subrogation which any insurer of Contractor may acquire from
Contractor by virtue of the payment of any loss.
E. Automobile Liability Insurance. Contractor shall provide Automobile Liability
Insurance at least as broad as ISO CA 00 01 (Any Auto) in the amount of, at least,
one million dollars ($1,000,000) per accident for bodily injury and property damage.
Such insurance shall provide coverage with respect to the ownership, operation,
maintenance, use, loading or unloading of any auto owned, leased, hired or
borrowed by Contractor or for which Contractor is responsible, in a form and with
insurance companies acceptable to the City. All policies of automobile insurance
shall permit and Contractor does hereby waive any right of subrogation which any
insurer of Contractor may acquire from Contractor by virtue of the payment of any
loss.
F. Privacy/Network Security (Cyber). Contractor shall provide Cyber Liability
Insurance, in a form and with insurance companies acceptable to City, in the amount
of, at least, one million dollars ($1,000,000) per occurrence and aggregate. Such
insurance shall provide coverage for: (1) privacy breaches, (2) system breaches, (3)
denial or loss of service, and (4) the introduction, implantation or spread of malicious
software code.
G. Aviation and/or Drone Liability. If Contractor shall utilize drones as part of the Work,
Contractor shall provide Aviation and/or Drone Liability Insurance, in a form and with
insurance companies acceptable to City, in the amount of, at least, one million dollars
Packet Page. 1115
($1,000,000) per occurrence limit. Such insurance shall provide coverage for bodily
injury and property damage.
H. Builder’s Risk [“All Risk”]
1. It is the Contractor’s responsibility to maintain or cause to be maintained Builder’s
Risk [“All Risk”] extended coverage insurance on all work, material, equipment,
appliances, tools, and structures that are or will become part of the Work and
subject to loss or damage by fire, vandalism, and malicious mischief, in an amount
to cover 100% of the replacement cost. The City accepts no responsibility for the
Work until the Work is formally accepted by the City. The Contractor shall provide
a certificate evidencing this coverage before commencing performance of the
Work.
2. The named insureds shall be Contractor, all Subcontractors of any tier (excluding
those solely responsible for design work), suppliers, and the City, its elected
officials, officers, employees, agents and authorized volunteers, as their interests
may appear. Contractor shall not be required to maintain property insurance for
any portion of the Work following acceptance by the City.
3. Policy shall be provided for replacement value on an “all risk” basis. There shall
be no coinsurance penalty provision in any such policy. Policy must include: (1)
coverage for any ensuing loss from faulty workmanship, nonconforming work,
omission or deficiency in design or specifications; (2) coverage against machinery
accidents and operational testing; (3) coverage for removal of debris, and insuring
the buildings, structures, machinery, equipment, materials, facilities, fixtures and
all other properties constituting a part of the Project; (4) transit coverage, including
ocean marine coverage (unless insured by the supplier), with sub-limits sufficient
to insure the full replacement value of any key equipment item; and (5) coverage
with sub-limits sufficient to insure the full replacement value of any property or
equipment stored either on or off the Site. Such insurance shall be on a form
acceptable to the City to ensure adequacy and sublimit.
4. In addition, the policy shall meet the following requirements:
a. Insurance policies shall be so conditioned as to cover the performance of any
extra work performed under the Contract.
b. Coverage shall include all materials stored on site and in transit.
c. Coverage shall include Contractor’s tools and equipment.
d. Insurance shall include boiler, machinery and material hoist coverage.
I. Contractor shall require all tiers of Subcontractors working under this Contract to
provide the insurance required under this Article unless otherwise agreed to in
writing by the City. Contractor shall make certain that any and all Subcontractors
hired by Contractor are insured in accordance with this Contract. If any
Subcontractor’s coverage does not comply with the foregoing provisions, Contractor
shall indemnify and hold the City harmless from any damage, loss, cost, or expense,
including attorneys’ fees, incurred by the City as a result thereof.
Packet Page. 1116
J. Notwithstanding the minimum limits set forth in this Contract for any type of
insurance coverage, if Contractor maintains higher limits than the minimums shown
above, the City requires and shall be entitled to coverage for the higher limits
maintained by the Contractor. Any available insurance proceeds in excess of the
specified minimum limits of insurance and coverage shall be available to the City.
K. Form and Proof of Carriage of Insurance
1. Any insurance carrier providing insurance coverage required by the Contract
Documents shall be admitted to and authorized to do business in the State of
California unless waived, in writing, by the City’s Risk Manager. Carrier(s) shall
have an A.M. Best rating of not less than an A:VII. Insurance deductibles or self-
insured retentions must be declared by the Contractor. At the election of the City
the Contractor shall either 1) reduce or eliminate such deductibles or self-insured
retentions, or 2) procure a bond which guarantees payment of losses and related
investigations, claims administration, and defense costs and expenses. If umbrella
or excess liability coverage is used to meet any required limit(s) specified herein,
the Contractor shall provide a “follow form” endorsement satisfactory to the City
indicating that such coverage is subject to the same terms and conditions as the
underlying liability policy.
2. Each insurance policy required by this Contract shall be endorsed to state that: (1)
coverage shall not be suspended, voided, reduced or cancelled except after thirty
(30) days prior written notice by certified mail, return receipt requested, has been
given to the City; and (2) any failure to comply with reporting or other provisions of
the policies, including breaches of warranties, shall not affect coverage provided
to the City, its officials, officers, agents, employees, and volunteers.
3. The Certificates(s) and policies of insurance shall contain or shall be endorsed to
contain the covenant of the insurance carrier(s) that it shall provide no less than
thirty (30) days written notice be given to the City prior to any material modification
or cancellation of such insurance. In the event of a material modification or
cancellation of coverage, the City may terminate the Contract or stop the Work in
accordance with the Contract Documents, unless the City receives, prior to such
effective date, another properly executed original Certificate of Insurance and
original copies of endorsements or certified original policies, including all
endorsements and attachments thereto evidencing coverage’s set forth herein and
the insurance required herein is in full force and effect. Contractor shall not take
possession, or use the Site, or commence operations under this Contract until the
City has been furnished original Certificate(s) of Insurance and certified original
copies of endorsements or policies of insurance including all endorsements and
any and all other attachments as required in this Article. The original
endorsements for each policy and the Certificate of Insurance shall be signed by
an individual authorized by the insurance carrier to do so on its behalf.
4. The Certificate(s) of Insurance, policies and endorsements shall so covenant and
shall be construed as primary, and the City’s insurance and/or deductibles and/or
self-insured retentions or self-insured programs shall not be construed as
contributory.
Packet Page. 1117
5. The City reserves the right to adjust the monetary limits and types of insurance
coverages during the term of this Contract including any extension thereof if, in the
City’s reasonable judgment, the amount or type of insurance carried by the
Contractor becomes inadequate.
6. Contractor shall report to the City, in addition to the Contractor’s insurer, any and
all insurance claims submitted by the Contractor in connection with the Work under
this Contract.
7. Products/completed operations coverage shall extend a minimum of three years
after the project completion. Coverage shall be included on behalf of the insured
for covered claims arising out of the actions of independent contractors. If the
insured is using subcontractors, the policy must include work performed “by or on
behalf” of the insured. Policy shall contain no language that would invalidate or
remove the insurer’s duty to defend or indemnify for claims or suits expressly
excluded from coverage. Policy shall specifically provide for a duty to defend on
the part of the insurer. The City, its officers, officials, agents employees, and
volunteers shall be included as insureds under the policy.
ARTICLE 5 -CONTRACTOR RESPONSIBILITIES; REGULATORY REQUIREMENTS
5.1 Applicable Laws
A. Contractor shall give all notices required by and shall comply with all Applicable Laws
applicable to the performance of the Work. Except where otherwise expressly
required by Applicable Laws, neither the City nor the City’s Representative shall be
responsible for monitoring Contractor’s compliance with any Applicable Laws. If
Contractor performs any Work knowing or having reason to know that it is contrary
to Applicable Laws, Contractor shall bear all claims, costs, losses, and damages
(including but not limited to all fees and charges of engineers, architects, attorneys,
and other professionals and all court or arbitration or other dispute resolution costs)
arising out of or relating to such Work.
5.2 Permits and Licenses
A. Permits and licenses necessary for prosecution of the Work shall be secured and
paid for by Contractor, including, but not limited to, excavation permit, for plumbing,
mechanical and electrical work and for operations in or over public streets or right of
way under jurisdiction of public agencies other than the City, unless otherwise
specified in the Contract Documents.
B. The Contractor shall arrange and pay for all off-site inspection of the Work related to
permits and licenses, including certification, required by the specifications, drawings,
or by governing authorities, except for such off-site inspections delineated as the
City’s responsibility pursuant to the Contract Documents.
C. Before acceptance of the Work, the Contractor shall submit all licenses, permits,
certificates of inspection and required approvals to the City.
Packet Page. 1118
5.3 Taxes
A. Contractor shall pay all sales, consumer, use, and other similar taxes required to be
paid in accordance with the Applicable Laws of the place of the Project which are
applicable during the performance of the Work. In accordance with Revenue and
Taxation Code section 107.6, the Contract Documents may create a possessory
interest subject to personal property taxation for which Contractor will be
responsible.
5.4 Traffic Control
A. Traffic control plans, if required, shall be prepared at Contractor’s expense. Traffic
control shall be performed at Contractor’s expense in accordance with the
requirements of the City and/or the local agency with jurisdiction. Costs for traffic
control plans, implementation of traffic control, or traffic signal services required by
the City shall be included in the Contractor’s Bid.
B. All warning signs and safety devices used by the Contractor to perform the Work
shall conform to the requirements contained in the State of California, Department
of Transportation’s current edition of “Manual of Traffic Controls for Construction and
Maintenance Work Zones” or to the requirements of the local agency. The Contractor
shall also be responsible for all traffic control required by the agency having
jurisdiction over the Project on the intersecting streets. Contractor must submit a
traffic control plan to the agency having jurisdiction over the Project for approval prior
to starting Work.
C. The Contractor’s representative on the site responsible for traffic control shall
produce evidence that he/she has completed training acceptable to the California
Department of Transportation for safety through construction zones. All of the streets
in which the Work will occur shall remain open to traffic and one lane of traffic
maintained at all times unless otherwise directed by the agency of jurisdiction.
Businesses and residences adjacent to the Work shall be notified forty-eight (48)
hours in advance of closing of driveways. The Contractor shall make every effort to
minimize the amount of public parking temporarily eliminated due to construction in
areas fronting businesses. No stockpiles of pipe or other material will be allowed in
traveled right-of-ways after working hours unless otherwise approved by the
Engineer.
5.5 Safety
A. Contractor shall be solely responsible for all safety precautions and programs in
connection with the Work. Such responsibility does not relieve Subcontractors of
their responsibility for the safety of persons or property in the performance of their
work, nor for compliance with applicable safety laws. Contractor shall comply with
all Applicable Laws relating to the safety of persons or property, or to the protection
of persons or property from damage, injury, or loss; and shall erect and maintain all
necessary safeguards for such safety and protection. Contractor shall notify owners
of adjacent property and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them in the
protection, removal, relocation, and replacement of their property.
Packet Page. 1119
B. The Contractor shall maintain emergency first aid treatment for his employees which
complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C. §
651 et seq.), and California Code of Regulations, Title 8, Industrial Relations Division
1, Department of Industrial Relations, Chapter 4. The Contractor shall ensure the
availability of emergency medical services for its employees in accordance with
California Code of Regulations, Title 8, Section 1512. The Contractor shall submit
an Illness and Injury Prevention Program and a Project Site specific safety program
to the City prior to beginning Work. Contractor shall maintain a confined space
program that meets or exceeds the City’s standards. Contractor needs to make
themselves aware of the City’s safety policies and procedures, and shall meet or
exceed all City standards in areas where the City must enter to perform inspections.
C. Hazard Communication Programs. Contractor shall be responsible for coordinating
any exchange of material safety data sheets or other hazard communication
information required to be made available to or exchanged between or among
employers at the Site in accordance with Applicable Laws.
5.6 Hazardous Materials
A. The City shall not be responsible for any Hazardous Waste brought to the site by the
Contractor. If the Contractor: (i) introduces and/or discharges a Hazardous Waste
onto the site in a manner not specified by the Contract Documents; and/or (ii)
disturbs a Hazardous Material identified in the Contract Documents, the Contractor
shall hire a qualified remediation contractor at Contractor’s sole cost to eliminate the
condition as soon as possible. Under no circumstance shall the Contractor perform
Work for which it is not qualified. The City, in its sole discretion, may require the
Contractor to retain at Contractor’s cost an independent testing laboratory.
B. If the Contractor encounters a Hazardous Waste which may cause foreseeable injury
or damage, Contractor shall immediately: (i) secure or otherwise isolate such
condition; (ii) stop all Work in connection with such material or substance (except in
an emergency situation); and (iii) notify the City (and promptly thereafter confirm
such notice in writing).
C. Subject to Contractor’s compliance with this Article 5.6(B), the City shall verify the
presence or absence of the Hazardous Waste reported by the Contractor, except as
qualified under Article 5.6(A) and Article 5.6(B) in the event such material or
substance is found to be present, verify that the levels of the hazardous material are
below OSHA Permissible Exposure Levels and below levels which would classify
the material as a state of California or federal hazardous waste. When the material
falls below such levels, Work in the affected area shall resume upon direction by the
City.
D. Contractor shall indemnify and hold harmless the City from and against claims,
damages, losses and expenses, arising from a Hazardous Waste on the Project Site,
if such Hazardous Waste exceeded OSHA Permissible Exposure Levels or levels
which would classify the material as a state of California or federal hazardous waste,
and was either i) shown on the Contract Documents or information available to
bidders; or (ii) brought to the site by Contractor. Nothing in this paragraph shall
obligate the Contractor to indemnify the City in the event of the sole or active
negligence or willful misconduct of the City, its officers, agents, or employees.
Packet Page. 1120
5.7 Sanitary Facilities.
A. Contractor shall provide sanitary temporary toilet buildings and hand washing
facilities for the use of all workers. All toilets and hand washing facilities shall comply
with local codes and ordinances. Toilets shall be placed inside sealed secondary
containment devices installed on a flat, level surface. Accumulated liquids in the
secondary containment devices shall be properly removed and legally disposed
without spillage onto the ground. Toilets shall be kept supplied with toilet paper and
shall have workable door fasteners. Toilets and hand washing facilities shall be
serviced no less than once weekly and shall be present in a quantity of not less than
1 per 20 workers as required by Cal/OSHA regulations. The toilets and hand
washing facilities shall be maintained in a sanitary condition at all times. Use of toilet
and hand washing facilities in the Work under construction shall not be permitted.
Any other sanitary facilities required by Cal/OSHA shall be the responsibility of the
Contractor.
5.8 Dust Control
A. Contractor, at its expense, shall maintain all excavations, embankments, haul roads,
permanent access roads, plant sites, waste disposal areas, borrow areas, and all
other work areas free from dust. Industry accepted methods of dust control suitable
for the area involved, such as sprinkling, chemical treatment, light bituminous
treatment or similar methods, will be permitted.
5.9 Air Pollution Control
A. Contractor shall comply with all air pollution control rules, regulations, ordinances
and statutes. All containers of paint, thinner, curing compound, solvent or liquid
asphalt shall be labeled to indicate that the contents fully comply with the applicable
material requirements.
B. Without limiting the foregoing, Contractor must fully comply with all applicable laws,
rules and regulations in furnishing or using equipment and/or providing services,
including, but not limited to, emissions limits and permitting requirements imposed
by the Air Quality Management District with jurisdiction over the Project and/or
California Air Resources Board (CARB). Contractor shall specifically be aware of
the application of these limits and requirements to "portable equipment", which
definition includes any item of equipment with a fuel-powered engine. Contractor
shall indemnify the City against any fines or penalties imposed by the air quality
management district, CARB, or any other governmental or regulatory agency for its
violations of Applicable Laws as well as those of its subcontractors or others for
whom Contractor is responsible under its indemnity obligations provided for in the
Contract Documents.
5.10 Water Quality Management and Compliance
A. Storm, surface, ground, nuisance, or other waters may be encountered at various
times during construction of the Work. The Contractor hereby acknowledges that it
has investigated the risk arising from such waters, has prepared its Bid accordingly,
and assumes any and all risks and liabilities arising therefrom.
Packet Page. 1121
B. Contractor shall keep itself and all subcontractors, staff, and employees fully
informed of and in compliance with all local, state and federal laws, rules and
regulations that may impact, or be implicated by the performance of the Work
including, without limitation, all applicable provisions regulating discharges of storm
water; the Federal Water Pollution Control Act (33 U.S.C. § 13000 et seq.); the
California Porter-Cologne Water Quality Control Act (Cal Water Code §§ 13000-
14950); and any and all regulations, policies, or permits issued pursuant to any such
authority. These include, but are not limited to California State Water Resources
Control Board Order Number 2009-0009-DWQ (NPDES Permit No. CAS000002),
as amended by Order Numbers 2010-0014-DWQ, 2012-0006-DWQ, and any
subsequent amendment to or renewal thereof, State Water Resources Control
Board Order No. 2013-0001-DWQ (NPDES Order No. CAS000004), Santa Ana
Regional Water Quality Control Board No. R8-2010-0036 (NPDES No. CAS618036),
and any amendment or renewal thereof.
C. Contractor shall comply with all conditions of the State Water Resources Control
Board (“State Water Board”) National Pollutant Discharge Elimination System
General Permit for Waste Discharge Requirements for Discharges of Storm Water
Runoff Associated with Construction Activity (“Construction General Permit”) for all
construction activity which results in the disturbance of in excess of one acre of total
land area or which is part of a larger common area of development or sale.
Contractor shall comply with the lawful requirements of the City, and any other
applicable municipality, drainage district, or other local agency with jurisdiction over
the location where the Work is to be conducted, regarding discharges of storm water
to separate storm drain systems or other watercourses under their jurisdiction,
including applicable requirements in municipal storm water management programs.
D. Unless otherwise specified in the Special Conditions or other portion of the Contract
Documents, the City has not prepared a Storm Water Pollution Prevention Plan
(“SWPPP”) or other storm water compliance plan for the Project Site. Contractor
shall be responsible for filing the Notice of Intent (“NOI”) and for obtaining coverage
under the Construction General Permit. This includes filing all necessary
documentation including the Permit Registration Documents (“PRDs”) through the
Stormwater Multiple Applications and Report Tracking System (“SMARTS”);
preparing and implementing a SWPPP for the Work site; implementing all other
provisions, and monitoring and reporting requirements required by the Construction
General Permit; and providing a Qualified SWPPP Developer (“QSD”) and Qualified
SWPPP Practitioner (“QSP”), as necessary for all Work site activities, including but
not limited to preparation and submittal of all reports, plans, inspections, and
monitoring information in compliance with the Construction General Permit. All
submittals shall be coordinated with the City’s Legally Responsible Person and
Authorized Signatory as those terms are defined in the Construction General Permit.
Before any NOI, PRD, SWPPP, or other Construction General Permit-related
document may be submitted to the State Water Board or implemented on the Project
site, it must first be reviewed and approved by the City and/or City’s designee.
Contractor shall include all costs of compliance with specified requirements in the
Contract Price.
E. The City retains the right to develop its own documentation for the Project site,
including but not limited to the SWPPP, and in the alternative may require Contractor
to adopt and implement portions of the City developed SWPPP. The City expressly
Packet Page. 1122
reserves the right to procure coverage under the Construction General Permit for
the Work site if Contractor fails to draft satisfactory PRDs or SWPPP or otherwise
fails to proceed in a manner that complies with the requirements of the Construction
General Permit. The City additionally reserves the right to hire additional contractors
to maintain compliance at the Work site. Whether Contractor has adequately
maintained compliance with the Construction General Permit shall be the City’s sole
determination. Any costs incurred by the City in procuring coverage under the
Construction General Permit, or drafting and/or implementing a SWPPP for the Work
site shall be paid by Contractor.
F. Notwithstanding the above, for those Work sites where construction activity results
in the disturbance of less than one acre of total land area and/or do not need
coverage under the Construction General Permit, the Contractor shall be
responsible for preparing and implementing an Erosion and Sediment Control Plan
in accordance with State Water Resources Control Board Order No. 2013-0001-
DWQ (NPDES Order No. CAS000004) and any amendment to or renewal thereof.
G. Failure to comply with the Construction General Permit, laws, regulations, and
ordinances listed in this Article is a violation of federal and state law.
Notwithstanding any other indemnity contained in these Contract Documents,
Contractor agrees to indemnify and hold harmless the City, its officials, officers,
agents, employees and authorized volunteers from and against any and all claims,
demands, fees, costs, expenses, or losses or liabilities of any kind or nature which
the City, its officials, officers, agents, employees and authorized volunteers may
sustain or incur for noncompliance with the Permit, laws, regulations, and ordinances
listed above, arising out of or in connection with the Work, except for liability resulting
from the sole established negligence, willful misconduct or active negligence of the
City, its officials, officers, agents, employees or authorized volunteers.
H. The City reserves the right to defend any enforcement action or civil action brought
against the City for Contractor’s failure to comply with any applicable water quality
law, regulation, or policy. Contractor hereby agrees to be bound by, and to
reimburse the City for the costs associated with, any settlement reached between
the City and any relevant enforcement entity.
5.11 Environmental Quality Protection
A. The Contractor shall comply with all requirements of applicable federal, state, and
local environmental rules and regulations. Any infractions of said rules and
regulations by the Contractor during the term of the Contract, which result in
penalties, will be the responsibility of the Contractor. The City operates under a
number of environmental permits issued by various agencies. If due to an action,
inaction, or negligence by the Contractor, the City becomes subject to non-
compliance penalties, the cost of such penalties shall be borne by the Contractor.
B. The Contractor shall exercise care to preserve the natural landscape and
vegetation, and shall conduct operations so as to prevent unnecessary destruction,
scarring, or defacing of the natural surroundings in the vicinity of the Work.
Movement of crews and equipment within the rights-of-way and over routes provided
for access to the Work shall be performed in a manner to prevent damage to
property. When no longer required, construction roads shall be restored to original
Packet Page. 1123
contours. Upon completion of the Work, and following removal of construction
facilities and required cleanup, land used for construction purposes and not required
for the completed installation shall be scarified and regraded, as required, so that all
surfaces are left in a condition that will facilitate natural revegetation, provide for
proper drainage, and prevent erosion.
C. If, in the performance of the Work, evidence of the possible occurrence of any
Federally listed threatened or endangered plant or animal is discovered, the
Contractor shall notify the City Representative immediately, giving the location and
nature of the findings. Written confirmation of the evidence, location and nature of
the findings shall be forwarded to City within two (2) Days. The Contractor shall
immediately cease all construction activities in the immediate area of the discovery
to the extent necessary to protect the endangered plant or animal. If directed by the
City Representative, Contractor will refrain from working in the immediate area,
suspend the Work in its entirety, or alter its performance to ensure full compliance
with all applicable permits, laws and regulations. Any City directed changes to the
Work as a result of a siting will be pursuant to the Contract Documents. Any costs
or delays incurred by City or the Contractor due to unreasonable or false notification
of an endangered plant or animal will be borne by the Contractor.
D. If, in the performance of the Work, Contractor should unearth cultural resources (for
example, human remains, animal bones, stone tools, artifacts and/or midden
deposits) through excavation, grading, watering or other means, the Contractor shall
notify the construction/archeological monitor and/or the City Representative
immediately, giving the location and nature of the findings. Written confirmation of
the evidence, location and nature of the findings shall be forwarded to the
construction/archeological monitor and/or City within two (2) Days. The Contractor
shall immediately cease all construction activities in the immediate area of the
discovery to the extent necessary to protect the cultural resource. If directed by the
City Representative, Contractor will refrain from working in the immediate area,
suspend the Work in its entirety, or re-sequence and/or alter its performance to
ensure full compliance with all applicable permits, laws and regulations. Should the
presence of cultural resources be confirmed, the Contractor will assist the City
Representative and the construction/archeological monitor in the preparation and
implementation of a data recovery plan. The Contractor shall provide such
cooperation and assistance as may be necessary to preserve the cultural resources
for removal or other disposition. Any City directed changes to the Work as a result
of the cultural resource will be pursuant to the Contract Documents. Should
Contractor, without permission, injure, destroy, excavate, appropriate, or remove
any cultural resource on or adjacent to the Site, it will be subject to disciplinary action,
arrest and penalty under applicable law. The Contractor shall be principally
responsible for all costs of mitigation and/or restoration of cultural resources related
to the unauthorized actions identified above. Contractor shall be required to pay for
unauthorized damage and mitigation costs to cultural resources (historical and
archeological resources) as a result of unauthorized activities that damage cultural
resources and shall indemnify City pursuant to the Contract Documents.
5.12 Excessive Noise
A. Contractor shall use only such equipment on the Work and in such state of repair so
that the emission of sound therefrom is within the noise tolerance level of that
Packet Page. 1124
equipment as established by Cal/OSHA. Contractor shall comply with the most
restrictive of the following: (1) local sound control and noise level rules, regulations
and ordinances and (2) the requirements contained in these Contract Documents,
including hours of operation requirements.
B. No internal combustion engine shall be operated on the Project without a muffler of
the type recommended by the manufacturer. Should any muffler or other control
device sustain damage or be determined to be ineffective or defective, the
Contractor shall promptly remove the equipment and shall not return said equipment
to the job until the device is repaired or replaced. Said noise and vibration level
requirements shall apply to all equipment on the job or related to the job, including
but not limited to, trucks, transit mixers or transit equipment that may or may not be
owned by the Contractor.
5.13 Diversion of Recyclable Waste Material
A. In compliance with the applicable City’s waste reduction and recycling efforts,
Contractor shall divert all Recyclable Waste Materials to appropriate recycling
centers as required for compliance with the local jurisdiction’s waste diversion
ordinances. Contractor will be required to submit weight tickets and written proof of
diversion with its monthly progress payment requests. Contractor shall complete
and execute any certification forms required by the City or other applicable agencies
to document Contractor’s compliance with these diversion requirements. All costs
incurred for these waste diversion efforts shall be the responsibility of the Contractor.
5.14 Inspector’s Field Office.
A. If required by the City, the Contractor shall be responsible for providing the
inspector’s field office. The office shall be a substantial waterproof construction with
adequate natural light and ventilation by means of stock design windows. Door shall
have a key type lock or padlock clasp. The office shall have heating and air
conditioning and shall be equipped with a telephone, a telephone answering
machine, an ability to connect to the internet, and a fax machine at Contractor’s
expense. The field office shall be provided within 20 Days of the Notice to Proceed.
B. A table satisfactory for the study of plans and two chairs shall be provided by
Contractor. Contractor shall provide and pay for adequate electric lights, local
telephone service, and adequate heat and air conditioning for the field office until
authorized removal.
5.15 Contractor’s Supervision.
A. Contractor shall continuously keep at the Project site, a competent and experienced
full-time Project superintendent with qualifications acceptable to the City.
Superintendent must be able to proficiently speak, read and write in English and
shall have the authority to make decisions on behalf of the Contractor. Contractor
shall continuously provide efficient supervision of the Project.
Packet Page. 1125
5.16 Workers.
A. Contractor shall at all times enforce strict discipline and good order among its
employees. Contractor shall not employ on the Project any unfit person for the duties
they were assigned or any one not skilled in the Work assigned to him or her.
B. Any person in the employ of the Contractor whom the City may deem incompetent
or unfit shall be dismissed from the Work and shall not be employed on this Project.
5.17 Independent Contractors.
A. Contractor shall be an independent contractor for the City and not an employee.
Contractor understands and agrees that it and all of its employees shall not be
considered officers, employees, or agents of the City and are not entitled to benefits
of any kind normally provided employees of the City, including but not limited to,
state unemployment compensation or workers’ compensation. Contractor assumes
full responsibility for the acts and omissions of its employees or agents related to the
Work.
5.18 Verification of Employment Eligibility.
A. By executing the Contract, Contractor verifies that it fully complies with all
requirements and restrictions of state and federal law respecting the employment of
undocumented aliens, including, but not limited to, the Immigration Reform and
Control Act of 1986, as may be amended from time to time, and shall require all
subcontractors, sub-subcontractors and consultants to comply with the same. Each
person executing this Contract on behalf of Contractor verifies that he or she is a
duly authorized officer of Contractor and that any of the following shall be grounds
for the City to terminate the Contract for cause: (1) failure of the Contractor or its
Subcontractors, sub-subcontractors or consultants to meet any of the requirements
provided for in this Article; (2) any misrepresentation or material omission concerning
compliance with such requirements; or (3) failure to immediately remove from the
Work any person found not to be in compliance with such requirements.
5.19 Labor.
A. Hours of Work
1. As provided in Article 3 (commencing at section 1810), Chapter 1, Part 7, Division
2 of the Labor Code, Contractor stipulates that eight (8) hours of labor shall
constitute a legal day’s work. The time of service of any worker employed at any
time by the Contractor or by any subcontractor on any subcontract under this
Contract upon the Work or upon any part of the Work contemplated by this
Contract is limited and restricted to eight (8) hours during any one calendar day
and 40 hours during any one calendar week, except as hereinafter provided.
Notwithstanding the provisions herein above set forth, work performed by
employees of Contractor in excess of eight (8) hours per day, and 40 hours during
any one week, shall be permitted upon this public work upon compensation for all
hours worked in excess of eight (8) hours per day at not less than one and one-
half times the basic rate of pay.
Packet Page. 1126
2. The Contractor and every Subcontractor shall keep an accurate record showing
the name of and actual hours worked each calendar day and each calendar week
by each worker employed in connection with the Work or any part of the Work
contemplated by this Contract. The record shall be kept open at all reasonable
hours to the inspection of the City and to the Division of Labor Law Enforcement,
Department of Industrial Relations of the State of California.
3. The Contractor shall pay to the City a penalty of twenty-five dollars ($25.00) for
each worker employed in the execution of this Contract by the Contractor or by
any subcontractor for each calendar day during which such worker is required or
permitted to work more than eight (8) hours in any calendar day and 40 hours in
any one calendar week in violation of the provisions of Article 3 (commencing at
section 1810), Chapter 1, Part 7, Division 2 of the Labor Code.
4. Any work necessary to be performed after regular working hours, or on Saturdays
and Sundays or other holidays, shall be performed without additional expense to
the City.
5. If Contractor gives notice of an inspection pursuant to the Contract Documents,
the City will provide inspection during normal working hours from 7:00 a.m. to 3:30
p.m. Monday through Friday. Requested inspections before or after this time will
be charged to the Contractor as reimbursable inspection time. Inspections on
weekends requires two (2) Days’ notice for review and approval. Upon written
request and approval the 8.5 hour working day may be changed to other limits
subject to city/county ordinance.
6. It shall be unlawful for any person to operate, permit, use, or cause to operate any
of the following at the Project Site, other than between the hours of 7:00 a.m. to
5:00 p.m., Monday through Friday, with no Work allowed on City-observed
Holidays, unless otherwise approved by the City:
a. Powered Vehicles
b. Construction Equipment
c. Loading and Unloading Vehicles
d. Domestic Power Tools
B. Payroll Records; Labor Compliance
1. Pursuant to Labor Code section 1776, Contractor and all subcontractors shall
maintain weekly certified payroll records, showing the names, addresses, Social
Security numbers, work classifications, straight time and overtime hours worked
each day and week, and the actual per diem wages paid to each journeyman,
apprentice, worker, or other employee employed by them in connection with the
Work under this Contract. Contractor shall certify under penalty of perjury that
records maintained and submitted by Contractor are true and accurate. Contractor
shall also require Subcontractor(s) to certify weekly payroll records under penalty
of perjury.
Packet Page. 1127
2. In accordance with Labor Code section 1771.4, the Contractor and each
Subcontractor shall furnish the certified payroll records directly to the Department
of Industrial Relations (“DIR”) on the specified interval and format prescribed by
the DIR, which may include electronic submission. Contractor shall comply with
all requirements and regulations from the DIR relating to labor compliance
monitoring and enforcement. The requirement to submit certified payroll records
directly to the Labor Commissioner under Labor Code section 1771.4 shall not
apply to work performed on a public works project that is exempt pursuant to the
small project exemption specified in Labor Code Section 1771.4.
3. Any stop orders issued by the DIR against Contractor or any Subcontractor that
affect Contractor’s performance of Work, including any delay, shall be Contractor’s
sole responsibility. Any delay arising out of or resulting from such stop orders shall
be considered Contractor caused delay subject to any applicable liquidated
damages and shall not be compensable by the City. Contractor shall defend,
indemnify and hold the City, its officials, officers, employees and agents free and
harmless from any claim or liability arising out of stop orders issued by the DIR
against Contractor or any Subcontractor.
4. The payroll records described herein shall be certified and submitted by the
Contractor at a time designated by the City. The Contractor shall also provide the
following:
a. A certified copy of the employee’s payroll records shall be made available for
inspection or furnished to such employee or his or her authorized representative
on request.
b. A certified copy of all payroll records described herein shall be made available
for inspection or furnished upon request of the DIR.
5. Unless submitted electronically, the certified payroll records shall be on forms
provided by the Division of Labor Standards Enforcement (“DLSE”) of the DIR or
shall contain the same information as the forms provided by the DLSE.
6. Any copy of records made available for inspection as copies and furnished upon
request to the public or any public agency, the City, the Division of Apprenticeship
Standards or the Division of Labor Standards Enforcement shall be marked or
obliterated in such a manner as to prevent disclosure of an individual's name,
address and social security number. The name and address of the Contractor
awarded the Contract or performing the Contract shall not be marked or
obliterated.
7. In the event of noncompliance with the requirements of this Article, the Contractor
shall have ten (10) Days in which to comply subsequent to receipt of written notice
specifying in what respects the Contractor must comply with this Article. Should
noncompliance still be evident after such 10-day period, the Contractor shall pay
a penalty of one hundred dollars ($100.00) to the City for each calendar day, or
portion thereof, for each worker, until strict compliance is effectuated. Upon the
request of the Division of Apprenticeship Standards or the Division of Labor
Standards Enforcement, such penalties shall be withheld from progress payment
then due.
Packet Page. 1128
8. The responsibility for compliance with this Article shall rest upon the Contractor.
C. Prevailing Rates of Wages
1. The Contractor is aware of the requirements of Labor Code sections 1720 et seq.
and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000
et seq. (“Prevailing Wage Laws”), which require the payment of prevailing wage
rates and the performance of other requirements on certain “public works” and
“maintenance” projects. Since this Project involves an applicable “public works” or
“maintenance” project, as defined by the Prevailing Wage Laws, and since the total
compensation is $1,000 or more, Contractor agrees to fully comply with such
Prevailing Wage Laws. The Contractor shall obtain a copy of the prevailing rates
of per diem wages at the commencement of this Contract from the website of the
Division of Labor Statistics and Research of the Department of Industrial Relations
located at www.dir.ca.gov. In the alternative, the Contractor may view a copy of
the prevailing rate of per diem wages which are on file at the City’s Administration
Office and shall be made available to interested parties upon request. Contractor
shall make copies of the prevailing rates of per diem wages for each craft,
classification, or type of worker needed to perform work on the Project available to
interested parties upon request, and shall post copies at the Contractor’s principal
place of business and at the Project site. Contractor shall defend, indemnify and
hold the City, its officials, officers, employees and authorized volunteers free and
harmless from any claims, liabilities, costs, penalties or interest arising out of any
failure or allege failure to comply with the Prevailing Wage Laws.
2. The Contractor shall forfeit as a penalty to the City not more than Two Hundred
Dollars ($200.00), pursuant to Labor Code section 1775, for each calendar day, or
portion thereof, for each worker paid less than the prevailing wage rate as
determined by the Director of the DIR for such work or craft in which such worker
is employed for any public work done under the Contract by it or by any
Subcontractor under it. The difference between such prevailing wage rate and the
amount paid to each worker for each calendar day or portion thereof, for which
each worker was paid less than the prevailing wage rate, shall be paid to each
worker by the Contractor.
3. Contractor shall post, at appropriate conspicuous points on the Project Site, a
schedule showing all determined general prevailing wage rates and all authorized
deductions, if any, from unpaid wages actually earned.
D. Public Works Contractor Registration
1. Pursuant to Labor Code sections 1725.5 and 1771.1, the Contractor and its
Subcontractors must be registered with the DIR prior to the execution of a contract
to perform public works. By entering into this Contract, Contractor represents that
it is aware of the registration requirement and is currently registered with the DIR.
Contractor shall maintain a current registration for the duration of the Project.
Contractor shall further include the requirements of Labor Code sections 1725.5
and 1771.1 in any subcontract and ensure that all Subcontractors are registered
at the time this Contract is entered into and maintain registration for the duration
of the Project. Notwithstanding the foregoing, the contractor registration
requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not
Packet Page. 1129
apply to work performed on a public works project that is exempt pursuant to the
small project exemption specified in Labor Code Sections 1725.5 and 1771.1.
E. Employment of Apprentices
1. Contractor and all Subcontractors shall comply with the requirements of Labor
Code sections 1777.5 and 1777.6 in the employment of apprentices.
2. Information relative to apprenticeship standards, wage schedules, and other
requirements may be obtained from the Director of Industrial Relations, ex officio
the Administrator of Apprenticeship, San Francisco, California, or from the Division
of Apprenticeship Standards and its branch offices.
3. Knowing violations of Labor Code section 1777.5 will result in forfeiture not to
exceed one hundred dollars ($100.00) for each calendar day of non-compliance
pursuant to Labor Code section 1777.7.
F. Nondiscrimination/Equal Employment Opportunity
1. Pursuant to Labor Code section 1735 and other applicable provisions of law, the
Contractor and its Subcontractors shall not discriminate against any employee or
applicant for employment because of race, religious creed, color, national origin,
ancestry, physical disability, mental disability, medical condition, marital status,
sex, age, sexual orientation, or any other classifications protected by law on this
Project. The Contractor will take affirmative action to insure that employees are
treated during employment or training without regard to their race, religious creed,
color, national origin, ancestry, physical disability, mental disability, medical
condition, marital status, sex, age, sexual orientation, or any other classifications
protected by law.
G. Debarment of Contractors and Subcontractors
1. Contractors or Subcontractors may not perform work on a public works project with
a subcontractor who is ineligible to perform work on a public project pursuant to
Labor Code section 1777.1 or 1777.7. Any contract on a public works project
entered into between a contractor and a debarred subcontractor is void as a matter
of law. A debarred subcontractor may not receive any public money for performing
work as a subcontractor on a public works contract. Any public money that is paid,
or may have been paid to a debarred subcontractor by a contractor on the project
shall be returned to the City. The Contractor shall be responsible for the payment
of wages to workers of a debarred subcontractor who has been allowed to work
on the Project.
5.20 Subcontracts.
A. Contractor agrees to bind every Subcontractor to the terms of the Contract
Documents as far as such terms are applicable to Subcontractor’s portion of the
Work. Contractor shall be as fully responsible to the City for the acts and omissions
of its subcontractors and of persons either directly or indirectly employed by its
subcontractors, as Contractor is for acts and omissions of persons directly employed
Packet Page. 1130
by Contractor. Nothing contained in these Contract Documents shall create any
contractual relationship between any subcontractor and the City.
B. The City reserves the right to accept all subcontractors. The City’s acceptance of
any Subcontractor under this Contract shall not in any way relieve Contractor of its
obligations in the Contract Documents.
C. Prior to substituting any Subcontractor listed in the Bid Forms, Contractor must
comply with the requirements of the Subletting and Subcontracting Fair Practices
Act pursuant to California Public Contract Code section 4100 et seq.
5.21 Progress Meetings
A. The Contractor shall schedule and hold regular progress meetings at least weekly
and at other times as requested by Engineer or as required by progress of the Work.
The Contractor, City, and all Subcontractors active on the Site shall attend each
meeting. Contractor may at its discretion request attendance by representatives of
its Suppliers, manufacturers, and other Subcontractors. The City will preside at the
progress meetings and will arrange for keeping and distributing the minutes. The
purpose of the meetings is to review the progress of the Work, maintain coordination
of efforts, discuss changes in scheduling, and resolve other problems which may
develop. During each meeting, the Contractor shall present any issues which may
impact its progress with a view to resolve these issues expeditiously.
5.22 Submittals
A. Schedule of Submittals. Within five (5) Days after the Notice to Proceed (unless
otherwise specified in the Contract Documents), Contractor will prepare and deliver
a Schedule of Submittals to the City that has been fully integrated with the progress
schedule and identifies each Submittal required by the Contract Documents as well
as the date on which Contractor will deliver each Submittal to the City. Each
Submittal must be delivered to the City at least thirty (30) Days prior to the date the
material or equipment is scheduled to be incorporated into the Work. The Contractor
is responsible for any schedule delays resulting from the Submittal process.
B. Submittal Procedures.
1. Contractor will follow the following procedures for each Submittal, Shop Drawing
and Sample required by the Contract Documents:
a. Submittals must be transmitted electronically.
b. Transmittals will be sequentially numbered. Contractor to mark revised
Submittals with original number and sequential alphabetic suffix.
c. Each Submittal will identify the Project, Contractor, Subcontractor and
Supplier, pertinent Drawing and detail number, and Specification Section
number appropriate to Submittal.
d. By transmitting a Submittal, Contractor certifies it has reviewed and approved
each Submittal, verified products required, field dimensions, adjacent
Packet Page. 1131
construction Work, and that coordination of information is according to
requirements of the Work and Contract Documents.
e. Identify variations in Contract Documents and product or system limitations
that may differ and/or be detrimental to successful performance of completed
Work.
f. When Submittal is revised for resubmission, Contractor shall promptly address
the City’s comments and resubmit. Contractor shall identify changes made
since previous submission.
g. The City’s review of Shop Drawings shall not relieve Contractor from
responsibility for deviations from the Contract Documents unless Contractor
has, in writing, called the City’s attention to such deviations at time of
submission and the City has taken no exception to the deviation. The City’s
review of Shop Drawings shall not relieve Contractor from responsibility for
errors in Shop Drawings.
h. Submittals not required by the Contract Documents or requested by the City
will not be acknowledged or processed.
i. Incomplete Submittals will not be reviewed by the City. Delays resulting from
incomplete Submittals are not the responsibility of the City.
j. Contractor shall not be entitled to any extension of the Contract Times as a
result of the Submittal process.
k. Contractor shall allow a minimum of 20 working days for review of Submittals
unless otherwise specified in the Contract Documents.
2. Where a Submittal, Shop Drawing or Sample is required by the Contract
Documents or the Schedule of Submittals, any related Work performed prior to the
City review and approval of the pertinent submittal will be performed at the sole
risk and expense and responsibility of Contractor.
C. Schedule Milestone for Submittals. Contractor must submit all Submittals required
by the Contract Documents in accordance with the Schedule of Submittals. If
Contractor fails to submit the Submittals in accordance with the Schedule of
Submittals, Contractor will be solely liable for any delays or impacts caused by the
delayed Submittal, whether direct or indirect. Contractor will be liable for the time
calculated from the date the Submittal is due until the date a compliant Submittal is
made. A compliant Submittal will be one that is complete and satisfies the
requirements of the Contract Documents.
5.23 Shop Drawings and Sample Submittal Procedures.
A. Before submitting each Shop Drawing or Sample, Contractor shall have:
1. Reviewed and coordinated each Shop Drawing or Sample with other Shop
Drawings and Samples and with the requirements of the Work and the Contract
Documents;
Packet Page. 1132
2. Determined and verified all field measurements, quantities, dimensions, specified
performance and design criteria, installation requirements, materials, catalog
numbers, and similar information with respect thereto;
3. Determined and verified the suitability of all materials offered with respect to the
indicated application, fabrication, shipping, handling, storage, assembly, and
installation pertaining to the performance of the Work; and
4. Determined and verified all information relative to Contractor’s responsibilities for
means, methods, techniques, sequences, and procedures of construction, and
safety precautions and programs incident thereto.
B. With each Submittal, Contractor shall give the City specific written notice of any
variations that the Shop Drawing or Sample may have from the requirements of the
Contract Documents. This notice shall be both a written communication separate
from the Shop Drawings or Sample Submittal and, in addition, a specific notation
made on each Shop Drawing or Sample submitted to the City for review and
approval of each such variation.
C. Shop Drawings.
1. Data shown on the Shop Drawings will be complete with respect to quantities,
dimensions, specified performance and design criteria, materials, and similar data
to show the City the services, materials, and equipment Contractor proposes to
provide and to enable the City to review the information for assessing conformance
with information given and design concept expressed in Contract Documents.
2. When required by individual Specification sections, provide Shop Drawings signed
and sealed by a professional engineer responsible for designing components
shown on Shop Drawings. Shop Drawings must include signed and sealed
calculations to support design in a form suitable for submission to and approval by
authorities having jurisdiction.
3. Shop Drawings for steel structures shall consist of shop details, erection and other
working Drawings showing details, dimensions, sizes of members and other
information necessary for the complete fabrication and erection of the metal work.
4. Shop Drawings of concrete structures shall consist of such detailed drawings as
may reasonably be required for the successful prosecution of the Work and which
are not included in the Drawings furnished by the Engineer. These may include
drawings for false work, bracing, centering and form work, masonry layout
diagrams, and diagrams for bent reinforcement.
5. Contractor shall make revisions and provide additional information when required
by authorities having jurisdiction.
D. Samples. Clearly identify each Sample as to material, Supplier, pertinent data such
as catalog numbers, the use for which intended and other data as required to enable
the City to review the submittal for assessing conformance with information given
and design concept expressed in Contract Documents. Samples should be of
appropriate size and detail to assess functional, aesthetic, color, texture, patterns
and finish selection.
Packet Page. 1133
E. City’s Review.
1. The City will review Shop Drawings and Samples in accordance with the Schedule
of Submittals. The City’s review and acceptance will be only to determine if the
items covered by the Submittals will, after installation or incorporation in the Work,
conform to the information given in the Contract Documents and be compatible
with the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents.
2. The City review and approval will not extend to means, methods, techniques,
sequences, or procedures of construction (except where a particular means,
method, technique, sequence, or procedure of construction is specifically and
expressly called for by the Contract Documents) or to safety precautions or
programs incident thereto. The review and approval of a separate item as such
will not indicate approval of the assembly in which the item functions.
3. The City’s review and acceptance shall not relieve Contractor from responsibility
for any variation from the requirements of the Contract Documents unless the City
has given written approval of each such variation by specific written notation
thereof incorporated in or accompanying the Shop Drawing or Sample.
F. Resubmittal Procedures. Contractor shall make corrections required by the City and
shall return corrected Shop Drawings and submit, as required, new Samples for
review and approval. Contractor shall direct specific attention in writing to revisions
other than the corrections called for by the City on previous Submittals.
5.24 Record (“As-Built”) Drawings.
A. The Contractor shall maintain one record set of Contract Documents at the Site or
digitally in an acceptable format. On these, it shall mark all Project conditions,
locations, configurations, and any other changes or deviations which may vary from
the information represented in the original Contract Documents, including buried or
concealed construction and utility features which are revealed during the course of
construction. Special attention shall be given to recording the horizontal and vertical
location of all buried utilities that differ from the locations indicated, or which were
not indicated on the Drawings. For all Projects involving the installation of any
pipeline, Contractor shall survey and record the top of the pipe at a minimum of every
100 linear feet, and at each bend, recording both the horizontal and vertical
locations. Said Drawings shall be supplemented by any detailed sketches as
necessary or directed to fully indicate the Work as actually constructed. Any required
as-built drawings of civil engineering elements of the Work shall be prepared by a
registered civil engineer.
B. These master Record Drawings of the as-built conditions, including all revisions
made necessary by Addenda and Change Orders, shall be maintained up-to-date
during the progress of the Project. Red ink shall be used for alterations and notes.
Notes shall identify relevant Change Orders by number and date. Record Drawings
shall be accessible to the Engineer at all times during the construction period.
Failure on the Contractor’s part to keep Record Drawings current could result in
withholding partial payment.
Packet Page. 1134
C. Upon completion of the Project and as a condition of final acceptance, the Contractor
shall finalize and deliver a complete set of Record Drawings to the Engineers. The
information submitted by the Contractor will be assumed to be correct, and the
Contractor shall be responsible for, and liable to the City, for the accuracy of such
information, and for any errors or omissions which may or may not appear on the
Record Drawings.
D. Unless otherwise called for by the Contract Documents, the cost of all material,
equipment, and labor required to complete the Record Drawings shall be included in
Contractor’s bid and distributed in the Bid Schedule. No additional compensation
shall be made to the Contractor for this Work.
5.25 Layout and Field Engineering.
A. The Contractor shall utilize a properly licensed surveyor to perform all layout surveys
required for the control and completion of the Work, and all necessary surveys to
compute quantities of Work performed.
5.26 Separate Contracts and Cooperation.
A. Separate Contracts. The City reserves the right to let other contracts in connection
with this Work or on the Project site. Contractor shall permit other contractors
reasonable access and storage of their materials and execution of their work and
shall properly connect and coordinate its Work with theirs. To ensure proper
execution of its subsequent Work, Contractor shall immediately inspect work already
in place and shall at once report to the Engineer any problems with the Work in place
or discrepancies with the Contract Documents.
B. Cooperation. Contractor shall ascertain to its own satisfaction the scope of the
Project and nature of any other contracts that have been or may be awarded by the
City in prosecution of the Project to the end that Contractor may perform this
Contract in the light of such other contracts, if any. Nothing herein contained shall
be interpreted as granting to Contractor exclusive occupancy at site of the Project.
Contractor shall not cause any unnecessary hindrance or delay to any other
contractor working on the Project. If simultaneous execution of any contract for the
Project is likely to cause interference with performance of some other contract or
contracts, the Engineer shall decide which Contractor shall cease Work temporarily
and which contractor shall continue or whether work can be coordinated so that
contractors may proceed simultaneously. The City shall not be responsible for any
damages suffered or for extra costs incurred by Contractor resulting directly or
indirectly from award, performance, or attempted performance of any other contract
or contracts on the Project Site.
5.27 Work Site.
A. Limitation of Use of Site and Other Areas. Rights-of-way, easements, or rights-of-
entry for the Work will be provided by the City. Unless otherwise specified in the
Special Provisions, the Contractor shall make arrangements, pay for, and assume
all responsibility for acquiring, using, and disposing of additional work areas and
facilities temporarily required. The Contractor shall indemnify and hold the City
harmless from all claims for damages caused by such actions. Contractor shall
Packet Page. 1135
confine construction equipment, the storage of materials and equipment, and the
operations of workers to the Site and other areas permitted by Applicable Laws, and
shall not unreasonably encumber the Site and other areas with construction
equipment or other materials or equipment. Contractor shall assume full
responsibility for any damage to any such land or area, or to City or occupant thereof,
or of any adjacent land or areas resulting from the performance of the Work.
B. Site Maintenance. During the progress of the Work, Contractor shall keep the Site
and other areas free from accumulations of waste materials, rubbish, and other
debris. Removal and disposal of such waste materials, rubbish, and other debris
shall conform to Applicable Laws. The Contractor shall furnish trash bins for all
debris from construction. All debris shall be placed in trash bins daily. Forms and
false-work that are to be re-used shall be stacked neatly concurrently with their
removal. Forms and false-work that are not to be re-used shall be disposed of
concurrently with their removal.
C. Cleaning. Prior to Completion of the Work, Contractor shall clean the Site and make
it ready for utilization by the City. At the completion of the Work Contractor shall
remove from the Site all tools, appliances, construction equipment and machinery,
and surplus materials and shall restore to original condition all property not
designated for alteration by the Contract Documents.
5.28 Utility Usage.
A. All temporary utilities, including but not limited to electricity, water, gas, and
telephone, used on the Work shall be furnished and paid for by Contractor.
Contractor shall provide necessary temporary distribution systems, including meters,
if necessary, from distribution points to points on the Work where the utility is
needed. Upon completion of the Work, Contractor shall remove all temporary
distribution systems. Contractor shall provide necessary and adequate utilities and
pay all costs for water, electricity, gas, oil, and sewer charges required for completion
of the Work, including but not limited to startup and testing required in the Contract
Documents. All permanent meters installed shall be listed in the Contractor’s name
until the Work is accepted. For Work to be performed in existing City facilities,
Contractor may use the City’s existing utilities, provided such use is reasonable
under the circumstances. If Contractor uses the City utilities, it will not need to
compensate the City for reasonably consumption of utilities, but Contractor will be
responsible for any excessive, unreasonable or wasteful utility usage. Amounts due
the City under this section may be deducted from progress payments.
5.29 Protection of Work and Property.
A. The Contractor shall digitally record video and take photographs of the Project site
and adjacent improvements in a manner and quality that clearly depicts the existing
condition of the Project Site and adjacent improvements immediately prior to the
start of Work (minimum 1080p video and 4MP photo). All videos and photographs
shall be date and time stamped. The Contractor shall submit the video and photos
in digital format on a memory stick before the commencement of Work, along with a
map outlining the route and locations of the videos and/or photographs. The
Contractor shall be responsible for all damages to persons or property that occur as
a result of the Work. Contractor shall be responsible for the proper care and
Packet Page. 1136
protection of all materials delivered and Work performed until completion and final
acceptance by the City. All Work shall be solely at the Contractor’s risk.
B. Contractor shall adequately protect adjacent property from settlement or loss of
lateral support as necessary. Contractor shall comply with all applicable safety laws
and building codes to prevent accidents or injury to persons on, about, or adjacent
to the Project site where Work is being performed. Contractor shall erect and
properly maintain at all times, as required by field conditions and progress of work,
all necessary safeguards, signs, barriers, lights, and watchmen for protection of
workers and the public, and shall post danger signs warning against hazards created
in the course of construction.
C. Contractor shall provide such heat, covering, and enclosures as are necessary to
protect all Work, materials, equipment, appliances, and tools against damage by
weather conditions.
D. Contractor shall take adequate precautions to protect existing sidewalks, curbs,
pavements, utilities, and other adjoining property and structures, and to avoid
damage thereto, and Contractor shall repair any damage thereto caused by the Work
operations. Contractor shall:
1. Enclose the working area with a substantial barricade, and arrange work to cause
minimum amount of inconvenience and danger to the public.
2. Provide substantial barricades around any shrubs or trees indicated to be
preserved.
3. Deliver materials to the Site over a route designated by the City.
4. Provide any and all dust control required and follow the applicable air quality
regulations as appropriate. If the Contractor does not comply immediately with a
notice from the City or a public agency responsible for air quality, the City shall
have the authority to provide dust control and deduct the cost from payments to
the Contractor.
5. Confine Contractor’s apparatus, the storage of materials, and the operations of its
workers to limits required by law, ordinances, permits, or directions of the City.
Contractor shall not unreasonably encumber the Site with its materials.
6. Take care to prevent disturbing or covering any survey markers, monuments, or
other devices marking property boundaries or corners. If such markers are
disturbed by accident, they shall be replaced by a civil engineer or land surveyor
acceptable to the City, at no cost to the City.
7. Ensure that existing facilities, fences and other structures are all adequately
protected and that, upon completion of all Work, all facilities that may have been
damaged are restored to a condition acceptable to the City.
8. Preserve and protect from injury all buildings, pole lines and all directional, warning
and mileage signs that have been placed within the right-of-way.
Packet Page. 1137
9. At the completion of work each day, leave the Work and the Site in a clean, safe
condition.
10. Comply with any stage construction and/or traffic handling plans. Access to
residences and businesses shall be maintained at all times, except with the City’s
written approval. Any request for approval to reduce or restrict access to
residences and business must be submitted to the City at least seven (7) Days in
advance, and the City may issue or withhold approval in its sole discretion.
E. These precautionary measures will apply continuously and not be limited to normal
working hours. Full compensation for the work involved in the protection and
preservation of life, safety and property as above specified shall be considered as
included in the prices paid for the various contract items of Work, and no additional
allowance will be made therefor.
F. Should damage to persons or property occur as a result of the Work, Contractor shall
promptly notify the City, in writing. Contractor shall be responsible for proper
investigation, documentation, including video or photography, to adequately
memorialize and make a record of what transpired. The City shall be entitled to
inspect and copy any such documentation, video, or photographs.
G. Contractor shall maintain all investigation documentation including video and/or
photographs for a minimum of four (4) years following completion of the Project.
5.30 Emergencies.
A. In emergencies affecting the safety or protection of persons or the Work or Property
at the Site or adjacent thereto, the Contractor, without special instruction or
authorization from the City or the Engineer, is obligated to act to prevent threatened
damage, injury or loss. The Contractor shall give the Engineer prompt written notice
if the Contractor believes that any significant changes in the Work or variations from
the Contract Documents have been caused thereby.
ARTICLE 6 -MATERIALS; INSPECTION
6.1 Access to Work.
A. The City, Engineer, their consultants and other representatives and personnel,
independent testing laboratories, and governmental agencies with jurisdictional
interests will have access to the Site and the Work at reasonable times for their
observation, inspection, and testing. Contractor shall provide them proper and safe
conditions for such access and advise them of Contractor’s safety procedures and
programs.
6.2 Materials.
A. Except as otherwise specifically stated in the Contract Documents, Contractor shall
provide and pay for all materials, labor, tools, equipment, water, lights, power,
transportation, superintendence, temporary constructions of every nature, and all
other services and facilities whatsoever necessary to execute and complete this
Contract within the Contract Time. Unless otherwise specified, all materials, parts,
Packet Page. 1138
and equipment furnished by the Contractor in the Work shall be new, the best of their
respective kinds and grades as noted and/or specified, and workmanship shall be of
good quality.
B. No materials, supplies, or equipment for Work under this Contract shall be
purchased subject to any chattel mortgage or under a conditional sale or other
agreement by which an interest therein or in any part thereof is retained by the seller
or supplier. Contractor warrants good title to all material, supplies, and equipment
installed or incorporated in the Work and agrees upon completion of all work to
deliver the Project, to the City free from any claims, liens, or charges.
C. Materials shall be furnished in ample quantities and at such times as to ensure
uninterrupted progress of the Work and shall be stored properly and protected as
required by the Contract Documents. Contractor shall be entirely responsible for
damage or loss by weather or other causes to materials or Work. Materials shall be
stored on the Project Site in such manner so as not to interfere with any operations
of the City or any independent contractor.
D. Contractor shall verify all measurements, dimensions, elevations, and quantities
before ordering any materials or performing any Work, and the City shall not be liable
for Contractor’s failure to so. Except for an adjustment to Unit Price Work for item
overruns and underruns in accordance with the Contract Documents, no additional
compensation, over and above payment for the actual quantities at the prices set
out in the Bid Schedule, will be allowed because of differences between actual
measurements, dimension, elevations and quantities and those indicated on the
Plans and in the Specifications. Any difference therein shall be submitted to the
Engineer for consideration before proceeding with the Work.
6.3 Test and Inspections.
A. Inspection and Testing of Work and Materials
1. If the Contract Documents, the Engineer, or any instructions, laws, ordinances, or
public authority requires any part of the Work to be tested or approved, Contractor
shall provide the Engineer at least two (2) working days’ notice of its readiness for
observation or inspection. If inspection is by a public authority other than the City,
Contractor shall promptly inform the City of the date fixed for such inspection.
Required certificates of inspection (or similar) shall be secured by Contractor.
Costs for City testing and inspection shall be paid by the City. Costs of tests for
Work found not to be in compliance shall be paid by the Contractor.
2. The Contractor shall pay for the cost of any minimum “show up” costs of a materials
testing technician that was called for by the Contractor but ultimately the Contractor
work was not ready for the inspection. Any such costs shall be deducted from any
amounts due to the Contractor.
3. If any Work is done or covered up without the required testing or approval, the
Contractor shall uncover or deconstruct the Work, and the Work shall be redone
after completion of the testing at the Contractor’s cost in compliance with the
Contract Documents.
Packet Page. 1139
4. Where inspection and testing are to be conducted by an independent laboratory
or agency, materials or samples of materials to be inspected or tested shall be
selected by such laboratory or agency, or by the City, and not by Contractor.
Unless otherwise stated and as provided by the Contract Documents, the City shall
employ and pay for the services of an independent testing laboratory to perform
all inspections, tests, or approvals required by the Contract Documents. All tests
or inspections of materials shall be made in accordance with the commonly
recognized standards of national organizations.
5. Reexamination of Work may be ordered by the City. If so ordered, Work must be
uncovered or deconstructed by Contractor. If Work is found to be in accordance
with the Contract Documents, the City shall pay the costs of reexamination and
reconstruction. If such work is found not to be in accordance with the Contract
Documents, Contractor shall pay all costs.
B. Testing of Materials
1. In advance of manufacture of materials to be supplied by Contractor which must
be tested or inspected, Contractor shall notify the City so that the City may arrange
for testing at the source of supply. Any materials which have not satisfactorily
passed such testing and inspection shall not be incorporated into the Work.
2. If the manufacture of materials to be inspected or tested will occur in a plant or
location greater than sixty (60) miles from the City, the Contractor shall pay for any
excessive or unusual costs associated with such testing or inspection, including
but not limited to excessive travel time, standby time and required lodging.
3. Unless otherwise specified in the Special Provisions, all initial testing and a
reasonable amount of retesting will be performed under the direction of the
Engineer, and at no expense to the Contractor. The Contractor shall notify the
Engineer in writing, at least 15 days in advance, of its intention to use materials for
which tests are specified, to allow sufficient time to perform the tests. The notice
shall name the proposed supplier and source of material. If the notice of intent to
use is sent before the materials are available for testing or inspection, or is sent so
far in advance that the materials on hand at the time will not last but will be replaced
by a new lot prior to use on the Work, it will be the Contractor's responsibility to re-
notify the Engineer when samples which are representative may be obtained.
4. A Certificate of Compliance shall be furnished to the Engineer prior to the use of
any material or assembled material for which these Specifications so require or if
so required by the Engineer. The Engineer may waive the materials testing
requirements and accept a Certificate of Compliance. Material test data may be
required by the Engineer to be included with the submittal. Materials used on the
basis of a Certificate of Compliance may be sampled and tested at any time. The
submission of a Certificate of Compliance shall not relieve the Contractor of
responsibility for incorporating material into the Work which conforms to the
requirements of the Contract Documents, and any material not conforming to the
requirements will be subject to rejection by the Engineer whether in place or not.
5. Copies of mill certificates of composition and quality of all component materials
(reinforcing steel, structural steel, lumber, etc.) incorporated in the construction of
Packet Page. 1140
the Work shall be provided to the City at the time of delivery. City shall retain the
right to reject any raw material not provided with a mill certificate at the time of
delivery.
6. If, after incorporating such materials into the Work, it is found that sources of supply
that have been approved do not furnish a uniform product, or if the product from
any source proves unacceptable at any time, the Contractor shall furnish approved
material from other approved sources. If any product proves unacceptable after
improper storage, handling or for any other reason it shall be rejected, not
incorporated into the Work, and shall be removed from the Project Site all at the
Contractor’s expense.
6.4 Requests for Substitutions.
A. For the purposes of this provision, the term “substitution” shall mean the substitution
of any material, method or service substantially equal to or better in every respect to
that indicated in the Standard Specifications or otherwise referenced herein.
B. Pursuant to Public Contract Code section 3400(b), the City may make a finding that
is described in the Notice Inviting Bids that designates certain products, things, or
services by specific brand or trade name.
C. Unless specifically designated in the Special Conditions, whenever any material,
process, or article is indicated or specified by grade, patent, or proprietary name or
by name of manufacturer, such specifications shall be deemed to be used for the
purpose of facilitating the description of the material, process, or article desired and
shall be deemed to be followed by the words “or equal.” Contractor may, unless
otherwise stated, offer for substitution any material, process, or article which may be
substantially equal to or better in every respect to that so indicated or specified in
the Contract Documents. However, the City has adopted uniform standards for
certain materials, processes, and articles.
D. The Contractor shall submit substitution requests, together with substantiating data,
for substitution of any “or equal” material, process, or article no later than thirty-five
(35) calendar days after award of Contract. Provisions regarding submission of
substitution requests shall not in any way authorize an extension of time for the
performance of this Contract. If a substitution request is rejected by the City, the
Contractor shall provide the material, method or service specified herein. The City
shall not be responsible for any costs incurred by the Contractor associated with
substitution requests. The burden of proof as to the equality of any material,
process, or article shall rest with the Contractor. The Engineer has the complete
and sole discretion to determine if a material, process, or article is substantially equal
to or better than that specified and to approve or reject all substitution requests.
E. Substantiating data as described above shall include, at a minimum, the following
information:
1. A signed affidavit from the Contractor stating that the material, process, or article
proposed as a substitution is substantially equal to or better than that specified in
every way except as may be listed on the affidavit.
Packet Page. 1141
2. Illustrations, specifications, catalog cut sheets, and any other relevant data
required to prove that the material, process, or article is substantially equal to or
better than that specified.
3. A statement of the cost implications of the substitution being requested, indicating
whether and why the proposed substitution will reduce or increase the amount of
the contract.
4. Information detailing the durability and lifecycle costs of the proposed substitution.
F. Failure to submit all the required substantiating data detailed above in a timely
manner so that the substitution request can be adequately reviewed may result in
rejection of the substitution request. The Engineer is not obligated to review multiple
submittals related the same substitution request resulting from the Contractor’s
failure to initially submit a complete package.
G. Time limitations within this Article shall be strictly complied with and in no case will
an extension of time for completion of the contract be granted because of
Contractor’s failure to provide substitution requests at the time and in the manner
described herein.
H. The Contractor shall bear the costs of all the City work associated with the review of
substitution requests.
I. If substitution requests approved by the Engineer require that Contractor furnish
materials, methods or services more expensive than that specified, the increased
costs shall be borne by Contractor.
ARTICLE 7 -SUBSURFACE AND PHYSICAL CONDITIONS; UTILITIES
7.1 Soils Investigations.
A. When a soils investigation report for the Site is available, such report is provided for
informational purposes only. Any information obtained from such report as to
subsurface soil condition, or to elevations of existing grades or elevations of
underlying rock, is approximate only and is not guaranteed. Contractor
acknowledges that any soils investigation report (including any borings) was
prepared for purposes of design only and Contractor is required to examine the Site
before submitting its Bid and must make whatever tests it deems appropriate to
determine the condition of the soil.
7.2 Ownership of Site Materials Found.
A. The title to water, soil, rock, gravel, sand, minerals, timber and any other materials
developed or obtained in the excavation or other operations of Contractor or any of
its Subcontractors in the performance of the Contract, and the right to use said items
in carrying out the Contract, or to dispose of same, is hereby expressly reserved by
the City. Neither Contractor nor any of its Subcontractors nor any of their
representatives or employees shall have any right, title, or interest in said materials,
nor shall they assert or make any claim thereto. Contractor will, as determined by
the City’s Representative, be permitted to use in the Work without charge, any such
Packet Page. 1142
materials which meet the requirements of the Contract Documents, provided the City
shall have the right to use or consume these materials without payment to a third
party.
7.3 Existence of Utilities at the Work Site.
A. Existing Utilities
1. The location of known existing utilities and pipelines are shown on the Plans in
their approximate locations. However, nothing herein shall be deemed to require
the City to indicate the presence of existing service laterals or appurtenances
whenever the presence of such utilities on the site of the project can be inferred
from the presence of other visible facilities, such as buildings, cleanouts, meter
and junction boxes, on or adjacent to the Site of the Project.
2. The City will assume the responsibility for the timely removal, relocation, or
protection of existing main or trunk line utility facilities located on the Project site if
such utilities are not identified by the City in the Contract Documents or which
cannot reasonably be inferred from the presence of other visible facilities.
B. Utility Location
1. It shall be the Contractor’s responsibility to determine the exact location and depth
of all utilities, including service connections, which have been marked by the
respective utility owners and which the Contractor believes may affect or be
affected by the Contractor’s operations. The Contractor shall not be entitled to
additional compensation nor time extensions for work necessary to avoid
interferences nor for repair to damaged utilities if the Contractor does not expose
all such existing utilities as required by this Article.
2. The locating of utilities shall be in conformance with Government Code Section
4216 et seq. except for the City’s utilities located on the City’s property and not on
public right-of-way.
3. A “High Priority Subsurface Installation” is defined in Government Code Section
4216 (j) as “high-pressure natural gas pipelines with normal operating pressures
greater than 415kPA gauge (60psig) or greater than six inches nominal pipe
diameter, petroleum pipelines, pressurized sewage pipelines, high-voltage electric
supply lines, conductors, or cables that have a potential to ground of greater than
or equal to 60kv, or hazardous materials pipelines that are potentially hazardous
to workers or the public if damaged.”
4. A “Subsurface Installation” is defined in Government Code Section 4216 (s) as
“any underground pipeline, conduit, duct, wire, or other structure, except
nonpressurized sewer lines, nonpressurized storm drains, or other nonpressurized
drain lines.”
5. Pursuant to Government Code Section 4216.2 the Contractor shall contact the
appropriate regional notification center (e.g. 811 USA North) at least two (2)
working days but not more than 14 Days before performing any excavation. The
date of the notification shall not count as part of the two-working-day notice. Before
Packet Page. 1143
notifying the appropriate regional notification center, the Contractor shall delineate
the area to be excavated. The Contractor shall request that the utility owners
conduct a utility survey and mark or otherwise indicate the location of their service.
The Contractor shall furnish to the Engineer written documentation of its contact(s)
with the regional notification center prior to commencing excavation at such
locations.
6. After the utility survey is completed, the Contractor shall commence “potholing” or
hand digging to determine the actual location of the pipe, duct, or conduit and in
accordance with Government Code Section 4216.4 if the excavation within the
“tolerance zone” of a subsurface installation. The Engineer shall be given notice
prior to commencing potholing operations. The Contractor shall uncover all piping
and conduits, to a point one (1) foot below the pipe, where crossings, interferences,
or connections are shown on the Drawings, prior to trenching or excavating for any
pipe or structures, to determine actual elevations. New pipelines shall be laid to
such grade as to clear all existing facilities, which are to remain in service for any
period subsequent to the construction of the run of pipe involved.
7. The Contractor's attention is directed to the requirements of Government Code
Section 4216.2 (c) which provides: “When the excavation is proposed within 10
feet of a high priority subsurface installation, the operator of the high priority
subsurface installation shall notify the excavator of the existence of the high priority
subsurface installation to set up an onsite meeting prior to the legal excavation
start date and time or at a mutually agreed upon time to determine actions or
activities required to verify the location and prevent damage to the high priority
subsurface installation. As part of the meeting, the excavator shall discuss with the
operator the method and tools that will be used during the excavation and the
information the operator will provide to assist in verifying the location of the
subsurface installation. The excavator shall not begin excavating until after the
completion of the onsite meeting.” The Contractor shall notify the Engineer in
advance of this meeting.
C. Utility Relocation and Repair
1. If interferences occur at locations other than those indicated in the Contract
Documents with reasonable accuracy, the Contractor shall notify the Engineer in
writing. The Engineer will supply a method for correcting said interferences in
accordance with the responsibilities of this section and Government Code Section
4215. To the extent any delay is caused thereby, Contractor shall submit a notice
of delay within five (5) Days of discovery of the circumstances giving rise to the
delay in accordance with Article 9.1 Change Orders and Time Extensions.
2. Care shall be exercised by the Contractor to prevent damage to adjacent existing
facilities and public or private works; where equipment will pass over these
obstructions, suitable planking shall be placed. If high priority subsurface
installations are damaged and the operator cannot be contacted, the Contractor
shall call 911 emergency services.
3. The City will compensate the Contractor for the costs of locating and repairing
damage not due to the failure of the Contractor to exercise reasonable care, and
for removing or relocating such main or trunk line utility facilities not indicated in
Packet Page. 1144
the Contract Documents with reasonable accuracy, and for the cost of equipment
on the Project necessarily idled during such work. The payment for such costs will
be made as provided in Article 9.1 Change Orders and Time Extensions. The
Contractor shall not be assessed liquidated damages for delay in completion of the
Project, when such delay is caused by the failure of the City or utility company to
provide for removal or relocation of such utility facilities. Requests for extensions
of time arising out of utility relocation or repair delays shall be filed in accordance
with Article 9.1 Change Orders and Time Extensions and Article 9.3 Time for
Completion and Liquidated Damages.
4. The public utility, where it is the owner of the affected utility, shall have the sole
discretion to perform repairs or relocation work or permit the Contractor to do such
repairs or relocation work at a reasonable price. The right is reserved to the City
and the owners of utilities or their authorized agents to enter upon the Work area
for the purpose of making such changes as are necessary for the rearrangement
of their facilities or for making necessary connections or repairs to their properties.
The Contractor shall cooperate with forces engaged in such work and shall
conduct its operations in such a manner as to avoid any unnecessary delay or
hindrance to the work being performed by such forces and shall allow the
respective utilities time to relocate their facility.
5. When the Contract Documents indicate that a utility is to be relocated, altered or
constructed by others, the City will conduct all negotiations with the utility company
and the work will be done at no cost to the Contractor, unless otherwise stipulated
in the Contract Documents.
6. Temporary or permanent relocation or alteration of utilities desired by the
Contractor for its own convenience shall be the Contractor’s responsibility and it
shall make arrangements and bear all costs for such work.
D. Construction at Existing Utilities
1. Where the Work to be performed crosses or otherwise interferes with water, sewer,
gas, or oil pipelines; buried cable; or other public or private utilities, the Contractor
shall perform construction in such a manner so that no damage will result to either
public or private utilities. It shall be the responsibility of the Contractor to determine
the actual locations of, and make accommodates to maintain, all utilities.
2. Before any utility is taken out of service, permission shall be obtained by the
Contractor from the owner. The owner, any impacted resident or business owner
and the City Representative will be advised of the nature and duration of the utility
outage as well as the Contractor’s plan for providing temporary utilities if required
by the owner. The Contractor shall be liable for all damage which may result from
its failure to maintain utilities during the progress of the Work, and the Contractor
shall indemnify City as required by the Contract Documents from all claims arising
out of or connected with damage to utilities encountered during construction;
damages resulting from disruption of service; and injury to persons or damage to
property resulting from the negligent, accidental, or intentional breaching of
utilities.
Packet Page. 1145
3. Unless otherwise called for by the Contract Documents, the cost of all material,
equipment, and labor required to complete this work, shall be included in
Contractor’s bid and distributed in the schedule of pay Items. No additional
compensation shall be made to the Contractor for this work.
7.4 Trenches
A. Trenches Five Feet or More in Depth.
1. Contractor shall submit to the Engineer at the preconstruction meeting, a detailed
plan showing the design of shoring, bracing, sloping or other provisions to be made
for worker protection from hazards of caving ground during the excavation of any
trench or trenches five feet or more in depth. If such plan varies from shoring
system standards established by the Construction Safety Orders of the California
Code of Regulations, Department of Industrial Relations, the plan shall be
prepared by a California registered civil or structural engineer. The plan shall not
be less effective than the shoring, bracing, sloping, or other provisions of the
Construction Safety Orders, as defined in the California Code of Regulations. The
Contractor shall designate in writing the “competent person” as defined in Title 8,
California Code of Regulations, who shall be present at the Work Site each day
that trenching/excavation is in progress. The “competent person” shall prepare
and provide daily trenching/excavation inspection reports to the Engineer.
Contractor shall also submit a copy of its annual California Occupational Safety
and Health Administration (Cal/OSHA) trench/excavation permit.
B. Excavations Deeper than Four Feet.
1. If the Work involves excavating trenches or other excavations that extend deeper
than four (4) feet below the surface, Contractor shall promptly within three (3)
Days, and before the excavation is further disturbed, notify the City in writing of
any of the following conditions:
a. Material that the Contractor believes may be material that is hazardous waste,
as defined in section 25117 of the Health and Safety Code, that is required to
be removed to a Class I, Class II, or Class III disposal site in accordance with
provisions of existing law.
b. Subsurface or latent physical conditions at the site differing from those
indicated.
c. Unknown physical conditions at the site of any unusual nature, different
materially from those ordinarily encountered and generally recognized as
inherent in work of the character provided for in the Contract.
2. The City shall promptly investigate the conditions, and if it finds that the conditions
do so materially differ, or do involve hazardous waste, and cause a decrease or
increase in Contractor’s cost of, or the time required for, performance of any part
of the Work, shall issue a Change Order under the procedures described in Article
9.1 Change Orders and Time Extensions.
Packet Page. 1146
3. In the event that a dispute arises between the City and the Contractor as to whether
the conditions materially differ, or involve hazardous waste, or cause a decrease
or increase in the Contractor’s cost of, or time required for, performance of any
part of the Work, the Contractor shall not be excused from any scheduled
completion date provided for by the Contract, but shall proceed with all Work to be
performed under the Contract. Contractor shall retain any and all rights provided
either by contract or by law which pertain to the resolution of disputes and protests
between the parties.
ARTICLE 8 -PROSECUTION OF THE WORK
8.1 Contractor’s Means and Methods.
A. Contractor is solely responsible for the means and methods utilized to perform the
Work. In no case shall the Contractor’s means and methods deviate from commonly
used industry standards.
8.2 Construction Schedule.
A. General Requirements. The schedule shall be prepared in a Critical Path Method
(“CPM”) format and in an electronic scheduling program acceptable to the City and
as specified in the Contract Documents. Contractor shall deliver the schedule and
all updates to the City in both paper and electronic form. The electronic versions
shall be in the format and include all data used to prepare the schedule. Copies are
not acceptable.
B. Schedule. The receipt or approval of any schedules by the City shall not in any way
relieve the Contractor of its obligations under the Contract Documents. The
Contractor is fully responsible to determine and provide for any and all staffing and
resources at levels which allow for good quality and timely completion of the Project.
Contractor’s failure to incorporate all elements of Work required for the performance
of the Contract or any inaccuracy in the schedule shall not excuse the Contractor
from performing all Work required for a completed Project within the specified
Contract Time. If the required schedule is not received by the time the first payment
under the Contract is due, Contractor shall not be paid until the schedule is received,
reviewed and accepted by the City.
C. Baseline Schedule Contents. The schedule shall allow enough time for inclement
weather. The schedule shall indicate the beginning and completion dates of all
phases of construction; critical path for all critical, sequential time related activities;
and “float time” for all “slack” or “gaps” in the non-critical activities. The schedule
shall include appropriate time allowances and constraints for submittals, items of
interface with Work performed by others, and specified construction, start-up and
performance tests. All float shall be owned by the Project. Schedules indicating
early or late completion shall not modify or have any effect on the Contract Time,
regardless of whether the schedules are reviewed and/or accepted by the City. For
purposes of determining Liquidated Damages, the Contract Time shall control and
may only be altered by a duly authorized Change Order.
D. Baseline Schedule Updates. Contractor shall continuously update its baseline
schedule. Contractor shall submit an updated and accurate baseline schedule to
Packet Page. 1147
the City: (1) prior to the start of construction, if there are any changes to the initial
schedule; (2) with each progress payment request; and (3) whenever requested to
do so by the City. The City may withhold progress payments or other amounts due
under the Contract Documents if Contractor fails to submit an updated and accurate
construction schedule. Upon the City’s request, Contractor shall submit any
schedules or updates to the City in the native electronic format of the software used
to create the schedule. Contractor shall also submit schedules showing a two-week
detailed look-ahead at weekly meetings conducted with the City. The two-week look-
ahead schedule shall clearly identify all staffing and other resources which in the
Contractor’s judgment are needed to complete the Work within the Contract Time,
and it shall clearly state the number of staff to be used on each daily segment of the
Work.
E. Acceptance. Acceptance of the baseline schedules by the City will not impose on
responsibility for accuracy, for sequencing, scheduling, or progress of the Work, or
compliance with the Contract Documents. Acceptance will not interfere with or
relieve Contractor from Contractor’s full responsibility therefor.
F. Recovery Schedule.
1. Should any of the following conditions exist, City may require Contractor to
prepare, at no extra cost to City, a plan of action and a recovery schedule for
completing the Work and achieving all contractual milestones within the allotted
Contract Time:
a. The Contractor's monthly progress report indicates delays that are, in the
opinion of City, of sufficient magnitude that City questions the Contractor's
ability to complete the Work;
b. The schedule shows the Contractor to be thirty (30) or more days behind the
critical path at any time during construction;
c. The Contractor desires to make changes in the logic or the planned duration
of future activities of the schedule which, in the opinion of City, are major in
nature.
2. The recovery schedule shall include proposed revisions to the Construction
Schedule, demonstrating how Contractor intends to achieve all contractual
milestones including Contract completion within the allotted Contract Time. The
submittal shall include a narrative describing the actions planned by the Contractor
to recover the schedule.
3. Contractor shall submit the Recovery Schedule within seven (7) Days of City’s
request. If Contractor asserts that City is responsible for the delay, failure to submit
the recovery schedule within seven (7) Days of City’s request, will be considered
a concurrent delay event attributable to Contractor, and Contractor shall only be
entitled to non-compensable adjustments to Contract Times. If Contractor is
responsible for the delay, this provision will not limit or affect Contractor's liability
and failure to submit the recovery schedule with seven (7) Days of City’s request
may result in City withholding progress payments or other amounts due under the
Contract Documents.
Packet Page. 1148
4. Contractor is responsible for all costs associated with the preparation and
execution of the recovery schedule, including any necessary recovery actions,
which may include, but are not limited to, assignment of additional labor, and/or
equipment, shift or overtime work, expediting of submittals or deliveries,
overlapping of activities or sequencing changes to increase activity concurrence.
Regardless of whether City directs Contractor to prepare a recovery schedule
pursuant to this Section, Contractor shall promptly undertake appropriate action at
no additional cost to City to recover the schedule whenever the current
construction schedule shows that the Contractor will not achieve a milestone
and/or complete the Work within the allotted Contract Time.
8.3 Time for Completion and Liquidated Damages
A. Time for Completion. The time for completion set forth in Article 2 of the Contract
for Construction shall commence: (1) on the date stated in the Notice to Proceed, or
(2) if the Notice to Proceed does not specify a commencement date, then on the
date of the Notice to Proceed and shall be completed by Contractor in the time
specified in the Contract Documents. The City is under no obligation to consider
early completion of the Project; and the Contract completion date shall not be
amended by the City’s receipt or acceptance of the Contractor’s proposed earlier
completion date. Any difference in time between the Contractor’s early completion
and the Contract Time shall be considered a part of the Project float. Contractor
shall not be entitled to compensation, and the City will not compensate Contractor,
for delays which impact early completion. Contractor shall not, under any
circumstances, receive additional compensation from the City (including but not
limited to indirect, general, administrative or other forms of overhead costs) for the
period between the time of earlier completion proposed by the Contractor and the
Contract completion date.
B. Liquidated Damages. If the Work is not completed within the Contract Time(s), it is
understood that the City will suffer damage. In accordance with Government Code
section 53069.85 and Public Contract Code section 7102, being impractical and
infeasible to determine the amount of actual damage, it is agreed that Contractor
shall pay to the City as fixed and liquidated damages, and not as a penalty, the sum
stipulated in the Contract for each calendar day of delay until the Work is fully
completed. Contractor and its surety shall be liable for any liquidated damages. Any
money due or to become due the Contractor may be retained to cover liquidated
damages.
C. Inclement Weather. Contractor shall abide by the Engineer’s determination of what
constitutes inclement weather. Time extensions for inclement weather shall only be
granted when the Work stopped during inclement weather is on the critical path of
the Project schedule. Contractor shall not be entitled to reverse liquidated damages
for time extensions resulting from inclement weather.
D. Extension of Time. Contractor’s entitlement to an extension of the Contract Time is
limited to a City-caused extension of the critical path, reduced by the Contractor’s
concurrent delays, and established by a proper time impact analysis. Contractor
shall not be charged liquidated damages because of any delays in completion of the
Work due to unforeseeable causes beyond the control and without the fault or
negligence of Contractor (or its Subcontractors or Suppliers). The City shall
Packet Page. 1149
ascertain the facts and extent of delay and grant extension of time for completing
the Work when, in its judgment, the facts justify such an extension. Contractor shall
not be entitled to an adjustment in the Contract Times for delays within the control
of Contractor. Delays attributable to and within the control of a Subcontractor or
Supplier shall be deemed to be delays within the control of Contractor.
E. Reverse Liquidated Damages. Consistent with Public Contract Code Section 7102,
Contractor will be compensated for damages incurred due to unreasonable delays
to the critical path for which the City is responsible. The parties agree that
determining Contractor’s exact delay damages are and will continue to be
impracticable and extremely difficult. As such, for each calendar day in excess of
the time for completion set forth in Article 2 of the Contract for Construction, the City
shall pay to the Contractor the sum stipulated in the Contract per day. Such amount
shall constitute the only payment allowed for any City-caused delays and shall
necessarily include all overhead, all profits, all administrative costs, all bond costs,
all labor, materials, equipment and rental costs and any other costs, expenses and
fees incurred or sustained as a result of such delays. Contractor shall not be entitled
to reverse liquidated damages for any change in the Work in which Contractor is
compensated for overhead and profit through a change in Unit Price Work or a
Change Order resulting in a lump sum or allowed mark-up for the additional Work.
The amount of reverse liquidated damages shall be reduced by Contractor’s
concurrent delays.
F. Force Majeure. In accordance with subparagraphs “D” and “E” above, the
Contractor shall not be charged liquidated damages, and the City shall not be
responsible, for any delays resulting from a Force Majeure Event. If a delay to the
critical path results from a Force Majeure Event, the Contractor will be entitled to a
time extension but will not receive an adjustment to the Contract Price or any other
compensation. Such a non-compensable adjustment shall be Contractor’s sole and
exclusive remedy for such delays.
G. No Damages for Reasonable Delay. The City’s liability to Contractor for delays for
which the City is responsible shall be limited to only an extension of time unless such
delays were unreasonable under the circumstances. In no case shall the City be
liable for any costs which are borne by the Contractor in the regular course of
business, including, but not limited to, home office overhead and other ongoing
costs. Damages caused by unreasonable City delay shall be based on actual costs
only, no proportions or formulas shall be used to calculate any delay damages.
H. Procedure for Time Extensions and Delay Damages. Contractor shall not be entitled
to any extension of time or any reverse liquidated damages unless Contractor
properly notices the delay and adjustment to compensation and requests a Change
Order in accordance with Article 9.1 Change Orders and Time Extensions.
Contractor’s failure to timely and fully comply with the Change Order procedures in
the Contract Documents shall constitute a waiver of Contractor’s right to a time
extension or reverse liquidated damages.
8.4 Contractor’s Responsibility for Work.
A. Until the acceptance of the Work by the Engineer as evidenced in writing, it shall be
under the charge and care of the Contractor. The Contractor shall take every
Packet Page. 1150
necessary precaution against injury or damage to any part thereof by the action of
the elements or from any cause whether arising from the execution or non-execution
of the Work. The Contractor shall rebuild, repair, restore and make good at its own
expense all injuries or damages to any portion of the Work before its completion and
acceptance. In the event of damage proximately caused by an Act of God, as
defined by Section 7105 of the Public Contract Code, the City will pay for repair or
restoration to damaged Work in excess of 5% of the total Bid.
8.5 Occupancy.
A. The City reserves the right to occupy or utilize any portion of the Work at any time
before completion, and such occupancy or use shall not constitute acceptance of
any part of Work covered by this Contract. This use shall not relieve the Contractor
of its responsibilities under the Contract.
8.6 Securities for Money Withheld
A. Pursuant to section 22300 of the Public Contract Code of the State of California,
Contractor may request the City to make retention payments directly to an escrow
agent or may substitute securities for any money withheld by the City to ensure
performance under the contract. At the request and expense of Contractor,
securities equivalent to the amount withheld shall be deposited with the City or with
a state or federally chartered bank as the escrow agent who shall return such
securities to Contractor upon satisfactory completion of the contract. Deposit of
securities with an escrow agent shall be subject to a written agreement substantially
in the form provided in section 22300 of the Public Contract Code.
8.7 The City’s Right to Suspend/Terminate the Contract
A. Suspension of Work by the City
1. The City may, at its sole option, decide to suspend at any time the performance of
all or any portion of the Work by notice in writing to Contractor. Such notice of
suspension of Work will designate the amount and type of plant, labor, and
equipment to be committed to the Project during the period of suspension.
Contractor shall use its best efforts to utilize its plant, labor, and equipment in such
a manner as to minimize costs associated with suspension.
2. Upon receipt of any such notice, Contractor shall, unless the notice requires
otherwise:
a. Immediately discontinue Work on the date and to the extent
specified in the notice;
b. Place no further orders or subcontracts for material, services, or
facilities with respect to suspended Work other than to the extent required
in the notice;
c. Promptly make every reasonable effort to obtain suspension upon
terms satisfactory to the City’s Representative of all orders, subcontracts,
Packet Page. 1151
and rental agreements to the extent they relate to performance of Work
suspended; and
d. Continue to protect and maintain the Work including those portions
on which Work has been suspended.
3. Except as provided by this Article, as full and complete compensation for such
suspension, Contractor shall be granted an adjustment in the Contract Price based
on a negotiated daily rate that reflects the Contractor’s actual costs associated with
the demobilized condition of the Site and an extension of the Contract Times equal
to the number of days performance of Work is suspended; provided, however, that
no adjustment of Contract Price or extension of Contract Times shall be granted if
the suspension results from Contractor's non-compliance with the requirements of
the Contract.
B. Termination for Cause by the City:
1. In the sole estimation of the City, if the Contractor refuses or fails to prosecute the
Work or any separable part thereof with such diligence as will insure its completion
within the time specified by the Contract Documents, or any extension thereof, or
fails to complete such Work within such time, or if the Contractor should be
adjudged a bankrupt, or if it should make a general assignment for the benefit of
its creditors, or if a receiver should be appointed on account of its insolvency, or
the Contractor or any of its subcontractors should violate any of the provisions of
this Contract, the City may serve written notice upon the Contractor and its surety
of the City's intention to terminate this Contract. This notice of intent to terminate
shall contain the reasons for such intention to terminate this Contract, and a
statement to the effect that the Contractor's right to perform this Contract shall
cease and terminate upon the expiration of ten (10) Days unless such violations
have ceased and arrangements satisfactory to the City have been made for
correction of said violations.
2. After expiration of the ten (10) Day period, the City may terminate the Contract by
providing a Notice of Termination to the Contractor. The City may take over and
complete the Work by any method it may deem appropriate, including enforcement
of the Project performance bond. Contractor and its surety shall be liable to the
City for any excess costs or other damages incurred by the City to complete the
Work. If the City takes over the Work, the City may, without liability for so doing,
take possession of and utilize in completing the Work such materials, appliances,
plant, and other property belonging to the Contractor as may be on the Site.
3. Upon termination, Contractor shall not be entitled to receive any further payment
from the City, except for Work which was duly performed prior to the effective date
of the Notice of Termination. Contractor shall submit an invoice for final payment
within thirty (30) Days of the effective date of the Notice of Termination. The City
may withhold from final payment up to 150% of any disputed amounts, including
any amounts which may be necessary to repair defective Work, complete
unfinished Work, or are otherwise occasioned by Contractor’s failure to perform its
duties under the Contract.
C. Termination for Convenience by the City:
Packet Page. 1152
1. The City may terminate performance of the Work called for by the Contract
Documents in whole or, from time to time, in part, upon ten (10) Days written notice
if the City determines that a termination is in the City's interest.
2. The Contractor shall terminate all or any part of the Work upon delivery to the
Contractor of a Notice of Termination specifying that the termination is for the
convenience of the City, the extent of termination, and the effective date of such
termination.
3. After receipt of Notice of Termination, and except as directed by the City's
Representative, the Contractor shall, regardless of any delay in determining or
adjusting any amounts due under this termination for convenience clause,
immediately proceed with the following obligations:
a. Stop Work as specified in the Notice.
b. Complete any Work specified in the Notice of Termination in a least
cost/shortest time manner while still maintaining the quality called for under
the Contract Documents.
c. Leave the property upon which the Contractor was working and
upon which the facility (or facilities) forming the basis of the Contract
Document is situated in a safe and sanitary manner such that it does not
pose any threat to the public health or safety.
d. Terminate all subcontracts to the extent that they relate to the
portions of the Work terminated.
e. Place no further subcontracts or orders, except as necessary to
complete the continued portion of the Contract.
f. Submit to the City's Representative, within ten (10) Days from the
effective date of the Notice of Termination, all of the usual documentation
called for by the Contract Documents to substantiate all costs incurred by
the Contractor for labor, materials and equipment through the effective date
of the Notice of Termination. Any documentation substantiating costs
incurred by the Contractor solely as a result of the City's exercise of its right
to terminate this Contract pursuant to this clause, which costs the
contractor is authorized under the Contract documents to incur, shall: (1)
be submitted to and received by the Engineer no later than 30 Days after
the effective date of the Notice of Termination; (2) describe the costs
incurred with particularity; and (3) be conspicuously identified as
“Termination Costs occasioned by the City's Termination for Convenience.”
If the City rejects any costs, Contractor shall be deemed to waive the
rejected costs unless Contractor files a Claim within thirty (30) Days of the
rejection pursuant to Article 9.2.
g. Contractor shall be entitled to receive only the amounts payable
under this Article, and Contractor specifically waives any claim for any other
amounts or damages, including, but not limited to, any claim for
consequential damages or lost profits. The provisions in this Article are in
Packet Page. 1153
addition to and not in limitation of any other rights or remedies available to
the City.
4. Termination of the Contract shall not relieve surety of its obligation for any just
claims arising out of or relating to the Work performed.
5. Notwithstanding any other provision of this Article, when immediate action is
necessary to protect life and safety or to reduce significant exposure or liability, the
City may immediately order Contractor to cease Work on the Project until such
safety or liability issues are addressed to the satisfaction of the City or the Contract
is terminated.
6. If the City terminates Contractor for cause, and if it is later determined that the
termination was wrongful, such default termination shall automatically be
converted to and treated as a termination for convenience. In such event,
Contractor shall be entitled to receive only the amounts payable under this section,
and Contractor specifically waives any claim for any other amounts or damages,
including, but not limited to, any claim for consequential damages or lost profits.
8.8 Completion and Acceptance of Work
A. Final Inspection. Upon written notice from Contractor that the entire Work is
complete, the Engineer will promptly make a final inspection with the City and
Contractor and will notify Contractor in writing of all particulars in which this
inspection reveals that the Work is incomplete or defective. Contractor shall
immediately take such measures as are necessary to complete such Work or
remedy such deficiencies.
B. Final Acceptance. The acceptance of the Work on behalf of the City will be made
by the Engineer. Such acceptance by the City shall not constitute a waiver of
defects. After Contractor has, in the opinion of the Engineer, satisfactorily completed
all corrections identified during the final inspection and has delivered, in accordance
with the Contract Documents, all maintenance and operating instructions,
schedules, guarantees, bonds, certificates or other evidence of insurance,
certificates of inspection, Record Documents, and other documents required by the
Contract Documents, the City shall execute a Notice of Completion, constituting final
acceptance and completion of the Project, except as may be expressly noted.
8.9 Warranty and Guaranty of Work.
A. Contractor hereby warrants that materials and Work shall be completed in
conformance with the Contract Documents and that the materials and Work provided
will fulfill the requirements of this Warranty. Contractor hereby agrees to repair or
replace, at the discretion of the City, any or all Work that may prove to be defective
in its workmanship, materials furnished, methods of installation or fail to conform to
the Contract Document requirements together with any other Work which may be
damaged or displaced by such defect(s) within a period of one (1) year (or as
otherwise indicated in the Contract Documents or in any guarantee or warranty
provided by any manufacturer or supplier of equipment or materials incorporated into
the Work, whichever is later) from the date of the Notice of Completion of the Project
without any expense whatever to the City, ordinary wear and tear and unusual abuse
Packet Page. 1154
and neglect excepted. Contractor shall be required to promptly repair or replace
defective equipment or materials, at Contractor’s option. All costs associated with
such corrective actions and testing, including the removal, replacement, and
reinstitution of equipment and materials necessary to gain access, shall be the sole
responsibility of the Contractor.
B. For any Work so corrected, Contractor’s obligation hereunder to correct defective
Work shall be reinstated for an additional one (1) year period, commencing with the
date of acceptance of such corrected Work. The reinstatement of the one (1) year
warranty shall apply only to that portion of work that was corrected. Contractor shall
perform such tests as the City may require to verify that any corrective actions,
including, without limitation, redesign, repairs, and replacements comply with the
requirements of the Contract. In the event of Contractor’s failure to comply with the
above-mentioned conditions within ten (10) Days after being notified in writing of
required repairs, to the reasonable satisfaction of the City, the City shall have the
right to correct and replace any defective or non-conforming Work and any work
damaged by such work or the replacement or correction thereof at Contractor’s sole
expense. Contractor shall be obligated to fully reimburse the City for any expenses
incurred hereunder immediately upon demand.
C. In addition to the warranty set forth in this Article, Contractor shall obtain for the City
all warranties that would be given in normal commercial practice and assign to the
City any and all manufacturer’s or installer’s warranties for equipment or materials
not manufactured by Contractor and provided as part of the Work, to the extent that
such third-party warranties are assignable and extend beyond the warranty period
set forth in this Article. Contractor shall furnish the City with all warranty and
guarantee documents prior to final acceptance of the Project by the City as required.
D. When specifically indicated in the Contract Documents or when directed by the
Engineer, the City may furnish materials or products to the Contractor for installation.
In the event any act or failure to act by Contractor shall cause a warranty applicable
to any materials or products purchased by the City for installation by the Contractor
to be voided or reduced, Contractor shall indemnify the City from and against any
cost, expense, or other liability arising therefrom, and shall be responsible to the City
for the cost of any repairs, replacement or other costs that would have been covered
by the warranty but for such act or failure to act by Contractor.
E. The Contractor shall remedy at its expense any damage to City-owned or controlled
real or personal property.
F. The City shall notify the Contractor, in writing, within a reasonable time after the
discovery of any failure, defect, or damage. The Contractor shall within ten (10)
Days after being notified commence and perform with due diligence all necessary
Work. If the Contractor fails to promptly remedy any defect or damage, the City shall
have the right to replace, repair or otherwise remedy the defect, or damage at the
Contractor’s expense.
G. In the event of any emergency constituting an immediate hazard to health, safety,
property, or licensees, when caused by Work of the Contractor not in accordance
with the Contract requirements, the City may undertake at Contractor’s expense,
and without prior notice, all Work necessary to correct such condition.
Packet Page. 1155
H. Acceptance of Defective Work.
1. If, instead of requiring correction or removal and replacement of defective Work,
the City prefers to accept it, the City may do so. Contractor shall pay all claims,
costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or arbitration
or other dispute resolution costs) attributable to the City’s evaluation of and
determination to accept such defective Work and for the diminished value of the
Work. If any acceptance of Defective Work occurs prior to release of the Project
retention, a Change Order will be issued incorporating the necessary revisions in
the Contract Documents with respect to the Work, and the City shall be entitled to
an appropriate decrease in the Contract Price, reflecting the diminished value of
Work and all costs incurred by the City. If the acceptance of defective occurs after
release of the Project retention, an appropriate amount will be paid by Contractor
to the City.
I. The City May Correct Defective Work
1. If Contractor fails within a reasonable time after written notice from the City to
correct Defective Work, or to remove and replace rejected Work as required by the
City, or if Contractor fails to perform the Work in accordance with the Contract
Documents, or if Contractor fails to comply with any other provision of the Contract
Documents, the City may, after seven (7) Days written notice to Contractor,
correct, or remedy any such deficiency.
2. In connection with such corrective or remedial action, the City may exclude
Contractor from all or part of the Site, take possession of all or part of the Work
and suspend Contractor’s services related thereto, take possession of Contractor’s
tools, appliances, construction equipment and machinery at the Site, and
incorporate in the Work all materials and equipment stored at the Site or for which
the City has paid Contractor but which are stored elsewhere. Contractor shall allow
the City, and the agents, employees, other contractors, and consultants of each of
them, access to the Site to enable the City to exercise the rights and remedies to
correct the Defective Work.
3. All claims, costs, losses, and damages (including but not limited to all fees and
charges of engineers, architects, attorneys, and other professionals and all court
or arbitration or other dispute resolution costs) incurred or sustained by the City
correcting the Defective Work will be charged against Contractor, and a Change
Order will be issued incorporating the necessary revisions in the Contract
Documents with respect to the Work; and the City shall be entitled to an
appropriate decrease in the Contract Price. Such claims, costs, losses and
damages will include but not be limited to all costs of repair, or replacement of work
of others destroyed or damaged by correction, removal, or replacement of
defective Work.
4. If the Change Order is executed after all payments under the Contract have been
paid by the City and the Project Retention is held in an escrow account as
permitted by the Contract Documents, Contractor will promptly alert the escrow
holder, in writing, of the amount of Retention to be paid to the City. If the Change
Order is executed after release of the Project retention, an appropriate amount will
Packet Page. 1156
be paid by Contractor to the City. Contractor shall not be allowed an extension of
the Contract Times because of any delay in the performance of the Work
attributable to the City correcting Defective Work.
J. Nothing in the warranty or in the Contract Documents shall be construed to limit the
rights and remedies available to the City at law or in equity, including, but not limited
to, Code of Civil Procedure section 337.15.
ARTICLE 9 -CHANGE ORDERS; DISPUTE RESOLUTION
9.1 Change Orders and Time Extensions
All changes to the Contract, including compensation increases and time extensions, shall be
through a written Change Order in accordance with this Article. The City, without invalidating the
Contract, may order changes in the Work consisting of additions, deletions or other revisions, and
Contractor’s compensation and the time for completion shall be adjusted accordingly. Whenever
any change is made as provided for herein, such change shall be considered and treated as
though originally included in the Contract, and shall be subject to all terms, conditions, and
provisions of the original Contract. Contractor shall not be entitled to claim or bring suit for
damages, whether for loss of profits or otherwise, on account of any decrease or omission of any
item or portion of Work to be done. No dispute, disagreement, or failure of the parties to reach
agreement on the terms of the Change Order shall relieve the Contractor from the obligation to
proceed with performance of the Work, including Additional Work, promptly and expeditiously.
Any alterations, extensions of time, Additional Work, or any other changes may be made without
securing consent of the Contractor’s surety or sureties.
A. Change in Contract Procedures
1. City Directive. The City may direct changes in the Work by delivering a written
directive. To the extent the work directive results in a change to compensation or
time, Contractor must timely request a Change Order and comply with all Change
Order procedures in accordance with this Article. Notwithstanding issuance of a
work directive, Contractor’s failure to timely request a Change Order shall
constitute a waiver by Contractor of any adjustment to compensation or time
extension for Work performed under the directive. The City shall not be liable to
Contractor for Work performed or omitted by Contractor in reliance on verbal
orders.
2. Contractor’s Notice of Change/Delay. If Contractor intends to initiate a Change
Order Request, then Contractor shall provide the City with written notice of the
underlying facts and circumstances that gave rise to the proposed change within
the following times:
a. If due to unknown subsurface or latent physical conditions, within three (3) days
from the discovery date or prior to the alterations of the conditions, whichever
is earlier.
b. If due to a Force Majeure Event, as soon as reasonably practicable under the
conditions, which shall be no longer than three (3) days from the date the
Contractor discovers that the Force Majeure Event gives rise to a change,
Packet Page. 1157
unless that the conditions are such that notice within three (3) days is not
possible or practicable.
c. If due to any other matter that may involve an adjustment to the Contract Time
or the Contract Price, within seven (7) days from the discovery date.
To be considered valid and complete, the notice of change/delay shall include
a general statement of the circumstances giving rise to the notice of
change/delay and a reasonable order of magnitude estimate of the additional
costs and/or time. If the circumstances give rise to both a cost adjustment and
time extension, Contractor shall submit the notice of change and notice of delay
concurrently.
3. Request for Change in Compensation and/or Extension of Time. Contractor shall
submit a Change Order Request for any adjustment to Contractor’s compensation
and/or any extension of time. The Change Order Request shall be made prior to
incurring any expense and within fourteen (14) Days from either Contractor’s
notice of change/delay or the City’s directive ordering the change. The Change
Order Request shall include all of the following information (unless inapplicable to
the change):
a. A detailed description of the circumstances giving rise to the
request;
b. A complete itemized cost proposal, including itemized pricing for
first tier Subcontractors;
c. Supporting documentation for all costs;
d. A time impact analysis showing the impact of the delay to the critical
path to completion;
e. If any added costs or information cannot be determined at the time
of the Change Order Request, the reason the costs or information cannot
be determined at the time; and
f. Certification to the accuracy of the Change Order Request under
penalty of perjury.
The time impact analysis shall be in the critical path method format
and shall show the sequencing of all critical and non-critical new
activities and/or activity revisions affected by the delay, with logic
ties to all affected existing activities noted on the schedule.
The City may demand, and Contractor shall provide, any additional
information supporting the Change Order Request, including but
not limited to native electronic format version of schedules and time
impact analyses. Contractor shall provide the requested additional
information within five (5) Days of the request.
Packet Page. 1158
For any costs or information that cannot be determined at the time
Contractor submits the Change Order Request, Contractor shall
submit to the City notice of the costs or information and all
supporting documentation within five (5) Days of when the costs or
other information become subject to determination.
4. City’s Final Decision on Change Order; Ordered Changes. If the City denies the
Change Order Request or disagrees with the proposal submitted by Contractor, it
will notify the Contractor, and the City will provide its opinion of the appropriate
price and/or time extension. If no agreement can be reached, the City shall have
the right to order the Work performed on a time and materials basis or to issue a
unilateral Change Order setting forth the City’s determination of the reasonable
additions or savings in costs and time attributable to the extra or deleted work. The
City shall also have the right to order changes in the Work to be performed
promptly by the Contractor on a time and materials basis or to issue a unilateral
Change Order setting forth the City’s determination of the reasonable additions or
savings in costs and time attributable to the extra or deleted work. The City’s
determination shall become final and binding if the Contractor fails to submit a
Claim in writing to the City within fourteen (14) Days of the issuance of the
unilateral Change Order, disputing the terms of the unilateral Change Order and
providing such supporting documentation for its position as the City may
reasonably require.
5. Contractor’s Waiver of Further Relief. CONTRACTOR’S FAILURE TO PROVIDE
A COMPLETE AND TIMELY NOTICE OF CHANGE/DELAY AND/OR CHANGE
ORDER REQUEST, OR TO COMPLY WITH ANY OTHER REQUIREMENT OF
THIS ARTICLE, SHALL CONSTITUTE A WAIVER BY CONTRACTOR OF THE
RIGHT TO A CONTRACT ADJUSTMENT ON ACCOUNT OF SUCH
CIRCUMSTANCES AND A WAIVER OF ANY RIGHT TO FURTHER RECOURSE
OR RECOVERY BY REASON OF OR RELATED TO SUCH CHANGE BY
MEANS OF THE CLAIMS DISPUTE RESOLUTION PROCESS OR BY ANY
OTHER LEGAL PROCESS OTHERWISE PROVIDED FOR UNDER
APPLICABLE LAWS.
Contractor recognizes and acknowledges that timely submission of a formal written
notice of change/delay and Change Order Request, whether or not the
circumstances of the change may be known to the City or available to the City
through other means, is not a mere formality but is of crucial importance to the
ability of the City to promptly identify, prioritize, evaluate and mitigate the potential
effects of changes. Any form of informal notice, whether verbal or written
(including, without limitation, statements in requests for information, statements in
Submittals, statements at any job meeting or entries on monthly reports, daily logs
or job meeting minutes), that does not strictly comply with the formal requirements
of this Article, shall accordingly be insufficient.
6. Change Order Format
a. A Change Order signed by the Contractor indicates the Contractor's agreement
therewith, including any adjustment in compensation or extension of time, and
the full and final settlement of all costs (direct, indirect and overhead) related
to the Work authorized by the Change Order.
Packet Page. 1159
b. The City may designate the forms to be used for notices, requests, and Change
Orders. If so designated, Contractor may only use such forms. Contractor
shall not reserve a right to assert impact costs, extended job site costs,
extended overhead, constructive acceleration and/or actual acceleration
beyond what is stated in the Change Order. No Claims shall be allowed for
impact, extended overhead costs, constructive acceleration and/or actual
acceleration due to a multiplicity of changes and/or clarifications. The
Contractor may not change or modify the City’s Change Order form in an
attempt to reserve additional rights.
B. Determining Adjustments to Compensation.
1. Limitation on Costs. Contractor shall not be entitled to any compensation for Work
subject to a Change Order except as expressly set forth in this Article. The mark-
up added in instances of Additional Work shall constitute the entire amount of
profit, any mark-ups, any field or home office overhead costs, including personnel,
equipment or office space, any materials, or any costs of equipment idle time for
such Work.
2. Unit Price Change Orders. When the actual quantity of a Unit Price Work item
varies from the Bid Schedule, compensation for the change in quantity will be
calculated by multiplying the actual quantity by the unit price. This calculation may
result in either an additive or deductive Change Order. Bid items included on the
Bid Schedule may be deducted from the Work in their entirety without any
negotiated extra costs. Because Unit Price Work includes overhead and profit as
determined by Contractor at the time of its Bid submission, no mark up or deduction
for overhead and profit will be allowed.
3. Lump Sum Change Orders. Whenever possible, any changes affecting
compensation shall be in a lump sum mutually agreed by the Contractor and the
City.
4. Time and Materials Change Orders. The City may direct the Contractor to proceed
with the Additional Work with payment to be made on the basis of actual cost of
the labor and materials required to complete the Additional Work. If the Project is
federally funded, a time and materials Change Order shall only be issued after a
determination that no other Change Order is suitable and the Change Order shall
include a ceiling price that the Contractor exceeds at its own risk.
5. Federally Funded Projects. For any change in price to the Contract, general and
administrative expenses shall be negotiated and must conform to the cost
principles set forth under at 2 C.F.R. Part 200, subpart E, and profit shall be
negotiated as a separate element of the cost. To establish a fair and reasonable
profit, consideration must be given to the complexity of the Additional Work to be
performed, the risk borne by the Contractor, the Contractor's investment, the
amount of subcontracting, the quality of its record of past performance, and
industry profit rates in the surrounding geographical area for similar work.
6. Allowed Costs. Estimates for lump sum quotations and accounting for time-and-
material work shall be limited to direct expenditures necessitated specifically by
the change and shall be segregated as follows:
Packet Page. 1160
a. Labor. The costs of labor will be the actual cost for wages prevailing locally for
each craft or type of worker at the time the Additional Work is done, plus
employer payments of payroll taxes and insurance, health and welfare,
pension, vacation, apprenticeship funds, and other direct costs resulting from
federal, state or local laws, as well as assessment or benefits required by lawful
collective bargaining agreements. The use of a labor classification which
would increase the Additional Work cost will not be permitted unless the
Contractor establishes the necessity for such additional costs. Labor costs for
equipment operators and helpers shall be reported only when such costs are
not included in the invoice for equipment rental.
b. Materials. The cost of materials reported shall be at the lowest current price at
which such materials are locally available in the quantities involved, plus sales
tax, freight and delivery. Materials costs shall be based upon supplier or
manufacturer’s invoice.
c. Tool and Equipment Use. Regardless of ownership, the rates to be used in
determining equipment use shall not exceed listed rates prevailing locally at
equipment rental agencies, or distributors, at the time the work is performed.
The Contractor shall furnish cost data supporting the establishment of the
rental rate. The rental rate to be applied for use of each items of equipment
shall be the rate resulting in the least total cost to the City for the total period
of use. The City shall the make the final determination as to an equitable rental
rate for the equipment. No payment will be made for the use of small tools,
which have a replacement value of $1,000 or less.
(i) The rental time to be paid for equipment shall be the time the equipment
is in productive operation on the Additional Work being performed.
Rental time will not be allowed while equipment is inoperative due to
breakdowns.
(ii) All equipment shall, in the opinion of the City, be in good working
condition and suitable for the purpose for which the equipment is to be
used. Equipment with no direct power unit shall be powered by a unit
of at least the minimum rating recommended by the manufacturer.
(iii) Before construction equipment is used on any Additional Work, the
Contractor shall plainly stencil or stamp an identifying number thereon
at a conspicuous location, and shall furnish to the City, in duplicate, a
description of the equipment and its identifying number.
(iv) When hourly rates are listed, any part of an hour less than 30 minutes
of operation shall be considered to be 1/2-hour of operation, and any
part of an hour greater than 30 minutes will be considered one hour of
operation. When daily rates are listed, any part of a day less than 4
hours operation shall be considered to be 1/2-day of operation.
d. Allowed Mark-up. The allowed mark-up for any and all overhead (including
supervision and home and field office costs) and profit on work added to the
Contract shall be determined in accordance with the following provisions:
Packet Page. 1161
(i) “Net Cost” is defined as the actual costs of labor, materials and tools
and equipment only, excluding overhead and profit. The costs of
applicable insurance and bond premium will be reimbursed to the
Contractor and Subcontractors at cost only, without mark-up.
Contractor shall provide the City with documentation of the costs,
including but not limited to payroll records, invoices, and such other
information as the City may reasonably request.
(ii) For Work performed by the Contractor’s forces the allowed mark-up
shall not exceed fifteen (15%) percent of labor costs, ten percent (10%)
of material costs, and ten percent (10%) of the cost of tools and
equipment use.
(iii) For Work performed by a Subcontractor, the added cost for overhead
and profit shall not exceed fifteen percent (15%) of the Subcontractor’s
Net Cost of the Work to which the Contractor may add up to five percent
(5%) of the Subcontractor’s Net Cost.
(iv) For Work performed by a sub-subcontractor, the added cost for
overhead and profit shall not exceed fifteen percent (15%) of the sub-
subcontractor’s Net Cost for Work to which the Subcontractor and
Contractor may each add up to an additional five percent (5%) of the
Net Cost of the lower tier subcontractor.
(v) No additional mark-up will be allowed for lower tier subcontractors, and
in no case shall the added cost for overhead and profit payable by the
City exceed twenty-five percent (25%) of the Net Cost as defined
herein, of the party that performs the Work.
(vi) Calculation of the mark-up will be subject to the limitations above and
to calculation as further detailed in (b)(B)(5) above.
e. Documentation of Time-and-Material Costs.
(i) T&M Daily Sheets. Contractor must submit timesheets, materials
invoices, records of equipment hours, and records of rental equipment
hours to the City’s for an approval signature each day that Work is
performed on a time-and-material basis. The Engineer’s signature on
time sheets only serves as verification that the Work was performed
and is not indicative of the City’s agreement to Contractor’s entitlement
to the cost.
(ii) T&M Summary Sheet. Contractor shall submit a T&M Summary Sheet,
which shall include total actual costs, within five (5) Days following
completion of Additional Work on a time-and-material basis.
Contractor’s total actual cost shall be presented in a summary table in
an electronic spreadsheet file by labor, material, equipment, and any
other costs, along with documentation supporting the costs.
Contractor’s failure to submit the T&M Summary Sheet within five (5)
Days of completion of the Additional Work will result in Contractor’s
Packet Page. 1162
waiver for any reimbursement of any costs associated with the
Additional Work.
f. Excluded Costs. The following costs or any other home or field office overhead
costs, all of which are to be considered administrative costs covered by the
Contractor’s mark-up, shall not be allowed costs and shall not be included in
any lump sum proposals or time-and-materials invoices:
(i) Overhead Cost. Payroll costs and other compensation of Contractor’s
officers, executives, principals, general managers, engineers,
architects, estimators, attorneys, auditors, accountants, purchasing
and contracting agents, timekeepers, clerks, and other personnel
employed by Contractor whether at the Site or in Contractor’s principal
office or any branch office, material yard, or shop for general
administration of the Work;
(ii) Office Expenses. Expenses of Contractor’s principal and branch
offices;
(iii) Capital Expenses. Any part of Contractor’s capital expenses, including
interest on Contractor’s capital employed for the Additional Work and
charges against Contractor for delinquent payments;
(iv) Negligence. Costs due to the negligence of Contractor or any
Subcontractor or Supplier, or anyone directly or indirectly employed by
any of them or for whose acts any of them may be liable, including
without limitation the correction of Defective Work, disposal of materials
or equipment wrongly supplied, and making good any damage to
property;
(v) Small Tools. Cost of small tools valued at less than $1,000 and that
remain the property of Contractor;
(vi) Administrative Costs. Costs associated with the preparation of Change
Orders (whether or not ultimately authorized), cost estimates, or the
preparation or filing of Claims;
(vii) Anticipated Lost Profits. Expenses of Contractor associated with
anticipated lost profits or lost revenues, lost income or earnings, lost
interest on earnings, or unpaid retention;
(viii) Home Office Overhead. Costs derived from the computation of a
“home office overhead” rate by application of the Eichleay, Allegheny,
burden fluctuation, or other similar methods;
(ix) Special Consultants and Attorneys. Costs of special consultants or
attorneys, whether or not in the direct employ of Contractor, employed
for services specifically related to the resolution of a Claim, dispute, or
other matter arising out of or relating to the performance of the
Additional Work.
Packet Page. 1163
(x) Other. Other overhead or general expense costs of any kind and the
cost of any item not specifically and expressly included in the Contract
Documents; including but not limited to: submittals, drawings, field
drawings, shop drawings, including submissions of drawings; field
inspection; general superintendence; computer services; reproduction
services; salaries of project engineer, superintendent, timekeeper,
storekeeper, and secretaries; janitorial services; small tools, incidentals
and consumables; temporary on-site facilities (offices, telephones, high
speed internet access, plumbing, electrical power, lighting; platforms,
fencing, water); surveying; estimating; protection of work; handling and
disposal fees; final cleanup; other incidental work; related warranties;
insurance and bond premiums.
(xi) Compliance with Federal Cost Principles. If the Project is federally
funded, any costs that are not allowable, reasonable and allocable to
the Project, under generally accepted accounting principles and the
applicable federal requirements.
9.2 Procedure for Resolving Claims.
Contractor shall timely comply with any and all requirement of the Contract Documents pertaining
to notices and requests for changes to the Contract Time or Contract Price, including but not
limited to all requirements of Article 9.1, as a prerequisite to filing any claim governed by this
Article. The failure to timely submit a notice of delay or notice of change, or to timely request a
change to the time for completion or Contractor’s compensation, or to timely provide any other
notice or request required herein shall constitute a waiver of the right to further pursue the claim
under the Contract or at law.
A. Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public
Contract Code prescribes a process utilizing informal conferences, non-binding
judicial supervised mediation, and judicial arbitration to resolve disputes on
construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of
the Public Contract Code prescribes a process for negotiation and mediation to
resolve disputes on construction claims. The intent of this Article is to implement
Sections 20104 et seq. and Section 9204 of the California Public Contract Code.
This Article shall be construed to be consistent with all applicable law, including but
not limited to these statutes.
B. Claims. For purposes of this Article, “Claim” means a separate demand by the
Contractor for:
1. An adjustment to the time for completion including, without limitation, for relief from
damages or penalties for delay assessed by the City;
2. Payment by the City of money or damages arising from Work done by or on behalf
of the Contractor pursuant to the Contract, payment for which is not otherwise
expressly provided or to which the Contractor is not otherwise entitled; or
3. An amount the payment of which is disputed by the City.
Packet Page. 1164
A “Claim” does not include any demand for payment for which the Contractor has
failed to provide notice, request a Change Order, or otherwise failed to follow any
procedures contained in the Contract Documents.
C. Filing Claims. Claims governed by this Article may not be filed unless and until the
Contractor completes any and all requirements of the Contract Documents
pertaining to notices and requests for changes to the Contract Time or Contract
Price, and Contractor’s request for a change has been denied in whole or in part.
Claims governed by this Article must be filed no later than thirty (30) Days after a
request for change has been denied in whole or in part or after any other event giving
rise to the Claim. The Claim shall be submitted in writing to the City and shall include
on its first page the following words in 16 point capital font: “THIS IS A CLAIM.” The
Claim shall include the all information and documents necessary to substantiate the
Claim, including but not limited to those identified below. Nothing in this Article is
intended to extend the time limit or supersede notice requirements otherwise
provided by Contract Documents. Failure to follow such contractual requirements
shall bar any Claims or subsequent proceedings for compensation or payment
thereon.
D. Documentation. The Contractor shall submit all Claims in the following format:
1. Summary description of Claim including basis of entitlement, merit and amount of
time or money requested, with specific reference to the Contract Document
provisions pursuant to which the Claim is made
2. List of documents relating to Claim:
a. Specifications
b. Drawings
c. Clarifications (Requests for Information)
d. Schedules
e. Other
3. Chronology of events and correspondence
4. Narrative analysis of Claim merit
5. Analysis of Claim cost, including calculations and supporting documents
6. Time impact analysis in the form required by the Contract Documents or, if the
Contract Documents do not require a particular format, CPM format, if an
adjustment of the Contract Time is requested
E. City’s Response. Upon receipt of a Claim pursuant to this Article, the City shall
conduct a reasonable review of the Claim and, within a period not to exceed 45 Days,
shall provide the Contractor a written statement identifying what portion of the Claim
is disputed and what portion is undisputed. Any payment due on an undisputed
Packet Page. 1165
portion of the Claim will be processed and made within 60 Days after the City issues
its written statement.
1. If the City needs approval from its governing body to provide the Contractor a
written statement identifying the disputed portion and the undisputed portion of the
Claim, and the City’s governing body does not meet within the 45 Days or within
the mutually agreed to extension of time following receipt of a Claim sent by
registered mail or certified mail, return receipt requested, the City shall have up to
three (3) Days following the next duly publicly noticed meeting of the City’s
governing body after the 45-Day period, or extension, expires to provide the
Contractor a written statement identifying the disputed portion and the undisputed
portion.
2. Within 30 Days of receipt of a Claim, the City may request in writing additional
documentation supporting the Claim or relating to defenses or Claims the City may
have against the Contractor. If additional information is thereafter required, it shall
be requested and provided pursuant to this subdivision, upon mutual agreement
of the City and the Contractor. The City’s written response to the Claim, as further
documented, shall be submitted to the Contractor within 30 Days (if the Claim is
less than $50,000, within 15 Days) after receipt of the further documentation, or
within a period of time no greater than that taken by the Contractor in producing
the additional information or requested documentation, whichever is greater.
F. Meet and Confer. If the Contractor disputes the City’s written response, or the City
fails to respond within the time prescribed, the Contractor may so notify the City, in
writing, either within 15 Days of receipt of the City’s response or within 15 Days of
the City’s failure to respond within the time prescribed, respectively, and demand in
writing an informal conference to meet and confer for settlement of the issues in
dispute. Upon receipt of a demand, the City shall schedule a meet and confer
conference within 30 Days for settlement of the dispute.
G. Mediation. Within 10 business days following the conclusion of the meet and confer
conference, if the Claim or any portion of the Claim remains in dispute, the City shall
provide the Contractor a written statement identifying the portion of the Claim that
remains in dispute and the portion that is undisputed. Any payment due on an
undisputed portion of the Claim shall be processed and made within 60 Days after
the City issues its written statement. Any disputed portion of the Claim, as identified
by the Contractor in writing, shall be submitted to nonbinding mediation, with the City
and the Contractor sharing the associated costs equally. The public entity and
Contractor shall mutually agree to a mediator within 10 business days after the
disputed portion of the Claim has been identified in writing, unless the parties agree
to select a mediator at a later time.
1. If the parties cannot agree upon a mediator, each party shall select a mediator and
those mediators shall select a qualified neutral third party to mediate with regard
to the disputed portion of the Claim. Each party shall bear the fees and costs
charged by its respective mediator in connection with the selection of the neutral
mediator.
2. For purposes of this Article, mediation includes any nonbinding process, including,
but not limited to, neutral evaluation or a dispute review board, in which an
Packet Page. 1166
independent third party or board assists the parties in dispute resolution through
negotiation or by issuance of an evaluation. Any mediation utilized shall conform
to the timeframes in this Article.
3. Unless otherwise agreed to by the City and the Contractor in writing, the mediation
conducted pursuant to this section shall excuse any further obligation under
Section 20104.4 to mediate after litigation has been commenced.
4. The mediation shall be held no earlier than the date the Contractor completes the
Work or the date that the Contractor last performs Work, whichever is earlier. All
unresolved Claims shall be considered jointly in a single mediation, unless a new
unrelated Claim arises after mediation is completed.
H. Procedures After Mediation. If following the mediation, the Claim or any portion
remains in dispute, the Contractor must file a Claim pursuant to Chapter 1
(commencing with Section 900) and Chapter 2 (commencing with Section 910) of
Part 3 of Division 3.6 of Title 1 of the Government Code prior to initiating litigation.
For purposes of those provisions, the running of the period of time within which a
Claim must be filed shall be tolled from the time the Contractor submits his or her
written Claim pursuant to subdivision (a) until the time the Claim is denied, including
any period of time utilized by the meet and confer conference.
I. Civil Actions. The following procedures are established for all civil actions filed to
resolve Claims of $375,000 or less:
1. Within 60 Days, but no earlier than 30 Days, following the filing or responsive
pleadings, the court shall submit the matter to non-binding mediation unless
waived by mutual stipulation of both parties or unless mediation was held prior to
commencement of the action in accordance with Public Contract Code section
9204 and the terms of this Contract. The mediation process shall provide for the
selection within 15 Days by both parties of a disinterested third person as mediator,
shall be commenced within 30 Days of the submittal, and shall be concluded within
15 Days from the commencement of the mediation unless a time requirement is
extended upon a good cause showing to the court.
2. If the matter remains in dispute, the case shall be submitted to judicial arbitration
pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of
the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The
Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter
3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding
brought under this subdivision consistent with the rules pertaining to judicial
arbitration. In addition to Chapter 2.5 (commencing with Section 1141.10) of Title
3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be
experienced in construction law, and (B) any party appealing an arbitration award
who does not obtain a more favorable judgment shall, in addition to payment of
costs and fees under that chapter, also pay the attorney’s fees on appeal of the
other party.
J. Government Code Claim Procedures.
Packet Page. 1167
1. This Article does not apply to tort claims and nothing in this Article is intended nor
shall be construed to change the time periods for filing tort claims or actions
specified by Chapter 1 (commending with Section 900) and Chapter 2
(commencing with Section 910) of Part 3 of Division 3.5 of Title 1 of the
Government Code.
2. In addition to any and all requirements of the Contract Documents pertaining to
notices of and requests for adjustment to the Contract Time, Contract Price, or
compensation or payment for Additional Work, disputed Work, construction claims
and/or changed conditions, the Contractor must comply with the claim procedures
set forth in Government Code Section 900, et seq. prior to filing any lawsuit against
the City.
3. Such Government Code claims and any subsequent lawsuit based upon the
Government Code claims shall be limited to those matters that remain unresolved
after all procedures pertaining to adjustment of the Contract Time or Contract Price
for Additional Work, disputed Work, construction claims, and/or changed
conditions have been followed by Contractor. If Contractor does not comply with
the Government Code claim procedure or the prerequisite contractual
requirements, Contractor may not file any action against the City.
4. A Government Code claim must be filed no earlier than the date the Work is
completed or the date the Contractor last performs Work on the Project,
whichever occurs first. A Government Code claim shall be inclusive of all
unresolved Claims known to Contractor or that should reasonably by known
to Contractor excepting only new unrelated Claims that arise after the
Government Code claim is submitted.
K. Non-Waiver. The City’s failure to respond to a Claim from the Contractor within the
time periods described in this Article or to otherwise meet the time requirements of
this Article shall result in the Claim being deemed rejected in its entirety, and shall
not constitute a waiver of any rights under this Article.
ARTICLE 10 - MEASUREMENT; PAYMENT
10.1 Cost Breakdown.
A. Lump Sum Work.
1. Contractor shall furnish on forms approved by the City within ten (10) Days of the
Notice to Proceed, a schedule of values allocating the entire Contract Price to the
various portions of the Work and prepared in such a form and supported by such
data to substantiate its accuracy as the Engineer may require. This schedule of
values, unless objected to by the Engineer, shall be used as a basis for reviewing
the Contractor’s applications for payment. Contractor shall submit the schedule of
values prior to submitting its first application for payment, and the City will not issue
any payment until it receives and approves the schedule of values.
B. Unit Price Work.
Packet Page. 1168
1. Where the Contract Documents provide that all or part of the Work is to be Unit
Price Work, initially the Contract Price will be deemed to include for all Unit Price
Work an amount equal to the sum of the unit price for each separately identified
item of Unit Price Work multiplied by the estimated quantity of each item as
indicated in the Contract. The estimated quantities of items of Unit Price Work are
not guaranteed and are solely for the purpose of comparison of Bids and
determining an initial Contract Price. Each unit price will be deemed to include an
amount considered by Contractor to be adequate to cover Contractor’s overhead
and or profit for each separately identified item.
2. Unless otherwise specified, payment will be based on the actual quantities of Work
as verified and approved by the Engineer, based on the price per unit as set forth
in the Bid.
3. The City or Contractor may initiate a Change Order or Change Order Request to
adjust the Contract Price in accordance with Contractor Documents based on
actual quantities of Unit Price Work. The City or Contractor may make a claim for
an adjustment in the Unit Price in accordance with the Contract Documents if:
a. the quantity of any item of Unit Price Work performed by Contractor
differs by twenty-five percent (25%) or more from the estimated quantity of
such item indicated in the Contract; and
b. there is no corresponding adjustment with respect to any other item
of Work; and
c. Contractor believes that Contractor is entitled to an increase in unit
price as a result of having incurred additional expense or the City believes
that the City is entitled to a decrease in unit price and the parties are unable
to agree as to the amount of any such increase or decrease.
10.2 Progress Estimates and Payment.
A. By the tenth (10th) Day of the following calendar month, Contractor shall submit to
Engineer a payment request which shall set forth in detail the value of the Work done
for the period beginning with the date Work was first commenced and ending on the
end of the calendar month for which the payment request is prepared. Contractor
shall include an adjusted list of actual quantities, verified by the Engineer, for unit
price items listed, if any, in the Bid. Contractor shall include any amount earned for
authorized Additional Work. Contractor shall certify under penalty of perjury, that all
cost breakdowns and periodic estimates accurately reflect the Work on the Project.
B. From the total thus computed, a deduction shall be made in the amount of five
percent (5%) for retention, except where the City has adopted a finding that the Work
done under the Contract is substantially complex, and then the amount withheld as
retention shall be the percentage specified in the Notice Inviting Bids. From the
remainder a further deduction may be made in accordance with Section C below.
The amount computed, less the amount withheld for retention and any amounts
withheld as set forth below, shall be the amount of the Contractor’s payment request.
Packet Page. 1169
C. The City may withhold a sufficient amount or amounts of any payment or payments
otherwise due to Contractor, as in its judgment may be necessary to cover:
1. Payments which may be past due and payable for just claims against Contractor
or any Subcontractors for labor or materials furnished in and about the
performance of work on the Project under this Contract.
2. Defective work not remedied.
3. Failure of Contractor to make proper payments to his Subcontractor or for material
or labor.
4. Completion of the Contract if there is a reasonable doubt that the Work can be
completed for balance then unpaid.
5. Damage to another contractor or a third party.
6. Amounts which may be due the Count for claims against Contractor.
7. Failure of Contractor to keep the Record Drawings up to date.
8. Failure to provide update on construction schedule as required herein.
9. Site cleanup.
10. Failure to comply with Contract Documents.
11. Liquidated damages.
12. Legally permitted penalties.
D. The City may apply such withheld amount or amounts to payment of such claims or
obligations at its discretion with the exception of subsections (C)(1), (3), and (5) of
this Article, which must be retained or applied in accordance with applicable law. In
so doing, the City shall be deemed the agent of Contractor and any payment so
made by the City shall be considered as a payment made under contract by the City
to Contractor and the City shall not be liable to Contractor for such payments made
in good faith. Such payments may be made without prior judicial determination of
claim or obligations. The City will render Contractor a proper accounting of such
funds disbursed on behalf of Contractor.
E. Upon receipt, the Engineer shall review the payment request to determine whether
it is undisputed and suitable for payment. If the payment request is determined to
be unsuitable for payment, it shall be returned to Contractor as soon as practicable
but not later than seven (7) Days after receipt, accompanied by a document setting
forth in writing the reasons why the payment request is not proper. The City shall
make the progress payment within 30 Days after the receipt of an undisputed and
properly submitted payment request from Contractor, provided that a release of liens
and claims has been received from the Contractor pursuant to Civil Code section
8132. The number of days available to the City to make a payment without incurring
Packet Page. 1170
interest pursuant to this paragraph shall be reduced by the number of Days by which
the Engineer exceeds the seven (7) Day requirement.
F. A payment request shall be considered properly executed if funds are available for
payment of the payment request and payment is not delayed due to an audit inquiry
by the financial officer of the City.
G. The City shall have the right to adjust any estimate of quantity and to subsequently
correct any error made in any estimate for payment.
10.3 Final Acceptance and Payment
A. Following the City’s acceptance of the Work, the Contractor shall submit to the City
a written statement of the final quantities of unit price items for inclusion in the final
payment request. The City shall have the right to adjust any estimate of quantity
and to correct any error made in any estimate for payment.
B. When the Work has been accepted there shall be paid to Contractor a sum equal to
the Contract Price less any amounts previously paid Contractor and less any
amounts withheld by the City from Contractor under the terms of the Contract. The
final five percent (5%), or the percentage specified in the Notice Inviting Bids where
the City has adopted a finding of substantially complete, shall not become due and
payable until as required by Public Contract Code section 7107. If the Contractor
has placed securities with the City as described herein, the Contractor shall be paid
a sum equal to one hundred percent (100%) of the Contract Price less any amounts
due the City under the terms of the Contract.
C. Unless Contractor advises the City in writing prior to acceptance of the final five
percent (5%) or the percentage specified in the Notice Inviting Bids where the City
has adopted a finding of completion, or the return of securities held as described
herein, said acceptance shall operate as a release to the City of all claims and all
liability to Contractor for all things done or furnished in connection with this Work and
for every act of negligence of the City and for all other claims relating to or arising
out of this Work. If Contractor advises the City in writing prior to acceptance of final
payment or return of the securities that there is a dispute regarding the amount due
the Contractor, the City may pay the undisputed amount contingent upon the
Contractor furnishing a release of all undisputed claims against the City with the
disputed claims in stated amounts being specifically excluded by Contractor from the
operation of the release. No payments, however, final or otherwise, shall operate to
release Contractor or its sureties from the Faithful Performance Bond, Labor and
Material Payment Bond, or from any other obligation under this Contract.
D. In case of suspension of the Contract any unpaid balance shall be and become the
sole and absolute property of the City to the extent necessary to repay the City any
excess in the cost of the Work above the Contract Price.
E. Final payment shall be made no later than 60 Days after the date of acceptance of
the Work by the City or the date of occupation, beneficial use and enjoyment of the
Work by the City including any operation only for testing, start-up or commissioning
accompanied by cessation of labor on the Work, provided that a release of liens and
claims has been received from the Contractor pursuant to Civil Code section 8136.
Packet Page. 1171
In the event of a dispute between the City and the Contractor, the City may withhold
from the final payment an amount not to exceed 150% of the disputed amount.
F. Within ten (10) Days from the time that all or any portion of the retention proceeds
are received by Contractor, Contractor shall pay each of its Subcontractors from
whom retention has been withheld each Subcontractor’s share of the retention
received. However, if a retention payment received by Contractor is specifically
designated for a particular Subcontractor, payment of the retention shall be made to
the designated Subcontractor if the payment is consistent with the terms of the
subcontract.
ARTICLE 11 - MISCELLANEOUS
11.1 Patents.
A. Contractor shall hold and save the City, officials, officers, employees, and authorized
volunteers harmless from liability of any nature or kind of claim therefrom including
costs and expenses for or on account of any patented or unpatented invention,
article or appliance manufactured, furnished or used by Contractor in the
performance of this Contract.
11.2 Document Retention & Examination
A. In accordance with Government Code section 8546.7, records of both the City and
the Contractor shall be subject to examination and audit by the State Auditor General
for a period of three (3) years after final payment.
B. Contractor shall make available to the City any of the Contractor’s other documents
related to the Project immediately upon request of the City.
C. In addition to the State Auditor rights above, the City shall have the right to examine
and audit all books, estimates, records, contracts, documents, bid documents,
subcontracts, and other data of the Contractor (including computations and
projections) related to negotiating, pricing, or performing the modification in order to
evaluate the accuracy and completeness of the cost or pricing data at no additional
cost to the City, for a period of four (4) years after final payment.
11.3 Notice.
A. All notices shall be in writing and either served by personal delivery or mailed to the
other party. Written notice to the Contractor shall be addressed to Contractor’s
principal place of business unless Contractor designates another address in writing
for service of notice. Notice to the City shall be addressed to the City as designated
in the Notice Inviting Bids unless the City designates another address in writing for
service of notice. Notice shall be effective upon receipt or five (5) Days after being
sent by first class mail, whichever is earlier. Notice given by facsimile shall not be
effective unless acknowledged in writing by the receiving party.
Packet Page. 1172
11.4 Notice of Third Party Claims
A. Pursuant to Public Contract Code section 9201, the City shall provide the Contractor
with timely notification of the receipt of any third-party claims relating to the Contract.
The City is entitled to recover reasonable costs incurred in providing such
notification.
11.5 State License Board Notice
A. Contractors are required by law to be licensed and regulated by the Contractors’
State License Board which has jurisdiction to investigate complaints against
contractors if a complaint regarding a patent act or omission is filed within four (4)
years of the date of the alleged violation. A complaint regarding a latent act or
omission pertaining to structural defects must be filed within ten (10) years of the
date of the alleged violation. Any questions concerning a contractor may be referred
to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento,
California 95826.
11.6 Assignment of Contract
A. Contractor shall not assign, transfer, convey, sublet or otherwise dispose of the
rights or title of interest of any or all of this contract without the prior written consent
of the City. Any assignment or change of Contractor’s name of legal entity without
the written consent of the City shall be void. Any assignment of money due or to
become due under this Contract shall be subject to a prior lien for services rendered
or material supplied for performance of Work called for under the Contract
Documents in favor of all persons, firms, or corporations rendering such services or
supplying such materials to the extent that claims are filed pursuant to the Civil Code,
the Code of Civil Procedure or the Government Code.
11.7 Change In Name And Nature Of Contractor’s Legal Entity.
A. Should a change be contemplated in the name or nature of the Contractor’s legal
entity, the Contractor shall first notify the City in order that proper steps may be taken
to have the change reflected on the Contract and all related documents. No change
of Contractor’s name or nature will affect the City’s rights under the Contract,
including but not limited to the bonds.
11.8 Prohibited Interests
A. No City official or representative who is authorized in such capacity and on behalf of
City to negotiate, supervise, make, accept, or approve, or to take part in negotiating,
supervising, making, accepting or approving any engineering, inspection,
construction or material supply contract or any subcontract in connection with
construction of the project, shall be or become directly or indirectly interested
financially in the Contract.
11.9 Controlling Law
A. Notwithstanding any subcontract or other contract with any subcontractor, supplier,
or other person or organization performing any part of the Work, this Contract shall
Packet Page. 1173
be governed by the law of the State of California excluding any choice of law
provisions.
11.10 Jurisdiction; Venue
A. Contractor and any subcontractor, supplier, or other person or organization
performing any part of the Work agrees that any action or suits at law or in equity
arising out of or related to the bidding, award, or performance of the Work shall be
maintained in the Superior Court of San Bernardino County, California, and
expressly consent to the jurisdiction of said court, regardless of residence or
domicile, and agree that said court shall be a proper venue for any such action.
11.11 Cumulative Remedies.
A. The duties and obligations imposed by these General Conditions and the rights and
remedies available hereunder to the parties hereto are in addition to, and are not to
be construed in any way as a limitation of, any rights and remedies available to any
or all of them which are otherwise imposed or available by Applicable Laws, by
special warranty or guarantee, or by other provisions of the Contract Documents.
The provisions of this Article will be as effective as if repeated specifically in the
Contract Documents in connection with each particular duty, obligation, right, and
remedy to which they apply.
11.12 Survival of Obligations.
A. All representations, indemnifications, warranties, and guarantees made in, required
by, or given in accordance with the Contract Documents, as well as all continuing
obligations indicated in the Contract Documents, will survive final payment,
completion, and acceptance of the Work or termination or completion of the Contract
or termination of the services of Contractor.
11.13 Headings.
A. Article and paragraph headings are inserted for convenience only and do not
constitute parts of these General Conditions.
11.14 Assignment of Antitrust Actions
A. In accordance with §7103.5(b) of the California Public Contract Code, Contractor
and Subcontractors must conform to the following requirements:
1. In entering into a public works contract or a subcontract to supply goods, services,
or materials pursuant to a public works contract, Contractor or Subcontractor offer
and agree to assign to the awarding body all rights, title, and interest in and to all
causes of action it may have under §4 of the Clayton Act (15 U.S.C. Sec. 15) or
under the Cartwright Act (Chapter 2 (commencing with §16700) of Part 2 of
Division 7 of the Business and Professions Code) arising from purchases of goods,
services, or materials pursuant to the public works contract or the subcontract.
2. This assignment must be made and become effective at the time the awarding
body tenders to Contractor, without further acknowledgment by the parties.
Packet Page. 1174
11.15 All Legal Provisions Included
A. Contractor shall give all notices and comply with all federal, state and local laws,
ordinances, rules and regulations bearing on conduct of work as indicated and
specified by their terms. References to specific laws, rules or regulations in this
Contract are for reference purposes only, and shall not limit or affect the applicability
of provisions not specifically mentioned. If Contractor observes that drawings and
specifications are at variance therewith, he shall promptly notify City in writing and
any necessary changes shall be adjusted as provided for in this Contract for changes
in Work. If Contractor performs any Work knowing it to be contrary to such laws,
ordinances, rules and regulations, and without such notice to City, he shall bear all
costs arising therefrom.
B. Contractor shall be responsible for familiarity with the Americans with Disabilities Act
(“ADA”) (42 U.S.C. § 12101 et seq.). The Work will be performed in compliance with
ADA laws, rules and regulations. Contractor shall comply with the Historic Building
Code, including, but not limited to, as it relates to the ADA, whenever applicable.
C. Contractor acknowledges and understands that, pursuant to Public Contract Code
section 20676, sellers of "mined material" must be on an approved list of sellers
published pursuant to Public Resources Code section 2717(b) in order to supply
mined material for this Contract.
D. No City official or representative who is authorized in such capacity and on behalf of
City to negotiate, supervise, make, accept, or approve, or to take part in negotiating,
supervising, making, accepting or approving any engineering, inspection,
construction or material supply contract or any subcontract in connection with
construction of the Work, shall be or become directly or indirectly interested
financially in the Contract.
E. All provisions of law required to be inserted in the Contract or Contract Documents
pursuant to any Applicable Laws shall be and are inserted herein. If through mistake,
neglect, oversight, or otherwise, any such provision is not herein inserted or inserted
in improper form, upon the application of either party, the Contract or Contract
Documents shall be changed by City, at no increase in Contract Price or extension
in Contract Times, so as to strictly comply with the Applicable Laws and without
prejudice to the rights of either party hereunder
11.16 Electronic Signature. Each Party acknowledges and agrees that this Agreement may be
executed by electronic or digital signature, which shall be considered as an original
signature for all purposes and shall have the same force and effect as an original signature
ARTICLE 12 -– FLEET COMPLIANCE
12.1 To the extent applicable, Contractor, shall comply, and shall ensure all subcontractors
comply, with all requirements of the most current version of the California Air Resources
Board (“CARB”) including, without limitation, all applicable terms of Title 13, California
Code of Regulations Division 3, Chapter 9 and all pending amendments (“Regulation”).
12.2 Throughout Project, and for three (3) years thereafter, Contractor shall make available for
inspection and copying any and all documents or information associated with Contractor’s
Packet Page. 1175
and subcontractors’ fleet including, without limitation, the CRCs, fuel/refueling records,
maintenance records, emissions records, and any other information the Contractor is
required to produce, keep or maintain pursuant to the Regulation upon two (2) calendar
days’ notice from the City.
12.3 Contractor shall be solely liable for any and all costs associated with complying with the
Regulation as well as for any and all penalties, fines, damages, or costs associated with
any and all violations, or failures to comply with the Regulation. Contractor shall defend,
indemnify and hold harmless the City, its officials, officers, employees and authorized
volunteers free and harmless from any claims, liabilities, costs, penalties or interest arising
out of any failure or alleged failure to comply with the Regulation.
Packet Page. 1176
00 73 13 – SPECIAL CONDITIONS
ARTICLE 1 -SCOPE OF WORK
1.1 Location of the Project.
A. 796 6th St, San Bernardino, CA 92410
Packet Page. 1177
1.2 Scope of Work.
A. The Scope of Work consists of, in general:
• Ancillary Demolition and
Removals
• Site Grading
• Utility Construction
• Landscaping
• Paving
• Underground Stormwater
Detention System Installation
• ADA accessibility improvements
• Connection and Finishing of
Installed Modular Building Parts
• Fencing and Wall Construction
• Site Lighting
• Adjacent Alley Access
Improvements
• Public Improvements that
include curb, gutter, sidewalk,
paving, trenching and restoration
• Signing and Striping
RELEASE OF MODULES: City’s General Contractor will release the modules for delivery once
an in-factory sign off has occurred. A representative of the City’s General Contractor must visit
the factory 72-hours prior to the release of modules and agree that the condition of the product
meets their expectation for delivery and ready for transport.
DELIVERY: Upon completion of fabrication of a Module or Modules, the City’s General Contractor
approves the release of Modules for transport and delivery. Modular Manufacture shall hire carrier
to transport Modules to a temporary or permanent location as directed by City and/or City’s
General Contractor (such permanent location of installation referred to hereinafter as “Property”)
and Modular Manufacturer shall pay all carrier charges. Modular Manufacturer bears
responsibility for the Modules during transport, and until the City accepts them.
Delivery of Modular Units: The Manufacturer shall provide the transportation of each module to
the project site and set on foundation that has been provided by a general contractor contracted
by the City.
ON-SITE SECURITY AND WEATHER PROTECTION: Upon acceptance by the City, City’s
General Contractor shall bear all responsibility for the Modules. It is highly recommended that
until entire building is erected, City’s General Contractor provides security and weather protection
for the Modules beginning at the time of delivery and Modules remain protected regardless of time
of year."
Packet Page. 1178
ARTICLE 2 -REQUIRED DOCUMENTS FOR PAY APPLICATION
Each monthly or milestone invoice from the General Contractor must include:
1. Contractor’s Invoice and Schedule of Values (SOV)
o Must reflect cumulative progress to date.
o Each line item should correspond to measurable work completed and/or
materials supplied.
2. Subcontractor Invoices
o Each subcontractor listed in the SOV must submit a corresponding invoice.
o Invoices should specify labor, materials, and equipment consistent with progress
reports.
3. Subcontractor Conditional/Unconditional Releases
o Conditional Waiver and Release on Progress Payment (Civil Code §8132)
for partial payments.
o Unconditional Waiver and Release on Progress Payment (Civil Code §8134)
once payment is made.
o Final Waivers (Civil Code §§8136–8138) upon project completion.
4. Material Supplier Documentation
o Invoices for materials incorporated into the project.
o Corresponding lien releases from suppliers to subcontractors or the GC.
o Delivery tickets or packing slips verifying material delivery to site.
5. Certified Payroll Records (CPRs)
o Weekly payroll reports for all contractors and subcontractors (Labor Code
§1776).
o Must match reported progress and labor hours billed.
o Electronic submission via the Department of Industrial Relations (DIR) is
required.
6. Apprenticeship Compliance Documentation
o Evidence of registered apprentices (Labor Code §1777.5).
o Proof of training contributions.
7. Inspection Reports / Field Verification
o Inspection logs confirming percent completion of each SOV line item.
o Field engineer sign-off on progress estimates.
Packet Page. 1179
8. Retention and Withholding Summary
o Confirmation of 5% retention per Public Contract Code §9203.
o Identification of withheld funds for non-compliant documentation.
ARTICLE 3 -MODIFICATIONS TO THE GENERAL CONDITIONS
Section not used.
END OF SPECIAL CONDITIONS
Packet Page. 1180
SPECIFICATIONS
"THE FOLLOWING SPECIFICATIONS ARE INCORPORATED HEREIN BY REFERENCE AS
IF SET FORTH IN THEIR ENTIRETY:
1. Navigation Center – Special Provisions for Standard Specifications for Public Works
Construction – Dated 11/5/2025
Packet Page. 1181
PLANS AND DRAWINGS
"THE FOLLOWING PLANS AND DRAWINGS ARE INCORPORATED HEREIN BY
REFERENCE AS IF SET FORTH IN THEIR ENTIRETY:
1. SB Hope Center – Navigation Center – Landscape Plans
2. SB Hope Center – Navigation Center – Precise Grading Plan
3. SB Hope Center – Navigation Center – Sixth Street Improvement Plans
Packet Page. 1182
ATTACHMENTS
List of Attachments:
1. Compliance With American Rescue Plan Act (Arpa) Coronavirus Local Fiscal Recovery
Fund (CLFRF) Federal Guidelines Use of ARPA CLFRF And Requirements
2. General Decision Number CA20250026, Dated 10/03/2025
3. HUD Packet Attachments – Federal Requirements
4. 24 CFR Part 75, Dated 11/4/2024
Packet Page. 1183
COMPLIANCE WITH AMERICAN RESCUE PLAN ACT (ARPA)
CORONAVIRUS LOCAL FISCAL RECOVERY FUND (CLFRF) FEDERAL GUIDELINES
USE OF ARPA CLFRF AND REQUIREMENTS
This Contract may be funded in whole or in part with funds provided by the American
Rescue Plan Act - Coronavirus Local Fiscal Recovery Fund (ARPA), Federal Award Identification
Number (FAIN): SLT0628 and Assistance Listing Number (formerly known as a CFDA number):
21.027, and therefore Contractor agrees to comply with any and all ARPA requirements in
addition to any and all applicable County, State, and Federal laws, regulations, policies, and
procedures pertaining to the funding of this Contract. The use of the funds must also adhere to
official federal guidance issued or to be issued on what constitutes a necessary expenditure. Any
funds expended by Contractor or its subcontractor(s) in any manner that does not adhere to the
ARPA requirements shall be returned or repaid to the City or County. Any funds paid to Contractor
i) in excess of the amount to which Contractor is finally determined to be authorized to retain; ii)
that are determined to have been misused; or iii) that are determined to be subject to a repayment
obligation pursuant to section 603(e) of the Act and have not been repaid, shall constitute a debt
to the federal government. Contractor agrees to comply with the requirements of section 603 of
the Act, regulations adopted by Treasury pursuant to the Act, and guidance issued by Treasury
regarding the foregoing. Contractor shall provide for such compliance in any agreements with
subcontractor(s).
Contractor agrees to comply with the following:
A. In accordance with Title 2 Code of Federal Regulations (C.F.R.) Section 200.322, the non-
Federal Contractor should, to the greatest extent practicable under a Federal award, provide
a preference for the purchase, acquisition, or use of goods, products, or materials produced
in the United States (including but not limited to iron, aluminum, steel, cement, and other
manufactured products). The requirements of this section must be included in all subawards
including all contracts and purchase orders for work or products under this award. For
purposes of this section: “Produced in the United States” means, for iron and steel products,
that all manufacturing processes, from the initial melting stage through the application of
coatings, occurred in the United States. “Manufactured products” means items and
construction materials composed in whole or in part of non-ferrous metals such as aluminum;
plastics and polymer-based products such as polyvinyl chloride pipe; aggregates such as
concrete; glass, including optical fiber; and lumber.
B. In accordance with Title 2 C.F.R. Section 200.471, costs incurred for telecommunications and
video surveillance services or equipment such as phones, internet, video surveillance, cloud
servers are allowable except for the following circumstances: Obligating or expending covered
telecommunications and video surveillance services or equipment or services (as described
in Title 2 C.F.R. Section 200.216) to: 1) Procure or obtain, extend or renew a contract to
procure or obtain; 2) Enter into a contract (or extend or renew a contract) to procure; or 3)
Obtain the equipment, services, or systems, as described in Title 2 C.F.R. Section 200.216
that uses covered telecommunications equipment or services as a substantial or essential
component of any system, or as critical technology as part of any system. As described in
Public Law 115-232, section 889, covered telecommunications equipment is
telecommunications equipment produced by Huawei Technologies Company or ZTE
Corporation (or any subsidiary or affiliate of such entities) and: (i) For the purpose of public
safety, security of government facilities, physical security surveillance of critical infrastructure,
and other national security purposes, video surveillance and telecommunications equipment
produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology
Packet Page. 1184
Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities); (ii)
Telecommunications or video surveillance services provided by such entities or using such
equipment; and (iii) Telecommunications or video surveillance equipment or services
produced or provided by an entity that the Secretary of Defense, in consultation with the
Director of the National Intelligence or the Director of the Federal Bureau of Investigation,
reasonably believes to be an entity owned or controlled by, or otherwise connected to, the
government of a covered foreign country. In implementing the prohibition under Public Law
115-232, section 889, subsection (f), paragraph (1), heads of executive agencies
administering loan, grant, or subsidy programs shall prioritize available funding and technical
support to assist affected businesses, institutions and organizations as is reasonably
necessary for those affected entities to transition from covered communications equipment
and services, to procure replacement equipment and services, and to ensure that
communications service to users and customers is sustained.
C. A non-Federal Contractor that is a state agency or agency of a political subdivision of a state
and its contractors must comply with section 6002 of the Solid Waste Disposal Act, as
amended by the Resource Conservation and Recovery Act. The requirements of Section 6002
include procuring only items designated in guidelines of the Environmental Protection Agency
(EPA) at Title 40 C.F.R. Part 247 that contain the highest percentage of recovered materials
practicable, consistent with maintaining a satisfactory level of competition, where the
purchase price of the item exceeds $10,000 or the value of the quantity acquired during the
preceding fiscal year exceeded $10,000; procuring solid waste management services in a
manner that maximizes energy and resource recovery; and establishing an affirmative
procurement program for procurement of recovered materials identified in the EPA guidelines.
D. Byrd Anti-Lobbying Amendment (31 U.S.C. Section 1352) - Contractors that apply or bid for
an award exceeding $100,000 must file the required certification. Each tier certifies to the tier
above that it will not and has not used Federal appropriated funds to pay any person or
organization for influencing or attempting to influence an officer or employee of any agency,
a member of Congress, officer or employee of Congress, or an employee of a member of
Congress in connection with obtaining any Federal contract, grant or any other award covered
by Title 31 U.S.C. Section 1352. Each tier must also disclose any lobbying with non-Federal
funds that takes place in connection with obtaining any Federal award. Such disclosures are
forwarded from tier to tier up to the non-Federal award.
E. Clean Air Act (42 U.S.C. Sections 7401-7671q.) and the Federal Water Pollution Control Act
(33 U.S.C. Sections 1251-1389), as amended - Contracts and subgrants of amounts in excess
of $150,000 must contain a provision that requires the non-Federal award to agree to comply
with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42
U.S.C. Sections 7401-7671q) and the Federal Water Pollution Control Act as amended (33
U.S.C. Sections1251-1389).
F. Rights to Inventions Made Under a Contract or Agreement. If the Federal award meets the
definition of “funding agreement” under Title 37 C.F.R. Section 401.2(a) and the recipient or
subrecipient wishes to enter into a contract with a small business firm or nonprofit organization
regarding the substitution of parties, assignment or performance of experimental,
developmental, or research work under that “funding agreement,” the Title 33 U.S.C. Sections
1251-1387 recipient or subrecipient must comply with the requirements of Title 37 C.F.R. Part
401, “Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under
Government Grants, Contracts and Cooperative Agreements,” and any implementing
regulations issued by the awarding agency.
Packet Page. 1185
G. Contract Work Hours and Safety Standards Act (40 U.S.C. Sections 3701-3708). Where
applicable, all contracts awarded by the non-Federal Contractor in excess of $100,000 that
involve the employment of mechanics or laborers must include a provision for compliance with
Title 40 U.S.C. Sections 3702 and 3704, as supplemented by Department of Labor regulations
(29 C.F.R. Part 5). Under Title 40 U.S.C. Section 3702 of the Act, each contractor must be
required to compute the wages of every mechanic and laborer on the basis of a standard work
week of 40 hours. Work in excess of the standard work week is permissible provided that the
worker is compensated at a rate of not less than one and a half times the basic rate of pay for
all hours worked in excess of 40 hours in the work week. The requirements of Title 40 U.S.C.
Section 3704 are applicable to construction work and provide that no laborer or mechanic
must be required to work in surroundings or under working conditions which are unsanitary,
hazardous or dangerous to health or safety. These requirements do not apply to the
purchases of supplies or materials or articles ordinarily available on the open market, or
contracts for transportation or transmission of intelligence.
H. Davis-Bacon Act, as amended (40 U.S.C. Sections 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by non-
Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C.
Sections 3141-3148) as supplemented by Department of Labor regulations (29 C.F.R. Part 5,
“Labor Standards Provisions Applicable to Contracts Covering Federally Financed and
Assisted Construction”). In accordance with the statute, contractors must be required to pay
wages to laborers and mechanics at a rate not less than the prevailing wages specified in a
wage determination made by the Secretary of Labor. In addition, contractors must be required
to pay wages not less than once a week. The non-Federal contractor must place a copy of
the current prevailing wage determination issued by the Department of Labor in each
solicitation. The decision to award a contract or subcontract must be conditioned upon the
acceptance of the wage determination. The non-Federal Contractor must report all suspected
or reported violations to the Federal awarding agency. The contracts must also include a
provision for compliance with the Copeland “Anti-Kickback” Act (18 U.S.C. Section 874 and
40 U.S.C. Section 3145), as supplemented by Department of Labor regulations (29 C.F.R.
Part 3, “Contractors and Subcontractors on Public Building or Public Work Financed in Whole
or in Part by Loans or Grants from the United States”). The Act provides that each contractor
or subrecipient must be prohibited from inducing, by any means, any person employed in the
construction, completion, or repair of public work, to give up any part of the compensation to
which he or she is otherwise entitled. The non-Federal contractor must report all suspected
or reported violations to the Federal awarding agency.
i. The Contractor and all Subcontractors and Sub-subcontractors are required to pay their
employees and workers a wage not less than the minimum wage for the work classification
as specified in both the Federal and California wage decisions. See Section 3.10.6
“Prevailing Wages” for additional information regarding California Prevailing Wage Rate
Requirements and the applicable general prevailing wage determinations which are on file
with the City and are available to any interested party on request. The higher of the two
applicable wage determinations, either California prevailing wage or Davis-Bacon Federal
prevailing wage, will be enforced for all applicable work/services under this Contract.
I. Contracts for more than the simplified acquisition threshold, which is the inflation adjusted
amount determined by the Civilian Agency Acquisition Council and the Defense Acquisition
Regulations Council (Councils) as authorized by Title 41 U.S.C. Section 1908, must address
Packet Page. 1186
administrative, contractual, or legal remedies in instances where Contractors violate or breach
contract terms, and provide for such sanctions and penalties as appropriate.
J. All contracts in excess of $10,000 must address termination for cause and for convenience
by the non-Federal Contractor including the manner by which it will be effected and the basis
for settlement.
K. Equal Employment Opportunity. Except as otherwise provided under Title 41 C.F.R. Part 60,
all contracts that meet the definition of “federally assisted construction contract” in Title 41
C.F.R. Section 60-1.3 must include the equal opportunity clause provided under Title 41
C.F.R. Section 60-1.4(b), in accordance with Executive Order 11246, “Equal Employment
Opportunity” (30 FR 12319, 12935, 3 C.F.R. Part, 1964-1965 Comp., p. 339), as amended by
Executive Order 11375, “Amending Executive Order 11246 Relating to Equal Employment
Opportunity,” and implementing regulations at 41 C.F.R. part 60, “Office of Federal Contract
Compliance Programs, Equal Employment Opportunity, Department of Labor.” The identified
clause is below and Contractor shall comply with the clause and all legal requirements and
include the equal opportunity clause in each of its nonexempt subcontracts.
i. The applicant hereby agrees that it will incorporate or cause to be incorporated into any
contract for construction work, or modification thereof, as defined in the regulations of the
Secretary of Labor at Title 41 C.F.R. Chapter 60, which is paid for in whole or in part with
funds obtained from the Federal Government or borrowed on the credit of the Federal
Government pursuant to a grant, contract, loan, insurance, or guarantee, or undertaken
pursuant to any Federal program involving such grant, contract, loan, insurance, or
guarantee, the following equal opportunity clause:
During the performance of this contract, the contractor agrees as follows:
(1) The contractor will not discriminate against any employee or applicant for employment
because of race, color, religion, sex, sexual orientation, gender identity, or national origin.
The contractor will take affirmative action to ensure that applicants are employed, and that
employees are treated during employment without regard to their race, color, religion, sex,
sexual orientation, gender identity, or national origin. Such action shall include, but not be
limited to the following: Employment, upgrading, demotion, or transfer; recruitment or
recruitment advertising; layoff or termination; rates of pay or other forms of compensation;
and selection for training, including apprenticeship. The contractor agrees to post in
conspicuous places, available to employees and applicants for employment, notices to be
provided setting forth the provisions of this nondiscrimination clause.
(2) The contractor will, in all solicitations or advertisements for employees placed by or on
behalf of the contractor, state that all qualified applicants will receive consideration for
employment without regard to race, color, religion, sex, sexual orientation, gender identity,
or national origin.
(3) The contractor will not discharge or in any other manner discriminate against any
employee or applicant for employment because such employee or applicant has inquired
about, discussed, or disclosed the compensation of the employee or applicant or another
employee or applicant. This provision shall not apply to instances in which an employee
who has access to the compensation information of other employees or applicants as a
part of such employee's essential job functions discloses the compensation of such other
employees or applicants to individuals who do not otherwise have access to such
information, unless such disclosure is in response to a formal complaint or charge, in
furtherance of an investigation, proceeding, hearing, or action, including an investigation
Packet Page. 1187
conducted by the employer, or is consistent with the contractor's legal duty to furnish
information.
(4) The contractor will send to each labor union or representative of workers with which
he has a collective bargaining agreement or other contract or understanding, a notice to
be provided advising the said labor union or workers' representatives of the contractor's
commitments under this section, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment.
(5) The contractor will comply with all provisions of Executive Order 11246 of September
24, 1965, and the rules, regulations, and relevant orders of the Secretary of Labor.
(6) The contractor will furnish all information and reports required by Executive Order
11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of
Labor, or pursuant thereto, and will permit access to his books, records, and accounts by
the administering agency and the Secretary of Labor for purposes of investigation to
ascertain compliance with such rules, regulations, and orders.
(7) In the event of the contractor's noncompliance with the nondiscrimination clauses of
this contract or with any of the said rules, regulations, or orders, this contract may be
canceled, terminated, or suspended in whole or in part and the contractor may be declared
ineligible for further Government contracts or federally assisted construction contracts in
accordance with procedures authorized in Executive Order 11246 of September 24, 1965,
and such other sanctions may be imposed and remedies invoked as provided in Executive
Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of
Labor, or as otherwise provided by law.
(8) The contractor will include the portion of the sentence immediately preceding
paragraph (1) and the provisions of paragraphs (1) through (8) in every subcontract or
purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor
issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that
such provisions will be binding upon each subcontractor or vendor. The contractor will
take such action with respect to any subcontract or purchase order as the administering
agency may direct as a means of enforcing such provisions, including sanctions for
noncompliance:
Provided, however, that in the event a contractor becomes involved in, or is threatened
with, litigation with a subcontractor or vendor as a result of such direction by the
administering agency, the contractor may request the United States to enter into such
litigation to protect the interests of the United States.
The applicant further agrees that it will be bound by the above equal opportunity clause
with respect to its own employment practices when it participates in federally assisted
construction work: Provided, That if the applicant so participating is a State or local
government, the above equal opportunity clause is not applicable to any agency,
instrumentality or subdivision of such government which does not participate in work on
or under the contract.
The applicant agrees that it will assist and cooperate actively with the administering
agency and the Secretary of Labor in obtaining the compliance of contractors and
subcontractors with the equal opportunity clause and the rules, regulations, and relevant
orders of the Secretary of Labor, that it will furnish the administering agency and the
Secretary of Labor such information as they may require for the supervision of such
compliance, and that it will otherwise assist the administering agency in the discharge of
the agency's primary responsibility for securing compliance.
The applicant further agrees that it will refrain from entering into any contract or contract
modification subject to Executive Order 11246 of September 24, 1965, with a contractor
debarred from, or who has not demonstrated eligibility for, Government contracts and
federally assisted construction contracts pursuant to the Executive Order and will carry
Packet Page. 1188
out such sanctions and penalties for violation of the equal opportunity clause as may be
imposed upon contractors and subcontractors by the administering agency or the
Secretary of Labor pursuant to Part II, Subpart D of the Executive Order. In addition, the
applicant agrees that if it fails or refuses to comply with these undertakings, the
administering agency may take any or all of the following actions: Cancel, terminate, or
suspend in whole or in part this grant (contract, loan, insurance, guarantee); refrain from
extending any further assistance to the applicant under the program with respect to which
the failure or refund occurred until satisfactory assurance of future compliance has been
received from such applicant; and refer the case to the Department of Justice for
appropriate legal proceedings.
L. Data Collection Requirements – Contractor agrees to collect pre-post data per County, and
United States Treasury guidelines and timeline, for project tracking and monitoring and
various reporting purposes. Data including, but not limited to: Required Project Demographic
Distribution Data; Required Performance Indicators and Programmatic Data; Required
Expenditure Report Data; and Required Program Evaluation Data. Contractor agrees to track
and monitor data in a quantifiable and reportable database - retrievable collective data that
needs to be available to County, State or Federal governments upon request.
M. Data Submission Requirements - Contractor agrees to furnish data to the County upon
request, per County, and United States Treasury guidelines and timeline, for project tracking
and monitoring and various reporting purposes. Data including, but not limited to: Required
Project Demographic Distribution Data; Required Performance Indicators and Programmatic
Data; Required Expenditure Report Data; Required Program Evaluation Data. Contractor
agrees to track and monitor data in a quantifiable and reportable database - retrievable
collective data that needs to be available at request.
N. Project Progress Reporting - Contractor agrees to provide project timeline and progress
updates to the City upon request, per County, and United States Treasury guidelines and
timeline. Contractor agrees to routine and impromptu program and project evaluation by the
City.
O. Contractor shall comply with Title 2 Code of Federal Regulations Part 200 (Uniform
Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards),
including, but not limited to, Title 2 C.F.R. Section 200.303 (internal control), Title 2 C.F.R.
Sections 200.331 through 200.333 (subrecipient monitoring and management), and Title 2
C.F.R. Part 200 Subpart F (audit requirements), as these sections currently exist or may be
amended. The use of funds must also adhere to official federal guidance issued or to be
issued on what constitutes an eligible expenditure. Any funds expended by Contractor or its
subcontractor(s) in any manner that does not adhere to official federal guidance shall be
returned to the County. Contractor agrees to comply with all official guidance regarding the
ARPA CLFRF. Contractor also agree that as additional federal guidance becomes available,
an amendment to this Contract may become necessary. If an amendment is required,
Contractor agrees to promptly execute the Contract amendment.
P. Contractor shall retain documentation of all uses of the funds, including but not limited to
invoices and/or sales receipts in a manner consistent with Title 2 C.F.R. Section 200.334
(retention requirements for records). Such documentation shall be produced to City upon
request and may be subject to audit. Unless otherwise provided by Federal or State law
(whichever is the most restrictive), Contractor shall maintain all documentation connected with
its performance under this Contract for a minimum of five (5) years from the date of the last
Packet Page. 1189
payment made by City or until audit resolution is achieved, whichever is later, and to make all
such supporting information available for inspection and audit by representatives of the City,
the State or the United States Government during normal business hours at Contractor.
Copies will be made and furnished by Contractor upon written request by City.
Q. Contractor shall establish and maintain an accounting system conforming to Generally
Accepted Accounting Principles (GAAP) to support Contractor’s requests for reimbursement
which segregate and accumulate costs of Contractor and produce monthly reports which
clearly identify reimbursable costs, matching fund costs (if applicable), and other allowable
expenditures by Contractor. Contractor shall provide a monthly report of expenditures under
this Contract no later than the 20th day of the following month.
R. Contractor shall cooperate in having an audit completed by City, at City’s option and expense.
Any audit required by ARPA CLFRF and its regulation and United States Treasury guidance
will be completed by Contractor at Contractor’s expense.
S. Contractor shall repay to City any reimbursement for ARPA CLFRF funding that is determined
by subsequent audit to be unallowable under the ARPA CLFRF within the time period required
by the ARPA CLFRF, but no later than one hundred twenty (120) days of Contractor receiving
notice of audit findings, which time shall include an opportunity for Contractor to respond to
and/or resolve the findings. Should the findings not be otherwise resolved and Contractor fail
to reimburse moneys due City within one hundred twenty (120) days of audit findings, or within
such other period as may be agreed between both parties or required by the ARPA CLFRF,
City reserves the right to withhold future payments due Contractor from any source under
City’s control.
T. Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal
Awards, Title 2 C.F.R. Part 200, other than such provisions as Treasury may determine are
inapplicable and subject to such exceptions as may be otherwise provided by Treasury.
Subpart F – Audit Requirements of the Uniform Guidance, implementing the Single Audit Act,
shall apply.
U. Universal Identifier and System for Award Management (SAM), Title 2 C.F.R. Part 25.
V. Reporting Subaward and Executive Compensation Information, Title 2 C.F.R. Part 170.
W. OMB Guidelines to Agencies on Governmentwide Debarment and Suspension
(nonprocurement), Title 2 C.F.R. Part 180, including the requirement to include a term or
condition in all lower tier covered transactions (contracts and subcontracts described in 2
C.F.R. Part 180, subpart B) that the award is subject to Title 2 C.F.R. Part 180 and Treasury’s
implementing regulation at Title 31 C.F.R. Part 19. Debarment and Suspension (Executive
Orders 12549 and 12689) - A contract award (see 2 C.F.R. Section 180.220) must not be
made to parties listed on the governmentwide exclusions in the System for Award
Management (SAM), in accordance with the OMB guidelines at Title 2 C.F.R. Part 180 that
implement Executive Orders 12549 (3 C.F.R. Part 1986 Comp., p. 189) and 12689 (3 C.F.R.
Part 1989 Comp., p. 235), “Debarment and Suspension.” SAM Exclusions contains the names
of parties debarred, suspended, or otherwise excluded by agencies, as well as parties
declared ineligible under statutory or regulatory authority other than Executive Order 12549.
X. Recipient Integrity and Performance Matters, pursuant to which the award terms set forth in
Title 2 C.F.R. Part 200, Appendix XII to Part 200 is hereby incorporated by reference.
Packet Page. 1190
Y. Government Requirements for Drug-Free Workplace, Title 31 C.F.R. Part 20.
Z. New Restrictions on Lobbying, Title 31 C.F.R. Part 21.
AA. Uniform Relocation Assistance and Real Property Acquisitions Act of 1970 (42 U.S.C.
Sections 4601-4655) and implementing regulations.
BB. Applicable Federal environmental laws and regulations.
CC. Statutes and regulations prohibiting discrimination include, without limitation, the following:
i. Title VI of the Civil Rights Act of 1964 (42 U.S.C. Sections 2000d et seq.) and
Treasury’s implementing regulations at Title 31 C.F.R. Part 22, which prohibit
discrimination on the basis of race, color, or national origin under programs or activities
receiving federal financial assistance.
ii. The Fair Housing Act, Title VIII of the Civil Rights Act of 1968 (42 U.S.C. Sections
3601 et seq.), which prohibits discrimination in housing on the basis of race, color,
religion, national origin, sex, familial status, or disability.
iii. Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. Section 794),
which prohibits discrimination on the basis of disability under any program or activity
receiving federal financial assistance.
iv. The Age Discrimination Act of 1975, as amended (42 U.S.C. Sections 6101 et seq.),
which prohibits discrimination on the basis of disability under programs, activities, and
services provided or made available by state and local governments or
instrumentalities or agencies thereto.
v. Title II of the Americans with Disabilities Act of 1990, as amended (42 U.S.C. Sections
12101 et seq.), which prohibits discrimination on the basis of disability under programs,
activities, and services provided or made available by state and local governments or
instrumentalities or agencies thereto.
DD. Contractor understands that making false statements or claims in connection with the
ARPA funded activities is a violation of federal law and may result in criminal, civil, or
administrative sanctions, including fines, imprisonment, civil damages and penalties,
debarment from participating in federal awards or contracts, and/or any other remedy
available by law.
EE. Any publications produced with ARPA funds must display the following language: “This
project [is being] [was] supported, in whole or in part, by federal award number SLT-0628
awarded to San Bernardino County by the U.S. Department of Treasury.”
FF. Pursuant to Executive Order 13043, 62 FR 19217 (Apr. 18, 1997), Contractor is being
encouraged to adopt and enforce on-the-job seat belt policies and programs for their
employees when operating company-owned, rented, or personally owned vehicles.
GG. Pursuant to Executive Order 13513, 74 FR 51225 (Oct. 6, 2009), Contractor is being
encouraged to adopt and enforce policies that ban text messaging while driving and
establishing workplace safety policies to decrease accidents caused by distracted drivers.
HH. As a recipient of federal financial assistance, the Civil Rights Restoration Act of 1987
applies, and Contractor assures that it:
Packet Page. 1191
i. Ensures its current and future compliance with Title VI of the Civil Rights Act of 1964,
as amended, which prohibits exclusion from participation, denial of the benefits of, or
subjection to discrimination under programs and activities receiving federal funds, of
any person in the United States on the ground of race, color, or national origin (42
U.S.C. Sections 2000d et seq.), as implemented by the Department of the Treasury
Title VI regulations at Title 31 C.F.R. Part 22 and other pertinent executive orders such
as Executive Order 13166, directives, circulars, policies, memoranda and/or guidance
documents.
ii. Acknowledges that Executive Order 13166, “Improving Access to Services for Persons
with Limited English Proficiency,” seeks to improve access to federally assisted
programs and activities for individuals who, because of national origin, have Limited
English proficiency (LEP). Contractor understands that denying a person access to
its programs, services, and activities, because of LEP is a form of national origin
discrimination prohibited under Title VI of the Civil Rights Act of 1964 and the
Department of the Treasury’s implementing regulations. Contractor shall initiate
reasonable steps, or comply with the Department of the Treasury’s directives, to
ensure LEP persons have meaningful access to its programs, services, and activities.
Contractor understands and agrees that meaningful access may entail provide
language assistance services, including oral interpretation and written translation
where necessary, to ensure effective communication.
iii. Agrees to consider the need for language services for LEP persons during
development of applicable budgets and when conducting programs, services, and
activities.
iv. Agrees to maintain a complaint log of any complaints of discrimination on the grounds
of race, color, or national origin, and limited English proficiency covered by Title VI of
the Civil Rights Act and implementing regulations and provide, upon request, a list of
all such reviews or proceedings based on the complaint, pending or completed,
including outcome.
II. The City must include the following language in every contract or agreement subject to Title
VI and its regulations:
“The sub-grantee, contractor, successor, transferee, and assignee shall comply with Title
VI of the Civil Rights Act of 1964, which prohibits recipients of federal financial assistance
from excluding a program or activity, denying benefits of, or otherwise discriminating
against a person on the basis of race, color, or nation origin (42 U.S.C. Section 2000d et
seq.), as implemented by the Department of the Treasury’s Title VI regulations, Title 31
C.F.R. Part 22, which are herein incorporated by reference and made a part of this contract
(or agreement). Title VI also includes protection to persons with “Limited English
Proficiency” in any program or activity receiving federal financial assistance, 42 U.S.C.
Section 2000d et seq., as implemented by the Department of the Treasury’s Title VI
regulations, Title 31 C.F.R. Sections Part 22, and herein incorporated by reference and
made a part of this contract or agreement.”
JJ. Contractor shall cooperate in any enforcement or compliance review activities by the City,
and/or the Department of the Treasury. Contractor shall comply with information requests,
on-site compliance reviews, and reporting requirements.
KK. Contractor shall maintain records and financial documents sufficient to evidence
compliance with section 603(c), regulations adopted by Treasury implementing those
sections, and guidance issued by Treasury regarding the foregoing.
Packet Page. 1192
LL. City has the right of access to records (electronic or otherwise) of Contractor in order to
conduct audits or other investigations.
MM. Contractor shall maintain records for a period of five (5) years after the completion of the
contract or a period of five (5) years after the last reporting date the City is obligated with the
Department of the U.S. Treasury, whichever is later.
NN. Contractor must disclose in writing any potential conflict of interest in accordance with Title
2 C.F.R. Section 200.112.
OO. In accordance with Title 41 U.S.C. Section 4712, subrecipient or Contractor may not
discharge, demote, or otherwise discriminate against an employee in reprisal for disclosing to
any of the list of persons or entities provided below, information that the employee reasonably
believes is evidence of gross mismanagement of a federal contract or grant, a gross waste of
federal funds, an abuse of authority relating to a federal contract or grant, a substantial and
specific danger to public health or safety, or a violation of law, rule, or regulation related to a
federal contract (including the competition for or negotiation of a contract) or grant.
The list of persons and entities referenced in the paragraph above includes the following: (i)
A member of Congress or a representative of a committee of Congress; (ii) An Inspector
General; (iii) The Government Accountability Office; (iv) A Treasury employee responsible for
contract or grant oversight or management; (v) An authorized official of the Department of
Justice or other law enforcement agency; (vi) A court or grand jury; or (vii) A management
official or other employee of Recipient, subrecipient, contractor, or subcontractor who has the
responsibility to investigate, discover, or address misconduct. Subrecipient or Contractor shall
inform its employees in writing of the rights and remedies provided under this section, in the
predominant native language of the workforce.
PP. City and Contractor acknowledge that if additional federal guidance is issued, an amendment
to this Contract may be necessary. In the event any of the terms in this Exhibit conflict with
any other terms in the Contract, the terms in this Exhibit shall control.
Packet Page. 1193
General Decision Number CA20250026, Dated 10/03/2025
Packet Page. 1194
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
"General Decision Number: CA20250026 10/03/2025
Superseded General Decision Number: CA20240026
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and
Highway
County: San Bernardino County in California.
BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not
include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does
not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally
required to pay at least the applicable minimum wage rate
required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered
contracts entered into by the federal government that are
subject to the Davis-Bacon Act itself, but do not apply to
contracts subject only to the Davis-Bacon Related Acts,
including those set forth at 29 CFR 5.1(a)(1).
______________________________________________________________
|If the contract is entered |. Executive Order 14026 |
|into on or after January 30, | generally applies to the |
|2022, or the contract is | contract. |
|renewed or extended (e.g., an |. The contractor must pay |
|option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $17.75 per hour (or |
| | the applicable wage rate |
| | listed on this wage |
|| determination, if it is |
|| higher) for all hours |
|| spent performing on the |
|| contract in 2025. |
|______________________________|_____________________________|
|If the contract was awarded on|. Executive Order 13658 |
|or between January 1, 2015 and| generally applies to the |
|January 29, 2022, and the | contract. |
|contract is not renewed or |. The contractor must pay all|
|extended on or after January | covered workers at least |
|30, 2022:| $13.30 per hour (or the |
|| applicable wage rate listed|
|| on this wage determination,|
|| if it is higher) for all |
|| hours spent performing on |
|| that contract in 2025. |
|______________________________|_____________________________|
The applicable Executive Order minimum wage rate will be
Packet Page. 1195
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
Executive Orders and a classification considered necessary for
performance of work on the contract does not appear on this
wage determination, the contractor must still submit a
conformance request.
Additional information on contractor requirements and worker
protections under the Executive Orders is available at
http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/03/2025
1 01/10/2025
2 01/24/2025
3 02/07/2025
4 02/21/2025
5 02/28/2025
6 03/28/2025
7 06/06/2025
8 08/01/2025
9 08/08/2025
10 08/15/2025
11 08/22/2025
12 09/05/2025
13 09/19/2025
14 09/26/2025
15 10/03/2025
ASBE0005-002 09/01/2024
Rates Fringes
Asbestos Workers/Insulator
(Includes the application of
all insulating materials,
protective coverings,
coatings, and finishes to all
types of mechanical systems).....$ 56.32 26.52
Fire Stop Technician
(Application of Firestopping
Materials for wall openings
and penetrations in walls,
floors, ceilings and curtain
walls)...........................$ 39.94 20.65
----------------------------------------------------------------
ASBE0005-004 07/04/2022
Rates Fringes
Asbestos Removal
worker/hazardous material
handler (Includes
Packet Page. 1196
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
scrapping, vacuuming, bagging
and disposing of all
insulation materials from
mechanical systems, whether
they contain asbestos or not)....$ 23.52 13.37
----------------------------------------------------------------
BOIL0092-003 01/01/2024
Rates Fringes
BOILERMAKER......................$ 51.98 42.11
----------------------------------------------------------------
* BRCA0004-011 05/01/2024
Rates Fringes
BRICKLAYER; MARBLE SETTER........$ 45.53 20.29
*The wage scale for prevailing wage projects performed in
Blythe, China lake, Death Valley, Fort Irwin, Twenty-Nine
Palms, Needles and 1-15 corridor (Barstow to the Nevada
State Line) will be Three Dollars ($3.00) above the
standard San Bernardino/Riverside County hourly wage rate
----------------------------------------------------------------
BRCA0018-004 06/01/2024
Rates Fringes
MARBLE FINISHER..................$ 43.38 15.36
TILE FINISHER....................$ 37.96 13.77
TILE LAYER.......................$ 51.82 19.32
----------------------------------------------------------------
BRCA0018-010 09/01/2024
Rates Fringes
TERRAZZO FINISHER................$ 42.11 14.67
TERRAZZO WORKER/SETTER...........$ 49.62 15.26
----------------------------------------------------------------
CARP0213-001 07/01/2025
Rates Fringes
CARPENTER
(1) Carpenter, Cabinet
Installer, Insulation
Installer, Hardwood Floor
Worker and acoustical
installer...................$ 52.24 26.18
(2) Millwright..............$ 52.24 26.68
(3) Piledrivermen/Derrick
Packet Page. 1197
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
Rock Bargeman or Scowman,
Rockslinger, Shingler
(Commercial)................$ 52.37 26.18
(4) Pneumatic Nailer,
Power Stapler...............$ 52.37 26.18
(5) Sawfiler...............$ 52.34 26.18
(6) Scaffold Builder.......$ 45.37 25.43
(7) Table Power Saw
Operator....................$ 52.34 26.18
FOOTNOTE: Work of forming in the construction of open cut
sewers or storm drains, on operations in which horizontal
lagging is used in conjunction with steel H-Beams driven or
placed in pre- drilled holes, for that portion of a lagged
trench against which concrete is poured, namely, as a
substitute for back forms (which work is performed by
piledrivers): $0.13 per hour additional.
----------------------------------------------------------------
CARP0213-002 07/01/2025
Rates Fringes
Diver
(1) Wet.....................$ 901.92 26.18
(2) Standby.................$ 450.96 26.18
(3) Tender..................$ 442.96 26.18
(4) Assistant Tender........$ 418.96 26.18
Amounts in ""Rates' column are per day
----------------------------------------------------------------
CARP0213-004 07/01/2025
Rates Fringes
Drywall
DRYWALL INSTALLER/LATHER....$ 52.24 26.18
STOCKER/SCRAPPER............$ 21.45 11.27
----------------------------------------------------------------
CARP0721-001 07/01/2025
Rates Fringes
Modular Furniture Installer......$ 25.00 13.06
----------------------------------------------------------------
ELEC0440-004 12/31/2024
COMMUNICATIONS AND SYSTEMS WORK
Rates Fringes
Communications System
Packet Page. 1198
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
SCOPE OF WORK:
Installation, testing, service and maintenance of systems
utilizing the transmission and/or transference of voice,
sound, vision and digital for commercial, educational,
security and entertainment purposes for the following: TV
monitoring and surveillance, background-foreground music,
intercom and telephone interconnect, inventory control
systems, microwave transmission, multi-media, multiplex,
nurse call systems, radio page, school intercom and sound,
burglar alarms, fire alarms, and low voltage master clock
systems in commercial buildings. Communication Systems
that transmit or receive information and/or control systems
that are intrinsic to the above listed systems; inclusion
or exclusion of terminations and testings of conductors
determined by their function; excluding all other data
systems or multiple systems which include control function
or power supply; excluding installation of raceway systems,
conduit systems, line voltage work, and energy management
systems. Does not cover work performed at China Lake Naval
Ordnance Test Station.
----------------------------------------------------------------
ELEC0477-002 06/01/2024
Rates Fringes
Electricians:....................$ 53.15 3%+27.48
CABLE SPLICER: $1.50 per hour above Electrician rate.
TUNNEL WORK: 10% above Electrician rate.
ZONE PAY:
Zone A - 80 road miles from Post Office, 455 Orange Show
Lane, San Bernardino, will be a free zone for all
contractors
Zone B - Any work performed outside Zone A's 80 road miles,
shall add $12.00 per hour to the current wage scale.
----------------------------------------------------------------
ELEC1245-001 01/01/2025
Rates Fringes
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 70.16 24.71
(2) Equipment specialist
(operates crawler
tractors, commercial motor
vehicles, backhoes,
trenchers, cranes (50 tons
and below), overhead &
Packet Page. 1199
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
(3) Groundman...............$ 40.76 21.76
(4) Powderman...............$ 51.87 18.79
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day,
Independence Day, Labor Day, Veterans Day, Thanksgiving Day
and day after Thanksgiving, Christmas Day
----------------------------------------------------------------
ELEV0018-001 01/01/2025
Rates Fringes
ELEVATOR MECHANIC................$ 69.43 38.435+a+b
FOOTNOTE:
a. PAID VACATION: Employer contributes 8% of regular hourly
rate as vacation pay credit for employees with more than 5
years of service, and 6% for 6 months to 5 years of service.
b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday
after Thanksgiving, and Christmas Day.
----------------------------------------------------------------
ENGI0012-004 08/01/2024
Rates Fringes
OPERATOR: Power Equipment
(DREDGING)
(1) Leverman................$ 64.10 38.75
(2) Dredge dozer............$ 58.13 38.75
(3) Deckmate................$ 58.02 38.75
(4) Winch operator (stern
winch on dredge)............$ 57.47 38.75
(5) Fireman-Oiler,
Deckhand, Bargeman,
Leveehand...................$ 56.93 38.75
(6) Barge Mate..............$ 57.54 38.75
----------------------------------------------------------------
ENGI0012-024 07/01/2023
Rates Fringes
OPERATOR: Power Equipment
(All Other Work)
GROUP 1....................$ 53.90 32.80
GROUP 2....................$ 54.68 32.80
GROUP 3....................$ 54.97 32.80
GROUP 4....................$ 56.46 32.80
GROUP 6....................$ 56.68 32.80
GROUP 8....................$ 56.79 32.80
Packet Page. 1200
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
GROUP 13....................$ 57.18 32.80
GROUP 14....................$ 57.21 32.80
GROUP 15....................$ 57.29 32.80
GROUP 16....................$ 57.41 32.80
GROUP 17....................$ 57.58 32.80
GROUP 18....................$ 57.68 32.80
GROUP 19....................$ 57.79 32.80
GROUP 20....................$ 57.91 32.80
GROUP 21....................$ 58.08 32.80
GROUP 22....................$ 58.18 32.80
GROUP 23....................$ 58.29 32.80
GROUP 24....................$ 58.41 32.80
GROUP 25....................$ 58.58 32.80
OPERATOR: Power Equipment
(Cranes, Piledriving &
Hoisting)
GROUP 1....................$ 55.25 32.80
GROUP 2....................$ 56.03 32.80
GROUP 3....................$ 56.32 32.80
GROUP 4....................$ 56.46 32.80
GROUP 5....................$ 56.68 32.80
GROUP 6....................$ 56.79 32.80
GROUP 7....................$ 56.91 32.80
GROUP 8....................$ 57.08 32.80
GROUP 9....................$ 57.25 32.80
GROUP 10....................$ 58.25 32.80
GROUP 11....................$ 59.25 32.80
GROUP 12....................$ 60.25 32.80
GROUP 13....................$ 61.25 32.80
OPERATOR: Power Equipment
(Tunnel Work)
GROUP 1....................$ 55.75 32.80
GROUP 2....................$ 56.53 32.80
GROUP 3....................$ 56.82 32.80
GROUP 4....................$ 56.96 32.80
GROUP 5....................$ 57.18 32.80
GROUP 6....................$ 57.29 32.80
GROUP 7....................$ 57.41 32.80
PREMIUM PAY:
$10.00 per hour shall be paid on all Power Equipment Operator
work on the followng Military Bases: China Lake Naval
Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base,
Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics
Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp
Pendleton
Workers required to suit up and work in a hazardous material
environment: $2.00 per hour additional. Combination mixer
and compressor operator on gunite work shall be classified
as a concrete mobile mixer operator.
Packet Page. 1201
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Bargeman; Brakeman; Compressor operator; Ditch
Witch, with seat or similar type equipment; Elevator
operator-inside; Engineer Oiler; Forklift operator
(includes loed, lull or similar types under 5 tons;
Generator operator; Generator, pump or compressor plant
operator; Pump operator; Signalman; Switchman
GROUP 2: Asphalt-rubber plant operator (nurse tank
operator);Coil Tubing Rig Operator, Concrete mixer
operator-skip type; Conveyor operator; Fireman; Forklift
operator (includes loed, lull or similar types over 5 tons;
Hydrostatic pump operator; oiler crusher (asphalt or
concrete plant); Petromat laydown machine; PJU side dum
jack; Screening and conveyor machine operator (or similar
types); Skiploader (wheel type up to 3/4 yd. without
attachment); Tar pot fireman; Temporary heating plant
operator; Trenching machine oiler
GROUP 3: Asphalt-rubber blend operator; Bobcat or similar
type (Skid steer); Equipment greaser (rack); Ford Ferguson
(with dragtype attachments); Helicopter radioman (ground);
Stationary pipe wrapping and cleaning machine operator
GROUP 4: Asphalt plant fireman; Backhoe operator (mini-max or
similar type); Boring machine operator; Boxman or mixerman
(asphalt or concrete); Chip spreading machine operator;
Concrete cleaning decontamination machine operator;
Concrete Pump Operator (small portable);Direct Push
Operator (Geoprobe or similar types) Drilling machine
operator, small auger types (Texoma super economatic or
similar types - Hughes 100 or 200 or similar types -
drilling depth of 30' maximum); Equipment greaser (grease
truck); Guard rail post driver operator; Highline cableway
signalman; Hydra-hammer-aero stomper; Micro Tunneling
(above ground tunnel); Power concrete curing machine
operator; Power concrete saw operator; Power-driven jumbo
form setter operator; Power sweeper operator; Rock Wheel
Saw/Trencher; Roller operator (compacting); Screed operator
(asphalt or concrete); Trenching machine operator (up to 6
ft.); Vacuum or much truck
GROUP 6: Articulating material hauler; Asphalt plant
engineer; Batch plant operator; Bit sharpener; Concrete
joint machine operator (canal and similar type); Concrete
planer operator; Dandy digger; Deck engine operator;
Derrickman (oilfield type); Drilling machine operator,
bucket or auger types (Calweld 100 bucket or similar types
- Watson 1000 auger or similar types - Texoma 330, 500 or
600 auger or similar types - drilling depth of 45'
maximum); Drilling machine operator; Hydrographic seeder
Packet Page. 1202
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
maintainer, or similar type; Kalamazoo Switch tamper, or
similar type; Machine tool operator; Maginnis internal full
slab vibrator, Mechanical berm, curb or gutter(concrete or
asphalt); Mechanical finisher operator (concrete,
Clary-Johnson-Bidwell or similar); Micro tunnel system
(below ground); Pavement breaker operator (truck mounted);
Road oil mixing machine operator; Roller operator (asphalt
or finish), rubber-tired earth moving equipment (single
engine, up to and including 25 yds. struck); Self-propelled
tar pipelining machine operator; Skiploader operator
(crawler and wheel type, over 3/4 yd. and up to and
including 1-1/2 yds.); Slip form pump operator (power
driven hydraulic lifting device for concrete forms);
Tractor operator-bulldozer, tamper-scraper (single engine,
up to 100 h.p. flywheel and similar types, up to and
including D-5 and similar types); Tugger hoist operator (1
drum); Ultra high pressure waterjet cutting tool system
operator; Vacuum blasting machine operator
GROUP 8: Asphalt or concrete spreading operator (tamping or
finishing); Asphalt paving machine operator (Barber Greene
or similar type); Asphalt-rubber distribution operator;
Backhoe operator (up to and including 3/4 yd.), small ford,
Case or similar types; Cable Bundling Machine Operator
(excluding handheld); Cable Trenching Machine Operator
(Spider Plow or similar types) Cast-in-place pipe laying
machine operator; Combination mixer and compressor operator
(gunite work); Compactor operator (self-propelled);
Concrete mixer operator (paving); Crushing plant operator;
Drill Doctor; Drilling machine operator, Bucket or auger
types (Calweld 150 bucket or similar types - Watson 1500,
2000 2500 auger or similar types - Texoma 700, 800 auger or
similar types - drilling depth of 60' maximum); Elevating
grader operator; Grade checker; Gradall operator; Grouting
machine operator; Heavy-duty repairman; Heavy equipment
robotics operator; Kalamazoo balliste regulator or similar
type; Kolman belt loader and similar type; Le Tourneau blob
compactor or similar type; Loader operator (Athey, Euclid,
Sierra and similar types); Mobark Chipper or similar; Ozzie
padder or similar types; P.C. slot saw; Pneumatic concrete
placing machine operator (Hackley-Presswell or similar
type); Pumpcrete gun operator; RCM Cementing Unit Operator,
Rail/Switch Grinder Operator (Harsco or similar types)
Rock Drill or similar types; Rotary drill operator
(excluding caisson type); Rubber-tired earth-moving
equipment operator (single engine, caterpillar, Euclid,
Athey Wagon and similar types with any and all attachments
over 25 yds. up to and including 50 cu. yds. struck);
Rubber-tired earth-moving equipment operator (multiple
engine up to and including 25 yds. struck); Rubber-tired
scraper operator (self-loading paddle wheel type-John
Deere, 1040 and similar single unit); Self- propelled curb
Packet Page. 1203
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
including 6-1/2 yds.); Soil remediation plant operator;
Surface heaters and planer operator; Tractor compressor
drill combination operator; Tractor operator (any type
larger than D-5 - 100 flywheel h.p. and over, or
similar-bulldozer, tamper, scraper and push tractor single
engine); Tractor operator (boom attachments), Traveling
pipe wrapping, cleaning and bendng machine operator;
Trenching machine operator (over 6 ft. depth capacity,
manufacturer's rating); trenching Machine with Road Miner
attachment (over 6 ft depth capacity): Ultra high pressure
waterjet cutting tool system mechanic; Water pull
(compaction) operator
GROUP 10: Drilling machine operator, Bucket or auger types
(Calweld 200 B bucket or similar types-Watson 3000 or 5000
auger or similar types-Texoma 900 auger or similar
types-drilling depth of 105' maximum); Dual drum mixer,
dynamic compactor LDC350 (or similar types); Monorail
locomotive operator (diesel, gas or electric); Motor
patrol-blade operator (single engine); Multiple engine
tractor operator (Euclid and similar type-except Quad 9
cat.); Rubber-tired earth-moving equipment operator (single
engine, over 50 yds. struck); Pneumatic pipe ramming tool
and similar types; Prestressed wrapping machine operator;
Rubber-tired earth-moving equipment operator (single
engine, over 50 yds. struck); Rubber tired earth moving
equipment operator (multiple engine, Euclid, caterpillar
and similar over 25 yds. and up to 50 yds. struck), Tower
crane repairman; Tractor loader operator (crawler and wheel
type over 6-1/2 yds.); Woods mixer operator (and similar
Pugmill equipment)
GROUP 12: Auto grader operator; Automatic slip form operator;
Drilling machine operator, bucket or auger types (Calweld,
auger 200 CA or similar types - Watson, auger 6000 or
similar types - Hughes Super Duty, auger 200 or similar
types - drilling depth of 175' maximum); Hoe ram or similar
with compressor; Mass excavator operator less tha 750 cu.
yards; Mechanical finishing machine operator; Mobile form
traveler operator; Motor patrol operator (multi-engine);
Pipe mobile machine operator; Rubber-tired earth- moving
equipment operator (multiple engine, Euclid, Caterpillar
and similar type, over 50 cu. yds. struck); Rubber-tired
self- loading scraper operator (paddle-wheel-auger type
self-loading - two (2) or more units)
GROUP 13: Rubber-tired earth-moving equipment operator
operating equipment with push-pull system (single engine,
up to and including 25 yds. struck)
GROUP 14: Canal liner operator; Canal trimmer operator;
Remote- control earth-moving equipment operator (operating
Packet Page. 1204
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
GROUP 15: Rubber-tired earth-moving equipment operator,
operating equipment with push-pull system (single engine,
Caterpillar, Euclid, Athey Wagon and similar types with any
and all attachments over 25 yds. and up to and including 50
yds. struck); Rubber-tired earth-moving equipment operator,
operating equipment with push-pull system (multiple
engine-up to and including 25 yds. struck)
GROUP 16: Rubber-tired earth-moving equipment operator,
operating equipment with push-pull system (single engine,
over 50 yds. struck); Rubber-tired earth-moving equipment
operator, operating equipment with push-pull system
(multiple engine, Euclid, Caterpillar and similar, over 25
yds. and up to 50 yds. struck)
GROUP 17: Rubber-tired earth-moving equipment operator,
operating equipment with push-pull system (multiple engine,
Euclid, Caterpillar and similar, over 50 cu. yds. struck);
Tandem tractor operator (operating crawler type tractors in
tandem - Quad 9 and similar type)
GROUP 18: Rubber-tired earth-moving equipment operator,
operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
single engine, up to and including 25 yds. struck)
GROUP 19: Rotex concrete belt operator (or similar types);
Rubber-tired earth-moving equipment operator, operating in
tandem (scrapers, belly dumps and similar types in any
combination, excluding compaction units - single engine,
Caterpillar, Euclid, Athey Wagon and similar types with any
and all attachments over 25 yds.and up to and including 50
cu. yds. struck); Rubber-tired earth-moving equipment
operator, operating in tandem (scrapers, belly dumps and
similar types in any combination, excluding compaction
units - multiple engine, up to and including 25 yds. struck)
GROUP 20: Rubber-tired earth-moving equipment operator,
operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
single engine, over 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating in tandem
(scrapers, belly dumps, and similar types in any
combination, excluding compaction units - multiple engine,
Euclid, Caterpillar and similar, over 25 yds. and up to 50
yds. struck)
GROUP 21: Rubber-tired earth-moving equipment operator,
operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
multiple engine, Euclid, Caterpillar and similar type, over
Packet Page. 1205
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
GROUP 22: Rubber-tired earth-moving equipment operator,
operating equipment with the tandem push-pull system
(single engine, up to and including 25 yds. struck)
GROUP 23: Rubber-tired earth-moving equipment operator,
operating equipment with the tandem push-pull system
(single engine, Caterpillar, Euclid, Athey Wagon and
similar types with any and all attachments over 25 yds. and
up to and including 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating with the tandem
push-pull system (multiple engine, up to and including 25
yds. struck)
GROUP 24: Rubber-tired earth-moving equipment operator,
operating equipment with the tandem push-pull system
(single engine, over 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating equipment with
the tandem push-pull system (multiple engine, Euclid,
Caterpillar and similar, over 25 yds. and up to 50 yds.
struck)
GROUP 25: Concrete pump operator-truck mounted; Rubber-tired
earth-moving equipment operator, operating equipment with
the tandem push-pull system (multiple engine, Euclid,
Caterpillar and similar type, over 50 cu. yds. struck);
Spyder Excavator Operator, with all attachments
CRANES, PILEDRIVING AND HOISTING EQUIPMENT CLASSIFICATIONS
GROUP 1: Engineer oiler; Fork lift operator (includes loed,
lull or similar types)
GROUP 2: Truck crane oiler
GROUP 3: A-frame or winch truck operator; Ross carrier
operator (jobsite)
GROUP 4: Bridge-type unloader and turntable operator;
Helicopter hoist operator
GROUP 5: Hydraulic boom truck; Stinger crane (Austin-Western
or similar type); Tugger hoist operator (1 drum)
GROUP 6: Bridge crane operator; Cretor crane operator; Hoist
operator (Chicago boom and similar type); Lift mobile
operator; Lift slab machine operator (Vagtborg and similar
types); Material hoist and/or manlift operator; Polar
gantry crane operator; Self Climbing scaffold (or similar
type); Shovel, backhoe, dragline, clamshell operator (over
3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist operator
GROUP 7: Pedestal crane operator; Shovel, backhoe, dragline,
Packet Page. 1206
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
GROUP 8: Crane operator (up to and including 25 ton
capacity); Crawler transporter operator; Derrick barge
operator (up to and including 25 ton capacity); Hoist
operator, stiff legs, Guy derrick or similar type (up to
and including 25 ton capacity); Shovel, backhoe, dragline,
clamshell operator (over 7 cu. yds., M.R.C.)
GROUP 9: Crane operator (over 25 tons and up to and including
50 tons mrc); Derrick barge operator (over 25 tons up to
and including 50 tons mrc); Highline cableway operator;
Hoist operator, stiff legs, Guy derrick or similar type
(over 25 tons up to and including 50 tons mrc); K-crane
operator; Polar crane operator; Self erecting tower crane
operator maximum lifting capacity ten tons
GROUP 10: Crane operator (over 50 tons and up to and
including 100 tons mrc); Derrick barge operator (over 50
tons up to and including 100 tons mrc); Hoist operator,
stiff legs, Guy derrick or similar type (over 50 tons up to
and including 100 tons mrc), Mobile tower crane operator
(over 50 tons, up to and including 100 tons M.R.C.);
GROUP 11: Crane operator (over 100 tons and up to and
including 200 tons mrc); Derrick barge operator (over 100
tons up to and including 200 tons mrc); Hoist operator,
stiff legs, Guy derrick or similar type (over 100 tons up
to and including 200 tons mrc); Mobile tower crane operator
(over 100 tons up to and including 200 tons mrc) ; Tower
crane operator and tower gantry
GROUP 12: Crane operator (over 200 tons up to and including
300 tons mrc); Derrick barge operator (over 200 tons up to
and including 300 tons mrc); Hoist operator, stiff legs,
Guy derrick or similar type (over 200 tons, up to and
including 300 tons mrc); Mobile tower crane operator (over
200 tons, up to and including 300 tons mrc)
GROUP 13: Crane operator (over 300 tons); Derrick barge
operator (over 300 tons); Helicopter pilot; Hoist operator,
stiff legs, Guy derrick or similar type (over 300 tons);
Mobile tower crane operator (over 300 tons)
TUNNEL CLASSIFICATIONS
GROUP 1: Skiploader (wheel type up to 3/4 yd. without
attachment)
GROUP 2: Power-driven jumbo form setter operator
GROUP 3: Dinkey locomotive or motorperson (up to and
including 10 tons)
Packet Page. 1207
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
Slip form pump operator (power-driven hydraulic lifting
device for concrete forms); Tugger hoist operator (1 drum);
Tunnel locomotive operator (over 10 and up to and including
30 tons)
GROUP 5: Backhoe operator (up to and including 3/4 yd.);
Small Ford, Case or similar; Drill doctor; Grouting machine
operator; Heading shield operator; Heavy-duty repairperson;
Loader operator (Athey, Euclid, Sierra and similar types);
Mucking machine operator (1/4 yd., rubber-tired, rail or
track type); Pneumatic concrete placing machine operator
(Hackley-Presswell or similar type); Pneumatic heading
shield (tunnel); Pumpcrete gun operator; Tractor compressor
drill combination operator; Tugger hoist operator (2 drum);
Tunnel locomotive operator (over 30 tons)
GROUP 6: Heavy Duty Repairman
GROUP 7: Tunnel mole boring machine operator
ENGINEERS ZONES
$1.00 additional per hour for all of IMPERIAL County and the
portions of KERN, RIVERSIDE & SAN BERNARDINO Counties as
defined below:
That area within the following Boundary: Begin in San
Bernardino County, approximately 3 miles NE of the intersection
of I-15 and the California State line at that point which is
the NW corner of Section 1, T17N,m R14E, San Bernardino
Meridian. Continue W in a straight line to that point which is
the SW corner of the northwest quarter of Section 6, T27S,
R42E, Mt. Diablo Meridian. Continue North to the intersection
with the Inyo County Boundary at that point which is the NE
corner of the western half of the northern quarter of Section
6, T25S, R42E, MDM. Continue W along the Inyo and San
Bernardino County boundary until the intersection with Kern
County, as that point which is the SE corner of Section 34,
T24S, R40E, MDM. Continue W along the Inyo and Kern County
boundary until the intersection with Tulare County, at that
point which is the SW corner of the SE quarter of Section 32,
T24S, R37E, MDM. Continue W along the Kern and Tulare County
boundary, until that point which is the NW corner of T25S,
R32E, MDM. Continue S following R32E lines to the NW corner of
T31S, R32E, MDM. Continue W to the NW corner of T31S, R31E,
MDM. Continue S to the SW corner of T32S, R31E, MDM. Continue
W to SW corner of SE quarter of Section 34, T32S, R30E, MDM.
Continue S to SW corner of T11N, R17W, SBM. Continue E along
south boundary of T11N, SBM to SW corner of T11N, R7W, SBM.
Continue S to SW corner of T9N, R7W, SBM. Continue E along
south boundary of T9N, SBM to SW corner of T9N, R1E, SBM.
Continue S along west boundary of R1E, SMB to Riverside County
Packet Page. 1208
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
T1S, R10E, SBM. Continue S along west boundary of R10E, SBM to
Imperial County line at the SW corner of T8S, R10E, SBM.
Continue W along Imperial and Riverside county line to NW
corner of T9S, R9E, SBM. Continue S along the boundary between
Imperial and San Diego Counties, along the west edge of R9E,
SBM to the south boundary of Imperial County/California state
line. Follow the California state line west to Arizona state
line, then north to Nevada state line, then continuing NW back
to start at the point which is the NW corner of Section 1,
T17N, R14E, SBM
$1.00 additional per hour for portions of SAN LUIS OBISPO,
KERN, SANTA BARBARA & VENTURA as defined below:
That area within the following Boundary: Begin approximately 5
miles north of the community of Cholame, on the Monterey County
and San Luis Obispo County boundary at the NW corner of T25S,
R16E, Mt. Diablo Meridian. Continue south along the west side
of R16E to the SW corner of T30S, R16E, MDM. Continue E to SW
corner of T30S, R17E, MDM. Continue S to SW corner of T31S,
R17E, MDM. Continue E to SW corner of T31S, R18E, MDM.
Continue S along West side of R18E, MDM as it crosses into San
Bernardino Meridian numbering area and becomes R30W. Follow
the west side of R30W, SBM to the SW corner of T9N, R30W, SBM.
Continue E along the south edge of T9N, SBM to the Santa
Barbara County and Ventura County boundary at that point whch
is the SW corner of Section 34.T9N, R24W, SBM, continue S along
the Ventura County line to that point which is the SW corner of
the SE quarter of Section 32, T7N, R24W, SBM. Continue E
along the south edge of T7N, SBM to the SE corner to T7N, R21W,
SBM. Continue N along East side of R21W, SBM to Ventura County
and Kern County boundary at the NE corner of T8N, R21W.
Continue W along the Ventura County and Kern County boundary to
the SE corner of T9N, R21W. Continue North along the East edge
of R21W, SBM to the NE corner of T12N, R21W, SBM. Continue
West along the north edge of T12N, SBM to the SE corner of
T32S, R21E, MDM. [T12N SBM is a think strip between T11N SBM
and T32S MDM]. Continue North along the East side of R21E, MDM
to the Kings County and Kern County border at the NE corner of
T25S, R21E, MDM, continue West along the Kings County and Kern
County Boundary until the intersection of San Luis Obispo
County. Continue west along the Kings County and San Luis
Obispo County boundary until the intersection with Monterey
County. Continue West along the Monterey County and San Luis
Obispo County boundary to the beginning point at the NW corner
of T25S, R16E, MDM.
$2.00 additional per hour for INYO and MONO Counties and the
Northern portion of SAN BERNARDINO County as defined below:
That area within the following Boundary: Begin at the
Packet Page. 1209
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
Section 17, T10N, R22E, Mt. Diablo Meridian. Continue S then
SE along the entire western boundary of Mono County, until it
reaches Inyo County at the point which is the NE corner of the
Western half of the NW quarter of Section 2, T8S, R29E, MDM.
Continue SSE along the entire western boundary of Inyo County,
until the intersection with Kern County at the point which is
the SW corner of the SE 1/4 of Section 32, T24S, R37E, MDM.
Continue E along the Inyo and Kern County boundary until the
intersection with San Bernardino County at that point which is
the SE corner of section 34, T24S, R40E, MDM. Continue E along
the Inyo and San Bernardino County boundary until the point
which is the NE corner of the Western half of the NW quarter of
Section 6, T25S, R42E, MDM. Continue S to that point which is
the SW corner of the NW quarter of Section 6, T27S, R42E, MDM.
Continue E in a straight line to the California and Nevada
state border at the point which is the NW corner of Section 1,
T17N, R14E, San Bernardino Meridian. Then continue NW along
the state line to the starting point, which is the center of
Section 18, T10N, R22E, MDM.
REMAINING AREA NOT DEFINED ABOVE RECIEVES BASE RATE
----------------------------------------------------------------
IRON0433-006 01/01/2025
Rates Fringes
IRONWORKER
Fence Erector...............$ 45.78 26.51
Ornamental, Reinforcing
and Structural..............$ 50.70 35.15
PREMIUM PAY:
$9.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval
Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training
Center-Goldstone, San Clemente Island, San Nicholas Island,
Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine
Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB
Army Defense Language Institute - Monterey, Fallon Air Base,
Naval Post Graduate School - Monterey, Yermo Marine Corps
Logistics Center
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock
----------------------------------------------------------------
LABO0300-005 07/01/2025
Packet Page. 1210
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
Asbestos Removal Laborer.........$ 46.48 25.93
SCOPE OF WORK: Includes site mobilization, initial site
cleanup, site preparation, removal of asbestos-containing
material and toxic waste, encapsulation, enclosure and
disposal of asbestos- containing materials and toxic waste
by hand or with equipment or machinery; scaffolding,
fabrication of temporary wooden barriers and assembly of
decontamination stations.
----------------------------------------------------------------
LABO0345-001 07/01/2025
Rates Fringes
LABORER (GUNITE)
GROUP 1.....................$ 55.88 23.77
GROUP 2.....................$ 54.93 23.77
GROUP 3.....................$ 51.39 23.77
FOOTNOTE: GUNITE PREMIUM PAY: Workers working from a
Bosn'n's Chair or suspended from a rope or cable shall
receive 40 cents per hour above the foregoing applicable
classification rates. Workers doing gunite and/or
shotcrete work in a tunnel shall receive 35 cents per hour
above the foregoing applicable classification rates, paid
on a portal-to-portal basis. Any work performed on, in or
above any smoke stack, silo, storage elevator or similar
type of structure, when such structure is in excess of
75'-0"" above base level and which work must be performed in
whole or in part more than 75'-0"" above base level, that
work performed above the 75'-0"" level shall be compensated
for at 35 cents per hour above the applicable
classification wage rate.
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Rodmen, Nozzlemen
GROUP 2: Gunmen
GROUP 3: Reboundmen
----------------------------------------------------------------
LABO0783-002 07/01/2025
Rates Fringes
LABORER (TUNNEL)
GROUP 1.....................$ 53.60 25.74
GROUP 2.....................$ 53.92 25.74
GROUP 3.....................$ 54.38 25.74
GROUP 4.....................$ 55.07 25.74
Packet Page. 1211
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
GROUP 1.....................$ 46.48 25.95
GROUP 2.....................$ 47.03 25.95
GROUP 3.....................$ 47.58 25.95
GROUP 4.....................$ 49.13 25.95
GROUP 5.....................$ 49.48 25.95
LABORER CLASSIFICATIONS
GROUP 1: Cleaning and handling of panel forms; Concrete
screeding for rough strike-off; Concrete, water curing;
Demolition laborer, the cleaning of brick if performed by a
worker performing any other phase of demolition work, and
the cleaning of lumber; Fire watcher, limber, brush loader,
piler and debris handler; Flag person; Gas, oil and/or
water pipeline laborer; Laborer, asphalt-rubber material
loader; Laborer, general or construction; Laborer, general
clean-up; Laborer, landscaping; Laborer, jetting; Laborer,
temporary water and air lines; Material hose operator
(walls, slabs, floors and decks); Plugging, filling of shee
bolt holes; Dry packing of concrete; Railroad maintenance,
repair track person and road beds; Streetcar and railroad
construction track laborers; Rigging and signaling; Scaler;
Slip form raiser; Tar and mortar; Tool crib or tool house
laborer; Traffic control by any method; Window cleaner;
Wire mesh pulling - all concrete pouring operations
GROUP 2: Asphalt shoveler; Cement dumper (on 1 yd. or larger
mixer and handling bulk cement); Cesspool digger and
installer; Chucktender; Chute handler, pouring concrete,
the handling of the chute from readymix trucks, such as
walls, slabs, decks, floors, foundation, footings, curbs,
gutters and sidewalks; Concrete curer, impervious membrane
and form oiler; Cutting torch operator (demolition); Fine
grader, highways and street paving, airport, runways and
similar type heavy construction; Gas, oil and/or water
pipeline wrapper - pot tender and form person; Guinea
chaser; Headerboard person - asphalt; Laborer, packing rod
steel and pans; Membrane vapor barrier installer; Power
broom sweeper (small); Riprap stonepaver, placing stone or
wet sacked concrete; Roto scraper and tiller; Sandblaster
(pot tender); Septic tank digger and installer(lead); Tank
scaler and cleaner; Tree climber, faller, chain saw
operator, Pittsburgh chipper and similar type brush
shredder; Underground laborer, including caisson bellower
GROUP 3: Buggymobile person; Concrete cutting torch; Concrete
pile cutter; Driller, jackhammer, 2-1/2 ft. drill steel or
longer; Dri-pak-it machine; Gas, oil and/or water pipeline
wrapper, 6-in. pipe and over, by any method, inside and
out; High scaler (including drilling of same); Hydro seeder
and similar type; Impact wrench multi-plate; Kettle person,
pot person and workers applying asphalt, lay-kold,
Packet Page. 1212
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
of such materials for pipe wrapping and waterproofing);
Operator of pneumatic, gas, electric tools, vibrating
machine, pavement breaker, air blasting, come-alongs, and
similar mechanical tools not separately classified herein;
Pipelayer's backup person, coating, grouting, making of
joints, sealing, caulking, diapering and including rubber
gasket joints, pointing and any and all other services;
Rock slinger; Rotary scarifier or multiple head concrete
chipping scarifier; Steel headerboard and guideline setter;
Tamper, Barko, Wacker and similar type; Trenching machine,
hand-propelled
GROUP 4: Asphalt raker, lute person, ironer, asphalt dump
person, and asphalt spreader boxes (all types); Concrete
core cutter (walls, floors or ceilings), grinder or sander;
Concrete saw person, cutting walls or flat work, scoring
old or new concrete; Cribber, shorer, lagging, sheeting and
trench bracing, hand-guided lagging hammer; Head rock
slinger; Laborer, asphalt- rubber distributor boot person;
Laser beam in connection with laborers' work; Oversize
concrete vibrator operator, 70 lbs. and over; Pipelayer
performing all services in the laying and installation of
pipe from the point of receiving pipe in the ditch until
completion of operation, including any and all forms of
tubular material, whether pipe, metallic or non-metallic,
conduit and any other stationary type of tubular device
used for the conveying of any substance or element, whether
water, sewage, solid gas, air, or other product whatsoever
and without regard to the nature of material from which the
tubular material is fabricated; No-joint pipe and stripping
of same; Prefabricated manhole installer; Sandblaster
(nozzle person), water blasting, Porta Shot-Blast
GROUP 5: Blaster powder, all work of loading holes, placing
and blasting of all powder and explosives of whatever type,
regardless of method used for such loading and placing;
Driller: All power drills, excluding jackhammer, whether
core, diamond, wagon, track, multiple unit, and any and all
other types of mechanical drills without regard to the form
of motive power; Toxic waste removal
TUNNEL LABORER CLASSIFICATIONS
GROUP 1: Batch plant laborer; Changehouse person; Dump
person; Dump person (outside); Swamper (brake person and
switch person on tunnel work); Tunnel materials handling
person; Nipper; Pot tender, using mastic or other materials
(for example, but not by way of limitation, shotcrete, etc.)
GROUP 2: Chucktender, cabletender; Loading and unloading
agitator cars; Vibrator person, jack hammer, pneumatic
tools (except driller); Bull gang mucker, track person;
Packet Page. 1213
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
GROUP 3: Blaster, driller, powder person; Chemical grout jet
person; Cherry picker person; Grout gun person; Grout mixer
person; Grout pump person; Jackleg miner; Jumbo person;
Kemper and other pneumatic concrete placer operator; Miner,
tunnel (hand or machine); Nozzle person; Operating of
troweling and/or grouting machines; Powder person (primer
house); Primer person; Sandblaster; Shotcrete person; Steel
form raiser and setter; Timber person, retimber person,
wood or steel; Tunnel Concrete finisher
GROUP 4: Diamond driller; Sandblaster; Shaft and raise work
----------------------------------------------------------------
LABO0783-005 07/01/2024
Rates Fringes
Brick Tender.....................$ 41.53 22.54
----------------------------------------------------------------
LABO1184-001 07/01/2025
Rates Fringes
Laborers: (HORIZONTAL
DIRECTIONAL DRILLING)
(1) Drilling Crew Laborer...$ 47.94 20.86
(2) Vehicle Operator/Hauler.$ 48.11 20.86
(3) Horizontal Directional
Drill Operator..............$ 49.96 20.86
(4) Electronic Tracking
Locator.....................$ 51.96 20.86
Laborers: (STRIPING/SLURRY
SEAL)
GROUP 1.....................$ 49.30 23.97
GROUP 2.....................$ 50.60 23.97
GROUP 3.....................$ 52.61 23.97
GROUP 4.....................$ 54.35 23.97
LABORERS - STRIPING CLASSIFICATIONS
GROUP 1: Protective coating, pavement sealing, including
repair and filling of cracks by any method on any surface
in parking lots, game courts and playgrounds; carstops;
operation of all related machinery and equipment; equipment
repair technician
GROUP 2: Traffic surface abrasive blaster; pot tender -
removal of all traffic lines and markings by any method
(sandblasting, waterblasting, grinding, etc.) and
preparation of surface for coatings. Traffic control
person: controlling and directing traffic through both
conventional and moving lane closures; operation of all
related machinery and equipment
Packet Page. 1214
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
GROUP 3: Traffic delineating device applicator: Layout and
application of pavement markers, delineating signs, rumble
and traffic bars, adhesives, guide markers, other traffic
delineating devices including traffic control. This
category includes all traffic related surface preparation
(sandblasting, waterblasting, grinding) as part of the
application process. Traffic protective delineating system
installer: removes, relocates, installs, permanently
affixed roadside and parking delineation barricades,
fencing, cable anchor, guard rail, reference signs,
monument markers; operation of all related machinery and
equipment; power broom sweeper
GROUP 4: Striper: layout and application of traffic stripes
and markings; hot thermo plastic; tape traffic stripes and
markings, including traffic control; operation of all
related machinery and equipment
----------------------------------------------------------------
LABO1414-003 08/06/2025
Rates Fringes
LABORER
PLASTER CLEAN-UP LABORER....$ 46.17 25.97
PLASTER TENDER..............$ 48.72 25.97
Work on a swing stage scaffold: $1.00 per hour additional.
Work at Military Bases - $3.00 additional per hour:
Coronado Naval Amphibious Base, Fort Irwin, Marine Corps Air
Station-29 Palms, Imperial Beach Naval Air Station, Marine
Corps Logistics Supply Base, Marine Corps Pickle Meadows,
Mountain Warfare Training Center, Naval Air
Facility-Seeley, North Island Naval Air Station, Vandenberg
AFB.
----------------------------------------------------------------
PAIN0036-001 07/01/2023
Rates Fringes
Painters: (Including Lead
Abatement)
(1) Repaint (excludes San
Diego County)...............$ 29.59 17.12
(2) All Other Work..........$ 38.52 18.64
REPAINT of any previously painted structure. Exceptions:
work involving the aerospace industry, breweries,
commercial recreational facilities, hotels which operate
commercial establishments as part of hotel service, and
sports facilities.
Packet Page. 1215
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
----------------------------------------------------------------
PAIN0036-008 09/01/2024
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 49.33 26.82
----------------------------------------------------------------
PAIN0036-015 01/01/2025
Rates Fringes
GLAZIER..........................$ 53.05 30.64
FOOTNOTE: Additional $1.25 per hour for work in a condor,
from the third (3rd) floor and up Additional $1.25 per
hour for work on the outside of the building from a swing
stage or any suspended contrivance, from the ground up
----------------------------------------------------------------
PAIN1247-002 01/01/2025
Rates Fringes
SOFT FLOOR LAYER.................$ 45.15 19.43
----------------------------------------------------------------
PLAS0200-008 08/03/2022
Rates Fringes
PLASTERER........................$ 47.37 19.64
FORT IRWIN; MARINE CORPS AIR STATION 29 PALMS, AND MARINE
CORPS LOGISTICS SUPPLY BASE: $3.00 additional per hour.
----------------------------------------------------------------
PLAS0500-002 07/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 47.70 27.07
----------------------------------------------------------------
PLUM0016-002 09/01/2025
Rates Fringes
PLUMBER, PIPEFITTER,
STEAMFITTER
Work at Edwards AFB.........$ 68.73 26.81
Work at Fort Irwin Army
Base........................$ 72.23 26.81
Work at Marine Corps
Logistic Base at Nebo,
Marine Corps Logistic Base
Packet Page. 1216
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
Palms Marine Base...........$ 68.73 26.81
Work ONLY on new additions
and remodeling of bars,
restaurants, stores and
commercial buildings, not
to exceed 5,000 sq. ft. of
floor space.................$ 59.85 25.83
Work ONLY on strip malls,
light commercial, tenant
improvement and remodel
work........................$ 44.29 24.16
All other work except work
on new additions and
remodeling of bars,
restaurant, stores and
commercial buildings not
to exceed 5,000 sq. ft. of
floor space and work on
strip malls, light
commercial, tenant
improvement and remodel
work........................$ 61.73 26.81
----------------------------------------------------------------
* PLUM0345-001 09/01/2025
Rates Fringes
PLUMBER
Landscape/Irrigation Fitter.$ 44.75 26.20
Sewer & Storm Drain Work....$ 48.84 23.58
----------------------------------------------------------------
ROOF0036-002 08/01/2025
Rates Fringes
ROOFER...........................$ 52.63 20.73
FOOTNOTE: Pitch premium: Work on which employees are exposed
to pitch fumes or required to handle pitch, pitch base or
pitch impregnated products, or any material containing coal
tar pitch, the entire roofing crew shall receive $1.75 per
hour ""pitch premium"" pay.
----------------------------------------------------------------
SFCA0669-009 01/01/2025
Does not include the northern part of the City of Chino, or the
Cities of Montclair and Ontario
Rates Fringes
Packet Page. 1217
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
SFCA0709-004 09/01/2025
THE NORTHERN PART OF THE CITY OF CHINO, AND THE CITIES OF
MONTCLAIR AND ONTARIO:
Rates Fringes
SPRINKLER FITTER (Fire)..........$ 58.60 33.65
----------------------------------------------------------------
SHEE0105-003 01/01/2025
LOS ANGELES (South of a straight line drawn between Gorman and
Big Pines)and Catalina Island, INYO, KERN (Northeast part, East
of Hwy 395), MONO ORANGE, RIVERSIDE, AND SAN BERNARDINO COUNTIES
Rates Fringes
SHEET METAL WORKER
(1) Commercial - New
Construction and Remodel
work........................$ 59.31 30.43
(2) Industrial work
including air pollution
control systems, noise
abatement, hand rails,
guard rails, excluding
aritechtural sheet metal
work, excluding A-C,
heating, ventilating
systems for human comfort...$ 56.95 30.04
----------------------------------------------------------------
TEAM0011-002 07/01/2025
Rates Fringes
TRUCK DRIVER
GROUP 1....................$ 41.59 35.69
GROUP 2....................$ 41.74 35.69
GROUP 3....................$ 41.87 35.69
GROUP 4....................$ 42.06 35.69
GROUP 5....................$ 42.09 35.69
GROUP 6....................$ 42.12 35.69
GROUP 7....................$ 42.37 35.69
GROUP 8....................$ 42.62 35.69
GROUP 9....................$ 42.82 35.69
GROUP 10....................$ 43.12 35.69
GROUP 11....................$ 43.62 35.69
GROUP 12....................$ 44.05 35.69
WORK ON ALL MILITARY BASES:
Packet Page. 1218
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
El Centro Naval Facility, Fort Irwin, Marine Corps
Logistics Base at Nebo & Yermo, Mountain Warfare Training
Center, Bridgeport, Point Arguello, Point Conception,
Vandenberg AFB]
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1: Truck driver
GROUP 2: Driver of vehicle or combination of vehicles - 2
axles; Traffic control pilot car excluding moving heavy
equipment permit load; Truck mounted broom
GROUP 3: Driver of vehicle or combination of vehicles - 3
axles; Boot person; Cement mason distribution truck; Fuel
truck driver; Water truck - 2 axle; Dump truck, less than
16 yds. water level; Erosion control driver
GROUP 4: Driver of transit mix truck, under 3 yds.; Dumpcrete
truck, less than 6-1/2 yds. water level
GROUP 5: Water truck, 3 or more axles; Truck greaser and tire
person ($0.50 additional for tire person); Pipeline and
utility working truck driver, including winch truck and
plastic fusion, limited to pipeline and utility work;
Slurry truck driver
GROUP 6: Transit mix truck, 3 yds. or more; Dumpcrete truck,
6-1/2 yds. water level and over; Vehicle or combination of
vehicles - 4 or more axles; Oil spreader truck; Dump truck,
16 yds. to 25 yds. water level
GROUP 7: A Frame, Swedish crane or similar; Forklift driver;
Ross carrier driver
GROUP 8: Dump truck, 25 yds. to 49 yds. water level; Truck
repair person; Water pull - single engine; Welder
GROUP 9: Truck repair person/welder; Low bed driver, 9 axles
or over
GROUP 10: Dump truck - 50 yds. or more water level; Water
pull - single engine with attachment
GROUP 11: Water pull - twin engine; Water pull - twin engine
with attachments; Winch truck driver - $1.25 additional
when operating winch or similar special attachments
GROUP 12: Boom Truck 17K and above
Packet Page. 1219
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
----------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
Packet Page. 1220
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
?SU? wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
Packet Page. 1221
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the ?SA? identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
Packet Page. 1222
file:///C/Users/SandraLee/Downloads/DBA%20CA20250026%20Mod%2015%20Dated%2010-03-2025%20Heavy.txt[11/3/2025 3:30:42 PM]
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION"
Packet Page. 1223
HUD PACKET ATTACHMENTS – FEDERAL REQUIREMENTS
Packet Page. 1224
CONTRACTOR INFORMATION
Company Name
Address
Telephone Fax E-mail
Type of Firm: Individual ( ) Partnership ( ) Corporation ( )
Corporation organized under the laws of the State of
Contractor's License Number State Classification Expiration Date
DIR Registration Number Expiration Date
Names and titles of all officers of the firm
Please circle all categories that are applicable to the company:
Ethnicity of Company Owner or Ownership
o Asian/Pacific American
o Black American
o Hasidic Jews
o Hispanic American
o Native American
o White American
Section 3 Certified Business Concern
o Section 3 Qualified Business
Certified Business Status
o Disadvantaged Business
o Local Small Business
o Minority Owned Business
o Women Owned Business
Packet Page. 1225
List of Proposed Subcontracts
Project Name:
Awarding Public Agency:
All subcontractors, concrete ready-mix suppliers, and trucking companies to be utilized must be listed reported on this list.
Company Name and Address
Updated 2/19/2025
Packet Page. 1226
Build America, Buy America Act
Required Self-Certification
For federally assisted public works project subject to Build America, Buy America Act (BABAA),
contractors, subcontractors, manufacturers, and all other applicable suppliers must copy and paste the
Self-Certification template (provided below), sign, and submit to the project before first day of work or
before placing order of or providing covered material to the project.
Copy and Paste Below on Company Letterhead
The undersigned certifies, to the best of their knowledge and belief, that:
The Build America, Buy America Act (BABAA) requires that no federal financial assistance for
“infrastructure” projects is provided “unless all of the iron, steel, manufactured products, and construction
materials used in the project are produced in the United States.” Section 70914 of Public Law No. 117-58,
§§ 70901-52.
The undersigned certifies that for the _________________________________________________ that
the iron, steel, manufactured products, and construction materials used in this contract are in full
compliance with the BABAA requirements including:
1. All iron and steel used in the project are produced in the United States. This means all
manufacturing processes, from the initial melting stage through the application of coatings,
occurred in the United States.
2. All manufactured products purchased with FEMA financial assistance must be produced in the
United States. For a manufactured product to be considered produced in the United States, the
cost of the components of the manufactured product that are mined, produced, or manufactured
in the United States is greater than 55% of the total cost of all components of the manufactured
product, unless another standard for determining the minimum amount of domestic content of the
manufactured product has been established under applicable law or regulation.
3. All construction materials are manufactured in the United States. This means that all
manufacturing processes for the construction material occurred in the United States.
“The [Contractor or Subcontractor], _____________________________, certifies or affirms the
truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the
[Contractor or Subcontractor] understands and agrees that the provisions of 31 U.S.C. Chap. 38,
Administrative Remedies for False Claims and Statements, apply to this certification and disclosure, if
any.”
________________________
Signature of [Contractor’s or Subcontractor’s] Authorized Official
________________________
Name and Title of [Contractor’s or Subcontractor’s] Authorized Official
________________________
Date
Packet Page. 1227
form HUD-92010 (3/2006)
VA form 26-421
U.S. Department of Housing
and Urban Development
Office of Housing OMB Control No. 2502-0029
Federal Housing Commissioner (exp. 4/30/2020)
Equal Employment
Opportunity Certification
Excerpt From 41 CFR §60-1.4(b)
The applicant hereby agrees that it will incorporate or cause to be
incorporated into any contract for construction work, or modifi-
cation thereof, as defined in the regulations of the Secretary of
Labor at 41 CFR Chapter 60, which is paid for in whole or in part
with funds obtained from the Federal Government or borrowed
on the credit of the Federal Government pursuant to a grant,
contract, loan insurance, or guarantee, or undertaken pursuant to
any Federal program involving such grant, contract, loan, insur-
ance, or guarantee, the following equal opportunity clause:
During the performance of this contract, the contractor agrees as
follows:
(1) The contractor will not discriminate against any employee or
applicant for employment because of race, color, religion,
sex, or national origin. The contractor will take affirmative
action to ensure that applicants are employed, and that em-
ployees are treated during employment without regard to
their race, color, religion, sex, or national origin, such action
shall include, but not be limited to the following: Employ-
ment, upgrading, demotion, or transfer; recruitment or re-
cruitment advertising; layoff or termination; rates of pay or
other forms of compensation; and selection for training,
including apprenticeship. The contractor agrees to post in
conspicuous places, available to employees and applicants
for employment, notices to be provided setting forth the
provisions of this nondiscrimination clause.
(2) The contractor will, in all solicitations or advertisements for
employees placed by or on behalf of the contractor, state that
all qualified applicants will receive considerations for em-
ployment without regard to race, color, religion, sex, or
national origin.
(3) The contractor will send to each labor union or representative
of workers with which it has a collective bargaining agree-
ment or other contract or understanding, a notice to be
provided advising the said labor union or workers' represen-
tatives of the contractor's commitments under this section,
and shall post copies of the notice in conspicuous places
available to employees and applicants for employment.
(4) The contractor will comply with all provisions of Executive
Order 11246 of September 24, 1965, and of the rules, regu-
lations and relevant orders of the Secretary of Labor.
(5) The contractor will furnish all information and reports re-
quired by Executive Order 11246 of September 24, 1965, and
by rules, regulations, and orders of the Secretary of Labor, or
pursuant thereto, and will permit access to its books, records,
and accounts by the administering agency and the Secretary
of Labor for purposes of investigation to ascertain compli-
ance with such rules, regulations, and orders.
(6) In the event of the contractor's noncompliance with the
nondiscrimination clauses of this contract or with any of the
said rules, regulations, or orders, this contract may be can-
celed, terminated, or suspended in whole or in part and the
contractor may be declared ineligible for further Govern-
ment contracts or federally assisted construction contracts in
accordance with procedures authorized in Executive Order
11246 of September 24, 1965, and such other sanctions may
be imposed and remedies invoked as provided in Executive
Order 11246 of September 24, 1965, or by rule, regulation, or
order of the Secretary of Labor, or as otherwise provided by law.
(7) The contractor will include the portion of the sentence imme-
diately preceding paragraph (1) and the provisions of para-
graphs (1) through (7) in every subcontract or purchase order
unless exempted by rules, regulations, or orders of the Sec-
retary of Labor issued pursuant to section 204 of Executive
Order 11246 of September 24, 1965, so that such provisions
will be binding upon each subcontractor or vendor. The
contractor will take such action with respect to any subcon-
tract or purchase order as the administering agency may
direct as a means of enforcing such provisions, including
sanctions for noncompliance: Provided, however, That in
the event a contractor becomes involved in, or is threatened
with, litigation with a subcontractor or vendor as a result of
such direction by the administering agency the contractor
may request the United States to enter into such litigation to
protect the interests of the United States.
The applicant further agrees that it will be bound by the above equal
opportunity clause with respect to its own employment practices
when it participates in federally assisted construction work:
Provided, That if the applicant so participating is a State or local
government, the above equal opportunity clause is not applicable
to any agency, instrumentality or subdivision of such government
which does not participate in work on or under the contract.
The applicant agrees that it will assist and cooperate actively with
the administering agency and the Secretary of Labor in obtaining
the compliance of contractors and subcontractors with the equal
opportunity clause and the rules, regulations, and relevant orders
of the Secretary of Labor, that it will furnish the administering
agency and the Secretary of Labor such information as they may
require for the supervision of such compliance, and that it will
otherwise assist the administering agency in the discharge of the
agency's primary responsibility for securing compliance.
The applicant further agrees that it will refrain from entering into
any contract or contract modification subject to Executive Order
11246 of September 24, 1965, with a contractor debarred from, or
who has not demonstrated eligibility for, Government contracts
and Federally-assisted construction contracts pursuant to the
Executive order and will carry out such sanctions and penalties
for violation of the equal opportunity clause as may be imposed
Firm Name and Address By
Title
Department of Veterans Affairs
Packet Page. 1228
form HUD-92010 (3/06)
VA form 26-421
upon contractors and subcontractors by the administering agency
or the Secretary of Labor pursuant to Part II, Subpart D of the
Executive order. In addition, the applicant agrees that if it fails or
refuses to comply with these undertakings, the administering
agency may take any or all of the following actions: Cancel,
terminate, or suspend in whole or in part this grant (contract, loan,
insurance, guarantee); refrain from extending any further assis-
tance to the applicant under the program with respect to which the
failure or refund occurred until satisfactory assurance of future
compliance has been received from such applicant; and refer the case
to the Department of Justice for appropriate legal proceedings.
Excerpt from HUD Regulations
200.410Definition of term “applicant”.
(a) In multifamily housing transactions where controls over the
mortgagor are exercised by the Commissioner either through
the ownership of corporate stock or under the provisions of
a regulatory agreement, the term “applicant” as used in this
subpart shall mean the mortgagor.
(b) In transactions other than those specified in paragraph(a) of
this section, the term “applicant” as used in this subpart shall
mean the builder, dealer or contractor performing the con-
struction, repair or rehabilitation work for the mortgagor or
other borrower.
200.420Equal Opportunity Clause to be included in contracts and
subcontracts.
(a) The following equal opportunity clause shall be included in
each contract and subcontract which is not exempt:
During the performance of this contract, the contractor agrees
as follows:
(1) The contractor will not discriminate against any em-
ployee or applicant for employment because of race, creed,
color, or national origin. The contractor will take affirmative
action to ensured that applicants are employed, and that
employees are treated during employment without regard to
their race, creed, color, or national origin. Such action shall
include, but not be limited to the following: employment,
upgrading, demotion or transfer; recruitment or recruitment
advertising; layoff or termination; rates of pay or other forms
of compensation; and selection for training, including ap-
prenticeship. The contractor agrees to post in conspicuous
places, available to employees and applicants for employ-
ment, notices to be provided setting forth the provisions of
the nondiscrimination clause.
(2)The contractor will in all solicitations or advertisements for
employees placed by or on behalf of the contractor, state that all
qualified applicants will receive consideration for employment
without regard race, creed, color, or national origin.
(3) The contractor will send to each labor union or repre-
sentative of workers with which he has a collective bargain-
ing agreement or other contract or understanding, a notice, to
be provided, advising the said labor union or workers’ repre-
sentative of the contractor’s commitments under this section,
and shall post copies of the notices in conspicuous places
available to employees and applicants for employment.
(4) The contractor will comply with all provisions of Ex-
ecutive Order 10925 of March 6 1961, as amended, and of the
regulations, and relevant orders of the President’s Commit-
tee on Equal Employment Opportunity created thereby.
(5) The contractor will furnish all information and reports
required by Executive Order 10925 of March 6, 1961, as
amended, and by the regulations, and orders of the said
Committee , or pursuant thereto, and will permit access to his
books, records, and accounts by HUD and the Committee for
purposes of investigation to ascertain compliance with such
regulations, and orders.
(6) In the event of the contractor’s non-compliance with
the nondiscrimination clause of this contract or with any of
the said regulations, or orders, this contract may be can-
celled, terminated or suspended in whole or in part and the
contractor may be declared ineligible for further Govern-
ment contracts or Federally-assisted construction contracts
in accordance with procedures authorized in Executive Order
10925 of March 6, 1961, as amende, and such other sanctions
may be imposed and remedies invoke s provided in the said
Executive Order or by regulations, or order of the President’s
Committee on Equal Employment Opportunity, or as other-
wise provided by law.
(7) The contractor will include the provisions of Para-
graphs(1) through (7) in every subcontract or purchase order
unless exempted by regulations, or orders of the President’s
Committee on Equal Employment Opportunity issued pursu-
ant to Section 303 of Executive Order 10925 of March 6,
1961, as amended, so that such provisions will be binding
upon each subcontractor or vender. The contractor will take
such action with respect to any subcontract or purchase
orders as HUD may direct as a means of enforcing such
provisions, including sanctions for noncompliance: Provided,
however, that in the event the contractor becomes involved
in, or is threatened with, litigation with a subcontractor or
vender as a result of such direction by HUD, the contractor
may request the United States to enter into such litigation to
protect the interests of the United States.
(b) Except in subcontracts for the performance of construction
work at the site of construction, the clause is not required to
be inserted in subcontracts below the second tier. Subcontracts
may incorporate by referenced to the equal opportunity clause.
200.425Modification in and exemptions from the regulations in
this subpart.
(a) The following transactions and contracts are exempt from the
regulations in this subpart:
(1) Loans, mortgages, contracts and subcontracts not ex-
ceeding $10,000.
(2) Contract and subcontracts not exceeding $100,000 for
standard commercial supplies or raw material;
(3)Contracts and subcontracts under which work is to be or has
been performed outside the United States and where no recruit-
ment of workers within the United States in involved. To the
extent that work pursuant to such contracts is done within the
Untied States, the equal opportunity clause shall be applicable;
(4) Contracts for the sale of Government property where
no appreciable amount of work is involved; and
(5) Contracts and subcontracts for an indefinite quantity
which are not to extend for ore than one year if the purchaser
determines that the amounts to be ordered under any such
contract or subcontract are not reasonably expected to exceed
$100,000 in the case of contracts or subcontracts for standard
commercial supplies and raw materials, or $10,000 in the
case of all other contracts and subcontracts.
Packet Page. 1229
Previous editions obsolete Form HUD-4010, (10/2023)
ref. Handbook 1344.1
1
HUD-4010 U.S. Department of Housing and Urban Development
Federal Labor Standards Provisions Office of Davis-Bacon and Labor Standards
A. APPLICABILITY
The Project or Program to which the construction work covered by this Contract pertains is being
assisted by the United States of America, and the following Federal Labor Standards Provisions are
included in this Contract pursuant to the provisions applicable to such Federal assistance.
1. Minimum wages and fringe benefits
i. All laborers and mechanics employed or working upon the site of the work (or otherwise working in
construction or development of the project under a development statute), will be paid
unconditionally and not less often than once a week, and without subsequent deduction or rebate
on any account (except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of basic hourly wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at
rates not less than those contained in the wage determination of the Secretary of Labor which is
attached hereto and made a part hereof, regardless of any contractual relationship which may be
alleged to exist between the contractor and such laborers and mechanics. As provided in 29 CFR
5.5(d) and (e), the appropriate wage determinations are effective by operation of law even if they
have not been attached to the contract. Contributions made or costs reasonably anticipated for bona
fide fringe benefits under the Davis-Bacon Act (40 U.S.C. 3141(2)(B)) on behalf of laborers or
mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of
paragraph (a)(1)(v) of these contract clauses; also, regular contributions made or costs incurred for
more than a weekly period (but not less often than quarterly) under plans, funds, or programs which
cover the particular weekly period, are deemed to be constructively made or incurred during such
weekly period. Such laborers and mechanics must be paid the appropriate wage rate and fringe
benefits on the wage determination for the classification(s) of work actually performed, without
regard to skill, except as provided in 29 CFR 5.5(a)(4). Laborers or mechanics performing work in
more than one classification may be compensated at the rate specified for each classification for the
time actually worked therein: Provided, That the employer’s payroll records accurately set forth the
time spent in each classification in which work is performed. The wage determination (including any
additional classifications and wage rates conformed under 29 CFR 5.5(a)(1)(iii)) and the Davis-Bacon
poster (WH-1321) must be posted at all times by the contractor and its subcontractors at the site of
the work in a prominent and accessible place where it can be easily seen by the workers.
ii. Frequently recurring classifications
A. In addition to wage and fringe benefit rates that have been determined to be prevailing under
the procedures set forth in 29 CFR part 1, a wage determination may contain, pursuant to § 1.3(f),
wage and fringe benefit rates for classifications of laborers and mechanics for which conformance
requests are regularly submitted pursuant to 29 CFR 5.5(a)(1)(iii), provided that:
1. The work performed by the classification is not performed by a classification in the wage
determination for which a prevailing wage rate has been determined;
2. The classification is used in the area by the construction industry; and
3. The wage rate for the classification bears a reasonable relationship to the prevailing wage rates
contained in the wage determination.
B. The Administrator will establish wage rates for such classifications in accordance with 29 CFR
5.5(a)(1)(iii)(A)(3). Work performed in such a classification must be paid at no less than the wage
and fringe benefit rate listed on the wage determination for such classification.
iii. Conformance
A. The contracting officer must require that any class of laborers or mechanics, including helpers,
which is not listed in the wage determination and which is to be employed under the contract be
Packet Page. 1230
Previous editions obsolete Form HUD-4010, (10/2023)
ref. Handbook 1344.1
2
classified in conformance with the wage determination. Conformance of an additional classification
and wage rate and fringe benefits is appropriate only when the following criteria have been met:
1. The work to be performed by the classification requested is not performed by a classification in
the wage determination; and
2. The classification is used in the area by the construction industry; and
3. The proposed wage rate, including any bona fide fringe benefits, bears a reasonable
relationship to the wage rates contained in the wage determination.
B. The conformance process may not be used to split, subdivide, or otherwise avoid application of
classifications listed in the wage determination.
C. If the contractor and the laborers and mechanics to be employed in the classification (if known),
or their representatives, and the contracting officer agree on the classification and wage rate
(including the amount designated for fringe benefits where appropriate), a report of the action
taken will be sent by the contracting officer by email to DBAconformance@dol.gov. The
Administrator, or an authorized representative, will approve, modify, or disapprove every
additional classification action within 30 days of receipt and so advise the contracting officer or
will notify the contracting officer within the 30–day period that additional time is necessary.
D. In the event the contractor, the laborers or mechanics to be employed in the classification or
their representatives, and the contracting officer do not agree on the proposed classification
and wage rate (including the amount designated for fringe benefits, where appropriate), the
contracting officer will, by email to DBAconformance@dol.gov, refer the questions, including
the views of all interested parties and the recommendation of the contracting officer, to the
Administrator for determination. The Administrator, or an authorized representative, will issue
a determination within 30 days of receipt and so advise the contracting officer or will notify
the contracting officer within the 30–day period that additional time is necessary.
E. The contracting officer must promptly notify the contractor of the action taken by the Wage
and Hour Division under 29 CFR 5.5 (a)(1)(iii)(C) and (D). The contractor must furnish a written
copy of such determination to each affected worker or it must be posted as a part of the wage
determination. The wage rate (including fringe benefits where appropriate) determined
pursuant to 29 CFR 5.5 (a)(1)(iii)(C) or (D) must be paid to all workers performing work in the
classification under this contract from the first day on which work is performed in the
classification.
iv. Fringe benefits not expressed as an hourly rate
Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics
includes a fringe benefit which is not expressed as an hourly rate, the contractor may either pay the
benefit as stated in the wage determination or may pay another bona fide fringe benefit or an hourly
cash equivalent thereof.
v. Unfunded plans
If the contractor does not make payments to a trustee or other third person, the contractor may
consider as part of the wages of any laborer or mechanic the amount of any costs reasonably
anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the
Secretary of Labor has found, upon the written request of the contractor, in accordance with the
criteria set forth in 29 CFR 5.28, that the applicable standards of the Davis-Bacon Act have been met.
The Secretary of Labor may require the contractor to set aside in a separate account assets for the
meeting of obligations under the plan or program.
vi. Interest In the event of a failure to pay all or part of the wages required by the contract, the
contractor will be required to pay interest on any underpayment of wages.
Packet Page. 1231
Previous editions obsolete Form HUD-4010, (10/2023)
ref. Handbook 1344.1
3
2. Withholding
i. Withholding requirements
The U. S. Department of Housing and Urban Development may, upon its own action, or must, upon
written request of an authorized representative of the Department of Labor, withhold or cause to be
withheld from the contractor so much of the accrued payments or advances as may be considered
necessary to satisfy the liabilities of the prime contractor or any subcontractor for the full amount
of wages and monetary relief, including interest, required by the clauses set forth in 29 CFR 5.5(a)
for violations of this contract, or to satisfy any such liabilities required by any other Federal
contract, or federally assisted contract subject to Davis-Bacon labor standards, that is held by the
same prime contractor (as defined in 29 CFR 5.2). The necessary funds may be withheld from the
contractor under this contract, any other Federal contract with the same prime contractor, or any
other federally assisted contract that is subject to Davis-Bacon labor standards requirements and is
held by the same prime contractor, regardless of whether the other contract was awarded or
assisted by the same agency, and such funds may be used to satisfy the contractor liability for which
the funds were withheld. In the event of a contractor’s failure to pay any laborer or mechanic,
including any apprentice or helper working on the site of the work (or otherwise working in
construction or development of the project under a development statute) all or part of the wages
required by the contract, or upon the contractor’s failure to submit the required records as
discussed in 29 CFR 5.5(a)(3)(iv), HUD may on its own initiative and after written notice to the
contractor, sponsor, applicant, owner, or other entity, as the case may be, take such action as may
be necessary to cause the suspension of any further payment, advance, or guarantee of funds until
such violations have ceased.
ii. Priority to withheld funds
The Department has priority to funds withheld or to be withheld in accordance with 29 CFR
5.5(a)(2)(i) or (b)(3)(i), or both, over claims to those funds by:
A. A contractor’s surety(ies), including without limitation performance bond sureties and
payment bond sureties;
B. A contracting agency for its reprocurement costs;
C. A trustee(s) (either a court-appointed trustee or a U.S. trustee, or both) in bankruptcy of a
contractor, or a contractor’s bankruptcy estate;
D. A contractor’s assignee(s);
E. A contractor’s successor(s); or
F. A claim asserted under the Prompt Payment Act, 31 U.S.C. 3901-3907.
3. Records and certified payrolls
i. Basic record requirements
A. Length of record retention. All regular payrolls and other basic records must be maintained by
the contractor and any subcontractor during the course of the work and preserved for all
laborers and mechanics working at the site of the work (or otherwise working in construction
or development of the project under a development statute) for a period of at least 3 years
after all the work on the prime contract is completed.
B. Information required Such records must contain the name; Social Security number; last known
address, telephone number, and email address of each such worker; each worker’s correct
classification(s) of work actually performed; hourly rates of wages paid (including rates of
contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of
the types described in 40 U.S.C. 3141(2)(B) of the Davis-Bacon Act); daily and weekly number of
hours actually worked in total and on each covered contract; deductions made; and actual
wages paid.
C. Additional records relating to fringe benefits. Whenever the Secretary of Labor has found
under 29 CFR 5.5(a)(1)(v) that the wages of any laborer or mechanic include the amount of any
Packet Page. 1232
Previous editions obsolete Form HUD-4010, (10/2023)
ref. Handbook 1344.1
4
costs reasonably anticipated in providing benefits under a plan or program described in 40
U.S.C. 3141(2)(B) of the Davis-Bacon Act, the contractor must maintain records which show that
the commitment to provide such benefits is enforceable, that the plan or program is financially
responsible, and that the plan or program has been communicated in writing to the laborers or
mechanics affected, and records which show the costs anticipated or the actual cost incurred
in providing such benefits.
D. Additional records relating to apprenticeship Contractors with apprentices working under
approved programs must maintain written evidence of the registration of apprenticeship
programs, the registration of the apprentices, and the ratios and wage rates prescribed in the
applicable programs.
ii. Certified payroll requirements
A. Frequency and method of submission The contractor or subcontractor must submit weekly,
for each week in which any DBA- or Related Acts-covered work is performed, certified
payrolls to HUD if the agency is a party to the contract, but if the agency is not such a party,
the contractor will submit the certified payrolls to the applicant, sponsor, owner, or other
entity, as the case may be, that maintains such records, for transmission to HUD. The prime
contractor is responsible for the submission of all certified payrolls by all subcontractors. A
contracting agency or prime contractor may permit or require contractors to submit certified
payrolls through an electronic system, as long as the electronic system requires a legally valid
electronic signature; the system allows the contractor, the contracting agency, and the
Department of Labor to access the certified payrolls upon request for at least 3 years after
the work on the prime contract has been completed; and the contracting agency or prime
contractor permits other methods of submission in situations where the contractor is unable
or limited in its ability to use or access the electronic system
B. Information required The certified payrolls submitted must set out accurately and completely
all of the information required to be maintained under 29 CFR 5.5(a)(3)(i)(B), except that full
Social Security numbers and last known addresses, telephone numbers, and email addresses
must not be included on weekly transmittals. Instead, the certified payrolls need only include
an individually identifying number for each worker (e.g., the last four digits of the worker’s
Social Security number). The required weekly certified payroll information may be submitted
using Optional Form WH-347 or in any other format desired. Optional Form WH-347 is
available for this purpose from the Wage and Hour Division Web site at https://www.dol.gov/
sites/dolgov/files/WHD/legacy/files/wh347.pdf or its successor website. It is not a violation of
this section for a prime contractor to require a subcontractor to provide full Social Security
numbers and last known addresses, telephone numbers, and email addresses to the prime
contractor for its own records, without weekly submission by the subcontractor to the
sponsoring government agency (or the applicant, sponsor, owner, or other entity, as the case
may be, that maintains such records).
C. Statement of Compliance Each certified payroll submitted must be accompanied by a
“Statement of Compliance,” signed by the contractor or subcontractor, or the contractor’s or
subcontractor’s agent who pays or supervises the payment of the persons working on the
contract, and must certify the following:
1. That the certified payroll for the payroll period contains the information required to be
provided under 29 CFR 5.5(a)(3)(ii), the appropriate information and basic records are being
maintained under 29 CFR 5.5 (a)(3)(i), and such information and records are correct and
complete;
2. That each laborer or mechanic (including each helper and apprentice) working on the contract
during the payroll period has been paid the full weekly wages earned, without rebate, either
directly or indirectly, and that no deductions have been made either directly or indirectly
Packet Page. 1233
Previous editions obsolete Form HUD-4010, (10/2023)
ref. Handbook 1344.1
5
from the full wages earned, other than permissible deductions as set forth in 29 CFR part 3;
and
3. That each laborer or mechanic has been paid not less than the applicable wage rates and
fringe benefits or cash equivalents for the classification(s) of work actually performed, as
specified in the applicable wage determination incorporated into the contract.
D. Use of Optional Form WH-347 The weekly submission of a properly executed certification
set forth on the reverse side of Optional Form WH-347 will satisfy the requirement for
submission of the “Statement of Compliance” required by 29 CFR 5.5(a)(3)(ii)(C).
E. Signature The signature by the contractor, subcontractor, or the contractor’s or
subcontractor’s agent must be an original handwritten signature or a legally valid electronic
signature.
F. Falsification The falsification of any of the above certifications may subject the contractor
or subcontractor to civil or criminal prosecution under 18 U.S.C. 1001 and 31 U.S.C. 3729.
G. Length of certified payroll retention The contractor or subcontractor must preserve all
certified payrolls during the course of the work and for a period of 3 years after all the work
on the prime contract is completed.
iii. Contracts, subcontracts, and related documents The contractor or subcontractor must maintain this
contract or subcontract and related documents including, without limitation, bids, proposals,
amendments, modifications, and extensions. The contractor or subcontractor must preserve these
contracts, subcontracts, and related documents during the course of the work and for a period of 3
years after all the work on the prime contract is completed.
iv Required disclosures and access
A. Required record disclosures and access to workers The contractor or subcontractor must
make the records required under 29 CFR 5.5(a)(3)(i)–(iii), and any other documents that
HUD or the Department of Labor deems necessary to determine compliance with the labor
standards provisions of any of the applicable statutes referenced by 29 CFR 5.1, available
for inspection, copying, or transcription by authorized representatives of HUD or the
Department of Labor, and must permit such representatives to interview workers during
working hours on the job.
B. Sanctions for non-compliance with records and worker access requirements If the
contractor or subcontractor fails to submit the required records or to make them available,
or refuses to permit worker interviews during working hours on the job, the Federal agency
may, after written notice to the contractor, sponsor, applicant, owner, or other entity, as the
case may be, that maintains such records or that employs such workers, take such action as
may be necessary to cause the suspension of any further payment, advance, or guarantee of
funds. Furthermore, failure to submit the required records upon request or to make such
records available, or to permit worker interviews during working hours on the job, may be
grounds for debarment action pursuant to 29 CFR 5.12. In addition, any contractor or other
person that fails to submit the required records or make those records available to WHD
within the time WHD requests that the records be produced will be precluded from
introducing as evidence in an administrative proceeding under 29 CFR part 6 any of the
required records that were not provided or made available to WHD. WHD will take into
consideration a reasonable request from the contractor or person for an extension of the
time for submission of records. WHD will determine the reasonableness of the request and
may consider, among other things, the location of the records and the volume of
production.
C. Required information disclosures Contractors and subcontractors must maintain the full
Social Security number and last known address, telephone number, and email address of
each covered worker, and must provide them upon request to HUD if the agency is a party to
Packet Page. 1234
Previous editions obsolete Form HUD-4010, (10/2023)
ref. Handbook 1344.1
6
the contract, or to the Wage and Hour Division of the Department of Labor. If the Federal
agency is not such a party to the contract, the contractor, subcontractor, or both, must,
upon request, provide the full Social Security number and last known address, telephone
number, and email address of each covered worker to the applicant, sponsor, owner, or
other entity, as the case may be, that maintains such records, for transmission to HUD, the
contractor, or the Wage and Hour Division of the Department of Labor for purposes of an
investigation or other compliance action.
4. Apprentices and equal employment opportunity
i. Apprentices
A. Rate of pay Apprentices will be permitted to work at less than the predetermined rate for
the work they perform when they are employed pursuant to and individually registered in a
bona fide apprenticeship program registered with the U.S. Department of Labor,
Employment and Training Administration, Office of Apprenticeship (OA), or with a State
Apprenticeship Agency recognized by the OA. A person who is not individually registered in
the program, but who has been certified by the OA or a State Apprenticeship Agency
(where appropriate) to be eligible for probationary employment as an apprentice, will be
permitted to work at less than the predetermined rate for the work they perform in the
first 90 days of probationary employment as an apprentice in such a program. In the event
the OA or a State Apprenticeship Agency recognized by the OA withdraws approval of an
apprenticeship program, the contractor will no longer be permitted to use apprentices at
less than the applicable predetermined rate for the work performed until an acceptable
program is approved.
B. Fringe benefits Apprentices must be paid fringe benefits in accordance with the provisions
of the apprenticeship program. If the apprenticeship program does not specify fringe
benefits, apprentices must be paid the full amount of fringe benefits listed on the wage
determination for the applicable classification. If the Administrator determines that a
different practice prevails for the applicable apprentice classification, fringe benefits must
be paid in accordance with that determination.
C. Apprenticeship ratio The allowable ratio of apprentices to journeyworkers on the job site in
any craft classification must not be greater than the ratio permitted to the contractor as to
the entire work force under the registered program or the ratio applicable to the locality of
the project pursuant to 29 CFR 5.5(a)(4)(i)(D). Any worker listed on a payroll at an
apprentice wage rate, who is not registered or otherwise employed as stated in 29 CFR
5.5(a)(4)(i)(A), must be paid not less than the applicable wage rate on the wage
determination for the classification of work actually performed. In addition, any apprentice
performing work on the job site in excess of the ratio permitted under this section must be
paid not less than the applicable wage rate on the wage determination for the work actually
performed.
D. Reciprocity of ratios and wage rates Where a contractor is performing construction on a
project in a locality other than the locality in which its program is registered, the ratios and
wage rates (expressed in percentages of the journeyworker’s hourly rate) applicable within the
locality in which the construction is being performed must be observed. If there is no
applicable ratio or wage rate for the locality of the project, the ratio and wage rate specified
in the contractor’s registered program must be observed.
ii Equal employment opportunity The use of apprentices and journeyworkers under this part must
be in conformity with the equal employment opportunity requirements of Executive Order 11246,
as amended, and 29 CFR part 30.
5 Compliance with Copeland Act requirements. The contractor shall comply with the requirements of 29
CFR part 3, which are incorporated by reference in this contract.
Packet Page. 1235
Previous editions obsolete Form HUD-4010, (10/2023)
ref. Handbook 1344.1
7
6 Subcontracts. The contractor or subcontractor must insert in any subcontracts the clauses contained in
29 CFR 5.5(a)(1) through (11), along with the applicable wage determination(s) and such other clauses
or contract modifications as the U.S. Department of Housing and
Urban Development may by appropriate instructions require, and a clause requiring the subcontractors
to include these clauses and wage determination(s) in any lower tier subcontracts. The prime
contractor is responsible for the compliance by any subcontractor or lower tier subcontractor with all
the contract clauses in this section. In the event of any violations of these clauses, the prime contractor
and any subcontractor(s) responsible will be liable for any unpaid wages and monetary relief, including
interest from the date of the underpayment or loss, due to any workers of lower-tier subcontractors,
and may be subject to debarment, as appropriate.
7 Contract termination: debarment. A breach of the contract clauses in 29 CFR 5.5 may be grounds for
termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29
CFR 5.12.
8 Compliance with Davis-Bacon and Related Act requirements. All rulings and interpretations of the
Davis-Bacon and Related Acts contained in 29 CFR parts 1, 3, and 5 are herein incorporated by
reference in this contract.
9 Disputes concerning labor standards. Disputes arising out of the labor standards provisions of this
contract shall not be subject to the general disputes clause of this contract. Such disputes shall be
resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR parts 5, 6,
and 7. Disputes within the meaning of this clause include disputes between the contractor (or any of its
subcontractors) and the contracting agency, the U.S. Department of Labor, or the employees or their
representatives.
10. Certification of eligibility.
i. By entering into this contract, the contractor certifies that neither it nor any person or firm who
has an interest in the contractor’s firm is a person or firm ineligible to be awarded Government
contracts by virtue of 40 U.S.C. 3144(b) or 29 CFR 5.12(a).
ii. No part of this contract shall be subcontracted to any person or firm ineligible for award of a
Government contract by virtue of 40 U.S.C. 3144(b) or 29 CFR 5.12(a).
iii. The penalty for making false statements is prescribed in the U.S. Code, Title 18 Crimes and
Criminal Procedure, 18 U.S.C. 1001.
11 Anti-retaliation It is unlawful for any person to discharge, demote, intimidate, threaten, restrain,
coerce, blacklist, harass, or in any other manner discriminate against, or to cause any person to
discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner
discriminate against, any worker or job applicant for:
i. Notifying any contractor of any conduct which the worker reasonably believes constitutes a
violation of the DBA, Related Acts, or 29 CFR parts 1, 3, or 5;
ii. Filing any complaint, initiating or causing to be initiated any proceeding, or otherwise asserting or
seeking to assert on behalf of themselves or others any right or protection under the DBA,
Related Acts, or 29 CFR parts 1, 3, or 5;
iii. Cooperating in any investigation or other compliance action, or testifying in any proceeding under
the DBA, Related Acts, or 29 CFR parts 1, 3, or 5; or
iv. Informing any other person about their rights under the DBA, Related Acts, or 29 CFR parts 1, 3,
or 5.
B. Contract Work Hours and Safety Standards Act (CWHSSA)
The Agency Head must cause or require the contracting officer to insert the following clauses set
forth in 29 CFR 5.5(b)(1), (2), (3), (4), and (5) in full, or (for contracts covered by the Federal
Acquisition Regulation) by reference, in any contract in an amount in excess of $100,000 and subject
to the overtime provisions of the Contract Work Hours and Safety Standards Act. These clauses must
Packet Page. 1236
Previous editions obsolete Form HUD-4010, (10/2023)
ref. Handbook 1344.1
8
be inserted in addition to the clauses required by 29 CFR 5.5(a) or 4.6. As used in this paragraph, the
terms “laborers and mechanics” include watchpersons and guards.
1. Overtime requirements. No contractor or subcontractor contracting for any part of the contract
work which may require or involve the employment of laborers or mechanics shall require or
permit any such laborer or mechanic in any workweek in which he or she is employed on such
work to work in excess of forty hours in such workweek unless such laborer or mechanic receives
compensation at a rate not less than one and one-half times the basic rate of pay for all hours
worked in excess of forty hours in such workweek.
2. Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the
clause set forth in 29 CFR 5.5(b)(1) the contractor and any subcontractor responsible therefor
shall be liable for the unpaid wages and interest from the date of the underpayment. In addition,
such contractor and subcontractor shall be liable to the United States (in the case of work done
under contract for the District of Columbia or a territory, to such District or to such territory), for
liquidated damages. Such liquidated damages shall be computed with respect to each individual
laborer or mechanic, including watchpersons and guards, employed in violation of the clause set
forth in 29 CFR 5.5(b)(1), in the sum of $31 for each calendar day on which such individual was
required or permitted to work in excess of the standard workweek of forty hours without
payment of the overtime wages required by the clause set forth in 29 CFR 5.5(b)(1).
3. Withholding for unpaid wages and liquidated damages
i. Withholding process The U.S Department of Housing and Urban Development or the recipient of
Federal assistance may, upon its own action, or must, upon written request of an authorized
representative of the Department of Labor, withhold or cause to be withheld from the contractor
so much of the accrued payments or advances as may be considered necessary to satisfy the
liabilities of the prime contractor or any subcontractor for any unpaid wages; monetary relief,
including interest; and liquidated damages required by the clauses set forth in 29 CFR 5.5(b) on
this contract, any other Federal contract with the same prime contractor, or any other federally
assisted contract subject to the Contract Work Hours and Safety Standards Act that is held by the
same prime contractor (as defined in 29 CFR 5.2). The necessary funds may be withheld from the
contractor under this contract, any other Federal contract with the same prime contractor, or any
other federally assisted contract that is subject to the Contract Work Hours and Safety Standards
Act and is held by the same prime contractor, regardless of whether the other contract was
awarded or assisted by the same agency, and such funds may be used to satisfy the contractor
liability for which the funds were withheld.
ii Priority to withheld funds The Department has priority to funds withheld or to be withheld in
accordance with 29 CFR 5.5(a)(2)(i) or (b)(3)(i), or both, over claims to those funds by:
A. A contractor’s surety(ies), including without limitation performance bond sureties and
payment bond sureties;
B. A contracting agency for its reprocurement costs;
C. A trustee(s) (either a court-appointed trustee or a U.S. trustee, or both) in bankruptcy of a
contractor, or a contractor’s bankruptcy estate;
D. A contractor’s assignee(s);
E. A contractor’s successor(s); or
F. A claim asserted under the Prompt Payment Act, 31 U.S.C. 3901-3907.
4. Subcontracts. The contractor or subcontractor must insert in any subcontracts the clauses set forth in
29 CFR 5.5(b)(1) through (5) and a clause requiring the subcontractors to include these clauses in any
lower tier subcontracts. The prime contractor is responsible for compliance by any subcontractor or
lower tier subcontractor with the clauses set forth in 29 CFR 5.5(b)(1) through (5). In the event of any
violations of these clauses, the prime contractor and any subcontractor(s) responsible will be liable for
any unpaid wages and monetary relief, including interest from the date of the underpayment or loss,
Packet Page. 1237
Previous editions obsolete Form HUD-4010, (10/2023)
ref. Handbook 1344.1
9
due to any workers of lower-tier subcontractors, and associated liquidated damages and may be subject
to debarment, as appropriate.
5 Anti-retaliation It is unlawful for any person to discharge, demote, intimidate, threaten, restrain,
coerce, blacklist, harass, or in any other manner discriminate against, or to cause any person to
discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner
discriminate against, any worker or job applicant for:
i. Notifying any contractor of any conduct which the worker reasonably believes constitutes a
violation of the Contract Work Hours and Safety Standards Act (CWHSSA) or its implementing
regulations in 29 CFR part 5;
ii. Filing any complaint, initiating or causing to be initiated any proceeding, or otherwise asserting
or seeking to assert on behalf of themselves or others any right or protection under CWHSSA or
29 CFR part 5;
iii. Cooperating in any investigation or other compliance action, or testifying in any proceeding
under CWHSSA or 29 CFR part 5; or
iv. Informing any other person about their rights under CWHSSA or 29 CFR part 5.
C. CWHSSA required records clause In addition to the clauses contained in 29 CFR 5.5(b), in any contract
subject only to the Contract Work Hours and Safety Standards Act and not to any of the other laws
referenced by 29 CFR 5.1, the Agency Head must cause or require the contracting officer to insert a
clause requiring that the contractor or subcontractor must maintain regular payrolls and other basic
records during the course of the work and must preserve them for a period of 3 years after all the work
on the prime contract is completed for all laborers and mechanics, including guards and watchpersons,
working on the contract. Such records must contain the name; last known address, telephone number,
and email address; and social security number of each such worker; each worker’s correct
classification(s) of work actually performed; hourly rates of wages paid; daily and weekly number of
hours actually worked; deductions made and actual wages paid. Further, the Agency Head must cause
or require the contracting officer to insert in any such contract a clause providing that the records to be
maintained under this paragraph must be made available by the contractor or subcontractor for
inspection, copying, or transcription by authorized representatives of the (write the name of agency)
and the Department of Labor, and the contractor or subcontractor will permit such representatives to
interview workers during working hours on the job.
D. Incorporation of contract clauses and wage determinations by reference Although agencies are
required to insert the contract clauses set forth in this section, along with appropriate wage
determinations, in full into covered contracts, and contractors and subcontractors are required to insert
them in any lower-tier subcontracts, the incorporation by reference of the required contract clauses
and appropriate wage determinations will be given the same force and effect as if they were inserted in
full text.
E. Incorporation by operation of law The contract clauses set forth in this section (or their equivalent
under the Federal Acquisition Regulation), along with the correct wage determinations, will be
considered to be a part of every prime contract required by the applicable statutes referenced by 29
CFR 5.1 to include such clauses, and will be effective by operation of law, whether or not they are
included or incorporated by reference into such contract, unless the Administrator grants a variance,
tolerance, or exemption from the application of this paragraph. Where the clauses and applicable wage
determinations are effective by operation of law under this paragraph, the prime contractor must be
compensated for any resulting increase in wages in accordance with applicable law.
Packet Page. 1238
Previous editions obsolete Form HUD-4010, (10/2023)
ref. Handbook 1344.1
10
F. HEALTH AND SAFETY
The provisions of this paragraph (F) are applicable where the amount of the prime contract exceeds
$100,000.
1. No laborer or mechanic shall be required to work in surroundings or under working conditions which are
unsanitary, hazardous, or dangerous to his or her health and safety, as determined under construction
safety and health standards promulgated by the Secretary of Labor by regulation.
2. The contractor shall comply with all regulations issued by the Secretary of Labor pursuant to 29 CFR Part
1926 and failure to comply may result in imposition of sanctions pursuant to the Contract Work Hours and
Safety Standards Act, (Public Law 91-54, 83 Stat 96), 40 U.S.C. § 3701 et seq.
3. The contractor shall include the provisions of this paragraph in every subcontract, so that such provisions
will be binding on each subcontractor. The contractor shall take such action with respect to any
subcontractor as the Secretary of Housing and Urban Development or the Secretary of Labor shall direct as
a means of enforcing such provisions.
Packet Page. 1239
Las versiones anteriores quedaron obsoletas 1 Formulario HUD-4010, (10/2023)
ref. Manual 1344.1
HUD-4010 Departamento de Vivienda y Desarrollo Urbano de EE. UU.
Disposiciones Laborales Federales Estándar Oficina de Normas Laborales y de la Ley Davis-Bacon
A. APLICABILIDAD
El proyecto o programa al cual pertenece el trabajo de construcción cubierto por este Contrato recibe
asistencia de los Estados Unidos de América, y las siguientes disposiciones laborales federales estándar
están incluidas en este Contrato conforme a las disposiciones aplicables a tal asistencia federal.
1. Salarios mínimos y beneficios complementarios
i. A todos los trabajadores y mecánicos empleados o que trabajan en el lugar de trabajo (o de otro
modo que trabajen en la construcción o desarrollo del proyecto en el alcance de una ley sobre
desarrollos), se les pagará incondicionalmente y con una frecuencia no menor a una vez a la
semana, y sin deducciones o descuentos posteriores por ningún motivo (excepto tales deducciones
de nómina según lo permitido por las reglamentaciones emitidas por el Secretario de Trabajo según
la Ley Copeland (29 CFR parte 3)), el monto total de salarios por hora básicos y beneficios
complementarios de buena fe (o sus equivalentes de efectivo) que se deben al momento del pago
computados a las tarifas no menores que aquellas contenidas en la determinación del salario del
Secretario de Trabajo que se adjunta al presente y que forma parte del mismo,
independientemente de cualquier relación contractual que pueda alegarse que existe entre el
contratista y tales trabajadores y mecánicos. Según se establece en 29 CFR 5.5(d) y (e), las
determinaciones salariales adecuadas son efectivas por imperio de la ley incluso si no se hayan
adjuntado al contrato. Las contribuciones realizadas o los costos razonablemente previstos para
beneficios complementarios de buena fe según la Ley Davis-Bacon (40 U.S.C. 3141(2)(B)) a cuenta
de los trabajadores o mecánicos se consideran salarios pagados a tales trabajadores o mecánicos,
sujeto a las disposiciones del párrafo (a)(1)(v) de estas cláusulas contractuales; además, las
contribuciones regulares realizadas o los costos incurridos por más de un período semanal (pero
con una frecuencia no menor a quincenal) en planes, fondos o programas que cubren el período
semanal en particular, se considera que se realizan de manera constructiva o que se incurren
durante tal período semanal. A dichos trabajadores y mecánicos se les debe pagar la tasa salarial
adecuada y los beneficios complementarios sobre la determinación salarial para la(s)
clasificación(es) de trabajo realmente realizadas, independientemente de la habilidad, excepto
según se estipula en 29 CFR 5.5(a)(4). Los trabajadores o mecánicos que realizan trabajos en más de
una clasificación podrán ser compensados a la tasa especificada en cada clasificación por el tiempo
trabajado en realidad en esa clasificación: Siempre que, los registros de la nómina del empleador
establezcan con precisión el tiempo dedicado a cada clasificación en la cual se realizó el trabajo. La
determinación salarial (incluyendo cualquier clasificación adicional y tasas salariales conformes a 29
CFR 5.5(a)(1)(iii)) y el póster Davis-Bacon (WH-1321) deben publicarse en todo momento por el
contratista y sus subcontratistas en el sitio de trabajo en un lugar destacado y accesible donde
pueda ser visto con facilidad por los trabajadores.
ii. Clasificaciones recurrentes con frecuencia
A. Además de las tasas salariales y beneficios complementarios que se han determinado para
prevalecer según los procedimientos establecidos en 29 CFR parte 1, una determinación salarial
puede contener, conforme a § 1.3(f), tasas salariales y beneficios complementarios para las
clasificaciones de trabajadores y mecánicos para las cuales se presentan solicitudes de conformidad
con regularidad de acuerdo con 29 CFR 5.5(a)(1)(iii), siempre que:
1. El trabajo realizado por la clasificación no se realiza por una clasificación en la
determinación salarial para la cual se haya determinado una tasa salarial prevalente;
2. La clasificación se utiliza en el área por el sector de la construcción; y
3. La tasa salarial para la clasificación mantiene una relación razonable con las tasas salariales
prevalecientes contenidas en la determinación salarial.
Packet Page. 1240
Las versiones anteriores quedaron obsoletas 2 Formulario HUD-4010, (10/2023)
ref. Manual 1344.1
B. El Administrador establecerá las tasas salariales para tales clasificaciones de conformidad con
29 CFR 5.5(a)(1)(iii)(A)(3). El trabajo realizado en tal clasificación se debe pagar a una tasa no
menor al salario y beneficios complementarios indicados en la determinación salarial para tal
clasificación.
iii. Conformidad
A. El funcionario que contrata debe exigir que cualquier clase de trabajadores o mecánicos,
incluyendo ayudantes, que no esté listada en la determinación salarial y que se va a emplear en el
contrato esté clasificado de conformidad con la determinación salarial. La conformidad de una
clasificación y tasa salarial y beneficios complementarios es adecuada solo cuando se hayan
cumplido los siguientes criterios:
1. El trabajo a realizar por la clasificación solicitada no es realizado por una clasificación en la
determinación salarial; y
2. La clasificación se utiliza en el área por el sector de la construcción; y
3. La tasa salarial propuesta, incluido cualquier beneficio complementario de buena
fe, tiene una relación razonable con la tasa salarial contenida en la determinación
salarial.
B. El proceso de conformidad no se puede utilizar para dividir, subdividir o evitar de otro modo la
aplicación de clasificaciones enumeradas en la determinación salarial.
C. Si el contratista y los trabajadores y mecánicos a ser empleados en la clasificación (si se conoce),
o sus representantes, y el funcionario que contrata están de acuerdo en la clasificación y tasa
salarial (incluyendo el monto designado para beneficios complementarios cuando
corresponda), se enviará un informe de la acción tomada por el funcionario que contrata por
correo electrónico a DBAconformance@dol.gov. El Administrador, o un representante
autorizado, aprobará, modificará o desaprobará cada acción de clasificación adicional dentro de
los 30 días de recepción y así lo informará al funcionario que contrata o notificará dentro del
período de 30 días que es necesario un tiempo adicional.
D. En caso de que el contratista, los trabajadores o mecánicos a ser empleados en la clasificación o
sus representantes, y el funcionario que contrata no estén de acuerdo con la clasificación y tasa
salarial propuestas (incluyendo el monto designado para beneficios complementarios, cuando
corresponda), el funcionario que contrata referirá, por correo electrónico a
DBAconformance@dol.gov las preguntas, incluyendo las opiniones de todas las partes
interesadas y la recomendación del funcionario que contrata, al Administrador para la
determinación. El Administrador, o un representante autorizado, emitirá una determinación
dentro del plazo de 30 días de la recepción y así lo informará al funcionario que contrata o
notificará dentro del período de 30 días que es necesario un tiempo adicional.
E. El funcionario que contrata debe notificar con prontitud al contratista de la acción tomada
por la División de Horas y Salarios conforme al 29 CFR 5.5 (a)(1)(iii)(C) y (D). El contratista debe
proporcionar una copia por escrito de tal determinación a cada trabajador afectado o debe
publicarse como parte de la determinación salarial. La tasa salarial (incluyendo los beneficios
complementarios cuando corresponda) determinada conforme al 29 CFR 5.5 (a)(1)(iii)(C) o (D)
debe pagarse a todos los trabajadores que realizan trabajos en la clasificación según el
presente contrato desde el primer día en el cual se realiza el trabajo de la clasificación.
iv. Beneficios complementarios no expresados como tarifa por hora
Cuando la tasa de salario mínimo prescripta en el contrato para una clase de trabajadores o
mecánicos incluya un beneficio complementario que no está expresado como tarifa por hora, el
contratista podrá pagar el beneficio según lo establecido en la determinación salarial o bien podrá
pagar otro beneficio complementario de buena fe o un equivalente de efectivo por hora del mismo.
v. Planes sin financiación
Si el contratista no realiza pagos a un fiduciario u otro tercero, el contratista podrá considerar como
Packet Page. 1241
Las versiones anteriores quedaron obsoletas 3 Formulario HUD-4010, (10/2023)
ref. Manual 1344.1
parte de los salarios de cualquier trabajador o mecánico el monto de cualquier costo previsto
razonablemente para proporcionar beneficios complementarios de buena fe en virtud de un plan o
programa, siempre que, el Secretario de Trabajo haya determinado, por solicitud por escrito del
contratista, conforme a los criterios establecidos en 29 CFR 5.28, que las normas de la ley Davis-Bacon
aplicables se han cumplido. El Secretario de Trabajo podrá exigir al contratista que aparte en una
cuenta separada activos para cumplir con las obligaciones en virtud del plan o programa.
vi. Interés En caso de un incumplimiento de pago de todo o parte de los salarios requeridos
por el contrato, el contratista deberá pagar intereses sobre cualquier pago incompleto de
salarios.
2. Retención
i. Requisitos de retención
El Departamento de Vivienda y Desarrollo Urbano de EE. UU. podrá, por iniciativa propia, o deberá, por
petición escrita de un representante autorizado del Departamento de Trabajo, retener o hacer que se
retengan del contratista tal importe de los pagos o adelantos devengados según se considere
necesario para satisfacer las obligaciones del contratista principal o cualquier subcontratista por el
monto total de salarios y reparación monetaria, incluyendo intereses, exigidos por las cláusulas
establecidas en 29 CFR 5.5(a) por las violaciones de este contrato, o para satisfacer cualquiera de
tales obligaciones exigidas por cualquier otro contrato federal, o contrato con asistencia federal
sujeto a las normas laborales Davis-Bacon, que tenga el mismo contratista principal (según lo
definido en 29 CFR 5.2). Los fondos necesarios pueden ser retenidos al contratista en virtud de este
contrato, de cualquier otro contrato federal con el mismo contratista principal, o de cualquier otro
contrato con asistencia federal que esté sujeto a los requisitos de las normas laborales Davis-Bacon
y que tenga el mismo contratista principal, independientemente de si el otro contrato se otorgó o
tuvo asistencia de la misma agencia, y tales fondos podrán utilizarse para satisfacer la
responsabilidad del contratista para la cual se retuvieron los fondos. En caso de la falta de pago de
un contratista a un trabajador o mecánico, incluyendo cualquier aprendiz o ayudante que trabaje
en el sitio de la obra (o de lo contrario que trabaje en construcción o desarrollo del proyecto según
una ley sobre desarrollos) el total o una parte de los salarios requeridos por el contrato, o cuando el
contratista no presente los registros obligatorios según se menciona en 29 CFR 5.5(a)(3)(iv), HUD
podrá por iniciativa propia y después de enviar un aviso por escrito al contratista, patrocinador,
solicitante, propietario u otra entidad, según sea el caso, tomar tales medidas que puedan ser
necesarias para ocasionar la suspensión de cualquier pago, adelanto o garantía de fondos posterior
hasta que tales violaciones hayan cesado.
ii. Prioridad sobre los fondos retenidos
El Departamento tiene prioridad sobre los fondos retenidos o a retener de conformidad con 29 CFR
5.5(a)(2)(i) o (b)(3)(i), o ambos, sobre las reclamaciones de aquellos fondos realizadas por:
A. Las garantías de un contratista, incluyendo entre otros las garantías de cumplimiento de
obligaciones contractuales y las garantías de pago;
B. Una agencia contratante por sus costos de reaprovisionamiento;
C. Uno o más síndicos (ya sea un síndico designado por el tribunal o un síndico designado por
el Fiscal General de EE. UU., o ambos) en la quiebra de un contratista, o la masa de la
quiebra de un contratista;
D. El/los cesionario(s) de un contratista;
E. El/los sucesor(es) de un contratista; o
F. Una reclamación efectuada conforme a la Ley de Pronto Pago, 31 U.S.C. 3901-3907.
3. Registros y nóminas certificadas
i. Requisitos de registros básicos
A. Duración de la retención de registros. Todos los registros de nómina regulares y otros
registros básicos deben mantenerse por el contratista y cualquier subcontratista durante el
Packet Page. 1242
Las versiones anteriores quedaron obsoletas 4 Formulario HUD-4010, (10/2023)
ref. Manual 1344.1
transcurso de la obra y deben ser conservados para todos los trabajadores y mecánicos que
trabajan en el sitio de la obra (o de otro modo que trabajen en la construcción o desarrollo del
proyecto en el alcance de una ley sobre desarrollos) por un período de al menos 3 años
después de completados todos los trabajos del contrato principal.
B. Información requerida Tales registros deben contener el nombre; número de Seguro Social;
última dirección conocida, número de teléfono y dirección de correo electrónico de cada uno de tales
trabajadores; la correcta clasificación laboral de cada trabajador para el trabajo realizado; tasas
por hora de salarios pagados (incluyendo tasas de contribuciones o costos previstos para
beneficios complementarios de buena fe o equivalentes de efectivo de los mismos para los
tipos que se describen en 40 U.S.C. 3141(2)(B) de la Ley Davis-Bacon); número de horas diarias y
semanales realmente trabajadas en total y en cada contrato cubierto; deducciones realizadas y
salarios reales pagados.
C. Registros adicionales relacionados con los beneficios complementarios. Cuando el
Secretario de Trabajo haya determinado conforme a 29 CFR 5.5(a)(1)(v) que los salarios de
cualquier trabajador o mecánico incluyen el monto de cualquier costo razonablemente
previsto para proporcionar los beneficios en virtud de un plan o programa descripto en 40
U.S.C. 3141(2)(B) de la Ley Davis-Bacon, el contratista debe mantener registros que demuestran
que el compromiso para proporcionar tales beneficios es exigible, que el plan o programa es
financieramente responsable, y que el plan o programa se ha comunicado por escrito a los
trabajadores o mecánicos afectados, y los registros que muestran los costos previstos o el
costo real incurrido para proporcionar tales beneficios.
D. Registros adicionales relacionados con los aprendices Los contratistas con aprendices que
trabajen bajo programas aprobados deben mantener evidencia por escrito del registro de los
programas para aprendices, el registro de los aprendices y la proporción y tasas salariales
prescritas en los programas aplicables.
ii. Requisitos de nómina certificada
A. Frecuencia y método de presentación El contratista o subcontratista podrá presentar
semanalmente, para cada semana en la cual se realice cualquier trabajo dentro del alcance
de la ley DBA o leyes relacionadas, las nóminas certificadas ante HUD si la agencia es una
parte del contrato, pero si la agencia no es parte, el contratista presentará las nóminas
certificadas al solicitante, patrocinador, propietario u otra entidad, según sea el caso, que
mantenga tales registros, para su transmisión a HUD. El contratista principal es responsable
de la presentación de todas las nóminas certificadas para todos los subcontratistas. Una
agencia contratista o contratista principal podrá permitir o exigir a los contratistas que
presenten nóminas certificadas mediante un sistema electrónico, siempre que el sistema
electrónico requiera una firma electrónica legalmente válida; el sistema permita al
contratista, la agencia contratante y al Departamento de Trabajo acceder a las nóminas
certificadas por petición durante al menos 3 años después de completado el trabajo del
contrato principal; y la agencia contratante o contratista principal permita otros métodos de
envío en situaciones donde el contratista no pueda o su capacidad sea limitada para usar o
acceder al sistema electrónico.
B. Información requerida Las nóminas certificadas presentadas deben establecer con precisión y
en forma completa toda la información que se requiere mantener según 29 CFR
5.5(a)(3)(i)(B), excepto que los números completos del Seguro Social y la última dirección
conocida, números de teléfono y dirección de correo electrónico no deben incluirse en las
transmisiones semanales. En cambio, las nóminas certificadas solo deben incluir un número
de identificación individual para cada trabajador (p. ej., los últimos cuatro dígitos del número
de Seguro Social del trabajador). La información semanal de la nómina certificada requerida
debe enviarse utilizando el formulario opcional WH-347 o en cualquier otro formato deseado.
Packet Page. 1243
Las versiones anteriores quedaron obsoletas 5 Formulario HUD-4010, (10/2023)
ref. Manual 1344.1
El formulario opcional WH-347 está disponible para este fin en el sitio de la División de Horas
y Salarios en https://www.dol.gov/ sites/dolgov/files/WHD/legacy/files/wh347.pdf o el sitio
web que lo reemplace. No es una infracción de esta sección para un contratista principal exigir a
un subcontratista que proporcione los números completos del Seguro Social y la última
dirección conocida, número de teléfono y dirección de correo electrónico al contratista
principal para sus propios registros, sin la presentación semanal por parte del subcontratista
a la agencia de gobierno patrocinante (o al solicitante, patrocinador, propietario u otra
entidad, según corresponda, que mantenga tales registros).
C. Declaración de cumplimiento Cada nómina certificada presentada debe estar acompañada
por una “Declaración de cumplimiento”, firmada por el contratista o subcontratista, o el
agente del contratista o subcontratista que paga o supervisa el pago de las personas que
trabajan en el contrato, y debe certificar lo siguiente:
1. Que la nómina certificada para el período de nómina contiene la información requerida
para ser proporcionada en virtud de 29 CFR 5.5(a)(3)(ii), la información adecuada y los
registros básicos se mantienen conforme a 29 CFR 5.5 (a)(3)(i), y tal información y registros
son correctos y completos;
2. Que a cada trabajador o mecánico (incluyendo cada ayudante y aprendiz) que trabaja en
el contrato durante el período de nómina se le ha pagado por completo el salario semanal que
ganó, sin descuentos, ya sea en forma directa o indirecta, y que no se han realizado
deducciones ya sea en forma directa o indirecta a los salarios ganados completos, excepto
las deducciones permitidas establecidas en 29 CFR parte 3; y
3. Que a cada trabajador o mecánico se le haya pagado no menos de las tasas salariales
aplicables y beneficios complementarios o equivalentes de efectivo para las clasificaciones
del trabajo realmente realizado, según lo especificado en la determinación salarial aplicable
incorporada al contrato.
D. Uso del formulario opcional WH-347 La presentación semanal de una certificación
adecuadamente firmada en el reverso del formulario opcional WH-347 cumplirá con el
requisito de presentación de la “Declaración de cumplimiento” exigido por 29 CFR
5.5(a)(3)(ii)(C).
E. Firma La firma del contratista, subcontratista o el agente del contratista o subcontratista
debe ser una firma manuscrita original o una firma electrónica legalmente válida.
F. Falsificación La falsificación de alguna de las certificaciones mencionadas arriba podrá
someter al contratista o subcontratista a proceso civil o penal conforme a 18 U.S.C. 1001
and 31 U.S.C. 3729.
G. Duración de la retención de la nómina certificada El contratista o subcontratista debe
conservar todas las nóminas certificadas durante el transcurso del trabajo y durante un
período de 3 años después de completado todo el trabajo del contrato principal.
iii. Contratos, subcontratos y documentos relacionados El contratista o subcontratista debe mantener
este contrato o subcontrato y documentos relacionados incluyendo, entre otros, licitaciones,
propuestas, enmiendas, modificaciones y prórrogas. El contratista o subcontratista debe conservar
estos contratos, subcontratos y documentos relacionados durante el transcurso del trabajo y
durante un período de 3 años después de completado todo el trabajo del contrato principal.
iv Divulgaciones y accesos requeridos
A. Divulgaciones de registros y acceso a los trabajadores requeridos El contratista o
subcontratista debe poner a disposición los registros exigidos según 29 CFR 5.5(a)(3)(i)–
(iii), y cualquier otro documento que HUD o el Departamento de Trabajo considere
necesarios para determinar el cumplimiento de las disposiciones sobre estándares
laborales de cualquiera de las leyes aplicables a las que se hace referencia en 29 CFR 5.1,
para inspección, copia o transcripción por parte de representantes autorizados de HUD o
Packet Page. 1244
Las versiones anteriores quedaron obsoletas 6 Formulario HUD-4010, (10/2023)
ref. Manual 1344.1
del Departamento de Trabajo, y debe permitir que tales representantes entrevisten a
trabajadores durante el horario laboral en el trabajo.
B. Sanciones por no cumplimiento de los requisitos de registros y acceso al trabajador Si el
contratista o subcontratista no presenta los registros requeridos o no los pone a
disposición, o se niega a permitir las entrevistas con trabajadores durante horario laboral
en el trabajo, la agencia federal podrá, luego de dar aviso por escrito al contratista,
patrocinante, solicitante, propietario u otra entidad, según sea el caso, que mantiene tales registros o
que emplea tales trabajadores, tomar tales acciones que considere necesarias para provocar la
suspensión de cualquier pago, adelante o garantía de fondos posterior. Además, la falta de
presentación de los registros requeridos mediante solicitud o la falta de puesta a
disposición de tales registros o no permitir las entrevistas con trabajadores durante el
horario laboral en el trabajo, podrá constituir fundamento para tomar medidas de
exclusión conforme a 29 CFR 5.12. Además, a cualquier contratista u otra persona que no
presente los registros requeridos o no ponga a disposición tales registros para WHD en el
plazo que solicite WHD que se exhiban los registros, se le impedirá presentar como
evidencia en un proceso administrativo conforme a 29 CFR parte 6 cualquiera de los
registros requeridos que no fueron proporcionados o no fueron puestos a disposición para
WHD. WHD tendrá en cuenta una solicitud razonable del contratista o la persona de una
prórroga del plazo para la presentación de registros. WHD determinará la razonabilidad de
la solicitud y podrá considerar, entre otras cosas, la ubicación de los registros y el volumen
de producción.
C. Divulgaciones de información requeridas Los contratistas y subcontratistas deben
mantener el número completo del Seguro Social y última dirección conocida, número de
teléfono y dirección de correo electrónico de cada trabajador cubierto, y deben
proporcionarlos a HUD si lo solicita, en caso de que la agencia sea parte del
contrato, o a la División de Horas y Salarios del Departamento de Trabajo. Si la agencia
federal no es parte del contrato, el contratista, subcontratista, o ambos, deben, si se
solicita, proporcionar el número completo del Seguro Social y la última dirección conocida,
número de teléfono y dirección de correo electrónico de cada trabajador cubierto al
solicitante, patrocinador, propietario u otra entidad, según sea el caso, que mantiene tales
registros, para su transmisión al HUD, el contratista, o la División de Horas y Salarios del
Departamento de Trabajo para fines de una investigación u otra acción de cumplimiento.
4. Aprendices y oportunidades de igualdad en el empleo
i. Aprendices
A. Tasa de pago A los aprendices se les permitirá trabajar a una tasa menor a la
predeterminada para el trabajo que realizan cuando están empleados y registrados
individualmente en un programa de aprendices de buena fe registrado en el Departamento
de Trabajo de EE. UU., Administración de Empleo y Capacitación, Oficina de Aprendices
(OA), o en una Agencia Estatal de Aprendices reconocida por la OA. Una persona que no
está registrada individualmente en el programa, pero que ha sido certificada por la OA o
una Agencia Estatal de Aprendices (cuando corresponda) para ser elegible para empleo a
prueba como aprendiz, se le permitirá trabajar a una tasa menor que la tasa
predeterminada aplicable para el trabajo que realiza en los primeros 90 días de empleo a
prueba como aprendiz en uno de tales programas. En caso de que la OA o una Agencia
Estatal de Aprendices reconocida por la OA retira la aprobación de un programa de
aprendiz, el contratista ya no estará autorizado a utilizar aprendices a una tasa menor que
la tasa predeterminada aplicable para el trabajo realizado hasta que un programa
aceptable sea aprobado.
B. Beneficios complementarios A los aprendices se les debe pagar los beneficios
Packet Page. 1245
Las versiones anteriores quedaron obsoletas 7 Formulario HUD-4010, (10/2023)
ref. Manual 1344.1
complementarios conforme a las disposiciones del programa de aprendices. Si el programa
de aprendices no especifica los beneficios complementarios, a los aprendices se les debe
pagar el importe completo de los beneficios complementarios indicados en la
determinación salarial para la clasificación correspondiente. Si el Administrador determina
que una práctica diferente prevalece para la clasificación de aprendiz aplicable, se deben
pagar los beneficios complementarios conforme a esa determinación.
C. Proporción de aprendices La proporción permitida de aprendices a trabajadores calificados
en el sitio de trabajo para cualquier clasificación de oficios no debe ser mayor a la proporción
permitida para el contratista respecto de la fuerza laboral completa en el programa
registrado o la proporción aplicable a la localidad del proyecto conforme a 29 CFR
5.5(a)(4)(i)(D). A cualquier trabajador listado en una nómina a una tasa salarial de aprendiz,
que no está registrado o empleado de otro modo según lo establecido en 29 CFR
5.5(a)(4)(i)(A), no se le debe pagar menos de la tasa salarial aplicable en la determinación
salarial para la clasificación de trabajo realmente realizado. Además, a cualquier aprendiz
que realice trabajos en el lugar de trabajo que supere la proporción permitida en esta
sección se le debe pagar no menos de la tasa salarial aplicable en la determinación salarial
para el trabajo realmente realizado.
D. Reciprocidad de proporciones y tasas salariales Cuando un contratista esté realizando la
construcción de un proyecto en una localidad que no sea la localidad donde está registrado
el programa, deben observarse las proporciones y tasas salariales (expresadas como
porcentajes de la tasa horaria del trabajador especializado) aplicables en la localidad en la
cual se realiza la construcción. Si no existe una proporción o tasa salarial aplicable para la
localidad del proyecto, deben observarse la proporción y la tasa salarial especificadas en el
programa registrado del contratista.
ii Igualdad de oportunidades de empleo El uso de aprendices y trabajadores especializados en esta
parte debe estar de acuerdo con los requisitos de la igualdad de oportunidades de empleo de la
Orden Ejecutiva 11246, y sus enmiendas, y 29 CFR parte 30.
5 Complimiento de los requisitos de la Ley Copeland. El contratista cumplirá con los requisitos del 29 CFR
parte 3, que se incorporan por referencia en este contrato.
6 Subcontratos. El contratista o subcontratista debe incorporar en cualquier subcontrato las cláusulas
contenidas en 29 CFR 5.5(a)(1) hasta (11), junto con las determinaciones salariales aplicables y tales
otras cláusulas o modificaciones de contrato según el Departamento de Vivienda y Desarrollo Urbano
de EE. UU. pueda requerir según instrucciones adecuadas, y una cláusula que exija que los
subcontratistas incluyan estas cláusulas y determinaciones salariales en cualquier subcontrato de nivel
inferior. El contratista principal es responsable del cumplimiento por parte de cualquier subcontratista
o subcontratista de nivel inferior de todas las cláusulas contractuales de esta sección. En caso de
cualquier infracción de estas cláusulas, el contratista principal y cualquiera del/de los subcontratista(s)
responsables serán responsables de cualquier salario impago y reparación monetaria, incluidos los
intereses desde la fecha de pago incompleto o pérdida, que se deba a cualquier trabajador de los
subcontratistas de nivel inferior, y podrá quedar sujeto a exclusión, según sea adecuado.
7 Finalización del contrato: exclusión. Una violación de las cláusulas contractuales en 29 CFR 5.5 podrá
constituir fundamento para la terminación del contrato, y para la exclusión como contratista y
subcontratista según lo estipulado en 29 CFR 5.12.
8 Cumplimiento de los requisitos de la Ley Davis-Bacon y leyes relacionadas. Todas las interpretaciones
y decisiones de la Ley Davis-Bacon y leyes relacionadas contenidas en 29 CFR partes 1, 3 y 5 están
incorporadas en el presente por referencia en este contrato.
9 Disputas relacionadas con las normas laborales. Las disputas que surjan de las disposiciones sobre
normas laborales de este contrato no estarán sujetas a la cláusula de disputas generales de este
contrato. Tales disputas se resolverán conforme a los procedimientos del Departamento de Trabajo
Packet Page. 1246
Las versiones anteriores quedaron obsoletas 8 Formulario HUD-4010, (10/2023)
ref. Manual 1344.1
establecidos en 29 CFR partes 5, 6 y 7. Las disputas dentro del significado de esta cláusula incluyen las
disputas entre el contratista (o cualquiera de sus subcontratistas) y la agencia contratante, el
Departamento de Trabajo de EE. UU. o los empleados o sus representantes.
10. Certificación de elegibilidad.
i. Al celebrar este contrato, el contratista certifica que ni él ni ninguna otra persona o firma que
tenga un interés en la firma del contratista es una persona o firma inelegible para que se le
otorguen contratos del gobierno en virtud del 40 U.S.C. 3144(b) o 29 CFR 5.12(a).
ii. Ninguna parte del presente contrato se subcontratará a cualquier persona o firma que no
sea elegible para recibir adjudicaciones de un contrato gubernamental en virtud de 40 U.S.C.
3144(b) o 29 CFR 5.12(a).
iii. La sanción por realizar declaraciones falsas está prescripta en el Código de EE. UU., Título
18 Delitos y procedimientos penales, 18 U.S.C. 1001.
11 Contra las represalias Es ilegal para cualquier persona despedir, bajar de categoría, intimidar,
amenazar, limitar, coaccionar, incluir en una lista negra, acosar o de cualquier otra manera
discriminar, o hacer que cualquier persona despida, baje de categoría, intimide, amenace, limite,
coaccione, incluya en una lista negra, acose o de cualquier otra manera discrimine, a cualquier
trabajador o solicitante de empleo por:
i. Notificar a cualquier contratista sobre cualquier conducta que el trabajador crea
razonablemente constituye una violación de la ley DBA, leyes relacionadas o 29 CFR partes 1,
3 o 5;
ii. Presentar cualquier queja, iniciar o hacer que se inicie cualquier procedimiento o de lo contrario
hacer valer o procurar hacer valer en su nombre o en nombre de terceros cualquier derecho o
protección en virtud de la ley DBA, leyes relacionadas o 29 CFR partes 1, 3, o 5;
iii. Cooperar en cualquier investigación u otra acción de cumplimiento, o testificar en cualquier
procedimiento en virtud de la ley DBA, leyes relacionadas o 29 CFR partes 1, 3, o 5; o
iv. Informar a cualquier otra persona acerca de sus derechos en virtud de la ley DBA, leyes
relacionadas o 29 CFR partes 1, 3, o 5.
B. Ley de Horas de Trabajo y Normas de Seguridad Ocupacional en Contratos (CWHSSA)
El Responsable de la agencia debe hacer o exigir que el funcionario que contrata inserte las siguientes
cláusulas estipuladas en 29 CFR 5.5(b)(1), (2), (3), (4) y (5) en su totalidad, o (para contratos cubiertos
por la Agencia Federal de Adquisiciones) por referencia, en cualquier contrato por un monto que
supere $100,000 y sujeto a las disposiciones de horas extra de la Ley de Horas de Trabajo y Normas de
Seguridad Ocupacional en Contratos.
Estas cláusulas deben incorporarse además de las cláusulas requeridas por 29 CFR 5.5(a) o 4.6. Según
su uso en este párrafo, los términos “trabajadores y mecánicos” incluyen a los serenos y guardias de
seguridad.
1. Requisitos de horas extras. Ningún contratista o subcontratista que se contrata para realizar
cualquier parte del trabajo del contrato que pueda requerir o involucrar el empleo de
trabajadores o mecánicos exigirá ni permitirá que tal trabajador o mecánico en cualquier
semana laboral en la cual esté empleado para tal trabajo, trabaje en exceso de cuarenta horas
en tal semana laboral a menos que ese trabajador o mecánico reciba compensación a una tasa
no menor a una vez y media la tasa básica de pago para todas las horas trabajadas en exceso de
las cuarenta horas de esa semana laboral.
2. Infracción; responsabilidad por salarios impagos; daños y perjuicios. En caso de cualquier
infracción de la cláusula establecida en 29 CFR 5.5(b)(1) el contratista y cualquier subcontratista
responsable de los salarios impagos y los intereses desde la fecha del pago incompleto. Además,
ese contratista y subcontratista será responsable ante los Estados Unidos (en caso de trabajo
realizado bajo contrato para el Distrito de Columbia o un territorio, ante tal distrito o tal
territorio), por daños y perjuicios. Tales daños y perjuicios se computarán con respecto a cada
Packet Page. 1247
Las versiones anteriores quedaron obsoletas 9 Formulario HUD-4010, (10/2023)
ref. Manual 1344.1
trabajador o mecánico individual, incluyendo serenos y guardias de seguridad, empleados en
infracción de la cláusula establecida en 29 CFR 5.5(b)(1), en la suma de $31 por cada día
calendario en el cual a ese individuo se le exigió o permitió trabajar en exceso de la semana
laboral estándar de cuarenta horas sin pago de las horas extras requeridas por la cláusula
establecida en 29 CFR 5.5(b)(1).
3. Retención para salarios impagos y daños y perjuicios
i. Proceso de retención El Departamento de Vivienda y Desarrollo Urbano de Estados Unidos o el
receptor de asistencia federal podrá, por iniciativa propia, o deberá, por petición escrita de un
representante autorizado del Departamento de Trabajo, retener o hacer que se retengan del
contratista tal importe de los pagos o adelantos devengados según se considere necesario para
satisfacer las obligaciones del contratista principal o cualquier subcontratista por cualquier
salario impago; reparación monetaria, incluyendo intereses, y daños y perjuicios exigidos por las
cláusulas establecidas en 29 CFR 5.5(b) de este contrato, cualquier otro contrato federal con el
mismo contratista principal, o cualquier otro contrato con asistencia federal sujeto a la Ley de
Horas de Trabajo y Normas de Seguridad Ocupacional en Contratos, que tenga el mismo
contratista principal (según lo definido en 29 CFR 5.2). Los fondos necesarios pueden ser
retenidos al contratista en virtud de este contrato, de cualquier otro contrato federal con el
mismo contratista principal, o de cualquier otro contrato federal con asistencia federal que esté
sujeto a la ley de Ley de Horas de Trabajo y Normas de Seguridad Ocupacional en Contratos y
que tenga el mismo contratista principal, independientemente de si el otro contrato se otorgó o
tuvo asistencia de la misma agencia, y tales fondos podrán utilizarse para satisfacer la
responsabilidad del contratista para la cual se retuvieron los fondos.
ii Prioridad sobre los fondos retenidos El Departamento tiene prioridad sobre los fondos
retenidos o a retener de conformidad con 29 CFR 5.5(a)(2)(i) o (b)(3)(i), o ambos, sobre las
reclamaciones de aquellos fondos realizadas por:
A. Las garantías de un contratista, incluyendo entre otros las garantías de cumplimiento
de obligaciones contractuales y las garantías de pago;
B. Una agencia contratante por sus costos de reaprovisionamiento;
C. Uno o más síndicos (ya sea un síndico designado por el tribunal o un síndico
designado por el Fiscal General de EE. UU., o ambos) en la quiebra de un contratista,
o la masa de la quiebra de un contratista;
D. El/los cesionario(s) de un contratista;
E. El/los sucesor(es) de un contratista; o
F. Una reclamación efectuada conforme a la Ley de Pronto Pago, 31 U.S.C. 3901-3907.
4. Subcontratos. El contratista o subcontratista debe incluir en cualquier subcontrato las
cláusulas establecidas en 29 CFR 5.5(b)(1) a (5) y una cláusula que requiere que los subcontratistas
incluyan estas cláusulas en cualquier subcontrato de nivel inferior. El contratista principal es
responsable del cumplimiento de cualquier subcontratista o subcontratista de nivel inferior de las
cláusulas establecidas en 29 CFR 5.5(b)(1) a (5). En caso de cualquier infracción de setas cláusulas, el
contratista principal y cualquier subcontratista(s) responsable serán responsables de cualquier salario
impago y reparación monetaria, incluyendo los intereses desde la fecha del pago incompleto o pérdida,
que se deba a cualquier trabajador de los subcontratistas de nivel inferior, y los daños y perjuicios
asociados y puede ser sujeto a exclusión, según corresponda.
5 Contra las represalias Es ilegal para cualquier persona despedir, bajar de categoría, intimidar,
amenazar, limitar, coaccionar, incluir en una lista negra, acosar o de cualquier otra manera
discriminar, o hacer que cualquier persona despida, baje de categoría, intimide, amenace, limite,
coaccione, incluya en una lista negra, acose o de cualquier otra manera discrimine, a cualquier
trabajador o solicitante de empleo por:
i. Notificar a cualquier contratista sobre cualquier conducta que el trabajador crea
Packet Page. 1248
Las versiones anteriores quedaron obsoletas 10 Formulario HUD-4010, (10/2023)
ref. Manual 1344.1
razonablemente constituye una violación de la Ley de Horas de Trabajo y Normas de
Seguridad Ocupacional en Contratos (CWHSSA, por sus siglas en inglés) o las
reglamentaciones que la implementan en 29 CFR parte 5;
ii. Presentar cualquier queja, iniciar o hacer que se inicie cualquier procedimiento o de lo contrario
hacer valer o procurar hacer valer en su nombre o en nombre de terceros cualquier derecho o
protección en virtud de la ley CWHSSA o 29 CFR parte 5;
iii. Cooperar en cualquier investigación u otra acción de cumplimiento, o testificar en cualquier
procedimiento en virtud de la ley CWHSSA o 29 CFR parte 5; o
iv. Informar a cualquier otra persona acerca de sus derechos en virtud de CWHSSA o 29 CFR parte 5.
C. Cláusula de registros requeridos por la ley CWHSSA Además de las cláusulas contenidas en 29 CFR
5.5(b), en cualquier contrato sujeto solo a la Ley de Horas de Trabajo y Normas de Seguridad
Ocupacional en Contratos y no a cualquiera de las otras leyes a la que se hacer referencia en 29 CFR
5.1, el Responsable de la agencia debe hacer o exigir que el funcionario que contrata inserte una
cláusula para exigir que el contratista o subcontratista deban mantener las nóminas regulares y otros
registros básicos durante el transcurso del trabajo y deba conservarlos por un período de 3 año
después de completado todo el trabajo del contrato principal para todos los trabajadores y mecánicos,
incluyendo guardias de seguridad y serenos, que trabajen en el contrato. Tales registros deben
contener el nombre, última dirección conocida, número de teléfono y dirección de correo electrónico;
y el número de seguro social de cada trabajador; la(s) correcta(s) clasificación(es) del trabajo realmente
realizado por cada trabajador; las tasas por hora de los salarios pagados; número de horas diarias y
semanales realmente trabajadas; deducciones realizadas y salarios reales pagados. Además, el
Responsable de la agencia debe hacer o exigir que el funcionario que contrata inserte una cláusula en
cualquiera de tales contratos que contemple que los registros que se deben mantener de conformidad
con este párrafo deben ser puestos a disposición por parte del contratista o subcontratista para
inspección, copia o transcripción por parte de representantes autorizados de (escribir el nombre de la
agencia) y el Departamento de Trabajo, y el contratista o subcontratista permitirán que tales
representantes entrevisten a los trabajadores durante el horario laboral en el trabajo.
D. Incorporación de cláusulas contractuales y determinaciones salariales por referencia Aunque las
agencias están obligadas a insertar las cláusulas contractuales establecidas en esta sección, junto o las
determinaciones salariales que correspondan, en su totalidad en los contratos cubiertos, y los
contratistas y subcontratistas están obligados a insertarlas en cualquier subcontrato de nivel inferior, la
incorporación por referencia de las cláusulas contractuales requeridas y determinaciones salariales que
correspondan tendrán la misma fuerza y efecto como si estuvieran incorporadas en texto completo.
E. Incorporación por imperio de la ley Las cláusulas contractuales establecidas en esta sección (o su
equivalente según la Regulación Federal de Adquisiciones), junto con las correctas determinaciones
salariales, se considerarán parte de cada contrato principal requeridas por las leyes aplicables a las que
se hace referencia en 29 CFR 5.1 para incluir tales cláusulas, y serán efectivas por imperio de la ley, ya
sea que estén o no incluidas o incorporadas por referencia en tal contrato, a menos que el
Administrador otorgue una variación, tolerancia o exención de la aplicación de este párrafo. Cuando las
cláusulas y las determinaciones de salarios aplicables sean efectivas por imperio de la ley de
conformidad con este párrafo, el contratista principal debe ser compensado por cualquier aumento
resultante de los salarios de acuerdo con la ley aplicable.
F. SALUD Y SEGURIDAD
Las disposiciones de este párrafo (F) son aplicables cuando el monto del contrato principal supere
$100,000.
1. A ningún trabajador o mecánico se le exigirá trabajar en los alrededores o en condiciones
laborales que sean insalubres, riesgosas o peligrosas para su salud o seguridad, según lo establecido en
las normas de salud y seguridad en la construcción promulgados por el Secretario de Trabajo mediante
reglamentaciones.
Packet Page. 1249
Las versiones anteriores quedaron obsoletas 11 Formulario HUD-4010, (10/2023)
ref. Manual 1344.1
2. El contratista cumplirá con todas las reglamentaciones emitidas por el Secretario de Trabajo
conforme a 29 CFR Parte 1926 y el incumplimiento podrá resultar en imposición de sanciones de
conformidad con la Ley de Horas de Trabajo y Normas de Seguridad Ocupacional en Contratos, (Ley
Pública 91-54, 83 Stat 96), 40 U.S.C. § 3701 y siguientes.
3. El contratista incluirá las disposiciones de este párrafo en cada subcontrato, para que tales
disposiciones sean vinculantes para cada subcontratista. El contratista tomará tales medidas respecto de
cualquier subcontratista que el Secretario de Vivienda y Desarrollo Urbano o el Secretario de Trabajo imparta
como medio para hacer cumplir tales disposiciones.
Packet Page. 1250
CERTIFICATION WITH REGARD TO THE PERFORMANCE OF PREVIOUS CONTRACTS
OR SUBCONTRACTS SUBJECT TO THE EQUAL OPPORTUNITY CLAUSE AND THE
FILING OF REQUIRED REPORTS
The ☐ bidder, ☐ proposed subcontractor, hereby certifies that he ☐ has, ☐ has not, participated in a previous
contract or subcontract subject to the equal opportunity clause, as required by Executive Orders 10925, 11114, or
11246, and that he ☐ has, ☐ has not, filed with the Joint Reporting Committee, the Director of the Office of Federal
Contract Compliance, a Federal Government contracting or administering agency, or the former President's
Committee on Equal Employment Opportunity, all reports due under the applicable filing requirements.
Project Number:
Awarding Agency:
Contractor Name: Contract Award: $
Affiliate Company: Total Number of Employees:
Date:
Authorized Representative (Print Name):
By (Signature):
Title:
NOTE: The above certification is required by the Equal Employment Opportunity Regulations of the Secretary of
Labor [41 CFR 60- 1.7 (b) (1)] and must be submitted by bidders and proposed subcontractors only in connection
with contracts and subcontracts which are subject to the equal opportunity clause. Contracts and subcontracts which
are exempt from the equal opportunity clause are set forth in 41 CFR 60- 1.5. (Generally only contracts or subcontracts
of $10,000 or under are exempt.)
Proposed prime contractors and subcontractors who have participated in a previous contract or subcontract subject to
the Executive Orders and have not filed the required reports should note that 41 CFR 60- 1.7 (b) (1) prevents the award
of contracts and subcontracts unless such contractor submits a report covering the delinquent period or such other
period specified by the U.S. Department of the Interior or by the Director, Office of Federal Contract Compliance, U.
S. Department of Labor.
Packet Page. 1251
FEDERAL LOBBYIST CERTIFICATION
Name of Firm: Address:
State: Zip Code: Telephone Number:
Acting on behalf of the above-named firm, as its Authorized Official, I make the following Certification to
the U. S. Department of Housing and Urban Development and the body awarding this federally assisted
construction contract:
1. No Federal appropriated funds have been paid by or on behalf of the above named firm to any
person for influencing or attempting to Influence an officer or employee of any agency, a Member
of Congress, an officer or employee of Congress, or an employee of a Member of Congress In
connection with the awarding of any Federal contract, the making of and Federal grant1 loan or
cooperative agreement, and any extension, continuation, renewal, amendment, or modification
thereof, and;
2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for
influencing or attempting to influence an officer or employee or any agency, a Member of Congress
an officer or employee of Congress or an employee of a Member of Congress In connection with
this federal contract, grant loan, or cooperative agreement, the above named firm shall complete and
submit Standard Form-LLL, "Disclosure Form to Report Lobbying". in accordance with Its
instructions, and;
3. The above name firm shall require that the language of this certification be Included in the award
documents for all sub-awards at all tiers (including subcontracts, sub-grants, and contracts under
grants, loans, and cooperative agreement) and that all sub-recipients shall certify and disclose
accordingly.
NOTE: This certification ls a material representation of fact upon which reliance was placed when this
transaction was made or entered into. Submission of this certification Is a prerequisite for making or
entering Into the transaction imposed by Section 1352 Title 31, U.S. Code. Any person who fails to file
the required certification shall be subject to a civil penalty of not less than $10,000 and not more than
$100,000 for each such failure.
Authorized Official:
Packet Page. 1252
CERTIFICATION OF NON-SEGREGATED FACILITIES
Federally Assisted Projects
The federally assisted construction contractor certifies that he does not maintain or provide for his employees any
segregated facilities at any of his establishments, and that he does not permit his employees to perform their services
at any location, under his control, where segregated facilities are maintained. The federally assisted construction
contractor certifies further that he will not maintain or provide for his employees any segregated facilities at any
of his establishments, and that he will not permit his employees to perform their services at any location, under his
control, where segregated facilities are maintained. The federally assisted construction contractor agrees that a
breach of this certification is a violation of the Equal Opportunity clause in this contract. As used in this
certification, the term "segregated facilities" means any waiting rooms, work areas, restrooms and washrooms,
restaurants and other eating areas, timeclocks, locker rooms and other storage or dressing areas, parking lots,
drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees
which are segregated by explicit directive or are in fact segregated on the basis of race, creed, color, or national
origin, because of habit, local custom, or otherwise. The federally assisted construction contractor agrees that
(except where he has obtained identical certifications form proposed subcontractors for specific time periods) he
will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding
$10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such
certifications in his files.
NOTE: The penalty for making false statements in offers
is prescribed in 18 USC. 1001
COMPANY NAME:
COMPANY OFFICER NAME:
SIGNATURE:
DATE:
Packet Page. 1253
Non-Collusion Affidavit
(Title 23 United States Code Section 112 and
Public Contract Code Section 7106)
To the CITY OF _________________
In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106 the bidder
declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership,
company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that
the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid,
and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else
to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner,
directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price
of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that
of any other bidder, or to secure any advantage against the public body awarding the contract of anyone
interested in the proposed contract; that all statements contained in the bid are true; and, further, that the
bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the
contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any
corporation, partnership, company association, organization, bid depository, or to any member or agent
thereof to effectuate a collusive or sham bid.
Note: The above Non-Collusion Affidavit is part of the Proposal. Signing this Proposal on
the signature portion thereof shall also constitute signature of this Non-Collusion
Affidavit. Bidders are cautioned that making a false certification may subject the
certifier to criminal prosecution.
The above Non-Collusion Affidavit must be signed by the Prime Contractor and all
Subcontractors.
COMPANY NAME:
COMPANY OFFICER NAME:
SIGNATURE:
DATE:
Packet Page. 1254
COMPLIANCE WITH CLEAN AIR AND WATER ACTS
(APPLICABLE TO FEDERALLY ASSISTED CONTRACTS AND RELATED
SUBCONTRACTS AT OR EXCEEDING $100,000)
During the performance of this contract, the contractor and all subcontractors shall comply with the requirements
of the Clean Air Act, as amended, 42 USC 1857 et seq., the Federal Water Pollution Control Act, as amended, 33
USC 1251 et seq., and the regulations of the Environmental Protection Agency with respect thereto, at 40 CFR
Part 15, as amended.
In addition to the foregoing requirements, all nonexempt contractors and subcontractors shall furnish to the owner
the following:
1. A stipulation by the contractor subcontractors, that any facility to be utilized in the performance of any
nonexempt contract or subcontract, is not listed on the list of Violating Facilities issued by the
Environmental Protection Agency (EPA) pursuant to 40 CFR 15.20.
2. Agreement by the contractor to comply with all the requirements of Section 114 of the Clean Air Act, as
amended, (42USC 1857c-8) and Section 308 of the Federal Water Pollution Control Act, as amended, (33
USC 1318) relating to inspection, Monitoring, entry reports and information, as well as all other
requirements specified in said Section 114 and Section 308, and all regulations and guidelines issued
thereunder.
3. A stipulation that as a condition for award of the contract, prompt notice will be given of any notification
received from the Director, Office of Federal Activities, EPA, indicating that a facility utilized, or to be
utilized for the contract, is under consideration to be listed on the EPA List of Violating Facilities.
4. Agreement by the contractor that he will include, or cause to be included, the criteria and requirements in
paragraph 1 through 4 of this section in every nonexempt subcontract and requiring that the contractor
will take such action as the government may direct as a means of enforcing such provisions.
I have read this required information regarding the Clean Air and Water Acts which
is evidenced by my signature.
COMPANY NAME:
COMPANY OFFICER NAME:
SIGNATURE:
DATE:
Packet Page. 1255
WORKER’S COMPENSATION CERTIFICATION
I certify, by my signature below, that I am aware of the provisions of Section 3700 of the
California Labor Code. §3700 requires every employer be insured against liability for worker’s
compensation or to undertake self-insurance in accordance with the provisions of that code. I
further certify that I will comply with such provisions before commencing the performance of
the work of this contract.
PROJECT NAME:
COMPANY NAME:
COMPANY OFFICER NAME:
SIGNATURE:
DATE:
Packet Page. 1256
DECLARATION OF INTENT TO COMPLY WITH
SECTION 3 REQUIREMENTS
As a minimum requirement for consideration of a contract award, the Bidder/Proposer shall declare his/her intent
to comply with Section 3 (24 CFR 75) of the Housing and Urban Development Act of 1968, as amended
(Section 3). The Bidder/Proposer is obliged, to the greatest extent feasible, to give opportunities for training and
employment to low-income and very low-income persons residing in the service area or neighborhood in which
the covered Section 3 project/service is located, and/or to award subcontracts to other Section 3 business
concerns that provide economic opportunities for Section 3 workers and Targeted Section 3 workers.
Bidder/Proposer agrees that, as a condition of responsiveness to the solicitation and prior to recommendation
for contract award by the Local Contracting Agency (LCA), he/she will agree to comply with the Section 3
requirements by including the Section 3 contract language in the contract, to the greatest extent feasible, to
meet the Section 3 benchmarks and report all accomplishments with required documentation on a quarterly
basis for the duration of the contract.
The Section 3 benchmarks apply to all Section 3 covered contracts as follows:
• Public housing financial assistance benchmarks:
o Section 3 workers: 25% or more for the total number of labor hours worked by all
workers employed, and
o Targeted Section 3 workers: 5% or more of the total number of labor hours worked by
all workers employed of which is included as part of the 25% threshold in the previous
bullet.
• Community development financial assistance benchmarks:
o Section 3 workers: 25% or more for the total number of labor hours worked by all
workers employed on a Section 3 project, and
o Targeted Section 3 workers: 5% or more of the total number of labor hours worked by all
workers employed on a Section 3 project of which is included as part of the 25% threshold in
the previous bullet.
Failure of the Bidder/Proposer to agree to comply with Section 3 requirements and reporting obligations shall
be grounds for determining the Bidder/Proposer non- responsive, and no further consideration for contract
award shall be granted.
I declare under penalty of perjury under the laws of the State of California that we agree to comply with the
Section 3 requirements as stated above.
Name of Contractor/Subcontractor Address
Print Name Title
Signature Date
Declaration of Intent to Comply with Section 3 Requirements Rev. 1/23/2025
Packet Page. 1257
NOTICE OF SECTION 3 COMMITMENT
TO:
(Name of Labor Union, Workers Representative, etc.
(Address)
Name of Business (Contractor):
Project Name: Project Number:
The Undersigned currently holds a contract with
involving Block Grant (CDBG) funds from the U. S. Department of Housing and Urban Development
or a subcontract with a prime contractor holding such contract.
You are advised that under the provisions of the above contract or subcontract and in accordance
with Section 3 of the Housing and Urban Development Act of 1968, the undersigned is obligated to
the greatest extent feasible, to give opportunities for employment and training to lower income
residence of the CDBG-assisted project area and to award contracts for work on the project to
business concerns which are located in or are owned in substantial part by project area residence.
Regarding employment opportunities for Section 3, the minimum number and job titles are:
Number Job Classification
Regarding job referrals, request that consideration be given, to the greatest extent feasible, to
assignment of persons residing in the service area or neighborhood in which the project is located.
The anticipated date the work will begin is . For additional information, you may
contact , at ( ) .
Contact Person’s Name Title
This notice is furnished to you pursuant to the provisions of the above contract or subcontract and
Section 3 of the Housing and Urban Development Act of 1968. Copies of this notice will be posted
by the undersigned in conspicuous places available to employees or applicants for employment.
By:
(Print Name) (Signature)
(Date) (Title)
Packet Page. 1258
CONTRACTOR FRINGE BENEFIT STATEMENT
Contract Number / Name: Contract Location: Today's Date:
Contractor / Subcontractor Name:Business Address:
Classification: Effective Date: Subsistence or Travel Pay:
$
Health & $ PAID TO:Name:
Welfare Address:
Pension $ PAID TO:Name:
Address:
Vacation/ $ PAID TO:Name:
Holiday Address:
Training $ PAID TO:Name:
and/or Other Address:
Classification: Effective Date: Subsistence or Travel Pay:
$
Health & $ PAID TO:Name:
Welfare Address:
Pension $ PAID TO:Name:
Address:
Vacation/ $ PAID TO:Name:
Holiday Address:
Training $ PAID TO:Name:
And/or Other Address:
Classification: Effective Date: Subsistence or Travel Pay:
$
Health & $ PAID TO:Name:
Welfare Address:
Pension $ PAID TO:Name:
Address:
Vacation/ $ PAID TO:Name:
Holiday Address:
Training $ PAID TO:Name:
And/or Other Address:
Submitted: Contractor / Subcontractor By: Name / Title
Supplemental statements must be submitted during the progress of work should a change in rate of any of the classifications be made.
F
R
I
N
G
E
B
E
N
E
F
I
T
S
F
R
I
N
G
E
B
E
N
E
F
I
T
S
F
R
I
N
G
E
B
E
N
E
F
I
T
S
In order that the proper Fringe Benefit rates can be verified when checking payrolls on the above contract, the hourly
rates for fringe benefits, subsistence and/or travel allowance payment made for employees on the various classes of
work are tabulated below.
DIR 371538
Packet Page. 1259
Rev. January 2025
OMB No.: 1235-0008
U.S. Department of Labor Davis-Bacon and Related Acts Weekly Certified Payroll Form
(For Contractor’s Optional Use; See Instructions at www.dol.gov/whd/forms/wh347instr.htm)
Unless otherwise noted, the information requested is specific to the named project below.
Persons are not required to respond to the collection of information unless it displays a currently valid OMB control number.
SUBMISSION OF FINAL DBRA CERTIFIED PAYROLL FORM PRIME CONTRACTOR SUBCONTRACTOR
EN
T
R
Y
N
O
.
LA
S
T
N
A
M
E
FI
R
S
T
MI
D
D
L
E
WO
R
K
E
R
(R
A)
RE
G
I
ST
ERD
(TOP) DAYS OF WORK WEEK
FO
R
W
E
E
K
CR
E
D
I
T
IN
L
I
E
U
O
F
D
AL
L
WO
R
K
DEDUCTIONS FOR ALL WORK
PA
Y
TO
W
O
R
K
E
R
AL
L
WO
R
K
-
(
MU
S
T
,
SE
E
HOURS WORKED
While use of Form WH-347 itself is optional, covered contractors and subcontractors performing work on Federal or federally assisted construction contracts are required by the DBRA regulations and the contract clauses to submit payroll information on a weekly basis. The Copeland Act (40 U.S.C. § 3145) requires contractors and subcontractors performing work on Federal or federally financed construction contracts to, on a weekly basis, “furnish a statement on the wages paid each employee during the prior week.” U.S. Department of Labor (DOL) Regulations at 29 C.F.R. § 5.5(a)(3)(ii) require contractors and subcontractors to submit weekly certified payrolls to the appropriate Federal agency if the agency is a party to the contract (or, if the agency is not such a party, to the applicant, sponsor, owner, or other entity, as the case may be, that maintains such records, for transmission to the Federal agency). Each certified payroll must be accompanied by a signed “Statement of Compliance” (e.g., page 2 of the WH-347 or another document with identical wording) indicating that the certified payrolls are accurate and complete, and that each laborer or mechanic has been paid not less than the required Davis-Bacon prevailing wage rate(s) (including any fringe benefits) for the work performed. DOL and contracting agencies receiving this information review the information to determine whether workers have received legally required wages and fringe benefits.
Public Burden Statement
We estimate that it will take an average of 55 minutes to complete this collection, including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. If you have any comments regarding these estimates or any other aspect of this collection, including suggestions for reducing this burden, send them to the Administrator, Wage and Hour Division, U.S. Department of Labor, Room S3502, 200 Constitution Avenue, N.W. Washington, D.C. 20210 (over)
Packet Page. 1260
PROJECT NAME PROJECT NO. or CONTRACT NO. PAYROLL NO. PRIME CONTRACTOR’S/SUBCONTRACTOR’S BUSINESS NAME
PROJECT LOCATION WEEK ENDING DATE CERTIFYING OFFICIAL’s NAME AND TITLE
I paid or supervised the payment of the laborers or mechanics working on the above project during the stated time period. I certify the following:
information submitted with this statement is correct and complete for the above project during the above period, and the wage and fringe benefit rates paid to the workers,
including credit taken for the reasonably anticipated costs of a bona fide fringe benefit plan, fund or program, are not less than the applicable wage and fringe benefits rates for the
classification(s) of work actually performed, as specified in the wage determination(s) incorporated into the contract.
All regular payrolls and all other basic records that the contractor is required to maintain for this payroll period are complete and accurate and will be made available upon request from the
agency or the Department of Labor.
The classifications reported for each laborer or mechanic are the classification(s) of work that each worker actually performed.
Any workers paid as apprentices during the above period are duly registered in a bona fide apprenticeship program registered with the Office of Apprenticeship, Employment and Training
Administration, United States Department of Labor (“OA”), or a State Apprenticeship Agency (“SAA”) recognized by Department of Labor. I have verified the registered apprenticeship program
information provided below as accurate and applicable to any apprentices identified on page 1 of this form.
OA SAA
OA SAA
OA SAA
Fringe benefits have been paid in cash and/or to bona fide fringe benefit plans, funds, or programs. Where the contractor is claiming an hourly credit for their contributions to or reasonably
anticipated costs of a bona fide fringe benefit plan, fund, or program, provide plan information and the hourly credit claimed for each worker listed on the previous page of this form.
HOURLY CREDIT FOR FRINGE BENEFITS
If an amount is listed in (6B) on the first page of this certified payroll form, enter the hourly credit claimed under each plan name, type and number for each worker and check whether the plan is funded or unfunded.
NAME OF WORKER
TOTAL
HOURLY
CREDIT
FB TYPE FB TYPE FB TYPE FB TYPE FB TYPE FB TYPE
PLAN NO. PLAN NO. PLAN NO. PLAN NO. PLAN NO. PLAN NO.
Funded Unfunded Funded Unfunded Funded Unfunded Funded Unfunded Funded Unfunded Funded Unfunded
Hourly Credit
All workers on the project have been paid the full weekly wages earned, and no rebates or deductions have been or will be made either directly or indirectly, other than permissible
deductions as defined in 29 CFR part 3.
( __ __ __ ) __ __ __ – __ __ __ __
THE WILLFUL FALSIFICATION OF ANY OF THE ABOVE STATEMENTS MAY SUBJECT THE CONTRACTOR OR SUBCONTRACTOR TO CIVIL OR CRIMINAL PROSECUTION (SEE SECTION 1001 OF TITLE 18 AND SECTION 3729 OF TITLE 31 OF THE UNITED STATES
CODE), AS WELL AS DEBARMENT FROM FUTURE FEDERAL AND FEDERALLY-ASSISTED CONTRACTS. INFORMATION REPORTED IN CERTIFIED PAYROLLS MAY BE SUBJECT TO DISCLOSURE IN RESPONSE TO A FREEDOM OF INFORMATION ACT REQUEST.
Packet Page. 1261
24 CFR Part 75, Dated 11/4/2024
Packet Page. 1262
Title 24 —Housing and Urban Development
Subtitle A —Office of the Secretary, Department of Housing and Urban Development
Part 75 Economic Opportunities for Low- and Very Low-Income Persons
Subpart A General Provisions
§ 75.1 Purpose.
§ 75.3 Applicability.
§ 75.5 Definitions.
§ 75.7 Requirements applicable to HUD NOFAs for Section 3 covered programs.
Subpart B Additional Provisions for Public Housing Financial Assistance
§ 75.9 Requirements.
§ 75.11 Targeted Section 3 worker for public housing financial assistance.
§ 75.13 Section 3 safe harbor.
§ 75.15 Reporting.
§ 75.17 Contract provisions.
Subpart C Additional Provisions for Housing and Community Development
Financial Assistance
§ 75.19 Requirements.
§ 75.21 Targeted Section 3 worker for housing and community development financial
assistance.
§ 75.23 Section 3 safe harbor.
§ 75.25 Reporting.
§ 75.27 Contract provisions.
Subpart D Provisions for Multiple Funding Sources, Recordkeeping, and
Compliance
§ 75.29 Multiple funding sources.
§ 75.31 Recordkeeping.
§ 75.33 Compliance.
PART 75—ECONOMIC OPPORTUNITIES FOR LOW- AND VERY LOW-
INCOME PERSONS
Authority:12 U.S.C. 1701u;42 U.S.C. 3535(d).
Source:85 FR 61562, Sept. 29, 2020, unless otherwise noted.
Subpart A—General Provisions
This content is from the eCFR and is authoritative but unofficial.
24 CFR Part 75 (up to date as of 11/04/2024)
Economic Opportunities for Low- and Very Low-Income Persons 24 CFR Part 75 (Nov. 4, 2024)
24 CFR 75 (enhanced display)page 1 of 14
Page 76
Packet Page. 1263
§ 75.1 Purpose.
This part establishes the requirements to be followed to ensure the objectives of Section 3 of the Housing and
Urban Development Act of 1968 (12 U.S.C. 1701u) (Section 3) are met. The purpose of Section 3 is to ensure that
economic opportunities, most importantly employment, generated by certain HUD financial assistance shall be
directed to low- and very low-income persons, particularly those who are recipients of government assistance for
housing or residents of the community in which the Federal assistance is spent.
§ 75.3 Applicability.
(a)General applicability.Section 3 applies to public housing financial assistance and Section 3 projects, as
follows:
(1)Public housing financial assistance.Public housing financial assistance means:
(i)Development assistance provided pursuant to section 5 of the United States Housing Act of
1937 (the 1937 Act);
(ii)Operations and management assistance provided pursuant to section 9(e) of the 1937 Act;
(iii)Development, modernization, and management assistance provided pursuant to section 9(d) of
the 1937 Act; and
(iv)The entirety of a mixed-finance development project as described in 24 CFR 905.604, regardless
of whether the project is fully or partially assisted with public housing financial assistance as
defined in paragraphs (a)(1)(i) through (iii) of this section.
(2)Section 3 projects.
(i)Section 3 projects means housing rehabilitation, housing construction, and other public
construction projects assisted under HUD programs that provide housing and community
development financial assistance when the total amount of assistance to the project exceeds a
threshold of $200,000. The threshold is $100,000 where the assistance is from the Lead Hazard
Control and Healthy Homes programs, as authorized by Sections 501 or 502 of the Housing
and Urban Development Act of 1970 (12 U.S.C. 1701z-1 or 1701z-2), the Lead-Based Paint
Poisoning Prevention Act (42 U.S.C 4801 et seq.); and the Residential Lead-Based Paint Hazard
Reduction Act of 1992 (42 U.S.C. 4851 et seq.). The project is the site or sites together with any
building(s) and improvements located on the site(s) that are under common ownership,
management, and financing.
(ii)The Secretary must update the thresholds provided in paragraph (a)(2)(i) of this section not
less than once every 5 years based on a national construction cost inflation factor through
FEDERAL REGISTER notice not subject to public comment. When the Secretary finds it is warranted
to ensure compliance with Section 3, the Secretary may adjust, regardless of the national
construction cost factor, such thresholds through FEDERAL REGISTER notice, subject to public
comment.
(iii)The requirements in this part apply to an entire Section 3 project, regardless of whether the
project is fully or partially assisted under HUD programs that provide housing and community
development financial assistance.
(b)Contracts for materials.Section 3 requirements do not apply to material supply contracts.
24 CFR Part 75 (up to date as of 11/04/2024)
Economic Opportunities for Low- and Very Low-Income Persons 24 CFR 75.1
24 CFR 75.3(b) (enhanced display)page 2 of 14
Page 77
Packet Page. 1264
§ 75.5 Definitions.
The terms HUD, Public housing,and Public Housing Agency (PHA)are defined in 24 CFR part 5. The following
definitions also apply to this part:
(c)Indian and Tribal preferences.Contracts, subcontracts, grants, or subgrants subject to Section 7(b) of the
Indian Self-Determination and Education Assistance Act (25 U.S.C. 5307(b)) or subject to tribal preference
requirements as authorized under 101(k) of the Native American Housing Assistance and Self-
Determination Act (25 U.S.C. 4111(k)) must provide preferences in employment, training, and business
opportunities to Indians and Indian organizations, and are therefore not subject to the requirements of
this part.
(d)Other HUD assistance and other Federal assistance.Recipients that are not subject to Section 3 are
encouraged to consider ways to support the purpose of Section 3.
1937 Act means the United States Housing Act of 1937,42 U.S.C. 1437 et seq.
Contractor means any entity entering into a contract with:
(1)A recipient to perform work in connection with the expenditure of public housing financial assistance
or for work in connection with a Section 3 project; or
(2)A subrecipient for work in connection with a Section 3 project.
Labor hours means the number of paid hours worked by persons on a Section 3 project or by persons employed
with funds that include public housing financial assistance.
Low-income person means a person as defined in Section 3(b)(2) of the 1937 Act.
Material supply contracts means contracts for the purchase of products and materials, including, but not limited
to, lumber, drywall, wiring, concrete, pipes, toilets, sinks, carpets, and office supplies.
Professional services means non-construction services that require an advanced degree or professional
licensing, including, but not limited to, contracts for legal services, financial consulting, accounting
services, environmental assessment, architectural services, and civil engineering services.
Public housing financial assistance means assistance as defined in § 75.3(a)(1).
Public housing project is defined in 24 CFR 905.108.
Recipient means any entity that receives directly from HUD public housing financial assistance or housing and
community development assistance that funds Section 3 projects, including, but not limited to, any State,
local government, instrumentality, PHA, or other public agency, public or private nonprofit organization.
Section 3 means Section 3 of the Housing and Urban Development Act of 1968, as amended (12 U.S.C. 1701u).
Section 3 business concern means:
(1)A business concern meeting at least one of the following criteria, documented within the last six-
month period:
(i)It is at least 51 percent owned and controlled by low- or very low-income persons;
(ii)Over 75 percent of the labor hours performed for the business over the prior three-month period
are performed by Section 3 workers; or
24 CFR Part 75 (up to date as of 11/04/2024)
Economic Opportunities for Low- and Very Low-Income Persons 24 CFR 75.3(c)
24 CFR 75.5 “Section 3 business concern” (1)(ii) (enhanced display)page 3 of 14
Page 78
Packet Page. 1265
(iii)It is a business at least 51 percent owned and controlled by current public housing residents or
residents who currently live in Section 8-assisted housing.
(2)The status of a Section 3 business concern shall not be negatively affected by a prior arrest or
conviction of its owner(s) or employees.
(3)Nothing in this part shall be construed to require the contracting or subcontracting of a Section 3
business concern. Section 3 business concerns are not exempt from meeting the specifications of
the contract.
Section 3 project means a project defined in § 75.3(a)(2).
Section 3 worker means:
(1)Any worker who currently fits or when hired within the past five years fit at least one of the following
categories, as documented:
(i)The worker's income for the previous or annualized calendar year is below the income limit
established by HUD.
(ii)The worker is employed by a Section 3 business concern.
(iii)The worker is a YouthBuild participant.
(2)The status of a Section 3 worker shall not be negatively affected by a prior arrest or conviction.
(3)Nothing in this part shall be construed to require the employment of someone who meets this
definition of a Section 3 worker. Section 3 workers are not exempt from meeting the qualifications of
the position to be filled.
Section 8-assisted housing refers to housing receiving project-based rental assistance or tenant-based
assistance under Section 8 of the 1937 Act.
Service area or the neighborhood of the project means an area within one mile of the Section 3 project or, if
fewer than 5,000 people live within one mile of a Section 3 project, within a circle centered on the Section
3 project that is sufficient to encompass a population of 5,000 people according to the most recent U.S.
Census.
Small PHA means a public housing authority that manages or operates fewer than 250 public housing units.
Subcontractor means any entity that has a contract with a contractor to undertake a portion of the contractor's
obligation to perform work in connection with the expenditure of public housing financial assistance or for
a Section 3 project.
Subrecipient has the meaning provided in the applicable program regulations or in 2 CFR 200.93.
Targeted Section 3 worker has the meanings provided in §§ 75.11,75.21, or 75.29, and does not exclude an
individual that has a prior arrest or conviction.
Very low-income person means the definition for this term set forth in section 3(b)(2) of the 1937 Act.
YouthBuild programs refers to YouthBuild programs receiving assistance under the Workforce Innovation and
Opportunity Act (29 U.S.C. 3226).
24 CFR Part 75 (up to date as of 11/04/2024)
Economic Opportunities for Low- and Very Low-Income Persons 24 CFR 75.5 “Section 3 business concern” (1)(iii)
24 CFR 75.5 “YouthBuild programs” (enhanced display)page 4 of 14
Page 79
Packet Page. 1266
§ 75.7 Requirements applicable to HUD NOFAs for Section 3 covered programs.
All notices of funding availability (NOFAs) issued by HUD that announce the availability of funding covered by § 75.3
will include notice that this part is applicable to the funding and may include, as appropriate for the specific NOFA,
points or bonus points for the quality of Section 3 plans.
Subpart B—Additional Provisions for Public Housing Financial Assistance
§ 75.9 Requirements.
(a)Employment and training.
(1)Consistent with existing Federal, state, and local laws and regulations, PHAs or other recipients
receiving public housing financial assistance, and their contractors and subcontractors, must make
their best efforts to provide employment and training opportunities generated by the public housing
financial assistance to Section 3 workers.
(2)PHAs or other recipients, and their contractors and subcontractors, must make their best efforts
described in paragraph (a)(1) of this section in the following order of priority:
(i)To residents of the public housing projects for which the public housing financial assistance is
expended;
(ii)To residents of other public housing projects managed by the PHA that is providing the
assistance or for residents of Section 8-assisted housing managed by the PHA;
(iii)To participants in YouthBuild programs; and
(iv)To low- and very low-income persons residing within the metropolitan area (or nonmetropolitan
county) in which the assistance is expended.
(b)Contracting.
(1)Consistent with existing Federal, state, and local laws and regulations, PHAs and other recipients of
public housing financial assistance, and their contractors and subcontractors, must make their best
efforts to award contracts and subcontracts to business concerns that provide economic
opportunities to Section 3 workers.
(2)PHAs and other recipients, and their contractors and subcontractors, must make their best efforts
described in paragraph (b)(1) of this section in the following order of priority:
(i)To Section 3 business concerns that provide economic opportunities for residents of the public
housing projects for which the assistance is provided;
(ii)To Section 3 business concerns that provide economic opportunities for residents of other
public housing projects or Section-8 assisted housing managed by the PHA that is providing
the assistance;
(iii)To YouthBuild programs; and
(iv)To Section 3 business concerns that provide economic opportunities to Section 3 workers
residing within the metropolitan area (or nonmetropolitan county) in which the assistance is
provided.
24 CFR Part 75 (up to date as of 11/04/2024)
Economic Opportunities for Low- and Very Low-Income Persons 24 CFR 75.7
24 CFR 75.9(b)(2)(iv) (enhanced display)page 5 of 14
Page 80
Packet Page. 1267
§ 75.11 Targeted Section 3 worker for public housing financial assistance.
§ 75.13 Section 3 safe harbor.
(a)Targeted Section 3 worker.A Targeted Section 3 worker for public housing financial assistance means a
Section 3 worker who is:
(1)A worker employed by a Section 3 business concern; or
(2)A worker who currently fits or when hired fit at least one of the following categories, as documented
within the past five years:
(i)A resident of public housing or Section 8-assisted housing;
(ii)A resident of other public housing projects or Section 8-assisted housing managed by the PHA
that is providing the assistance; or
(iii)A YouthBuild participant.
(b)[Reserved]
(a)General.PHAs and other recipients will be considered to have complied with requirements in this part, in
the absence of evidence to the contrary, if they:
(1)Certify that they have followed the prioritization of effort in § 75.9; and
(2)Meet or exceed the applicable Section 3 benchmarks as described in paragraph (b) of this section.
(b)Establishing benchmarks.
(1)HUD will establish Section 3 benchmarks for Section 3 workers or Targeted Section 3 workers or
both through a document published in the FEDERAL REGISTER. HUD may establish a single nationwide
benchmark for Section 3 workers and a single nationwide benchmark for Targeted Section 3
workers, or may establish multiple benchmarks based on geography, the type of public housing
financial assistance, or other variables. HUD will update the benchmarks through a document
published in the FEDERAL REGISTER, subject to public comment, not less frequently than once every 3
years. Such notice shall include aggregate data on labor hours and the proportion of PHAs and other
recipients meeting benchmarks, as well as other metrics reported pursuant to § 75.15 as deemed
appropriate by HUD, for the 3 most recent reporting years.
(2)In establishing the Section 3 benchmarks, HUD may consider the industry averages for labor hours
worked by specific categories of workers or in different localities or regions; averages for labor hours
worked by Section 3 workers and Targeted Section 3 workers as reported by recipients pursuant to
this section; and any other factors HUD deems important. In establishing the Section 3 benchmarks,
HUD will exclude professional services from the total number of labor hours as such hours are
excluded from the total number of labor hours to be reported per § 75.15(a)(4).
(3)Section 3 benchmarks will consist of the following two ratios:
(i)The number of labor hours worked by Section 3 workers divided by the total number of labor
hours worked by all workers funded by public housing financial assistance in the PHA's or other
recipient's fiscal year.
24 CFR Part 75 (up to date as of 11/04/2024)
Economic Opportunities for Low- and Very Low-Income Persons 24 CFR 75.11
24 CFR 75.13(b)(3)(i) (enhanced display)page 6 of 14
Page 81
Packet Page. 1268
§ 75.15 Reporting.
(ii)The number of labor hours worked by Targeted Section 3 workers, as defined in § 75.11(a),
divided by the total number of labor hours worked by all workers funded by public housing
financial assistance in the PHA's or other recipient's fiscal year.
(a)Reporting of labor hours.
(1)For public housing financial assistance, PHAs and other recipients must report in a manner
prescribed by HUD:
(i)The total number of labor hours worked;
(ii)The total number of labor hours worked by Section 3 workers; and
(iii)The total number of labor hours worked by Targeted Section 3 workers.
(2)Section 3 workers' and Targeted Section 3 workers' labor hours may be counted for five years from
when their status as a Section 3 worker or Targeted Section 3 worker is established pursuant to §
75.31.
(3)The labor hours reported under paragraph (a)(1) of this section must include the total number of
labor hours worked with public housing financial assistance in the fiscal year of the PHA or other
recipient, including labor hours worked by any contractors and subcontractors that the PHA or other
recipient is required, or elects pursuant to paragraph (a)(4) of this section, to report.
(4)PHAs and other recipients reporting under this section, as well as contractors and subcontractors
who report to PHAs and recipients, may report labor hours by Section 3 workers, under paragraph
(a)(1)(ii) of this section, and labor hours by Targeted Section 3 workers, under paragraph (a)(1)(iii) of
this section, from professional services without including labor hours from professional services in
the total number of labor hours worked under paragraph (a)(1)(i) of this section. If a contract covers
both professional services and other work and the PHA, other recipient, contractor, or subcontractor
chooses not to report labor hours from professional services, the labor hours under the contract that
are not from professional services must still be reported.
(5)PHAs and other recipients may report on the labor hours of the PHA, the recipient, a contractor, or a
subcontractor based on the employer's good faith assessment of the labor hours of a full-time or
part-time employee informed by the employer's existing salary or time and attendance based payroll
systems, unless the project or activity is otherwise subject to requirements specifying time and
attendance reporting.
(b)Additional reporting if Section 3 benchmarks are not met.If the PHA's or other recipient's reporting under
paragraph (a) of this section indicates that the PHA or other recipient has not met the Section 3
benchmarks described in § 75.13, the PHA or other recipient must report in a form prescribed by HUD on
the qualitative nature of its Section 3 compliance activities and those of its contractors and
subcontractors. Such qualitative efforts may, for example, include but are not limited to the following:
(1)Engaged in outreach efforts to generate job applicants who are Targeted Section 3 workers.
(2)Provided training or apprenticeship opportunities.
(3)Provided technical assistance to help Section 3 workers compete for jobs (e.g.,resume assistance,
coaching).
24 CFR Part 75 (up to date as of 11/04/2024)
Economic Opportunities for Low- and Very Low-Income Persons 24 CFR 75.13(b)(3)(ii)
24 CFR 75.15(b)(3) (enhanced display)page 7 of 14
Page 82
Packet Page. 1269
§ 75.17 Contract provisions.
Subpart C—Additional Provisions for Housing and Community Development Financial
Assistance
§ 75.19 Requirements.
(4)Provided or connected Section 3 workers with assistance in seeking employment including: drafting
resumes, preparing for interviews, and finding job opportunities connecting residents to job
placement services.
(5)Held one or more job fairs.
(6)Provided or referred Section 3 workers to services supporting work readiness and retention (e.g.,
work readiness activities, interview clothing, test fees, transportation, child care).
(7)Provided assistance to apply for/or attend community college, a four-year educational institution, or
vocational/technical training.
(8)Assisted Section 3 workers to obtain financial literacy training and/or coaching.
(9)Engaged in outreach efforts to identify and secure bids from Section 3 business concerns.
(10)Provided technical assistance to help Section 3 business concerns understand and bid on contracts.
(11)Divided contracts into smaller jobs to facilitate participation by Section 3 business concerns.
(12)Provided bonding assistance, guaranties, or other efforts to support viable bids from Section 3
business concerns.
(13)Promoted use of business registries designed to create opportunities for disadvantaged and small
businesses.
(14)Outreach, engagement, or referrals with the state one-stop system as defined in Section 121(e)(2) of
the Workforce Innovation and Opportunity Act.
(c)Reporting frequency.Unless otherwise provided, PHAs or other recipients must report annually to HUD
under paragraph (a) of this section, and, where required, under paragraph (b) of this section, in a manner
consistent with reporting requirements for the applicable HUD program.
(d)Reporting by Small PHAs.Small PHAs may elect not to report under paragraph (a) of this section. Small
PHAs that make such election are required to report on their qualitative efforts, as described in paragraph
(b) of this section, in a manner consistent with reporting requirements for the applicable HUD program.
(a)PHAs or other recipients must include language in any agreement or contract to apply Section 3 to
contractors.
(b)PHAs or other recipients must require contractors to include language in any contract or agreement to
apply Section 3 to subcontractors.
(c)PHAs or other recipients must require all contractors and subcontractors to meet the requirements of §
75.9, regardless of whether Section 3 language is included in contracts.
(a)Employment and training.
24 CFR Part 75 (up to date as of 11/04/2024)
Economic Opportunities for Low- and Very Low-Income Persons 24 CFR 75.15(b)(4)
24 CFR 75.19(a) (enhanced display)page 8 of 14
Page 83
Packet Page. 1270
§ 75.21 Targeted Section 3 worker for housing and community development financial
assistance.
§ 75.23 Section 3 safe harbor.
(1)To the greatest extent feasible, and consistent with existing Federal, state, and local laws and
regulations, recipients covered by this subpart shall ensure that employment and training
opportunities arising in connection with Section 3 projects are provided to Section 3 workers within
the metropolitan area (or nonmetropolitan county) in which the project is located.
(2)Where feasible, priority for opportunities and training described in paragraph (a)(1) of this section
should be given to:
(i)Section 3 workers residing within the service area or the neighborhood of the project, and
(ii)Participants in YouthBuild programs.
(b)Contracting.
(1)To the greatest extent feasible, and consistent with existing Federal, state, and local laws and
regulations, recipients covered by this subpart shall ensure contracts for work awarded in
connection with Section 3 projects are provided to business concerns that provide economic
opportunities to Section 3 workers residing within the metropolitan area (or nonmetropolitan county)
in which the project is located.
(2)Where feasible, priority for contracting opportunities described in paragraph (b)(1) of this section
should be given to:
(i)Section 3 business concerns that provide economic opportunities to Section 3 workers residing
within the service area or the neighborhood of the project, and
(ii)YouthBuild programs.
(a)Targeted Section 3 worker.A Targeted Section 3 worker for housing and community development financial
assistance means a Section 3 worker who is:
(1)A worker employed by a Section 3 business concern; or
(2)A worker who currently fits or when hired fit at least one of the following categories, as documented
within the past five years:
(i)Living within the service area or the neighborhood of the project, as defined in § 75.5; or
(ii)A YouthBuild participant.
(b)[Reserved]
(a)General.Recipients will be considered to have complied with requirements in this part, in the absence of
evidence to the contrary if they:
(1)Certify that they have followed the prioritization of effort in § 75.19; and
(2)Meet or exceed the applicable Section 3 benchmark as described in paragraph (b) of this section.
(b)Establishing benchmarks.
24 CFR Part 75 (up to date as of 11/04/2024)
Economic Opportunities for Low- and Very Low-Income Persons 24 CFR 75.19(a)(1)
24 CFR 75.23(b) (enhanced display)page 9 of 14
Page 84
Packet Page. 1271
§ 75.25 Reporting.
(1)HUD will establish Section 3 benchmarks for Section 3 workers or Targeted Section 3 workers or
both through a document published in the FEDERAL REGISTER. HUD may establish a single nationwide
benchmark for Section 3 workers and a single nationwide benchmark for Targeted Section 3
workers, or may establish multiple benchmarks based on geography, the nature of the Section 3
project, or other variables. HUD will update the benchmarks through a document published in the
FEDERAL REGISTER, subject to public comment, not less frequently than once every 3 years. Such
notice shall include aggregate data on labor hours and the proportion of recipients meeting
benchmarks, as well as other metrics reported pursuant to § 75.25 as deemed appropriate by HUD,
for the 3 most recent reporting years.
(2)In establishing the Section 3 benchmarks, HUD may consider the industry averages for labor hours
worked by specific categories of workers or in different localities or regions; averages for labor hours
worked by Section 3 workers and Targeted Section 3 workers as reported by recipients pursuant to
this section; and any other factors HUD deems important. In establishing the Section 3 benchmarks,
HUD will exclude professional services from the total number of labor hours as such hours are
excluded from the total number of labor hours to be reported per § 75.25(a)(4).
(3)Section 3 benchmarks will consist of the following two ratios:
(i)The number of labor hours worked by Section 3 workers divided by the total number of labor
hours worked by all workers on a Section 3 project in the recipient's program year.
(ii)The number of labor hours worked by Targeted Section 3 workers as defined in § 75.21(a),
divided by the total number of labor hours worked by all workers on a Section 3 project in the
recipient's program year.
(a)Reporting of labor hours.
(1)For Section 3 projects, recipients must report in a manner prescribed by HUD:
(i)The total number of labor hours worked;
(ii)The total number of labor hours worked by Section 3 workers; and
(iii)The total number of labor hours worked by Targeted Section 3 workers.
(2)Section 3 workers' and Targeted Section 3 workers' labor hours may be counted for five years from
when their status as a Section 3 worker or Targeted Section 3 worker is established pursuant to §
75.31.
(3)The labor hours reported under paragraph (a)(1) of this section must include the total number of
labor hours worked on a Section 3 project, including labor hours worked by any subrecipients,
contractors and subcontractors that the recipient is required, or elects pursuant to paragraph (a)(4)
of this section, to report.
(4)Recipients reporting under this section, as well as subrecipients, contractors and subcontractors
who report to recipients, may report labor hours by Section 3 workers, under paragraph (a)(1)(ii) of
this section, and labor hours by Targeted Section 3 workers, under paragraph (a)(1)(iii) of this
section, from professional services without including labor hours from professional services in the
total number of labor hours worked under paragraph (a)(1)(i) of this section. If a contract covers
24 CFR Part 75 (up to date as of 11/04/2024)
Economic Opportunities for Low- and Very Low-Income Persons 24 CFR 75.23(b)(1)
24 CFR 75.25(a)(4) (enhanced display)page 10 of 14
Page 85
Packet Page. 1272
both professional services and other work and the recipient or contractor or subcontractor chooses
not to report labor hours from professional services, the labor hours under the contract that are not
from professional services must still be reported.
(5)Recipients may report their own labor hours or that of a subrecipient, contractor, or subcontractor
based on the employer's good faith assessment of the labor hours of a full-time or part-time
employee informed by the employer's existing salary or time and attendance based payroll systems,
unless the project or activity is otherwise subject to requirements specifying time and attendance
reporting.
(b)Additional reporting if Section 3 benchmarks are not met.If the recipient's reporting under paragraph (a) of
this section indicates that the recipient has not met the Section 3 benchmarks described in § 75.23, the
recipient must report in a form prescribed by HUD on the qualitative nature of its activities and those its
contractors and subcontractors pursued. Such qualitative efforts may, for example, include but are not
limited to the following:
(1)Engaged in outreach efforts to generate job applicants who are Targeted Section 3 workers.
(2)Provided training or apprenticeship opportunities.
(3)Provided technical assistance to help Section 3 workers compete for jobs (e.g.,resume assistance,
coaching).
(4)Provided or connected Section 3 workers with assistance in seeking employment including: drafting
resumes, preparing for interviews, and finding job opportunities connecting residents to job
placement services.
(5)Held one or more job fairs.
(6)Provided or referred Section 3 workers to services supporting work readiness and retention (e.g.,
work readiness activities, interview clothing, test fees, transportation, child care).
(7)Provided assistance to apply for/or attend community college, a four-year educational institution, or
vocational/technical training.
(8)Assisted Section 3 workers to obtain financial literacy training and/or coaching.
(9)Engaged in outreach efforts to identify and secure bids from Section 3 business concerns.
(10)Provided technical assistance to help Section 3 business concerns understand and bid on contracts.
(11)Divided contracts into smaller jobs to facilitate participation by Section 3 business concerns.
(12)Provided bonding assistance, guaranties, or other efforts to support viable bids from Section 3
business concerns.
(13)Promoted use of business registries designed to create opportunities for disadvantaged and small
businesses.
(14)Outreach, engagement, or referrals with the state one-stop system as defined in Section 121(e)(2) of
the Workforce Innovation and Opportunity Act.
(c)Reporting frequency.Unless otherwise provided, recipients must report annually to HUD under paragraph
(a) of this section, and, where required, under paragraph (b) of this section, on all projects completed
within the reporting year in a manner consistent with reporting requirements for the applicable HUD
program.
24 CFR Part 75 (up to date as of 11/04/2024)
Economic Opportunities for Low- and Very Low-Income Persons 24 CFR 75.25(a)(5)
24 CFR 75.25(c) (enhanced display)page 11 of 14
Page 86
Packet Page. 1273
§ 75.27 Contract provisions.
Subpart D—Provisions for Multiple Funding Sources, Recordkeeping, and Compliance
§ 75.29 Multiple funding sources.
§ 75.31 Recordkeeping.
(a)Recipients must include language applying Section 3 requirements in any subrecipient agreement or
contract for a Section 3 project.
(b)Recipients of Section 3 funding must require subrecipients, contractors, and subcontractors to meet the
requirements of § 75.19, regardless of whether Section 3 language is included in recipient or subrecipient
agreements, program regulatory agreements, or contracts.
(a)If a housing rehabilitation, housing construction or other public construction project is subject to Section 3
pursuant to § 75.3(a)(1) and (2), the recipient must follow subpart B of this part for the public housing
financial assistance and may follow either subpart B or C of this part for the housing and community
development financial assistance. For such a project, the following applies:
(1)For housing and community development financial assistance, a Targeted Section 3 worker is any
worker who meets the definition of a Targeted Section 3 worker in either subpart B or C of this part;
and
(2)The recipients of both sources of funding shall report on the housing rehabilitation, housing
construction, or other public construction project as a whole and shall identify the multiple
associated recipients. PHAs and other recipients must report the following information:
(i)The total number of labor hours worked on the project;
(ii)The total number of labor hours worked by Section 3 workers on the project; and
(iii)The total number of labor hours worked by Targeted Section 3 workers on the project.
(b)If a housing rehabilitation, housing construction, or other public construction project is subject to Section
3 because the project is assisted with funding from multiple sources of housing and community
development assistance that exceed the thresholds in § 75.3(a)(2), the recipient or recipients must follow
subpart C of this part, and must report to the applicable HUD program office, as prescribed by HUD.
(a)HUD shall have access to all records, reports, and other documents or items of the recipient that are
maintained to demonstrate compliance with the requirements of this part, or that are maintained in
accordance with the regulations governing the specific HUD program by which the Section 3 project is
governed, or the public housing financial assistance is provided or otherwise made available to the
recipient, subrecipient, contractor, or subcontractor.
(b)Recipients must maintain documentation, or ensure that a subrecipient, contractor, or subcontractor that
employs the worker maintains documentation, to ensure that workers meet the definition of a Section 3
worker or Targeted Section 3 worker, at the time of hire or the first reporting period, as follows:
(1)For a worker to qualify as a Section 3 worker, one of the following must be maintained:
(i)A worker's self-certification that their income is below the income limit from the prior calendar
year;
24 CFR Part 75 (up to date as of 11/04/2024)
Economic Opportunities for Low- and Very Low-Income Persons 24 CFR 75.27
24 CFR 75.31(b)(1)(i) (enhanced display)page 12 of 14
Page 87
Packet Page. 1274
§ 75.33 Compliance.
(ii)A worker's self-certification of participation in a means-tested program such as public housing
or Section 8-assisted housing;
(iii)Certification from a PHA, or the owner or property manager of project-based Section 8-assisted
housing, or the administrator of tenant-based Section 8-assisted housing that the worker is a
participant in one of their programs;
(iv)An employer's certification that the worker's income from that employer is below the income
limit when based on an employer's calculation of what the worker's wage rate would translate
to if annualized on a full-time basis; or
(v)An employer's certification that the worker is employed by a Section 3 business concern.
(2)For a worker to qualify as a Targeted Section 3 worker, one of the following must be maintained:
(i)For a worker to qualify as a Targeted Section 3 worker under subpart B of this part:
(A)A worker's self-certification of participation in public housing or Section 8-assisted
housing programs;
(B)Certification from a PHA, or the owner or property manager of project-based Section
8-assisted housing, or the administrator of tenant-based Section 8-assisted housing that
the worker is a participant in one of their programs;
(C)An employer's certification that the worker is employed by a Section 3 business concern;
or
(D)A worker's certification that the worker is a YouthBuild participant.
(ii)For a worker to qualify as a Targeted Section 3 worker under subpart C of this part:
(A)An employer's confirmation that a worker's residence is within one mile of the work site or,
if fewer than 5,000 people live within one mile of a work site, within a circle centered on
the work site that is sufficient to encompass a population of 5,000 people according to the
most recent U.S. Census;
(B)An employer's certification that the worker is employed by a Section 3 business concern;
or
(C)A worker's self-certification that the worker is a YouthBuild participant.
(c)The documentation described in paragraph (b) of this section must be maintained for the time period
required for record retentions in accordance with applicable program regulations or, in the absence of
applicable program regulations, in accordance with 2 CFR part 200.
(d)A PHA or recipient may report on Section 3 workers and Targeted Section 3 workers for five years from
when their certification as a Section 3 worker or Targeted Section 3 worker is established.
(a)Records of compliance.Each recipient shall maintain adequate records demonstrating compliance with
this part, consistent with other recordkeeping requirements in 2 CFR part 200.
(b)Complaints.Complaints alleging failure of compliance with this part may be reported to the HUD program
office responsible for the public housing financial assistance or the Section 3 project, or to the local HUD
field office.
24 CFR Part 75 (up to date as of 11/04/2024)
Economic Opportunities for Low- and Very Low-Income Persons 24 CFR 75.31(b)(1)(ii)
24 CFR 75.33(b) (enhanced display)page 13 of 14
Page 88
Packet Page. 1275
(c)Monitoring.HUD will monitor compliance with the requirements of this part. The applicable HUD program
office will determine appropriate methods by which to oversee Section 3 compliance. HUD may impose
appropriate remedies and sanctions in accordance with the laws and regulations for the program under
which the violation was found.
24 CFR Part 75 (up to date as of 11/04/2024)
Economic Opportunities for Low- and Very Low-Income Persons 24 CFR 75.33(c)
24 CFR 75.33(c) (enhanced display)page 14 of 14
Page 89
Packet Page. 1276
Sl!l S Cfl EULE BUILDING
'PROJf.CT NAME: HomeJei.:s N.11..,lgaflon Cttntt,r C~mp~u• CfJEN1':
Cit y of San 8crnard 1n1>
PROJECT No GB24 010
LOCATION· 796 6th St San Be1,1aidino, CA a2~10
BIO OPENING DATE · January 13 2 026
No. Div 0.scrilJtion
I
8 00100 General Requi1•m11nts
0130 00 Administrative Requirements
0140 00 Quality Control, Testing and Commissioning
0150 00 Temporary Facilities and Controls
0190 00
Life Cycle Activities-Includes commissioning of furnished and installed equipment as required by p,oject plans,
specifications or applicable codes and standards
1J 00300 concrote
0310 00
Concrete Formfng and Accessories-For Reinforced Concrete Foundation-Front Offices and Communal Spaces
0310 00 Concrete Forming and Accessories-For Reinforced Concrete Foundation-Flex Space
031000
COncrete Forming and Accessories-For Reinforced Concrete Foundation•lounge, Storage end Hot Bo)(
031000 Concrete Forming and Accessories-For Reinforced Concrete Foundatlons•Offices
031000 Concrete Forming and Accessories-For Reinforced Concrete Foundation•Med Congregate Beds 1
031000 Concrete Forming and Accessories.-For Reinforced Concrete Foundation• Triage/Medical Beds
031000 Concrete Forming and Accessories.For Reinforced Concrete Foundation•Kitchen/Dining
0310 00 Concrete Forming and Accessories-For Reinforced Concrete Foundation.Congregate Beds 1
031000 Concrete Forming and Accessories.For Reinforced Concrete Foundation.Congregate Beds 2
0310 00 Concrete Forming and Accessories.For Reinforced Concrete Foundation•lndividual Sleeping Units
03 10 00 Concrete Forming and Accessories-For Reinforced Concrete Foundation-Dog Wash
0310 00 Concrete Forming and Accessories-For Relnforced Concrete Foundation-Dog Kennel
031000 Concrete Forming and Accessories-For Reinforced Concrete Foundation-Storage
031519 Furnish and Install Cast-in-Concrete Base Plates-Front Offices and Communal Spaces
031519 Furnish and Install Cast-in-Concrete Base Plates-Flex Space
031519 Furnish and Install Cast-in-Concrete Base Plates•Lounge, Storage and Hot Box
031519 Furnish and Install Cast-in.concrete Base Plates-Offices
031519 Furnlsh and Install cast-in-Concrete Base Plates,.Med Congregate Beds 1
031519 Furnish and Install cast-in-Concrete Base Plates-TriageMedical Beds
031519 Furnish and Install Cast-in-Concrete Base Plates-Kitchen/Dining
031519 Furnish and Install Cast.in-Concrete Base Plates--Congregate Beds 1
031519 Furnish and Install Cast-in-Concrete Base Plates-Congregate Beds 2
03 15 19 Furnish and Install cast-in-concrete Base Plate~ndividual Sleeping Units
03 15 19 Furnish and Install cast-in-concrete Base Plates-Dog wash
03 JS 19 Furnish and Install cast-in-concrete Base Plates-Dog Kennel
03 15 19 Furnish ,ind Install Cast.in-Concrete B;ise Plates-Storage
03 30 IIO Furnish and Install Anchor straps-Front Offices and Communal Sp;ices
OJ 30 011 Furnish and Install Anchor Straps-Flex Space
03 30 011 Furnish and Install Anchor Straps-lounge, Storage and Hot Bo)(
03 30110 Furnish and Install Anchor Straps-Offices
113 30 on Furnish and Install Anchor Straps-Med Congregate Beds 1
Qty Unit Contractor's Bid
Unit Price Amount
1 LS $796,000.00 $796,000.00
$0.00
$0.00
$0.00
$0.00
$0 .00
1,243 SF $35,00 $43,505.00
965 SF $35.00 $33 ,775 .00
1,073 SF $35.00 $37,555.00
871 SF $35.00 $30,485.00
1,056 SF $35,00 $36,960.00
807 SF $35 .00 $28,245.00
916 SF $35.00 $32,060.00
1,950 SF $35 ,00 $68 ,250.00
938 SF $35.00 $32,830.00
5,661 SF $35 ,00 $ I 98,135.00
566 SF $35.00 $19,810.00
566 SF $35 .00 $19 ,8 10.00
566 SF $35.00 $19,810.00
34 EA $750.00 $25 ,500 .00
15 EA $750.00 $11,250.00
24 EA $750.00 $18,000.00
26 EA $750.00 $19,500.00
26 EA $750,00 $19,500.00
23 EA $750,00 $17,250.00
28 EA $750.00 $21,000 .00
63 EA $750.00 $47,250.00
22 EA $750,00 $16,500.00
90 EA $750.00 $67,500.00
4 EA $750.00 $3,000 .00
4 EA $750.00 $3,000.00
4 EA $750.00 $3,000.00
34 EA $135.00 $4,590.00
25 EA $585.00 $14,625 .00
29 EA $585.00 $16,965 .00
10 EA $585.00 $5,850 .00
8 EA $585.00 $4,680.00
Packet Page. 1277
OJ 311011 Furnish and Install Anchor Straps. Triag8/Medical Beds JS EA $585 .00 $8,775.00
UJ 3000 Furnish and Install Anchor Sbaps-Kilchen,t)jnjng 20 EA $585 .00 $11 ,700.00
03 30 00 Furnish ~nd lns1all Anchor Slr;lps-Congregate Beds 1 47 EA $585.00 $27 ,495.00
03 311011 Furnish and Install Anchor Straps-Congregate Beds 2 22 EA $585.00 $12,870.00
03 30 no Furnish and Install Anchor Straps-lndMdual Sleeping Units 1711 EA $585.00 $99,450.00
03 311110 Furnish and Install Anchor Straps-Dog Wash 14 EA $585.00 $8,190.00
03 311110 Furnish and lnstan Anchor Straps-Dog Kennel 14 EA $585.00 $8,190.00
03 31100 Furnish and lnsta" Anchor straps,-Slorage 14 EA $585.00 $8,190.00
Furnish and Install Cast.In-Place Reinforced Concrete Foundation.front Offices and Communal Spaces
$135.00 03 30110 30 $4,050.00
CY
03 311110 Furnish and Install Cast-fo-Pfoce Reinforced Concre1e Foundation-Flex Space 24 $135 .00 $3,240 .00
CY
03 30 00 Furnish and lnstaR cast.Jn.ptace Reinforced Concrete Foundation.Lounge, storage and Hot Sox 13 CY $135.00 $2,430.00
03 30 IKI Furnish and Install Cast-~..Place Reinforced Concre1e Foundaion.-Offices 13 $135 .00 $2,430.00
0
OJ 3000 FurnJsh and lnst8'/ Cast-In-Place Reinforced Concrete Foundation.Med Congregate Beds 1 20 $135 .00 $2,700.00
C,
03 30 Oil furnish and tnstaa Cast-ln..f>lace Reinforced Concrete Foundation-Triage,1\Aedical Beds IS $135.00 $2,025.00
"
OJ J0 IKI Furnish and lnstaR Cast-ln-Ptact! Reinforced Concrete Foundation--Kachen/Dining 17 $135 .00 $2,295.00
er
Ul 30 00 Fumish and Install Casf.ln-fllace Reinforced Concrete Foundation-Congregate Beds 1 35 $135 .00 $4,725.00
Cf
113 JIJ0II Flrnish and Install Cast-In-Place Reinforced Concrete Foundation.Congregale Beds 2 17 $135 .00 $2,295.00
"'
0330110 Furnish and lnstaV Cast-ln4llace Reinrorced Concrete Foundation-Individual Sleepilg Units 154 CY $135 .00 $20,790.00
03 31100 Fumish and Install Cast-fn..Plact! Reinforced Concrete Foundation•Oog Wash 9 $135 .00 $1,215.00
Cl
03 3000 Furnish and fnstall Cast~n-Place Reinforced Concrete Foundation-Dog Kennel 9 $135 .00 $1,215.00
~
03 30 00 Furnish and lnsta U cast-In-Place Reinforced Concrete Foundation-Storage 9 $135.00 $1 ,215.00
~ . D0500 Metals $0.00
05 10 U0
Connect Set Modular Units to foundations-Include s required Nute and Bolls-Front Offices and Communal Spaces
34 EA $2,500.00 $85,000.00
OS Ill on Connect Se1 Modular Units to foundations-Includes required Nuts and Bo4ts-Flex Space 15 EA $2,500.00 $37,500.00
05 10 00
Connect Set Modular Units to foundations.Includes requlrod Nuts and Botts.Lounge, storage and Hot Boir
24 EA $2,500.00 $60,000.00
0510 00 Connect Set Modular Units to foundations-Includes required Nuts end Bolts-Offices 26 EA $2,500.00 $65,000.00
0510 00
Connect Set Modular Units to foundatiORS-lncludes ,equi'ed Nuts and Bolts-Med Congregate Beds 1
26 EA $2,500.00 $65 ,000.00
0510 00 Connect Set Modular Units to fouodaUon s-lnciudes required Nuls and Bofts·Triage/Mecftcal Beds 23 EA $2,500.00 $57,500.00
0510 00 Connect Set Modular Units to foundations-Includes required Nuts and Bolls~itchen/Oining 28 EA $2,500.00 $70,000.00
0510 00 Connect Set Modular Unils lo found~nciudes required Nuts and Bolts--Congregate Beds 1 63 EA $2,500.00 $157,500.00
0510 00 COnncct Set Modular Units to foundations-lnciudes required Nuts and Bolts-Congregate Beds 2 22 EA $2,500.00 $55,000.00
0510 00
Connect Set Modular Units to foundations-1ncludes required Nuts and Bolts-lndrvidual Sleeping Units
BO EA $2,500.00 $225,000.00
0510 OD Connect Set Modular Unils to foundations-Includes required Nuts and Bolts-Dog Wash 4 EA $2,500.00 $10,000.00
0510 00 Connect Set Modular Uoils to foundaUons-lncludes required Nuts and Bolts-Dog Kennel 4 EA $2,500.00 $10,000.00
0510 00 Connect Set Modular Units lo foundations-Includes required Nuts end Botts-Storage 4 EA $2,500.00 $10,000.00
0510 00
Furnish and Install Top Cotinection Plates including required Nu1s and Bolts•Front Offices and Comrnunal Spaces
45 EA $1,800.00 $81 ,000.00
051000 Furnish and lnstal Top Connection Plates including required Nuts and ~ls-Flex Space 16 EA $1 ,800.00 $28,800.00
0510 00
Furnish and Install Top Connection Plates including required Nuts and Bolts--Lounge, Storage and Hot Box
30 EA $1,800.00 $54,000.00
0510 00 Furnish and Install Top Connection Plales Including reqJlrod Nuts and Bol1s•Offices 34 EA $1,800.00 $61,200.00
051000
Furnish and lnstan Top Connection Plates inctudiog required Nuts and Bolts-Med Congregate Beds 1
30 EA $1,800.00 $54,000 .00
0510 OD Furnish and Install Top Connection Plates including required Nuts and Bolts--Trfage/Medlcal Beds 27 EA $1,800.00 $48,600 .00
0510 00 Fumtsh aoo Install Top Connection Plates Including required Nuts and Botts-KltcheniOnlng 30 EA $1,800.00 $54,000.00
Packet Page. 1278
05 10 00 Furnish and Install Top ConnecUon Plates including required Nuts and Bolts-congregate Beds I 90 EA $1,800.00 $162,000.00
05 10 00 Furnish and Install Top Connection Plates includlng required Nuts and Bolls-Congregate Beds 2 18 EA $1,800.00 $32,400.00
OS 10 00
Furnish and lnstaU Top Connection Plates including required Nuts and Sotts-tndMdual Sleeping Unns
EA $0.00 $0.00
0510 DD Furnish and Install Top Connection Plates Including required Nuts and Bolts--Dog Wash EA $0.00 $0.00
0510 DD Furnish and Install Top Connection Plates including required Nuls and Bolts-Dog Kennel EA $0.00 $0.00
05 10 OD Furnish and Install Top Connection Plates Including required Nuts and Bolts--Storage EA $0.00 $0.00
• 00600 -wood. PlactJc and Composites $0.00
06 B000
Furnish and Install Exterior Acrylic Fa □ade-lndudcs required Waterprooling•Front Offices and Communal Spaces
~,384 SF $19.75 $86,584.00
06 B000 Furnish and Install Exterior Acrylic Fal lade-Includes required Waterproofing-Flex Space 3,200 SF $19 .75 $63,200.00
06 8000
Furnish and Install Exterior Acrylic Fanede-lncludes required Waterproofing-Lounge, Storage and Hot Box
3,648 SF $19 .75 $72,048.00
06 8000 furnish and Install Exterior Acrylic Fanade-lncludes required Waterproofing-Offices 1,280 SF $19.75 $25,280.00
06 B000
Furnish and lnsteU Exterior Acrvlic Faf.lade-lncludas required Waterprooffng-Med Congregate Beds 1
992 SF $19 .75 $19,592.00
06 8000 Furnish and Install Exterior Acrylic Fanade-lncludes required Waterproofing-Triage/Medlcal Beds 1,856 SF $19.75 $36,656.00
06 8000 Furnish and Install Exterior Acrylic Fa! lade-Includes required Waterpraoflng-Kitchen/Oining 2,592 SF $19 .75 $51,192.00
06 8000 Furrish and Install Exterior Acrytic Fal ede-lncludes required WateJl)looflng-Congregate Beds l 5.984 SF $19.75 $118,184.00
()6 SO IN) Furnish and lnstan Exteticr Acrylic FarJada-lncludes re-quired Waterproofing-Congregate Beds 2 2.784 SF $19.75 $54,984.00
06 SIi 110
Furnish and Install Exterior Actylic Fanade-lndude!i required Waterproofing-Individual Sleeping Units
21,760 SF $19 .75 $429,760.00
068000 Furnish and Install Exterior Acrylic FaUade-1ncfudes required Waterproofing-Dog Wash 1.728 SF $19.75 $34,128.00
1168000 Fumish and lnslaU Exte,ior Aayfic Fanad•lnctudn requiJed W81Mproofing.0og Keooet 1.721 SF $19 .75 $34,128.00
06 so oo Furnish and Install Exte1io1 Acrylic Fan ade--lnclude-s requ ired Waterprooflng-Storoge 1,728 SF $19.75 $34,128.00
l07 D0700 •Thermal and Moisture Ptotection $0.00
07 50 IKI
Furnish and Install TPO Roof Sygtem-lncludes Waterproofing, Drainage and Trim-Front Offices and Communal Spaces
4,5011 SF $18 .00 $81,000.00
01 soon Furnish and Install TPO Roof Sygtem-lncludes Waterproofing, Drainage and Trim-FJe,c Space 2.240 SF $18 .00 $40,320.00
U750UIJ
Furnish and Install TPO Roof Syslem-lndudes Walerproofing, Drainage and Trim-Lounge-, Storage and Hot Box
3,360 SF $18.00 $60,480.00
117 50 110 Furnish and Install TPO Roof System-Includes Waterproonng, Drainage and Trim-Offices 3,360 SF $18.00 $60,480.00
111511 no Furnish and Install TPO Roof System-Includes Waterproofing, Drainage and Trim-Med Congregate Beds I
3,640 SF $18.00 $65,520.00
07 50 00
Furnish and Install TP0 Roof System-Includes Waterproofing, Drainage and Trim-Triage/Medical Beds
3.36U $18.00 $60,480.00 SF
117 511 00 Furnish and Install TPO Roof System-Includes Waterproofing, Drainage and Trim-Kitchen/Dining 3.6411 SF $18.00 $65,520.00
07 50011
Furnish and Install TPO Roof System-Includes Waterproofing, Drainage and Trim-Congregate Beds
I 8,&211 SF $18.00 $158,760.00
111511 no Furnish and Install TPO Roof System-Includes Waterproofing, Drainage and Trim-Cong regate Beds
2 2.8110 SF $18 .00 $50,400 .0 0
07 50 00
Furnish end Install TPO Roof System-Includes Waterproofing. Drainage and Trlm-lndNkfual Sleeping Unils
5.61!0 SF $18.00 $100,800.00
07 50 1HI Furnish and lnstan TPO Roof System-Includes Wa1erproofing, Drainage and Trim-Dog Wash 560 SF $18 .00 $10,080.00
07 50 00 Furnish and Install TPO Roaf System-Includes Waterproofing, Drainage and Trim-Cog Kennel 560 SF $18.00 $10,080.00
07 50IHI Furnish and Install TPO Roof System-Includes Waterproofing, Drainage and Trim--Slorage 560 SF $18.00 $10,080.00
0791100
Fumiah and lnslall Floor. WaU and Ceiling Joint Sealant at Mate Une Locations-Front Offices and Communal Spaces
420 LF $26.00 $10,920.00
ll7911011 Furnish and Install Floor, Woll and Ceiling Joint Sealant at Mate Lina Lccations-Flex Space 280 LF $26.00 $7,280.00
11790110
Furnl$h and Install Floor, Wall and Celling Joint Sealant at Mate Une Locatfons~Lounge. Stor119e and Hat Box
500 LF $26.00 $13,000.00
07911 00 Furnish and Install Floor, Wall and Ceiling Joint Sealant at Mate Line Lc~ions-Offlces 4&0 LF $26.00 $12,480.00
07901!0
Furnlsh and lnstaU Floor, Wall and Ceiling Joint Sealant at Mats Line LccaUons.-Med Congregate Beds I
420 LF $26.00 $10,920.00
07901!0
Furnish and Install Floor, Wall and Celllng Joint Sealant at Mate Line Locations-Triage/Madical Beds
480 LF $Z6 .00 $12,480.00
07901MI Furnish and Install Floor, Wall and Ceiling Joint Sealant at Mate Line Locations-Kitchen/Dining 420 LF $26.00 $10,920.00
07 90 00 Fumi&h and Install Floor, Wall and Ceiling Joinl Sealant al Mate Lina L0catlDJ1s-COn9regate Beds l 1.600 LF $26.00 $41,600.00
1179000 Furnish and Install Flo0f. Wall and Ceiling Joint Sealant at Mate Une Location$-Cong1egate Beds 2 320 LF $26.00 $8,320.00
Furnis;h and Install Floor, Wall and Ceiling Joint Sealant ■t Mate Line Locations-Individual Sleeping Units
$0 .00 $0.00 079000 LF
Packet Page. 1279
0790{1(} Furnish and Install floor, Wall and Ce~ing Joilt Sealant al Mala Linc Locatlons--Oog Wash LF $0.00 $0.00
07 90 00 Furnish and Install Floor, wan and CeUlng Joint Sealant 111 Mate Line Locations-Dog Kennel LF $0.00 $0.00
0790{)(1 Furnish and tnstaK Floor, Wall and CeiOng ..Qnl Sealant at Mate Line Locations-Storage LF $0.00 $0.00
134 D0900 Fillishes $0.00
0980 00 Fumlsh ar,,d lnsta.11 f:.11enor Pllnt,-Pnmer alld 2 Col'.lts--Fron1 Ofr.ces end Commu~ Spe.ae!ii 4,3&4 Sf $3 .25 $14,248.00
09 90 00 Furnish and Install Exterior Paiht-Primer and 2 Coats-.flex Space 3,200 SF $3-25 $10,400.00
09 90 00 Furnish and Install Exterior Paint-Primer and 2 Coats-Lounge, Storage and Hot Bo• 3,6<8 SF $3 .25 $11,856.00
09 90 00 Furnish and tnstatl Exterior Paint-Primer and 2 Coats-Offices 1.2eo SF $3.25 $4,160.00
09 90 00 Furnish and lnstaU Exterior Paint-Primer and 2 Coats-Med Congregate Beds 1 992 Sf $3 .25 $3,224.00
09 9000 Furnish and Install Exterior Paint-Primer and 2 Coats-Trtageflv1edK:al Beds l ,8SB Sf $3.25 $6,032 .00
09 90 00 Furnish and Install Exterior Paint-Primer end 2 Coats-Kitchen/Dining 2 :5 92, SF $3.25 $8,424.00
09 90 00 Furnish and Install Exterior Paint-Primer and 2 Coats-Congregate Beds 1 5.9M SF $3.25 $19,448.00
09 90 00 Furnish and Install Extertor Palnt-PrimMand 2 Coats-congregate Beds 2 2.784 SF $3 .25 $9,048.00
099000 Furnish and Install Exterior Paill-Ptimerond 2 Coa~ndividual Sleeping Units 21 .760 SF $3 .25 $70,720.00
09 90 00 Furnish end Install Exterior Palnt..Prlmer and 2 Coats-Dog Wash 1 ,7<B SF $3.25 $5,616.00
099000 Furnish and hlste.11 Exterk>r Paint-Primer and 2 Coats-Dog Kennel ,.rn SF $3.25 $5,616 .00
09 90 00 Furnish and Install Exterior Paint-Primer and 2 Coats-Storage 1,7211 Sf $3.25 $5,616.00
09 70 00
Furnish and Inst.di Re~ient Floortng-ARMSTRONG RAFFIA STREAM• WI DIO, 12"X24" STANDARD COLOR
2,400 SF $28.00 $67,200.00 TBD·Hallways
149 01300 ~pecfal ConstNctlon $0.00
1321 26.1 Furnfsh and Install Walk-In Cooler. Includes floor, ceiling and wall panels, equipment and finishes BO SF $650.00 $52,000.00
13 2126.2 Furnish and lnstall Walk-In Freezer. Includes floor, cetllng and wall panets, equipment and finishes 60 SF $650.00 $39,000.00
111 D2100 FI .. Prolection $0.00
211000
Connect Ftre Servk:e line to Modular B1.11ldings-lncludes all required fittings and up to 5 feet of pipe•2R
4 EA $3,500.00 $14,000.00
211000
Conned Fire Setvice Line lo Modular B1111dlngs-lncludes all required fittings and up to 5 feet of pipe-1"
13 EA $2,500.00 $32,500.00
211000
Connect Fire Sprinkler Pipes at Mate Lines-Includes all required fittings and up to 5 feet of plpe-Front Offices and
EA $0.00 $0,00 Comrmmal Spaces
2110 00
Connect F,re Sprinkler Pipes at Mete Lines-Includes all required fittings and up to 5 feet of pipe-Fie, Space
4 EA $2,200 .00 $8,800.00
211000
Connect Fire Sp1inkler Pipes al Mate Lines--fnrJudes all required fittilgs and up to 5 reet of pipe-Lounge, Storage
5 EA $2,200 .00 $11 ,000.00 and Hot Box
211000
Connect Fire Sprinkler Pipes at Mate Lines-Includes an required fittings and up to 5 feet of pipe-Offices
3 EA $2,200.00 $6,600.00
211000
Connec;t Fire SprinkSer Pipes at Mate UleS-ln<:ludes atl required fittings and up to 5 feet of pipe-Med Congreg.ite
5 EA $2,200.00 $11,000 .00 Beds 1
211000
Connect Fire Sprinkler Pipes at Mate Unes-lncludes all required fiWngs and up to 5 feet of pipe-Triage/Medic.al Beds
5 EA $2,200 .00 $11,000.00
211000
Connect Fire Sprinkler Pipes at Mate Lines-Includes all required fittings and up to 5 feet of pipe-Kitchen/Dining
4 EA $2,200.00 $8,800.00
211000
Connect Fire Sprinkle, Pipes at Mate Lruts..incfudas all requhd ftttkigs and up to 5 feet of pipe-Congregate Beds 1
40 EA $2,200 .00 $88 ,000.00
211000
Connect Fire Sprinkler Pipes at Mate Wnes-lncludes an required fittings and up to 5 feet of pipe-Congregale Beds 2
2 EA $2,200 .00 $4,400 .00
211000
Connect Fire Sprinkler Pipes at Mate Liles-Includes all required fitings and up to 5 feet of plpe-lndMdu.n Steeping
Units 1( EA $2,200.00 $22,000 .00
211000
Connect Fire Sprinkler Pipes at Mate Ules-lncludes all required fittings and up to 5 feet of pipe-Dog Wash
EA $0.00 $0.00
211000
Connect Fire Sprinkler Pipes al Mate Liles-Includes all required fittings and up to 5 feet of pipe-Dog Kennel
I EA $2,200.00 $2,200.00
211000
Connect Fire Sprinkler Pipes at Mate Lines-Includes aU required 6Wngs and up to S feet of pipe--Slorage
EA $0.00 $0.00
16B 02200 ""Plumbing $0.00
221100
Connect Potable Water Service to Modular Bulklings-tncludes a.II required frttings and up to 5 feet of pipe-Front
Offices and communal Spaces-1" 1 EA $3,000.00 $3,000.00
221100
Connect Potable Water Service to Moduar Buildings-Includes 8'1 required fittings and up to 5 feel of pipe.front
Offices and Communal Spaces-Ls· 10 EA $2,500.00 $25,000.00
221100
Connoct Potable Water Service to Modular Buildings-Includes all required fittings end up to 5 feet of pipe-Front
Office& and Communal Spaccs-2• 2 EA $2,200.00 $4,400.00
221100
Connect Potable Weter Service to Modular Bulklings-lncludes all required fittings and upto 5 feet of pipe-Front
Ofices and Communal Spaces-3" 3 EA $2,400.00 $7,200.00
221100
Connect Potablo Water Servtce pipe at Mate6nes-tndudes aJI required fittings and up to 5 feet of pipe-Front Offices
and Communal Spaces 3 EA $2,400.00 $7,200.00
221100
Connect Potable Water Setvice pipe etMatellnes-lncludes all required fittings and upto 5 feet of pipe-Flex Space
0 EA $0.00 $0.00
Packet Page. 1280
2211 00
Connect Potable Wa1er Service pipe at Matelines-lncludes all required fittings and up to 5 feet of pipe-Lounge,
Storage and Hot Box 4 EA $2,200.00 $8,800.00
2211 00
Connect Potable Water Service pipe at Matelines-lncludes all required fittings and up to 5 feet of pipe-Offices
EA $0.00 $0.00
2211 00
Connect Potable Water Service pipe at MataHnes-lnciudes ell required fittings and up to S feet of pipe--Med
Congregate Beds; 1 EA $0 .00 $0.00
221100
Connect Potable Water Service pipe at Matellnes-lncludes all required fittings and up to 5 reet of pipe-
EA $0.00 $0.00 Triage/M'edical Beds
221100
Connect Potable Waler Service pipe at Matelines-lnciudes all required fittings and up to 5 feet of pipe-
Krlchen/Dining 1 EA $2,200.00 $2,200.00
Connect Potable Water Service pipe at Matelines-lnciudes all required fittings and up to 5 feet of pipe-Congregate
$0 .00 $0 .00 221100 Beds1 EA
Connect Potable Water Service pipe at MateDnes-lncludes all required fittings and up to 5 feet or pipe-Congregate
221100 Beds2 2 EA $2,200.00 $4,400.00
221100
Connect Potable Water Service pipe at Matellne!.-l11cludes an required fittings and up to 5 reet or pipe•lndividual
Sleeping Units EA $0.00 $0.00
221100
Connect Potable Water Service pipe at Matelines-lncludes all required fittings and up to 5 feet of pfpe-Dog Wash
EA $0.00 $0.00
221100
Connect Potable Water Service pipe at Matellnes•lncludes all required fittings and up to 5 feet of pipe-Dog Kennel
EA $0 .00 $0 ,00
Connect Potable Weter Service to Modular Buildings-Includes all required fittings. and up to S feet of pipe.storage
$0 .00 $0.00 221100 EA
221300
Conneci Sewer lateral to Modular Buildings-Includes all required fittings and up to 5 feet of pipe-1.Sn
2 EA $2,500.00 $5,000.00
2213 00
Connect S8'Ner lateral to Modular Buildings-Includes. all required fittings and up to 5 feet of ptpe-4•
24 EA $2,000.00 $48,000.00
2213 OD
Connect Sewer Lateral Pipes at Matelines-lncludes an required rrtmgs and up to 5 feet of pipe-front Offices and
Communal Spaces EA $0.00 $0.00
Connect Sewer Lateral Pipes at Malelines-lncludes all required fJttlngs and up to 5 feet of pipe-flex Space
$0.00 $0 .00 221300 EA
2213 00
Connect Sewer Lateral Pipes at Matelines-lncludes all required fittings and up to 5 feet of pipe-Lounge, Storage and
Hot Box 4 EA $2,600.00 $10,400.00
Connect sewer Lateral Pipes at MateUnes-lncludes eU required fittings and up to 5 feet of pipe-Offices
$0.00 $0 .00 22 13 DO EA
2213 DO
Connect Sewer Lateral Pipes at Matellnes-lncJudes all requi red fitdngs and up to 5 feet of pipe-Med Congregate
Beds 1 EA $0.00 $0.00
2213 OD
Cohnect Sewer Lateral Pipes at Matelines--lncludes all required fittings and up to 5 feet of pipe-Triageflv1edical Beds
EA $0.00 $0.00
221300
Connect Sewer Lateral Pipes at Matelines-lndudos all required fittings and up to 5 feet of pipe-Kitchen/Dining
1 EA $2,500.00 $2,500.00
221300
Connect Sewer lateral Pipes at Matellnes-lncludes all required fittings and up to 5 feet of pipe-Congregate Beds 1
EA $0.00 $0.00
2213 OD
Connect Sewer Lateral Pipes at MateUnes.lncludes all required fittings and up lo 5 feet of pipe-Congregate Beds 2
EA $0.00 $0.00
2213 00
Connect Sewer Lateral Pipes et Matellnes-lncludes all required fittings and up to 5 feet of plpe-lndMdual Sleeping
Units EA $0.00 $0.00
Connect Sewer Lateral Pipes at Matellnes-lncludes all required fittings and up to 5 feet of pipe-Dog Wash $0 .00 $0 .00 2213 00 EA
Connect Sewer late,al Pipes et Metelines-lncludes all required fittings and up to 5 feet of pipe-Oog Kennel $0 .00 $0.00 2213 OD EA
2213 00
Connect Sewer Lateral Pipe-s at Matellnes-lncludes all required fittings and up to 5 feet of pipe-Storage
EA $0.00 $0.00
2214 00
Furnish and Install 6"x4" Primary and Overflow Roof Drainage Scuppers-Front Offices and Communal Spaces
4 EA $850.00 $3,400.00
2214 DD Furnish and Install 6•x4" Primary and Overflow Roof Drainage Scuppers-Flex Spece 2 EA $850.00 $1,700.00
2214 00
furnish and Install 6"x4• Primary and Overflow Roof Oralnage Scuppers-Lounge, Storage and Hot Box
2 EA $850 .00 $1,700.00
2214 00 Furnish and Install 6"x4• Prtmary and Overflow Roof Drainage Scuppers-Offices 2 EA $850.00 $1,700.00
2214 DO Furnish and Install 6"x4" Primary and overflow Roof Drainage Scuppers-Med Congregate Beds 1 2 EA $850 .00 $1,700.00
221400 Furnish and Install 6"x4" Primary and Overflow Roof Drainage Scuppers-Triage/Medical Beds 2 EA $850 .00 $1,700.00
221400 Furnish and Install 8"x4" Primary and Overflow Roof Drainage Scuppers-Kitchen/Dining 2 EA $850.00 $1,700 .00
2214 00 Furnish and Install 6"x4" Primary and Overflow Roof Drainage Scuppers-Congregate Beds 1 8 EA $850.00 $6,800.00
2214 00 Furnish end Install 6"x4n Primary and Overflow Roof Drainage Scuppers-Congregate Beds 2 2 EA $850,00 $1,700.00
2214 00 Furnish and Install 6"x4" Primary end Overflow Roof Drainage Scuppers-Individual Sleeping Units 10 EA $850 .00 $8 ,500.00
2214 OD Furnish and lnstall 6"x4" Primary and OVerflow Roof Drainage Scuppers-Dog Wash 2 EA $850 ,00 $1 ,700.00
2214 DD Furnish and Install 8"x4• Primary and OVerflow Roof Drainage Scuppers-Dog Kennel 2 EA $850.00 $1,700.00
2214 DD Furnish and Install 8",c4" Primary and Overflow Roof Drainage Scuppers-Storage 2 EA $850.00 $1,700.00
2233 00 Furnish and Install Electric Domestic Water Heater 1 EA $9,500.00 $9,500.00
215 02300 HVAC EA $0.00
231100
Connect 2• Gas Service to Kitchen/Dining BuUding. Includes all required fittings and up to 5 feet of Jipe
1 EA $8,500.00 $8,500.00
Packet Page. 1281
23 3100
Connect 12X8 HVAC Duct at Matelines-lncludes required Insulation and up to 5 feet of ducf...f'ront Offices and
3 EA $250.00 $750.00 Communal Spaces
23 3100
Connect 10X8 HVAC Duct at Matelines•lnc:fudes required insulaion and upto S feet of duct-Front Offices and
3 EA $250.00 $750.00 Communal Spaces
23 3100
Coooect 6X8 HVAC Duct at Matellnes-lncludes required insulation and up to S feet of duel-Front Offices and
1 EA $250.00 $250.00 Communal Spaces
23 3100 Connect2• HVAC Ax Distrilulion Pipe atMatelines-hlcludes required insulation and up to S feet of pipe-Front
11 EA $250.00 $2,750.00 Offices and Communal Spaces
23 3100
Connect 12X8 H\/AC Duct at MateNnes-lncludes required insulation and up to 5 feet of duct-Flex Space
EA $0.00 $0.00
23 3100
Connect 10X8 HVAC Duct at Male lines-Includes required insulation and up to 5 feet or duct-Flex Space
EA $0.00 $0.00
23 3100
Connect 2" HVAC AA Distribution Pipe at Matelines-lncludes required insulation and up to S feel of pipe-Flex Space
18 EA $500.00 $9,000.00
23 3100
Connect 12X8 HVAC Duct at Matcllnes-b:ludes required insulation and up to S feet of duct-Lounge, Storage and
7 EA $250.00 $1,750 .00 Hot Box Area
23 3100
Connect 10X8 HVAC Duct at Matellnes-t\cludes required Insulation and up to 5 feel of dud-Louge, storage and
EA $0.00 $0.00 Hot Box Area
23 3100
Connect 2" HVAC Air Distribution Pipe atMatelines-lncludes required Insulation and up to 5 feet of pipe-lounge,
3 EA $250.00 $750.00 Storage and Hol Box Afea
23 3100
Connect 12X8 HVAC Duct al Matelines-lncludes required insulation and up to S feet of duct-Offices
EA $0.00 $0.00
23 3100
Connect 10XB HVAC Duct at Matelines-lncludes required insulation and upto 5 feet of duct-Offices
6 EA $250.00 $1,500 .00
23 3100
Connect2• HVAC Air Dlstnbution Pipe atMatelines-lncludes required insulation and up to S feet of pips-Offices
3 EA $500.00 $1,500.00
23 3100
Connect 12X14 HVAC Duct at Mate!ines-lndudes required Insulation and up to 5 feet of duct-Med Congregate Beds
2 EA $250.00 $500.00 1
23 3100 Connect 12X8 HVAC Duct at Matelines--lncludes required insulation and up to S feet of duct-Med Congregate Beds
1 EA $250.00 $250.00 1
23 3100
Connoct 10X8 HVAC Duct at Matelines-.lncludes required Insulation and up lo S feet of duct-Med Congregate Beds
2 EA $250.00 $500.00 1
23 3100 Conned Z' HVAC Air Distribution Pipe al Ma1elines-lncludes required insulation and up to S reet of pipe-Med
2 EA $250.00 $500.00 Congregate Beds 1
23 3100 Connec112X8 HVAC Duct at Matelines-lncludes required insulation and up to 5 feel of duct-Triage/Medical Beds
1 EA $250.00 $250.00
23 3100 Connect 1 OX8 HVAC Duct at Mate1ines--tncludes required Insulation and up lo 5 feet of duct-Triage/Medical Beds
3 EA $250.00 $750.00
23 3100
Connect 2~ HVAC Air Distribution Pipe alMatelines-lncludes reqWred Insulation and up to 5 feet of pipe-
Triage/Medical Beds 25 EA $500.00 $12,500 .00
23 3100
Connect 12X.8 HVAC Duct at Mateltles-lncludes required insulation and up to s feet of duct-Kitchen/Dining
1 EA $250.00 $250.00
23 3100
Connect 10XB 1-NAC Duct at Matelines-lnctudes required Insulation and up to S feet of duct-l<Hchen/Olnlng
EA $0.00 $0.00
23 3100
Connect 'Z' HVAC Air Dlstrilution Pipe atMeteltnes-l ncludes required Insulation and up to 5 feet of pipe-
14 EA $250.00 $3,500.00 Kitchen/Dining
23 3100
Connect 12X8 HVAC Duct at Matelines-lncludes required insulation and up to S feel of duct-Congregate Beds 1
2 EA $250.00 $500.00
23 3100
Connect 10X8 HVAC Duct at Matel!nes-lncludes required insul:ation and up to S feet of duel-Congregate Beds 1
23 EA $250.00 $5,750.00
23 3100
Connect 2• HVAC Air Distribution Pipe al Matellnes-lncludes required insulation end up to 5 feet of pipe-Congregate
29 EA $250.00 $7,250.00 Beds 1
23 3100
Connect 12X8 HVAC Duct at Matelines-hcludes required insulation and up 1o S feet of duct-Congregate Beds 2
1 EA $250.00 $250.00
23 3100
Connect 1 0XB HVAC Duct at Matelines-tncludes required insulation and up to 5 feet of duct-Congregate Beds 2
3 EA $250.00 $750.00
23 3100
Connect 2" HVAC PJr Oistribl.ltion Pipe atMateUnes-locludes required insulation and up to 5 feet of pi'pe-Con5'egate
8 EA $500.00 $4,000.00 Beds2
23 3613 Furnish and Install Commerclal Kitchen Hood-Fast Kitchen•• Model SSH-DPSP or Approved Equivalent
1 EA $24,850.00 $24,850.00
23 74 00
Furnish end Install Johnson Controts• HVAC Rooftop Units-Model KQG06E2C!AASA111AI or Approved Equivalent
2 EA $16,000.00 $32,000.00
246 D2600 "EJe:ctrlcal $0.00
2610 00 Connect Electrical transmission Line to Modular Buildings 13 EA $2,400.00 $31,200.00
261000
Conned Electrlcol lincs at Matelines-Jncludes up to 20 feet of cable-Front Offices and Communal Spaces
1 EA $1,600.00 $1,600.00
2610 00 Connect Electrical lines at Matei nes--lncludes up to 20 feel of cable-Flex Space 1 EA $1,600.00 $1,600.00
2610 DO Connect Electrical lines at Matallnos-Jndudes up to 20 feet of cable-Lounge, Storage and Hot Box 1 EA $1,600.00 $1,600 .00
2610 00 Connect Electrical Unes at Male1ln0s-lndudes up to 20 feet of cable-Offices 1 EA $1 ,600.00 $1,600.00
281000 Connect BectriaM lines at Matelines~lndudes up to 20 feet of cabl~ed Congregate Beds 1 1 EA $1,600.00 $1,600.00
28 1000 Connect Electrical lines et Matelincs-lncludes up to 20 feet of cable--TriageJMedical Beds 1 EA $1,600.00 $1,600.00
261000 Connect Electrical lines at Matelinea-lncludes up lo 20 feet of cable-Kitchen/Dining 1 EA $1,600.00 $1,600.00
2610 00 Connect Bectrical tines at Matelines-lncludes up to 20 feet of cable-Congregate Beds 1 1 EA $1,600.00 $1,600.00
261000 Connect Electrical lin&S at Matellnes-klctudes up to 20 feet of cable-Congregate Beds 2 1 EA $1,600.00 $1,600.00
2610 00 Connect Electrical lines at Matelines-lncludes upto 20 feet of cable-Individual Sleeping Units 1 EA $1 ,600.00 $1,600.00
2610 00 Connecl Electrical llnes al Matellnes-lnciudes up lo 20 feet of cable-Dog Wash 1 EA $1,600.00 $1,600.00
261000 Connect Ele<;trical lines al Malellnes-tncludes up to 20 feet of cable-Dog Kennel 1 EA $1,600.00 $1,600.00
Packet Page. 1282
2610 00 Connect Electrical lines at Mate~nes-lncludes up to 20 feet of cable--Storege 1 EA $1,600.00 $1,600.00
26 20 00 Connect Low Voltage Transmission Line to Modular Buildings 13 EA $2,400.00 $31,200.00
26 20 00
Connect Low Voltaae Transmission lfnes at Matelines-ll"ICludes up to 20 fe el of cable-Front Offices and Commune I
Spaces 1 EA $1 ,600.00 $1,600.00
26 20 00 Connect Low Volt.age Transmission lines at Matellnes-lncludes upto 20 feot of cable-Flex Space 1 EA $1,600.00 $1,600.00
26 20 00
Connect Low Voltage Transmission /Ines at Matellnes-lncludes up to 20 feet of cable-lounge, Storage and Hot Sox
1 EA $1,600.00 $1,600.00
262000 Connect Low Vottsge Transmission Jines el Mate6nes.-lnciudes up to 20 feet of cable-Offices 1 EA $1,600 .00 $1,600.00
2620 00
Connect Low Voltage Transmission lines at Matellnes..Jncludes up to 20 feet of cable-Med Congregate Beds 1
1 EA $1,600.00 $1,600.00
2620 00
Connect Low Voltage Transmission lines at Matelines-lncludes up to 20 feet of cable-Triage/Medical Beds
1 EA $1 ,600.00 $1 ,600 .00
2620 00
Connect Low Voltage Transmission lines at Matetines-lncludes up to 20 feet of cable-Kitche~nlng
1 EA $1,600 .00 $1,600.00
26 20 00
Connect Low Voltage Transmission !Ines at Matelines-lncludes up to 20 feet of cabte-Congregote Beds 1
1 EA $1,600.00 $1,600.00
262000
Connect Low Voltage Transmis,sion lines at Matelines-Jncludes up to 20 feet of cable-Congregate Beds 2
1 EA $1 ,600 .00 $1,600.00
26 20 00
Connect Low Voltage Transmission lines at Matelines-lncludes up to 20 feet of cable-lndMdual Sleeping Units
1 EA $1,600.00 $1,600.00
2620 00 Connect Low Voltage Transmission !Ines at Matelines-lndudes upto .20 feet of cable-Dog Wash 1 EA $1,600.00 $1,600.00
262000 Connect Low Voltage Transmission lines at Matelines-lncludcs up to 20 feet of cable-Dog Kennel 1 EA $1 ,600 .00 $1,600.00
2620 00 Connect Low Voltage Transmi&Sion lines at Matelines-lncludes up to 20 feet of cable-Storege 1 EA $1,600.00 $1 ,600.00
26 30 00
Furnish and Install a 125 KW Generator-Johnson Power Systems• or Approved Equivalent. Includes Fuel Tank,
1 EA $1 ,600.00 $1 ,600.00 Piping and Acce&Sories
26 40 00 Furnish and Install Lightning Protection System 13 EA. $2 ,800 .00 $36,400.00
2?9 D2700 •eommunfc:atlons $0.00
2710 00 Connect Communication Line to Modular Buildings 13 EA $2,500.00 $32,500.00
2710 00
Connect Communication lines at Mataines-lncludes up to 20 feet of cable-Front Offices and Communal Spaces
1 EA $1,600.00 $1,600.00
271000 Connect Comm1.1nlcatlon lines at Matellnes-/ncludes up to 20 feet of cable-Flex Space 1 EA $1,600 .00 $1,600.00
2710 00
Connect Communication lines at Matelincs-lncludes up to 20 feet of cable-Lounge. Storage and Hot Box
1 EA $1 ,600.00 $1 ,600.00
271000 Connect Communication lines at Matelines-lncludes up to 20 feet of cable,.Offices 1 EA $1,600.00 $1,600.00
271000
Connect Communication lines at Matellnes-lncludes up lo 20 feet of cable-Med Congregate Beds 1
1 EA $1 ,600.00 $1 ,600 .00
271000 Connect Communication llnBS at Matel nes-lnctudes up to 20 feet of cable-. Triage/Medical Beds 1 EA $1,600 .00 $1,600.00
2710 00 Connect Communication lines at Matollnes-lncludes up to 20 feet of cable-Kitchen/Dining 1 EA $1,600.00 $1,600.00
271000 Connect Communication lines at Matellnes-lncludes up to 20 feet of cable•Congregate Beds 1 1 EA $1 ,600 .00 $1 ,600.00
2710 00 Connect Communication lines at Matellnes-lncludes up to 20 feet of cable-Congregate Beds 2 1 EA $1,600.00 $1,600.00
2710 00
Connect Communication llnes at Mate lines-Includes up to 20 feet of cable-Individual Sleeping Units
1 EA $1,600.00 $1,600.00
271000 Connect Comm unication fin es at Mateflnes-lncludes up to 20 feet of ceble,.Oog Wash 1 EA $1 ,600 .00 $1 ,600.00
2710 00 Connect Communication lines at Matelines•lncludes up to 20 feet of cable-Dog Kennel 1 EA $1,600.00 $1 ,600.00
27 10 00 Connect Communlcatton lines at Matclines-lncfudes up to 20 feet of cable-Storage 1 EA $1,600 .00 $1 ,600.00
27 2000 Data Communications 1 LS $15,000 .00 $15 ,000.00
27 30 00 Voice Communications 1 LS $15,000.00 $15,000.00
27 40 00 Aucfio--Video Communications 1 LS $15,000.00 $15,000.00
27 50 00 Distributed Communications end Monitoring Systems 1 LS $15,000 .00 $15,000.00
298 D2800 •Elec:tronlc Safety and Security $0.00
26 08 00 Commissioning of Electronic Safety 8fld Security 1 LS $15 ,000.00 $15 ,000.00
26 10 00 Access Control 1 LS $985,000.00 $985,000.00
28 20 00 Video Survelllance 1 LS $445,000 .00 $445 ,000.00
283000 Security Detection, Alarm, and Monitoring 1 LS $15,000 .00 $15,000.00
28 40 00 Ute Safety 1 LS $25,000.00 $25,000.00
28 50 00 Specialized Systems 1 LS $2,500.00 $2,500.00
305 D3100 Excavation $0 .00
312300
Excavation for Foundation-Includes Excavation for Crawl Space-Front Offices and Communal Space
458 CY $255.00 $116,790.00
Packet Page. 1283
312300 Excavatk:in for Foundalion-lnciudes Excavation fDf Crawl Space-Flex Space 235 CY $255 .00 $59,925.00
312300 Excavation for Foundation-klcludes Excavation for Crawl Space-Lounge, Storage and Hot Box 3-44 CY $255 .00 $87,720.00
312300 Excavation for Foundation-Includes Excavalon tor Crawl Space-Off,ces 338 CY $255.00 $86,190.00
312300 ExcavaUon for Foundation--lncludes Ercavation for Crawt Space-Med Congregate Beds 1 386 CY $255.00 $93,330.00
312300 Excavation for Foundation-Includes Excavation for Crawl Space-TriageJMedical Beds 337 CY $255.00 $85,935.00
312300 Excavation for Foundalion-tnctudes Excavaion for Crawl Space-Kitchen/Dining 365 CY $255.00 $93,075.00
312300 Excavaion for Foundation-Includes Excavation for Crawt Space•Congregate Beds 1 285 CY $255.00 $72,675.00
312300 ExcavaUon for Foundation-Includes Excavation for Crawt Space-Congregate Beds 2 288 CY $255 .00 $73,440.00
312300 Excavation for Foundation-Individual Sleeping Units 227 CY $255.00 $57,885.00
312300 Excavation for Foundation-Dog Wash 13 CY $255 .00 $3 ,315.00
312300 Excavation for Foundation-Dog KeMel 13 CY $255 .00 $3 ,315.00
312300 Excavation for Foundation-storage 13 CY $255 .00 $3,315.00
150 List Any Item Here that is Not Listed Above I LS $812 ,273.00 $812,273.00
$0.00
Total Base Bi<H3Ullding $9,637,000.00
* Design lnfonnation regarding this item maynotyel be available at this time, end the General Contractor Is encouraged to use reasonable assumpions regarding this scope of work in preparing their bids until sufficient
details become evakab(e on the design pans. Should design infonnaUon become avai!abJe
subsequent to award of the Contract, the City of San Bernardino wiU negotiate the actual price of the work for which design plans or specifications are missing
with the lowest responsive bidder.
IMO SCHEULE
SITE WORKS ANO INFRASTRUCTURE
PROJECT fiAJ'1 E· llomt>less ria>laanon Center Ca111n.n
PROJECT rio • G824-010
J O('ATIOl'i 796 6Ih St, San Rcmarclino C·\ 92410
BID Oflf.N ING DATE Janual}' 13 2026
BASE SID SCOPE
No DESCRIPTION (REFERTO PLANS & SPECIFICATIONS FOR FURTHER INFORMATION) Qty Unit!
I
#1 -General Conditions
I.I Mobi1ization, Insurance, Demobilization I LS 45000
12
Clearing and Grubbing, Tree Removal and Other Items for Demolition Unclassified Excavation and I LS 25000 Unctassffied Fil per project plans and specs.
1.3 Project Construction Sign I EA 4500
1.4 Furnish, install, and maintain all traffJC control, detour sign. sq>ing, fencirs and safety meaStXes to perform I LS l0000 work, including traffic control and/or construction phasing plan.
1.5 Construction Safety, Daily Cleanup, & Construction Best Management Practices (SWPPP, Erosion & Dust I LS 25000 Control etc.)
1.6 Construction Staking, SuNey, Unes & Grade I LS 50000
#2-
Remove Existing Asphalt Pavement Section (Defih= r) 320 SF 4 2.1
Grind & Overlay Asphalt Pavement (Depth• 0.15') 5,765 SF 3 2.2
Relocate Power Pole Guy Anchor 1 2.3 EA 3500
2.4 Remove Existing Concrete Sidewalk 2,800 SF 4
Remove Emling Concrete (Reinrorced) 8.500 SF 3.75 2.5
2.6 Remove Eliisting Asphalt Pavement and Base 38.600 Sf 1.55
2.7 Remove Existing EarthlTurf in Preparation for Site Improvements 57 .100 SF 0.75
Remove Existing Concrete Driveway Approach 990 SF 4 2.8
2.9 Remove Existing Concrete Pads, Including Utilities 23,600 SF 2.75
Remove Existing S" Concrete Curb & Gutter 110 LF 6 2.10
2.11 Remove faisting 6" Concrete Curb 530 LF 6
2.12 Remove Existmg Tree 33 EA 850
2 .13 Remove Existing Mailbox 1 EA 75
2.14 Remove Exlsting Chain Link Fence 450 Lf 6
Remove Existing Tubular Fence 1,600 LF 8 2.15
2.16 Remove Existing Metal Post 3 EA 75
Contractor's Bid
Unit Prit:e Amount
$25,000.00
$15 ,000.00
$4,500.00
$10,000.00
$25,000.00
$30,000.00
$1,280.00
$17,295 .00
$3,500 .00
$11,200.00
$31,875.00
$59,830 .00
$42,825.00
$3,960.00
$64,900.00
$660.00
$3,180.00
$28,050.00
$75 .00
$2,700.00
$12,800.00
$225 .00
Packet Page. 1284
2.17
Remove Existing Sign 2 EA 75 $150.00
2.18
Construct 3'" Asphalt Concrete over 4" Aggregate Base 3,980 SF 4.75 $18,905.00
2.19
Construct 3" Asphalt Concrete over 6" Aggregate Base 19,600 SF 5.75 $112,700.00
2.20 Construct e· PCC Concrete over-I" Aggregate 8'Jse 14,000 SF 18 $252,000.00
2.21
Construct 6" PCC Concrete over 4• Aggregate Base Commercial Driveway 2,200 Sf 16 $35,200.00
2.22 Furnish & Install Trash Enclosure 1 EA 25000 $25,000.00
223
Construct 4· PCC Sidewalk 21,700 SF 12.5 $271,250.00
2.24 Construct Type "A'" Concrete Curb 2,030 LF 30 $60,900.00
225
Construct Type "C'" Concrete Curb 1,200 LF 55 $66,000.00
226
Construct 4" Rolled Concrete Curb 25 LF 55 $1,375.00
227 Furnish & Install Cast-In-Place Detectable Warning Surface, Color Yellow 75 SF 70 $5,250.00
2.28 Construct Accessible Concrete Ramp 550 SF 25 $13,750.00
2.29
Paint 4" Wide While stripe 240 LF 7 $1 ,680.00
2.30
Paint Accessible Striping and Markings 610 Lf IS $9,150.00
2.31
Furnish and Install 4" Round NOS Brass Grate 8 EA 975 $7,800 .00
2.32
Furnish and Install a· Atrium Grate 36 EA 650 $23,400.00
2.33 Furnish & Install 12''x12'" Square NOS Catch Basin or Approved Equal 7 EA 3000 $21,000.00
2.34
Furnish & Install 24"x24" Square NOS Cetch Basin or Approved Equal 4 EA 6000 $24,000.00
2.35
Furnish & Install 36"x36" Square NOS Catch Basin or Approved Equal 1 EA 12000 $12,000.00
2.36 Furnish & Install Grease Interceptor 1 EA 50000 $50,000.00
2.37
Furnish & tnstall 8" Sewer Cleanout 16 EA 2000 $32,000.00
2.38 Furnish & lnstall 6" PVC SCH 40 Pipe with Trenching and Backfill 680 LF 90 $61,200.00
2.39
Furnish & Install 4" PVC SOR 35 Pipe with Trenching and Backfill 300 Lf 78 $23 ,400.00
2.40 furnlah & Install B" PVC SOR 35 Pipe with Trencl!ing end Backfin BOO LF 80 $64,000.00
2.41
Furnish & Install 10" PVC SOR :35 Pipe with Trenching and Backfill 340 LF 95 $32,300.00
2.42 Furnish & Install 12" PVC SOR 35 Pipe with Trenching and Backfill 260 LF 150 $39 ,000.00
Furnish & Install 16" PVC SOR 35 Pipo with Trencltlng and BackfiU 290 LF 135 $39,150.00 2.43
2.44
Furnish & Install 2◄" PVC SOR 35 Pipe with Trenching and Backfill 140 Lf 350 $49,000.00
2.45
Furnish & Install 6" DIP Fire Water, A.W.W.A C151 Class 350with Trenching and Backfill 1,630 LF 105 $171 ,150.00
2 .48
Furnish & Install 2" CPVC Pipe with Trenching and Backfill 200 LF 170 $34,000.00
2.47
Furnish & Install 2~ PVC SCH 40 Pipe with Trenching and Backfill 920 Lf 50 $46,000.00
2,48 Furnish & Install 24"X24" Flogard Catch Basin with Filter Model FGP-24F 2 EA 9000 $18,000.00
2.49
Furnish & Install Stormtrap Undorground Vault 1 EA 465000 $465,000.00
2.50
Furnish & Install StormTrap StormSettler 2 EA 45000 $90,000.00
2.51
Furnish & Ins1a11 Et Double Check Detector Valve Assembly 1 EA 26000 $26,000.00
lnslall 8" Fire Hydrant 4 EA 12000 $48,000.00 2.52
2.53 Furnish & Install 1-1/2" Irrigation Water Meter 1 EA 26000 $26,000.00
2.54 Furnish & lnstall 2" Domestic Water Meter 1 EA 26000 $26,000 .00
2.55 Furnish & Install Reduced Pressure Backflow Prevention Assembly 2 EA 4500 $9,000.00
2.58
Earthwork/Grading: Perform Grade Cut 4,000 CY 20 $80,000.00
2 .57 Earthwork/Grading: Perform Gracie FOi 4,000 CY 20 $80,000,00
2.58
Paint 4~ Wide Green Stripe BO Lf JO $800.00
2.59 Install AfJA Perking Sign 1 EA 250 $250.00
2.80 Install EV Chorglng Parking Sign 4 EA 350 $1,400.00
1
Install Unauthorized Vehicle R112 (CA) Sign 1 EA 300 $300.00 2.6
2.6 2 Construct 12" dla. X 6' Deep Infiltration Device 24 EA 1000 $24,000.00
#3-
Lan
3,1 Furnish & Install Natural Turf Sod 1.284 I sf l2.2 8 1$2,927.52
Packet Page. 1285
3.2
Install IS Box Trees 23 EA 151 $3,473.00
3.3 lns1all24 Box Trees 41 EA 383 $15,703.00
3.4
Install Root Barrier 64 RA 61 $3,904.00
3.5 Install Landscape (Shrubs and Mulch) 24,007 SF 2.14 $51,374.98
3.8 Soit Preparation and Fine Gracing 24,007 SF 0.54 $12,963.78
3.7
lnstaR Irrigation System 24,007 LS 8.28 $198,777.96
3.8 Fumtsh & Install Irrigation Controller and Electrlcal Power Connection 1 EA 6000 $6,000.00
3.9
Furnish & Install Artiflclal Turf 1,537 SF 20 $30,740.00
3.10 Furnish & lnstal Decomposed Granite 955 SF 6 $5,730.00
3.11
Furnish & Install Mow Curb 28 LF 100 $2,800.00
3.12 Furnish & Install Concrete Edge Restraint 24 LF 30 $720.00
3.13 Furlish & Install Seal Wall 17 LF 250 $4,250.00
3.14 Furnish & Install Shade Salls 1 EA 95000 $95,000.00
3.15 Furnish & Install Bench 10 EA 2000 $20,000.00
3.16 Furnish & Install P-tenlc Tab&& 4 BA 3400 $13,600.00
3.17 Furnish & Install ADA Picnic Ta~e 2 EA 3900 $7,800.00
Furnish & Install Trash Receptacles 4 BA 2000 $8,000.00 3.18
3.19 Funish & Install Bicycle Rack 3 BA 1500 $4,500.00
320 Furnish & Install Pet Waste Station 1 BA 1300 $1,300.00
321 Furnish & Install Dog Run Course 1 BA 47000 $47,000.00
3.22
3.5' Seating Boulders 5 BA 350 $1,750.00
323 4-5' seating Boulders 6 EA 650 $3,900.00
324 90 Day Maintenance Period 24,007 SF 0.2 $4,801.40
#4-
Elec
Furnish and install Primal)' Utility Condul and Pole Riser including one (115-lnch conduit Including trenching, backfill, compaction, 145 $7,975.00 and surface restoration, in compliance with SCE requiements, project plans, specifications, and the Contract Documents. Work
shal include all incidentals necessary for a complete 55 LF
lnstaltation
4.1
Furnish and Install secondary utility eight (8) 5-lnch conduits including trenching, backfill, compaction, and surface restoration, in 235 $56,400.00 compliance vi.th SCE requirements. plans, and specfficalions. All wDfk. shall be complete in place per the Contract Documents
240 LF
42
Furnish and instaU 2-inch conduit v..th (3) 112 conductors and (1) 114 grounding conductor, complete In place, including 95 $19,950.00 trenching, backfil, compaction, and surface restoratiOn, tn accordance with the plans, and project specifications.
210 LF
4.3
Furnish and install 4-lnch conduit with (3) 4/0 conduclors and (1) G 210 as shown on the plans, com~ete In place, including 118 $153,990.00 trenching, backfill, compactfon, and surface restoration, in accordance With the Contract Documents
1305 LF
4.4
Furnish and Install ten (10) 2-inch PVC underground conduit runs as shown on the plans conductors consisting of (4) No. 2 AWG 96 $23,520.00 and (1) No. 8 AWG grounding conductor, including conduit stub-ups per Detail "An on Sheet E-2.0, and including all trenching,
boctfill, compaclion, surface restoration , tenninations. testing, and incidenlals required for a complete and operational Installation
In accordance with the plens, and project specifications.
245 LF
4.5
Furnish and Install four (4) 60-.Amp leYel 2 EV chargers YMh four (4) 1-ilch condlits, including 114 conductors, complete in 48000 $48,000 .00 place. Work shall Include aU materials, connectlons, testing, coordination, and Incidentals necessary fore fully operational
system, in accordance with the Contract Documents. 1 LS
4.8
Furnish and Install all matertals, {11) 3" PVC conduit run with 118 ground and CAT 5 cable, (1)2" Conduttwith 118 ground, 60000 $60,000.00 treflchilg, connections, backfdl and sulface restoration, and associated work as shown on Sheet E 11 (Communication Plan),
complete fn place, In accordance with the plans, andprojectspecfflcations. 1 LS
4.7
Furnish and install one (1) 400-amp panel with the specified AIC rating, complete in pJace, In accordance 'Mth the plans, and 13000 $13,000.00 project specifications.
1 EA
4.8
11500 $57,500.00
Furnish and install new 225-amp panel rated at-42 kAIC, complete in place, per the Contract Documents. 5 EA
4.9
Packet Page. 1286
Furnish and install new 100-amp panel with the specified AIC rating, complete in place, In accordance with the plans, and project
specifications.
9500 $123,500.00
13 EA
4.10
Furnish and Install one (1) 2,000-amp switchgear assembly rated at 82 kAIC, complete in place, Including all associated 90000 $90,000.00
connections, testing. wiring and coordination required for a fully funcUonet system. per the Contract Documents.
1 EA
4.11
Furnish and Install generator as shown on the approved plans and specifications, complete in place, including au accessories, 67000 $67,000.00
connections, testing, and comm~ioning required for operational acceptance, in accordance with the Contract Documents.
1 LS
4.12
Furnish and Install Automatic Transfer Switches complete In place, in accordance with the plan end project specifications 22000 $44,000.00
2 EA
4.13
Furnish and Install new 1 so.amp panel with the specified AIC rating, complete in place, In accordance with the plans, and proj~t
specifications.
12000 $24,000.00
2 EA
4.14
4.15
Furnish and Install Parking Lot Lighting, Including conduit and ,-iring . 1 LS 65000 $65,000.00
4.16
Furnish and Install Street Lighting, including conduit and wiring. 30 EA 7500 $225,000.00
Furnish & Install New Utility Transformer Concrete Pad 2 EA 16000 $32,000.00 4.17
4.18
Furmlh and Install Utility Pull Box 1 EA 16000 $16,000.00
Install Combined Utility Trench 400 L.F 44 $17,600.00 4.19
Furnish and Install complete and fully operational Avigilon Security Camera (CC1V) System, consisting of eighteen (18) cameras 250 $14,500.00
58 EA
4.20
4.21
Furnish and Install complete operating Avlgllon Access Control Badge Readers. 6B EA 350 $23,800.00
#5•
5.1
tnstaU lS'xlS' Accessible Concrete Pad w/ Ramp & Hand/Guard Raits 225 SF 45 $10,125.00
Demolish (El Fence Including Footings 1579 LF 14 $22,106.00 5.2
5.3
Furnish & Ins.tall New 4' High Wire Mesh Fencing w/ (1) Pedestrian Gates Complete wt Footings 132 LF 166 $21 ,912.00
5.4
furnish & Install New 8' High Wire Screen Fencing w/ (4) Pedesbian Gates Complete w/ Footings 609 LF 269 $163,821.00
5.5 Furnish & Install New (1) 16' Wide Vehicular Gate Complete w/ Footings 1 EA 12000 $12,000.00
Furnish & Install New (1) 22' Wide Vehicular Gate Complete w/ Footings 1 EA 15000 $15,000.00 5.6
5.7 Furnish & Install New S High Block Wall 1,695 LF 150 $254,250.00
#6-
Co
Furnish and Install all materials, (11) I" conduit run with #8 ground, (1)2. Condultwfth #S ground, trenching, connections, backfill 180000 $180,000.00
and surface restoraUan. and associated work as shown on Sheet E-11 (Communication Plan), complete in ptace, ln accordance
with the plans. and project specifications. 1 LS
6.1
Furnish and install Avigilon Access Control (Badge Reader) System card/badge readers at all doors, exit points, and security 15000 $15 ,000.00
gates as indicated on the plans. The Contractor shall review the plans and door schedules to verify the number of modules and
the locatioll$ of badge readers at each buiking door e)dl and security gate. The Contractor shaa furn.Sh all labor, materials,
equipment. supeJVislon, coordination, testing, and commissioning necessary to provfde a complete and fully operational Avigilon
Access Control (Badge Reader) System, In accordance with the Contract Documents end City of San Bernardino requirements.
1 LS
6.2
Furnish and Install dedicated conduit pathways from each badge reader locaHon to the Intermediate Distribution Frame (IDF) 50000 $50,000.00
located within the office areas. The Contractor shall furnish all labor, materials, equipment, supervision, coordination, testing. and
commissioning necessary to provide a complete In place in accordance with the Contract Documents and City of San Bernardino
requirements . 1 LS
6.3
Furnish and Install Category 6 (Cat 6) cabRng, lncludlng terminations, labeling, and testing, from badge readers to the IDF 15000 $15,000.00
necessary to provide a complete In place system in accordance with the Contract Documents end City of San Bernardino
requirements. 1 LS
6 .4
Furnish and install access control panels, power supplles, enclosures, and batteiy backup systems necessary lo provide a LS
complete in piece $)'Stem In accordance with the Contract Documents and City of San Bernardino requirements.
12000 $12,000.00
1
6.5
Furnish and instaU etectric !ocioog hardware, including electric strikes or magnetic locks, door position switches, and request-to-2220.36 $2,220.36
extt devices, as required necessary lo provide a complete in place system in accordance with the Contract Documents and City of
San Bernardino requirements. 1 LS
6 .6
Programming end configuration of access levels, schedu~s. and credentials as directed by the Cly 1 LS 2500 $2,500.00
6.7
Packet Page. 1287
I
!Testing of all system components. including noml31 and fail-safe operations I 1 I Ls !1soo 6.6
6.9 I 'Preparation and submission of as-built drawings and complete system documentation
I
1 I Ls 11soo
#7-
CCT
7.1 I Provide AH Other Work Not Listed Above But Required by Plans & Specifications
I
1 I LS I
#8-
8.1 I
I Provide All other Work Not Usted Above But Required by Plans & Speciftc:ations I 1 I LS I
TOTAL BASE BID. sin: WORKS AND INl%\STRuc-ruR~: I
Building
site
,.
$9,637,000.00
$5,400,000.00
$15 ,037 ,000.00
1 $1 ,500.00
J $1,500,00
1$0 .00
J$0 .00
I s5,4oo,ooo.oo
.,
Packet Page. 1288
Packet Page. 1289
Packet Page. 1290
Packet Page. 1291
Packet Page. 1292
HOMELESS NAVIGATION CENTER CAMPUS Page 4 of 31 ADDENDUM NO. 7
Spec Construction Co., Inc.
$796,000.00 $796,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$35.00 $43,505.00
$35.00 $33,775.00
$35.00 $37,555.00
$35.00 $30,485.00
$35.00 $36,960.00
$35.00 $28,245.00
$35.00 $32,060.00
$35.00 $68,250.00
$35.00 $32,830.00
$35.00 $198,135.00
$35.00 $19,810.00
$35.00 $19,810.00
$35.00 $19,810.00
$750.00 $25,500.00
$750.00 $11,250.00
$750.00 $18,000.00
$750.00 $19,500.00
$750.00 $19,500.00
$750.00 $17,250.00
$750.00 $21,000.00
$750.00 $47,250.00
$750.00 $16,500.00
Packet Page. 1293
HOMELESS NAVIGATION CENTER CAMPUS Page 5 of 31 ADDENDUM NO. 7
$750.00 $67,500.00
$750.00 $3,000.00
$750.00 $3,000.00
$750.00 $3,000.00
$135.00 $4,590.00
$585.00 $14,625.00
$585.00 $16,965.00
$585.00 $5,850.00
$585.00 $4,680.00
$585.00 $8,775.00
$585.00 $11,700.00
$585.00 $27,495.00
$585.00 $12,870.00
$585.00 $99,450.00
$585.00 $8,190.00
$585.00 $8,190.00
$585.00 $8,190.00
$135.00 $4,050.00
$135.00 $3,240.00
$135.00 $2,430.00
$135.00 $2,430.00
$135.00 $2,700.00
$135.00 $2,025.00
$135.00 $2,295.00
$135.00 $4,725.00
$135.00 $2,295.00
$135.00 $20,790.00
$135.00 $1,215.00
$135.00 $1,215.00
$135.00 $1,215.00
$2,500.00 $85,000.00
$2,500.00 $37,500.00
Packet Page. 1294
HOMELESS NAVIGATION CENTER CAMPUS Page 6 of 31 ADDENDUM NO. 7
$2,500.00 $60,000.00
$2,500.00 $65,000.00
$2,500.00 $65,000.00
$2,500.00 $57,500.00
$2,500.00 $70,000.00
$2,500.00 $157,500.00
$2,500.00 $55,000.00
$2,500.00 $225,000.00
$2,500.00 $10,000.00
$2,500.00 $10,000.00
$2,500.00 $10,000.00
$1,800.00 $81,000.00
$1,800.00 $28,800.00
$1,800.00 $54,000.00
$1,800.00 $61,200.00
$1,800.00 $54,000.00
$1,800.00 $48,600.00
$1,800.00 $54,000.00
$1,800.00 $162,000.00
$1,800.00 $32,400.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$19.75 $86,584.00
$19.75 $63,200.00
$19.75 $72,048.00
$19.75 $25,280.00
$19.75 $19,592.00
$19.75 $36,656.00
$19.75 $51,192.00
$19.75 $118,184.00
Packet Page. 1295
HOMELESS NAVIGATION CENTER CAMPUS Page 7 of 31 ADDENDUM NO. 7
$19.75 $54,984.00
$19.75 $429,760.00
$19.75 $34,128.00
$19.75 $34,128.00
$19.75 $34,128.00
$18.00 $81,000.00
$18.00 $40,320.00
$18.00 $60,480.00
$18.00 $60,480.00
$18.00 $65,520.00
$18.00 $60,480.00
$18.00 $65,520.00
$18.00 $158,760.00
$18.00 $50,400.00
$18.00 $100,800.00
$18.00 $10,080.00
$18.00 $10,080.00
$18.00 $10,080.00
$26.00 $10,920.00
$26.00 $7,280.00
$26.00 $13,000.00
$26.00 $12,480.00
$26.00 $10,920.00
$26.00 $12,480.00
$26.00 $10,920.00
$26.00 $41,600.00
$26.00 $8,320.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Packet Page. 1296
HOMELESS NAVIGATION CENTER CAMPUS Page 8 of 31 ADDENDUM NO. 7
$3.25 $14,248.00
$3.25 $10,400.00
$3.25 $11,856.00
$3.25 $4,160.00
$3.25 $3,224.00
$3.25 $6,032.00
$3.25 $8,424.00
$3.25 $19,448.00
$3.25 $9,048.00
$3.25 $70,720.00
$3.25 $5,616.00
$3.25 $5,616.00
$3.25 $5,616.00
$28.00 $67,200.00
$650.00 $52,000.00
$650.00 $39,000.00
$3,500.00 $14,000.00
$2,500.00 $32,500.00
$0.00 $0.00
$2,200.00 $8,800.00
$2,200.00 $11,000.00
$2,200.00 $6,600.00
$2,200.00 $11,000.00
$2,200.00 $11,000.00
$2,200.00 $8,800.00
$2,200.00 $88,000.00
$2,200.00 $4,400.00
$2,200.00 $22,000.00
$0.00 $0.00
$2,200.00 $2,200.00
Packet Page. 1297
HOMELESS NAVIGATION CENTER CAMPUS Page 9 of 31 ADDENDUM NO. 7
$0.00 $0.00
$3,000.00 $3,000.00
$2,500.00 $25,000.00
$2,200.00 $4,400.00
$2,400.00 $7,200.00
$2,400.00 $7,200.00
$0.00 $0.00
$2,200.00 $8,800.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$2,200.00 $2,200.00
$0.00 $0.00
$2,200.00 $4,400.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$2,500.00 $5,000.00
$2,000.00 $48,000.00
$0.00 $0.00
$0.00 $0.00
$2,600.00 $10,400.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$2,500.00 $2,500.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Packet Page. 1298
HOMELESS NAVIGATION CENTER CAMPUS Page 10 of 31 ADDENDUM NO. 7
$0.00 $0.00
$850.00 $3,400.00
$850.00 $1,700.00
$850.00 $1,700.00
$850.00 $1,700.00
$850.00 $1,700.00
$850.00 $1,700.00
$850.00 $1,700.00
$850.00 $6,800.00
$850.00 $1,700.00
$850.00 $8,500.00
$850.00 $1,700.00
$850.00 $1,700.00
$850.00 $1,700.00
$9,500.00 $9,500.00
$8,500.00 $8,500.00
$250.00 $750.00
$250.00 $750.00
$250.00 $250.00
$250.00 $2,750.00
$0.00 $0.00
$0.00 $0.00
$500.00 $9,000.00
$250.00 $1,750.00
$0.00 $0.00
$250.00 $750.00
$0.00 $0.00
$250.00 $1,500.00
$500.00 $1,500.00
$250.00 $500.00
$250.00 $250.00
$250.00 500.00
Packet Page. 1299
HOMELESS NAVIGATION CENTER CAMPUS Page 11 of 31 ADDENDUM NO. 7
$250.00 $500.00
$250.00 $250.00
$250.00 $750.00
$500.00 $12,500.00
$250.00 $250.00
$0.00 $0.00
$250.00 $3,500.00
$250.00 $500.00
$250.00 $5,750.00
$250.00 $7,250.00
$250.00 $250.00
$250.00 $750.00
$500.00 $4,000.00
$24,850.00 $24,850.00
$16,000.00 $32,000.00
$2,400.00 $31,200.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$2,400.00 $31,200.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
Packet Page. 1300
HOMELESS NAVIGATION CENTER CAMPUS Page 12 of 31 ADDENDUM NO. 7
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$2,800.00 $36,400.00
$2,500.00 $32,500.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$1,600.00 $1,600.00
$15,000.00 $15,000.00
$15,000.00 $15,000.00
$15,000.00 $15,000.00
$15,000.00 $15,000.00
Packet Page. 1301
HOMELESS NAVIGATION CENTER CAMPUS Page 13 of 31 ADDENDUM NO. 7
$15,000.00 $15,000.00
$985,000.00 $985,000.00
$445,000.00 $445,000.00
$15,000.00 $15,000.00
$25,000.00 $25,000.00
$2,500.00 $2,500.00
$255.00 $116,790.00
$255.00 $59,925.00
$255.00 $87,720.00
$255.00 $86,190.00
$255.00 $93,330.00
$255.00 $85,935.00
$255.00 $93,075.00
$255.00 $72,675.00
$255.00 $73,440.00
$255.00 $57,885.00
$255.00 $3,315.00
$255.00 $3,315.00
$255.00 $3,315.00
$812,273.00 $812,273.00
$9,637,000.00
Packet Page. 1302
HOMELESS NAVIGATION CENTER CAMPUS Page 14 of 31 ADDENDUM NO. 7
$25,000.00 $25,000.00
$15,000.00 $15,000.00
$4,500.00 $4,500.00
$10,000.00 $10,000.00
$25,000.00 $25,000.00
$30,000.00 $30,000.00
$4.00 $1,280.00
$3.00 $17,295.00
$3,500.00 $3,500.00
$4.00 $11,200.00
$3.75 $31,875.00
$1.55 $59,830.00
$0.75 $42,825.00
$4.00 $3,960.00
$2.75 $64,900.00
$6.00 $660.00
$6.00 $3,180.00
$850.00 $28,050.00
$75.00 $75.00
$6.00 $2,700.00
$8.00 $12,800.00
$75.00 $225.00
$75.00 $150.00
$4.75 $18,905.00
$5.75 $112,700.00
$18.00 $252,000.00
$16.00 $35,200.00
$25,000.00 $25,000.00
$12.50 $271,250.00
Packet Page. 1303
HOMELESS NAVIGATION CENTER CAMPUS Page 15 of 31 ADDENDUM NO. 7
$30.00 $60,900.00
$55.00 $66,000.00
$55.00 $1,375.00
$70.00 $5,250.00
$25.00 $13,750.00
$7.00 $1,680.00
$15.00 $9,150.00
$975.00 $7,800.00
$650.00 $23,400.00
$3,000.00 $21,000.00
$6,000.00 $24,000.00
$12,000.00 $12,000.00
$50,000.00 $50,000.00
$2,000.00 $32,000.00
$90.00 $61,200.00
$78.00 $23,400.00
$80.00 $64,000.00
$95.00 $32,300.00
$150.00 $39,000.00
$135.00 $39,150.00
$350.00 $49,000.00
$105.00 $171,150.00
$170.00 $34,000.00
$50.00 $46,000.00
$9,000.00 $18,000.00
$465,000.00 $465,000.00
$45,000.00 $90,000.00
$26,000.00 $26,000.00
$12,000.00 $48,000.00
$26,000.00 $26,000.00
$26,000.00 $26,000.00
$4,500.00 $9,000.00
$20.00 $80,000.00
$20.00 $80,000.00
$10.00 $800.00
Packet Page. 1304
HOMELESS NAVIGATION CENTER CAMPUS Page 16 of 31 ADDENDUM NO. 7
$250.00 $250.00
$350.00 $1,400.00
$300.00 $300.00
$1,000.00 $24,000.00
$2.28 $2,927.52
$151.00 $3,473.00
$383.00 $15,703.00
$61.00 $3,904.00
$2.14 $51,374.98
$0.54 $12,963.78
$8.28 $198,777.96
$6,000.00 $6,000.00
$20.00 $30,740.00
$6.00 $5,730.00
$100.00 $2,800.00
$30.00 $720.00
$250.00 $4,250.00
$95,000.00 $95,000.00
$2,000.00 $20,000.00
$3,400.00 $13,600.00
$3,900.00 $7,800.00
$2,000.00 $8,000.00
$1,500.00 $4,500.00
$1,300.00 $1,300.00
$47,000.00 $47,000.00
$350.00 $1,750.00
$650.00 $3,900.00
$0.20 $4,801.40
$145.00 $7,975.00
$235.00 $56,400.00
Packet Page. 1305
HOMELESS NAVIGATION CENTER CAMPUS Page 17 of 31 ADDENDUM NO. 7
$95.00 $19,950.00
$118.00 $153,990.00
$96.00 $23,520.00
$48,000.00 $48,000.00
$60,000.00 $60,000.00
$13,000.00 $13,000.00
$11,500.00 $57,500.00
$9,500.00 $123,500.00
$90,000.00 $90,000.00
$67,000.00 $67,000.00
$22,000.00 $44,000.00
$12,000.00 $24,000.00
$65,000.00 $65,000.00
$7,500.00 $225,000.00
$16,000.00 $32,000.00
$16,000.00 $16,000.00
$44.00 $17,600.00
$250.00 $14,500.00
$350.00 $23,800.00
$45.00 $10,125.00
Packet Page. 1306
HOMELESS NAVIGATION CENTER CAMPUS Page 18 of 31 ADDENDUM NO. 7
$14.00 $22,106.00
$166.00 $21,912.00
$269.00 $163,821.00
$12,000.00 $12,000.00
$15,000.00 $15,000.00
$150.00 $254,250.00
$180,000.00 $180,000.00
$15,000.00 $15,000.00
$50,000.00 $50,000.00
$15,000.00 $15,000.00
$12,000.00 $12,000.00
$2,220.36 $2,220.36
$2,500.00 $2,500.00
$1,500.00 $1,500.00
$1,500.00 $1,500.00
$0.00 $0.00
$0.00 $0.00
$5,400,000.00
Packet Page. 1307
Packet Page. 1308
Packet Page. 1309
Packet Page. 1310
Packet Page. 1311
Packet Page. 1312
Packet Page. 1313
Packet Page. 1314
Packet Page. 1315
Packet Page. 1316
Packet Page. 1317
Packet Page. 1318
Packet Page. 1319
Packet Page. 1320
Packet Page. 1321
Packet Page. 1322
Packet Page. 1323
Packet Page. 1324
Packet Page. 1325
Packet Page. 1326
Packet Page. 1327
Packet Page. 1328
Packet Page. 1329
Packet Page. 1330
Packet Page. 1331
Packet Page. 1332
Packet Page. 1333
Packet Page. 1334
Packet Page. 1335
Packet Page. 1336
Packet Page. 1337
Packet Page. 1338
Packet Page. 1339
Packet Page. 1340
Packet Page. 1341
Packet Page. 1342
Packet Page. 1343
Packet Page. 1344
Packet Page. 1345
Packet Page. 1346
Packet Page. 1347
Packet Page. 1348
Packet Page. 1349
Packet Page. 1350
Packet Page. 1351
Packet Page. 1352
Packet Page. 1353
Packet Page. 1354
Packet Page. 1355
Packet Page. 1356
Packet Page. 1357
Packet Page. 1358
Packet Page. 1359
Packet Page. 1360
Packet Page. 1361
Packet Page. 1362
Packet Page. 1363
Packet Page. 1364
Packet Page. 1365
Packet Page. 1366
Packet Page. 1367
Packet Page. 1368
Packet Page. 1369
Packet Page. 1370
Packet Page. 1371
Packet Page. 1372
Packet Page. 1373
Packet Page. 1374
Packet Page. 1375
Packet Page. 1376
Packet Page. 1377
Packet Page. 1378
Packet Page. 1379
Packet Page. 1380
Packet Page. 1381
Attachment 4
Navigation Center Project Site
400 ft
N
➤➤
N
Packet Page. 1382
3
1
2
7
DISCUSSION
January 21, 2026
Honorable Mayor and City Council Members
Gabriel Elliott, Director of Community Development & Housing
Community Development & Housing
It is recommended that the Mayor and City Council of the City of San Bernardino,
California adopt Resolution No. 2026-006:
1. Approve the Exclusive Negotiating Agreement (ENA) between the City of San
Bernardino and Neighborhood Housing Services of the Inland Empire (NHSIE),
a California non-profit public benefit corporation, for the development of
approximately 0.86 acres of city-owned surplus land, identified as sites 8, 9 and
10 (“Property”), for affordable housing; and
2. Authorize the City Manager, Deputy City Manager, or designee to execute the
ENA, along with any subsequent amendments, extensions, and other
necessary documents to complete the transaction.
City Manager recommends approval.
Packet Page. 1383
3
1
2
7
The proposed action would authorize the City of San Bernardino to enter into an
Exclusive Negotiating Agreement (ENA) with Neighborhood Housing Services of the
Inland Empire (NHSIE), a nonprofit affordable housing developer, for the potential
development of affordable homeownership housing on three City-owned surplus land
sites located along East 49th Street in Ward 4 (Sites 8, 9, and 10), totaling
approximately 0.86 acres. The sites were declared surplus pursuant to the Surplus
Land Act, and all required notification and good faith negotiation procedures have been
completed in coordination with the California Department of Housing and Community
Development (HCD). The ENA establishes a structured negotiation period to evaluate
project feasibility and negotiate the terms of a future Disposition and Development
Agreement (DDA), including site control, affordability, design, financing, and long-term
operations.
Background
The City owns properties located on East 49th Street, identified as Surplus Land Act
Sites 8, 9, and 10. These properties have been designated for disposal under the
Surplus Land Act, meaning they are considered excess property that the City does not
need for public use and may be made available for development or other purposes.
The sites include the following Assessor’s Parcel Numbers (APNs): 0154-125-07 (Site
8), 0154-126-01 and 0154-126-02 (Site 9), and 0154-126-30 (Site 10).
On November 16, 2022, the City Council of the City of San Bernardino adopted
Resolution No. 2022-234, which declared the Property surplus, pursuant to
Government Code Section 54220 and issued Notices of Availability (“NOA”) on
February 27, 2024.
On August 2, 2023, the City selected NHSIE, a nonprofit affordable housing developer,
to partner with the City to develop approximately 0.86 acres of the Property for
affordable housing (“Project”).
On October 18, 2024, the California Department of Housing and Community
Development (HCD) issued a letter to the City determining that the City had met all the
requirements under the Surplus Land Act (SLA) for the purposes of disposing of the
Property.
Discussion
Neighborhood Housing Services of the Inland Empire (NHSIE) is a community-based,
community-driven 501(c)(3) nonprofit organization with more than 40 years of
experience advancing housing stability and neighborhood revitalization throughout the
Inland Empire. As a U.S. Department of Housing and Urban Development (HUD)-
approved housing counseling agency, a certified Community Development Financial
Institution (CDFI), and an experienced affordable housing developer, NHSIE integrates
financial counseling, development expertise, and long-term asset management to
deliver sustainable housing outcomes.
NHSIE’s proposed development approach is informed by demonstrated community
Packet Page. 1384
3
1
2
7
need identified through its direct service programs. Over the past three years, NHSIE
has documented demand from more than 100 households within 12 months of
mortgage readiness seeking homeownership opportunities, as well as approximately
2,400 residents interested in naturally affordable rental housing. This demand has
shaped a comprehensive housing strategy designed to address the full continuum of
housing needs, including homeownership, transitional housing, and workforce-oriented
rental opportunities.
Packet Page. 1385
3
1
2
7
For Surplus Land Act Sites 8, 9, and 10, NHSIE proposes the development of a small-
scale homeownership community consisting of approximately 19 townhome units
distributed across the three sites (approximately five to eight units per site). The homes
are designed to average approximately 1,300 square feet and are intended to serve
first-time homebuyers and families seeking stable, long-term housing opportunities.
On NHSIE-owned property, the organization proposes a hybrid model that combines
immediate homeownership opportunities with a lease-to-own pathway for households
participating in NHSIE’s Self-Sufficiency Program. Under this model, certain units will
be offered for purchase upon completion, while a portion will be retained as rental units
to support households actively preparing for homeownership. This approach provides
a structured transition for families building financial capacity and housing readiness.
NHSIE also proposes utilizing innovative construction methods to reduce development
costs, shorten construction timelines, and enhance building durability and climate
resilience. These strategies are intended to support long-term affordability by lowering
both initial development costs and ongoing operating expenses.
Traditional sustainability measures will include high-performance building envelopes,
energy-efficient windows and doors, advanced air sealing, and high-efficiency HVAC
systems with smart controls. Projects will incorporate drought-tolerant, native
landscaping to reduce water use and maintenance demands and will prioritize locally
sourced materials where feasible. Developments will pursue third-party green building
certifications, such as LEED, ENERGY STAR, or Green Globes, to verify
environmental performance.
Where feasible, NHSIE proposes the use of 3D concrete printing technology, which
utilizes computer-controlled equipment to construct structural walls layer by layer using
specialized concrete mixes. This method significantly accelerates construction
timelines and improves structural resilience. The technology offers enhanced fire
resistance, seismic performance, energy efficiency, and durability, while reducing long-
term maintenance needs.
NHSIE also proposes the strategic use of factory-built manufactured housing
constructed in climate-controlled environments in accordance with federal HUD
standards. As a licensed manufactured housing dealer, NHSIE is able to achieve cost
savings that are passed directly to residents through reduced purchase prices.
Manufactured housing offers consistent quality control, accelerated construction
schedules, and affordability advantages compared to traditional site-built construction.
Through this integrated approach, combining demonstrated community need,
innovative construction technologies, and sustainable design, NHSIE is positioned to
deliver high-quality housing that advances the City’s affordable housing goals,
supports workforce stability, and promotes long-term neighborhood investment and
growth.
Packet Page. 1386
3
1
2
7
The following are the key terms of the ENA with NHSIE:
Agreement to Negotiate: The City and the Developer agree to engage in
exclusive, good-faith negotiations during the Negotiating Period to finalize a
mutually acceptable Disposition and Development Agreement (DDA).
Negotiating Period: The parties have a 6-month period (with the potential of
(2) extensions for a period of three (3) months each time) to negotiate the
Disposition and Development Agreement (DDA). The ENA terminates upon
signing of the DDA or if no agreement is reached by the end of the period.
Disposition and Development Agreement (DDA): The DDA is the final legal
contract that will outline the specific terms of the development project, including
property transfer, project design, development schedule, budgeting, operational
procedures, maintenance, compliance with CEQA, NEPA, and other relevant
details.
Environmental Review: The project must comply with the California
Environmental Quality Act (CEQA) and National Environmental Policy Act
(NEPA) and undergo an environmental impact assessment to identify potential
environmental impacts and implement mitigation measures to reduce or avoid
significant impacts.
Financing Proposal: The Developer must provide a detailed financial analysis,
including development costs, operating expenses, and funding sources, to
demonstrate the project's financial feasibility.
Development Documents: The Developer must prepare detailed plans,
drawings, and specifications for the project and obtain necessary permits and
approvals from relevant agencies.
Due Diligence: The Developer must conduct thorough investigations, including
inspections, tests, and studies, to assess the Property's condition and suitability
for development and to identify and mitigate potential risks and liabilities.
Community Engagement: The City and Developer must engage with the
community through public meetings, surveys, or other methods to seek input
and address community concerns.
Upon completion of negotiations, staff will return at a later date to present a Disposition
and Development Agreement (DDA) for the City Council’s consideration and approval.
Approval of the ENA establishes a framework to negotiate key project terms and
advance project planning but does not obligate the City to convey the properties. This
initiative reflects the City’s commitment to addressing housing needs through
sustainable partnerships and strategic investments.
2021-2025 Strategic Targets and Goals
Approving the ENA aligns with Key Strategic Target and Goal No. 3: Improved Quality
of Life. Partnering with NHSIE to develop affordable housing will reduce the number of
blighted city-owned properties while providing essential affordable housing
opportunities to the community.
Packet Page. 1387
3
1
2
7
Fiscal Impact
There is no impact to the General Fund associated with approving an Exclusive
Negotiating Agreement (ENA) between the City of San Bernardino and
Neighborhood Housing Services of the Inland Empire (NHSIE). No additional funding
is being requested with this item.
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino,
California:
1. Approve the Exclusive Negotiating Agreement (ENA) between the City of San
Bernardino and Neighborhood Housing Services of the Inland Empire (NHSIE),
a California non-profit public benefit corporation, for the development of
approximately 0.86 acres of city-owned surplus land, identified as sites 8, 9 and
10, for affordable housing; and
2. Authorize the City Manager, Deputy City Manager, or designee to execute the
ENA, along with any subsequent amendments, extensions, and other
necessary documents to complete the transaction.
Attachments
Attachment 1 Resolution No. 2022-234
Attachment 2 Resolution No. 2026-006
Attachment 3 NHSIE Sites 8-10 ENA
Ward:
Fourth Ward
Synopsis of Previous Council Actions: N/A
CC: Eric Levitt, City Manager
Packet Page. 1388
Packet Page. 1389
Packet Page. 1390
Packet Page. 1391
Packet Page. 1392
Packet Page. 1393
Packet Page. 1394
Packet Page. 1395
Packet Page. 1396
Packet Page. 1397
Packet Page. 1398
Packet Page. 1399
Packet Page. 1400
Packet Page. 1401
Packet Page. 1402
Packet Page. 1403
Packet Page. 1404
Packet Page. 1405
Packet Page. 1406
Packet Page. 1407
Packet Page. 1408
Packet Page. 1409
Packet Page. 1410
Packet Page. 1411
Packet Page. 1412
Packet Page. 1413
Packet Page. 1414
Packet Page. 1415
Packet Page. 1416
Packet Page. 1417
Packet Page. 1418
Packet Page. 1419
Packet Page. 1420
Packet Page. 1421
Packet Page. 1422
Packet Page. 1423
Packet Page. 1424
Packet Page. 1425
Packet Page. 1426
Packet Page. 1427
Packet Page. 1428
Packet Page. 1429
Packet Page. 1430
Packet Page. 1431
Packet Page. 1432
Packet Page. 1433
Packet Page. 1434
Packet Page. 1435
Packet Page. 1436
Packet Page. 1437
Packet Page. 1438
Packet Page. 1439
Packet Page. 1440
Packet Page. 1441
Packet Page. 1442
Packet Page. 1443
Packet Page. 1444
Packet Page. 1445
Packet Page. 1446
Packet Page. 1447
Packet Page. 1448
Packet Page. 1449
Packet Page. 1450
Packet Page. 1451
Resolution No. 2026-006
Resolution 2026-006
January 21, 2026
Page 1 of 3
RESOLUTION NO. 2026-006
RESOLUTION OF THE MAYOR AND CITY COUNCIL OF
THE CITY OF SAN BERNARDINO, CALIFORNIA,
APPROVING THE EXCLUSIVE NEGOTIATING
AGREEMENT BETWEEN THE CITY OF SAN
BERNARDINO AND NEIGHBORHOOD HOUSING
SERVICES OF THE INLAND EMPIRE (NHSIE)
WHEREAS, the City of San Bernardino (“City”), acting in the capacity as the Successor
Housing Agency to the former Redevelopment Agency of the City of San Bernardino, is the fee
owner of that certain real property located at East 49th Street, identified as Surplus Land Act Sites
8, 9, and 10 for Surplus Land Act (the “Act”) disposal purposes, (APN: 0154-125-07 (Site 8),
0154-126-01 and 0154-126-02 (Site 9), and 0154-126-30 (Site 10), in the City of San Bernardino
and State of California more specifically described in Exhibit A ("Property"); and
WHEREAS, on November 16, 2022, the City Council of the City of San Bernardino
(“City Council”) adopted Resolution No. 2022-234, which declared the Property surplus,
pursuant to Government Code Section 54220 of the Act and issued Notices of Availability
(“NOA”) on February 27, 2024; and
WHEREAS, on or about October 18, 2024, the California Department of Housing and
Community Development (“HCD”) issued a letter to the City determining that the City had met
all the requirements under the Act for the purposes of disposing the Property; and
WHEREAS, City has selected Neighborhood Housing Services of the Inland Empire
(“Developer”), to partner with the City to develop approximately 0.86 acres of the Property for
affordable housing (“Project”); and
WHEREAS, the City and Developer negotiated the terms of an Exclusive Negotiation
Agreement (“ENA”) in order to, among other things, establish a specific period of time for the
City and the Developer to negotiate regarding the potential sale of the Property from the City to
the Developer and the potential development of an affordable housing project on the Property by
the Developer; and
WHEREAS, the City desires to adopt the ENA to facilitate the development of the
Property; and
WHEREAS, the City has determined the approval of the ENA is exempt from the
California Environmental Quality Act (“CEQA”), pursuant to State CEQA Guidelines Section
15061(b)(3), because it can be seen with certainty that there is no possibility that the City’s
approval of the ENA may have a significant effect on the environment.
Packet Page. 1452
Resolution No. 2026-006
Resolution 2026-006
January 21, 2026
Page 2 of 3
BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF
SAN BERNARDINO AS FOLLOWS:
SECTION 1. The above recitals are true and correct and are incorporated herein by this
reference.
SECTION 2. CEQA Compliance. The Mayor and City Council hereby finds and
determines that it can be seen with certainty that there is no possibility that the adoption of this
Resolution and the ENA may have a significant effect on the environment. Thus, the adoption of
this Resolution is exempt from the requirements of CEQA pursuant to Section 15061(b)(3) of the
State CEQA Guidelines. The City Council hereby authorizes and directs the City to file a Notice
of Exemption with the San Bernardino County Recorder’s Office on the Authority’s behalf within
five (5) days from the adoption of this Resolution.
SECTION 3. Approval of ENA. The Mayor and City Council do hereby authorize the
City Manager, Deputy City Manager, or designee to execute the ENA, attached hereto as Exhibit
B and incorporated herein by this reference, along with any subsequent amendments, extensions,
and other necessary documents to complete the transaction. The Mayor and City Council hereby
acknowledge that the ENA shall establish the terms by which the City and the Developer will
negotiate the transfer of the Property to the Developer.
SECTION 4. Severability. If any provision of this Resolution or the application thereof
to any person or circumstance is held invalid, such invalidity shall not affect other provisions or
applications, and to this end the provisions of this Resolution are declared to be severable.
SECTION 5. Effective Date. This Resolution shall become effective immediately.
APPROVED and ADOPTED by the City Council and signed by the Mayor and attested
by the City Clerk this 21st day of January 2026.
Helen Tran, Mayor
City of San Bernardino
Attest:
Telicia Lopez, City Clerk
Approved as to form:
Sonia Carvalho, City Attorney
Packet Page. 1453
Resolution No. 2026-006
Resolution 2026-006
January 21, 2026
Page 3 of 3
CERTIFICATION
STATE OF CALIFORNIA )
COUNTY OF SAN BERNARDINO) ss
CITY OF SAN BERNARDINO )
I, Telicia Lopez, CMC, City Clerk, hereby certify that the attached is a true copy of
Resolution No. 2026-006, adopted at a regular meeting held on the 21st day of January 2026 by
the following vote:
Council Members: AYES NAYS ABSTAIN ABSENT
SANCHEZ _____ _____ _______ _______
IBARRA _____ _____ _______ _______
FIGUEROA _____ _____ _______ _______
SHORETT _____ _____ _______ _______
KNAUS _____ _____ _______ _______
FLORES _____ _____ _______ _______
ORTIZ _____ _____ _______ _______
WITNESS my hand and official seal of the City of San Bernardino this ___ day of ____________
2026.
Telicia Lopez, City Clerk
Packet Page. 1454
DRAFT
CITY OF SAN BERNARDINO
th Street, San Bernardino CA 92404
th Street, San Bernardino, CA 92404
th Street, San Bernardino, CA 92404
th Street, San Bernardino, CA”)
This EXCLUSIVE RIGHT TO NEGOTIATE AGREEMENT “East 49th Street, San Bernardino
CA” is dated as of __________, 2026 (this “Agreement”), and is entered into by and between
the CITY OF SAN BERNARDINO, a California municipal corporation (the “City”) and
Neighborhood Housing Services of The Inland Empire (NHSIE) , a California limited liability
company (“Developer”).
A. The City desires to encourage and effectuate the development of certain real property
located within areas commonly referred to as “Site 8” - 288 E. 49th Street, San Bernardino CA 92404,
comprising approximately [insert] acres, “Site 9” - 251/255 E. 49th Street, San Bernardino, CA
92404, comprising approximately [insert] acres, and “Site 10” - 299 E. 49th Street, San Bernardino,
CA 92404, comprising approximately [insert] acres.
B. Site 8 is located at or generally bounded by APN 0154-125-07-0000, Site 9 is located
at or generally bounded by APNs 0154-126-01 and 0154-126-02, and Site 10 is located or generally
bounded by APN 0154-126-30, each of which are depicted on the “Maps” attached hereto as Exhibit
“A” and is legally described on Exhibit “B” attached hereto (the “Properties”); and
C.The City is the fee owner of the Properties; and
D.The Properties are generally vacant land with all building structures and
infrastructure having been demolished; and
E.On November 16, 2022, the City Council of the City of San Bernardino (the “City
adopted Resolution No. 2022-_234_, which, among other things, declared the Properties surplus,
pursuant to section 54221 of the Surplus Land Act (Government Code section 54220 et seq.) (the
“Act”); and
F.On or about November 22, 2024, the California Department of Housing and
Community Development (“HCD”) issued letters to the City determining that the City had met
“all the requirements under the [Act] for the purposes of disposing of [the Properties]” and “is
permitted to proceed with the sale of” the Properties outside of the Act; and
G.As a condition of the City’s disposition of the Properties under the Act, the City
must, prior to disposition, record on title to each of the Properties a restrictive covenant ensuring
that 25 percent (25%) of the total number of those units must be sold or rented at an affordable
Packet Page. 1455
DRAFT
cost or affordable rent to lower income households – all as defined in Section 50052.5 of the
California Health and Safety Code; and
H.The Developer and City contemplate an affordable housing project consisting of 5
or more residential units at Site 8, 8 or more residential units at Site 9, and 6 or more residential
units at Site 10, with not less than 25 percent of the total number of residential units developed on
each site to be sold or rented at affordable housing cost, to lower income households, as defined
in Section 50079.5 of the California Health and Safety Code. Rental units shall remain affordable
to and occupied by lower income households for a period of 55 years for rental housing and 45
years for ownership housing (the “Project”); and
I.The Developer proposes acquiring the Properties for fair market value, as
determined by an appraisal, and developing the Project pursuant to a disposition and development
agreement or some other definitive agreement (“DDA”), which will include compliance with that
certain Contract for Loan Guarantee Assistance Under Section 108 of the Housing and Community
Development Act of 1974, as Amended 42 U.S.C. § 5308, by and between the City and the U.S.
Department of Housing and Urban Development (“HUD”), dated September 13, 2006, and
approved by the City Council on July 27, 2006 by Resolution No. 2006-271 (the “HUD Contract”),
a copy of which has been provided to the Developer, and under which, among other things, the
City (as subrecipient) is obligated to repay a $7.5 million loan from HUD to the City in annual
principal installments through 2025; and
J.In connection with the preparation of the DDA and prior to consideration of the
approval of such DDA, the Parties shall determine the necessary steps for compliance with the
California Environmental Quality Act of 1970 (as amended, “CEQA”), and take such steps as
needed for compliance with CEQA; provided that approval of this Agreement shall not be
considered a "project" under CEQA or constitute City's agreement to any course of action with
respect to Properties or the development thereof; and
K.Based upon information furnished by the Developer to the City, together with
further investigations conducted by the City, the Developer is qualified to assist the City in
undertaking economically sustainable development on the Properties, which will include the
planning for and development of a specific study, and the evaluation and planning by the
Developer and the City of appropriate and feasible development alternatives.
The Negotiation Period; Term of Agreement; Options to Extend.
a.The rights and duties of the parties established by this Agreement shall
commence on the date that the parties each execute this Agreement (the “Effective Date”). This
Agreement will continue in effect for six (6) months from the Effective Date, at which time this
Agreement shall automatically terminate, unless the parties (prior to the expiration of such 6-
month period) mutually extend the Exclusivity Period in a writing signed by both parties, as
authorized by sub-paragraph (b) of this Section 1.
Packet Page. 1456
DRAFT
b.The parties shall, at the sole discretion of the City Manager, be entitled to
extend the initial 6-month period two (2) times for a period of three (3) months each time – i.e.,
for a total time period of twelve (12) months from the Effective Date. The time period during
which this Agreement shall be in effect (including any extensions of time approved by the City
Manager) shall be referred to as the “Negotiation Period.”
2.Developer Acknowledgments.
a.The Developer hereby acknowledges and agrees that no provision of this
Agreement shall be deemed to be an offer by the City or an acceptance by the City of any offer or
proposal from the Developer to convey any interest in the Properties to the Developer. Any studies
relating to the Properties that may hereafter be undertaken by the Developer, in its sole discretion,
shall be the sole responsibility of the Developer and shall not be deemed to be undertaken for the
benefit of the City.
b.The qualifications and identity of the Developer are of particular concern to
the City. The City has relied on these qualifications and identity in entering into this Agreement
with the Developer. During the term of this Agreement, no voluntary or involuntary successor-in-
interest of the Developer shall acquire any right or power under this Agreement. The Developer
shall not assign all or any part of this Agreement or any rights hereunder, without the prior written
approval of the City Manager, which approval may be granted, withheld, or conditioned in the sole
and absolute discretion of the City Manager. Reference herein to the “City Manager” of the City
shall refer to the City Manager or the City Manager’s designee. Notwithstanding the foregoing,
the Developer shall have the right to assign this Agreement and its rights hereunder to an entity,
which controls, is controlled by, or is under common control with the Developer or its principals,
members, or affiliates.
c.The Developer shall promptly notify the City in writing of any and all
changes whatsoever to the identity of the business entities and individuals in control of the
Developer, as well as any and all material changes in the interest or the degree of control of the
Developer by any such party, of which information the Developer or any of its partners or officers
have been notified or may otherwise have knowledge or information. Upon the occurrence of any
material change in interest or control, whether voluntary or involuntary, in membership,
ownership, management or control of the Developer (other than such changes occasioned by the
death or incapacity of any individual) unless approved in writing, in advance, by the City Manager,
the City may terminate this Agreement by serving written notice of such termination on the
Developer referencing this Section.
3.Deposit.
(a) Prior to the Effective Date, the Developer shall pay to the
City a deposit in the amount of Twenty Five Thousand Dollars ($25,000.00) in immediately
available funds (“Initial Deposit”) to ensure that the Developer will proceed diligently and in good
faith to fulfill its obligations under this Agreement, as part of the consideration for the City’s
agreement not to negotiate with other persons during the Negotiation Period, and to defray certain
costs of the City in pursuing the contemplated negotiations with the Developer during the
Negotiation Period, including staff time, consultant fees and attorneys’ fees associated with review
Packet Page. 1457
DRAFT
and implementation of this Agreement or preparing the DDA, all of which shall be charged against
the initial Deposit. The City shall provide notice to the Developer if at any time during the
Negotiation Period the Initial Deposit falls below Five Thousand Dollars ($5,000), at which time
Developer may make additional deposit of any amount. If Developer opts not to make any further
additional deposits, then, upon the complete exhaustion of the Initial Deposit, this Agreement shall
automatically terminate without any further notice to either party, and neither Party shall have any
further rights or obligations to the other under this Agreement, except obligations that expressly
survive termination of this agreement. Any funds remaining in the Initial Deposit at the termination
of this Agreement shall either be returned to the Developer or applied towards the purchase price
of the Properties at the Developer’s discretion. The Initial Deposit shall not include or be applied
to any fees and expenses required by the City of Developer for any permit, other required
entitlement or Project processing.
(b)Upon each extension of the Negotiation Period, if any, the
Developer shall deposit an additional Ten Thousand Dollars ($10,000) in immediately available
funds with the City on the first day of any extension of the negotiation Period (each, an “Extension
Deposit”). Each Extension Deposit is intended to ensure that the Developer will proceed diligently
and in good faith to fulfill its obligations under this agreement during any extension of the
Negotiation Period, as part of the consideration for the City’s agreement not to negotiate with other
persons during any such extension of the Negotiation Period, and to defray certain costs of the City
in pursuing the contemplated negotiations with the Developer during any such extension of the
Negotiation Period, pursuant to this Agreement. Any funds remaining in the Extension Deposit at
the termination of this Agreement shall either be returned to the Developer or applied toward the
purchase price of the Properties at the Developer’s discretion.
Exclusive Agreement to Negotiate.
a.Required Actions.
(1)Within thirty (30) days of the Effective Date the Developer shall submit an
updated study that validates the financial feasibility of the development scope identified by
Developer in the June 30, 2024 response to the City’s request for additional information as part of
the developer selection process.
(2)Within ninety (90) days from the Effective Date, Developer shall submit to
the City an updated “Preliminary Development Concept Package,” consisting of the following:
(a)A development proposal generally describing the anticipated use,
including, affordability levels and targeted population;
(b)Identification of the architect proposed to be used by the Developer;
(c)Proposed site plan;
(d)A statement describing the proposed method of financing, including
construction and permanent financing and identity of the person(s)
or companies providing debt financing or equity.
Packet Page. 1458
DRAFT
(e)A list of financial references;
(f)A comprehensive construction and operating pro forma which
identifies all sources and uses of funds for the construction and
operation of the Project;
(g)A schedule of performance;
(h)A summary of relevant development experience, particularly with
affordable housing projects;
(i)A community engagement and outreach plan; and
(j) Evidence of site control required for the project, to the extent non-City
Property is involved.
(3)Within one hundred twenty (120) days of the Effective Date, Developer
shall submit to the City a “Final Development Concept Package,” consisting of the following:
(a)Updated information, current as of the date of submittal of the Final
Development Concept Package, as to each and every item set forth
under the heading “Preliminary Development Concept Package”
and addressing such other and additional matters as may arise during
negotiations, including, but not limited to;
(i)Proposed final identification of sources of financing, with a
description of the terms and conditions of such financing;
(ii)A revised schedule of performance.
(4)The Developer shall bear all cost for its performance under this Agreement.
(5)The City and the Developer will continue to negotiate toward the execution
of a DDA within the Negotiation Period for the disposition, use and development of the Properties.
During the term of this Agreement, the City will negotiate exclusively with Developer, except as
to potential users, concerning disposition, use, and development of the Properties. If a DDA is
approved by the City Council and fully executed by the Parties, it shall supersede this Agreement.
(6)The DDA must be presented to the City Council for review and approval,
in its sole and absolute discretion The DDA shall contain terms and conditions for the disposition
and use of the Properties, including an affordability covenant, as negotiated between the City and
the Developer, which comply with all legal requirements for disposition of the Properties.
(a)Agreement to Negotiate. The City (by and through its staff and
consultants) and Developer agree that for the term of the Negotiation Period (whether said period
expires or is earlier terminated by the provisions herein), each party shall negotiate diligently and
in good faith to carry out its obligations under this Agreement. The Developer acknowledges that
the City holds title to the Properties. The Developer expressly agrees and acknowledges that its
Packet Page. 1459
DRAFT
rights pursuant to this Agreement are subject to and based upon compliance by the Developer with
this Agreement, including without limitation the making of all submittals required pursuant to this
Agreement, in conformity with this Agreement, and City's review of the submittals under
applicable laws. Developer further agrees and acknowledges that the agreement to negotiation is
not, and shall not be construed as, an approval of a DDA or other definitive agreement for
disposition of the Properties.
(b)Supplemental Progress Reports. In addition to the information
required in Section 3.a above, for so long as this Agreement remains in effect Developer agrees to
provide monthly written reports, or as often as reasonably requested, to the Agency Director of
Community, Housing, and Economic Development advising the City on all matters and all studies
being made.
No Predetermination of City Discretion. The Parties agree and acknowledge that nothing
in this Agreement in any respect does or shall be construed to affect or prejudge the exercise of
the discretion of the City. The Developer acknowledges in this regard that the feasibility of the
Developer’s proposal has not been finally determined, and further that, at the discretion of the City,
an environmental review will be prepared and circulated for comment by the City, in connection
with the consideration of the DDA. Further, nothing in this Agreement in any respect does or shall
be construed to affect or prejudge the City’s discretion to consider, negotiate, or undertake the
acquisition and/or development of any portion of the Properties, or shall affect the City’s
compliance with the laws, rules, and regulations governing land uses, environmental review, or
disposition of the Properties.
Environmental and Other Requirements. Certain state and local environmental
requirements (including, but without limitation, the California Environmental Quality Act of 1970,
Public Resources Code Section 21000, et seq.) ("CEQA") may be applicable to the Project.
Pursuant to such requirements, certain environmental documents may be required to be prepared
and certified for the Project. The City, by this Agreement, undertakes no obligation to pay any
costs associated with such environmental documents or to supply data and information both to
determine the impact of the development on the environment and to assist in the preparation of
any necessary environmental documents, or any such related information for purposes of
determining whether any project on the Properties would qualify for an exemption from CEQA.
Costs and Expenses. Except as otherwise provided in this Agreement, each party shall be
responsible for its own costs and expenses in connection with any activities and negotiations
undertaken in connection with the performance of its obligations under this Agreement.
Non-Discrimination. Developer shall not discriminate against nor segregate, any person,
or group of persons on account of sex, race, color, marital status, religion, creed, national origin or
ancestry in the sale, lease, sublease, transfer, use, occupancy, tenure or enjoyment of the Properties,
nor shall the Developer establish or permit any such practice or practices of discrimination or
segregation in the selection, location, number, use, or occupancy of tenants, lessees, subtenants,
sublessees or vendees of the Properties.
Address for Notices. Any notices pursuant to this Agreement shall be in writing and sent
(i) by Federal Express (or other established express delivery service which maintains delivery
Packet Page. 1460
DRAFT
records), (ii) by hand delivery, or (iii) by certified or registered mail, postage prepaid, return receipt
requested, to the following addresses:
Default. Failure by either party to perform any of its duties as provided in this Agreement
shall constitute an event of default under this Agreement. The non-defaulting party shall give
written notice of a default to the defaulting party, specifying the nature of the default and the action
required to cure the default.
Remedies for Breach of Agreement. In the event of a default that remains uncured for
ten (10) business days, the sole remedy of the non-defaulting party shall be to terminate this
Agreement. Following such termination, neither party shall have any further rights, remedies or
obligations under this Agreement. Neither party shall have any liability to the other for monetary
damages or specific performance for the breach of this Agreement, or failure to reach agreement
on a DDA, and each party hereby waives and releases any such rights or claims it may otherwise
have at law or at equity. Furthermore, the Developer knowingly agrees that it shall have no right
to specific performance for conveyance of, nor to claim any right of title or interest in the Properties
or any portion thereof.
Termination. This Agreement shall: (i) automatically terminate at the time(s) set forth in
Section 1 above, and (ii) terminate prior to the time(s) set forth in Section 1 above in the event the
Developer shall fail to perform its obligations hereunder to the reasonable satisfaction of the City
Manager; provided that prior to termination, the City shall provide the Developer with notice of
the failure(s) and provide ten (10) business days in which to cure, if such failures are curable. In
addition, the parties agree that if either party shall determine, in their sole and absolute discretion,
that it is infeasible to proceed with the disposition and development of the Properties as
contemplated hereunder, either party may, upon ten (10) business days’ written notice to the other
party, terminate this Agreement. Upon termination of this Agreement, whether upon expiration of
the Negotiation Period or otherwise, both Parties knowingly agree that neither Party shall have any
Packet Page. 1461
DRAFT
further rights or remedies as to the other and the Developer shall have no rights in respect to the
Properties.
Time of Essence. Time is of the essence of every portion of this Agreement in which time
is a material part. During the Negotiation Period the time periods set forth in this Agreement for
the performance obligations hereunder shall apply and commence upon a complete submittal of
the applicable information or occurrence of an applicable event. In no event shall an incomplete
submittal by the Developer trigger any of the City’s obligations of review, approval and/or
performance hereunder; provided, however, that the City shall notify the Developer of an
incomplete submittal as soon as is practicable and in no event later than the applicable time set
forth for the City’s action on the particular item in question. Further, the time periods set forth
herein are outside dates of performance.
Real Estate Commissions. The City shall not be liable for any real estate commission or
brokerage fees which may arise with respect to this Agreement or the Properties.
Developer Not an Agent. The Developer is not an agent of the City.
Press Releases. The Developer agrees not to issue any press releases about this Agreement
or the Properties without the express written approval of the City Manager or his/her designee.
Entire Agreement; Modifications; Waiver. This Agreement constitutes the entire
understanding and agreement of the parties, integrates all of the terms and conditions mentioned
herein or incidental hereto, and supersedes all negotiations or previous agreements, written or oral,
between the parties or their predecessors in interest with respect to all or any part of the subject
matter hereof. Any amendment, modification, or waiver of this Agreement or any part hereof shall
not be effective unless in writing and signed by both parties and shall be subject to Section 21.
Agreement Does Not Constitute Development Approval. The City reserves final
discretion and approval as to any DDA and all proceedings and decisions in connection therewith.
This Agreement shall not be construed as a grant of development rights, interest in the Properties,
or land use entitlements to construct the Project or any other project. All design, architectural, and
building plans for the Project shall be subject to the review and approval of the City. By its
execution of this Agreement, the City is not committing itself to or agreeing to undertake the
disposition or development of the Properties or other real property to the Developer, or any other
acts or activities requiring the subsequent independent exercise of discretion by the City, or any
agency or department thereof.
Governing Law; Venue. This Agreement shall be construed in accordance with the laws
of the State of California, and venue for any action initiated by a party to interpret or enforce this
Agreement shall lie exclusively in the state and federal courts in the County of San Bernardino.
Attorneys’ Fees. Each party shall be responsible for payment of its own attorneys’ fees
and expenses with respect to negotiation and preparation of this Agreement. In the event any action
is brought to enforce or interpret any of the provisions of this Agreement, the prevailing party in
such action or proceeding, shall be entitled to have and recover its reasonable attorneys’ fees and
expenses.
Packet Page. 1462
DRAFT
21.Implementation of Agreement. The City shall maintain authority to implement this
Agreement through the City Manager. The City Manager shall have the authority to issue
interpretations, waive provisions, and/or enter into certain amendments of this Agreement on
behalf of the City so long as such actions do not materially or substantially add to the costs or risks
incurred or to be incurred by the City as specified herein, and such interpretations, waivers and/or
amendments may include extensions of time to perform, subject to Section 1 herein. All other
material and/or substantive interpretations, waivers, or amendments shall require the collective
consideration, action and written consent of the governing board of the City.
Counterparts. This Agreement may be signed in multiple counterparts, each of which
shall be deemed an original, but all of which taken together shall constitute one and the same
instrument.
Signatures on Following Page]
Packet Page. 1463
DRAFT
Packet Page. 1464
DRAFT
NOW THEREFORE, the Parties have executed this Negotiation Agreement as of the date
first set forth above.
CITY:
CITY OF SAN BERNARDINO,
a California municipal corporation
By:
Eric Levitt, City Manager
Date:
ATTEST:
Telicia Lopez, City Clerk
Date:
APPROVED AS TO FORM:
Albert Maldonado, City Attorney
BEST BEST & KRIEGER LLP
Neighborhood Housing Services of the Inland
Empire (NHSIE)
a California limited liability company
By:
Title
Date:
Packet Page. 1465
DRAFT
EXHIBIT A
Packet Page. 1466
DRAFT
EXHIBIT B
SITE 8
APN: 0154-125-07:
Parcel 1:
Lot 7 of Block 20, of Tract 1834, as per maps of record in Book 26, Page(s) 52 of Maps in
the Office of the County recorder of said County.
Parcel 2:
An appurtenant easement for ingress and egress and public utilities over and across the
West 9.5 feet to the Southernmost 55 feet of Lot 8, Block 20, of Tract 1834, as per maps
in Book 26, page(s) 52 of maps, in the Office of the County Recorder of said County.
SITE 9
APN: 0154-126-01:
Lot 1, Block 19 of Tract 1834, San Bernardino Heights, in the City of San Bernardino,
County of San Bernardino, State of California, as per map recorded in Book 26, Page(s) 52
of Maps in the Office of the County recorder of said County.
Together with an easement for ingress and egress and surface water flow across Lots 1, 2,
and 3 and for the benefit of Lots 1, 2, and 3, block 19, Tract 1834, 10 feet in width running
East and West, the South line of which is 23 feet North of and parallel to the South line of
said Lots 1, 2, and 3.
APN: 0154-126-02
Lot 2, Block 19 of Tract 1834, San Bernardino Heights, in the City of San Bernardino,
County of San Bernardino, State of California, as per map recorded in Book 26, Page(s) 52
of Maps in the Office of the County recorder of said County.
Together with an easement for ingress and egress and surface water flow across Lots 1, 2,
and 3 and for the benefit of Lots 1, 2, and 3, block 19, Tract 1834, 10 feet in width running
East and West, the South line of which is 23 feet North of and parallel to the South line of
said Lots 1 and 2.
SITE 10
APN: 0154-126-30:
Parcel 1:
Lots 10 and 11, Block 19 of Tract 1834, in the City of San Bernardino, County of San
Bernardino, State of California, as per map recorded in Book 26, Page(s) 52 of Maps in the
Office of the County recorder of said County.
Parcel 2:
Packet Page. 1467
DRAFT
A non-exclusive easement for ingress and egress of that portion of Lot 12, Block, 19, Tract
1834, in the City of San Bernardino, County of San Bernardino, State of California, as per
map recorded in Book 26, Page 52 of Maps in the Office of the County recorder of said
County described as follows:
Commencing at the Northeast corner of said Lot;
Thence West along the North line of said Lot 30 feet;
Thence Southeasterly to a point on the East line of said Lot, distant South 20 feet from the
Northeast corner thereof;
Thence North 20 feet to the point of beginning,
Packet Page. 1468
DRAFT
EXHIBIT C
Packet Page. 1469
DRAFT
Packet Page. 1470