Loading...
HomeMy WebLinkAboutVerdemont Heights City Council (SAFER Appeal) Response Letter (9-2-26) 66131174.1 Brent R. McManigal Director bmcmanigal@fennemorelaw.com 550 E Hospitality Ln, Suite 350 San Bernardino, California 92408 PH (909) 723-1807 | FX (909) 890-9877 fennemorelaw.com September 2, 2026 VIA E-MAIL Honorable Mayor and Members of the City Council City of San Bernardino 201 North E Street, 3rd Floor San Bernardino, California 92401 cityofsanbernardino@sbcity.org Chantel Choice, Senior Planner Community Development & Housing Department City of San Bernardino 201 North E Street, 3rd Floor San Bernardino, California 92401 choice_ch@sbcity.org Re: Verdemont Heights Residential Development (Tentative Tract Map No. 20707) Supplemental Response to August 31, 2026 SAFER Appeal Comment Honorable Mayor and Members of the City Council: This firm represents the Project Applicant for the Verdemont Heights Residential Development, Tentative Tract Map No. 20707 (the “Project”). We submit this brief supplemental response to the August 31, 2026 letter submitted by Lozeau Drury LLP on behalf of Supporters Alliance for Environmental Responsibility (“SAFER”), including the memorandum prepared by SAFER’s consultant, Mr. Patrick Sutton. The City Council can and should deny the appeal. SAFER’s August 31 letter was submitted two days before the City Council hearing and raises air quality, greenhouse gas, and noise arguments that were not presented to the Planning Commission and were not included with SAFER’s July 27 appeal. The consultant memorandum attached to SAFER’s letter is dated May 17, 2026, meaning this information existed before the Planning Commission hearing and before SAFER filed its appeal. SAFER offers no explanation for waiting until the eve of the City Council hearing to submit it. City of San Bernardino – City Council September 2, 2026 Page 2 66131174.1 More importantly, the August 31 letter does not identify a new Project fact or newly discovered environmental impact. It instead reframes the Project through assumptions that are not established by the City’s record including: a hypothetical accelerated construction schedule, assumed overlapping construction and occupancy, a characterization of the site as “natural lands” rather than an underutilized vacant site within an urbanized residential area that has been routinely disced for weed abatement as required by the Fire Department, and a City of Los Angeles noise methodology substituted for the City’s analysis. Those assumptions do not show that the IS/MND inaccurately described the Project or that the Project will cause a significant unmitigated environmental impact. SAFER’s air quality argument treats CalEEMod’s modeling duration as though it were the Project’s actual construction schedule. But the IS/MND explains that the CalEEMod analysis uses default parameters, including default assumptions regarding construction duration and phasing, to estimate emissions in the absence of finalized Project-specific construction details. SAFER’s consultant does not identify a Project-specific schedule, grading plan, equipment fleet, or phasing plan demonstrating that the default parameters materially understate emissions or that the Project will be constructed under the accelerated scenario assumed in the August 31 letter. Instead, he substitutes a different set of assumptions for the default parameters used in the City’s analysis without providing substantial evidence that those assumptions are inaccurate or that they would result in a significant unmitigated impact. SAFER’s overlapping construction and operation argument is likewise speculative. SAFER’s consultant states that the subdivision appears to be separated into phases and that phased projects “typically” involve occupancy of some phases while others remain under construction. The City’s conditions contemplate that the Project may be developed in phases and require phase-specific improvement plans addressing public safety, public services, and traffic circulation. But those conditions do not establish that construction and occupancy will overlap, identify the timing or sequence of any phases, or authorize occupied homes to be located adjacent to active construction. SAFER identifies no approved phasing plan, construction schedule, or Project-specific emissions or noise analysis demonstrating that any actual phase sequence would cause a significant impact. SAFER’s diesel particulate matter comment also does not establish a significant health risk. SAFER’s consultant did not prepare a health risk assessment, did not calculate a Project-specific cancer-risk number, did not model diesel particulate dispersion, and did not identify any applicable risk threshold that the Project would exceed. He simply argues that an additional study should be prepared. A request for additional analysis is not substantial evidence that the Project will cause a significant environmental impact. SAFER’s greenhouse gas argument similarly rests on an overstated description of the Project and an improper attempt to turn selected CARB Scoping Plan policy attributes into mandatory CEQA thresholds. SAFER’s consultant characterizes the Project as converting “natural lands” into single- City of San Bernardino – City Council September 2, 2026 Page 3 66131174.1 family homes, but that is not a fair description of the City’s record. The IS/MND describes the Project Site as vacant land within an urbanized, primarily residential area, and the City staff report describes the subdivision as future residential development on an underutilized vacant site compatible with surrounding residential uses. In fac, the property is routinely disced to comply with the City's weed abatement ordinance. SAFER’s consultant also faults the Project for not satisfying selected Scoping Plan residential attributes such as 20 dwelling units per acre, 20 percent affordable housing, reduced parking, and all-electric appliances. Those policy attributes are not mandatory significance thresholds for every residential subdivision and do not override the IS/MND’s quantified GHG analysis. Finally, SAFER’s noise argument substitutes a different methodology and different assumptions for the City’s analysis. The IS/MND used the Federal Transit Administration construction-noise threshold because the City of San Bernardino does not establish a numeric construction-source noise threshold. The IS/MND found construction noise would remain below that threshold and includes construction-noise best management practices. SAFER’s consultant instead applies City of Los Angeles construction-noise guidance and assumes equipment operating as close as 30 feet from existing residences. That alternative calculation does not show that the City’s analysis is unsupported or that the Project will result in an unavoidable significant impact. The City Council is not required to delay action, recirculate the IS/MND, or require an EIR based on late-submitted assumptions. CEQA requires substantial evidence in light of the whole record. Argument, speculation, unsubstantiated opinion, and assumptions not grounded in Project-specific facts do not require an EIR. The whole record before the City supports the City’s determination that the Project’s environmental impacts have been adequately analyzed and mitigated to less than significant levels. For these reasons, the Project Applicant respectfully requests that the City Council deny SAFER’s appeal, find that SAFER’s August 31 letter does not provide substantial evidence requiring an EIR or recirculation, uphold the Planning Commission’s July 14, 2026 approval, adopt the IS/MND and MMRP, and allow the Project to proceed. Respectfully submitted, FENNEMORE LLP Brent R. McManigal City of San Bernardino – City Council September 2, 2026 Page 4 66131174.1 BMCM